November 15-21, 2025
Bypass lanes for I-195 West traffic from East Providence to Providence remain open. This temporary traffic pattern allows three lanes of travel eastbound and three lanes of travel westbound – all operating on the eastbound Washington Bridge. Expect delays.
East Providence: Potter St., between Freeborn St. and School St., alternating one-way traffic for survey work, Mon., 9 a.m. – 3 p.m.
Providence: I-195 East and West, at the deck of the Washington Bridge, up to two lanes closed for bridge preservation work, Sun. – Thurs. nights, 9 p.m. – 5 a.m.
Providence: I-195 East and West, over the Washington Bridge, brief alternating lane closures for WIM maintenance, Sun. night, 10 p.m. – 1 a.m.
Providence: Route 1A on-ramp to I-195 East, alternating lane closures for a bridge inspection, Tues. –Thurs., 9 a.m. – 3 p.m.
Providence: Starting Sun. night (Nov. 16) through Tues. night (Nov. 18), from 8 p.m. – 6 a.m., RIDOT is scheduled to close the two right lanes on I-195 West over the Providence River Bridge. One lane will close at 8 p.m., and the second and the on-ramp from I-195 West to I-95 North, starting at 10 p.m. for pavement repairs. On Wed. and Thurs. nights (Nov. 19 and 20), the left lane will be closed, 8 p.m. – 6 a.m. Follow signed detour. Learn more.
Providence: I-95 North motorists are using a new traffic pattern after the Downtown exit and near Providence Place Mall with a newly relocated Exit 38, about one mile south of its former location. RIDOT has posted numerous signs to guide motorists to their destinations.
Providence: I-95 North at Exit 37BCD interchange, various ramps will be temporarily closed and reopened as needed for barrier painting and bridge work, Sun. – Thurs. nights, 11 p.m. – 6 a.m. Follow signed detour.
Providence: I-95, from Exit 37A to Exit 39A, alternating lane closures for striping and barrier painting, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
Cranston: All travel lanes on I-95 North and South at Route 10 have shifted to the right through 2026.
Providence: All travel lanes are shifted to the right on I-95 North, between the Rte. 10/Elmwood Ave. off-ramp (Exit 33) and the Thurbers Ave. off-ramp (Exit 35), for replacement of the Broad and Eddy St. Bridges in Providence through 2027. Learn more.
Providence: I-95 at Eddy Street, all lanes are narrowed and shifted to the left on I-95 North and South at this overpass, located near the Thurbers Ave. (Exit 35) interchange for bridge work until further notice.
Providence: Beginning Fri. night (Nov. 14) at 8 p.m. through Mon. (Nov. 17) at 5 a.m., we will close two lanes in both directions on I-95 for the decommissioning of a bridge over an inactive rail line between Cadillac Dr. and the Roger Williams Park Zoo property. Expect delays and seek alternate routes. Learn more.
Warwick/West Warwick/East Greenwich: Starting on Fri. night (Nov. 14) at 9 p.m., we will continue shifting lanes on I-95 North after Exit 24B (Route 2 North) and Route 4 South on the ramp from I-95 South to Exit 9 (Division Street) to create work zones for RIDOT's Rte. 4 "Missing Move" project. All lanes shift to the left. Learn more.
Johnston: I-295 South to Exit 7 will be temporarily closed for brush cutting, Mon. night, 9 p.m. – 7 a.m.
Johnston: Plainfield Pk. on-ramp to I-295 South will be temporarily closed for brush cutting, Wed. night, 9 p.m. – 7 a.m.
West Warwick: I-95 South Exit 24A off-ramp to Rte. 2 (quaker Ln.) will be temporarily closed for barrier installation, Tues. night, 9 p.m. – 5 a.m. Follow signed detour.
Providence: I-95 North, from Exit 36B to Exit 37B, alternating double lane closures for a bridge inspection, Wed. night, 9 p.m. – 3:30 a.m. Lanes will also be shifted on I-95 North Exit 37A, and the I-95 South on-ramp from Rte. 6 East.
Providence/Cranston: I-95, from Park Ave. to Thurbers Ave., alternating lane closures for bridge demolition/construction, Sun. – Thurs. nights, 8 p.m. – 5 a.m.
