WO2011093945A1 - Stockage temporaire dans un champ de gaz pour optimiser le développement d'un champ - Google Patents

Stockage temporaire dans un champ de gaz pour optimiser le développement d'un champ Download PDF

Info

Publication number
WO2011093945A1
WO2011093945A1 PCT/US2010/058749 US2010058749W WO2011093945A1 WO 2011093945 A1 WO2011093945 A1 WO 2011093945A1 US 2010058749 W US2010058749 W US 2010058749W WO 2011093945 A1 WO2011093945 A1 WO 2011093945A1
Authority
WO
WIPO (PCT)
Prior art keywords
zone
gas
formation
water
fluids
Prior art date
Application number
PCT/US2010/058749
Other languages
English (en)
Inventor
Robert Barnum
Robert D. Kaminsky
Thomas H. Higdon
Original Assignee
Exxonmobil Upstream Research Company
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxonmobil Upstream Research Company filed Critical Exxonmobil Upstream Research Company
Priority to AU2010344186A priority Critical patent/AU2010344186B2/en
Priority to US13/520,987 priority patent/US20130098608A1/en
Priority to CA2787014A priority patent/CA2787014A1/fr
Publication of WO2011093945A1 publication Critical patent/WO2011093945A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/13Lifting well fluids specially adapted to dewatering of wells of gas producing reservoirs, e.g. methane producing coal beds

