Washington Bridge REBUILD

  • RIDOT Washington Bridge Rebuild
    Washington Bridge - Aerial View Looking Southeast
  • RIDOT Washington Bridge Rebuild
    Washington Bridge - Elevation View Looking South
  • RIDOT Washington Bridge Rebuild
    Washington Bridge - Nighttime Aerial View Looking Southeast
  • RIDOT Washington Bridge Rebuild
    Washington Bridge - East Approach Looking West
  • RIDOT Washington Bridge Rebuild
    Washington Bridge - Gano St. Relocation and West Infill Spans Looking Southwest
  • RIDOT Washington Bridge Rebuild
    Washington Bridge - Waterfront Drive Off-Ramp and East Infill Spans Looking South

Bridge Rebuild Documents

The Project

Construction of the new westbound side of the Washington Bridge is underway. In the initial months of this project, the design-build team will be very busy with a wide range of tasks, including finalizing the design, surveying the site, drilling for borings, obtaining all necessary permits, ordering materials, fabricating steel in off-site mills and factories, and mobilizing workers and equipment.

Construction will take 25 months and traffic lanes will open on November 3, 2028.

The design which is both pragmatic and efficient has been executed by the contractor two times before, making this build even easier and quicker to do.  It also reduces the length of the bridge by 459 feet by reducing the number of supporting piers.  The bridge will be brand new from the substructure to the bridge deck and will have a 100-year life to support the 80,000 vehicles that use it daily.

Traffic mitigation measures includes addressing the historical backup in commuter traffic coming west on the bridge from the Massachusetts state line.  There will be five through lanes over the new bridge in addition to a new on-ramp to I-195 west from Gano Street and an off-ramp from I-195 west to Waterfront Drive.  The project will pave, repair and replace drainage structures.

The project is fully funded using in part $221 in competitive federal grants and GARVEE bonds.  The full cost of the new construction is $427.9 million.

Project Features:

  1. Additional travel lane, new off-ramp: Includes increasing the number of lanes over the bridge from four to five and constructing a new on-ramp to I-195 West from Gano Street and an off-ramp from I-195 West to Waterfront Drive.
  2. New travel lane configurations to reduce longstanding congestion: Includes new lane configurations for I-195 West in East Providence to eliminate longstanding traffic delays westbound toward Providence. This will provide an additional travel lane approaching the bridge. To accomplish this, the contractor will widen I-195 West to provide three lanes instead of four between the Broadway on-ramp and the Washington Bridge, replace the Potter Street overpass, and relocate an existing pier connected to the off-ramp from I-195 East to Taunton Avenue. 
  3. New substructure: The bridge will be built on an entirely new substructure. The removal of the substructure was added to the demolition project last fall. 
  4. Smaller footprint: The new bridge will have a footprint that is more than 450 feet shorter than the old bridge. The design calls for far fewer supporting piers in the river. 
  5. Aesthetics: Aesthetic lighting will illuminate the length of the bridge deck on its northern side. Prefabricated arches will be built over local streets on both the Providence and East Providence sides of the river to mimic the look the original Washington Bridge.

The completion of the Washington bridge Replacement and Redevelopment project will advance the key objectives of both RIDOT and USDOT, improving a critical piece of highway infrastructure in the heart of Rhode Island.

Project Schedule & Cost

  • Location: Providence/East Providence
  • Start: Summer 2025
  • Finish: All Lanes Open Fall 2028; project finalized Summer 2029
  • Total Projected Cost: $427.88 Million
  • Detours Needed: No

PROJECT UPDATES | JULY 18, 2025

Bridge preservation work will continue on Tuesday, July 22 from 9 p.m. to 4 a.m. with up to two lanes closed on I-195 East, from Exit 1A to Exit 1B. Up to two lanes will also be closed on Thursday, July 24 and Tuesday, July 29 from 9 p.m. to 4 a.m. along I-195 East, from Exit 1A to Exit 1B, and I-195 West, from Exit 2 to Exit 1C. Daytime bridge preservation work will occur weekdays under the bridge with no lane closures.

Overnight Structural Health Monitoring (SHM) work is scheduled on I-195 East, with up to two lanes closed from Exit 1A to Exit 1B-C, and on I-195 West, from the Potter Street overpass to the Gano Street on-ramp, Sunday-Wednesday nights, July 20-23, and Sunday-Tuesday nights, July 27-29, from 9 p.m. to 4 a.m. It also is scheduled on I-195 East, with up to two lanes closed from Exit 1A to Exit 1B-C, Thursday night, July 24 and Wednesday and Thursday nights, July 30 and 31, from 9 p.m. to 4 a.m.

The approved in-water demolition work continues. In accordance with CRMC guidelines, debris will be removed from the river as work progresses, placed onto barges and towed to land for transfer into trucks for offsite disposal. Temporary protective sheeting and turbidity curtains are in place. Demolition work will take place weekdays only from 6 a.m. to 4 p.m. No work is currently planned after 4 p.m. to avoid any disruptive noise during evening hours.

All of this work is part of our ongoing effort to have a high level of maintenance on this bridge. We are doing work proactively to provide a measure of safety.

Click here for project update archives

Washington Bridge Live Cams

  • Camera at I-195 E @ Rt 114Exit 2B (Route 114)Live Stream
  • Camera at I-195 W @ Washington BridgeWashington BridgeLive Stream
  • Camera at I-195 W @ Gano StExit 1D (Gano Street)Live Stream

Travel Reports

The following charts provide travel time information over the prior month, compared to the same date range one year ago, prior to the bridge closure as well as traffic volume on the bridge. Travel Reports are updated weekly.

Weigh in Motion Data

Weigh-in-motion data for the eastbound Washington Bridge will be posted weekly. This technology will provide additional information on potential overweight trucks.

Washington Bridge - Monthly Report

Press Releases

Click the links below for Washington Bridge-related press releases.

Press Release: Governor McKee Announces $220.9M in Grant Funding for Washington Bridge Rebuild
Press Release: RIDOT Begins Posting Weigh-In-Motion Data for Eastbound Washington Bridge
Press Release: Final RFP Posted for Washington Bridge Replacement Project

Frequently Asked Questions

Why was the bridge closed? »

During work on a pre-existing $78-million project to rehabilitate the Washington Bridge westbound, RIDOT consultants identified a critical failure of some bridge components in a different area of the bridge. The components, called anchor rods, are part of the original bridge structure built in 1968 and provide counterbalance for a cantilevered bridge structure. RIDOT moved to close the bridge to all traffic for the safety of the motoring public.


What is the timeline for repairing or replacing the bridge? »

The State on June 6, 2025 announced the selection of Walsh Construction Company to build the new Washington Bridge. Work on this design-build project begins immediately.

Initial work includes surveying the site, ordering materials, and mobilizing workers. Their project completion date is November 2028.

To keep the project moving forward on schedule, the State has established up to $10 million in incentives if lanes are opened ahead of schedule and penalties of $25,000 per day if the project timeline is exceeded.

The new Washington Bridge will be designed for easier inspection and maintenance, with a 100-year design life. Walsh’s plan includes several key improvements.

Please click here to learn more.


How has this affected traffic? »

In the initial week of the bridge closure in December 2023, RIDOT moved quickly to install bypass lanes on I-195 to allow two lanes in each direction on the eastbound Washington Bridge, which is an entirely different structure from the westbound bridge. By April 2024, an additional lane was added for each direction of travel, providing three travel lanes in each direction on the eastbound bridge.

Traffic volumes have largely returned to pre-closure conditions. Crashes have reduced significantly. Travel times are similar to pre-closure conditions. Additional travel time may be needed during rush hour periods. Motorists are encourage to review travel time information on this webpage to help plan their travel.


Are there alternate routes you recommend? »

RIDOT publishes travel tools on this web page to help motorists plan their travel. These include reports showing recent travel times compared to pre-closure travel times. RIDOT also has a real-time travel dashboard showing current estimated travel times for I-195 and a number of other travel routes.


How do you calculate travel times? Is it different than my GPS or Waze? »

RIDOT uses probe data, a measurement that tracks vehicles based on signals transmitted by cell phones. The data is provided to RIDOT as part of a service many other states subscribe to, provided by INRIX. This is same source of data travel apps like Google, Waze and Apple Maps use, as well as GPS companies. These already take travel time into account when display travel times.

The data provides information on the speed of the vehicles carrying those cell phones and the data is computed into travel time and displayed on the travel time dashboard. This data is refreshed every five minutes.


Has the Washington Bridge closure affected other construction projects in Rhode Island? »

No, work is continuing on all of RIDOT’s 62 other projects, which are largely on time and on budget. The Department publishes a detailed Quarterly Report on its website with budget and schedule information on all its projects at: www.ridot.net/accountability.


How does RIDOT inform the public regarding the bridge? »

RIDOT publishes a monthly Snapshot Report on this web page. Weekly project updates are also published to this site each Friday. Anyone can elect to receive these updates by signing up using the form at the bottom of this webpage. Additionally, RIDOT periodcally meets with East Bay legislators to provide updates and answer questions about the Washington Bridge