Warwick: I-95 North, at the East Ave. overpass, alternating lane closures for crane demobilization, Sun. night, 8 p.m. – 6 a.m.
West Warwick: I-95 South on-ramp from Rte. 2 South (Quaker Ln.), left shoulder closed with lanes narrowed for barrier installation, Tues. and Wed. nights, 9 p.m. – 5 a.m.
West Warwick/East Greenwich: I-95 North in the vicinity of Rte. 2 and Rte. 4, alternating lane closures to implement a traffic shift, Fri. and Sat. nights (Nov. 14 and 15), 9 p.m. – 5 a.m. All lanes shift to the left.
West Warwick/East Greenwich: I-95 North in the vicinity of Rte. 2 and Rte. 4, left lane closed for barrier installation, Mon. night, and alternating lane closures for striping, Tues. and Wed. nights, 9 p.m. – 5 a.m.
West Warwick/East Greenwich: I-95 South in the vicinity of Rte. 4 South Exit 24B and Rte. 2 (Quaker Ln.), alternating lane closures for striping, Tues. and Wed. nights, 9 p.m. – 5 a.m.
Warwick/West Warwick/East Greenwich: I-95 North in the vicinity of Rte. 4, alternating lane closures to implement a traffic shift, Sat. night (Nov. 15), 9 p.m. – 5 a.m. All lanes shift to the left.
Warwick/East Greenwich: I-95 South Exit 24B off-ramp to Rte. 4 South, alternating lane closures with shifted and narrowed lanes to implement a traffic shift, Fri. night (Nov. 14), 9 p.m. – 5 a.m.
Cumberland: I-295, over Rte. 122 (Mendon Rd.), at the Mendon Rd. Bridge, travel lanes reduced from three to two for bridge work.
Warwick: The on-ramp to I-95 North from Rte. 113 (East Ave.) will be closed through the fall. Follow signed detour.
All schedules are weather-dependent and subject to change. Back to top
North Smithfield: A lane split is in place on Rte. 146 North and South just before the Sayles Hill Rd. intersection. Rte. 146 through-traffic will continue straight over the new portion of the Sayles Hill Rd. flyover in the left lane. Sayles Hill Rd. traffic, local turns, and wide loads are directed to the right lane. Both lanes continue north through Rte. 146.
Lincoln: Rte. 146 service roads, between Exits 8A and 8C will be temporarily closed to shift lanes, Fri. night, (Nov. 14) 9 p.m. – 6 a.m. Follow signed detour
Lincoln: I-295 between Exit 18A and Exit 18B, alternating lane closures for guardrail installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
Lincoln: Rte. 146, from Exit 8A to Exit 8C, will be closed for guardrail installation, with traffic detour to the service roads, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detour.
Lincoln: Rte. 146, from Exit 8A to Exit 8B, will be temporarily closed for guardrail installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detour.
Lincoln: Rte. 146 North Service Rd. and Exit 18B on I-295 North, and Rte. 146 South Service Rd. and Exit 18A on I-295 South will be closed for guardrail installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detour.
Lincoln: Rte. 99 South, from Exit 1 to the Rte. 146 South merge, alternating lane closures for bridge repairs, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
Lincoln/North Smithfield: Rte. 146, from Exit 7 (Rte. 116) to the Mass. line, alternating lane closures for road construction, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
North Smithfield: The Rte. 146 North and South Service Roads, from Rte. 99 to Exit 10, will be closed for road construction, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
North Smithfield: Rte. 146, at Exits 11, 13, and 14 on-and-off ramps will be closed and reopened as needed for guardrail installation, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detour.
North Smithfield: The east side of Sayles Hill Rd., from Rte. 99 to Rte. 146, alternating lane closures for road construction, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Westbound traffic from Rte. 99 to Sayles Hill Rd. will not be permitted. Follow signed detour.
North Smithfield: The west side of Sayles Hill Rd., from Rte. 146 to Iron Mine Hill Rd. will be closed for road and bridge construction, Sun. – Thurs. nights, 9 p.m. – 6 a.m. Follow signed detour.
