WO2003038189A1 - Procede de fabrication d'une poutre porteuse d'un chemin de fer a sustentation magnetique - Google Patents
Procede de fabrication d'une poutre porteuse d'un chemin de fer a sustentation magnetique Download PDFInfo
- Publication number
- WO2003038189A1 WO2003038189A1 PCT/CN2002/000462 CN0200462W WO03038189A1 WO 2003038189 A1 WO2003038189 A1 WO 2003038189A1 CN 0200462 W CN0200462 W CN 0200462W WO 03038189 A1 WO03038189 A1 WO 03038189A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- span
- beams
- continuous
- manufacturing
- simply supported
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 11
- 239000000725 suspension Substances 0.000 title abstract 2
- 238000000034 method Methods 0.000 claims abstract description 12
- 238000005339 levitation Methods 0.000 claims description 7
- 238000009434 installation Methods 0.000 claims description 5
- 238000005452 bending Methods 0.000 claims description 4
- 238000006243 chemical reaction Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000009417 prefabrication Methods 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000011437 continuous method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000013332 literature search Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
- E01B25/30—Tracks for magnetic suspension or levitation vehicles
- E01B25/305—Rails or supporting constructions
Definitions
- the present invention relates to a method for manufacturing a track beam, in particular to a method for manufacturing a track beam for a magnetic levitation and railroad railway, and belongs to the field of rails in the field of transportation.
- the system Since modern high-speed rail transportation systems such as magnetic levitation trains run at high speeds, the system has exceptionally high accuracy requirements for the line structure. It is required that the deformation and deflection of the line be controlled within a small range under the action of temperature differences and moving loads. The deflection or overarching of the beam caused by temperature difference or moving load is not a problem in traditional bridges. For modern high-speed traffic rail vehicles, especially in magnetic levitation tracks, these temperature difference or moving load The small deformation caused will affect the high-speed operation of the train. Under the action of temperature difference, the support reaction force of the middle pier of the continuous track beam, whether vertical or horizontal, is generally much greater than that of the simply supported beam.
- the method is self-explanatory: In high-speed traffic, especially in high-speed traffic on magnetic levitation tracks, the running track of a rail vehicle is distributed on a reinforced concrete multi-span beam.
- the multi-span beam is designed with a support and is supported on a support pier, which supports either end of a span.
- the beams referred to here, especially the empty box beams, have a bridge-shaped structure on the side.
- the beams are provided with anchors, which run vertically and are curved, similar to a sine curve.
- the highest point of the element is within the range of the support, and its lowest point is basically in the middle of each span of the beam, so each span of the beam has a certain curvature to compensate its own weight.
- the present invention contemplates a new manufacturing method that reduces manufacturing and construction costs and has a more reasonable structural force.
- This method is suitable for the traveling track of a rail vehicle, and is particularly suitable for a maglev railway.
- Tracks, track beams can be reinforced concrete structures or steel structures, which are connected by several single-span or multi-span beams.
- the connection method is: prefabricated, simply transported, installed, positioned according to simply supported beams, and then connected.
- the connected continuous points are close to continuous two-span or multi-span continuous beams in the direction of the vertical plane, but are still close to hinged two-span or multi-span simply supported beams in the horizontal plane.
- Each section of the track beam between each support pier is prefabricated, processed, transported, installed, accurately positioned in the form of a simply supported beam, and then every two or more spans In the vertical plane, that is, the bending rigidity is connected as much as possible around the horizontal axis, close to the structural form of the continuous beam, and in the horizontal direction, that is, about the vertical axis, the bending stiffness is designed to be as small as possible, close to the hinged two.
- Span or multispan simply supported beam is designed to be as small as possible, close to the hinged two.
- the continuous beam has superior structural performance compared with two simply supported beams of equal section in terms of controlling deformation caused by temperature difference or live load, but due to the continuous beam structure of the track beam Generally, it is constructed by prefabrication and erection. Due to its huge size and weight, and because the multi-span continuous beam belongs to an external statically indeterminate structure with multi-point support, it must always maintain the state of multi-point support during transportation and lifting. In addition, the relative displacement of any fulcrum must be controlled within a small range to ensure the safety of the track beam itself. Otherwise, the entire beam will be easily damaged during the construction process.
- the invention has substantial characteristics and significant progress, solves the disadvantages of large volume and awkwardness of continuous beams in prefabrication, processing, transportation and installation, and has a low foundation cost.
