July 26 – August 1, 2025
Bypass lanes for I-195 West traffic from East Providence to Providence remain open. This temporary traffic pattern allows three lanes of travel eastbound and three lanes of travel westbound – all operating on the eastbound Washington Bridge. Expect delays.
Providence: I-195 East, from Exit 1A to Exit 1B/C, and I-195 West, from the Potter St. overpass to the Gano St. on-ramp up to two lanes closed for Structural Health Monitoring (SHM) system work, Sun. – Tues. nights, and up to two lanes closed on I-195 East, from Exit 1A to Exit 1B-C, Wed. and Thurs. nights, 9 p.m. – 4 a.m.
Providence: I-95 North motorists are using a new traffic pattern after the Downtown exit and near Providence Place Mall with a newly relocated Exit 38, about one mile south of its former location. RIDOT has posted numerous signs to guide motorists to their destinations.
Providence: I-95 North, from Exit 38 to Exit 39A, right lane closed for bridge work, Sat. night (July 26), 11 p.m. – 6 a.m.
Providence: I-95, from Exit 36A to Exit 39A, alternating lane closures for paving and barrier installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
Cranston: All travel lanes on I-95 North and South at Route 10 have shifted to the right through 2026.
Providence: I-95 at Eddy Street, all lanes will be narrowed and shifted to the left on I-95 North and South at this overpass, located near the Thurbers Ave. (Exit 35) interchange for bridge work until further notice.
Pawtucket: I-95 North at Exit 41A to Garden St. will be closed for electrical work, Wed., and Thurs. nights, 10 p.m. – 5 a.m. Follow signed detour.
Warwick: I-95 South at East Ave. will be closed for bridge construction, Sun. night, 11 p.m. – 5 a.m. Follow signed detours.
Warwick: I-295 South at East Ave. will be closed for bridge construction, Mon., and Tues. nights, 10 p.m. – 6 a.m. Follow signed detours.
Warwick: I-295 North at East Ave. will be closed for bridge construction, Wed., and Thurs. nights, 10 p.m. – 6 a.m. Follow signed detours.
Cranston: I-295 South at Rte. 37, lane closures for a bridge inspection, Mon. night (right lane), and Tues. night (left lane), 9 p.m. – 3 a.m.
Cranston: I-295 North at Rte. 37, lane closures for a bridge inspection, Wed. night (left lane), and Thurs. night (right lane), 9 p.m. – 3 a.m.
Cumberland: I-295 under Rte. 114, alternating lane closures for bridge work, Sun. – Thurs. nights, 9 p.m. – 5 a.m.
Providence/Cranston/Warwick: I-95, from Rte. 37. to Thurbers Ave., alternating lane closures for barrier and drainage installation, and bridge demolition, Sun. – Thurs. nights, 8 p.m. – 5 a.m.
Warwick: I-95 South at East Ave., left and center lanes closed for bridge construction, Sun. night, 8 p.m. – 11 p.m.
Warwick: I-95 North, from Exit 24A to Exit 27, left lane closed for median barrier removal, Sun. – Thurs. nights, 9 p.m. – 5 a.m.
Warwick: I-95 at East Ave., alternating lane closures for bridge construction, Mon. – Thurs. nights, 8 p.m. – 6 a.m.
Warwick: I-95 North, from Exit 28B to Exit 31 A/B/C, left lane closed for electrical work, Mon. night, 9 p.m. – 7 a.m.
Warwick: I-95 below Rte. 37 West, alternating lane closures for a bridge inspection, Mon. night, 9 p.m. – 4 a.m.
Warwick: I-295 South at East Ave., left lane closed for bridge construction, Mon., and Tues. nights, 7 p.m. – 10 p.m.
Warwick: I-295 North at East Ave., left lane closed for bridge construction, Wed., and Thurs. nights, 7 p.m. – 10 p.m.
Cumberland: I-295, over Rte. 122 (Mendon Rd.), at the Mendon Rd. Bridge, travel lanes reduced from three to two for bridge work.
Warwick: I-95 North, from Exit 24B to Exit 27, lanes have shifted to the right for road widening through June.
Warwick: The on-ramp to I-95 North from Rte. 113 (East Ave.) will be closed through the fall. Follow signed detour.
All schedules are weather-dependent and subject to change. Back to top
North Smithfield: A lane split is in place on Rte. 146 North just before the Sayles Hill Rd. intersection. Rte. 146 NB through-traffic will continue straight over the new portion of the Sayles Hill Rd. flyover in the left lane. Sayles Hill Rd. traffic, local turns, and wide loads are directed to the right lane. Both lanes continue north through Rte. 146.
Lincoln: I-295 at Exits 18A/18B to Rte. 146, alternating lane closures for drainage installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
Lincoln: Rte. 146 North and South service roads at I-295 North and South Exits 18A/B will be temporarily closed for drainage installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detours.
Lincoln: Rte. 146 mainline, from Exit 8A to Exit 8C, alternating lane closures with intermittent road closures for drainage installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detours.