North Smithfield: The west side of Sayles Hill Rd., from Rte. 146 to Iron Mine Hill Rd. will be closed for road construction, Mon. – Fri., 7 a.m. – 2 p.m. Follow signed detour.
North Smithfield: The east side of Sayles Hill Rd., from Rte. 99 to Rte. 146, alternating lane closures for road construction, Mon. – Fri.., 7 a.m. – 2 p.m. Westbound traffic from Rte. 99 to Rte. 146 will not be permitted. Follow signed detour.
North Smithfield: Rte. 146, from Exit 10 to the Mass. line, alternating lane closures for road construction, Mon. – Fri., 7 a.m. – 3 p.m.
North Smithfield: Travel lanes have shifted at the Rte. 146/Rte. 146A (Exit 10) interchange, with the following changes:
Cranston: A new traffic pattern with travel lanes going from two to one in each direction on Route 2 (New London Avenue) at the Route 37 overpass is in place through November for bridge replacement. Learn more.
Cranston: Travel lanes are reduced from three to two and are shifted to the right on a section of Rte. 37 East over Amtrak's Northeast Corridor, from Exit 2B (I-95 North) and Exit 3A (Route 1/Post Road North) in Warwick, for bridge replacement. Learn more.
Cranston: I-295 North on-ramp from Rte. 37 West Exit 1B will be temporarily closed for guardrail installation, Sun. – Thurs. nights, 8 p.m. – 5 a.m. Follow signed detour.
Cranston: I-295 South in the vicinity of Rte. 37, alternating lane closures for bridge construction, Sun. – Thurs. nights, 8 p.m. – 5 a.m.
Cranston: I-295 North, from Rte. 37 Exit 3 A/B to Phenix Ave., right lane closed for guardrail installation, and bridge construction, Sun. – Tues. nights, 8 p.m. – 5 a.m.
Cranston: Rte. 37, from Natick Ave. to I-295 North, alternating lane closures for drainage work, Tues. night, 8 p.m. – 5 a.m.
Cranston: I-295 North, from Rte. 37 Exit 3 A/B to Exit 9, alternating lane closures for road work, Wed. and Thurs. nights, 8 p.m. – 5 a.m.
East Greenwich: Rte. 4 North, from Exit 5 to Exit 7 will be temporarily closed for bridge demolition, Sun. night, 8 p.m. – 6 a.m. Follow signed detours.
East Greenwich: Rte. 4 South, from Exit 7 to Exit 5 will be temporarily closed for bridge demolition, Mon. and Tues. night, 8 p.m. – 6 a.m. Follow signed detours.
East Greenwich: Rte. 4 South in the vicinity of Exit 9 (Division St.) will be temporarily closed for striping, Tues. and Wed. nights, 9 p.m. – 5 a.m.
Providence: Rte. 146 North at Mineral Spring off-ramp will be temporarily closed for brush cutting, Thurs. night, 9 p.m. – 4 a.m.
Providence/Cranston: Beginning Fri. night (Nov. 21) at 9 p.m., RIDOT will shift traffic onto a portion of a newly constructed bridge carrying Rte. 10 over Elmwood Ave. in Providence. During this transition, Route 10 South will be detoured onto Elmwood Ave. A detour will be posted to Park Ave. Learn more.
Warwick/East Greenwich: Starting on Fri. night (Nov. 14) at 9 p.m., we will continue shifting lanes on I-95 North after Exit 24B (Route 2 North) and Route 4 South on the ramp from I-95 South to Exit 9 (Division Street) to create work zones for RIDOT's Rte. 4 "Missing Move" project. All lanes shift to the left. Learn more.
Cranston: Elmwood Ave. at the Rte. 10 overpass, lanes are narrowed, and one of the two lanes on Elmwood Ave. southbound is closed for bridge work until further notice.
Cumberland/Lincoln: All Rte. 99 traffic has shifted to the right through the end of the year at the Blackstone River Bridge, carrying Rte. 99 over the Blackstone River.
East Greenwich: Expect shoulder closures on Rte. 4 at Exit 5 through summer 2026.
