Prior art keywords
quarry
teaching
target position
automatic operation
crushed stone
Prior art date
Application number
PCT/JP1999/001363
Other languages
English (en)
French (fr)
Inventor
Toru Kurenuma
Akira Hashimoto
Kazuhiro Sugawara
Yoshiyuki Nagano
Hideto Ishibashi
Original Assignee
Hitachi Construction Machinery Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP06873398A external-priority patent/JP3926464B2/ja
Priority claimed from JP10190806A external-priority patent/JP2000015135A/ja
Application filed by Hitachi Construction Machinery Co., Ltd. filed Critical Hitachi Construction Machinery Co., Ltd.
Priority to EP19990909235 priority Critical patent/EP0990739A4/en
Priority to US09/424,061 priority patent/US6523765B1/en
Priority to AU28534/99A priority patent/AU740949B2/en
Publication of WO1999047759A1 publication Critical patent/WO1999047759A1/ja

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/205Remotely operated machines, e.g. unmanned vehicles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E02F3/437Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E02F3/438Memorising movements for repetition, e.g. play-back capability
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2037Coordinating the movements of the implement and of the frame
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2041Automatic repositioning of implements, i.e. memorising determined positions of the implement
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices

Definitions

  • the present invention relates to an automatic operation shovel, and more particularly, to an automatic operation that enables automatic adjustment of an excavation trajectory according to the magnitude of excavation resistance when excavating a rock or the like having a large excavation resistance.
  • hydraulic excavators have been known as a typical example of construction machinery.
  • a hydraulic excavator repeats a monotonous work from excavation to dumping, the operation is performed by automatic operation. It is like that.
  • problems that must be solved in order to automatically operate a hydraulic excavator. For example, if the baguette hits a rock or the like during the excavation work with a hydraulic shovel and does not perform the desired operation, an experienced operator will notice such a condition and take an evacuation operation. The work should be continued smoothly, but it is necessary to devise ways to make this work done by the automated driving shovel.
  • Japanese Patent Publication No. 61-9453 has provided an overload detection sensor for detecting overload applied to an arm and a bucket.
  • a technique is disclosed in which when an overload is detected, the boom is slightly raised to reduce the overload and continue automatic excavation.
  • Japanese Patent Application Laid-Open No. Hei 4-350220 discloses that, during excavation, a detection value from a pressure sensor attached to a cylinder for operating a boom, an arm, and a packet reaches a predetermined value or more. If the operating speed obtained from the angle sensor attached to the boom, arm, and baguette falls below the specified value, it is an overload.
  • a technology has been disclosed that shifts the excavation trajectory to avoid obstacles to excavation work.
  • Japanese Patent Application Laid-Open No. 9-195321 discloses the technology of an automatic slab stone plant.
  • This automatic crushing plant is designed to scoop the quarry collected by a bulldozer with a hydraulic shovel, discharge it to a mobile crusher, and generate gravel with a mobile crusher.
  • the bulldozer operated by the operator is equipped with a hydraulic shovel and a control device for automatically controlling the mobile crusher, as well as a hydraulic shovel.
  • a control device for automatic operation control of the hydraulic shovel and the mobile crusher is provided at a position away from the vehicle.
  • Japanese Patent Publication No. 61-9453 requires a sensor for detecting overload in addition to a position detection sensor for detecting the position of each joint.
  • a processing load for performing automatic operation was large.
  • Japanese Patent Application Laid-Open No. Hei 4-350202 requires various types of sensors, requires calculations based on data detected by the sensors, and is provided with an automatic operation shovel. This increases the computational load on the control device, and when the automatic operation shovel is moved slowly, the operating speed decreases and the overload is distinguished from the low-speed operation. There was a possibility of false detection.
  • the pressure of the cylinder increases when it hits rocks, etc.
  • the operator riding the dozer should pay attention to the distance between the bulldozer and the bulldozer so that the bulldozer does not come into contact with the front of the hydraulic shovel where the crushed stone is being scooped. I had to control.
  • the hydraulic shovel when crushed stones are being scooped by a hydraulic shovel, the hydraulic shovel must be operated with a bulldozer to prevent contact with the front of the hydraulic shovel. If the quarry accumulation in the area has to be suspended and the amount of quarry in the working area of the hydraulic shovel is low, hydraulic There was a problem that the operation of the shovel had to be stopped, and there was a problem that the crushed stone could not be stably and efficiently performed.
  • an object of the present invention is to provide a simple and convenient method for detecting an overload condition during excavation without using a special device.
  • the purpose is to provide an automatic operation shovel that can avoid the problem, and to improve the work efficiency of the crushed stone processing system using the automatic operation shovel. Disclosure of the invention
  • the invention according to claim 1 includes a hydraulic shovel and a hydraulic shovel provided on the hydraulic shovel to perform a cycle of operation from drilling to dumping.
  • the automatic operation controller composed of an automatic operation controller that performs a regenerating operation on a hydraulic excavator and the automatic operation controller
  • the automatic operation controller is set for each teaching position of the hydraulic excavator.
  • Positioning decision means for judging arrival within a predetermined positioning range based on the determined positioning accuracy, and when it is determined that the hydraulic shovel has reached the predetermined positioning range, the following teaching is performed.
  • the feature is to output the position as the target position.
  • the invention of claim 2 is the invention according to claim 1, wherein the automatic driving controller sets the taught position as a target position during the regenerating operation from the start of excavation to the end of excavation. After output, the positioning judgment The feature is to output the target position based on the next teaching position without performing the judgment by the step.
  • the invention according to claim 3 includes, at least, a hydraulic cylinder that operates a boom, an arm, and a bucket, and an electromagnetic switching valve that operates a hydraulic motor that operates a revolving unit;
  • a hydraulic shovel including an angle detector for detecting an angle between the boom and the arm and between the arm and the bucket; and sequentially teaching and storing teaching position data.
  • Teaching position output means for reading and outputting, and inputting the teaching position data and outputting target position data in which the teaching position data is interpolated so that the hydraulic shovel operates smoothly.
  • Automatic operation comprising: servo pre-processing means for inputting the target position data; and servo control means for outputting a control signal to the electromagnetic switching valve in order to control the hydraulic shovel to a target position by inputting the target position data.
  • an automatic operation controller comprising the controller, wherein the automatic operation controller is configured such that the hydraulic shovel has a predetermined position based on the positioning accuracy set for each teaching position. It is provided with a positioning judging means for judging the arrival in the positioning range, and when it is judged that the hydraulic shovel has reached the predetermined positioning range, the next teaching position is sent from the servo preprocessing unit. It is characterized in that target position data based on data is output to the servo control unit.
  • the automatic driving controller is configured to control the revolving superstructure, the boom, the arm, and the robot based on positioning accuracy set for each of the teaching positions.
  • Calculating means for calculating the positioning accuracy of each of the buckets wherein the positioning determining means determines the predetermined accuracy of the revolving unit, the boom, the arm, and the bucket based on the calculated positioning accuracy. It is characterized in that it is determined that the vehicle has reached the positioning range.
  • the invention of claim 5 is the invention according to any one of claim 3 or claim 4, wherein the servo pre-processing unit performs each of the following operations during the reproduction operation from the start of excavation to the end of excavation. Corresponds to teaching position data overnight --
  • the target position data based on the next teaching position data is output without performing the determination by the positioning determination means.
  • the invention according to claim 6 is the invention according to any one of claims 1, 3, and 4, wherein the teaching position is set for each of the teaching positions from the start of excavation to the end of cutting.
  • the positioning accuracy at the teaching position excluding the digging start position and the digging end position is set lower than the positioning accuracy at the digging start position and the digging end position.
  • the positioning accuracy set for each of the teaching positions in the excavation operation is: In the unloading operation, the positioning accuracy is set lower than the positioning accuracy set for each of the teaching positions.
  • the invention according to claim 8 is the invention according to any one of claims 1 to 7, wherein the positioning accuracy set for each of the teaching positions is the hydraulic pressure level or the hydraulic pressure level. It is characterized in that it can be set arbitrarily by operating means provided at a position distant from it.
  • the invention of claim 9 is directed to an automatic operation method in an automatic operation shovel in which a hydraulic shovel reproduces a rounded operation from excavation to earth removal taught by a teaching position, And a first step of instructing a playback operation speed and a positioning accuracy at the teaching position, and an interpolated target position for facilitating the playback operation between the teaching position before the teaching position and the teaching position.
  • the final target position is determined.
  • a command is issued for the next teaching position after the teaching position and the reproduction operation speed and positioning accuracy at the next teaching position. It is characterized in that it consists of 7 steps and
  • the invention according to claim 10 is an automatic operation that is provided on the hydraulic shovel and that is operated by the hydraulic shovel to regenerate the cycle from the taught excavation to the unburdening operation.
  • the automatic operation controller including the controller, the teaching point taught by the automatic operation controller in the regeneration operation from the start of the excavation to the end of the excavation is set to the target position data.
  • a delay means for outputting the next target position data after a predetermined time has elapsed after the output is provided.
  • the invention according to claim 11 includes at least an electromagnetic switching valve that operates a hydraulic cylinder that operates a boom, an arm, and a bucket, and a hydraulic motor that operates a revolving unit, and the revolving unit and the revolving unit.
  • a hydraulic shovel including an angle detector for detecting an angle between each of the booms, between the boom and the arm, and between the arm and the bucket, and the teaching position data stored by teaching.
  • a target position output means for reading out and outputting as target position data; and inputting the target position data and outputting the target position data so that the hydraulic shovel operates smoothly.
  • Servo pre-processing means for outputting the interpolated target position data; and a server for inputting each of the target position data and outputting a control signal to the electromagnetic switching valve to control the hydraulic shovel to the target position.
  • an automatic operation controller comprising an automatic operation controller having a robot control means, and the target position output means for performing a regeneration operation from the start of excavation to the end of excavation.
  • the servo pre-processing means After the teaching point taught by the servo pre-processing means is output to the servo control unit as the target position data overnight, after a predetermined time has elapsed, the next target position data is output. It is characterized by providing delay means.
  • the invention according to claim 12 is the invention according to any one of claims 10 or 11, wherein the predetermined time set by the delay means is at a time of light load or no load. After outputting the taught teaching point as target position data, it is set to a time until the hydraulic shovel reaches the target position of the target position data.
  • the quarry stone ⁇ storage part for storing quarry dropped below the loading surface where quarry is carried in, and the quarry stone storage part. It is characterized by having an excavator that scoops and discharges quarry and a crusher that crushes quarry discharged by this excavator and generates framing stone.
  • An invention according to claim 14 is a crushed stone processing system for generating crushed stone, which comprises a quarry transporter for transporting quarry, and a crushed stone for storing quarry dropped below a loading surface carried by the quarry transporter.
  • An invention according to claim 15 is a crushed stone processing system for generating crushed stone, which comprises a quarry transporter for transporting quarry, and a crushed stone for storing quarry dropped below a loading surface carried by the quarry transporter.
  • a storage unit an excavator that automatically operates to scoop and discharge the quarry stored in the quarry storage unit, and a crusher that crushes the quarry discharged by the excavator to generate crushed stone.
  • a remote control device for remotely controlling the automatic operation of the excavator.
  • the invention of claim 16 is any of claim 13 or claim 15
  • the bottom surface of the crushed stone storage unit is located below the installation surface of the excavator.
  • the invention according to claim 17 is the invention according to any one of claims 13 to 15, wherein the bottom surface of the crushed stone storage unit is located substantially on the same plane as the installation surface of the excavator. It is characterized by doing.
  • the invention of claim 18 provides a crushed stone storage system of a crushed stone processing system that generates crushed stone, wherein a quarry storage bottom and a quarry dropped by a quarry carrier are guided to the bottom.
  • the invention of claim 19 is the invention of claim 18, characterized in that the bottom surface of the bottom is located below the installation surface of the excavator.
  • the invention according to claim 20 is characterized in that, in the crushed stone storage unit of the crushed stone processing system that generates a frame stone, a bottom part for storing quarry and a guide surface for guiding quarry dropped by the quarry carrier to the bottom part. It is characterized by having.
  • Invention of I 5 claim 2 in the crushed stone processing method for generating a stone, quarry which is carried by ⁇ stone transporter, to drop the frame stone reservoir having a bottom surface downwardly Ri by installation surface of the excavator A step of scooping quarry deposited in the crushed stone storage unit by an excavator and discharging the quarry to a crusher; and crushing the quarry by the crusher to generate crushed stone.
  • FIG. 1 is a view showing an example of an automatic operation shovel body and a working form thereof according to a first embodiment of the present invention.
  • 2 5 2 is a block diagram showing the control mechanism of the teaching playback apparatus main body to be mounted in-vehicle apparatus and the operation board click scan is mounted on the automatic operation tio bell body according to a first embodiment .
  • FIG. 3 is a block diagram showing details of the functional configuration of the automatic operation controller according to the first embodiment.
  • FIG. 5 is a diagram showing an example of a playback command stored in the playback command storage unit shown in FIG.
  • FIG. 6 is a diagram showing dimensions and angles of respective joints whose origin is set at the center of rotation of the boom of the automatic operation shovel main body according to the first embodiment.
  • FIG. 7 is a diagram illustrating an excavation start position P1, an excavation intermediate position P2, and an excavation end position P3 of the automatic operation shovel body according to the first embodiment.
  • FIG. 8 is a flowchart showing a processing procedure of a regeneration operation of the automatic operation shovel according to the first embodiment.
  • FIG. 9 is a block diagram showing the details of the functional configuration of the automatic operation controller according to the second embodiment of the present invention.
  • FIG. 10 is a diagram showing an example of the playback command stored in the playback command storage section 503 shown in FIG.
  • FIG. 11 is a diagram for explaining a method for avoiding obstacles such as rocks in the self-driving shovel according to the second embodiment.
  • FIG. 12 is a diagram showing the overall configuration of a crushed stone processing system according to a third embodiment of the present invention and the working form thereof.
  • FIG. 13 is a block diagram showing an outline of a control mechanism of the crushed stone processing system according to the third embodiment.
  • FIG. 14 is a diagram showing the overall configuration of another frame processing system according to the third embodiment and the working form thereof.
  • FIG. 15 is a diagram showing the overall configuration of another crushed stone processing system according to the third embodiment and the working form thereof.
  • FIG. 1 is a side view showing an example of an automatic operation shovel according to each embodiment and an operation state thereof. --
  • 1 is an automatic operation shovel body that excavates debris stored in a stock yard 2 and discharges it to a crusher 3 described later
  • 3 is an automatic operation shovel body.