Definitions

  • the present invention pertains to the field of recovery of hydrocarbon gas from a coal-bearing formation or gas reservoir. More specifically, the present invention relates to the economically efficient development of a field having coalbed methane.
  • coalbed methane (CBM) now accounts for about 10% of natural gas production in the United States. Significant CBM production occurs domestically in Wyoming, Colorado, Alabama, New Mexico, and other states.
  • Coal beds can be attractive targets for gas development because of their ability to retain large amounts of gas. While coal beds are typically considered low-permeability formations, a coal seam is nevertheless able to store, in some cases, multiple times more gas (at standard conditions) than an equivalent volume of rock. This is because the methane compounds are able to adsorb onto the coal.
  • coal seams also contain water within the coal-bearing formation.
  • the producer or field operator will typically "dewater" the formation. This involves drilling a plurality of water production wells. Production of water will cause pressure in the coal-bearing formation to reduce and allow gas to desorb.
  • Figure 1 presents a Cartesian coordinate graph 100 plotting fluid volume versus time.
  • the graph 100 demonstrates phases 110, 120, 130 of field development for a coalbed methane field.
  • Phase 110 is a dewatering stage;
  • Phase 120 is a stable gas production stage;
  • Phase 130 is a decline stage.
  • the graph 100 also demonstrates production decline curves 140, 150.
  • Decline curve 140 represents the production of water in units of volume over time.
  • Decline curve 150 represents the production of methane, also in units of volume over time.
  • the graph 100 of Figure 1 represents a fairly typically decline curve for a coalbed methane field. Many CBM zones require dewatering of the coal prior to exhibiting substantial gas production. This is discussed more fully in V.A. Kuuskraa and C.F. Brandenberg, "Coalbed Methane Sparks a New Energy Industry", Oil and Gas Journal, 87(41), 49-56 (1989); L. Bassett, Guidelines to Successful Dewatering of CBM Wells, SPE Paper No. 104,290, Society of Petroleum Engineers Eastern Regional Meeting, Canton, Ohio (October 11-13, 2006); J.P. Seidle, A Numerical Study of Coalbed Dewatering, SPE Paper No. 24,358, Society of Petroleum Engineers Rocky Mountain Regional Meeting, Casper, Wyoming (May 18-21, 1992).
  • Phase 110 shown in Figure 1 may represent a period of time that is, for example, three to 36 months.
  • a low, but not insignificant, amount of natural gas may be produced. This gas needs to be dealt with. In some cases, flaring may be an option for dealing with this early gas. However, flaring is becoming less environmentally acceptable and, hence, alternatives are desirable.
  • coalbed methane when coalbed methane is produced, it may contain non-negligible amounts of acid gases, such as carbon dioxide or hydrogen sulfide, and/or other noncombustible or poisonous gases.
  • acid gases such as carbon dioxide or hydrogen sulfide
  • other gases may include, for example, nitrogen or mercaptans.
  • Undesirable gas components need to be separated from the methane gas in order to meet pipeline specifications. For example, some pipeline specifications may require that methane gas contain less than 2 mol. percent of C0 2 , and less than 4 ppm H 2 S and mercaptans.
  • Another approach for treating raw natural gas involves the use of chemical solvents.
  • chemical solvents include methyl diethanol amine (MDEA), and the Flexsorb ® family of amines.
  • Amine -based solvents rely on a chemical reaction with acid gas components in the hydrocarbon gas stream. Such chemical reactions are generally more effective than physical-based solvents, particularly at feed gas pressures below about 300 psia (2.07 MPa).
  • Hybrid solvents have also been used for the removal of acidic components.
  • Hybrid solvents employ a mixture of physical and chemical solvents.
  • An example of a hybrid solvent is Sulfmol ® .
  • Cryogenic gas processing techniques are also known.
  • Cryogenic gas processing is a distillation process that generates a cooled overhead gas stream at moderate pressures (e.g., 350-550 pounds per square inch gauge (psig)).
  • moderate pressures e.g., 350-550 pounds per square inch gauge (psig)
  • liquefied acid gas is generated as a "bottoms" product.
  • the removal of acid gases creates a "sweetened" hydrocarbon gas stream.
  • the sweetened stream may be used as an environmentally-acceptable fuel or as feedstock to a chemicals or gas-to-liquids facility.
  • the sweetened gas stream may be chilled to form liquefied natural gas, or LNG.
  • the construction of a gas processing facility represents a significant capital outlay before the development of a field. Managing the expenditure of capital before and during the early development of a gas field can be critical to obtaining favorable economics. A key aspect of optimizing capital outlay is to minimize excess capacity in processing and export facilities.
  • coalbed methane and other gas fields such as shale gas fields and tight gas fields, can have long ramp-up times prior to reaching a high, relatively constant production rate.
  • transport and export facilities may also be constructed to deal with gas produced during the dewatering stage of Phase 110.
  • economic considerations typically favor exploiting economies of scale and constructing facilities suitable for the gas output rate expected when a field is fully operational and dewatering has been completed for many wells.
  • facilities suitable for such gas rates will be significantly oversized during the initial dewatering stage of Phase 110. This mismatch between facility size and immediate needs represents inefficient use of capital.
  • LNG liquefied natural gas
  • gas processing may include dehydration, heavier hydrocarbon removal, and C0 2 and H 2 S removal.
  • the subsurface formation may be a coalbed zone, a shale gas zone, or a tight gas zone.
  • the subsurface formation is in a field, such as a coalbed methane field or other field wherein natural gas is to be produced.
  • the method includes completing one or more wells in a first zone within the subsurface formation, and then producing formation fiuids from the first zone so as to at least partially dewater the first zone.
  • the method also includes completing one or more wells in a second zone within the subsurface formation, and then producing formation fluids from the second zone so as to at least partially dewater the second zone.
  • the method further includes injecting gas from the formation fluids from the second zone into the first zone.
  • the purpose is to temporarily store the gas for later production.
  • the method also includes completing one or more wells in one or more subsequent zones within the subsurface formation.
  • a gas processing facility is required for the field. Accordingly, the method also includes substantially completing a gas processing facility. The gas processing facility is not substantially completed until (i) the gas production rate from the field is able to exceed a designated level, or (ii) at least the first and second zones of the subsurface formation have been dewatered to a designated level. After substantially completing the gas processing facility, the method includes co-producing formation fluids from the first zone, the second zone, and the one or more subsequent zones.
  • the method also includes substantially separating water in the co-produced formation fluids from the gas in a separator.
  • the gas is delivered to the gas processing facility for processing.
  • the method also includes completing one or more water injection wells in a subterranean storage zone.
  • the subterranean zone may be an aquifer, a salt cavern, a depleted hydrocarbon reservoir zone, or a coalbed zone that has been previously substantially dewatered.
  • the method then includes separating water from the gas in the formation fluids from the first zone during dewatering, and injecting water from the formation fluids from the first zone into the subterranean storage zone.
  • the method may also include flaring a majority of the gas from the formation fluids from the first zone during dewatering of the first zone. As an alternative to flaring, the gas may be injected into a subsurface permeable zone for essentially permanent disposal.
  • the method further comprises completing one or more wells in a third zone within the subsurface formation, and producing formation fluids from the third zone so as to at least partially dewater the third zone.
  • the method also includes shutting in the one or more wells completed in the second zone, and injecting gas from the formation fluids from the third zone into the first zone for temporary storage. This injecting step is done before the gas processing facility is substantially completed.
  • the method may then also include separating water from gas in the formation fluids from the second zone during dewatering of the second zone, injecting water from the formation fiuids from the second zone into the subterranean storage zone, and also injecting water from the formation fluids from the third zone into the subterranean storage zone.
  • the subsurface formation may be a coalbed zone, a shale gas zone, or a tight gas zone.
  • the subsurface formation is in a field, such as a coalbed methane field or other field wherein natural gas is to be produced.
  • the method includes completing one or more wells in a first zone within the subsurface formation, and producing formation fluids from the first zone so as to at least partially dewater the first zone.
  • the method also includes completing one or more injection wells in a zone in a second subsurface formation with higher permeability than the first zone.
  • the zone in the second subsurface formation may be an aquifer, a salt cavern, or a depleted hydrocarbon reservoir zone.
  • the zone in the second subsurface formation is located in subsurface strata that is deeper than the subsurface formation that is undergoing dewatering.
  • the method further includes injecting gas produced from the first zone into the second subsurface formation.
  • the gas from the first zone is held in the second subsurface formation for temporary storage.
  • the method also includes completing one or more wells in a second zone within the subsurface formation, and producing formation fluids from the second zone.
  • the method may also include substantially completing a gas processing facility.
  • the gas processing facility is not substantially completed until (i) the gas production rate from the field is able to exceed a designated level, or (ii) at least two zones of the subsurface formation have been dewatered to a designated level.
  • the method includes co-producing formation fluids from the first zone and the second zone.
  • the method also includes substantially separating water in the co-produced formation fluids from the gas in a separator.
  • the gas is delivered to the gas processing facility for processing.
  • the method also includes completing one or more wells in one or more subsequent zones within the subsurface formation, producing formation fluids from the one or more subsequent zones so as to at least partially dewater the one or more subsequent zones, and injecting gas from the formation fluids from the one or more subsequent zones into the zone in the second subsurface formation for temporary storage before substantially completing the gas processing facility.
  • the method may include separating water from gas in the formation fluids from the first zone during dewatering, and delivering water from the formation fluids from the first zone to a water disposal location. After the gas processing facility is completed, gas is produced from the zone in the second subsurface formation, and delivered to the separator along with the co-produced formation fluids from the first zone and the second zone.