Providence: All traffic on Rte. 146 under the Hawkins St. Bridge has shifted to the right.
Providence/Cranston: The off-ramp from Rte. 10 North to Elmwood Ave. is be closed through fall 2026 while we work to build a new interchange as part of ongoing work for our I-95 15 Bridges Project. Learn more.
East Greenwich: Rte. 4 South in the vicinity of I-95, alternating lane closures to implement a traffic shift, Fri. and Sat. nights (Nov. 14 and 15), 9 p.m. – 5 a.m. All lanes shift to the left.
East Greenwich: Rte. 4 South Exit 9 off-ramp to Division St. will be temporarily closed to implement a traffic shift, Fri. and Sat. nights (Nov. 14 and 15), 9 p.m. – 5 a.m. All lanes shift to the left.
East Greenwich: Rte. 403 East, from Rte. 4 to Rte. 2, right lane closed for bridge demolition, Sun. – Fri. nights (Nov. 21), 10 p.m. – 5 a.m.
East Greenwich: Rte. 4 South in the vicinity of I-95, right lane closed for barrier installation, Sun. night. 9 p.m. – 5 a.m.
East Greenwich: Rte. 4 North, from Exit 5 to Exit 7, alternating lane closures for bridge demolition, Tues. – Thurs. nights, 8 p.m. – 6 a.m.
East Greenwich: Rte. 4 South in the vicinity of I-95 South Exit 24B, alternating lane closures for striping, Tues. and Wed. nights, 9 p.m. – 5 a.m.
East Greenwich: Rte. 4 at Division St., left lane closed for brush cutting, Thurs. night, 9 p.m. – 4 a.m.
Lincoln: Rte. 146 at Twin River Rd., left lane closed for bridge work, in the early morning hours Mon., 2 a.m. – 6 a.m.
Providence: Rte. 6, under Atwells Ave., alternating lane closures for a bridge inspection, Mon. and Tues. nights, 9 p.m. – 4 a.m.
Providence: Rte. 6, from Memorial Blvd. to the Rte. 10 split, alternating lane closures for a bridge inspection, Wed. and Thurs. nights, 9 p.m. – 3 a.m.
Warwick/East Greenwich: I-95 South Exit 24B off-ramp to Rte. 4 South, alternating lane closures with shifted and narrowed lanes to implement a traffic shift, Fri. night (Nov. 14), 9 p.m. – 5 a.m.
Providence: Rte. 6 West at the Pedestrian Bridge, right shoulder closed for drainage work and landscaping, Wed. – Fri., 9 a.m. – 3 p.m.
All schedules are weather-dependent and subject to change. Back to top
Providence: Harris Ave., from Acorn St. to Providence Pl., alternating lane closures for a bridge inspection, Mon., 9 a.m. – 3 p.m.
Providence: Dean St., from Kinsley Ave. to Rte. 6 on-ramp, and Rte. 6 Exit 37D to Providence Pl., lanes narrowed for a bridge inspection, Tues., 9 a.m. – 3 p.m.
Providence: Eddy St. over I-95 is reduced to one lane of alternating traffic until further notice. Seek alternate routes.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
Barrington/Warren: Rte. 114, at the Barrington and Warren Bridges, the northbound boardwalks remain open during construction of the bike path bridges, providing a continuous off-road path around the construction area.
Barrington: Rte. 103 (County Rd.), from Washington Rd. to Rte. 114 (Wampanoag Tl.), alternating lane closures for curb and sidewalk installation, and paving, Mon. – Fri., 9 a.m. – 3 p.m.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
Tiverton: Alternating lane closures are needed at the following intersections for signage inspection: Rte. 138 (Main Rd.) at Canonicus St., Rte. 77 (Main Rd.) at East Rd., and Rte. 177 (Bulgarmarsh Rd.) at Stafford Rd., Mon. night, 9 p.m. – 4 a.m.
Middletown: Rte. 138 (East Main Rd.), from Mitchell's Ln. to Aquidneck Ave., lane shifts for sidewalk work and paving, Mon. – Fri., 7 a.m. – 3 p.m.
