WO2017036769A1 - Installation fonctionnant suivant le concept csp (compact strip production) et procédé de fonctionnement d'une telle installation - Google Patents
Installation fonctionnant suivant le concept csp (compact strip production) et procédé de fonctionnement d'une telle installation Download PDFInfo
- Publication number
- WO2017036769A1 WO2017036769A1 PCT/EP2016/069220 EP2016069220W WO2017036769A1 WO 2017036769 A1 WO2017036769 A1 WO 2017036769A1 EP 2016069220 W EP2016069220 W EP 2016069220W WO 2017036769 A1 WO2017036769 A1 WO 2017036769A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- rolling
- semi
- thickness
- continuous operation
- batch mode
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/466—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a non-continuous process, i.e. the cast being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2201/00—Special rolling modes
- B21B2201/08—Batch rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/004—Heating the product
Definitions
- the invention relates to a system and a method for producing
- Metal bands preferably steel bands, of a thickness of 0.8 to 3.0 mm, of pre-potted thin slabs with a thickness of 40 - 140 mm, in batch or semi-continuous operation.
- the invention further relates to a method for operating such a system.
- CSP-® stands for “Compact Strip Production.”
- CSP-® stands for “Compact Strip Production.”
- the liquid steel is cast into thin slabs, which after a
- a hot strip produced on a CSP ® plant is characterized by a high quality, it has a uniform structure and homogeneous mechanical-physical properties over the entire strip length and width. The band geometry lies within the narrowest tolerances.
- the invention relates to a system which can be operated both in batch mode and in semi-continuous operation, in particular can be switched between these modes.
- the expert calls such a procedure of the system in which the emerging from the casting thin slab is shortened depending on the thickness and even before entering the downstream tunnel kiln to such a length that after leaving the rolling device in the downstream coiler a Coil can be wound with a predetermined length and a predetermined weight.
- a so-called semi-continuous operation of the expert calls a driving style of such a system in which the thin slab is cut after leaving the casting machine so that a so-called Jumbobramme arises whose length usually corresponds to an integer multiple of a slab from the batch mode. From such a Jumbobramme, which after leaving the
- Casting machine is also introduced into the tunnel kiln, is then in
- Thin slabs have long been known to the skilled person for many years. The same applies to the CSP ® system concept.
- EP 2 195 124 B1 describes a compact and flexible CSP® plant for continuous, semi-continuous and batch operation.
- the system described here is designed so that it can be operated in all three possible modes for such types of plant, usually for batching two parallel casting machines are provided in front of the rolling device and a pair of scissors between the caster and the rolling device is arranged to the
- WO 2011/141790 A2 describes a method and an installation for the production of flat rolled products, which also implements the CSP plant concept. Under certain conditions, switching between all three operating modes mentioned above will also be effected in this system.
- Rolling mills in which the roll nips, if necessary provided with a bias, are completely closed in order, in the event of operational suspension of the respective rolling mills, under the influence of the rolling forces acting on the metal strip
- disturbances can occur.
- the initiation of a semi-continuous operation especially in higher-strength grades leads to disruption of the rolling operation, for example due to a not easily introducing the strip beginnings in the nip.
- the semi-continuous operation can be used when the rolling device is warm and a final thickness in the target area of the minimum final thickness has already been reached in advance in the batch mode.
- the first final thickness in the semi-continuous operation preferably corresponds to the final final thickness in batch mode, wherein by means of adjusting at least the roll gap of a roll stand, preferably a plurality of roll nips of the rolling stands of the rolling device, by means of so-called "flying-gauge-change" then the minimum Final thickness set and achieved in the thin strip.
- the separation of the band takes place in coils with a behind the
- Roller device arranged flying shears, which is arranged in front of the reel device, in particular the here commonly used underfloor reels.
- the invention thus provides a method and a system with a correspondingly programmed control device, which enables the switching from batch mode to semi-continuous mode, in which a part of a pre-potted Jumbobramme, preferably at least half of the Jumbobramme, with the minimum end thickness can be produced without the need to bring the hot strip to operating temperature under the action of external energy; Rather, the setting of the operating temperature of the system according to the invention, in particular of their rolling, in batch mode or in semi-continuous operation during the production of metal strips by selecting the correct rolling speed.
- the system of the invention is thus able to produce thin strips of a variety of steel grades both in batch mode and semi-continuous operation and this produce particularly low thicknesses energetically favorable.