- the implementation of the present invention has a level of creativity that overcomes problems that the background technology cannot solve for a long time, and has strong practical value.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Railway Tracks (AREA)
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN01132090.7 | 2001-11-01 | ||
CN01132090A CN1127593C (zh) | 2001-11-01 | 2001-11-01 | 磁悬浮、有轨铁路的轨道梁的制造方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2003038189A1 true WO2003038189A1 (fr) | 2003-05-08 |
Family
ID=4671135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2002/000462 WO2003038189A1 (fr) | 2001-11-01 | 2002-07-01 | Procede de fabrication d'une poutre porteuse d'un chemin de fer a sustentation magnetique |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN1127593C (zh) |
HK (1) | HK1045342B (zh) |
WO (1) | WO2003038189A1 (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10253136A1 (de) * | 2002-11-14 | 2004-05-27 | Cbp Guideway Systems Gmbh | Funktionsebenenträger |
CN100465376C (zh) * | 2005-06-29 | 2009-03-04 | 上海磁浮交通工程技术研究中心 | 高速磁浮叠合式轨道梁连接机构、轨道梁及其制造方法 |
CN1317454C (zh) * | 2005-06-29 | 2007-05-23 | 上海磁浮交通工程技术研究中心 | 磁浮交通叠合式轨道梁及其制造方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1272437A (zh) * | 2000-06-02 | 2000-11-08 | 宋铁理 | 单轨道梁的安装方法及其运梁车和架桥机 |
CN1313919A (zh) * | 1999-08-09 | 2001-09-19 | 马克斯博革建筑有限公司 | 多跨支承梁体 |
-
2001
- 2001-11-01 CN CN01132090A patent/CN1127593C/zh not_active Expired - Lifetime
-
2002
- 2002-07-01 WO PCT/CN2002/000462 patent/WO2003038189A1/zh not_active Application Discontinuation
- 2002-08-10 HK HK02105855.1A patent/HK1045342B/zh not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1313919A (zh) * | 1999-08-09 | 2001-09-19 | 马克斯博革建筑有限公司 | 多跨支承梁体 |
CN1272437A (zh) * | 2000-06-02 | 2000-11-08 | 宋铁理 | 单轨道梁的安装方法及其运梁车和架桥机 |
Also Published As
Publication number | Publication date |
---|---|
CN1343812A (zh) | 2002-04-10 |
HK1045342A1 (en) | 2002-11-22 |
HK1045342B (zh) | 2004-07-23 |
CN1127593C (zh) | 2003-11-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Qin et al. | Developments and prospects of long-span high-speed railway bridge technologies in China | |
Hu et al. | Recent development of design and construction of medium and long span high-speed railway bridges in China | |
US6571717B2 (en) | Y-shaped support structure for elevated rail-vehicle guideway | |
CN110029540B (zh) | 一种高速磁浮交通双线箱梁与轨道结构 | |
EP1424443B1 (en) | A track structure of the rapid track transit | |
CN110184894A (zh) | 公铁同层混合梁悬索斜拉协作桥 | |
US3930451A (en) | Roadway for high performance rapid transit railways | |
US6564516B1 (en) | Support structure for elevated railed-vehicle guideway | |
CN201102544Y (zh) | 吊挂轨道悬挂列车交通系统 | |
CN105568786B (zh) | 一种悬挂式单轨交通底板外伸组合箱型轨道梁悬挂体系 | |
Reis et al. | Composite truss bridges: new trends, design and research | |
CN109930469B (zh) | 一种适用于跨座式单轨的钢箱梁薄壁墩刚构斜拉桥 | |
CN108222051A (zh) | 一种铁路钢混结合梁的接触网立柱基础及钢混结合桥梁 | |
CN112900232B (zh) | 一种高速磁悬浮大跨度组合式钢桁架拱桥 | |
CN213571497U (zh) | 一种大跨度桁架式铁路便梁结构 | |
CN110004779A (zh) | 一种含有π型轨道的梁轨一体化中低速磁浮轨道梁 | |
CN109457558A (zh) | 一种梁-轨一体化中低速磁浮轨道梁 | |
WO2003038189A1 (fr) | Procede de fabrication d'une poutre porteuse d'un chemin de fer a sustentation magnetique | |
CN108342980B (zh) | 一种铁路悬索桥上承式钢桁梁桥面结构 | |
CN110029538B (zh) | 一种含纵横梁式轨排的高速磁浮轨道与桥梁梁部结构 | |
CN111893816B (zh) | 一种胶轮电车导轨、轨道及道路 | |
CN112030712B (zh) | 一种适用于胶轮有轨电车与市政通道共建的斜拉桥 | |
CN212505808U (zh) | 一种适用于胶轮有轨电车与市政通道共建的斜拉桥 | |
CN216378953U (zh) | 隧道内铺设的磁浮轨道梁系统 | |
CN214301032U (zh) | 一种磁悬浮桥梁结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG US UZ VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LU MC NL PT SE SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
122 | Ep: pct application non-entry in european phase | ||
NENP | Non-entry into the national phase |
Ref country code: JP |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |