WO2001026005A1 - Procede de determination du cout total de la propriete - Google Patents
Procede de determination du cout total de la propriete Download PDFInfo
- Publication number
- WO2001026005A1 WO2001026005A1 PCT/US2000/027518 US0027518W WO0126005A1 WO 2001026005 A1 WO2001026005 A1 WO 2001026005A1 US 0027518 W US0027518 W US 0027518W WO 0126005 A1 WO0126005 A1 WO 0126005A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- costs
- measure
- cost
- management
- metrics
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 37
- 238000005516 engineering process Methods 0.000 claims abstract description 31
- 238000007726 management method Methods 0.000 claims description 97
- 238000009434 installation Methods 0.000 claims description 16
- 230000006872 improvement Effects 0.000 claims description 13
- 238000013461 design Methods 0.000 claims description 9
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000003339 best practice Methods 0.000 claims description 5
- 238000012544 monitoring process Methods 0.000 claims description 5
- 238000004590 computer program Methods 0.000 claims description 2
- 238000013439 planning Methods 0.000 description 38
- 238000005259 measurement Methods 0.000 description 34
- 230000008520 organization Effects 0.000 description 25
- 230000008859 change Effects 0.000 description 19
- 230000000295 complement effect Effects 0.000 description 18
- 238000012549 training Methods 0.000 description 16
- 238000004458 analytical method Methods 0.000 description 9
- 230000006870 function Effects 0.000 description 9
- 238000012423 maintenance Methods 0.000 description 9
- 238000011161 development Methods 0.000 description 8
- 238000004891 communication Methods 0.000 description 7
- 230000007423 decrease Effects 0.000 description 6
- 238000011084 recovery Methods 0.000 description 6
- 230000004044 response Effects 0.000 description 6
- 238000003860 storage Methods 0.000 description 6
- 238000012360 testing method Methods 0.000 description 5
- 102100032912 CD44 antigen Human genes 0.000 description 4
- 101000868273 Homo sapiens CD44 antigen Proteins 0.000 description 4
- 101000917858 Homo sapiens Low affinity immunoglobulin gamma Fc region receptor III-A Proteins 0.000 description 4
- 101000917839 Homo sapiens Low affinity immunoglobulin gamma Fc region receptor III-B Proteins 0.000 description 4
- 102100029185 Low affinity immunoglobulin gamma Fc region receptor III-B Human genes 0.000 description 4
- 238000013508 migration Methods 0.000 description 4
- 230000005012 migration Effects 0.000 description 4
- 238000013024 troubleshooting Methods 0.000 description 4
- 102100029722 Ectonucleoside triphosphate diphosphohydrolase 1 Human genes 0.000 description 3
- 101001012447 Homo sapiens Ectonucleoside triphosphate diphosphohydrolase 1 Proteins 0.000 description 3
- 101001057504 Homo sapiens Interferon-stimulated gene 20 kDa protein Proteins 0.000 description 3
- 101001055144 Homo sapiens Interleukin-2 receptor subunit alpha Proteins 0.000 description 3
- 102100027268 Interferon-stimulated gene 20 kDa protein Human genes 0.000 description 3
- 101100245625 Nicotiana tabacum PSBP1 gene Proteins 0.000 description 3
- 101100245627 Nicotiana tabacum PSBP2 gene Proteins 0.000 description 3
- 102100024616 Platelet endothelial cell adhesion molecule Human genes 0.000 description 3
- 230000002776 aggregation Effects 0.000 description 3
- 238000004220 aggregation Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000011156 evaluation Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000008439 repair process Effects 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 238000012384 transportation and delivery Methods 0.000 description 3
- 101150013553 CD40 gene Proteins 0.000 description 2
- 102100030886 Complement receptor type 1 Human genes 0.000 description 2
- 102100025012 Dipeptidyl peptidase 4 Human genes 0.000 description 2
- 101000727061 Homo sapiens Complement receptor type 1 Proteins 0.000 description 2
- 101000908391 Homo sapiens Dipeptidyl peptidase 4 Proteins 0.000 description 2
- 102100040245 Tumor necrosis factor receptor superfamily member 5 Human genes 0.000 description 2
- 241000700605 Viruses Species 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 230000002596 correlated effect Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000009432 framing Methods 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 102100031585 ADP-ribosyl cyclase/cyclic ADP-ribose hydrolase 1 Human genes 0.000 description 1
- 102100038080 B-cell receptor CD22 Human genes 0.000 description 1
- 102100022005 B-lymphocyte antigen CD20 Human genes 0.000 description 1
- 102100027207 CD27 antigen Human genes 0.000 description 1
- 102000049320 CD36 Human genes 0.000 description 1
- 108010045374 CD36 Antigens Proteins 0.000 description 1
- 102100032768 Complement receptor type 2 Human genes 0.000 description 1
- 238000012357 Gap analysis Methods 0.000 description 1
- 102100031573 Hematopoietic progenitor cell antigen CD34 Human genes 0.000 description 1
- 101000777636 Homo sapiens ADP-ribosyl cyclase/cyclic ADP-ribose hydrolase 1 Proteins 0.000 description 1
- 101000884305 Homo sapiens B-cell receptor CD22 Proteins 0.000 description 1
- 101000897405 Homo sapiens B-lymphocyte antigen CD20 Proteins 0.000 description 1
- 101000914511 Homo sapiens CD27 antigen Proteins 0.000 description 1
- 101000941929 Homo sapiens Complement receptor type 2 Proteins 0.000 description 1
- 101000777663 Homo sapiens Hematopoietic progenitor cell antigen CD34 Proteins 0.000 description 1
- 101001078143 Homo sapiens Integrin alpha-IIb Proteins 0.000 description 1
- 101000935043 Homo sapiens Integrin beta-1 Proteins 0.000 description 1
- 101000777628 Homo sapiens Leukocyte antigen CD37 Proteins 0.000 description 1
- 101000608935 Homo sapiens Leukosialin Proteins 0.000 description 1
- 101000878605 Homo sapiens Low affinity immunoglobulin epsilon Fc receptor Proteins 0.000 description 1
- 101000917826 Homo sapiens Low affinity immunoglobulin gamma Fc region receptor II-a Proteins 0.000 description 1
- 101000917824 Homo sapiens Low affinity immunoglobulin gamma Fc region receptor II-b Proteins 0.000 description 1
- 101000934338 Homo sapiens Myeloid cell surface antigen CD33 Proteins 0.000 description 1
- 101000884271 Homo sapiens Signal transducer CD24 Proteins 0.000 description 1
- 101000914514 Homo sapiens T-cell-specific surface glycoprotein CD28 Proteins 0.000 description 1
- 101000851376 Homo sapiens Tumor necrosis factor receptor superfamily member 8 Proteins 0.000 description 1
- 102100025306 Integrin alpha-IIb Human genes 0.000 description 1
- 102100025304 Integrin beta-1 Human genes 0.000 description 1
- 102100031586 Leukocyte antigen CD37 Human genes 0.000 description 1
- 102100039564 Leukosialin Human genes 0.000 description 1
- 102100038007 Low affinity immunoglobulin epsilon Fc receptor Human genes 0.000 description 1
- 102100029204 Low affinity immunoglobulin gamma Fc region receptor II-a Human genes 0.000 description 1
- 102100025243 Myeloid cell surface antigen CD33 Human genes 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 101710120717 Oxygen-evolving enhancer protein 2 Proteins 0.000 description 1
- 101710163902 Oxygen-evolving enhancer protein 2, chloroplastic Proteins 0.000 description 1
- 101710142589 Oxygen-evolving enhancer protein 2-1, chloroplastic Proteins 0.000 description 1
- 102100038081 Signal transducer CD24 Human genes 0.000 description 1
- 102100027213 T-cell-specific surface glycoprotein CD28 Human genes 0.000 description 1
- 102100036857 Tumor necrosis factor receptor superfamily member 8 Human genes 0.000 description 1
- 230000002155 anti-virotic effect Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000009225 cognitive behavioral therapy Methods 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 238000011217 control strategy Methods 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000012946 outsourcing Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 230000009385 viral infection Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Definitions
- This invention generally relates to methods for calculating costs attributed to the use of computing equipment and services.