- the operating mode Batch mode is in principle for larger end thicknesses and the mode Semi-continuous mode for thinner or thinnest Thicknesses selected, the plant has a total capacity of about 4 million.
- the rolling device has two groups of a plurality of rolling stands, in particular a first group with two rolling stands and a second group arranged downstream of the first group with up to five rolling stands. Between these groups of rolling stands, an induction heating can be arranged, which preferably consists of the
- Rolling device and the entire rolling line is provided extendable. While induction heating is not used regularly in batch mode, induction heating can be used in semi-continuous operation, in particular in the case of induction heating
- Rolling device used to keep the structure of the hot strip throughout the rolling process in the austenitic phase region.
- Roller device stands.
- the switching is preferably carried out after rolling a plurality, preferably of more than two, more preferably of between two to two and a half, individual slabs.
- a standard size of z. B. has five individual slab lengths, produces at least half of the coils produced from the Jumbobramme in the desired minimum final thickness in semi-continuous operation.
- a preferably flying scissors is arranged, with which the thin strip produced can be cut to the desired length for the coil.
- Rolling device dimensioned so that it corresponds to at least the length of a jumbo booms for performing the semi-endless operation.
- the length of a jumbobramme will correspond to a multiple of the length of a single slab, the length of the furnace, preferably of the tunnel kiln, being dimensioned such that a jumbobramme of five times the length of a long single slab
- Leave casting machines with a thickness of 40 to 140 mm This provides a process that provides the greatest possible mix of products, both in terms of final thickness achievable and steel grades to be processed.
- steel strip of the grade "low carbon steel” preferably steel strip with a thickness of 0.8 to 1, 2 mm in semi-continuous operation and steel strip with a thickness greater than 1, 2 mm in batch mode ,
- the plant manufactures steel strip grade "medium-carbon steel”, preferably steel strip with a thickness of 1, 4 to 1, 8 mm in semi-continuous operation and steel strip with thickness greater than 1, 8 mm in batch mode is also preferred.
- the plant manufactures steel strip of the grade "high carbon steel”, preferably steel strip with a thickness of 1, 4 to 2.0 mm in semi-continuous operation and steel strip with thicknesses greater than 2.0 mm is also preferred.
- the plant manufactures steel strip of the "high-strength low-alloyed steel” grade preferably steel strip with a thickness of 1.4 to 2.0 mm in semi-continuous operation and with thicknesses greater than 2.0 mm in batch mode.
- FIG. 1 is a schematic representation of a CSP ® plant according to the invention.
- Figure 2 is a tabular listing of the producible strip thicknesses
- Figure 1 shows a schematic representation of a CSP ® plant according to the invention, which is able to cast over the casting machine into thin slabs
- At least the length of the upper tunnel kiln 3 is dimensioned such that at least one jumbobramme for carrying out a semi-continuous operation can be completely accommodated in the tunnel kiln 3.
- the lower tunnel kiln 3 immediately downstream of the parallel casting machine 1 may also have this length, but must be at least equal to the length of a single slab for batch operation to be able to receive and heat this single slab when performing the batch operation.
- the second tunnel kiln 3 can also serve as a buffer for the upper casting machine tunnel kiln arrangement 1, 3 via a suitable switching device between the tunnel kilns 3.
- a scale scrubber 4 for removing surface scale is provided downstream of the upper tunnel kiln 3 and in front of the first roll stand group 5, thereby positively promoting rolling in the first group of rolling stands 5
- Roll stand group 5 and the second roll stand group 8 is also a Induction heating 7 is arranged, which can preferably be removed from the rolling line, if the induction heater 7 is not required for carrying out the rolling process. This is regularly the case when the system according to the invention is run in batch mode, or when in semi-continuous operation bands with comparatively large thicknesses of 2 to 2.5 mm are to be produced.
- a laminar cooling section 9 is arranged for setting the desired reeling temperature for the thin strip.
- This laminar cooling section 9 is preferably provided with means for controllably increased cooling of the thin strip, usually liquid nozzles or nozzles capable of applying a mixture of air and a cooling liquid to the thin strip.
- FIG. 2 shows, by way of example, a tabular listing of the steel grades that can be machined on the system according to the invention and in the method according to the invention and the strip thicknesses to be produced via the system, wherein it is also indicated which steel grades and which strip thicknesses in the semi-endless-roll mode and the batch mode operating mode can be produced.