  • Crusher for crushing debris released from 1, 4 is an operation box installed at any place suitable for regenerating operation of autonomous driving shovel body 1 .
  • the self-driving shovel main body 1 includes a traveling body 10, a revolving body 11 rotatably provided on the traveling body 10, and a boom 12 rotatably provided on the revolving body 11.
  • An arm 13 rotatably provided at the tip of the boom 12, a bucket 14 rotatably provided at the tip of the arm 13, a boom 12, the arm 13, and the bracket Signals are transmitted between the cylinders 15, 16, and 17 for rotating the actuator 14 and the operation cab 18 provided on the revolving unit 11 and the operation box 4, respectively. It consists of an antenna 19 for sending and receiving.
  • the automatic operation vehicle body 1 includes an angle sensor 111 for detecting a turning angle of the revolving unit 111 and an angle sensor 111 for detecting a turning angle between the revolving unit 11 and the boom 12. And an angle sensor 113 for detecting a rotation angle between the boom 12 and the arm 13, and an angle sensor 111 for detecting a rotation angle between the arm 13 and the bracket 14. .
  • the crasher 3 is composed of a traveling body 30, a hopper 31, a crushed stone portion 32, and a conveyor 33, and 34 is a crasher 3. Therefore, it shows a framed crushed stone.
  • the operation box 4 is composed of a support base 40 and a teaching / reproducing apparatus main body 41 fixed to the support base 40, and the teaching / reproduction apparatus main body 41 has a start button 4111 and a start button 411. , A stop button 4 1 2, an emergency stop button 4 1 3, a teaching operation section 4 1 4 which is provided so as to be mechanically and electrically connectable to the teaching / reproducing apparatus main body 4 1 and is operated at the time of teaching, A display section 419 for displaying the results and the like, and an antenna 415 for transmitting and receiving signals between the antenna 19 of the automatic operation shovel main body 1 are provided.
  • Fig. 2 shows the control mechanism of the in-vehicle onboard unit 5 and the operation / reproduction unit main body 41 of the operation box 4 mounted on the autonomous driving vehicle main body 1 shown in Fig. 1. -
  • FIG. 4 is a block diagram showing an outline of the configuration.
  • reference numeral 4 16 denotes a playback operation unit operated during playback
  • 4 17 denotes a signal output from the teaching operation unit 4 14 or the playback operation unit 4 16 to an automatic operation control described later.
  • the command generators 4 18 and 54 for forming predetermined signals to be output to the roller 50 are provided for transmitting and receiving signals of the automatic operation controller 50 to and from the teaching / reproduction device 41, respectively. It is a radio device.
  • the command generation unit 417 is configured by a general controller using a micro computer, and has a function of generating a command code corresponding to an input signal. .
  • Reference numeral 5 denotes an in-vehicle device
  • 50 denotes an automatic operation controller mainly composed of a computer and performs various controls for automatically driving an automatic operation shovel
  • 51 denotes an automatic operation controller.
  • the proportional solenoid valve driven by the drive current output from the operation controller 50, the solenoid valve 52 is controlled by the hydraulic signal output from the solenoid valve 51, and A control valve for controlling the amount of oil flowing in the evening or the oil pressure is provided.
  • 53 is a key for operating the joints of the autonomous vehicle body 1, such as cylinders 15, 16, 17. 4 and 4 ′ are teaching operation units.
  • the configuration indicated by the other reference numerals is the same as that shown in FIG.
  • the teaching operation is normally performed by an operation from a teaching operation unit 4 14 ′ mounted in the operator's cab 18, and the automatic operation controller 50 follows the operation according to the operation.
  • Detected values from each of the angle sensors 11 1 to 11 14 are input and calculated, and are stored as teaching position data in a predetermined storage area as described later.
  • a playback command to be used at the time of playback is set and stored in a predetermined storage area by an operation from the teaching operation units 4 14 and 4 14 ′.
  • the teaching operation unit 4 14 is shown as being detached from the teaching operation unit 4 14 ′ in the operator's cab 18 and being attached to the teaching playback operation device 4 1. .
  • the predetermined signal generated in the command generation section 417 is transmitted via the antennas 415 and 199.
  • FIG. 3 is a block diagram showing details of a functional configuration of the automatic operation controller 50 shown in FIG. 2 according to the present embodiment.
  • reference numeral 501 denotes a current position calculation unit for calculating the angle signal detected by the angle sensors 111 to 114 into current position data
  • 502 denotes a teaching operation unit for teaching.
  • a teaching processing unit that outputs the current position of the automatic operation shovel main body 1 obtained from the current position calculation unit 501 as the teaching position data by operating from 4 14 ′.
  • Numeral 503 stores commands for instructing various operations at the time of the reproducing operation set by the teaching processing unit 502 in accordance with the instructions from the teaching operation units 4 14 and 4 14 ′.
  • Play command storage unit, 504 is a teaching position storage unit that stores the teaching position data output from the teaching processing unit 502, and 505 is a start signal from the playback operation unit 4 16 When activated, the playback commands stored in the playback command storage unit 503 are sequentially interpreted and the teaching position is stored.
  • Command-in pre- evening section which instructs the output of the specified teaching position data from 504, and 506, the teaching position in response to the command from command-in section 505
  • a teaching position output processing unit that outputs teaching position data from the storage unit 504, and 507 is a teaching position output processing unit that enables the automatic operation shovel body 1 to smoothly operate between each teaching position.
  • the teaching position data is interpolated and the target position data is created and output, that is, the given starting point (current position or teaching position) and Interpolation between end points (teaching positions) is performed at intervals of a certain time to create time-series data, which is sequentially set as the angle target value.
  • the servo preprocessing section that outputs to the servo control section 508, 508 is the target position data that is output from the servo preprocessing section 507 and is interpolated, and is output from the current position calculation section 501
  • Reference numeral 509 denotes a positioning reference value storage unit which stores a positioning reference value serving as a reference for setting the positioning accuracy of each joint
  • reference numeral 510 denotes a command from the servo preprocessing unit 507.
  • the position accuracy of each joint at each teaching position is calculated and calculated based on the reference value stored in the positioning reference value storage unit 509 and the positioning accuracy set at each teaching position.
  • a positioning accuracy calculation unit 511 is a positioning determination unit which is controlled by a command from the servo preprocessing unit 507 and determines whether each joint has reached the positioning range at each teaching position. .
  • the configuration indicated by the other reference numerals is the same as that shown in FIG.
  • FIG. 4 is a diagram showing an example of the teaching position data stored in the teaching position storage section 504 shown in FIG.
  • P1 to Pn correspond to the teaching position and also to the labels P1 to Pn of the playback command described later.
  • the swing angle, boom angle, arm angle, and packet angle to be taken are set.
  • FIG. 5 is a diagram showing an example of the playback command according to the present embodiment stored in the playback command storage unit 503.
  • L1 represents a line label, not a command.
  • V is a command for specifying the moving speed. A larger value indicates that the moving speed is higher.
  • PAC positional accuracy
  • This number is --
  • M ⁇ VE is a command for instructing movement to a specified teaching position
  • P1 to Pn are labels indicating angle information of each joint of the MOVE command.
  • MOVEP1 indicates that the teaching position data stored in the teaching position storage section 504 should be moved to the position No. PI shown in FIG.
  • GOTOL1 is a command for instructing that execution be restarted from line label L1.
  • the teaching operation is performed from the teaching operation unit 4 14 or 4 14 ′.
  • the teaching operation section 4 14 ′ is mounted in the cab 18 of the automatic operation vehicle main body 1 and teaching operation is performed from the cab.
  • the command is input to the teaching processing unit 5 02, and the current position calculation unit 5 0 Input the current position data from 1 and generate a playback command and teaching position data corresponding to each teaching position.
  • the generated playback command and teaching position data are stored in the playback command storage unit 503 and the teaching position storage unit 504, respectively.
  • the playback operation is performed by turning on the start button 4 11 1, and the playback command stored in the playback command storage section 5 03 is executed by the command interface Read and execute sequentially.
  • the playback command is the M0VE instruction
  • the corresponding parameter is output from the teaching position storage section 504 to the teaching position output processing section 506, and the servo pre-processing section is output. Transfer to 5 0 7.
  • the servo preprocessing unit 507 performs the interpolation calculation of the angles so that each joint operates at the target speed given from the command input unit 505 and the servo control unit 507. To output the target angle value.
  • the servo control unit 508 generates a general filter based on the current position data calculated by the current position calculation unit 501 and the angle target value output from the servo preprocessing unit 507. Drive current for driving the proportional solenoid valve 51 -
  • control valve 52 is controlled, a predetermined pressure oil is supplied to the actuator 53, and each joint of the automatic operation shovel main body 1 is driven.
  • the positioning accuracy calculation unit 510 calculates the positioning accuracy for each joint according to the positioning accuracy given at each teaching position based on the reference value stored in the positioning reference value storage unit 509. To calculate.
  • the interpolating operation in the servo preprocessing unit 507 reaches the final target position (for example, P 2 in the case of MOVEP 2), and the final target position data is output to the servo control unit 508.
  • the positioning judging unit ⁇ 11 receives the command from the servo pre-processing unit 507, and the current position of each joint is calculated by the positioning accuracy calculating unit 5 10. It is determined whether or not it has reached the positioning range set based on. If the result of the determination is that each joint has not reached the positioning range, the servo preprocessing unit 507 continues to output the final target position to the servo control unit 508.
  • the servo pre-processing unit 507 terminates the output of the final target position, and outputs from the teaching position ( ⁇ 2) and the teaching position output processing unit 506. Interpolation calculation between the next teaching position ( ⁇ 3) to be output is performed and the operation of automatic operation is continued. Next, the operation of the automatic operation shovel body 1 during excavation will be described with reference to Figs.
  • FIG. 6 is a diagram showing the dimensions and angles of the joints of the automatic operation shovel body 1 with the rotation center of the boom 12 as the origin ⁇ , and G indicates the connection of the automatic operation shovel body 1.
  • L bm is the boom length
  • L am is the arm length
  • L bk is the bucket length
  • 0 sw is the angle between the revolving unit 11 and the traveling unit 10
  • 6 bm is the horizontal axis X
  • the angle between the boom 12 and 0, 0 am is the angle between the boom 12 and the arm 13
  • 0 bk is the angle between the arm 13 and the bucket 14.
  • FIG. 7 is a diagram showing the excavation start position P 1, the excavation intermediate position P 2, and the excavation end position P 3 of the main body of the automatic operation shovel centered on the origin ⁇ , and eam Pl is P 1 Arm angle at, S am P 2 is P 2 6 one
  • the arm angle at, and () am P 2 P AC represents the positioning range for the arm at P 2.
  • the operation sequence in the reproduction operation is performed in the order of P 1 -P 2 -P 3, and the operation from P 1 ⁇ P 2 is the operation of only the arm cloud.
  • the operation from P1 to P2 is based on the following commands stored in the playback command storage section 503 by the command input section 505 shown in FIG. Is output to the servo preprocessor 507.
  • V in equation (1) is a command representing the speed as described above.
  • the servo pre-processing unit operates at 90% of the maximum speed of the arm.
  • An interpolation operation is performed at 507. Also,
  • the PAC in equation (2) is a command that indicates the positioning accuracy at the intermediate excavation position P2 as described above, and the positioning accuracy of each of the revolving unit, the boom, the arm, and the bucket is ,
  • the positioning accuracy calculation unit 5110, the revolving unit, boom, and arm stored in the positioning accuracy value PAC and the positioning reference value storage unit 509 at each teaching position P 1, P 2, P 3.
  • the positioning accuracy of each joint is determined by the force obtained by using the relations of the above equations (4) to (6) to determine the positioning accuracy and the positioning reference value. You can set it arbitrarily. Note that the positioning accuracy S bm P 2 PAC, ⁇ am P 2 PAC, and 0 bk P 2 PAC of other joints are also obtained in the same manner as ⁇ am P 2 PAC. Normally, when the final target position is output to the servo control unit 508 in the servo preprocessing unit 507, the automatic operation system is performed in the positioning determination unit 511 based on the calculated positioning accuracy of each joint. It is determined whether the pager body has reached the positioning range.
  • the respective sections of the automatic operation vehicle main body 1 reach the above-mentioned positioning range, the output of the final target position ends, and the position between the excavation interrogation position P2 and the next excavation end position P3 is set. The interpolation operation is started, and the new interpolated target value is output, and each joint starts moving toward the new position.
  • the servo preprocessor 507 outputs the final target position P 2
  • the operation immediately proceeds to the interpolation calculation from the next P 2 to P 3, and each joint is set to the new interpolated target position. Since the operation starts to move toward the target value, it is possible to avoid a situation in which excavation stagnates due to the resistance of obstacles such as rocks that follow the target position P 2 without any reason. , P1-P2 ⁇ P3 can be operated smoothly without stopping.
  • step 1 After outputting the final target position P 1 from the servo preprocessing unit 507, when it is determined that each joint has reached the positioning range by the positioning determination unit 5 11.
  • step 3 the positioning accuracy for each joint is calculated in the positioning accuracy calculation unit 5110.
  • step 3 an interpolation operation between P1 and P2 is performed in the servo preprocessing unit 507, and in step 4, the target position obtained by the interpolation operation is output to the servo control unit 508. Then, each joint is operated by servo control.
  • step i3 the eye output as a result of the interpolation operation in step 3 -i-
  • step 6 it is determined in step 6 whether the positioning accuracy P AC at the teaching position (P 2) is larger than a predetermined value S arbitrarily set. If the positioning accuracy PAC is larger than the predetermined value S, each joint is within the predetermined positioning range of the final target position (P 2) based on the positioning accuracy of each joint calculated in step 2 in step 7. Is determined.
  • Step 7 If each joint does not reach the predetermined positioning range of the final target position (P2), it is determined whether each joint has reached the final target position (P2). Repeat the processing of Step 7 until the joint reaches the predetermined positioning range of Step 7. When each joint reaches the predetermined positioning range of the final target position (P 2), the processing shifts to Step 8.
  • the section 507 outputs the final target position (P 2) as a result of the interpolation calculation, no matter which of the following joints is in the excavation start position P 1 and the excavation intermediate position P 2, Immediately without being servo-controlled toward the final target value P2, a new interpolated target position between the excavation interposition position P2 and the excavation end position P3 is obtained.
