WO2009008279A1 - コンピュータシステム、管理装置、及びコンピュータシステム管理方法 - Google Patents
コンピュータシステム、管理装置、及びコンピュータシステム管理方法 Download PDFInfo
- Publication number
- WO2009008279A1 WO2009008279A1 PCT/JP2008/061843 JP2008061843W WO2009008279A1 WO 2009008279 A1 WO2009008279 A1 WO 2009008279A1 JP 2008061843 W JP2008061843 W JP 2008061843W WO 2009008279 A1 WO2009008279 A1 WO 2009008279A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- computer system
- requests
- processing
- resource
- variation
- Prior art date
Links
- 238000007726 management method Methods 0.000 title 2
- 238000012545 processing Methods 0.000 abstract 5
- 238000005259 measurement Methods 0.000 abstract 2
- 238000000034 method Methods 0.000 abstract 1
- 238000012805 post-processing Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
- G06F11/3466—Performance evaluation by tracing or monitoring
- G06F11/3476—Data logging
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
- G06F11/3409—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment for performance assessment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
- G06F11/3452—Performance evaluation by statistical analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2201/00—Indexing scheme relating to error detection, to error correction, and to monitoring
- G06F2201/88—Monitoring involving counting
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Probability & Statistics with Applications (AREA)
- Evolutionary Biology (AREA)
- Bioinformatics & Computational Biology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Debugging And Monitoring (AREA)
Abstract
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP08790756A EP2177993A4 (en) | 2007-07-10 | 2008-06-30 | COMPUTER SYSTEM, MANAGEMENT DEVICE, AND METHOD OF MANAGING COMPUTER SYSTEM |
JP2009522582A JP5152186B2 (ja) | 2007-07-10 | 2008-06-30 | コンピュータシステム、管理装置、及びコンピュータシステム管理方法 |
US12/668,624 US8312136B2 (en) | 2007-07-10 | 2008-06-30 | Computer system management based on request count change parameter indicating change in number of requests processed by computer system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2007-180843 | 2007-07-10 | ||
JP2007180843 | 2007-07-10 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2009008279A1 true WO2009008279A1 (ja) | 2009-01-15 |
Family
ID=40228457
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2008/061843 WO2009008279A1 (ja) | 2007-07-10 | 2008-06-30 | コンピュータシステム、管理装置、及びコンピュータシステム管理方法 |
Country Status (4)
Country | Link |
---|---|
US (1) | US8312136B2 (ja) |
EP (1) | EP2177993A4 (ja) |
JP (1) | JP5152186B2 (ja) |
WO (1) | WO2009008279A1 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013128789A1 (ja) * | 2012-03-02 | 2013-09-06 | 日本電気株式会社 | キャパシティ管理支援装置、キャパシティ管理方法およびプログラム |
JP2014170474A (ja) * | 2013-03-05 | 2014-09-18 | Hitachi Systems Ltd | 仮想マシン管理システム |
JP2016170493A (ja) * | 2015-03-11 | 2016-09-23 | 富士通株式会社 | データ配置プログラム、データ配置方法およびデータ配置装置 |
Families Citing this family (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100088197A1 (en) * | 2008-10-02 | 2010-04-08 | Dehaan Michael Paul | Systems and methods for generating remote system inventory capable of differential update reports |
US8775574B2 (en) * | 2008-11-26 | 2014-07-08 | Red Hat, Inc. | Remote network management having multi-node awareness |
US8255409B2 (en) * | 2009-02-27 | 2012-08-28 | Red Hat, Inc. | Systems and methods for generating a change log for files in a managed network |
US8719392B2 (en) * | 2009-02-27 | 2014-05-06 | Red Hat, Inc. | Searching a managed network for setting and configuration data |