Middletown: Rte. 138A (Aquidneck Ave.), from Reservoir Rd. to Newport Ave., various lane closures for survey work, followed by water main installation, weekdays, 9 a.m. – 3 p.m. through the end of the year.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
Cumberland: We have shifted traffic onto the newly constructed south side of the Mendon Road Bridge on Rte. 122. One lane in each direction will be maintained on the bridge through fall 2025.
Foster: Alternating one-way traffic with a temporary traffic signal at the Moosup Valley Rd. Bridge, from Potter Rd. to the Tyler Free Library, will remain in place until further notice. Learn more.
Lincoln: School St., from Rte. 126 (Old River Rd.) to Main St. in Albion, will close weekdays from 7 a.m. – 5 p.m. for utility and roadway improvements through the end of the year. Access to local businesses and homes will be maintained. Follow signed detours.
Cumberland: Rte. 114 (Diamond Hill Rd.), from Rte. 120 to the Bentley Field Complex, alternating one-way traffic for bridge demolition, Sun. and Mon. nights, 8 p.m. – 6 a.m.
Cumberland: Rte. 122 (Mendon Rd.), from the Lincoln line to I-295 North, alternating lane closures for curb and sidewalk work, Sun. – Thurs. nights, 9 p.m. – 6 a.m.
Foster: Mill Rd., from Rte. 102 (Foster Center Rd.) to Wright Ln., alternating lane closures with shifted lanes for striping, Fri. night (Nov. 14), 10 p.m. – 2 a.m.
Cumberland: Rte. 114 (Diamond Hill Rd.), from Rte. 120 to the Bentley Field Complex, alternating one-way traffic for bridge demolition, Mon. – Fri., 9 a.m. – 3 p.m.
Cumberland: Rte. 116 (Angell Rd.), from Mendon Rd. to Diamond Hill Rd., alternating lane closures for drainage and road work, Mon. – Fri., 9 a.m. – 3:30 p.m.
Cumberland: Rte. 122 (Mendon Rd.), from Scott Rd. to Albion Rd., right lane closed for bridge work, Mon. – Fri., 7 a.m. – 3 p.m.
Smithfield: Rte. 7 South over I-295, right lane closed for utility work, Mon. – Fri., 6 a.m. – 3 p.m.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
North Kingstown: The Devil's Foot Rd. Bridge, located between School St. and the Davisville Rd./Old Baptist Rd. intersection is closed for replacement through the end of the year. Follow signed detour.
Westerly: The on-ramp from Route 91 (Oak Street) to Route 78 West is temporarily closed, and Route 78 West traffic is shifted to the left through December for bridge work. Follow signed detour. Learn more.
North Kingstown: Compass Circle, at West Davisville Rd., alternating one-way traffic with frequent vehicle access in/out of the work zone for drainage improvements, Sun. – Thurs. nights, 9 p.m. – 5 a.m.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top
East Greenwich: South County Trail, at Fairgrounds Wy., alternating lane closures for a traffic signal inspection, Tues., 9 a.m. – 3 p.m.
East Greenwich: South County Trail, at Bostitch driveway, alternating lane closures for a traffic signal inspection, Thurs., 9 a.m. – 3 p.m.
Warwick: Rte. 117 (Centerville Rd.), from Dunmore Rd. to Gauvin Dr., partial lane closures for sidewalk work, Mon. – Fri., 7 a.m. – 3 p.m.
Coventry: Maple Valley Rd., from Town Farm Rd. to Rte. 117 is closed for bridge replacement through the fall. Follow signed detours.
East Greenwich: The travel lanes on Rte. 2 (South County Tl.) over Rte. 4 are reduced from two to one in each direction for bridge construction through summer 2026. Learn more.
East Greenwich: Rte. 402 (Frenchtown Rd.) at the Frenchtown Road Bridge, lanes are temporarily reduced from two to one in each direction through the end of the year for bridge replacement. Learn more.
Warwick: Rte. 113 (East Ave.) over I-95 and I-295, lanes shifted for bridge demolition through the summer. One lane in each direction is in place.
Additional lane closures for this region
may be listed under Other Limited Access Highways
All schedules are weather-dependent and subject to change. Back to top