  • the method further includes: producing formation fluids from the second zone so as to at least partially dewater the second zone; separating water from gas in the formation fluids from the second zone during dewatering of the second zone; injecting gas from the formation fluids from the second zone into a zone in a second subsurface formation with higher permeability than the first zone for temporary storage; delivering separated water from the formation fluids to the water disposal location; and after the gas processing facility is completed, producing gas from the zone in the second subsurface formation and delivering the gas to the separator along with the co-produced formation fluids from the first zone and the second zone.
  • the method is for managing the production of fluids from a coalbed formation in a field.
  • the fluids comprise water and gas.
  • the method includes: completing one or more wells in a first production section within the coalbed formation; producing formation fluids from the first production section so as to at least partially dewater the first section; completing one or more injection wells in a first subterranean storage zone; completing one or more injection wells in a second subterranean storage zone; separating the formation fluids into a liquid stream comprised substantially of water, and a gas stream comprising at least 50 mole percent methane gas; injecting the gas from the gas stream into a first subsurface formation for temporary storage; injecting water from the liquid stream into the second subterranean storage zone; completing one or more wells in a subsequent production section within the coalbed formation; substantially completing a gas processing facility for the field; after the first section has been at least partially dewatered and after the
  • the first subterranean storage zone may be a zone in the coalbed formation.
  • the first subterranean storage zone may be an aquifer that is deeper than the coalbed formation.
  • Figure 1 is graph showing various phases of development for a coalbed methane field. Production rates for water and methane gas are shown on separate decline curves.
  • Figures 2A and 2B present a single flowchart showing steps for managing the production of fluids from a low-permeability formation, in one embodiment.
  • Figures 3A through 3D provide illustrative cross-sectional views of a field under hydrocarbon gas development in accordance with the methods herein, in one embodiment.
  • FIG. 3A formation fluids are being produced from a first zone in a gas- producing formation. Produced water is sent for disposal, while the gas is flared.
  • FIG. 3C formation fluids are being produced from a third zone in the gas- producing formation. Produced water is sent for disposal, while methane gas is injected into the first zone. Production wells from the second zone are shut in.
  • Figures 4 A and 4B present a single flowchart showing steps for managing the production of fluids from a low-permeability formation, in an alternate embodiment.
  • Figures 5A through 5C provide illustrative cross-sectional views of a field under hydrocarbon gas development in accordance with the methods herein, in an alternate embodiment.
  • formation fluids are being produced from first and second zones of a gas-producing formation. Produced water is sent for disposal, while methane gas is injected into a zone in a second subsurface formation for temporary storage.
  • FIG. 5B formation fluids are being produced from a plurality of zones in a gas-producing formation. Produced water is sent for disposal, while methane gas is processed in a gas processing facility and exported.
  • Formation fluids are being produced from a plurality of zones in a gas-producing formation, along with water and previously-injected methane gas from the zone in the second subsurface formation. Produced water is sent for disposal, while methane gas is processed in a gas processing facility and exported.
  • coal refers to any combustible rock containing more than about 50% by weight carbonaceous material, and formed by compaction and induration of plant matter.
  • coal bed or "coal seam” refer to any stratum or bed of coal. The terms may be used interchangeably herein.
  • coal bed formation refers to a body of strata containing at least one coal bed, and typically one or more other strata including, without limitation, clay, shale, carbonaceous shale, sandstone and other inorganic rock types. While a coal bed formation generally contains organic matter, at any one location the content of organic matter present can vary from almost none to nearly 100% of the total matter present.
  • CBM coalbed methane
  • Coalbed methane refers to a natural gas consisting of primarily of methane, and also one or more acid gases such as carbon dioxide, nitrogen, or hydrogen sulfide. Coalbed methane may also include lesser amounts of ethane, propane and other heavy hydrocarbons. Coalbed methane may be referred to by some as "coal gas.” CBM may be present in a free state, in an adsorbed state, and/or in solution with water or liquid hydrocarbons.
  • injectivity means an indicator of the relative ease with which a fluid is injected into a rock formation. Factors affecting injectivity into a coal bed formation include permeability, fracture conductivity, and secondary porosity. Injectivity may be measured in m 3 /day-kPa or Mscf/day-psi.
  • gas refers to a fluid that is substantially in its vapor phase at ambient conditions (1 atm and 15° C).
  • fluid refers to gases, liquids, and combinations of gases and liquids, as well as to combinations of gases and solids, and combinations of liquids and solids.
  • Condensable hydrocarbons means those hydrocarbons that condense at about 15° C and one atmosphere absolute pressure. Condensable hydrocarbons may include, for example, a mixture of hydrocarbons having carbon numbers greater than 4.
  • hydrocarbon refers to an organic compound that includes primarily, if not exclusively, the elements hydrogen and carbon. Hydrocarbons generally fall into two classes: aliphatic, or straight chain hydrocarbons, and cyclic, or closed ring hydrocarbons, including cyclic terpenes. Examples of hydrocarbon-containing materials include any form of natural gas, oil, coal, and bitumen that can be used as a fuel or upgraded into a fuel.
  • hydrocarbon fluids refers to a hydrocarbon or mixtures of hydrocarbons that are gases or liquids.
  • hydrocarbon fluids may include a hydrocarbon or mixtures of hydrocarbons that are gases or liquids at formation conditions, at processing conditions, or at 15° C and 1 atm pressure.
  • Hydrocarbon fluids may include, for example, oil, natural gas, coal bed methane, shale oil, pyrolysis oil, pyrolysis gas, a pyrolysis product of coal, and other hydrocarbons that are in a gaseous or liquid state.
  • natural gas refers to a multi-component gas obtained from a crude oil well (associated gas) or from a subterranean gas-bearing formation (non- associated gas).
  • the composition and pressure of natural gas can vary significantly.
  • a typical natural gas stream contains methane (Ci) as a significant component.
  • the natural gas stream may also contain ethane (C 2 ), higher molecular weight hydrocarbons, and one or more acid gases.
  • an “acid gas” means any gas that dissolves in water producing an acidic solution.
  • acid gases include hydrogen sulfide (H 2 S), carbon dioxide (C0 2 ), carbon disulfide (CS 2 ), carbonyl sulfide (COS), mercaptans, or mixtures thereof.
  • the term "tight gas zone” refers to subsurface strata wherein gas is held within rock having very low permeability, such as less than about 0.1 md. Such a formation is may be highly compacted and may have undergone cementation and recrystalization. Such strata may be, for example, a sandstone, in which case the formation may be referred to as a "tight sand.” In a tight gas formation, it is important to expose as much of the reservoir as possible, making horizontal and directional drilling desirable. This enables the wellbore to run along the formation, opening up more opportunities for the natural gas to enter the wellbore.
  • subsurface refers to geologic strata occurring below the earth's surface.
  • Methods for managing the production of fluids from a low-permeability subsurface formation are provided herein.
  • the subsurface formation is in a field, such as a coalbed methane field or other field wherein natural gas is to be produced.
  • the methods have utility during initial field development. More specifically, the methods may be used during an initial production phase when dewatering of the subsurface formation takes place.
  • Figures 2A and 2B present a unified flowchart showing steps for a method 200 of managing the production of fluids from a low-permeability subsurface formation, in one embodiment.
  • the method 200 first comprises completing one or more water production wells in a subterranean storage zone. This is shown at Box 210.
  • the "completing" step may be performed by drilling one or more wellbores into the subterranean zone, and then completing the wellbores as water injection wells. Alternatively, the "completing" step may mean re-connecting previously-plugged wells with the subterranean storage zone.
  • the subterranean storage zone may be an existing aquifer.
  • the subterranean zone may be a salt cavern or a substantially depleted hydrocarbon reservoir that is available to the operator of the field.
  • the subterranean storage zone may be a coalbed zone which has been previously dewatered.
  • the subterranean storage zone may be a section of a coalbed methane field or other field wherein natural gas is to be produced.
  • the method 200 also includes completing one or more production wells in a first zone. This is provided at Box 215.
  • the first zone is in a gas-producing formation in the field.
  • the gas-producing formation may be a shale gas formation.
  • the gas- producing formation may be a so-called tight gas formation.
  • the formation is a coal-bearing formation.
  • the gas produced from the formation is coal bed methane.
  • the subterranean storage zone may be a lateral extension of the first zone which has been previously dewatered.
  • the method 200 also includes the step of co-producing water and methane gas through the production wells. This is shown at Box 220. Production takes place from the first zone. During the initial stage of production, production fluids will predominantly include water. As production from the first zone continues, the water content of the produced fluids will decline, and the gas content will increase. The gas itself will comprise at least 50 mole percent methane.
  • the water produced from the production wells will need to be managed. Accordingly, the method 200 next includes disposing of the water produced from the production wells. This is provided at Box 225. Disposal may mean injecting the water into the subterranean storage zone or releasing the water, preferably after treating, into a surface body of water, such as a river, lake, or ocean.
  • the method 200 further includes the step of flaring the gas initially produced from the first zone. This is seen at Box 230. Flaring may be utilized during the initial development of the field as the gas volumes are very low. As an alternative, however, the gas may be stored or essentially permanently disposed. Storage or disposal may be, for example, in a separate permeable formation within the subsurface. Storage may alternatively be in a depleted hydrocarbon reservoir. Storage may be desirable as the gas content of the formation fluids becomes higher.
  • the method also includes completing one or more wells in a second zone. This is shown at Box 235 of Figure 2A.
  • the second zone is a second zone in the gas-producing formation of the field.
  • the wells include production wells for producing formation fluids, that is, water and gaseous hydrocarbons.
  • the method 200 then further includes co-producing water and methane gas from the second zone. This is seen at Box 240.
  • the method 200 next includes disposing of the produced water, such as by injecting the water produced from the production wells of the second zone into a subterranean zone or by releasing it to a surface body of water, such as a river, lake or ocean. This is provided at Box 245. It is understood that some environmental treatment or purification of the water may be required before injection or other disposal. If the water can be treated to sufficient quality, in certain embodiments the produced water may be used for irrigation or drinking.
  • the gas produced from the production wells completed in the second zone will also need to be managed.