Lincoln: Rte. 99 South, from Exit 1 to Rte. 146 South, alternating lane closures for bridge work, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
Lincoln/North Smithfield: Rte. 146, from Exit 7 to the Mass. line, alternating lane closures for road construction, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
North Smithfield: Rte. 146 South service Rd., from #859 Eddie Dowling Hwy. to Sayles Hill Rd. will be closed for bridge construction, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Local access only. Follow signed detours.
North Smithfield: Rte. 146 at Sayles Hill Rd., left turn access restricted for bridge work, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detour.
North Smithfield: Sayles Hill Rd East, from Rte. 146 to Iron Mine Hill Rd. will be closed for bridge construction, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detours.
North Smithfield: Rte. 146 South off-ramp, Exit 14 will be temporarily closed for guardrail installation, Mon., and Tues. nights, 9 p.m. – 6 a.m. Follow signed detour.
North Smithfield: Rte. 146 South on-ramp, Exit 14 from School St. will be temporarily closed for guardrail installation, Wed., and Thurs. nights, 9 p.m. – 6 a.m.
North Smithfield: Rte. 146, from Exit 10 to the Mass. line, alternating lane closures for road construction, Sat. (July 26), and Mon. – Fri., 7 a.m. – 3 p.m.
Lincoln: I-295 North, at the Rte. 146 interchange, lanes remain shifted to the left.
North Smithfield: Travel lanes have shifted at the Rte. 146/Rte. 146A (Exit 10) interchange, with the following changes:
Cranston: I-295 North in the vicinity of Rte. 37, left lane closed for road work, Fri. night (July 25) at 8 p.m. – Mon., 5 a.m.
Cranston: Rte. 37 East Exit 1B on-ramp to I-295 North will be closed for realignment, Fri. night (July 25) at 8 p.m. – Mon., 5 a.m. Follow signed detours.
Cranston: I-295 North in the vicinity of Rte. 37, alternating lane closures for bridge and road construction, Mon. – Thurs. nights, 8 p.m. – 5 a.m.
Cranston: I-295 North, from Exit 3A to Rte. 37 East, alternating shoulder closures in a moving operation for overhead signage installation, Mon. night, 8 p.m. – 5 a.m.
Cranston: Rte. 37, from I-295 South to Rte. 2 (Reservoir Ave.), right lane closed in a moving operation for overhead signage installation, Tues. – Thurs. nights, 8 p.m. – 5 a.m.
Cranston: Cranston St. below Rte. 37, from Sherman Ave. to Overbrook Dr., alternating one-way traffic for bridge painting, Mon. – Fri., 7 a.m. – 3 p.m.
Route 10
Affected City Streets
Project-wide
Cranston: Elmwood Ave. at the Rte. 10 overpass, lanes will be narrowed and one of the two lanes on Elmwood Ave. southbound will be closed for bridge work until further notice.
Cumberland/Lincoln: All Rte. 99 traffic will shift to the right through the end of the year at the Blackstone River Bridge, carrying Rte. 99 over the Blackstone River.
Providence: All traffic on Rte. 146 under the Hawkins St. Bridge has shifted to the right.
Lincoln/Cumberland: Rte. 99 North over the Blackstone River will be temporarily closed for bridge work, Sun. – Wed. nights, 9 p.m. – 5 a.m. Follow signed detour.
Lincoln: The on-ramps from Breakneck Hill Rd. to Rte. 146 remain closed for bridge work until further notice. Follow signed detour.
East Greenwich: Rte. 4, from the Rte. 403 off-ramp to the Rte. 403 on-ramp, left lane closed for bridge work, Sun. – Thurs. nights, 8 p.m. – 6 a.m.
North Kingstown: Rte. 403 East at Devils Foot Rd., right lane closed for bridge demolition, Fri. night (July 25), and Mon. – Thurs. nights, 10 p.m. – 5 a.m.
Providence/Cranston: Rte. 10 North, from I-95 to Reservoir Ave., alternating lane closures for bridge work, Sun. – Thurs. nights, 8 p.m. – 5 a.m.
Lincoln/Cumberland: Rte. 99 South, from Mendon Rd. to Exit 1 will be closed for bridge work, Sun. – Thurs. nights, 9 p.m. – 5 a.m. through the summer. Follow signed detours.
All schedules are weather-dependent and subject to change. Back to top
Providence: Beginning Mon., July 28, Eddy St. over I-95 will be reduced to one lane of alternating traffic until further notice. Seek alternate routes.
East Providence: Waterman Ave., from Walnut St. to Central Ave., alternating lane closures for utility structure alignment, Tues., 8 a.m. – 4 p.m.
East Providence: North Broadway at the Waterman Ave./Taunton Ave. intersection, alternating lane closures for a bridge inspection, Wed., 9 a.m. – 4 p.m.
East Providence/Providence: On the Henderson Bridge, alternating lane closures for barrier work, Mon. – Fri., 9 a.m. – 2 p.m.