- this invention relates to the costs of providing and maintaining computing services and methods to analyze those costs.
- TCO Total Cost of Ownership
- the invention includes a method for determining the cost per user of an information technology system.
- the method includes obtaining base costs, ongoing direct costs, and ongoing indirect costs.
- the method further includes gathering information relating to user profiles and organizational characte ⁇ stics. These costs and information are input mto a computer program to determine the cost for each user.
- the invention includes a method for analyzing the costs associated with supporting an information technology system.
- the method includes obtaining cost information and system characte ⁇ stics.
- Appraisal metncs are calculated based on the cost information and system characte ⁇ stics.
- the metncs may be compared against established benchmarks.
- This invention defines both metncs used to measure the costs associated with distributed computing when performing a TCO analysis, as well as metncs used to evaluate the operations effectiveness and efficiency Where possible, the metncs are referenced to IT organizational functions in order to define precisely potential added value.
- One application of this invention is to provide a TCO framework aligned as far as possible with the Management of Distnaded Environments (MODE) framework (an IT organizational framework commercially available from MODE).
- MODE Distnaded Environments
- Another useful aspect of this invention is a set of metrics that give a holistic view of the TCO. These metncs enable comparative studies and benchmarking, as well as assessing the impact of possible changes and determining improvement opportunities through MODE's best practices implementation.
- FIG 1 shows a representation of one embodiment of the method of the present invention DETAILED DESCRIPTION OF THE INVENTION
- the TCO analysis becomes part of any Information Systems (IS) organization's continuous process of measurement, improvement and resource planning; it enables the simulation of improvement plans for asset changes, best practice implementation and complexity reductions
- IS Information Systems
- the initial step is to categonze the costs according to the MODE framework, or any other IT organizational framework implemented m an enterpnse's IT systems.
- this mvention is descnbed m terms of the MODE framework
- the costs may be categorized according to the IT framework which is described in co-pending application No , entitled Organization of Information Technology Functions, by Dove et al . which was filed October 6, 2000, which is herein incorporated by reference.
- the costs have to be "standardized," l e., put under a format that allows one to compare the data elements with others and do benchmarking to depict typical values for each data element and metric
- appraisal metrics will tally key staffing ratios, activity person hours, help desk performance metrics, and end user satisfaction metrics to provide the client with a complete perspective of its actual position and potential evolution
- Benchmarks are considered to carry out a consistent evaluation of an enterprise's position that also give insight to improvement initiatives Actual and typical values for all the metrics and data elements, with all the relevant assumptions required to understand those values, are developed by experience in evaluating IT systems. The benchmarks are useful for an Opportunity/problem analysis.
- BASE COSTS and ONGOING COSTS have been considered and have been adopted to categonze both one off investment and costs incurred through ongoing operations. Only the ONGOING COSTS will be aligned to the MODE framework, since MODE'S added value pnncipally lies m the potential changes that have to be made.
- the BASE COSTS measure the one off costs of implementing the base
- the ONGOING COSTS measures the total amount of expense since the IT Infrastructure has been running.
- the costs are catego ⁇ zed as direct and indirect costs.
- the direct costs are the day-to-day operational costs such as maintenance, support, momtonng etc.
- the indirect costs pertain to the unbudgeted costs that are caused either by downtime or end-user inefficiency at work
- the Direct Costs that refers to the Ongoing expenses of running IT operations, are hard factual costs, whereas the Indirect costs are often related as "soft" costs, because they are more subjective (i.e., it is difficult to measure them in a consistent way).
- TCO Dnvers like Enterpnse profile (industry or business type, world-wide geographic location, enterpnse size, end users type), Technology volume and type (servers, Client computers-mobiles + desktops- pe ⁇ pherals, network), Management Practices (Technology, Process, People), Complexity (IS organization, IS processes and service, end-user organization, hardware and software) are "tuning" the average typical values collected in benchmarking databases. These factors must be related as assumptions when compa ⁇ ng data in order not to come to wrong conclusions.
- Cost metncs can be denved straight forwardly from the costs elements, when associating the costs to another quantities (number of employees, number of desktops, etc.), which allows one to compare the TCO of vanous companies without having to make conversions.
- Metncs are also helpful to provide the decision makers with a holistic view of the TCO. There are not only quantitative metncs, but also qualitative metncs, that examine the global performance of a company, and tend to determine its profile. Several appraisal metncs are defined that are categonzed according to three different areas:
- IEP-Th ⁇ s area looks at the system's future and scalability.
- the appropnate MODE function For each metric developed, the appropnate MODE function is allocated. category referenced, the parameters descnbed, how to compute it (construction and formula) and possibly its benchmark. Then the different relations that exist between all the appraisal metncs are detailed in order to make their interpretation easier and thus allowing to perform a better opportunity study.
- the TCO metncs are aimed at not only reporting the costs of a distnaded environment, but also give a holistic view of its components.
- the first step is to measure the costs, and then to see where they stem from, identify the factors of influence for each cost areas, the correlation between the metncs. and try to assess the impacts of change (management, technology) withm the IT organization The completion of this step will allow for assessment of opportunities agamst different plausible ⁇ os.
- One embodiment of the method of the present mvention is represented m Figure 1.
- a senes of cost data about a particular aspect of an information technology system is gathered.