  • the gas produced from the second zone will be temporarily stored in the first zone. This is shown at Box 250. Injecting produced gas into the first zone has the benefit of causing the first zone to have an increased gas content. Where the gas-bearing formation is a coal bed, the coal will adsorb much of the gas.
  • gas injection wells will need to be provided.
  • production wells for the first zone are converted into gas injection wells.
  • the gas is temporarily stored, it is not immediately processed through a gas processing facility.
  • the method 200 may include constructing a gas processing facility. This is shown at Box 255.
  • the gas processing facility is not completed before the export of methane gas commences; instead, completion of the gas processing facility is delayed.
  • substantially final construction of the gas processing facility does not take place until the gas production rate from the field is able to exceed a designated level.
  • the designated level might be 25 percent or, more preferably, 50 percent, or even 75 percent of the anticipated maximum weekly production rate from the field.
  • construction of the gas processing facility may not be finalized until at least two zones of the gas-producing formation have been dewatered to a designated level.
  • the designated level may be, for example, a reduction in average weekly water production rate of 25 percent, or 50 percent, or even 75 percent, from the initial water production rate from the second zone.
  • the above approaches involve calculating production rate averages. Average production rates, such as daily, weekly, or monthly averages may be used. In making such calculations, shut-in times for field or facility maintenance or upsets may be excluded from the averages.
  • the gas processing facility may include an export facility.
  • the method 200 also includes completing one or more production wells in a third zone within the gas-producing formation of the field, which is representative of one or more subsequent zones. This is shown in Box 260 of Figure 2B. At the same time, the one or more production wells completed in the second zone may be temporarily shut in. This step is seen at Box 265. The shutting-in step is optional as the operator may choose to at least partially overlap production from the second zone and the third zone.
  • the method 200 next includes completing one or more production wells in a subsequent zone. This is provided at Box 270.
  • the subsequent zone may be a fourth zone, a fifth zone, or more.
  • the operator produces formation fluids from the subsequent zone and all previous zones. This means that water and hydrocarbon gas is produced from through the production wells of the first, second, third, and subsequent zones. This is seen at Box 275.
  • the zones will contain primarily in situ gas.
  • the method 200 also includes processing gas produced from the subsequent zone(s) and all previous zones in the gas processing facility. This is shown at Box 280. It is noted here that the gas produced with the formation fluids may contain not only methane, but also ethane or heavier hydrocarbons. Further, it is possible that the gas will contain at least some percentage of acid gases such as carbon dioxide or hydrogen sulfide. Thus, in order to bring the hydrocarbon gas into a pipeline specification, the gas processing facility may need to remove at least a portion of acid gas components, remove heavy hydrocarbon components, remove inert components, and/or remove water through dehydration.
  • Box 255 may optionally include processing gas produced from the third zone before production occurs in the subsequent zone. However, it is preferred that a significant volume of produced gas be available from previous zones before gas processing commences. Therefore, the operator may produce formation fluids from a fourth, fifth, or even sixth zone before processing begins in the gas processing facility. Construction of the gas processing facility is in all embodiments delayed in accordance with Box 255.
  • the water produced from the production wells related to the third and subsequent zones will also need to be managed. Accordingly, the method 200 further includes disposing of the water produced from the production wells of the third and subsequent zones. This is seen at Box 285. Disposal may comprise injecting the water into the subterranean storage zone through the connected wells of Box 210.
  • the subterranean zone is a separate, preferably deeper, zone from the production zones.
  • disposal may involve releasing the produced water into a surface body of water, such as a river, a lake, or an ocean. This may be after suitable treatment.
  • Figures 3A through 3D provide illustrative cross-sectional views of a field 300 undergoing hydrocarbon gas development, in one embodiment.
  • the field 300 contains a surface 302, and a subsurface 304. Further, the field 300 contains a gas-producing formation 350.
  • the gas-producing formation 350 may be a shale gas formation.
  • the gas-producing formation may be a so-called tight gas formation.
  • the formation 350 is a coal-bearing formation.
  • the gas produced from the formation 350 is coal bed methane.
  • the gas-producing formation 350 has been sectioned to provide a first zone 310.
  • a section may reflect a pattern such as a 5 -spot pattern, or several adjacent patterns of wells.
  • Production wells 312 have been completed in the gas-producing formation 350. Formation fluids are being produced from the first zone 310 of the gas-producing formation 350.
  • the field 300 also contains a water storage reservoir 360.
  • the water storage reservoir 360 may be an existing aquifer.
  • the water storage reservoir 360 may be a salt cavern or a substantially depleted hydrocarbon reservoir that is available to the operator of the field 300.
  • the water storage reservoir 360 may be a coalbed zone which has been previously dewatered.
  • the water storage reservoir 360 may be an extension of the gas-producing formation 350.
  • the water storage reservoir 360 serves as a subterranean storage zone. Although the water storage reservoir 360 is shown as being shallower than the gas-producing formation 350, it may be deeper.
  • Injection wells 362 are completed in the water storage reservoir 360.
  • the injection wells 362 may have been drilled into the water storage reservoir 360 especially for injection of water.
  • the injection wells 362 may be converted production wells, such as dewatering or gas production wells that had been previously-plugged. In either instance, one or more stages of fluid pumping may be utilized to obtain injection pressures resulting in sufficient and desired injection rates.
  • the formation fluids are being transported by the production wells 312 through the subsurface 304 and to the surface 302. At the surface 302, the formation fluids are transported through production lines 314 to a separator 305.
  • the separator 305 separates the formation fluids into liquids and gases.
  • the separator 305 may be a gravity separator, a centrifugal separator, a flash vessel, or other separation unit for separating liquids from gases.
  • the liquids comprise primarily water, while the gases comprise primarily methane. Because methane boils at such a low temperature, it is preferred that the separator 305 be a low-temperature flash vessel to minimize water vapor.
  • the formation fluids may be taken through a cooling unit (not shown) before entry into the separator 305.
  • the separator 305 may operate, for example, near ambient temperature and 50 psig.
  • a water transport line 365 is provided in the field 300.
  • the water transport line 365 transports water from the separator 305 to the injection wells 362. From there, water is injected through the injection wells 362 and into the water storage reservoir 360.
  • a gas transport line 315 is also provided.
  • the gas transport line 315 transports methane and other gases from the separator 305 to a flare 312. From there, the gases are combusted and vented to the atmosphere.
  • the operator may choose to temporarily or permanently store the gases in a separate underground reservoir.
  • an above- ground storage tank or even a transport truck may be used for temporary storage. It is noted here that at the beginning of production from the first zone 310, the produced fluids comprise predominantly water. Therefore, relatively little gas is flared or is otherwise captured.
  • Figure 3B presents a second view of the field 300. This represents a next stage in development of the field 300.
  • the gas-producing formation 350 has been sectioned into a second zone 320.
  • Production wells 322 have been completed in the second zone 320. Formation fluids are now being produced from the second zone 320 and to the surface 302.
  • the formation fluids are transported through production lines 324 at the surface 302. From there, the production fluids from the second zone 320 are taken to the separator 305. The production fluids from the second zone 320 are then separated into water and gas. The water exits the separator 305, and is transported through the water transport line 365 to the injection wells 362. The water from the second zone 320 is then injected into the water storage reservoir 360. [0104] Concerning formation fluids in the gas phase, the gases produced from the second zone 320 are not flared or disposed; instead, the gas is transported through the gas transport line 315, and then diverted back through production lines 314 and into the production wells 312.
  • the wells 312 have been temporarily converted to injection wells to facilitate the injection of gases from the second zone 320 of the gas-producing formation 350 into the first zone 310.
  • dedicated injector wells into the first zone 310 may be used alternatively or in addition to the wells 312.
  • Injection of gas from the second zone 320 of the gas-producing formation 350 into the first zone 310 provides temporary storage.
  • the gas will be re-produced to the surface 302 in a later stage of field development.
  • temporary storage in the first zone 310 allows the developer of the field 300 to delay the construction of an expensive, full-capacity gas processing facility.
  • the injection of gases from the second zone 320 of the gas- producing formation 350 into the first zone 310 need not wait until the first zone 310 has been fully dewatered.
  • the operator may convert the production wells 312 into injection wells when water production from the first zone 310 has dropped from, for example, an initial production rate to a lower designated water production rate.
  • the designated reduction might be a decrease in average weekly production rate of about 50 percent, or 80 percent, or 90 percent.
  • Figure 3C presents a third view of the field 300. This represents yet a next stage in the development of the field 300.
  • the gas-producing formation 350 has been sectioned into a third zone 330.
  • Production wells 332 have been completed in the third zone 330. Formation fluids are now being produced from the third zone 330 and to the surface 302.
  • the formation fluids are directed into production lines 334.
  • the formation fluids are delivered through the production lines 334 to the separator 305.
  • the formation fluids from the third zone 330 are separated into water and gases.
  • the water from the third zone 330 exits the separator 305 and is transported through the water transport line 365 to the injection wells 362.
  • the water is then injected into the water storage reservoir 360.
  • the gases produced from the third zone 330 are not flared or disposed. Instead, the gas is released from the separator 305 through the gas transport line 315, directed into one or more of the production lines 314, and injected into the now-injection wells 312.
  • the wells 312, again, have been temporarily converted to injection wells to facilitate the injection of gases from the third zone 330 of the gas-producing formation 350 into the first zone 310.
  • the production wells 322 from the second zone 320 may have been temporarily shut-in, or may continue to produce.
  • Injection of gas from the third zone 330 of the gas-producing formation 350 provides temporary storage.