Providence: Rte. 1A, from Blackstone St. to Globe St., alternating lane closures for a bridge inspection, Thurs., 9 a.m. – 3 p.m.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
Barrington/Warren: Rte. 114, at the Barrington and Warren Bridges, the northbound boardwalks remain open during construction of the bike path bridges, providing a continuous off-road path around the construction area.
Warren: Rte. 114 (Main St.) at #790, shoulder closures for sidewalk and wheelchair ramp installation, Wed. – Fri., 9 a.m. – 3 p.m.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
Middletown: Rte. 138 (East Main Rd.) at Turner Rd., lane shifts needed for curb and drainage work, Mon. – Fri., 7 a.m. – 3 p.m.
Tiverton: Rte. 138 (Main Rd.), from #242 to #258, shoulder closures for sidewalk and wheelchair ramp installation, Mon., and Tues., 9 a.m. – 3 p.m.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
North Providence: Rte. 7, from the Providence line to #1703 Mineral Spring Ave. will be temporarily closed for electrical and sidewalk work, and paving, Sun. – Fri. nights (Aug. 1), 8 p.m. – 5 a.m. Follow signed detour.
Burrillville: The Glendale Bridge, carrying Victory Hwy. over the Branch River, between Main St. and Snake Hill Rd. is back open to traffic.
Burrillville: A temporary traffic signal and alternating traffic on Rte. 7, between Dion Dr. and Reynolds Mill St., is in place to repair a retaining wall through the end of 2025. Seek alternate routes.
Cumberland: We have shifted traffic onto the newly constructed south side of the Mendon Road Bridge on Rte. 122. One lane in each direction will be maintained on the bridge through fall 2025.
Foster: Moosup Valley Road, between Potter Road and the Tyler Free Library, one lane of traffic with alternating direction controlled by a temporary traffic signal through spring 2026 for bridge work.
Lincoln: School St., from Rte. 126 (Old River Rd.) to Main St. in Albion, is closed weekdays from 7 a.m. to 5 p.m. for utility and roadway improvements through the end of the year. Access to local businesses and homes will be maintained. Follow signed detours.
Cumberland: Rte. 122 (Mendon Rd.), from Lincoln line to I-295 North ramps, alternating lane closures for drainage work, Sun. – Wed. nights, 8 p.m. – 5 a.m.
Cumberland: Rte. 114 (Diamond Hill Rd.), from Rte. 120 to the Bentley Field Complex, alternating one-way traffic with intermittent short-term road closures for bridge work, Mon., and Tues. nights, 10 p.m. – 5 a.m.
Cumberland: Rte. 122 (Mendon Rd.), from Scott Rd. to Albion Rd., crews will be performing curb and sidewalk installation behind barrier, Mon. – Fri., 6 a.m. – 3 p.m.
Smithfield: Rte. 7 over I-295, right lane closed for drainage and electrical work, Mon. – Fri., 6 a.m. – 3 p.m.
Smithfield/North Providence: Rte. 7, from Lime Rock Rd. to the Providence line, alternating lane closures for guardrail installation, Mon. – Fri., 9 a.m. – 3 p.m.
Foster: Rams Trail Rd., between Rte. 6 and Central Pk., is closed for a bridge replacement through October. Follow signed detours.
Foster: Mill Rd., from Rte. 102 (Foster Center Rd.) to Wright Ln., is closed for bridge replacement through October. Follow signed detours.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
North Kingstown: Rte. 1, from Shermantown Rd. to the Rte. 1/Rte. 4 split, alternating lane and temporary ramp closures for electrical work and paving, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detours.
North Kingstown: Rte. 138, at the ramps from Rte. 1 (Tower Hill Rd.), bridge work behind barrier, with frequent vehicle access in/out of the work zone, Mon. – Fri., 6:30 a.m. – 3 p.m.
South Kingstown: Rte. 108, from Kersey Rd. to Sweet Fern Ln., alternating lane closures for paving, Mon., 9 a.m. – 3 p.m.
South Kingstown: Rte. 108, from School St. to Columbia St., alternating shoulder closures for road work, Mon. – Fri., 7 a.m. – 3 p.m.
North Kingstown: The Devil's Foot Rd. Bridge, located between School St. and the Davisville Rd./Old Baptist Rd. intersection in North Kingstown is closed through the end of the year for replacement.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
Coventry: Maple Valley Rd., from Town Farm Rd. to Rte. 117, is closed for bridge replacement through the fall. Follow signed detours.
Warwick: Rte. 117 (Centerville Rd.), from Dunmore Rd. to Gavin Rd., partial lane closures for sidewalk work, Mon. – Fri., 7 a.m. – 3 p.m.
Warwick: Rte. 113 (East Ave.) over I-95 and I-295, lanes will be shifted for bridge demolition through the summer. One lane in each direction is in place.
Warwick: Jefferson Blvd. under I-95, the right lane in each direction will be closed until further notice for bridge work.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top