- "low-carbon steel" steel grades with final thicknesses greater than 1.4 mm can be used in batch mode and in the
- Thickness range 0.8 mm to 1, 4 mm are produced in semi-continuous operation.
- the steel grade "advanced high-strength steel” is again produced in the thickness range 1, 4 to 2.5 mm in semi-continuous operation.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Rolling (AREA)
Abstract
L'invention concerne une installation et un procédé de fabrication de bandes métalliques, de préférence de bandes d'acier, d'une épaisseur de 0,8 à 25 mm en fonctionnement par lots ou semi-continu, comportant au moins une machine de coulée (1) pour la coulée de brames minces et un dispositif de laminage (5, 8) disposé en aval de l'au moins une machine de coulée (1) et présentant plusieurs cages de laminoir pour le laminage des brames minces de manière à former des bandes métalliques d'épaisseur prédéfinie, ainsi qu'au moins un dispositif de bobinage (11) disposé en aval du dispositif de laminage (5, 6), une cisaille (6) et un four (3) étant disposés entre l'au moins une machine de coulée (1) et le dispositif de laminage (5, 8), le dispositif de laminage comprenant un dispositif de modification de l'emprise d'au moins une cage de laminoir pendant l'opération de laminage et un dispositif de commande étant prévu, lequel commande l'installation de telle sorte qu'une commutation du fonctionnement par lots au fonctionnement semi-continu ou inversement s'effectue en fonction de la qualité du métal, de préférence la qualité de l'acier, et de l'épaisseur souhaitée de la bande métallique à fabriquer, et que la commutation du fonctionnement par lots au fonctionnement semi-continu peut s'effectuer au cours de l'opération de laminage au moyen du dispositif de laminage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP16756979.7A EP3341142B1 (fr) | 2015-08-28 | 2016-08-12 | Procédé de fonctionnement d'une installation fonctionnant suivant le concept csp (compact strip production) |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102015216512.4 | 2015-08-28 | ||
DE102015216512.4A DE102015216512A1 (de) | 2015-08-28 | 2015-08-28 | Anlage nach dem CSP-Konzept sowie Verfahren zum Betreiben einer solchen Anlage |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017036769A1 true WO2017036769A1 (fr) | 2017-03-09 |
Family
ID=56800272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2016/069220 WO2017036769A1 (fr) | 2015-08-28 | 2016-08-12 | Installation fonctionnant suivant le concept csp (compact strip production) et procédé de fonctionnement d'une telle installation |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3341142B1 (fr) |
DE (1) | DE102015216512A1 (fr) |
TW (1) | TWI615210B (fr) |
WO (1) | WO2017036769A1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108405616A (zh) * | 2018-03-07 | 2018-08-17 | 黑龙江工程学院 | 一种超声波辅助镁合金材料连铸连轧的制备方法及设备 |
CN113102504A (zh) * | 2020-01-10 | 2021-07-13 | 达涅利机械设备股份公司 | 生产扁平金属产品的方法和设备 |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102019207459A1 (de) * | 2018-05-23 | 2019-11-28 | Sms Group Gmbh | Gieß-Walzanlage für den Batch- und Endlosbetrieb |
CN109731914B (zh) * | 2019-02-21 | 2020-07-24 | 江苏沙钢集团有限公司 | 一种改善双辊连铸轧带表面质量的轧制方法 |
CN110202106A (zh) * | 2019-06-04 | 2019-09-06 | 甘肃酒钢集团宏兴钢铁股份有限公司 | 控制csp薄板连铸机生产中碳合金钢板坯表面裂纹的方法 |
EP4049768A1 (fr) * | 2021-02-25 | 2022-08-31 | Primetals Technologies Austria GmbH | Installation combinée de coulée et de laminage et procédé de fabrication de feuillard d'une épaisseur finale inférieure à 1,2 mm sur l'installation combinée de coulée et de laminage |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2195124A1 (fr) * | 2007-09-13 | 2010-06-16 | SMS Siemag AG | Installation csp compacte et flexible pour un fonctionnement continu, semi-continu et par lots |
WO2011141790A2 (fr) * | 2010-05-10 | 2011-11-17 | Danieli & C. Officine Meccaniche Spa | Procédé et installation de production de produits laminés plats |
WO2014135710A1 (fr) * | 2013-03-08 | 2014-09-12 | Sms Siemag Ag | Procédé de production d'une bande métallique au moyen de cylindres de coulée |
EP2881185A1 (fr) * | 2013-12-05 | 2015-06-10 | SMS Siemag AG | Procédé et dispositif de fabrication d'une bande métallique dans le cadre du procédé de laminage |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2327375A (en) | 1997-07-21 | 1999-01-27 | Kvaerner Metals Cont Casting | Continuous metal manufacturing method and apparatus therefore |
MX2007012433A (es) | 2005-04-07 | 2007-11-09 | Giovanni Arvedi | Proceso y sistema para fabricar tiras y laminas de metal sin solucion de continuidad entre el moldeo y el laminado continuo. |
DE102006054932A1 (de) * | 2005-12-16 | 2007-09-13 | Sms Demag Ag | Verfahren und Vorrichtung zum Herstellen eines Metallbandes durch Gießwalzen |
DE102006005635A1 (de) * | 2006-02-08 | 2007-08-09 | Sms Demag Ag | Rollenherdofen zum Aufheizen und/oder Temperaturausgleichen von Stranggiessprodukten aus Stahl oder Stahllegierung und dessen Anordnung vor einer Warmband-Fertigwalzstrasse |
DE102008029581A1 (de) | 2007-07-21 | 2009-01-22 | Sms Demag Ag | Verfahren und Vorrichtung zum Herstellen von Bändern aus Silizum-Stahl oder Mehrphasenstahl |
DE102008020412A1 (de) | 2007-08-24 | 2009-02-26 | Sms Demag Ag | Verfahren und Vorrichtung zum Herstellen eines Metallbandes durch Gießwalzen |
BRPI0921435B1 (pt) | 2008-10-30 | 2020-09-15 | Siemens Aktiengesellschaft | Método para ajustar uma espessura de descarga de um material de laminação, equipamento de controle e/ou regulagem para um laminador e laminador com um trem de laminação de múltiplas cadeiras para laminar material de laminação metálico |
TWI421138B (zh) * | 2008-12-09 | 2014-01-01 | Sms Siemag Ag | 製造金屬帶的方法及實施此方法的生產設備 |
EP2441540A1 (fr) * | 2010-10-12 | 2012-04-18 | Siemens VAI Metals Technologies GmbH | Procédé et installation de production à efficience énergétique d'une bande chaude en acier |
DE202014011231U1 (de) | 2013-12-20 | 2018-09-13 | Novelis do Brasil Ltda. | System für dynamische Reduktionsverschiebung (DSR) zum Regeln einer Temperatur in Tandem-Walzwerken |
-
2015
- 2015-08-28 DE DE102015216512.4A patent/DE102015216512A1/de active Pending
-
2016
- 2016-08-12 WO PCT/EP2016/069220 patent/WO2017036769A1/fr unknown
- 2016-08-12 EP EP16756979.7A patent/EP3341142B1/fr active Active
- 2016-08-15 TW TW105125923A patent/TWI615210B/zh active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2195124A1 (fr) * | 2007-09-13 | 2010-06-16 | SMS Siemag AG | Installation csp compacte et flexible pour un fonctionnement continu, semi-continu et par lots |
WO2011141790A2 (fr) * | 2010-05-10 | 2011-11-17 | Danieli & C. Officine Meccaniche Spa | Procédé et installation de production de produits laminés plats |
WO2014135710A1 (fr) * | 2013-03-08 | 2014-09-12 | Sms Siemag Ag | Procédé de production d'une bande métallique au moyen de cylindres de coulée |
EP2881185A1 (fr) * | 2013-12-05 | 2015-06-10 | SMS Siemag AG | Procédé et dispositif de fabrication d'une bande métallique dans le cadre du procédé de laminage |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108405616A (zh) * | 2018-03-07 | 2018-08-17 | 黑龙江工程学院 | 一种超声波辅助镁合金材料连铸连轧的制备方法及设备 |
CN113102504A (zh) * | 2020-01-10 | 2021-07-13 | 达涅利机械设备股份公司 | 生产扁平金属产品的方法和设备 |