  • the gas from the third zone 330 will later be re-produced to the surface 302 along with gas from the first 310 and second 320 zones in a later stage of field development.
  • Temporary storage of gas in the first zone 310 again allows the developer of the field 300 to delay the construction of an expensive, full-capacity gas processing facility.
  • the injection of gas from the third zone 330 of the gas-producing formation 350 into the first zone 310 need not wait until the second zone 320 has been completely dewatered. Some overlap in production between the second zone 320 and the third zone 330 may take place.
  • the operator may choose to inject and temporarily store the gas from the third zone 330 of the gas-producing formation 350 into the second zone 320, or another previously dewatered zone, rather than the first zone 310. In this instance, the production wells 312 from the first zone 310 are shut-in.
  • Figure 3D presents a fourth view of the field 300. This represents yet a next stage in the development of the field 300.
  • the gas-producing formation 350 has been sectioned into yet a fourth zone 340.
  • Production wells 342 have been completed in the fourth zone 340. Formation fluids are now being produced from the fourth zone 340 and to the surface 302.
  • the formation fluids enter production lines 344 at the surface 302.
  • the formation fluids are transported to the separator 305 for fluid separation.
  • the separator 305 again separates production fluids from the fourth zone 340 into water and gas.
  • Water from the fourth zone 340 is transported through the water transport line 365 and to the injection wells 362.
  • the water is then injected into the water storage reservoir 360.
  • gas is released from the separator 305 into gas transport line 315.
  • Gas transport line 315 is preferably an overhead flash line.
  • the gases produced from the fourth zone 340 are not flared or disposed; instead, the gases are moved to a new gas processing facility 370. To this end, a gas processing facility 370 has now been completed and is ready for gas processing and exporting.
  • the gas processing facility 370 is not completed before the export of methane gas from the field 300 commences; instead, completion of the gas processing facility 370 is delayed.
  • substantially final construction of the gas processing facility does not take place until the gas production rate from the field 300 is able to exceed a designated level.
  • the designated level might be 50 percent or, more preferably, 75 percent, or even 100 percent of the anticipated maximum weekly production rate from the field 300.
  • the designated level may be, for example, 100 mscf/week, or 250 mscf/week.
  • construction of the gas processing facility 370 may not be finalized until at least two zones of the gas-producing formation have been dewatered to a designated level.
  • the designated level may be, for example, a reduction in average weekly water production rate of 50 percent, or 80 percent for the second zone.
  • construction of the gas processing facility 370 may not be finalized until at least three zones of the gas-producing formation have been substantially dewatered and gas produced from the second 320 and third 330 zones has been injected into the first zone 310.
  • Formation fluids produced from the first 310, second 320, third 330, and fourth 340 zones are produced to the surface 302.
  • the formation fluids are transported through production lines 314, 324, and 334, respectively, to the separator 305.
  • the separator 305 separates all of these formation fluids into water and gas. Water exits the separator 305, and is directed through water transport line 365.
  • the water transport line 365 carries water to the water injection wells 362, where water continues to be injected into the water storage reservoir 360.
  • Methane and other gases are released from the separator 305 through the gas transport line 315.
  • the gases then travel through gas line 372 and into the gas processing facility 370. Because gas is produced from three or four (or even more) zones simultaneously, the gas processing facility 370 is able to operate immediately at high or even substantially full capacity.
  • FIG. 4A and 4B present a unified flowchart showing steps for a method 400 for managing the production of formation fluids, in an alternate embodiment.
  • the method 400 first comprises completing one or more production wells in a low-permeability, gas-producing formation. This is shown at Box 410 of Figure 4 A.
  • the wells are completed in a first zone and in a second zone in a gas producing formation of a field.
  • the gas-producing formation in the field may be a shale gas formation.
  • the gas-producing formation may be a so-called tight gas formation.
  • the formation is a coal-bearing formation.
  • gas produced from the formation is coal bed methane.
  • the produced gas comprises greater than 50 mol. percent methane.
  • the method 400 also includes the step of co-producing water and methane gas through the production wells. This is shown at Box 415.
  • the water and methane gas together comprise the majority of production fluids produced through the production wells from the first and second zones. During the initial stage of production, production fluids will predominantly be water. As production from the first and second zones continues, the water content of the produced fluids declines, and the gas content increases.
  • the method 400 also includes disposing of the water produced from the production wells. This is provided at Box 420.
  • Disposal may mean injecting the water through injection wells into a subterranean storage zone.
  • disposal may mean transporting the water to a tank or other place of temporary storage.
  • disposal may mean delivering the water for agricultural purposes, or releasing the water into the local water shed.
  • the method 400 further includes completing one or more gas injection wells in a zone in a second subsurface formation, preferably of higher permeability than that of the first zone. This is provided at Box 425.
  • the "completing" step may be performed by drilling one or more wellbores into the zone in the second subsurface formation, and then completing the wellbores as water injection wells. Alternatively, the "completing" step may mean reconnecting previously-plugged wells with the zone in the second subsurface formation.
  • the method 400 also includes temporarily storing the gas produced from the first zone and the second zone in the zone in the second subsurface formation.
  • the zone in the second subsurface formation may be an existing aquifer.
  • the zone in the second subsurface formation may be a salt cavern or a substantially depleted hydrocarbon reservoir that is available to the operator of the field.
  • the zone in the second subsurface formation may be a coalbed formation which may or may not have been partially dewatered.
  • methane gas produced from the first and second zones is injected into the zone in the second subsurface formation through the one or more gas injection wells.
  • the method also includes completing one or more wells in a third zone. This is shown at Box 435 of Figure 4A.
  • the third zone is in the gas-producing formation of the field.
  • the wells include production wells for producing formation fluids, that is, water and gaseous hydrocarbons.
  • the method 400 then further includes co-producing the water and methane gas from the third zone. This is seen at Box 440.
  • formation fluids are co-produced from the one or more wells in each of the first and second zones along with the one or more wells from the third zone.
  • the produced fluids from the first and second zones will contain water. However, because these wells have been at least partially dewatered, they will also contain a higher percentage of methane gas than the third zone.
  • the first and second zones have been dewatered by at least 50 percent or, more preferably, by at least 80 percent, before they are placed in line for co-production with the third zone.
  • the first and second zones have been dewatered sufficiently that the weekly average water production rate has fallen by at least 20 percent, or by at least 50 percent from the peak rate.
  • a high volume of gas is now available for distribution to a gas processing facility.
  • the method 400 also includes constructing a gas processing facility. This is shown at Box 445 of Figure 4A.
  • the gas processing facility is not completed before the export of methane gas from the zones commences; instead, completion of the gas processing facility is delayed.
  • substantially final construction of the gas processing facility does not take place until the gas production rate from the field is able to exceed a designated level.
  • the designated level might be 50 percent or, more preferably, 80 percent, or even 100 percent of the anticipated maximum weekly production rate from the field.
  • construction of the gas processing facility may not be finalized until at least two zones of the gas-producing formation have been dewatered to a designated level.
  • the designated level may be, for example, a reduction in average weekly water production rate of 25 percent, or 50 percent, or more preferably, 75 percent, from initial water production rate for the combined first and second zones.
  • the above methods 200, 400 involve calculating production rate averages. Average production rates, such as daily, weekly, or monthly averages may be used. In making such calculations, shut-in times for field or facility maintenance or upsets may be excluded from the averages.
  • the gas processing facility may include an export facility.
  • the method 400 also includes optionally co-producing water and methane gas from the zone in the second subsurface formation. This is shown in Box 450 in Figure 4B. Because of previous injections, these formation fluids will contain at least some methane gas, depending on how long the previous injection took place.
  • the water produced from the first, second, and third zones, and optionally from the zone in the second subsurface formation, will need to be managed. Accordingly, the method 400 next includes disposing of the water produced from these zones. This is provided at Box 455. Disposal may again mean injecting the water through injection wells into a subterranean storage zone. Alternatively, disposal may mean transporting the water to a tank or other place of temporary storage. Alternatively still, disposal may mean delivering the water for agricultural purposes, or releasing the water into the local water shed.
  • the method 400 includes processing the gas produced from these zones. This is provided at Box 455. Processing is conducted in the newly completed gas processing facility.
  • Figures 5A through 5C provide illustrative cross-sectional views of a field 500 under hydrocarbon gas development in accordance with the methods herein, in an alternate embodiment. These figures depict three of the stages for implementing the method 400, described above.
  • the field 500 contains a surface 502, and a subsurface 504. Further, the field 500 contains a low-permeability gas-producing formation 550.
  • the gas-producing formation 550 may be a shale gas formation. Alternatively, the gas-producing formation 550 may be a so-called tight gas formation. Preferably, however, the formation 550 is a coal- bearing formation. In this instance, the gas produced from the formation 550 is coal bed methane.
  • the field 500 also contains a zone in a second subsurface formation 540.
  • the zone in the second subsurface formation 540 serves as a place of temporary storage for produced gas from the gas-producing formation 550.
  • the zone in the second subsurface formation 540 may or may not have a classic geological trap structure. Although injecting into a trap structure is preferred, such structures may not be available. If the geostructure of the zone in the second subsurface formation 540 is relatively flat, the injected gas may slowly migrate laterally. However since the gas may be reproduced in a relatively short amount of time, such as one to three years, a significant amount of the gas may be recaptured as described below in connection with Figure 5C.
  • the gas-producing formation 550 has been sectioned to provide a first zone 510 and a second zone 520.