JP5347648B2 (ja) * | 2009-03-30 | 2013-11-20 | 富士通株式会社 | プログラム、情報処理装置及び状態出力方法 |
US8566459B2 (en) * | 2009-05-29 | 2013-10-22 | Red Hat, Inc. | Systems and methods for integrated console management interface |
US9280399B2 (en) * | 2009-05-29 | 2016-03-08 | Red Hat, Inc. | Detecting, monitoring, and configuring services in a netwowk |
US8607093B2 (en) * | 2009-08-31 | 2013-12-10 | Red Hat, Inc. | Systems and methods for detecting machine faults in network using acoustic monitoring |
US8463885B2 (en) * | 2009-08-31 | 2013-06-11 | Red Hat, Inc. | Systems and methods for generating management agent installations |
US8166341B2 (en) * | 2009-08-31 | 2012-04-24 | Red Hat, Inc. | Systems and methods for testing results of configuration management activity |
US8914787B2 (en) * | 2009-08-31 | 2014-12-16 | Red Hat, Inc. | Registering software management component types in a managed network |
US9967169B2 (en) * | 2009-09-30 | 2018-05-08 | Red Hat, Inc. | Detecting network conditions based on correlation between trend lines |
US8719782B2 (en) | 2009-10-29 | 2014-05-06 | Red Hat, Inc. | Integrated package development and machine configuration management |
JP2011134018A (ja) * | 2009-12-22 | 2011-07-07 | Canon Inc | 情報処理装置、情報処理システム、制御方法、及びプログラム |
US9058210B2 (en) * | 2010-03-23 | 2015-06-16 | Ebay Inc. | Weighted request rate limiting for resources |
US20120317249A1 (en) * | 2011-06-13 | 2012-12-13 | Salsburg Michael A | Methods and systems for extreme capacity management |
US20130024494A1 (en) * | 2011-06-13 | 2013-01-24 | Steven Guarrieri | Methods and systems for platform optimized design |
WO2012021324A2 (en) * | 2010-08-12 | 2012-02-16 | Unisys Corporation | Moving enterprise software applications to a cloud domain |
US9279898B2 (en) | 2012-02-09 | 2016-03-08 | Pgs Geophysical As | Methods and systems for correction of streamer-depth bias in marine seismic surveys |
JP5794181B2 (ja) * | 2012-03-15 | 2015-10-14 | 富士通株式会社 | プログラム、分析方法、情報処理装置 |
US9239727B1 (en) * | 2012-10-17 | 2016-01-19 | Amazon Technologies, Inc. | Configurable virtual machines |
JP2014115963A (ja) * | 2012-12-12 | 2014-06-26 | Canon Inc | 情報処理装置、情報処理方法、及びプログラム |
US20150081400A1 (en) * | 2013-09-19 | 2015-03-19 | Infosys Limited | Watching ARM |
CN104461714A (zh) * | 2014-12-24 | 2015-03-25 | 北京奇虎科技有限公司 | 服务器进程的处理方法及装置 |
EP4171105A1 (en) * | 2016-03-29 | 2023-04-26 | Huawei Technologies Co., Ltd. | Resource statistics collection method and terminal |
US11314573B2 (en) * | 2018-11-30 | 2022-04-26 | Hewlett Packard Enterprise Development Lp | Detection of event storms |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005316808A (ja) * | 2004-04-30 | 2005-11-10 | Nec Software Chubu Ltd | 性能監視装置および性能監視方法並びにプログラム |
JP2006011683A (ja) * | 2004-06-24 | 2006-01-12 | Fujitsu Ltd | システム分析プログラム、システム分析方法及びシステム分析装置 |
JP2006178851A (ja) * | 2004-12-24 | 2006-07-06 | Nec Corp | 障害監視方法、障害監視システムおよびプログラム |
JP2006227999A (ja) * | 2005-02-18 | 2006-08-31 | Nec Corp | ボトルネック検出システム、測定対象サーバ、ボトルネック検出方法およびプログラム |
JP2006301852A (ja) * | 2005-04-19 | 2006-11-02 | Nec Corp | 計算資源運用管理装置およびシステム |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003157185A (ja) | 2001-11-19 | 2003-05-30 | Nec Corp | 計算機の動作の解析・表示装置とその解析・表示方法及びコンピュータプログラム |
JP2003280931A (ja) | 2002-03-22 | 2003-10-03 | Nec Corp | トランザクション処理システムおよび処理方法 |
US7769802B2 (en) * | 2003-12-04 | 2010-08-03 | Microsoft Corporation | Systems and methods that employ correlated synchronous-on-asynchronous processing |
JP4756675B2 (ja) * | 2004-07-08 | 2011-08-24 | インターナショナル・ビジネス・マシーンズ・コーポレーション | コンピュータ資源のキャパシティを予測するためのシステム、方法およびプログラム |
US20060230016A1 (en) * | 2005-03-29 | 2006-10-12 | Microsoft Corporation | Systems and methods for statistics over complex objects |
-
2008
- 2008-06-30 WO PCT/JP2008/061843 patent/WO2009008279A1/ja active Application Filing
- 2008-06-30 US US12/668,624 patent/US8312136B2/en not_active Expired - Fee Related
- 2008-06-30 JP JP2009522582A patent/JP5152186B2/ja not_active Expired - Fee Related
- 2008-06-30 EP EP08790756A patent/EP2177993A4/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005316808A (ja) * | 2004-04-30 | 2005-11-10 | Nec Software Chubu Ltd | 性能監視装置および性能監視方法並びにプログラム |
JP2006011683A (ja) * | 2004-06-24 | 2006-01-12 | Fujitsu Ltd | システム分析プログラム、システム分析方法及びシステム分析装置 |
JP2006178851A (ja) * | 2004-12-24 | 2006-07-06 | Nec Corp | 障害監視方法、障害監視システムおよびプログラム |
JP2006227999A (ja) * | 2005-02-18 | 2006-08-31 | Nec Corp | ボトルネック検出システム、測定対象サーバ、ボトルネック検出方法およびプログラム |
JP2006301852A (ja) * | 2005-04-19 | 2006-11-02 | Nec Corp | 計算資源運用管理装置およびシステム |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013128789A1 (ja) * | 2012-03-02 | 2013-09-06 | 日本電気株式会社 | キャパシティ管理支援装置、キャパシティ管理方法およびプログラム |
JP2014170474A (ja) * | 2013-03-05 | 2014-09-18 | Hitachi Systems Ltd | 仮想マシン管理システム |
JP2016170493A (ja) * | 2015-03-11 | 2016-09-23 | 富士通株式会社 | データ配置プログラム、データ配置方法およびデータ配置装置 |
Also Published As
Publication number | Publication date |
---|---|
US8312136B2 (en) | 2012-11-13 |
EP2177993A4 (en) | 2011-01-12 |
JP5152186B2 (ja) | 2013-02-27 |
US20100198964A1 (en) | 2010-08-05 |
JPWO2009008279A1 (ja) | 2010-09-09 |
EP2177993A1 (en) | 2010-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2009008279A1 (ja) | コンピュータシステム、管理装置、及びコンピュータシステム管理方法 | |
WO2006127363A3 (en) | Usage metering system | |
WO2007062897A3 (en) | Apparatus and method for measuring and reporting processor capacity and processor usage in a computer system with processors of different speed and/or architecture | |
JP5299161B2 (ja) | 計算機装置および消費電力のサンプリング方法 | |
CN103631201B (zh) | 一种数控机床子系统可靠性影响度分析方法 | |
WO2007124294A3 (en) | Neural network methods and apparatuses for monitoring substrate processing | |
WO2008149975A1 (ja) | 通信網の障害原因分析システムと障害原因分析方法、及び障害原因分析用プログラム | |
GB2434670B (en) | Monitoring and management of distributed information systems | |
GB2599062A (en) | Container-based applications | |
RU2013150592A (ru) | Способ и устройство измерения стресса | |
WO2010120441A3 (en) | Cloud computing as a basis for a process historian | |
WO2015055710A3 (en) | Method of quality analysis for computer user behavourial data collection processes | |
EP2339429A3 (en) | Power management | |
WO2007132424A8 (en) | Multi-processing system and a method of executing a plurality of data processing tasks | |
WO2012050747A3 (en) | System and method to balance servers based on server load status | |
WO2009034967A1 (ja) | 情報処理装置、情報処理方法、及びプログラム | |
WO2008084601A1 (ja) | 分析装置 | |
WO2007095589A3 (en) | Aggregating and using physical samples | |
WO2012083303A3 (en) | Automated fault analysis and response system | |
WO2007126591A3 (en) | Torque estimator for a machine | |
EP2015461A3 (en) | Impulse Noise Detection and Mitigation in Receivers | |
EP1956486A3 (en) | Failure processing in a partitioned computer system | |
DE602004007754D1 (de) | Verfahren und Vorrichtung zur Feststellung einer Prozessorenbelastung | |
FI20075908A0 (fi) | Elektroniikkalaite ja menetelmä | |
WO2005017724A3 (en) | Event time-stamping |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08790756 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2009522582 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2008790756 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 12668624 Country of ref document: US |