  • Each joint is servo-controlled toward the position. Therefore, for example, even if there is an obstacle, such as rock, between the excavation start position P1 and the excavation intermediate position P2, the excavation starts in the direction from the excavation intermediate position P2 to the excavation end position P3. It can be removed from the direction from the position P 1 to the intermediate excavation position P 2, and the automatic operation shovel body 1 automatically avoids the obstacle and continues the regeneration operation without stagnation be able to.
  • an obstacle such as rock
  • the servo preprocessing unit 507 performs the interpolation calculation.
  • the final target position (P 2) is output, each of the following joints is located between the excavation start position P 1 and the excavation intermediate position P 2, but the cutting resistance is small. Since the delay of each joint is small, the current position of each joint is located at a position close to the final target position (P2), and the excavation is performed according to the teaching positions P1, P2, P3,. Excavation with high cutting accuracy can be performed.
  • FIG. 9 is a block diagram showing details of a functional configuration of the automatic operation controller 50 shown in FIG. 3 according to the present embodiment.
  • Reference numeral 509 denotes an evening image which receives a command from the command interpreter section 505, counts for a predetermined time, and responds to the command-in evening section 505.
  • the other configurations are the same as those of the same reference numerals shown in FIG.
  • FIG. 10 is a diagram showing an example of a playback command according to the present embodiment stored in the playback command storage unit 503 shown in FIG.
  • PAC positional accuracy
  • WAIT is a command to instruct standby for a predetermined time.
  • the output information is transmitted to the command input section 505, and the command interpreter section 505 If the WAIT command is set, the timer outputs the set time specified by the WAIT command to timer 509, and the evening timer 509 outputs a complete answer after the set time has elapsed. Output to the command interpreter block 509. When the completion answer is issued, the command input section 509 sends the interpolated target position between the taught target position data P3 and the target position data P4 to the servo preprocessing section 507.
  • Px, Px + 1, and Px + 2 are the target positions based on the teaching position data stored in the teaching position storage unit 53, respectively, and pl, 2, p3,.
  • the target positions calculated and interpolated based on the teaching position data, P 1 ′, P 2 ′, p 3 ′,... ′, Indicate the positions where the bucket tip actually passed.
  • the current position data PX is obtained via the servo pre-processing unit 507 force, the angle sensor 111 to 114, the current position calculation unit 501, and the servo control unit 508. Hold. Next, the target teaching position data PX + 1 is read from the teaching position output processing section 506, and ⁇ H-
  • a difference of 1Z8 of the difference C is calculated, and the position data PX + the position data of the difference CZ8 is output to the servo controller 508.
  • the servo control is performed toward the interpolated target positions p i, p 2--. Therefore, when the PAC is set to zero, as shown in Fig. 11 (a), it is necessary to go to the target position PX + 1 until the PAC reaches a predetermined circle determined by the value of the PAC. Since servo control is not performed, even if the bucket hits an obstacle such as a rock and becomes difficult to move, the target position is changed to P 1, 2-'' and the passing point pl '. 2'. P 3 ' ⁇ ⁇ ⁇ You can pass through 'and avoid obstacles such as rocks.
  • the target target position Px + 1 is output from the servo control section 508, the current position of the bucket tip is still any position (position between PX and PX11).
  • the WAIT is set without starting the interpolation process between the target position Px + 1 and the next target position PX + 2 to set the next target position. Maintain the target position PX + 1 as the target point for a predetermined time.
  • the packet moves toward the target position PX + 1, and after a lapse of a predetermined time (position B), starts the interpolation processing between the target position PX + 1 and the next target position PX + 2.
  • position B starts the interpolation processing between the target position PX + 1 and the next target position PX + 2.
  • the bucket tip is servo-controlled toward the sequentially interpolated target positions p 1, 2-'without going to the target position P X + 1.
  • the interpolation processing is started after waiting for a predetermined time, and during this time, the bucket is controlled so as to move the bucket to the target position ⁇ X + 1. Therefore, when there are no obstacles such as rocks, the work can be performed by passing through the position close to the target position ⁇ X + 1, and the reproduction operation with high accuracy can be performed. In addition, even if the packet cannot move due to collision with an obstacle such as a rock, the target position is changed from the target position ⁇ X + 1 to the target position ⁇ 1, ⁇ after a predetermined time. It is changed to 2 ⁇ ⁇ ⁇ , and obstacles such as rocks can be avoided.
  • FIG. 12 is a diagram showing the entire configuration of the crushed stone processing system according to the present embodiment and the working form thereof.
  • reference numeral 1 denotes a backhoe-type automatic operation shovel body as used in the first and second embodiments.
  • Reference numeral 2 denotes a stockyard for temporarily storing quarry 2 1, and the stockyard 2 is located near the installation site of the self-driving shovel body 1.
  • the stock yard 2 has a first guide surface 22 formed with an inclination angle on the side away from the installation location of the automatic operation shovel body 1, and the installation location side of the automatic operation shovel body 1.
  • a second guide surface 23 formed with an inclined angle at the bottom, and a bottom portion 24 formed between the first guide surface 22 and the second guide surface 23, the bottom portion 24 being operated automatically It is formed below the surface where the Shovel body 1 is installed.
  • the first guide surface 23 and the second guide surface 22 are formed so as to become wider as going upward from the bottom portion 24, and furthermore, the first guide surface 23 and the second guide surface 22 are further expanded.
  • the surface 23 extends above the surface where the automatic operation shovel body 1 is installed.
  • the inclination angle of the first guide surface 23 is set such that the quarry 21 discharged from the extending portion above it, that is, the quarry 21 supplied from the quarry 21 is deposited on the bottom portion 24. It is desirable to set to.
  • the inclination angle of the second guide surface 22 is determined from the viewpoint of the efficiency of the quarry scooping work, because the quarry after being scooped by the bucket 14 of the automatic operation shovel body 1 is at the bottom 24. Set the angle to return to -lb-
  • Numeral 6 denotes a quarry transporter such as a track which enters the extended portion of the first guide surface 23 constituting the stock yard 2, namely, the supply portion 25 of the quarry 21.
  • the quarry transporter 6 is equipped with a vessel 61 for transporting quarry generated by breaking the ground at other locations.
  • the quarry transporter 6 is operated by an operator mounted on the quarry transporter, and the quarry loaded in the vessel 61 is discharged into the supply part 25, and the quarry is released to the stock yard 2 by the tilting of the vessel 61.
  • Reference numeral 3 denotes a crusher disposed near the automatic operation shovel body 1, which detects an abnormal state of the crusher 3 and outputs an abnormal state detection signal. It has antenna 37. Other configurations are the same as those shown in FIG.
  • FIG. 13 is a block diagram showing an outline of a control mechanism of the framing stone processing system according to the present embodiment. Other configurations are the same as those shown in FIG.
  • Reference numeral 419 denotes a display section for displaying various states of the crushed stone processing system, such as an abnormal operation state of the automatic operation shovel, a normal operation state, and a teaching operation state.
  • Reference numeral 7 denotes a device on which the crusher 3 is mounted
  • 36 denotes a wireless device that transmits an abnormal condition detection signal to the operation box 4
  • 38 denotes a device that transmits an abnormal signal when an abnormal condition is detected. It is a command generation unit to instruct.
  • the quarry is discharged to the stock yard 2 by the quarry transporter 6.
  • the quarry discharging time by the quarry transporter 6 is set so as not to coincide with the scooping operation of the quarry 21 by the bucket 14 of the automatic operation shovel body 1.
  • the quarry discharged by the quarry transporter 6 falls along the first guide surface 23 constituting the stock yard 2 and is deposited on the bottom 24.
  • the automatic operation console 1 receives the teaching motion stored in advance.
  • the teaching operation is reproduced according to the work. That is, the quarry 21 in the stock jar 2 is scooped by the baguette 14, the revolving body 11 is swung in this state, and the socket 14 is moved to the crusher 3. To the hopper 31 and then rotate the bucket 14 to discharge the quarry in the bucket 14 to the hopper 31 and rotate the revolving unit 11 again to rotate the bucket. The operation of moving the nut 14 to the stocker 2 and scooping the quarry 21 is repeated.
  • the quarry 21 put into the hopper 31 of the crusher 3 is released as crushed stone 34 by the conveyor 33 after the frame is broken. Crushed stones 34 are carried out by other prepared transporter.
  • the quarry 21 is inserted into the stock yard 2 at a position farther from the installation position of the automatic operation shovel body 1, so that the quarry carrier 6 and the automatic operation There is no need to worry about contact with the bell body 1. As a result, the quarry 21 can be safely and efficiently supplied into the stock yard 2.
  • the detection signal from the abnormal state detector 35 is transmitted to the operation box 4, so that the operation box 4 This abnormal state is displayed on the display section 4 19 and a stop command is sent to the crusher 3.
  • the abnormalities of the crusher 3 can be centrally managed, and the production of the framing stone can be performed stably and efficiently.
  • FIG. 14 is a diagram showing the overall configuration of a crushed stone processing system different from that of FIG. 12 according to the present embodiment, and the working form thereof.
  • the same reference numerals as those shown in FIG. 12 indicate the same parts.
  • this crushed stone processing system the bucket 14 of the automatic operation shovel body 1 is instructed to move so as to move around the quarry movement suppressing member 26. Further, this frame stone processing system is effective when the stock yard 2 cannot be installed sufficiently lower than the installation surface of the dynamic operation excavator body 1, and is similar to the crushed stone processing system described above. The effect can be achieved.
  • the second guide surface 22 constituting the stock yard 2 is formed with an inclined angle, but may be formed substantially vertically.
  • FIG. 15 is a diagram showing the entire configuration of another crushed stone processing system different from those shown in FIGS. 12 and 14 according to the present embodiment and the working form thereof.
  • the difference between this crushed stone processing system and the framed stone processing system shown in Fig. 12 and Fig. 14 is that the automatic operation shovel body 1 uses a single-handed shovel type, The bottom surface of the bottom part 24 that constitutes the wickard 2 and the installation surface of the automatic operation shovel body 1 are substantially flush with each other.
  • the automatic operation shovel main body 1 is a mouthpiece type, the bottom surface of the bottom part 24 of the stock yard 2 and the installation surface of the automatic operation shovel main body 1 are different from each other.
  • the quarry 21 can be efficiently scooped even when the quarries are arranged on substantially the same plane.
  • the crusher 3 is installed below the installation surface of the autonomous shovel body 1, and the crusher 3 is automatically operated. It can be installed on almost the same surface as the installation surface of 1.
  • the automatic operation shovel provides the automatic operation controller with an automatic operation controller having a position within a predetermined teaching position range based on the positioning accuracy set for each teaching position of the hydraulic shovel.
  • a positioning judging means for judging the arrival is provided, and when it is judged that the hydraulic shovel has reached the predetermined teaching position range, the next teaching position is outputted as the target position.
  • the positioning accuracy is set arbitrarily for each teaching position, the excavation accuracy can be controlled according to each excavation and unburdening work position, so that automatic operation with high accuracy and high work efficiency can be performed. Can be.
  • the automatic operation controller outputs the teaching position as the target position during the regenerating operation from the start of the excavation to the end of the excavation, and then outputs the instruction position as the target position. Since the target position based on the next teaching position is output without performing judgment, the excavation trajectory can be automatically changed according to the magnitude of the excavation resistance during excavation. In addition, it is possible to prevent stagnation of excavation due to collision with an obstacle having high excavation resistance, such as rocks, and to perform efficient excavation. Further, the automatic operation shovel of the present invention provides the automatic operation controller with a lapse of a predetermined time after outputting the taught point as target position data in the regeneration operation from the start of digging to the end of digging.
  • delay means for outputting the next target position data are provided, so if there is no obstacle such as rocks, it can pass through the position close to the taught target position and excavation with high accuracy Work can be performed. In addition, even if it becomes impossible to move due to obstacles such as rocks, the target position to be moved by the autonomous driving shovel is changed to the next target position after a predetermined time, and the obstacle is avoided. Digging without wasteful avoidance action 2 g
  • the automatic driving vehicle of the present invention does not require various sensors as in the prior art in order to achieve the above-mentioned effects, and also has a processing load on the automatic driving controller. Not much.
  • the quarry processing system of the present invention deposits quarries on stockyards and scoops up the quarried stones with a grinding machine, so that the quarrying operation can be performed stably and efficiently. Can be.
  • the crushed stone processing system of the present invention can deposit quarries so as to be able to be scooped by an excavator, so that work for depositing quarries is not required, and the efficiency of the quarry stone processing operation is improved. be able to.
  • the lithotripsy treatment system of the present invention repeats the operation of depositing quarry on a stock yard, scooping the quarry deposited by an excavator and discharging the quarry to a crusher. Since crushed stone is generated from the lasher, the efficiency of crushed stone processing work can be improved.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Operation Control Of Excavators (AREA)
  • Earth Drilling (AREA)
  • Manipulator (AREA)

Description

_ , ― JP9謂 363
f§月 糸田 自動運転ショベルおよびそれを用いた枠石処理システム 技術分野
本発明は、 自動運転ショベルに係わり、 更に詳しく は、 掘削抵抗 の大きな岩石等を含む掘削物の掘削時において、 掘削抵抗の大きさ に応じて掘削軌跡を自動調整することを可能にした自動運転ショ べ ル、 およびこの自動運転ショ ベルを利用した枠石処理システムに関 する。 背景技術
従来、 建設機械の代表例として油圧ショ ベルが知られているが、 近年、 油圧ショ ベルによってその掘削から放土までの一巡する単調 な作業を繰り返す場合には、 自動運転によってその作業を行わせる ようになつている。 しかし、 油圧ショベルを自動運転するためには 解決しなければならない種々の問題がある。 例えば、 油圧ショ べル による掘削作業中にバゲッ トが岩石等に当たって所望の動作を しな く なる場合には、 熟練のォペレ一夕はこのような状態を察知して回 避動作をと り、 作業を円滑に継続させるが、 これを自動運転ショ べ ルに行わせるためには工夫が必要である。
従来、 このような掘削作業時の問題を解決するものとして、 特公 昭 6 1 - 9 4 5 3号公報には、 アームおよびバケツ 卜に加わる過負 荷を検出する過負荷検出センサを設け、 過負荷が検出されたときは ブームを微量上昇させることによってその過負荷を軽減し自動掘削 を継続する技術が開示されている。 また、 特開平 4 一 3 5 0 2 2 0 号公報には、 掘削時に、 ブーム、 ァ一ム、 およびパケッ トを動作さ せるシリ ンダに取り付けた圧力センサからの検出値が所定値以上に 達し、 かつブーム、 アーム、 およびバゲッ トに取り付けた角度セン ザから求めた動作速度が所定値以下になった場合は、 過負荷である と判断して掘削軌跡をずら し、 掘削作業の障害を回避する技術が開 示されている。
また、 近年、 砕石現場での碎石作業の 自動化も進め られてきてお り 、 特開平 9 — 1 9 5 3 2 1 号公報には自動枠石プラ ン ト の技術が 開示されている。 この 自動砕石プラ ン ト は、 ブル ドーザによ り かき 集めた採石を、 油圧シ ョ ベルで掬い取って、 モ一ビルク ラ ッ シャに 排出 し、 モービルク ラ ッ シャで砂利を生成する ものであ り 、 さ ら に、 ォペ レ一夕 によ り操作されるブル ドーザには、 油圧シ ョ ベルおよび モー ビルク ラ ッ シャを 自動運転制御させる制御装置が設け られてい る と共に、 油圧シ ョ ベルか ら離れた位置に も、 油圧シ ョ ベルおよび モー ビルク ラ ッ シャを 自動運転制御する制御装置が設け られている。
しか し、 特公昭 6 1 — 9 4 5 3 号公報のものは、 各関節の位置を 検出するための位置検出セ ンサに加えて、 過負荷を検出するための センサも必要であ り 、 また自動運転を行う ための処理負荷も大きい と い う 問題があった。 特開平 4 一 3 5 0 2 2 0 号公報のものは、 各 種のセ ンサを必要と し、 また、 センサによって検出されたデータ に 基づく 演算が必要であ り 、 自動運転シ ョ ベルが備える制御装置の演 算負荷を増大させる こ と にな り 、 また、 自動運転シ ョ ベルをゆつ く り 動か した場合には、 動作速度が小さ く な り 、 過負荷時の低速時と の区別がつけ難く 誤検出の可能性があった。 さ ら に、 シ リ ンダの圧 力は岩石等に当たった時は大き く なる力 その時のシ ョ ッ クでその 岩石が動き出すと圧力が低く なるためその時も誤検出の可能性があ り 、 さ ら に、 このよ う な圧力セ ンサや動作速度か ら過負荷を求める 方法では、 どの程度の圧力値でどの程度の動作速度であれば過負荷 であるかを判定する こ とが実用上難しかった。
また、 特開平 9 — 1 9 5 3 2 1 号公報に示される碎石プラ ン トで は、 油圧シ ョ ベルは、 ブル ドーザによ って集めた採石を予め記憶 し た順番で掬い込むよ う に設定されている力 、 油圧シ ョ ベルが砕石を 効率良 く 掬い込むためには、 ブル ドーザを操作 して、 崩された碎石 を油圧シ ョ ベルの作業範囲まで集積する必要があ り 、 その際、 ブル _ g
ドーザに乗車 しているオペ レータは、 ブル ドーザが砕石の掬い込み 作業を行っている油圧シ ョ ベルのフ ロ ン ト部に接触しないよ う に両 者間の距離に注意してブル ドーザを制御 しなければな らなかった。 さ ら に、 油圧シ ョ ベルによって碎石の掬い込み作業が行われている 時には、 油圧シ ョ ベルのフ ロ ン ト部との接触を防ぐために、 ブル ド 一ザによる油圧シ ョ ベルの作業範囲への採石の集積動作を休止しな ければな らず、 また、 油圧シ ョ ベルの作業範囲での採石量が少な く なっ た場合には、 ブル ドーザによって採石を集積するために、 油圧 シ ョ ベルの運転を休止しなければな らない等の問題もあ り 、 砕石処 理を安定かつ効率よ く 行えないという 問題があっ た。
本発明の 目的は、 上記の種々 の間題点に鑑みて、 掘削時の過負荷 状態を検出するために特別の装置を必要とする こ とな く 、 简便な方 法で掘削時の障害物を回避する こ とのできる 自動運転シ ョ ベルを提 供する と共に、 自動運転シ ョ ベルを用いた砕石処理システムにおい て作業効率の向上を図る こ とにある。 発明の開示
上記の目的を達成するために、 請求項 1 の発明は、 油圧シ ョ ベル と、 該油圧シ ョ ベルに設け られ、 教示された捆削か ら放土までの一 巡する動作を当該油圧シ ョ ベルに再生動作させる 自動運転コ ン ト 口 ーラ と、 か ら構成される 自動運転シ ョ ベルにおいて、 前記自動運転 コ ン 卜 ローラは、 当該油圧シ ョ ベルの各教示位置毎に設定された位 置決め精度に基づく 所定の位置決め範囲内への到達を判定する位置 決め判定手段を備え、 当該油圧シ ョ ベルが前記所定の位置決め範囲 内に到達したと判定された ときは、 次の教示位置を 目標位置と して 出力する こ とを特徴とする。 また、 請求項 2 の発明は、 請求項 1 の発明において、 前記自動運 転コ ン ト ローラは、 掘削開始か ら掘削終了間の再生動作時において、 教示された教示位置を 目標位置と して出力後、 前記位置決め判定手 段による判定を行う こ とな く 、 次の教示位置に基づく 目標位置を出 力する こ とを特徴とする。
また、 請求項 3 の発明は、 少なく と も、 ブーム、 アームおよびバ ケ ッ ト を作動する油圧シ リ ンダ並びに旋回体を作動する油圧モー夕 を作動する電磁切換弁と、 前記旋回体と前記ブーム問、 前記ブ一ム と前記アーム間、 前記アーム と前記バケ ッ 卜間のそれぞれの角度を 検出する角度検出器とを備える油圧シ ョ ベルと、 教示して記憶され た教示位置データを逐次読み出 して出力する教示位置出力手段と、 前記教示位置デ一夕 を入力 して当該油圧シ ョ ベルが円滑に動作する よ う に前記教示位置データ間が補間された 目標位置データを出力す るサーボ前処理手段と、 前記目標位置デー タ を入力 して当該油圧シ ョ ベルを 目標位置に制御するために前記電磁切換弁に制御信号を出 力するサーボ制御手段とを備える 自動運転コ ン ト ローラ と、 か ら構 成される 自動運転シ ョ ベルにおいて、 前記自動運転コ ン ト ローラは、 当該油圧シ ョ べルが各教示位置毎に設定された位置決め精度に基づ く 所定の位置決め範囲内への到達を判定する位置決め判定手段を備 え、 当該油圧シ ョ ベルが前記所定の位置決め範囲内に到達したと判 定されたときは、 前記サーボ前処理部か ら次の教示位置データ に基 づく 目標位置データ を前記サーボ制御部に出力する こ とを特徴とす る。
また、 請求項 4 の発明は、 請求項 3 の発明において、 前記自動運 転コ ン ト ローラは、 前記教示位置毎に設定された位置決め精度に基 づいて、 前記旋回体、 ブーム、 アーム、 およびバケ ツ 卜のそれぞれ の位置決め精度を演算する演算手段を備え、 前記位置決め判定手段 は、 前記の旋回体、 ブーム、 アーム、 およびバケ ッ トが前記演算さ れたそれぞれの位置決め精度に基づく それぞれの所定の位置決め範 囲内への到達を判定する こ とを特徴とする。
また、 請求項 5 の発明は、 請求項 3 ない しは請求項 4 のいずれか 1 つの請求項の発明において、 前記サーボ前処理部は、 掘削開始か ら掘削終了問の再生動作時において、 各教示位置デ一夕に対応する - ―
最終目標位置データの出力後、 前記位置決め判定手段による判定を 行う こ とな く 、 次の教示位置データ に基づく 目標位置データ を出力 する こ とを特徴とする。
また、 請求項 6 の発明は、 請求項 1 、 請求項 3 、 または請求項 4 のいずれか 1 つの請求項の発明において、 掘削開始か ら搌削終了ま での間の前記教示位置毎に設定される位置決め精度の う ち、 掘削開 始位置および掘削終了位置を除く 教示位置における位置決め精度は、 前記掘削開始位置および前記掘削終了位置における位置決め精度よ り低く 設定されている こ とを特徴とする。
請求項 7 の発明は、 請求項 1 、 請求項 3 、 請求項 4 、 または請求 項 6 のいずれか 1 つの請求項の発明において、 掘削動作において前 記教示位置毎に設定される位置決め精度は、 放土動作において前記 教示位置毎に設定される位置決め精度よ り低く 設定されてい こ とを 特徴とする。
請求項 8 の発明は、 請求項 1 ない しは請求項 7 のいずれか 1 つの 請求項の発明において、 前記教示位置毎に設定された位置決め精度 は、 当該油圧シ ョ ベルまたは当該油圧シ ョ ベルか ら離れた位置に設 けられた操作手段によ り任意に設定し得る こ とを特徴とする。
請求項 9 の発明は、 教示された掘削か ら放土までの一巡する動作 を油圧シ ョ ベルに再生動作させる 自動運転シ ョ ベルにおける 自動運 転方法において、 再生動作させるために、 教示位置、 および当該教 示位置における再生動作速度と位置決め精度を指令する第 1 の工程 と、 当該教示位置の前の教示位置と当該教示位置との間の再生動作 を円滑化するための補間された目標位置の演算を行う第 2 の工程と、 前記目標位置を順次指令する第 3 の工程と、 前記目標位置の う ち 当 該教示位置に相当する最終目標位置を指令 したか否かを判定 し、 前 記最終目標位置を指令 していない と判定した ときは、 前記最終目標 位置が指令されるまで前記第 3 の工程を実行する第 4 の工程と、 前 記第 4 の工程において、 前記最終目標位置を指令 した と判定された ときは、 当該教示位匱における前記位置決め精度が所定値以上であ f) _
るか否かを判定する第 5 の工程と、 前記第 5 の工程において、 所定 値以上である と判定された ときは、 現在位置が前記位置決め精度に 基づく 所定の位置決め範囲内に到達したか否かを判定し、 到達して いない と判定された ときは、 到達するまで当該判定を繰り 返す第 6 の工程と、 前記第 5 の工程において、 所定値以上である と判定され ないとき、 または前記第 6 の工程において、 現在位置が前記所定の 位置決め範囲内に到達したと判定された ときは、 当該教示位置の次 の教示位置、 および次の教示位置における再生動作速度と位置決め 精度を指令する第 7 の工程と、 か ら構成されている こ とを特徴とす る。
請求項 1 0 の発明は、 油圧シ ョ ベルと、 該油圧シ ョ ベルに設けら れ、 教示された掘削か ら放土までの一巡する動作を当該油圧シ ョ べ ルに再生動作させる 自動運転コ ン ト ローラ と、 か ら構成される 自動 運転シ ョ ベルにおいて、 前記自動運転コ ン ト ローラ に、 掘削開始か ら掘削終了間の再生動作において、 教示された教示点を 目標位置デ 一夕 と して出力後、 所定時間経過してか ら次の目標位置データ を出 力させるための遅延手段を設けたこ とを特徴とする。
請求項 1 1 の発明は、 少な く と も、 ブーム、 アームおよびバケ ツ ト を作動する油圧シ リ ンダ並びに旋回体を作動する油圧モー夕 を作 動する電磁切換弁と、 前記旋回体と前記ブーム間、 前記ブーム と前 記アーム間、 前記アーム と前記バケ ツ ト間のそれぞれの角度を検出 する角度検出器とを備える油圧シ ョ ベルと、 教示して記憶された教 示位置データ を逐次読み出 して目標位置データ と して出力する 目標 位置出力手段と、 前記目標位置デ一夕 を入力 して前記目標位置デー 夕 を出力する と共に当該油圧シ ョ ベルが円滑に動作するよ う に補間 した目標位置データを出力するサーボ前処理手段と、 前記各目標位 置データを入力 して当該油圧シ ョ ベルを 目標位置に制御するために 前記電磁切換弁に制御信号を出力するサーボ制御手段とを備える 自 動運転コ ン ト ローラ と、 か ら構成される 自動運転シ ョ ベルにおいて、 前記目標位置出力手段に、 掘削開始か ら掘削終了間の再生動作にお ― ―
いて、 前記サーボ前処理手段か ら 、 教示さ れた教示点が目標位置デ 一夕 と してサーボ制御部に出力後、 所定時閒経過してか ら次の目標 位置データ を出力させるための遅延手段を設けた こ とを特徴とする。
請求項 1 2 の発明は、 請求項 1 0 ない しは請求項 1 1 のいずれか 1 つの請求項の発明において、 前記遅延手段において設定される前 記所定時間は、 軽負荷または無負荷時において、 前記教示された教 示点を 目標位置データ と して出力後、 当該油圧シ ョ ベルが前記目標 位置データの 目標位置に到達する までの時間に設定される こ と を特 徴とする。
請求項 1 3 の発明は、 砕石を生成する砕石処理システムにおいて、 採石が搬入される搬入面よ り 下方に投下される採石を貯留する枠石 '貯留部と、 この砕石貯留部に貯留された採石を掬い取って排出する 掘削機と、 この掘削機によ り 排出される採石を破砕して枠石を生成 する ク ラ ッ シャ とを備えたこ とを特徴とする。
請求項 1 4 の発明は、 碎石を生成する碎石処理システムにおいて、 採石を運搬する採石運搬機と、 この採石運搬機によって搬入される 搬入面よ り 下方に投下される採石を貯留する砕石貯留部と、 この砕 石貯留部に貯留された採石を掬い取って排出する掘削機と、 この掘 削機によ り 排出される採石を破枠して砕石を生成する ク ラ ッ シ ャ と を備えた こ とを特徴とする。
請求項 1 5 の発明は、 砕石を生成する砕石処理システムにおいて、 採石を運搬する採石運搬機と、 この採石運搬機によって搬入される 搬入面よ り 下方に投下される採石を貯留するための砕石貯留部と、 この砕石貯留部に貯留された採石を掬い取って排出する作業を 自動 運転する掘削機と、 こ の掘削機によ り排出される採石を破砕して砕 石を生成する ク ラ ッ シャ と、 前記掘削機の 自動運転を遠隔操作制御 する遠隔操作装置とを備えたこ とを特徴とする。
求項 1 6 の発明は、 請求項 1 3 ない しは請求項 1 5 のいずれか
1 つの請求項の発明において、 前記砕石貯留部の底面が前記掘削機 の設置面よ り 下方に位置している こ とを特徴とする。 ― ―
請求項 1 7 の発明は、 諸求項 1 3 ない し は請求項 1 5 のいずれか 1 つの請求項の発明において、 前記砕石貯留部の底面が前記掘削機 の設置面と略同面に位置 している こ とを特徴とする。
請求項 1 8 の発明は、 砕石を生成する砕石処理システムの碎石貯 5 留部において、 採石を貯留する底部と、 採石運搬機によっ て投下さ れる採石を前記底部に案内する第 1 の案内面と、 ク ラ ッ シャ に前記 採石を移送するための捆削機による前記採石の掬い取 り後の残余の 採石が前記底部に戻るよ う に案内するための第 2 の案内面と を備え たこ とを特徴とする。
1() 請求項 1 9 の発明は、 請求項 1 8 の発明において、 前記底部の底 面が前記掘削機の設置面よ り 下方に位置 している こ とを特徴とする。 請求項 2 0 の発明は、 枠'石を生成する砕石処理システムの碎石貯 留部において、 採石を貯留する底部と、 採石運搬機によって投下さ れる採石を前記底部に案内する案内面とを備えた こ とを特徴とする。
I5 請求項 2 1 の発明は、 石を生成する砕石処理方法において、 碎 石運搬機によって搬入された採石を、 掘削機の設置面よ り下方に底 面を有する枠石貯留部に投下する工程と、 前記砕石貯留部に堆積さ れた採石を掘削機によっ て掬い取ってク ラ ッ シャ に排出する工程と、 前記ク ラ ッ シャ によっ て前記採石を破砕して砕石を生成する工程と
20 か らなる こ とを特徴とする。 図面の簡単な説明
図 1 は、 本発明の第 1 の実施形態に係わる 自動運転ショ ベル本体 およびその作業形態の一例を示す図である。
25 図 2 は、 第 1 の実施形態に係わる 自動運転シ ョ ベル本体に搭載さ れる車載装置および操作ボ ッ ク ス に搭載される教示再生装置本体の 制御機構を示すブロ ッ ク 図である。
図 3 は、 第 1 の実施形態に係わる 自動運転コ ン ト ローラの機能構 成の詳細を示すブロ ッ ク図である。
30 図 4 は、 図 3 に示す教示位置格納部に格納される教示位置データ ―
の一例を示す図である。
図 5 は、 図 3 に示す再生コマン ド格納部に格納される再生コマ ン ドの一例を示す図である。
図 6 は、 第 1 の実施形態に係わる 自動運転シ ョ ベル本体のブーム の回転中心を原点〇 とする各関節の寸法および角度を示す図である。 図 7 は、 第 1 の実施形態に係わる 自動運転シ ョ ベル本体の掘削開 始位置 P 1 、 掘削中間位置 P 2 、 および掘削終了位置 P 3 を示す図 である。
図 8 は、 第 1 の実施形態に係わる 自動運転シ ョ ベルの再生動作の 処理手順を示すフ ローチヤ一 トである。
図 9 は、 本発明の第 2 の実施形態に係わる 自動運転コ ン ト ロ一ラ の機能構成の詳細を示すブロ ッ ク図である。
図 1 0 は、 図 9 に示す再生コマン ド格納部 5 0 3 に格納される再 生コマン ドの一例を示す図である。
図 1 1 は、 第 2 の実施形態に係わる 自動運転シ ョ ベルの岩石等の 障害物か ら の回避方法を説明する図である。
図 1 2 は、 本発明の第 3 の実施形態に係わる砕石処理システムの 全体構成およびその作業形態を示す図である。
図 1 3 は、 第 3 の実施形態に係わる砕石処理システムの制御機構 の概要を示すブロ ッ ク 図である。
図 1 4 は、 第 3 の実施形態に係わる他の枠石処理システムの全体 構成およびその作業形態を示す図である。
図 1 5 は、 第 3 の実施形態に係わる他の砕石処理システムの全体 構成およびその作業形態を示す図である。 発明を実施するための最良の形態
はじめに、 本発明の第 1 の実施形態を図 1 〜図 8 を用いて説明す る。
図 1 は、 各実施形態に関わる 自動運転シ ョ ベルおよびその作業形 態の一例を示す側面図である。 - -
同図において、 1 はス ト ツ ク ヤー ド 2 に貯留された土石を掘削 し て、 後述する ク ラ ッ シ ャ 3 に放土する 自動運転シ ョ ベル本体、 3 は 自動運転シ ョ ベル本体 1 か ら放土された土石を碎石する ク ラ ッ シャ 、 4 は自動運転シ ョ ベル本体 1 の再生操作を行う のに適した任意の場 所に設置された操作ボ ッ ク スである。
自動運転シ ョ ベル本体 1 は、 走行体 1 0 と、 走行体 1 0 上に旋回 可能に設け られた旋回体 1 1 と、 旋回体 1 1 に回動可能に設け られ たブーム 1 2 と、 ブーム 1 2 の先端に回動可能に設け られたアーム 1 3 と、 アーム 1 3 の先端に回動可能に設け られたバケツ ト 1 4 と、 ブーム 1 2 、 アーム 1 3 、 ノ 'ケ ッ ト 1 4 とをそれぞれ回動動作する ための シ リ ン ダ 1 5 、 1 6 、 1 7 と、 旋回体 1 1 に設け られた運転 室 1 8 と、 操作ボッ ク ス 4 との間で信号の送受信を行う ア ンテナ 1 9 とか ら構成されている。
また、 自動運転シ ョ ベル本体 1 には、 旋回体 1 1 の旋回角 を検出 する角度センサ 1 1 1 、 旋回体 1 1 とブーム 1 2 との回動角 を検出 する角度セ ンサ 1 1 2 と、 ブーム 1 2 とアーム 1 3 の回動角 を検出 する角度センサ 1 1 3 と、 アーム 1 3 とノ ケッ ト 1 4 との回動角 を 検出する角度センサ 1 1 4 が設け られている。
また、 ク ラ ッ シ ャ 3 は、 走行体 3 0 と、 ホッ パ 3 1 と、 砕石部 3 2 と、 コ ンベア 3 3 とか ら構成されてお り 、 3 4 はク ラ ッ シ ャ 3 に よって枠かれた碎石を示す。
また、 操作ボ ッ ク ス 4 は、 支持台 4 0 と、 支持台 4 0 に固定され た教示再生装置本体 4 1 とか ら構成され、 教示再生装置本体 4 1 に は起動ボタ ン 4 1 1 と、 停止ボタ ン 4 1 2 と、 非常停止ボタ ン 4 1 3 と、 教示再生装置本体 4 1 と機械的かつ電気的に接続可能に設け られ教示時に操作される教示操作部 4 1 4 と、 教示結果等を表示す る表示部 4 1 9 と、 自動運転シ ョ ベル本体 1 のア ンテナ 1 9 との間 で、 信号の送受信を行う ア ンテナ 4 1 5 とを備えている。
図 2 は、 図 1 に示す自動運転シ ョ ベル本体 1 に搭載される車内搭 載装膛 5 および操作ボ ッ ク ス 4 の教示再生装置本体 4 1 の制御機構 -
の概要を示すブロ ッ ク図である。
同図において、 4 1 6 は再生時に操作される再生操作部、 4 1 7 は教示操作部 4 1 4 または再生操作部 4 1 6 か ら 出力される信 ^を、 後述する 自動運転コ ン ト ローラ 5 0 に出力するための所定の信号に 形成する コマン ド生成部、 4 1 8 および 5 4 はそれぞれ教示再生装 置 4 1 と 自動運転コ ン ト ローラ 5 0 問の信号を送受信するための無 線装置である。 なお、 コマ ン ド生成部 4 1 7 は、 マイ ク ロ コ ン ピュ 一夕 を使用 した一般的なコ ン 卜 ローラで構成され、 入力 した信号に 相当する指令コ ー ドを生成する機能を有する。
5 は車内装置を示し、 5 0 は主と してコ ン ピュータで構成され自 動運転シ ョ ベルを 自動運転するための各種の制御を行う 自動運転コ ン ト ロ一ラ、 5 1 は自動運転コ ン ト ローラ 5 0 か ら 出力される駆動 電流によ っ て駆動される比例電磁弁、 5 2 は比例電磁弁 5 1 か ら出 力される油圧信号によ り 制御され、 ァ クチユエ一夕 に流入する油量 または油圧を制御する コ ン ト ロールバルブ、 5 3 は自動運転シ ョ べ ル本体 1 の各関節を作動するためのシ リ ンダ 1 5 、 1 6 、 1 7 等の ァ クチユエ一夕 、 4 1 4 ' は教示操作部である。 その他の符号に示 す構成は図 1 に示す同符号のものと同 じである。
同図において、 教示操作は、 通常、 運転室 1 8 内に装着される教 示操作部 4 1 4 ' か ら の操作によって教示が行われ、 自動運転コ ン ト ローラ 5 0 はその操作に従って、 各角度セ ンサ 1 1 1 〜 1 1 4 か らの検出値を入力 して演算 し、 後述するよ う に、 所定の記憶領域に 教示位置データ と して記憶する。 また、 教示操作部 4 1 4 , 4 1 4 ' か ら の操作によ り 所定の記憶領域に再生時に使用される再生コマ ン ドを設定し記憶する。 なお、 同図において、 教示操作部 4 1 4 は、 運転室 1 8 内の教示操作部 4 1 4 ' か ら外されて、 教示再生操作装 置 4 1 に装着されている ときの状態を示す。
再生時は、 再生操作部 4 1 6 か ら起動ボタ ン 4 1 1 をオンする こ とによって、 コマン ド生成部 4 1 7 において生成された所定の信号 がア ンテナ 4 1 5 および 1 9 を介して自動運転コ ン ト ローラ 5 0 に -
送信され、 再生処理が開始される。 自動運転コ ン ト ロ一ラ 5 0 にお いて再生処理が開始される と、 記憶されている教示データが呼び出 され、 角度セ ンサ 1 1 1 〜 1 1 4 か ら得られた現在位置情報と対比 しながら 、 この教示位置データ に合致するよ う に、 旋回体 1 1 、 ブ ーム 1 2 、 アーム 1 3 、 バケ ツ ト 1 4 をそれぞれ作動させるための 比例電磁弁 5 1 に駆動電流を出力する。 比例電磁弁 5 1 か ら はさ ら にコ ン ト ロールバルブ 5 2 を介 して、 各ァ クチユエ一夕 5 3 を制御 して自動運転ショ ベル本体 1 の再生動作が行われる。
図 3 は、 図 2 に示す自動運転コ ン ト ローラ 5 0 の本実施形態に係 わる機能構成の詳細を示すプロ ッ ク図である。
同図において、 5 0 1 は角度セ ンサ 1 1 1 〜 1 1 4 において検出 された角度信号を現在の位置データ に演算する現在位置演算部、 5 0 2 は教示時、 教示操作部 4 1 4 または 4 1 4 ' か らの操作によ り 、 現在位置演算部 5 0 1 か ら得られた自動運転シ ョ ベル本体 1 の現在 位置を教示位置デ一夕 と して出力する教示処理部、 5 0 3 は教示操 作部 4 1 4 , 4 1 4 ' か らの指令によ り 教示処理部 5 0 2 によって 設定された再生動作時の各種の動作を指令する コマン ドが格納され ている再生コマ ン ド格納部、 5 0 4 は教示処理部 5 0 2 か ら出力さ れた教示位置データ を格納する教示位置格納部、 5 0 5 は再生操作 部 4 1 6 か らの起動信号によ り起動された とき、 再生コマン ド格納 部 5 0 3 に格納されている再生コマン ドを逐次解釈して、 教示位置 格納部 5 0 4 か ら所定の教示位置データの出力を指示する コマ ン ド イ ン夕 プリ 夕部、 5 0 6 はコマ ン ドイ ン夕プリ 夕部 5 0 5 か ら の指 令に応じて教示位置格納部 5 0 4 か ら教示位置データ を出力処理す る教示位置出力処理部、 5 0 7 は自動運転シ ョ ベル本体 1 が各教示 位置間を円滑に動作するよ う に、 教示位置出力処理部 5 0 6 か ら 出 力された教示位置データ に基づいて教示位置データ問を補間 した目 標位置データ を作成 し 出力する、 即ち 、 与え られた始点 (現在位置 も し く は教示位置) と終点 (教示位置) 間を、 ある一定時間きざみ で補間演算を行って時系列データ を作成 し 、 順次角度目標値と して - _
サーボ制御部 5 0 8 に出力するサーボ前処理部、 5 0 8 はサーボ前 処理部 5 0 7 か ら 出力されて補間された目標位置データ と、 現在位 置演算部 5 0 1 か ら出力された現在位置データ と を対比して、 自動 運転シ ョ ベル本体 1 の各関節を所定の位置に制御するための駆動電 流を出力するサーボ制御部である。
また、 5 0 9 は各関節の位置決め精度を設定するための基準とな る位置決め基準値が格納されている位置決め基準値格納部、 5 1 0 はサーボ前処理部 5 0 7 か らの指令によっ て制御され、 各教示位置 における各関節の位置決め精度を、 位置決め基準値格納部 5 0 9 に 格納されている基準値と 各教示位置において設定された位置決め精 度とに基づいて演算して求める位置決め精度演算部、 5 1 1 はサー ボ前処理部 5 0 7 か ら の指令によって制御され、 各関節が各教示位 置におけ位置決め範囲に到達したか否かを判定する位置決め判定部 である。 その他の符号に示す構成は図 2 に示す同符号のもの と同 じ である。
図 4 は、 図 3 に示す教示位置格納部 5 0 4 に格納される教示位置 データの一例を示す図である。
同図において、 P 1 〜 P n は、 教示位置に対応する と共に後述す る再生コマ ン ドのラベル P 1 〜 P n に対応してお り 、 各教示位置で 自動運転シ ョ ベルの各部が取るべき旋回角、 ブーム角、 アーム角、 パケッ ト角、 の各値が設定されている。
図 5 は、 再生コマン ド格納部 5 0 3 に格納される本実施形態に係 わる再生コマン ドの一例を示す図である。
同図において、 L 1 はコマン ドではな く 行ラベルを表す。 Vは移 動速度を指定する コマ ン ドであ り 、 数値が大きい程移動速度が高速 である こ と を示す。 P A C ( p o s i t i o n a l a c c u r a c y ) は移動の位置 決め精度を指定する コマン ドであ り 、 これは所定の教示位置に 自動 運転シ ョ ベルを移動させる こ とは容易でない こ とか ら この数値に示 すよ う な位置決め精度の数値内に達した ら 自動運転シ ョ ベルは当該 教示位置に到達 したもの と判定するために使用 される。 この数値が - -
大き い程高精度に教示位置への追随が要求される。 M〇 V E は指定 された教示位置への移動を指令する コマ ン ドであ り 、 P 1 〜 P n は M O V E コマ ン ドの各関節の角度情報を示すラベルである。 例えば、 M O V E P 1 は教示位置格納部 5 0 4 に格納されている教示位置 データのう ち 、 図 4 に示す位置 N o . P I に移動すべき こ とを示す。
G O T O L 1 は行ラベル L 1 か ら再び実行を開始する こ とを指示 する コマン ドである。
次に、 本実施形態に係わる 自動運転シ ョ ベルの動作を図 3 に基づ いて説明する。
教示操作は、 教示操作部 4 1 4 または 4 1 4 ' か ら操作される。 通常は、 教示操作部 4 1 4 ' が自動運転シ ョ ベル本体 1 の運転室 1 8 内に装着され、 運転室か ら教示操作が行われる。
教示操作部 4 1 4 ' が運転室 1 8 に装着され、 教示操作が行われ る と、 その指令は教示処理部 5 0 2 に入力され、 教示処理部 5 0 2 で現在位置演算部 5 0 1 か ら現在位置データ を入力 して、 各教示位 置に対応する再生コマン ド と教示位置データ を生成する。 生成され た再生コ マ ン ド と教示位置データ はそれぞれ再生コマ ン ド格納部 5 0 3 と教示位置格納部 5 0 4 に格納される。
再生動作は、 起動ボタ ン 4 1 1 をオンする こ とによって、 コマン ドイ ンタ プリ 夕部 5 0 5 力 起動命令によ り 再生コマ ン ド格納部 5 0 3 に格納されている再生コマン ドを順次読み出 して実行する。 再 生コ マ ン ドが M 0 V E命令の場合には、 教示位置出力処理部 5 0 6 に、 教示位置格納部 5 0 4 か ら該当するパラ メ一夕 を出力 し、 サー ボ前処理部 5 0 7 に転送する。
サーボ前処理部 5 0 7 は、 コマ ン ドイ ン夕 プリ 夕部 5 0 5 か ら与 え られた目標速度で各関節が動作するよ う に角度の補間演算を行い、 サーボ制御部 5 0 8 に角度目標値を出力する。 サーボ制御部 5 0 8 は、 現在位置演算部 5 0 1 で演算された現在位置データ と、 サーボ 前処理部 5 0 7 か ら 出力される角度目標値とを基に、 一般的なフ ィ 一 ドバ ッ ク制御を行い、 比例電磁弁 5 1 を駆動するための駆動電流 -
を出力する。 これによ り コ ン ト ロールバルブ 5 2 が制御されてァ ク チユエ一夕 5 3 に所定の圧油が供給され、 自動運転シ ョ ベル本体 1 の各関節が駆動される。
一方、 位置決め精度演算部 5 1 0 は、 各教示位置において与え ら れた位置決め精度に応じた各関節に対する位置決め精度を、 位置決 め基準値格納部 5 0 9 に格納されている基準値に基づいて演算する。
こ こで、 サーボ前処理部 5 0 7 における補問演算が最終目標位置 (例えば M O V E P 2 の場合には P 2 ) に達し、 その最終目標位 置データがサーボ制御部 5 0 8 へと出力される と、 位置決め判定部 δ 1 1 はサーボ前処理部 5 0 7 か らの指令によ り 、 各関節の現在位 置が位置決め精度演算部 5 1 0 によって演算された各関節の位置決 め精度に基づいて設定された位置決め範囲内に達したかど う かを判 定する。 判定の結果、 各関節が位置決め範囲内に達していない場合 には、 サーボ前処理部 5 0 7 は前記の最終目標位置をサーボ制御部 5 0 8 に出力 し続ける。 また、 各関節が所定の位置決め範囲内に達 した場合は、 サーボ前処理部 5 0 7 は最終目標位置の出力を終了 し、 教示位置 ( Ρ 2 ) と教示位置出力処理部 5 0 6 か ら出力される次の 教示位置 ( Ρ 3 ) 間の補間演算を行い 自動運転の動作を続行する。 次に、 掘削時の 自動運転シ ョ ベル本体 1 の動作を図 6 〜図 7 を用 いて説明する。
こ こで、 図 6 はブーム 1 2 の回転中心を原点〇 とする 自動運転シ ョ ベル本体 1 の各関節の寸法および角度を示す図であ り 、 Gは自動 運転シ ョ ベル本体 1 の接地面、 L b mはブーム長さ 、 L a mはァー ム長さ 、 L b k はバケ ツ ト長さ 、 0 s wは旋回体 1 1 が走行体 1 0 となす角度、 6 b mは水平軸 X とブーム 1 2 とのなす角度、 0 a m はブーム 1 2 とアーム 1 3 とのなす角度、 0 b k はアーム 1 3 とバ ケッ 卜 1 4 とのなす角度である。
図 7 は、 前記原点〇を中心とする 自動運転シ ョ ベル本体の掘削開 始位置 P 1 、 掘削中間位置 P 2 、 および掘削終了位置 P 3 を示す図 であ り 、 e a m P l は P 1 におけるアーム角度、 S a m P 2 は P 2 6 一
におけるアーム角度、 () a m P 2 P A C は P 2 におけるアームに対 する位置決め範囲を表す。
再生動作における動作順序は P 1 — P 2 — P 3 の順で行われ、 P 1 → P 2 の動作はアーム ク ラ ウ ドのみの動作とする。
はじめに、 P 1 力、 ら P 2 への動作は、 図 3 に示すコマ ン ドイ ン 夕 プリ 夕部 5 0 5 によ り 再生コマ ン ド格納部 5 0 3 に格納されている 以下のコマ ン ドがサーボ前処理部 5 0 7 に出力される。
V = 9 0 ( 1 )
P A C = 0 ( 2 )
M O V E P 2 ( 3 )
こ 二で、 ( 1 ) 式の Vは、 前述のよ う に速度を表すコマ ン ドであ り 、 この場合アームの最大速度に対する 9 0 %の速度で動作するよ う に、 サーボ前処理部 5 0 7 において補間演算が行われる。 また、
( 2 ) 式の P A C は、 前述のよ う に掘削中間位置 P 2 における位置 決め精度を表すコマ ン ドであ り 、 旋回体、 ブーム、 アーム、 および バケ ツ 卜 のそれぞれの関節の位置決め精度は、 位置決め精度演算部 5 1 0 において、 各教示位置 P 1 , P 2 , P 3 · · ' における位置 決め精度値 P A C と位置決め基準値格納部 5 0 9 に格納されている 旋回体、 ブーム、 アーム、 およびバケ ツ 卜 の各関節の位置決め基準 値 s w P A C 、 Θ b m P A C > Θ a m P A C , および 0 b k P A C とに基づいて演算される。
こ こで、 例えば、 P A C = 1 0 0 の場合には、 P 2 におけるァー ムに対する位置決め精度 Θ a m P 2 P A Cは、
0 a m P 2 P A C = { 1 + ( 1 0 0 - P A C ) / 1 0 } 0 a m P A C
= Θ a m P A C ( 4 )
と して計算され、 P A C = 5 0 の場合は、
« a m P 2 P A C = { 1 + ( 1 0 0 — P A C ) / 1 0 } Θ a m P A C
= 6 Θ a m P A C ( 5 ) と して計算され、 P A C = 0 の場合は、
0 a m P 2 P A C = { 1 + ( 1 0 0 — P A C ) / 1 0 } ί a m P A C
= 1 1 & a m P A C ( 6 )
と して計算される。
ただし、 本実施形態では、 P A C = 0 の場合は、 サーボ前処理部 5 0 7 における補間演算が最終目標位置 ( P 2 ) に達した場合は、 位置決め判定部 5 1 1 における判定を行わず、 即ち、 各関節の現在 位置が P 1 と P 2間の どの位置にあるかを問わずに、 直ち に次の P 2 か ら P 3への補間演算へと移行する。
なお、 本実施形態では、 各関節の位匱決め精度を、 位置決め精度 と位置決め基準値を上式 ( 4 ) 〜 ( 6 ) の関係を利用 して求めた力 、 このよ う な関係式を用 いずに任意に設定してもかまわない。 なお、 他の関節の位置決め精度 S b m P 2 P A C、 Θ a m P 2 P A C , お よび 0 b k P 2 P A Cも、 Θ a m P 2 P A C と同様に求め られる。 通常は、 サーボ前処理部 5 0 7 において最終目標位置がサーボ制 御部 5 0 8へと出力される と、 演算された各関節の位置決め精度に 基づき、 位置決め判定部 5 1 1 において自動運転シ ョ ベル本体が位 置決め範囲に達したかどう かが判定される。 つま り 、 最終目標値が 出力されても、 ブーム、 アーム、 バケ ツ 卜等の各関節はその最終目 標位置よ り 遅れて追随している。 そのため、 例えば、 アームについ ては、 P A C = 5 0 の場合、 ( 5 ) 式か ら 、 (9 a m P 2 ± 6 e a m P 2 P A Cの位置決め範囲に達したか どう かが判定される。 達して いない場合は、 サーボ前処理部 5 0 7 は最終目標位置をサ一ボ制御 部 5 0 8へと出力 し続け、 自動運転シ ョ ベル本体 1 の各関節は最終 目標位置に向かって動作し続ける。 自動運転シ ョ ベル本体 1 の各関 節が前記の位置決め範囲内に達した場合は、 最終目標位置の出力は 終了 し 、 掘削中問位置 P 2か ら次の掘削終了位置 P 3 間の補間演算 を開始して、 補間された新たな目標値が出力 し、 各関節はその新た な位置に向かって移動 し始める。 - 1 -
本実施形態では、 掘削開始位置 P 1 か ら捆削中間位置 P 2 に向か う時は、 岩石等によ り 大きな捆削抵抗を受け、 掘削中間位置 P 2 に 到達する こ とが難し く なる可能性を考慮して、 掘削中間位置 P 2 に おける位置決め精度を、 例えば、 P A C = 0 に設定している。 その 結果、 サーボ前処理部 5 0 7 が最終目標位置 P 2 を出力 した ら 、 直 ち に次の P 2 か ら P 3 への補間演算へと移行 し、 各関節は補間され た新たな目標値に向かって移動 し始めるよ う に動作するので、 いた ずら に目標位置 P 2 を追随するあま り岩石等の障害物の抵抗を受け て掘削が停滞する等の事態を回避する こ とができ、 P 1 - P 2→ P 3 の動作を停止する こ となく スムーズに動作させる こ とができる。 また、 本実施形態では、 掘削終了位置 P 3 では、 荷こばれを防止 するために、 P A C = 8 0 と してバケ ツ 卜 の抱え込み姿勢を高い精 度で指定している。 また、 ク ラ ッ シャ ホ ッパ上での放土時のよ う に 十分な位置決めが必要な場合には、 位置決め精度 P A C の値を大き く する こ とによって位置決め範囲を狭く し、 十分な精度での位置決 めを可能に している。
こ こで、 自動運転コ ン ト ローラ 5 0 の各教示位置 (こ こでは、 教 示位置 P 1 か ら教示位置 P 3 ) における再生動作の処理手順を図 8 に示すフ ローチヤ一 ト を用い説明する。
はじめに、 図示 していないが、 サーボ前処理部 5 0 7 か ら最終目 標位置 P 1 を出力後、 各関節が位置決め判定部 5 1 1 において位置 決め範囲に到達している と判定される と、 ステッ プ 1 において、 再 生コマン ド格納部 5 0 3 か ら教示位置 P 2 に対する再生コマン ド、 V = 9 0 、 P A C = 0 および M O V E P 2 が出力される。 次に、 ステッ プ 2 で、 位置決め精度演算部 5 1 0 において各関節に対する 位置決め精度が演算される。 次いで、 ステッ プ 3 においてサーボ前 処理部 5 0 7 において P 1 か ら P 2 間の補間演算が行われ、 ステツ プ 4 において補間演算によって得られた目標位置をサーボ制御部 5 0 8 へと出力 し、 サーボ制御によ り 各関節を動作させる。 次に、 ス テ ッ プ i3 においてステ ッ プ 3 における補間演算の結果出力された目 - i -
標位置の最終目標位置 ( P 2 ) が出力されたか否かが判定される。 二 こで、 補間演算された 目標位 が最終 日 標位置に達していない場 合はステッ プ 4 へと戻 り 、 補間された目標位置と して最終目標位置 ( P 2 ) が出力するまでサーボ制御部 5 0 8 に出力される。 サーボ 制御部 5 0 8 に最終目標位置が出力される と、 ステッ プ 6 において 教示位置 ( P 2 ) における位置決め精度 P A Cが任意に設定された 所定値 S よ り 大きいか否かが判定される。 位置決め精度 P A Cが所 定値 S よ り 大きい場合は、 ステッ プ 7 においてステッ プ 2 で演算さ れた各関節の位置決め精度に基づいて、 各関節が最終目標位置 ( P 2 ) の所定の位置決め範囲内に到達したか否かが判定される。 つま り 、 &関節力 、 s w P 2 士 Θ s w P 2 P A C、 かつ b m P 2 土 fl b m P 2 P A C , かつ 0 a m P 2 ± 6 a m P 2 P A (:、 かつ Θ b k P 2 ± Θ b k P 2 P A C の範囲内に到達したか否かが判定される。 各関節が最終目標位置 ( P 2 ) の所定の位置決め範囲に到達してい ない ときは、 各関節が最終目標位置 ( P 2 ) の所定の位置決め範囲 に到達する までステッ プ 7 の処理を繰 り 返す。 各関節が最終目標位 置 ( P 2 ) の所定の位置決め範囲に到達したときは、 ステッ プ 8 に 移行する。 またステッ プ 6 において、 位置決め精度 P A Cが所定値 S よ り 小さ い場合、 例えば、 ステッ プ 1 に示すよ う に P A C = 0 に 設定されている場合は、 ステッ プ 7 における位置決め範囲への到達 の判定は行わず、 ステッ プ 8 へと移行して、 次の教示位置 P 3 にお ける再生コマン ドを直ち に出力する。 以降はステッ プ 1 以降の処理 手順と同様の処理を繰り 返し再生動作を続行する。
上記の ごと く 、 本実施形態によれば、 捆削時おいて、 掘削中間位 置 P 2 における 自動運転シ ョ ベルの各関節の位置決め精度を低く ( P A C = 0 ) 設定 して、 サーボ前処理部 5 0 7 が補間演算の結果、 最終目標位置 ( P 2 ) を出力 した ら、 追随動作している各関節が掘 削開始位置 P 1 と掘削中間位置 P 2 のいかなる位置にあって も、 最 終目標値 P 2 に向かってサーボ制御される こ となく 、 直ち に、 掘削 中問位置 P 2 と掘削終了位置 P 3 間の新たな補間演算された目標位 _ _
置に向かっ て各関節はサーボ制御される。 そのため、 例えば、 掘削 開始位置 P 1 と掘削中間位置 P 2 間に岩石等の掘削抵抗の大きい障 害物があっても、 掘削中間位置 P 2 か ら掘削終了位置 P 3 向かう 方 向を掘削開始位置 P 1 か ら掘削中間位置 P 2 に向かう 方向か ら外す こ とができ、 自動運転シ ョ ベル本体 1 は自動的に前記障害物を回避 して、 再生動作を停滞する こ となく 継続させる こ とができる。
また、 本実施形態によれば、 掘削開始位置 P 1 と搌削中問位置 P 2 問が砂等の捆削抵抗の小さ い掘削物の場合は、 サーボ前処理部 5 0 7 が補間演算の結果、 最終目標位置 ( P 2 ) を出力 した時点で、 追随動作している各関節は掘削開始位置 P 1 と掘削中間位置 P 2 間 のいずれかの位置にあるが、 捆削抵抗が小さ い と、 各関節の遅れが 少ないため、 各関節の現在位置が最終目標位置 ( P 2 ) に近接した 位置にある こ とにな り 、 教示位置 P 1 , P 2 , P 3 · · ' に従い掘 削精度の高い掘削を行わせる こ とができる。
次に、 本発明の第 2 の実施形態を図 9 および図 1 1 を用いて説明 する。
図 9 は、 図 3 に示す自動運転コ ン ト ローラ 5 0 の本実施形態に 係わる機能構成の詳細を示すブロ ッ ク図である。
5 0 9 は、 コマン ドイ ンタ プリ タ部 5 0 5 か ら指令を受けて所定 時間のカ ウ ン ト を行いコマン ドイ ン夕プリ 夕部 5 0 5 に応答する夕 イ マである。 その他の構成は図 3 に示す同符号の もの と同 じである ので説明を省略する。
図 1 0 は、 図 3 に示す再生コマ ン ド格納部 5 0 3 に格納される本 実施形態に係わる再生コマン ドの一例を示す図である。
同図において、 P A C (pos i t ional accuracy) は、 先に説明 し たよ う に移動の位置決め精度を指定する コマン ドであるが、 こ こで は、 P A C = 0 に して、 掘削作業がスムーズに進行するよ う に位置 決め精度を小さ く し、 目標位置と現在位置に大きな開きがあっても 移動の完了ができるよ う に している。
W A I Tは所定時間の待機を指令する コマ ン ドであ り 、 教示位置 1 —
データ P 3 がサーボ前処理部 5 0 7か らサーボ制御部 5 0 8 に出力 後、 その出力情報がコマン ドイ ン夕プリ 夕部 5 0 5 に伝達され、 コ マン ドイ ンタプリ タ部 5 0 5 は W A I Tコマン ドが設定されている と、 タイ マ 5 0 9 にその WA I Tコマ ン ドで指定される設定時間を 出力 し、 夕イ マ 5 0 9 はその設定時間経過後、 完了ア ンサを コマ ン ドイ ンタ プリ タ部 5 0 9 に出力する。 完了ア ンサが出される と コマ ン ドイ ン夕プリ 夕部 5 0 9 はサーボ前処理部 5 0 7 に、 各教示され た目標位置データ P 3 と 目標位置データ P 4間の補間された目標位 置デ一夕 をサーボ前処理部 5 0 7 からサ一ボ制御部 5 0 8 に出力 し、 自動運転シ ョ ベル本体 1 を 目標位置データ P 4 に向かって移動する よ う にサーボ制御する。 設定時間は、 軽負荷状態または無負荷状態 でサーボ前処理部 5 0 7 か ら教示された目標位置データ を出力 して か ら 自動運転シ ョ ベル本体 1 が概ねその目標位置データの 目標位置 に到達する までの時間に設定する。 なお、 その他のコマン ドは図 5 に示すもの と同一であるので説明を省略する。
次に、 本実施形態に係わる 自動運転シ ョ ベル本体 1 の岩石等の障 害物か らの回避動作を図 1 1 を用いて説明する。
図 1 1 ( a ) は、 P A C≠ 0 の場合のパケッ ト先端の目標位置お よびその軌跡を示す図、 図 1 1 ( b ) は P A C = 0 の場合のバケ ツ ト先端の目標位置およびその軌跡を示す図、 図 1 1 ( c ) は P A C = 0 、 WA I Tあ り 、 の場合のバケツ ト先端の 目標位置およびその 軌跡を示す図である。 こ こで、 P x , P x + 1 , P x + 2 はそれぞ れ教示位置格納部 5 3 に格納された教示位置データ に基づく 目標位 置、 p l , 2 , p 3 , · · ' は教示位置データ に基づいて算出さ れ補間された目標位置、 P 1 ' , P 2 ' , p 3 ' , · · ' は実際に バケツ 卜先端が通過した位置を表す。
はじめに、 サ一ボ前処理部 5 0 7力 、 角度センサ 1 1 1 〜 1 1 4、 現在位置演算部 5 0 1 、 サーボ制御部 5 0 8 を介して、 現在位置デ 一夕 P X を入手 し保持する。 次いで、 教示位置出力処理部 5 0 6 か ら 目標となる教示位置データ P X + 1 が読み込まれ、 こ こで両者の ~ H -
差分 C の、 例えば、 1 Z 8 の差分を算出 し、 位置データ P X +差分 C Z 8 の位置データ をサーボ制御部 5 0 8 に出力する。 次に、 サー ボ前処理部 5 0 7 は、 位置データ P X +差分 2 C Z 8 をサーボ制御 部 5 0 8 に出力する。 以下同様の処理を繰り 返して、 位置データ P X +差分 C ( =教示位置デ一夕 P X + 1 ) をサーボ制御部 5 0 8 に 出力する。
と こ ろで、 実際のサーボ制御では、 サーボ制御部 5 6 か ら 目標と なる移動指令が比例電磁弁 5 1 に出力されても、 例えば、 バケ ッ ト 先端は遅れて追随する。 そのため、 図 1 1 ( a ) に示すよ う に、 P A Cがゼロ以外の所定の値に設定されている場合は、 目標位置 P X 十 1 がサ一ボ制御部 5 0 8 か ら 出力されても、 バケツ ト先端の現在 位置が未だ P X と P X + 1 間のいずれかの位置にある場合は、 目標 位置 P X 十 1 に向かっ てサ一ボ制御される。 バケ ツ ト先端が移動し て P A Cの所定の値に対応する図 1 1 ( a ) に示す円内に達する と、 最早、 P x + 1 を 目標位置とする こ とな く 、 算出され補間された目 標位置 P 1 を 目標と してサーボ制御が行われる。
しか し、 この場合は、 P A C の値を適切な値に設定する こ と によ り 、 再生動作を精度良く 実行する こ とができるが、 図 1 1 ( a ) に おいて、 目標位置 P X + 1 が出力された時点で、 パケ ッ ト先端の現 在位置が未だ P X と P X + 1 間のいずれかの位置にあ り 、 未だ円内 に達していない状態において、 バケ ツ 卜が岩石等の障害物に当た り 移動できな く なった場合でも、 さ ら にバケ ツ ト を 目標位置 P X + 1 に向かって移動させよ う と し、 バケツ トがその点で停滞し障害物を 回避できない場合がある。
次に、 図 1 1 ( b ) に示すよ う に、 P A C の値がゼロ に設定さ れ ている場合は、 教示された目標位置 P X + 1 がサーボ制御部 5 0 8 か ら算出された時点で、 バケ ツ ト先端の現在位置が未だ P X と P X ÷ 1 間のいずれかの位置にあっ ても、 目標位置 P X + 1 と次の 目標 位置 P X + 2 との間の補間処理が開始され、 逐次、 補間された 目標 位置 p 1 , p 2 · · ' が設定される。 そのため、 ノ ケ ッ ト先端は目 _ _
標位置 Ρ χ + 1 に向か う こ とな く 、 補問された目標位置 p i , p 2 - - · に向かっ てサーボ制御される こ とになる。 そのため、 P A C がゼロ に設定される場合は、 図 1 1 ( a ) の場合のよ う に、 P A C の値で決まる所定の円内に達する まで目標位置 P X + 1 に向か う よ う にはサーボ制御されないので、 バケッ 卜が岩石等の障害物に当た り移動困難になった場合でも、 目標位置が P 1 , 2 - ' ' に変更 され、 通過点 p l ' . 2 ' . p 3 ' . · · ' を通過し、 岩石等の 障害物を回避する こ とができる。
しか し、 この場合 P A C をゼロ に設定する こ とよ り 、 上記のよ う に、 掘削時、 岩石等の障害物を回避する こ とはできる も のの、 図示 するよ う に、 岩石等の障害物の有無にかかわ らず、 本来通過すべき 目標位置 P X + 1 、 次いで補間された目標位置 P 1 , P 2 · · · を 通過せず、 精度の良い作業を行わせる こ とができない。
そこで、 本実施形態では、 このよ う な岩石等の障害物と衝突する 可能性のある場合は、 図 1 1 ( c ) に示すよ う に、 P A C = 0 、 W A I Tのコマ ン ドを設ける。 その結果、 目標となる 目標位置 P x + 1 がサーボ制御部 5 0 8 か ら 出力された時点で、 バケ ッ 卜先端の現 在位置が未だ P X と P X 十 1 間のいずれかの位置 (位置 A ) にある 場合は、 次の 目標位置を設定するために、 目標位置 P x + 1 と次の 目標位置 P X + 2 との問の補間処理を開始する こ とな く 、 W A I T で設定される所定時間、 目標位置 P X + 1 を 目標点と して維持する。 その間、 パケッ ト は目標位置 P X + 1 に向かって移動 し、 所定時間 経過後 (位置 B ) に、 目標位置 P X + 1 と次の 目標位置 P X + 2 と の間の補間処理を開始 し、 補間された 目標位置 P 1 , P 2 · · · を 設定する。 この時点か らバケ ツ ト先端は目標位置 P X + 1 に向かう こ とな く 、 逐次補間された目標位置 p 1 , 2 - · ' に向かっ てサ ーボ制御される。
このよ う に、 本実施形態によれば、 教示された目標位置 P X + 1 が出力された時点で、 バケ ツ ト先端の現在位置が未だ P と P X +
1 問のいずれかの位置にある場合は、 直ち に、 次ぎの 目標位 の補 - -
間処现を開始する こ とな く 、 所定時問待っ てか ら補間処理を開始 し、 その間バケ ッ ト を目標位置 Ρ X + 1 に向か う よ う にサ一ボ制御する よ う に したので、 岩石等の障害物が無い場合は目標位置 Ρ X + 1 に 近接した位置を通過して作業をさせる こ とができ精度の良い再生動 作をさせる こ とができる。 また、 パケ ッ トが岩石等の障害物に当た り移動できな く なっ た場合でも、 所定時間経つ と、 目標位置が目標 位置 Ρ X + 1 か ら補問された目標位置 Ρ 1 , ρ 2 · · · に変更され、 岩石等の障害物を回避する こ とができる。
次に、 本発明の第 3 の実施形態に係わる砕石処理システムを図 1 2 か ら図 1 5 を用いて説明する。
図 1 2 は、 本実施形態に係わる砕石処理システムの全体構成およ びその作業形態を示す図である。
同図において、 1 は第 1 および第 2 の実施形態で用い られたよ う なバッ クホータイ プの自動運転ショ ベル本体である。
2 は採石 2 1 を一時的に貯えるス ト ッ クヤー ドで、 ス ト ッ クャ一 ド 2 は自動運転ショ ベル本体 1 の設置場所の近傍に配置される。 ス ト ツ クヤー ド 2 は自動運転シ ョ ベル本体 1 の設置場所から離れる側 に傾斜角を もっ て形成された第 1 の案内面 2 2 と、 自動運転シ ョ べ ル本体 1 の設置場所側に傾斜角 を もって形成された第 2 の案内面 2 3 と、 第 1 の案内面 2 2 と第 2 の案内面 2 3 間に形成 した底部 2 4 とか ら構成され、 底部 2 4 は自動運転シ ョ ベル本体 1 の設置場所面 よ り も下方に形成される。 第 1 の案内面 2 3 および第 2 の案内面 2 2 とは底部 2 4 か ら上方に向かう に従っ て先広が り となるよ う に形 成されて り 、 さ ら に第 1 の案内面 2 3 は自動運転シ ョ ベル本体 1 の 設置場所面よ り も上方に延在している。 また、 第 1 の案内面 2 3 の 傾斜角度は、 その上方の延在部、 即ち採石 2 1 の供給部 2 5 か ら放 出される採石 2 1 が底部 2 4 に堆積されるよ う な角度に設定する こ とが望ま しい。 さ ら に第 2 の案内面 2 2 の傾斜角度は、 採石掬い取 り作業の効率の面か ら 、 自動運転ショ ベル本体 1 のバケツ ト 1 4 に よって掬い取れた後の採石が底部 2 4 に戻るよ う な角度に設定する - l b -
こ とが望ま しい。