  • Production wells 512 and 522 have been completed in the gas-producing formation 550 for the two respective zones 510, 520.
  • Formation fluids are being produced from the first zone 510 and the second zone 520 through the gas-producing formation 550.
  • each zone 510, 520 may, and preferably does, have more than one production well completed therein. Further, there may be only one zone or more than two zones completed in the gas-bearing formation 550 during early production.
  • the field 500 also contains a water disposal location 560.
  • the water disposal location 560 may be an existing aquifer, such as aquifer 360 shown in Figure 3A.
  • the water disposal location 560 may be a substantially depleted hydrocarbon reservoir that is available to the operator of the field 500.
  • the water disposal location 560 may be a coalbed zone which has been previously dewatered.
  • the water disposal location 560 may be an extension of the gas- producing formation 550.
  • the water disposal location 560 is shown schematically in each of Figures 5 A, 5B, and 5C.
  • FIG. 5A formation fluids are being produced from the first 510 and second 520 zones of the gas-producing formation 550.
  • the formation fluids are being transported by the production wells 512, 522 through the subsurface 504 and up to the surface 502.
  • the formation fluids are transported through production lines to a separator 505.
  • FIG. 5A separate lines are shown for the production wells 512, 522, with production line 514 transporting fluids produced through production well 512, and production line 524 transporting fluids produced through production well 522. Fluids from the two transport lines 514, 524 merge into line 516 before entering the separator 505.
  • the separator 505 separates the formation fluids into liquids and gases.
  • the separator 505 may be a gravity separator, a centrifugal separator, a flash vessel, or other separation unit for separating liquids from gases.
  • the liquids comprise primarily water, while the gases comprise primarily methane. Because methane boils at such a low temperature, it is preferred that the separator 505 be a low-temperature flash vessel.
  • the formation fluids may be taken through a cooling unit (not shown) before entry into the separator 505.
  • the separator 505 may operate, for example, at 10° C and 50 psig to minimize water vapor.
  • a water transport line 565 is provided in the field 500. The water transport line 565 transports water from the separator 505 to the water disposal location 560.
  • a gas transport line 515 is also provided.
  • the gas transport line 515 transports methane and other gases to a return line 546. From there, the gases enter a transport line 544 associated with injection well 542.
  • the injection well 542 is completed in the zone in the second subsurface formation 540.
  • the methane and other gases are then injected into the second subsurface zone 540 for temporary storage.
  • FIG. 5A through 5C only one well 542 is shown as a gas injection well. However, it is likely that two or more injection wells will be completed for gas injection. One or more stages of gas compression may be utilized to obtain injection pressures resulting in sufficient and desired injection rates through the gas injection well 542.
  • the zone in the second subsurface formation 540 is below the gas-producing formation 550.
  • a deeper zone is preferred for temporary storage so not to interfere with drilling into the target gas producing zones.
  • the zone in the second subsurface formation 540 may be any subsurface stratum having an acceptable porosity and permeability for receiving and holding water.
  • Such a formation may be a sandstone anticline, a deeper coalbed, an aquifer, or other such formation.
  • the produced fluids comprise predominantly water. Therefore, little gas is stored in the zone in the second subsurface formation 540. As dewatering takes place in the first 510 and second 520 zones, the gas content of the formation fluids will increase.
  • Injection of production fluids from the first 510 and second 520 zones of the gas- producing formation 550 into the zone in the second subsurface formation 540 provides temporary storage of gas.
  • the gas will be re-produced to the surface 502 in a later stage of field development.
  • temporary storage in the zone in the second subsurface formation 540 allows the developer of the field 500 to delay the construction of an expensive, full-capacity gas processing facility.
  • Figure 5B presents a second view of the field 500. This represents a next stage in development of the field 500.
  • the gas-producing formation 550 has been sectioned into a third zone 530.
  • Production wells 532 have been completed in the third zone 530. Formation fluids are now being produced from the third zone 530 and to the surface 502.
  • the formation fluids are transported through production lines 534 at the surface 502. From there, the production fluids from the third zone 530 are taken to the separator 505. En route, the production fluids from the third zone 530 may be merged with production fluids in lines 514 and 524 from the first 510 and second 520 zones, which continue to be produced. The merged production fluids travel together through line 516.
  • the production fluids from the three zones 510, 520, 530 are separated in the separator 505 into water and gases.
  • the water exits the separator 505 and is transported through the water transport line 565.
  • the water is then carried to the water disposal location 560, which may be away from the field 500.
  • Gas line 515 is preferably an overhead flash line.
  • the gases are then transported through gas transport line 572 into a newly completed gas processing facility 570.
  • the one or more injection wells 542 are shut in.
  • the gas processing facility 570 is not completed before the export of methane gas from the field 500 commences; instead, completion of the gas processing facility 570 is delayed.
  • substantially final construction of the gas processing facility does not take place until the gas production rate from the field 500 is able to exceed a designated level.
  • the designated level might be 50 percent or, more preferably, 75 percent, or even 100 percent of the anticipated maximum weekly production rate from the field 500.
  • the designated level may be, for example, 100,000,000 scf/week, or 250,000,000 scf/week.
  • construction of the gas processing facility 570 may not be finalized until at least two zones of the gas-producing formation 550 have been dewatered to a designated level.
  • the designated level may be, for example, a reduction in average weekly water production rate from the combined first and second zones of 50 percent, or 75 percent.
  • construction of the gas processing facility 570 may not be finalized until at least three zones of the gas-producing formation 550 have been substantially dewatered.
  • the gas processing facility 570 is now completed, it is ready to receive gas production from the gas-producing field 500.
  • gases from the first 510, second 520 and third 530 zones are being transported through a gas transport line 572 to the gas processing facility 570.
  • Processed gas is then exported from the field 500 through export line 574.
  • the processed gas may ultimately be exported via pipeline or liquefied natural gas (LNG) ships.
  • LNG liquefied natural gas
  • Figure 5C presents a third view of the field 500. This represents yet a next stage in development of the field 500.
  • the well 542 completed in the zone in the second subsurface formation 540 has been converted from an injection well to a production well. Formation fluids are now being produced from the zone in the second subsurface formation 540, through the subsurface 504, and to the surface 502. At the same time, formation fluids continue to be produced from the gas-producing formation 540 through production wells 512, 522, 532.
  • the formation fluids from the zone in the second subsurface formation 540 enter the fluid line 544 at the surface 502.
  • the formation fluids are then transported to the separator 505 through transport line 548.
  • the formation fluids from the zone in the second subsurface formation 540 may be merged with formation fluids being transported through lines 514, 524, and 534.
  • the merged fluids then travel to the separator 505 through production line 516.
  • the separator 505 the formation fluids from the various zones 510, 520, 530, 540 are separated just as they were in the stage shown in Figure 5B. Separated water from the zones 510, 520, 530, 540 is transported through the water transport line 565 to the water disposal location, shown schematically at 560. At the same time, gases are released from the separator 505 into the gas transport line 515. The gases are routed through the gas line 572 to the gas processing facility 570. Because gas is being produced from three or even four zones simultaneously, the gas processing facility 570 is able to operate immediately at high or even substantially full capacity.
  • the gas processing facility 570 is being shown in Figures 5B and 5C schematically. It is understood that the gas processing facility will be equipped with various valves, compressors, flow lines, and separator vessels for substantially removing any water vapor and acid gases from the gas introduced from line 572.
  • the gas processing facility 570 may include a cryogenic distillation tower that substantially "freezes" out carbon dioxide and hydrogen sulfide.
  • the gas processing facility 570 may include a contactor that utilizes a physical solvent or a chemical solvent to remove acid gases through counter-current or co-current contacting, along with a regenerator vessel.
  • the gas processing facility may further include a Klaus sulfur recovery unit, a tail gas treating unit, and a combustion furnace.
  • the gas processing facility may further have a refrigeration system for chilling the processed methane into liquefied natural gas (LNG).
  • LNG liquefied natural gas
  • inventions for managing the production of formation fluids from a low-permeability subsurface formation are provided herein.
  • the subsurface formation is in a field wherein natural gas is to be produced.
  • the methods have utility during initial field development. More specifically, the methods may be used during an initial production phase when dewatering of the subsurface formation takes place.
  • the methods allow the developer of a field to use capital for the field more efficiently by delaying or spreading out the erection of main gas processing equipment until the field is ready for substantial gas production and sale. Stated another way, completion of the gas processing facility more or less coincides with a gas field being able to provide gas at near the facilities' rated capacities.
  • the methods herein may also reduce flaring needs.
  • the methods herein permit gas handling early in the development of coalbed methane fields while not requiring excessive facility construction and capital outlay to deal with the modest amounts of gas produced during initial dewatering stages.
  • the subsurface formation is a coalbed methane field.
  • the field is divided into two or more coalbed zones.
  • more than one coalbed zone is simultaneously dewatered to a designated level.
  • the co-produced gas from the produced zones is sent to a single, previously dewatered coalbed zone for temporary storage.
  • Injecting gas into a dewatered coalbed zone to repressurize or even increase the pressure above an initial pressure may cause adsorption and storage of significant amounts of gas.
  • This gas may be stored for perhaps about 1 to about 5 years until gas processing and export facilities are available.
  • the increased pressure in the dewatered zone may help keep water from flowing back into this zone.
  • wells used for dewatering a coalbed zone are also used for injecting gas for storage in the zone.
  • gas produced from a coalbed zone may be temporarily stored in two or more types of subterranean formations.
  • the produced gas may be injected into and temporarily stored in a salt cavern, an aquifer zone, or a depleted hydrocarbon reservoir, in addition to storage in an earlier dewatered coalbed zone.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Gas Separation By Absorption (AREA)

Abstract

L'invention porte sur des procédés pour gérer la production de fluides venant d'une formation sous la surface à faible perméabilité dans un champ, lesquels procédés peuvent comprendre la production de fluides à partir d'une formation de filon de houille. Le procédé met en œuvre la production de fluides de formation à partir d'une première zone dans la formation sous la surface pendant une certaine période de temps de façon à déshumidifier au moins partiellement la première zone. Les fluides de formation sont séparés en un courant de liquide qui comprend principalement de l'eau, et un courant de gaz qui comprend principalement du gaz méthane. L'eau est envoyée pour la mise au rebut, par exemple dans une formation sous la surface, tandis que le gaz est temporairement stocké ou brûlé à la torche. Une installation de traitement de gaz est construite pour le champ. La construction de l'installation de traitement de gaz est étalée ou retardée jusqu'à ce que le champ soit prêt à produire suffisamment de gaz pour permettre à l'installation de traitement de gaz de fonctionner à une capacité sensiblement supérieure à celle qui serait réalisée au commencement du développement du champ.
PCT/US2010/058749 2010-01-29 2010-12-02 Stockage temporaire dans un champ de gaz pour optimiser le développement d'un champ WO2011093945A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AU2010344186A AU2010344186B2 (en) 2010-01-29 2010-12-02 Temporary field storage of gas to optimize field development
US13/520,987 US20130098608A1 (en) 2010-01-29 2010-12-02 Temporary field storage of gas to optimize field development
CA2787014A CA2787014A1 (fr) 2010-01-29 2010-12-02 Stockage temporaire dans un champ de gaz pour optimiser le developpement d'un champ

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US29969210P 2010-01-29 2010-01-29
US61/299,692 2010-01-29

Publications (1)

Publication Number Publication Date
WO2011093945A1 true WO2011093945A1 (fr) 2011-08-04

Family

ID=44319658

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2010/058749 WO2011093945A1 (fr) 2010-01-29 2010-12-02 Stockage temporaire dans un champ de gaz pour optimiser le développement d'un champ

Country Status (4)

Country Link
US (1) US20130098608A1 (fr)
AU (1) AU2010344186B2 (fr)
CA (1) CA2787014A1 (fr)
WO (1) WO2011093945A1 (fr)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8880384B2 (en) 2010-05-07 2014-11-04 Exxonmobil Upstream Research Company Artifact reduction in iterative inversion of geophysical data
US9081115B2 (en) 2011-03-30 2015-07-14 Exxonmobil Upstream Research Company Convergence rate of full wavefield inversion using spectral shaping
US9140812B2 (en) 2011-09-02 2015-09-22 Exxonmobil Upstream Research Company Using projection onto convex sets to constrain full-wavefield inversion
US9176930B2 (en) 2011-11-29 2015-11-03 Exxonmobil Upstream Research Company Methods for approximating hessian times vector operation in full wavefield inversion
EP2807338A4 (fr) * 2012-01-03 2016-03-09 Exxonmobil Upstream Res Co Procédé pour la production d'hydrocarbures en utilisant des cavernes
US9702998B2 (en) 2013-07-08 2017-07-11 Exxonmobil Upstream Research Company Full-wavefield inversion of primaries and multiples in marine environment
US9702993B2 (en) 2013-05-24 2017-07-11 Exxonmobil Upstream Research Company Multi-parameter inversion through offset dependent elastic FWI
US9772413B2 (en) 2013-08-23 2017-09-26 Exxonmobil Upstream Research Company Simultaneous sourcing during both seismic acquisition and seismic inversion
US9910189B2 (en) 2014-04-09 2018-03-06 Exxonmobil Upstream Research Company Method for fast line search in frequency domain FWI
US9977142B2 (en) 2014-05-09 2018-05-22 Exxonmobil Upstream Research Company Efficient line search methods for multi-parameter full wavefield inversion
US9977141B2 (en) 2014-10-20 2018-05-22 Exxonmobil Upstream Research Company Velocity tomography using property scans
US10012745B2 (en) 2012-03-08 2018-07-03 Exxonmobil Upstream Research Company Orthogonal source and receiver encoding
US10036818B2 (en) 2013-09-06 2018-07-31 Exxonmobil Upstream Research Company Accelerating full wavefield inversion with nonstationary point-spread functions
US10185046B2 (en) 2014-06-09 2019-01-22 Exxonmobil Upstream Research Company Method for temporal dispersion correction for seismic simulation, RTM and FWI
US10310113B2 (en) 2015-10-02 2019-06-04 Exxonmobil Upstream Research Company Q-compensated full wavefield inversion
US10317548B2 (en) 2012-11-28 2019-06-11 Exxonmobil Upstream Research Company Reflection seismic data Q tomography
US10317546B2 (en) 2015-02-13 2019-06-11 Exxonmobil Upstream Research Company Efficient and stable absorbing boundary condition in finite-difference calculations
US10386511B2 (en) 2014-10-03 2019-08-20 Exxonmobil Upstream Research Company Seismic survey design using full wavefield inversion
US10416327B2 (en) 2015-06-04 2019-09-17 Exxonmobil Upstream Research Company Method for generating multiple free seismic images
US10422899B2 (en) 2014-07-30 2019-09-24 Exxonmobil Upstream Research Company Harmonic encoding for FWI
US10459117B2 (en) 2013-06-03 2019-10-29 Exxonmobil Upstream Research Company Extended subspace method for cross-talk mitigation in multi-parameter inversion
US10520618B2 (en) 2015-02-04 2019-12-31 ExxohnMobil Upstream Research Company Poynting vector minimal reflection boundary conditions
US10520619B2 (en) 2015-10-15 2019-12-31 Exxonmobil Upstream Research Company FWI model domain angle stacks with amplitude preservation
US10670750B2 (en) 2015-02-17 2020-06-02 Exxonmobil Upstream Research Company Multistage full wavefield inversion process that generates a multiple free data set
US10768324B2 (en) 2016-05-19 2020-09-08 Exxonmobil Upstream Research Company Method to predict pore pressure and seal integrity using full wavefield inversion
US10838093B2 (en) 2015-07-02 2020-11-17 Exxonmobil Upstream Research Company Krylov-space-based quasi-newton preconditioner for full-wavefield inversion
US10838092B2 (en) 2014-07-24 2020-11-17 Exxonmobil Upstream Research Company Estimating multiple subsurface parameters by cascaded inversion of wavefield components
US11163092B2 (en) 2014-12-18 2021-11-02 Exxonmobil Upstream Research Company Scalable scheduling of parallel iterative seismic jobs

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3567211A1 (fr) * 2018-05-10 2019-11-13 BP Exploration Operating Company Limited Outil d'équilibrage d'eau produite
US10787872B1 (en) 2019-10-11 2020-09-29 Halliburton Energy Services, Inc. Graphene oxide coated membranes to increase the density of water base fluids
US10919781B1 (en) * 2019-10-11 2021-02-16 Halliburton Energy Services, Inc. Coated porous substrates for fracking water treatment
CA3126480A1 (fr) * 2020-07-31 2022-01-31 Trindade Reservoir Services Inc. Systeme et procede de production d'energie propre a partir de reservoirs d'hydrocarbures
US11746961B2 (en) * 2021-05-20 2023-09-05 Saudi Arabian Oil Company Simultaneous injection-reproduction in underground gas storage

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6681855B2 (en) * 2001-10-19 2004-01-27 Cdx Gas, L.L.C. Method and system for management of by-products from subterranean zones
US7100687B2 (en) * 2003-11-17 2006-09-05 Cdx Gas, Llc Multi-purpose well bores and method for accessing a subterranean zone from the surface
US7152675B2 (en) * 2003-11-26 2006-12-26 The Curators Of The University Of Missouri Subterranean hydrogen storage process
US7222670B2 (en) * 2004-02-27 2007-05-29 Cdx Gas, Llc System and method for multiple wells from a common surface location
US7287585B2 (en) * 2003-02-28 2007-10-30 Yates Petroleum Corporation Methods of quantifying gas content of a gas-sorbed formation solid