- the cost data includes base costs (10), ongoing direct costs (12), and ongomg indirect costs (14), which are input into a cost data array (16).
- Infrstructure and evolution charactenstics (22) are obtained and input mto an IEP metncs array (28)
- Specific cost information from the cost data array (16) is input mto the FP metncs array (24) and used for calculating certain FP metrics
- the data is used to calculate cost information which is used to generate a summary report (30) of the total cost of ownership.
- the cost data and the metrics are used to generate functional category detail reports and benchmark analyses (32). These reports and analyses break down the cost information and appraisal metncs according to the IT organizational functional categones to which that information corresponds.
- the cost detail and appraisal metncs are broken out and provided in separate reports relating to service management (34), systems management (36), service planning (38), and managing of change (40)
- the definitions and formulas used to calculate these cost data and metncs are provided in the detailed desc ⁇ ption which follows.
- the formulas can be programmed on a computer, such as in a spreadsheet (e g., Excel), to calculate the costs and metncs and display or pnntout reports
- the cost categories are to be as precise and detailed as possible so that benchmarks from external data providers can be referenced
- the costs are preferably evaluated on an annual basis, for the BASE costs as well as the ONGOING costs. Each time when necessary the life-cycle and depreciation of capital expenditures will have to be detailed and the global labor costs for a given time pe ⁇ od annuahzed.
- Base costs include 1) Design; 2) Acquisition Costs; and 3) Installation Costs.
- Ongoing costs include 1) Direct Costs; 2) Systems management - aligned to MODE'S System's Management
- the base costs are descnbed m detail below
- the base costs are identified by "Cost Data" designations CD1 through CD 15 , which are depicted in Fig 1
- Capital and Expense costs are distinguished, as they are most of the time accounted for separately in the chart of accounts of a company. There are only labor Expenses in the Design and Installation Costs section, whereas the
- CD1 costs relates to systems research and planning CD1 costs include the labor expenses for identifying infrastructure needs, operations architecture service quality, setting standards, defining organization and support requirements, considenng configuration options, assessing scalability, predict TCO hfecycle, and plan rollout, (MODE functions: service planning).
- CD2 costs relate to vendor management.
- CD2 costs include the labor costs and other expenses (e.g., travel, etc.) for working with service vendors. IS labor time spent on meetings, workshops, writing RFPs, reviewing proposals and dealing with vendor issues. Another issue here is to include the Service Level Agreements (SLAs) and Operating Level Agreements (OLAs) Acquisition costs
- SLAs Service Level Agreements
- OLAs Operating Level Agreements
- This cost category refers to the hardware and software purchases. In order to compare these costs to industry averages, these costs are typically Capital Costs which are annuahzed, and we also have to consider the hardware value depreciation according to the life-time of the each component Different
- CD3 relates to end-stations acquisition CD3 costs include the capital expenditures associated with the purchase of a computer (client, sen. er, net- computer, dumb-terminal, laptop, etc.) This includes. the basic configuration: CPU, monitor, mouse, keyboard, mothercard, memory, with possible bundles. the penpherals- video/sound cards, floppy and CD-ROM drives the possible memory and storage upgrades (RAM+ROM) and devices for databases the network and communication devices modem, network cards "CD4" costs relate to network hardware CD4 costs include the capital expenditures for the network communication devices (hubs, b ⁇ dges. routers, switches), cablmg-dependmg on the transmission medium, optic fiber, coax etc.
- CD5 costs relate to operations and multimedia devices CD5 costs include the capital expenditures associated with pnnters, scanners, and all the other multimedia devices (digital cameras, microphones, etc )
- CD6 costs relate to operating system CDT costs include the capital expenditures on operating system licenses This cost is separated from the end- station acquisition cost, even if sometimes the operating system is already installed and there is a bundle p ⁇ ce.
- CD7 costs relate to application software.
- CD7 costs include the capital expenditures for business and productivity software. This includes packages such as MS Office, financial and accounting software such as SAP, and all the software related to programming languages that help to build new applications (compilers, test tools, etc.).
- CD8 costs relate to groupware and communication software.
- CD8 costs include the capital expenditures on software used to connect users and enable sharing of information across the network. This includes: e-mail and other messaging software, Groupware (Lotus Notes, etc.%) and remote connectivity software.
- CD9 costs relate to systems management software CD9 costs include the capital expenditures on secunty (virus protection and elimination), performance momto ⁇ ng, production control (file transfer, backup and restore, storage) and failure control (fault detection and recovery) software.
- Enterpnse Management software is included in this category, and can offer bundles for the previous systems management features.
- CD 10 costs relate to utility software.
- CD 10 costs include the capital expenditures for both multimedia software (videoconferencing tools), and end user utilities (screen savers, disk managers, PhotoShop, etc.) which are not productivity enhancing.
- Other entertainment software audio and video tools are included here
- CD 11 costs relate to hardware set-up CD11 costs include after labor expenses (internal + external) associated with the deployment of the network and system infrastructure: i.e., put the network devices and the workstations m place, pull down the cables and connect all the workstations to each other. There is also costs to setup the router according to the network topology and all the other network connectivity devices, depending on the protocols used.
- CD 12 costs relate to operating system installation.
- CD 12 costs include the labor costs (internal + external) associated with the installation of any operating system (UNIX, Windows NT/95, etc.).
- CD 13 costs relate to application software.
- CD 13 costs include the labor costs (internal + external) associated with the installation of all the applications related in the previous section.
- CD 14 costs relate to groupware and communication software CD 14 costs include the labor costs (internal + external) associated with the installation and configuration of all the messaging software and the databases.
- CD 15 costs relate to systems management software.
- CD 15 costs include the labor costs associated (internal + external) with the installation of the network and systems management platform and the anti-virus systems.
- the ongoing costs are divided into two categones: the direct costs (CD 16-
- CD39 CD39
- indirect costs CD40-CD44
- the direct costs are the budgeted costs to maintain and optimize the availability of key network resources, manage the system and implement the changes, and support the network users.
- the indirect costs are expenses that are not budgeted and often not accounted for in most of the IT organizations. These hidden costs make the true costs of IS systems underestimated, because the impact of downtime - which is a crucial factor increasing the overall costs - is too often not measured.
- the catego ⁇ es tend to match the MODE framework.
- CD 16 costs relate to application management.
- CD 17 costs relate to storage management.
- the annual labor expenses internal + external
- disk and file management optically readable media
- data access management providing user availability to information: database management, server file access and remote servers access
- backup and archiving and repository management may include development costs.
- CD 18 costs relate to traffic management.
- CD 19 costs relate to event management. The annual labor expenses to log, classify and present event messages on consoles with pre-established filters or thresholds. In case of a fault, the message should be forwarded to those who can correct the fault and do a diagnosis.
- CD20 costs relate to performance management. The annual labor expenses for interpreting, planning and balancing the performance of servers, networked systems and applications.
- CD21 costs relate to physical site management.
- the task operated is a kind of overall maintenance labor.
- CD22 costs relate to secunty and virus protection The annual labor costs and other expenses (development costs) for preventing from secunty violations; password management, access restnction, virus infection and recovering from such violations or intrusions should they occur
- Detection is tallied in the momto ⁇ ng section.
- CD23 costs relate to LAN/WAN troubleshooting and repair.
- CD24 costs relate to disaster planning and recovery The annual labor expenses for restonng data, building disaster recovery and management plans including backup and restore procedures, record keeping and disaster recovery team organization.
- CD25 costs relate to hardware maintenance fees.
- the annual maintenance contracts fees Generally agreed upon in SLAs, these contracts are earned out, monitored and recorded for each asset Changes And Upgrades
- This cost area refers as well to the ongoing upgrades to the system as to the deeper changes that affect the whole system.
- CD26 costs relate to change planning. The annual costs associated with management of change planning. These costs are labor costs associated with the development of change control strategies and migration control (move from the development environment to the test and finally the production environment), and outsourced management fees such as strategic and tactical consulting.
- CD27 costs relate to asset management.
- Asset management is mventoned here because it is necessary to know what exists before implementing a change.
- CD28 Cost and labor costs relate to product evaluation and testing The annual labor expenses for evaluation and testing of new technology mate ⁇ als (hardware, software) pnor to purchase. Here are also accounted for the "vendor management” ongoing labor costs (see DESIGN section)
- CD29 costs relate to products procurement and implementation.
- the annual expenses for the purchase of new hardware and software, and the labor costs associated with their initial installation and configuration Included here are the labor costs associated with software licensing and distnbution, i.e . metenng the number of available licenses and monitonng their usage (operating systems, applications, and connectivity software)
- CD30 costs relate to user administration (adds, moves and changes to users).
- the support costs are the direct labor expenses and fees associated with supporting the network's users.
- CD31 costs relate to help desk (Tier I support).
- the Tier I refers to the time spent by phone staff to answer calls and support End-Users without any intervention.
- Support Services performed at Tier II and III, that implies advanced troubleshooting and failure recovery are recorded in Systems Management.
- CD32 costs relate to request and problem management and planning.
- CD33 costs relate to casual learning. The annual labor expenses of IS professional's time spent on independent, self-education and learning outside of formal training programs. Topics include self-education on computers, networks, printers, storage systems, network communication devices, as well as IS utilities and end-user applications
- CD34 costs relate to training The annual labor expenses and fees for develop, deliver training courses and train as well end users as IS personnel. This includes
- CD35 The labor expenses for the delivery by trainers of end-user training courses, and the time spent by end-users on computer systems and all application training (incl. the initial framing just after rollout) "CD35" costs relate to operating costs.
- the travel expenses include as well the travel time to support remote branch offices, attend training sessions, visit vendors as the travel expenditures.
- CD36 costs are related to communications fees The annual expenses for communication fees such as lease line fees, on-line access-fees, remote access services, WEBTSP hosting fees, and allocated WAN fees.
- CD37 costs relate to leased asset fees.
- the annual fees for leased assets including, e.g., servers, printers, hubs, bndges, routers, switches, or client software.
- CD38 costs relate to IS commodity expenditures.
- the annuahzed capital fees for computer supplies such as floppy disks, CD-ROM disks, backup tapes, toner cartridges and other expendables
- CD39 costs relate to insurance.
- the annual fees for insurance agamst theft, voltage shortage (implying data loss), etc.
- the indirect costs are those that are not ongmally budgeted because they stem from a productivity loss due either to the end user themselves or to unplanned systems downtime. The majonty of these metrics are sometimes difficult to measure. These costs are identified as CD40-CD44, as shown in FIG.
- CD40 costs relate to casual learning.
- CD41 costs relate to peer and self support.
- These tasks-repair, support, maintenance. installation, framing- are performed extensively by end-users in remote offices not staffed by dedicated IS personnel or covered by support contracts.
- CD42 costs relate to Futz factor.
- the annual labor expenses associated with the development and customization of non-busmess applications (Notes scnpts, etc.), the unnecessary changes to their computer or network settings (screen, file organization, folder, sounds, pnnters, etc ), and the time spent on playing games or web surfing
- Downtime expenses are defined as a potential annual loss due to the unavailability of the IT Infrastructure due to faults, and its impact as measured as loss of productivity.
- Downtime can be either due to the waiting for a help desk problem to be resolved, to an infrastructure issue (planned maintenance), or unplanned failures (application bugs or inaccessibility, network outages, etc.), for example.
- CD43 costs relate to planned downtime.
- CD44 costs relate to unplanned downtime.
- the unplanned network outages are almost always obtained from end user surveys.
- the appraisal metncs are intended to be key performance indicators for IT operations as a measurement and assessment tool for the TCO, to evaluate and monitor its effectiveness. Different areas, divided mto sections, have been distinguished to facilitate the comprehension and the use of all the metncs along the analysis. The comparison with available market data should allow then to elaborate best practices.
- the parameters involved are preferably must be homogeneous, i.e., each parameter has to be measured within the same time penod. The time period is taken to be equal to one year.
- the metrics are categonzed as follows:
- metncs are constructed according to the same template.
- This template defines the name of the metnc and gives it a number, provides the MODE functions that are involved, indicates the parameters that are involved, how to compute them, the objective of each metnc and additional comments.
- TCO by the budgeted TCO for the last financial year.
- the actual cost should not go over the budgeted cost, and should not be more than 5% less than the budgeted cost (otherwise the budget would be badly managed).
- This metnc is actually an aggregation of several metrics, each being a ratio between different areas of the ongoing costs.
- the areas considered are support, systems management, change and upgrades, and indirect costs.
- Direct Costs (measure 1) - the sum of all costs related ⁇ (CD16+...+CD39)...$.
- Indirect Costs (measure 2) - the sum of all costs related ⁇ (CD40+ ... +CD44) ... $ .
- this metric is an aggregation of two metrics that intend to define the importance of the labor costs for the TCO as well as outsourcing trends.
- This ratio can be used to compare similar industry companies to determine industry trends in the way that some IT operations are outsourced Sources such as Gartner Group provide information about outsourcmg trends that can be used for benchmarking
- the metncs in this area measure the performance of the business, focusing on system and operations quality, availability, and efficiency Quality
- OEEI-A Number of Faults per User
- This metric e ⁇ understandes the global systems performance required by company business needs.
- the systems overall performance will be rated from 1 to 5, according to both technology efficiency (bandwidth available, file transfer speed, storage capacity) and fault tolerance and recovery (e.g., banks are very sensitive to downtime); basic technology and great fault tolerance; medium technology and great fault tolerance; medium technology and little fault tolerance; high technology and little fault tolerance; high technology and no fault tolerance.
- OEE1-C Physical and Logical Security Rating
- This metric evaluates the performance of the system in terms of security. The rating, going from 1 to 5, allows to indicate how important security is to the company, and then to assess the budget that could be spent on this area. For a given rate and according to the industry sector, benchmarks concerning budgets allocated to security may be available; system not secured; system poorly secured; system globally secured; system well secured; and system highly secured.
- This metric measures both the call reloggmg rate and abandonment rate at the Help Desk.
- the average response time metnc determines the average time it takes the support organization to respond to an incident or problem. Normally, response time is defined as the time from the support organization first being aware of the incident or problem to the time at which the first action is taken (usually informing or giving status to users) It may be divided into further metncs based on the cnticality of the requests (low, medium, high, c ⁇ tical).
- the average resolution time is the measure of the time from an incident or request being reported to the time at which it is resolved.
- an incident is an occurrence-system error or malfunction-that requires assistance from the support organization, whereas a request refers to an action that a user asks to be performed that is usually related to network/workstation administration or software/hardware changes.
- metnc can be considered according to the defined cnticality of the incident or request.
- Metric objective and additional comments This metric measures the average time to deliver desktop services, from the order to the end of the installation, including the delivery and configuration. It allows to determine the flexibility of the system and its ability to administrate the users
- This metnc measures both the rate of ongoing systems operations covered by SLAs as the actual performance of these operations agamst the SLAs
- This area looks at the scalability of the infrastructure and at how sustainable the performances are likely to be m the future.
- This measure rates the upgradeabihty of the system's technology from 1 to 5. depending on the different technologic features of the system, gives the number of different platforms operated and the system ' s like span to assess the system ' s flexibility.
- the objective could be to determine if the WAN bandwidth utilization is withm a certain range and if it is not. the extent and frequency with which it is out of range This also allows to see the supportable traffic increase on the network
- IEP2-B End-user Staff Growth or Attrition
- Support Costs per FTE since the Support Costs are labor costs that are at least partly performed by employees of the company
- One metric can be similarly influenced by another metnc, i.e.. its value is partly determined by another metric' s value.
- Two metncs can have a complementary relationship, i.e., their vanations should be correlated.
- Two metncs can have a trade-off relationship, i.e., if the value of one metnc increases, the value of the other should tend to decrease.
- metncs For each metnc, the related metncs as well as the nature of their relationships is provided in the Tables below. All the metncs except those related to Infrastructure and Evolution Perspective, i.e., metncs IEP2-B, C and D, have relationships with other metncs, and often there are cross-categories relationships.
- OEE3-C Help Desk call handling rate Is influenced by OEEl-A
- the value for the appraisal metrics is in companng them in time v. ith previous calculated metncs for a system, or in comparing them with predetermined benchmarks. For some metrics there are no given benchmarks, but rather expected value ranges, which allows to include values for different industry types in the same table. Of course, other benchmark values may be used for specific industries, and for specific experiences with certain IT organization configurations. In Table 33 below, some exemplary benchmarks are provided.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU78618/00A AU7861800A (en) | 1999-10-06 | 2000-10-06 | Method for determining total cost of ownership |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15825999P | 1999-10-06 | 1999-10-06 | |
US60/158,259 | 1999-10-06 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2001026005A1 true WO2001026005A1 (fr) | 2001-04-12 |
Family
ID=22567316
Family Applications (12)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2000/027801 WO2001026011A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la planification strategique de la gestion des operations |
PCT/US2000/027803 WO2001026013A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour gestion des niveaux de service |
PCT/US2000/027629 WO2001026008A1 (fr) | 1999-10-06 | 2000-10-06 | Procede de surveillance d'evenements/defaillances et dispositif d'estimation associe |
PCT/US2000/027857 WO2001025877A2 (fr) | 1999-10-06 | 2000-10-06 | Organisation de fonctions de technologie de l'information |
PCT/US2000/027795 WO2001025876A2 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la modelisation et la planification de la capacite |
PCT/US2000/027856 WO2001025970A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur pour l'evaluation de modeles de maturite d'operations |
PCT/US2000/027518 WO2001026005A1 (fr) | 1999-10-06 | 2000-10-06 | Procede de determination du cout total de la propriete |
PCT/US2000/027592 WO2001026007A1 (fr) | 1999-10-06 | 2000-10-06 | Methode et estimateur destines a la planification antisinistre d'une affaire |
PCT/US2000/027796 WO2001026010A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur pour l'ordonnancement de la production |
PCT/US2000/027804 WO2001026014A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur destines a la mise en oeuvre d'une commande de services |
PCT/US2000/027593 WO2001026028A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur de gestion du changement |
PCT/US2000/027802 WO2001026012A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la gestion des moyens de stockage |
Family Applications Before (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2000/027801 WO2001026011A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la planification strategique de la gestion des operations |
PCT/US2000/027803 WO2001026013A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour gestion des niveaux de service |
PCT/US2000/027629 WO2001026008A1 (fr) | 1999-10-06 | 2000-10-06 | Procede de surveillance d'evenements/defaillances et dispositif d'estimation associe |
PCT/US2000/027857 WO2001025877A2 (fr) | 1999-10-06 | 2000-10-06 | Organisation de fonctions de technologie de l'information |
PCT/US2000/027795 WO2001025876A2 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la modelisation et la planification de la capacite |
PCT/US2000/027856 WO2001025970A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur pour l'evaluation de modeles de maturite d'operations |
Family Applications After (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2000/027592 WO2001026007A1 (fr) | 1999-10-06 | 2000-10-06 | Methode et estimateur destines a la planification antisinistre d'une affaire |
PCT/US2000/027796 WO2001026010A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur pour l'ordonnancement de la production |
PCT/US2000/027804 WO2001026014A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur destines a la mise en oeuvre d'une commande de services |
PCT/US2000/027593 WO2001026028A1 (fr) | 1999-10-06 | 2000-10-06 | Procede et estimateur de gestion du changement |
PCT/US2000/027802 WO2001026012A1 (fr) | 1999-10-06 | 2000-10-06 | Technique et estimateur pour la gestion des moyens de stockage |
Country Status (4)
Country | Link |
---|---|
EP (2) | EP1226523A4 (fr) |
AU (12) | AU1193601A (fr) |
CA (1) | CA2386788A1 (fr) |
WO (12) | WO2001026011A1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1959325A2 (fr) | 2003-07-10 | 2008-08-20 | Daimler AG | Procédé et dispositif destinés à la réduction de la fréquence des pannes |
US8572003B2 (en) * | 2003-07-18 | 2013-10-29 | Sap Ag | Standardized computer system total cost of ownership assessments and benchmarking |
Families Citing this family (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2002256550A1 (en) * | 2000-12-11 | 2002-06-24 | Skill Development Associates Ltd | Integrated business management system |
US7035809B2 (en) * | 2001-12-07 | 2006-04-25 | Accenture Global Services Gmbh | Accelerated process improvement framework |
US7937281B2 (en) | 2001-12-07 | 2011-05-03 | Accenture Global Services Limited | Accelerated process improvement framework |
WO2004040409A2 (fr) | 2002-10-25 | 2004-05-13 | Science Applications International Corporation | Systeme et procede destines a determiner des capacites de niveau de performance selon des criteres de modeles predetermines |
US8566147B2 (en) * | 2005-10-25 | 2013-10-22 | International Business Machines Corporation | Determining the progress of adoption and alignment of information technology capabilities and on-demand capabilities by an organization |
EP1808803A1 (fr) * | 2005-12-15 | 2007-07-18 | International Business Machines Corporation | Système et procédé de sélection automatique d'une ou plusieurs mesures pour la réalisation d'une évaluation CMMI |
US8457297B2 (en) | 2005-12-30 | 2013-06-04 | Aspect Software, Inc. | Distributing transactions among transaction processing systems |
US8355938B2 (en) | 2006-01-05 | 2013-01-15 | Wells Fargo Bank, N.A. | Capacity management index system and method |
US7523082B2 (en) * | 2006-05-08 | 2009-04-21 | Aspect Software Inc | Escalating online expert help |
WO2008105825A1 (fr) * | 2007-02-26 | 2008-09-04 | Unisys Corporation | Procédé pour des services fondés sur une technologie de diversification |
EP2210227A2 (fr) * | 2007-10-25 | 2010-07-28 | Markport Limited | Modification de l'infrastructure permettant la fourniture de services dans les réseaux de télécommunication |
US8326660B2 (en) | 2008-01-07 | 2012-12-04 | International Business Machines Corporation | Automated derivation of response time service level objectives |
US8320246B2 (en) * | 2009-02-19 | 2012-11-27 | Bridgewater Systems Corp. | Adaptive window size for network fair usage controls |
US8200188B2 (en) | 2009-02-20 | 2012-06-12 | Bridgewater Systems Corp. | System and method for adaptive fair usage controls in wireless networks |
US9203629B2 (en) | 2009-05-04 | 2015-12-01 | Bridgewater Systems Corp. | System and methods for user-centric mobile device-based data communications cost monitoring and control |
US8577329B2 (en) | 2009-05-04 | 2013-11-05 | Bridgewater Systems Corp. | System and methods for carrier-centric mobile device data communications cost monitoring and control |
US20110066476A1 (en) * | 2009-09-15 | 2011-03-17 | Joseph Fernard Lewis | Business management assessment and consulting assistance system and associated method |
US20110231229A1 (en) * | 2010-03-22 | 2011-09-22 | Computer Associates Think, Inc. | Hybrid Software Component and Service Catalog |
EP2633450A4 (fr) * | 2010-10-27 | 2017-10-11 | Hewlett-Packard Enterprise Development LP | Systèmes et procédés pour programmer des changements |
US8880960B1 (en) | 2012-05-09 | 2014-11-04 | Target Brands, Inc. | Business continuity planning tool |
WO2015126409A1 (fr) | 2014-02-21 | 2015-08-27 | Hewlett-Packard Development Company, L.P. | Migration de ressources en nuage |
US10148757B2 (en) | 2014-02-21 | 2018-12-04 | Hewlett Packard Enterprise Development Lp | Migrating cloud resources |
WO2015153988A1 (fr) * | 2014-04-03 | 2015-10-08 | Greater Brain Group, Inc. | Systèmes et procédés d'augmentation de capacité de systèmes d'entreprises ou d'autres entités par une évolution de maturité |
US9984044B2 (en) | 2014-11-16 | 2018-05-29 | International Business Machines Corporation | Predicting performance regression of a computer system with a complex queuing network model |
US10044786B2 (en) | 2014-11-16 | 2018-08-07 | International Business Machines Corporation | Predicting performance by analytically solving a queueing network model |
US10460272B2 (en) * | 2016-02-25 | 2019-10-29 | Accenture Global Solutions Limited | Client services reporting |
CN106682385B (zh) * | 2016-09-30 | 2020-02-11 | 广州英康唯尔互联网服务有限公司 | 健康信息交互系统 |
EP3782021A4 (fr) * | 2018-04-16 | 2022-01-05 | Ingram Micro, Inc. | Système et procédé d'appariement de flux de revenus dans une plateforme de courtage de services en nuage |
WO2019232434A1 (fr) * | 2018-06-01 | 2019-12-05 | Walmart Apollo, Llc | Système et procédé de modification de capacité pour de nouvelles installations |
US20190369590A1 (en) | 2018-06-01 | 2019-12-05 | Walmart Apollo, Llc | Automated slot adjustment tool |
US11483350B2 (en) | 2019-03-29 | 2022-10-25 | Amazon Technologies, Inc. | Intent-based governance service |
CN110096423A (zh) * | 2019-05-14 | 2019-08-06 | 深圳供电局有限公司 | 一种基于大数据分析的服务器存储容量分析预测方法 |
US11119877B2 (en) | 2019-09-16 | 2021-09-14 | Dell Products L.P. | Component life cycle test categorization and optimization |
MX2022005750A (es) * | 2019-11-11 | 2022-08-17 | Snapit Solutions Llc | Sistema para producir y entregar productos y servicios de tecnologia de la informacion. |
US11288150B2 (en) | 2019-11-18 | 2022-03-29 | Sungard Availability Services, Lp | Recovery maturity index (RMI)-based control of disaster recovery |
US20210160143A1 (en) | 2019-11-27 | 2021-05-27 | Vmware, Inc. | Information technology (it) toplogy solutions according to operational goals |
CN111753443B (zh) * | 2020-07-29 | 2024-10-08 | 哈尔滨工业大学 | 一种基于能力累积的武器装备联合试验设计方法 |
US11501237B2 (en) | 2020-08-04 | 2022-11-15 | International Business Machines Corporation | Optimized estimates for support characteristics for operational systems |
US11329896B1 (en) | 2021-02-11 | 2022-05-10 | Kyndryl, Inc. | Cognitive data protection and disaster recovery policy management |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0652518A1 (fr) * | 1993-11-04 | 1995-05-10 | Microsoft Corporation | Système de contrôle de la performance de programmes, basée sur le système d'exploitation |
JPH08320855A (ja) * | 1995-05-24 | 1996-12-03 | Hitachi Ltd | システム導入効果評価方法およびシステム |
US5745880A (en) * | 1994-10-03 | 1998-04-28 | The Sabre Group, Inc. | System to predict optimum computer platform |
US5771179A (en) * | 1991-12-13 | 1998-06-23 | White; Leonard R. | Measurement analysis software system and method |
US5793632A (en) * | 1996-03-26 | 1998-08-11 | Lockheed Martin Corporation | Cost estimating system using parametric estimating and providing a split of labor and material costs |
US5960417A (en) * | 1996-03-19 | 1999-09-28 | Vanguard International Semiconductor Corporation | IC manufacturing costing control system and process |
US6157916A (en) * | 1998-06-17 | 2000-12-05 | The Hoffman Group | Method and apparatus to control the operating speed of a papermaking facility |
Family Cites Families (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4827423A (en) * | 1987-01-20 | 1989-05-02 | R. J. Reynolds Tobacco Company | Computer integrated manufacturing system |
JPH03111969A (ja) * | 1989-09-27 | 1991-05-13 | Hitachi Ltd | 計画作成支援方法 |
US5233513A (en) * | 1989-12-28 | 1993-08-03 | Doyle William P | Business modeling, software engineering and prototyping method and apparatus |
US5701419A (en) * | 1992-03-06 | 1997-12-23 | Bell Atlantic Network Services, Inc. | Telecommunications service creation apparatus and method |
US5586021A (en) * | 1992-03-24 | 1996-12-17 | Texas Instruments Incorporated | Method and system for production planning |
US5646049A (en) * | 1992-03-27 | 1997-07-08 | Abbott Laboratories | Scheduling operation of an automated analytical system |
US5978811A (en) * | 1992-07-29 | 1999-11-02 | Texas Instruments Incorporated | Information repository system and method for modeling data |
US5630069A (en) * | 1993-01-15 | 1997-05-13 | Action Technologies, Inc. | Method and apparatus for creating workflow maps of business processes |
US5819270A (en) * | 1993-02-25 | 1998-10-06 | Massachusetts Institute Of Technology | Computer system for displaying representations of processes |
CA2118885C (fr) * | 1993-04-29 | 2005-05-24 | Conrad K. Teran | Systeme de commande de processus |
WO1994029804A1 (fr) * | 1993-06-16 | 1994-12-22 | Electronic Data Systems Corporation | Systeme de gestion des processus |
US5724262A (en) * | 1994-05-31 | 1998-03-03 | Paradyne Corporation | Method for measuring the usability of a system and for task analysis and re-engineering |
US5563951A (en) * | 1994-07-25 | 1996-10-08 | Interval Research Corporation | Audio interface garment and communication system for use therewith |
JP3315844B2 (ja) * | 1994-12-09 | 2002-08-19 | 株式会社東芝 | スケジューリング装置及びスケジューリング方法 |
EP0770967A3 (fr) * | 1995-10-26 | 1998-12-30 | Koninklijke Philips Electronics N.V. | Système d'aide de décision pour la gestion d'une chaíne de l'alimentation agile |
US5875431A (en) * | 1996-03-15 | 1999-02-23 | Heckman; Frank | Legal strategic analysis planning and evaluation control system and method |
US5960200A (en) * | 1996-05-03 | 1999-09-28 | I-Cube | System to transition an enterprise to a distributed infrastructure |
US5673382A (en) * | 1996-05-30 | 1997-09-30 | International Business Machines Corporation | Automated management of off-site storage volumes for disaster recovery |
US5864483A (en) * | 1996-08-01 | 1999-01-26 | Electronic Data Systems Corporation | Monitoring of service delivery or product manufacturing |
US5974395A (en) * | 1996-08-21 | 1999-10-26 | I2 Technologies, Inc. | System and method for extended enterprise planning across a supply chain |
US5930762A (en) * | 1996-09-24 | 1999-07-27 | Rco Software Limited | Computer aided risk management in multiple-parameter physical systems |
US6044354A (en) * | 1996-12-19 | 2000-03-28 | Sprint Communications Company, L.P. | Computer-based product planning system |
US5903478A (en) * | 1997-03-10 | 1999-05-11 | Ncr Corporation | Method for displaying an IT (Information Technology) architecture visual model in a symbol-based decision rational table |
US6028602A (en) * | 1997-05-30 | 2000-02-22 | Telefonaktiebolaget Lm Ericsson | Method for managing contents of a hierarchical data model |
US6106569A (en) * | 1997-08-14 | 2000-08-22 | International Business Machines Corporation | Method of developing a software system using object oriented technology |
US6092047A (en) * | 1997-10-07 | 2000-07-18 | Benefits Technologies, Inc. | Apparatus and method of composing a plan of flexible benefits |
US6131099A (en) * | 1997-11-03 | 2000-10-10 | Moore U.S.A. Inc. | Print and mail business recovery configuration method and system |
US6119097A (en) * | 1997-11-26 | 2000-09-12 | Executing The Numbers, Inc. | System and method for quantification of human performance factors |
-
2000
- 2000-10-06 AU AU11936/01A patent/AU1193601A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027801 patent/WO2001026011A1/fr active Application Filing
- 2000-10-06 AU AU78666/00A patent/AU7866600A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027803 patent/WO2001026013A1/fr active Application Filing
- 2000-10-06 AU AU11938/01A patent/AU1193801A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027629 patent/WO2001026008A1/fr active Application Filing
- 2000-10-06 WO PCT/US2000/027857 patent/WO2001025877A2/fr not_active Application Discontinuation
- 2000-10-06 AU AU80018/00A patent/AU8001800A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027795 patent/WO2001025876A2/fr active Application Filing
- 2000-10-06 AU AU80017/00A patent/AU8001700A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027856 patent/WO2001025970A1/fr active Search and Examination
- 2000-10-06 AU AU14317/01A patent/AU1431701A/en not_active Abandoned
- 2000-10-06 AU AU14318/01A patent/AU1431801A/en not_active Abandoned
- 2000-10-06 EP EP00973433A patent/EP1226523A4/fr not_active Withdrawn
- 2000-10-06 WO PCT/US2000/027518 patent/WO2001026005A1/fr active Application Filing
- 2000-10-06 WO PCT/US2000/027592 patent/WO2001026007A1/fr active Application Filing
- 2000-10-06 AU AU78618/00A patent/AU7861800A/en not_active Abandoned
- 2000-10-06 AU AU77566/00A patent/AU7756600A/en not_active Abandoned
- 2000-10-06 AU AU16539/01A patent/AU1653901A/en not_active Abandoned
- 2000-10-06 AU AU79960/00A patent/AU7996000A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027796 patent/WO2001026010A1/fr active Application Filing
- 2000-10-06 AU AU79961/00A patent/AU7996100A/en not_active Abandoned
- 2000-10-06 WO PCT/US2000/027804 patent/WO2001026014A1/fr active Application Filing
- 2000-10-06 EP EP00979124A patent/EP1222510A4/fr not_active Withdrawn
- 2000-10-06 WO PCT/US2000/027593 patent/WO2001026028A1/fr active Application Filing
- 2000-10-06 WO PCT/US2000/027802 patent/WO2001026012A1/fr active Application Filing
- 2000-10-06 CA CA002386788A patent/CA2386788A1/fr not_active Abandoned
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5771179A (en) * | 1991-12-13 | 1998-06-23 | White; Leonard R. | Measurement analysis software system and method |
EP0652518A1 (fr) * | 1993-11-04 | 1995-05-10 | Microsoft Corporation | Système de contrôle de la performance de programmes, basée sur le système d'exploitation |
JPH07182209A (ja) * | 1993-11-04 | 1995-07-21 | Microsoft Corp | オペレーティング・システム・ベースのプログラムの性能モニタ方法およびシステム |
US5485574A (en) * | 1993-11-04 | 1996-01-16 | Microsoft Corporation | Operating system based performance monitoring of programs |
US5745880A (en) * | 1994-10-03 | 1998-04-28 | The Sabre Group, Inc. | System to predict optimum computer platform |
JPH08320855A (ja) * | 1995-05-24 | 1996-12-03 | Hitachi Ltd | システム導入効果評価方法およびシステム |
US5960417A (en) * | 1996-03-19 | 1999-09-28 | Vanguard International Semiconductor Corporation | IC manufacturing costing control system and process |
US5793632A (en) * | 1996-03-26 | 1998-08-11 | Lockheed Martin Corporation | Cost estimating system using parametric estimating and providing a split of labor and material costs |
US6157916A (en) * | 1998-06-17 | 2000-12-05 | The Hoffman Group | Method and apparatus to control the operating speed of a papermaking facility |
Non-Patent Citations (4)
Title |
---|
COMMUNICATIONS OF THE ACM, vol. 29, no. 3, March 1986 (1986-03-01), pages 212 - 217 * |
DATABASE INSPEC [online] SIRCAR ET AL.: "The relationship between benchmark tests and microcomputer price", XP002935927, Database accession no. 02660085 * |
DATABASE INSPEC [online] TAKAHASHI: "Network planning for transportation business", XP002935926, Database accession no. 4481017 * |
JOURNAL OF THE INSTITUTE OF ELECTRONICS, INFORMATION AND COMMUNICATIONS ENGINEERS, vol. 76, no. 2, February 1993 (1993-02-01), pages 126 - 128 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1959325A2 (fr) | 2003-07-10 | 2008-08-20 | Daimler AG | Procédé et dispositif destinés à la réduction de la fréquence des pannes |
US7627452B2 (en) | 2003-07-10 | 2009-12-01 | Daimler Ag | Method and device for predicting a failure frequency |
US8572003B2 (en) * | 2003-07-18 | 2013-10-29 | Sap Ag | Standardized computer system total cost of ownership assessments and benchmarking |
Also Published As
Publication number | Publication date |
---|---|
AU8001800A (en) | 2001-05-10 |
CA2386788A1 (fr) | 2001-04-12 |
AU7756600A (en) | 2001-05-10 |
AU7996100A (en) | 2001-05-10 |
WO2001025876A2 (fr) | 2001-04-12 |
AU1653901A (en) | 2001-05-10 |
AU8001700A (en) | 2001-05-10 |
WO2001025970A8 (fr) | 2001-09-27 |
WO2001026008A1 (fr) | 2001-04-12 |
WO2001026028A8 (fr) | 2001-07-26 |
WO2001026013A1 (fr) | 2001-04-12 |
WO2001026010A1 (fr) | 2001-04-12 |
WO2001025876A3 (fr) | 2001-08-30 |
WO2001026014A1 (fr) | 2001-04-12 |
EP1226523A4 (fr) | 2003-02-19 |
EP1226523A1 (fr) | 2002-07-31 |
AU1193801A (en) | 2001-05-10 |
AU7996000A (en) | 2001-05-10 |
EP1222510A2 (fr) | 2002-07-17 |
EP1222510A4 (fr) | 2007-10-31 |
AU1431801A (en) | 2001-05-10 |
AU1193601A (en) | 2001-05-10 |
AU7866600A (en) | 2001-05-10 |
WO2001025970A1 (fr) | 2001-04-12 |
WO2001026028A1 (fr) | 2001-04-12 |
AU1431701A (en) | 2001-05-10 |
WO2001026011A1 (fr) | 2001-04-12 |
WO2001025877A3 (fr) | 2001-09-07 |
WO2001026007A1 (fr) | 2001-04-12 |
AU7861800A (en) | 2001-05-10 |
WO2001025877A2 (fr) | 2001-04-12 |
WO2001026012A1 (fr) | 2001-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7020621B1 (en) | Method for determining total cost of ownership | |
WO2001026005A1 (fr) | Procede de determination du cout total de la propriete | |
US6738736B1 (en) | Method and estimator for providing capacacity modeling and planning | |
US7707015B2 (en) | Methods for capacity management | |
US6901347B1 (en) | Availability, reliability or maintainability index including outage characterization | |
US8856646B2 (en) | Asset transition project management | |
US8589196B2 (en) | Knowledge management system | |
US10380079B1 (en) | Information technology configuration management | |
US7447729B1 (en) | Funding forecast in a data storage infrastructure for a communication network | |
US7752437B1 (en) | Classification of data in data flows in a data storage infrastructure for a communication network | |
US7865380B2 (en) | Automated information technology management system | |
US20070061180A1 (en) | Centralized job scheduling maturity model | |
US20100274616A1 (en) | Incident communication interface for the knowledge management system | |
US20060161884A1 (en) | Methods for managing capacity | |
US20100274814A1 (en) | Academy for the knowledge management system | |
US20040088411A1 (en) | Method and system for vendor management | |
US8595051B2 (en) | Metrics capability self assessment | |
US20060112317A1 (en) | Method and system for managing information technology systems | |
US8510429B1 (en) | Inventory modeling in a data storage infrastructure for a communication network | |
US7788302B1 (en) | Interactive display of a data storage infrastructure for a communication network | |
US7801973B1 (en) | Classification of information in data flows in a data storage infrastructure for a communication network | |
US7895295B1 (en) | Scoring data flow characteristics to assign data flows to storage systems in a data storage infrastructure for a communication network | |
US7797395B1 (en) | Assignment of data flows to storage systems in a data storage infrastructure for a communication network | |
Davis | Systems analysis for data communications networks at an electric utility | |
Parker et al. | A fool with a tool is still a fool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
122 | Ep: pct application non-entry in european phase | ||
NENP | Non-entry into the national phase |
Ref country code: JP |