WO2021140531A1 (fr) | 2020-01-10 | 2021-07-15 | Danieli & C. Officine Meccaniche S.P.A. | Procédé et appareil de production de produits métalliques plats |
JP2023509217A (ja) * | 2020-01-10 | 2023-03-07 | ダニエリ アンド チ.オフィチーネ メカーニク エッセピア | 板状の金属製品を製造するための方法および装置 |
JP7404545B2 (ja) | 2020-01-10 | 2023-12-25 | ダニエリ アンド チ.オフィチーネ メカーニク エッセピア | 板状の金属製品を製造するための方法および装置 |
CN113102504B (zh) * | 2020-01-10 | 2024-01-02 | 达涅利机械设备股份公司 | 生产扁平金属产品的方法和设备 |
EP4087692B1 (fr) * | 2020-01-10 | 2024-01-31 | Danieli & C. Officine Meccaniche S.p.A. | Procédé et appareil de production de produits métalliques plats |
Also Published As
Publication number | Publication date |
---|---|
EP3341142B1 (fr) | 2020-01-15 |
TWI615210B (zh) | 2018-02-21 |
EP3341142A1 (fr) | 2018-07-04 |
TW201711766A (zh) | 2017-04-01 |
DE102015216512A1 (de) | 2017-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3341142B1 (fr) | Procédé de fonctionnement d'une installation fonctionnant suivant le concept csp (compact strip production) | |
DE69411971T3 (de) | Warmwalzwerk für Stahlblech und Walzverfahren | |
DE4402402B4 (de) | Verfahren zur Herstellung von warmgewalztem Stahlband aus stranggegossenem Vormaterial und Anlage zur Durchführung des Verfahrens | |
DE69814513T2 (de) | Walzverfahren und Walzstrasse für dünne Flacherzeugnisse | |
EP2964404B1 (fr) | Procédé de production d'une bande métallique au moyen de cylindres de coulée | |
DE202011110781U1 (de) | Anlage zur Herstellung von flachgewalzten Produkten | |
DE19540978A1 (de) | Produktionsanlage zum kontinuierlichen- oder diskontinuierlichen Auswalzen von Warmband | |
DE102008003222A1 (de) | Kompakte flexible CSP-Anlage für Endlos-, Semi-Endlos- und Batchbetrieb | |
EP3504013B2 (fr) | Procédé de fabrication d'une bande métallique dans une installation de laminage direct | |
DE102006054932A1 (de) | Verfahren und Vorrichtung zum Herstellen eines Metallbandes durch Gießwalzen | |
EP1318876A1 (fr) | Procede et installation pour produire des feuillards et des toles en acier | |
EP1305122A1 (fr) | Procede et installation de fabrication de produits plats minces | |
AT504782A4 (de) | Verfahren zur herstellung eines warmgewalzten stahlbandes und kombinierte giess- und walzanlage zur durchführung des verfahrens | |
DE10304318B4 (de) | Verfahren zum Walzen von dünnen und/oder dicken Brammen aus Stahlwerkstoffen zu Warmband | |
EP3797006B1 (fr) | Installation de coulée et de laminage destinée au fonctionnement par lots et continu | |
EP2663412B1 (fr) | Installation et procédé destinés à produire des bandes d'acier laminées à chaud | |
DE4009861C2 (de) | Verfahren zur Herstellung von warmgewalztem Stangenmaterial wie Feinstahl oder Draht und Anlage zur Durchführung des Verfahrens | |
WO2016165933A1 (fr) | Installation de coulée et de laminage et procédé servant à faire fonctionner ladite installation | |
DE69705555T2 (de) | Verfahren zum Walzen von Langprodukten und Walzstrasse zur Durchführung dieses Verfahrens | |
WO2023186471A1 (fr) | Installation de rouleaux lamineurs et procédé pour la faire fonctionner | |
DE102012224531A1 (de) | Verfahren zur Herstellung von kornorientierten Silizium-Stählen | |
WO2015014864A1 (fr) | Installation de laminage de coulée continue et procédé de fabrication de brames | |
DE102006010137A1 (de) | Verfahren und Vorrichtung zum Herstellen eines Metallbandes durch Gießwalzen | |
EP1107834A1 (fr) | Procede et installation de production de larges feuillards a chaud, notamment de brames minces | |
WO2022194467A1 (fr) | Installation et procédé de laminage à froid d'une bande métallique à partir d'acier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16756979 Country of ref document: EP Kind code of ref document: A1 |