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2922281A (en) * 1954-07-15 1960-01-26 Sun Oil Co Underground storage of hydrocarbons
GB1145913A (en) * 1965-07-02 1969-03-19 Acieries Et Minieres De La Sam Improvements in underground gas storage
US5402847A (en) * 1994-07-22 1995-04-04 Conoco Inc. Coal bed methane recovery
AU2007227262B2 (en) * 2006-03-21 2012-08-23 Compressed Energy Systems, Llc Method and apparatus for recovering and transporting methane gas
US8256992B2 (en) * 2008-02-29 2012-09-04 Seqenergy, Llc Underground sequestration system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6681855B2 (en) * 2001-10-19 2004-01-27 Cdx Gas, L.L.C. Method and system for management of by-products from subterranean zones
US7287585B2 (en) * 2003-02-28 2007-10-30 Yates Petroleum Corporation Methods of quantifying gas content of a gas-sorbed formation solid
US7100687B2 (en) * 2003-11-17 2006-09-05 Cdx Gas, Llc Multi-purpose well bores and method for accessing a subterranean zone from the surface
US7152675B2 (en) * 2003-11-26 2006-12-26 The Curators Of The University Of Missouri Subterranean hydrogen storage process
US7222670B2 (en) * 2004-02-27 2007-05-29 Cdx Gas, Llc System and method for multiple wells from a common surface location

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10002211B2 (en) 2010-05-07 2018-06-19 Exxonmobil Upstream Research Company Artifact reduction in iterative inversion of geophysical data
US8880384B2 (en) 2010-05-07 2014-11-04 Exxonmobil Upstream Research Company Artifact reduction in iterative inversion of geophysical data
US9081115B2 (en) 2011-03-30 2015-07-14 Exxonmobil Upstream Research Company Convergence rate of full wavefield inversion using spectral shaping
US9140812B2 (en) 2011-09-02 2015-09-22 Exxonmobil Upstream Research Company Using projection onto convex sets to constrain full-wavefield inversion
US9176930B2 (en) 2011-11-29 2015-11-03 Exxonmobil Upstream Research Company Methods for approximating hessian times vector operation in full wavefield inversion
EP2807338A4 (fr) * 2012-01-03 2016-03-09 Exxonmobil Upstream Res Co Procédé pour la production d'hydrocarbures en utilisant des cavernes
US9322253B2 (en) 2012-01-03 2016-04-26 Exxonmobil Upstream Research Company Method for production of hydrocarbons using caverns
US10012745B2 (en) 2012-03-08 2018-07-03 Exxonmobil Upstream Research Company Orthogonal source and receiver encoding
US10317548B2 (en) 2012-11-28 2019-06-11 Exxonmobil Upstream Research Company Reflection seismic data Q tomography
US9702993B2 (en) 2013-05-24 2017-07-11 Exxonmobil Upstream Research Company Multi-parameter inversion through offset dependent elastic FWI
US10459117B2 (en) 2013-06-03 2019-10-29 Exxonmobil Upstream Research Company Extended subspace method for cross-talk mitigation in multi-parameter inversion
US9702998B2 (en) 2013-07-08 2017-07-11 Exxonmobil Upstream Research Company Full-wavefield inversion of primaries and multiples in marine environment
US9772413B2 (en) 2013-08-23 2017-09-26 Exxonmobil Upstream Research Company Simultaneous sourcing during both seismic acquisition and seismic inversion
US10036818B2 (en) 2013-09-06 2018-07-31 Exxonmobil Upstream Research Company Accelerating full wavefield inversion with nonstationary point-spread functions
US9910189B2 (en) 2014-04-09 2018-03-06 Exxonmobil Upstream Research Company Method for fast line search in frequency domain FWI
US9977142B2 (en) 2014-05-09 2018-05-22 Exxonmobil Upstream Research Company Efficient line search methods for multi-parameter full wavefield inversion
US10185046B2 (en) 2014-06-09 2019-01-22 Exxonmobil Upstream Research Company Method for temporal dispersion correction for seismic simulation, RTM and FWI
US10838092B2 (en) 2014-07-24 2020-11-17 Exxonmobil Upstream Research Company Estimating multiple subsurface parameters by cascaded inversion of wavefield components
US10422899B2 (en) 2014-07-30 2019-09-24 Exxonmobil Upstream Research Company Harmonic encoding for FWI
US10386511B2 (en) 2014-10-03 2019-08-20 Exxonmobil Upstream Research Company Seismic survey design using full wavefield inversion
US9977141B2 (en) 2014-10-20 2018-05-22 Exxonmobil Upstream Research Company Velocity tomography using property scans
US11163092B2 (en) 2014-12-18 2021-11-02 Exxonmobil Upstream Research Company Scalable scheduling of parallel iterative seismic jobs
US10520618B2 (en) 2015-02-04 2019-12-31 ExxohnMobil Upstream Research Company Poynting vector minimal reflection boundary conditions
US10317546B2 (en) 2015-02-13 2019-06-11 Exxonmobil Upstream Research Company Efficient and stable absorbing boundary condition in finite-difference calculations
US10670750B2 (en) 2015-02-17 2020-06-02 Exxonmobil Upstream Research Company Multistage full wavefield inversion process that generates a multiple free data set
US10416327B2 (en) 2015-06-04 2019-09-17 Exxonmobil Upstream Research Company Method for generating multiple free seismic images
US10838093B2 (en) 2015-07-02 2020-11-17 Exxonmobil Upstream Research Company Krylov-space-based quasi-newton preconditioner for full-wavefield inversion
US10310113B2 (en) 2015-10-02 2019-06-04 Exxonmobil Upstream Research Company Q-compensated full wavefield inversion
US10520619B2 (en) 2015-10-15 2019-12-31 Exxonmobil Upstream Research Company FWI model domain angle stacks with amplitude preservation
US10768324B2 (en) 2016-05-19 2020-09-08 Exxonmobil Upstream Research Company Method to predict pore pressure and seal integrity using full wavefield inversion

Also Published As

Publication number Publication date
AU2010344186A1 (en) 2012-08-16
CA2787014A1 (fr) 2011-08-04
US20130098608A1 (en) 2013-04-25
AU2010344186B2 (en) 2016-04-14

Similar Documents

Publication Publication Date Title
AU2010344186B2 (en) Temporary field storage of gas to optimize field development
US8622129B2 (en) Method of injecting carbon dioxide
RU2502862C2 (ru) Способ совместной добычи и переработки углеводородов из коллекторов гидратов природного газа и обычных коллекторов углеводородов (варианты) и система для его осуществления
AU2011305697B2 (en) Method of using carbon dioxide in recovery of formation deposits
WO2011002556A1 (fr) Système et procédé de production de méthane houiller
Mohammadian et al. CO2-EOR/Sequestration: Current
US20080031792A1 (en) Process For The Reduction/Removal Of The Concentration Of Hydrogen Sulfide Contained In Natural Gas
US20140318773A1 (en) Methane enhanced liquid products recovery from wet natural gas
US8124824B2 (en) System and method for using super critical state carbon dioxide (CO2) as a hydrocarbon diluent
KR20250029867A (ko) 천연 수소 저장조 저장 용량 또는 적합한 지표 밑 저장조들과 다른 수소 소스들 및 싱크들의 통합
Anikin et al. Gas Enhanced Oil Recovery Methods For Offshore Oilfields: Features, Implementation, Operational Status
Mathur et al. Techno-economic analysis of natural and stimulated geological hydrogen
Amott et al. Coal Bed Methane-Unconventional Gas Becomes an Optimised Solution
Mearkeltor Natural Gas Sweetening Process Design.
CA2758529A1 (fr) Systeme et procede pour utiliser du dioxyde de carbone a l'etat supercritique (co2) pour la recuperation et le transport d'hydrocarbures
KR20160024485A (ko) 개선된 탄층 가스 생산 방법
WO2010120876A1 (fr) Système et procédé pour utiliser du dioxyde de carbone à l'état supercritique (co2) pour la récupération et le transport d'hydrocarbures

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10844928

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 13520987

Country of ref document: US

ENP Entry into the national phase

Ref document number: 2787014

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2010344186

Country of ref document: AU

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2010344186

Country of ref document: AU

Date of ref document: 20101202

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 10844928

Country of ref document: EP

Kind code of ref document: A1

点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载