6 はス ト ッ ク ヤー ド 2 を構成する第 1 の案内面 2 3 の延在部、 即 ち採石 2 1 の供給部 2 5 に侵入する ト ラ ッ ク等の採石運搬機であ り 、 採石運搬機 6 は他の箇所の地山を崩 して生成された採石を運搬する ためのベッセル 6 1 を備えている。 採石運搬機 6 はこれに搭乗した オペレータ によって運転され、 ベッセル 6 1 に積み込まれた採石を 供給部 2 5 において、 ベッセル 6 1 の傾動によ り 、 採石をス ト ッ ク ヤー ド 2 に放出する。
3 は自動運転シ ョ ベル本体 1 の近傍に配置したク ラ ッ シャであ り 、 ク ラ ッ シャ 3 の異常状態を検出 して異常状態検出信号を出力する異 常状態検出部 3 5 と、 ア ンテナ 3 7 を備えている。 その他の構成は 図 1 に示す同符号のもの と同 じである。
図 1 3 は本実施形態に係わる枠石処理システムの制御機構の概要 を示すブロ ッ ク図である。 その他の構成は図 2 に示す同符号のもの と同 じである。
4 1 9 は自動運転シ ョ ベルの動作異常状態、 正常運転状態、 教示 操作状態等の当該碎石処理システムの各種の状態を表示する表示部 である。
7 はク ラ ッ シャ 3 の搭載装置を示し、 3 6 は操作ボ ッ ク ス 4 に異 常状態検出信号を送信する無線装置、 3 8 は異常状態が検出された ときは異常信号の送信を指令するコマ ン ド生成部である。
次に、 本実施形態に係わる碎石処理システムの動作を図 1 2 およ び図 1 3 を用いて説明する。
図 1 2 に示すよ う に、 ス ト ッ クヤー ド 2 には、 採石運搬機 6 によ り採石が放出される。 この採石運搬機 6 による採石放出時期は、 自 動運転シ ョ ベル本体 1 のバケ ツ 卜 1 4 による採石 2 1 の掬い込み動 作と 一致しないよ う に行われる。 採石運搬機 6 によ り 放出された採 石は、 ス ト ッ クヤー ド 2 を構成する第 1 の案内面 2 3 に沿って落下 し、 底部 2 4 に堆積される。 自動運転シ ョ ベル本体 1 は、 操作ボ ッ ク ス 4 か ら の起動指令を受信する こ とによ り 、 予め記憶した教示動 作に従って教示動作を再生する。 即ち、 バゲッ ト 1 4 によ り ス ト ツ クヤー ド 2 内の採石 2 1 を掬い込み、 この状態で旋回体 1 1 を旋回 して、 ノ ケ ッ ト 1 4 を ク ラ ッ シャ 3 のホ ッノ \° 3 1 上に位置させ、 次 にバケ ツ ト 1 4 を回動させて、 ノ ケッ ト 1 4 内の採石をホッパ 3 1 に放出 し、 再び旋回体 1 1 を旋回させてバケ ツ ト 1 4 をス ト ッ クャ 一 ド 2 に移動させて採石 2 1 を掬い込むという動作を繰り 返す。
ク ラ ッ シャ 3 のホッパ 3 1 に投入された採石 2 1 は、 破枠後、 コ ンベア 3 3 によ り砕石 3 4 と して放出される。 砕石 3 4 は他に用意 された運搬機によ り搬出される。
碎石の生成作業において、 自動運転シ ョ ベル本体 1 のバケツ ト 1 4 によって、 ス ト ッ クヤー ド 2 内の採石 2 1 を掬い込んだとき、 バ ケッ ト 1 4 か ら こぼれ落ちた採石 2 1 および自動運転シ ョ ベル本体 1 側に寄せられた採石 2 1 は、 ス ト ッ クヤー ド 2 を構成する第 2 の 案内面 2 2 によ り 、 底部 2 4側に戻される。 その結果、 ス ト ッ クャ ー ド 2 の底面 2 4 には、 採石 2 1 がー個所に偏って堆積する こ とが ないので、 自動運転シ ョ ベル本体 1 のバケ ツ ト 1 4 による掬い込み 作業効率を向上させる こ とができる。
また、 ス ト ッ クヤー ド 2 内への採石 2 1 の投入位置は、 自動運転 シ ョ ベル本体 1 の設置位置よ り も離れた位置に設定してあるので、 採石運搬機 6 と 自動運転シ ョ ベル本体 1 との接触を心配する必要が ない。 その結果、 採石 2 1 をス ト ッ クヤー ド 2 内に安全かつ効率良 く 供給する こ とができる。
さ ら に、 ク ラ ッ シャ 3 に異常が発生した場合には、 その異常状態 検出部 3 5 か ら の検出信号が、 操作ボ ッ ク ス 4 に送信されるので、 操作ボ ッ クス 4 ではこの異常状態を表示部 4 1 9 に表示する と共に、 ク ラ ッ シャ 3 に停止指令を送信する。 その結果、 ク ラ ッ シャ 3 の異 常も一元的に管理する こ とができ、 枠石生成を安定かつ効率的に行 う こ とができる。
図 1 4 は、 本実施形態に係わる図 1 2 のもの と異なる他の砕石処 理システムの全体構成およびその作業形態を示す図である。 なお、 同図において、 図 1 2 に示す符号と同一符号の箇所は同一 箇所を示す。
この碎石処理システムが図 1 2 に示したもの と異なる点は、 ス ト ッ クヤー ド 2 を構成する第 2 の案内面 2 2 と 自動運転シ ョ ベル本体 1 の設置面との交点付近に、 自動運転シ ョ ベル本体 1 の設置面側へ の採石 2 1 の移動を抑止する採石移動抑止部材 2 6 を設けた こ とに ある。
この砕石処理システムでは、 自動運転シ ョ ベル本体 1 のバケ ツ ト 1 4 は採石移動抑止部材 2 6 を回避して移動するよ う に動作教示さ れる。 また、 この枠石処理システムによれば、 ス ト ッ クヤー ド 2 を 動運転シ ョ ベル本体 1 の設置面よ り 十分低く 設置できない場合に 有効である と共に、 先の碎石処理システム と同様な効果を奏する こ とができる。
なお、 上記の各砕石処理システムにおいて、 ス ト ッ クヤー ド 2 を 構成する第 2 の案内面 2 2 は、 傾斜角を もって形成 したが、 略垂直 に形成してもよい。
図 1 5 は、 本実施形態に係わる図 1 2 および図 1 4 に示すものと 異なる他の碎石処理システムの全体構成およびその作業形態を示す 図である。
なお、 同図において、 図 1 2 に示す符号と同一符号の箇所は同一 箇所を示す。
この碎石処理システムが図 1 2 および図 1 4 に示す枠石処理シス テム と異なる点は、 自動運転シ ョ ベル本体 1 と して口一ディ ングシ ョ ベルタイ プの ものを用 い、 ス 卜 ッ クヤー ド 2 を構成する底部 2 4 の底面と 自動運転シ ョ ベル本体 1 の設置面と を略同一面と した こ と に め " s 。
この砕石処理システムでは、 自動運転シ ョ ベル本体 1 が口一ディ ングシ ョ ベルタイ プであるので、 ス ト ッ クヤー ド 2 の底部 2 4 の底 面と 自動運転シ ョ ベル本体 1 の設置面と を略同一面に配置 しても、 採石 2 1 を効率よ く 掬い取る こ とができる。 なお、 上記の各碎石処理システムでは、 ク ラ ッ シャ 3 を 自動運転 シ ョ ベル本体 1 の設置面よ り も下方に設置 している力 、 ク ラ ッ シャ 3 を 自動運転シ ョ ベル本体 1 の設置面とほぼ同一の面に設置する こ と も可能である。 産業上の利用可能性
上記の ごと く 、 本発明の 自動運転シ ョ ベルは、 自動運転コ ン ト 口 ーラ に、 油圧シ ョ ベルの各教示位置毎に設定された位置決め精度に 基づく 所定の教示位置範囲内への到達を判定する位置決め判定手段 を設け、 当該油圧シ ョ ベルが前記所定の教示位置範囲内に到達した と判定されたときは、 次の教示位置を 目標位置と して出力するよ う に したので、 各教示位置毎に位置決め精度は任意に設定されている ので、 掘削や放土の各作業位置に応じて掘削精度を制御できるので、 高精度でかつ作業効率の高い自動運転を行わせる こ とができる。 ま た、 本発明の 自動運転シ ョ ベルでは、 自動運転コ ン ト ローラは、 掘 削開始か ら掘削終了間の再生動作時において、 教示位置を 目標位置 と して出力後、 位置決め判定手段による判定を行う こ とな く 、 次の 教示位置に基づく 目標位置を出力するよ う に したので、 掘削時の掘 削抵抗の大きさ に応じて掘削軌跡を 自動的に変更する こ とができる ので、 岩石等の掘削抵抗の大きな障害物への衝突による掘削の停滞 を防止する こ とができ、 効率の良い掘削を行わせる こ とができる。 また、 本発明の自動運転シ ョ ベルは、 自動運転コ ン ト ローラ に、 掘削開始か ら掘削終了間の再生動作において、 教示された教示点を 目標位置データ と して出力後、 所定時間経過してか ら次の 目標位置 データを出力させるための遅延手段を設けたので、 岩石等の障害物 が無い場合は教示された目標位置に近接した位置を通過させる こ と ができ精度の良い掘削作業を行わせる こ とができる。 また、 岩石等 の障害物に当た り 移動できな く なった場合でも、 所定時間経つ と、 自動運転シ ョ ベルが移動すべき 目標位置が次の目標位置に変更され 障害物を回避する こ とができ、 無駄な回避動作をする こ とな く 、 掘 2 g
削作業を継続する こ とができる。 また、 本発明の 自動運転シ ョ ベル は、 上記の各効果を奏するために、 従来のよ う に各種のセ ンサを必 要とせず、 また自動運転コ ン ト ロ一ラ に対する演算の処理負担も少 ない。
また、 本発明の砕石処理システムは、 採石をス ト ッ クヤー ド に堆 積し、 この堆積した採石を捆削機によって掬い込むよ う に したので、 採石処理作業を安定かつ効率的に行う こ とができる。 また、 本発明 の碎石処理システムは、 採石を掘削機によって掬い込み可能に堆積 させる こ とができるので、 採石を堆積するための作業が不要とな り 、 枠石処理作業の効率を向上させる こ とができる。 また、 本発明の砕 石処理システムは、 ス ト ッ クヤー ドに採石を堆積し、 掘削機によつ て堆積された採石を掬い込んでク ラ ッ シャ に放出する動作を繰り 返 させ、 ク ラ ッ シャか ら碎石を生成するので、 碎石処理作業の効率を 向上させる こ とができる。

Claims

言青 求 の 範 囲
1 . 油圧シ ョ ベルと、 該油圧シ ョ ベルに設け られ、 教示された掘削 か ら放土までの一巡する動作を当該油圧シ ョ ベルに再生動作させる 自動運転コ ン ト ローラ と、 か ら構成される 自動運転シ ョ ベルにおい て、 前記自動運転コ ン ト ローラ は、 当該油圧シ ョ ベルの各教示位置 毎に設定された位置決め精度に基づく 所定の位置決め範囲内への到 達を判定する位置決め判定手段を備え、 当該油圧シ ョ ベルが前記所 定の位置決め範囲内に到達した と判定された ときは、 次の教示位置 を 目標位置と して出力する こ とを特徴とする 自動運転シ ョ ベル。
2 . 請求項 1 において、 前記自動運転コ ン ト ローラは、 掘削開始か ら掘削終了間の再生動作時において、 教示された教示位置を 目標位 置と して出力後、 前記位置決め判定手段による判定を行う こ となく 、 次の教示位置に基づく 目標位置を出力する こ とを特徴とする 自動運 転シ ョ ベル。
3 . 少なく と も、 ブーム、 アームおよびバケ ツ ト を作動する油圧シ リ ンダ並びに旋回体を作動する油圧モータ を作動する電磁切換弁と、 前記旋回体と前記ブーム間、 前記フーム と ^記アーム間、 前記ァー ム と前記パケ ッ ト問のそれぞれの角度を検出する角度検出器とを備 える油圧シ ョ ベルと、 教示 して記憶された教示位置データ を逐次読 み出 して出力する教示位置出力手段と、 前記教示位置データ を入力 して当該油圧シ ョ ベルが円滑に動作するよ う に前記教示位置データ 問が補間された目標位置データ を出力するサーボ前処理手段と、 前 記目標位置デ一夕 を入力 して当該油圧シ ョ ベルを 目標位置に制御す るために前記電磁切換弁に制御信号を出力するサーボ制御手段と を 備える 自動運転コ ン ト ローラ と、 から構成される 自動運転シ ョ ベル において、 前記自動運転コ ン ト ローラは、 当該油圧シ ョ ベルが各教 示位置毎に設定された位置決め精度に基づく 所定の位置決め範囲内 への到達を判定する位置決め判定手段を備え、 当該油圧シ ョ ベルが 前記所定の位置決め範囲内に到達した と判定されたときは、 前記サ ーボ前処理部か ら次の教示位置データ に基づく 目標位置データ を前 記サーボ制御部に出力する こ とを特徴とする 自動運転シ ョ ベル。
4 . 請求項 3 において、 前記自動運転コ ン ト ローラは、 前記教示位 置毎に設定された位置決め精度に基づいて、 前記旋回体、 ブーム、 アーム、 およびバケ ツ 卜のそれぞれの位置決め精度を演算する演算 手段を備え、 前記位置決め判定手段は、 前記の旋回体、 ブーム、 ァ ーム、 およびバゲ ッ トが前記演算されたそれぞれの位置決め精度に 基づく それぞれの所定の位置決め範囲内への到達を判定する こ とを 特徴とする 自動運転シ ョ ベル。
5 . 請求項 3 ない しは請求項 4 のいずれか 1 つの請求項において、 ijij記サーボ前処理部は、 掘削開始か ら掘削終了間の再生動作時にお いて、 各教示位置データ に対応する最終目標位置データの出力後、 前記位置決め判定手段による判定を行う こ とな く 、 次の教示位置デ 一夕 に基づく 目標位置データ を出力する こ とを特徴とする 自動運転 シ ョ ベル。
6 . 請求項 1 、 請求項 3 、 または請求項 4 のいずれか 1 つの請求項 において、
掘削開始か ら掘削終了までの間の前記教示位置毎に設定される位 置決め精度の う ち、 掘削開始位置および掘削終了位置を除く 教示位 置における位置決め精度は、 前記掘削開始位置および前記掘削終了 位置における位置決め精度よ り低く 設定されている こ とを特徴とす る 自動運転シ ョ ベル。
7 . 請求項 1 、 請求項 3 、 請求項 4 、 または請求項 6 のいずれか 1 つの請求項において、 掘削動作において前記教示位置毎に設定され る位置決め精度は、 放土動作において前記教示位置毎に設定される 位置決め精度よ り低く 設定されてい こ と を特徴とする 自動運転シ ョ ベル。
8 . 請求項 1 ない しは請求項 7 のいずれか 1 つの請求項において、 前記教示位置毎に設定された位置決め精度は、 当該油圧シ ョ ベルま たは当該油圧シ ョ べルか ら離れた位置に設け られた操作手段によ り 任意に設定 し得る こ とを特徴とする 自動運転シ ョ ベル。
9 . 教示された掘削か ら放土までの一巡する動作を油圧シ ョ べルに 再生動作させる 自動運転シ ョ ベルにおける 自動運転方法において、 再生動作させるために、 教示位置、 および当該教示位置における再 生動作速度と位置決め精度を指令する第 1 の工程と、 当該教示位置 の前の教示位置と当該教示位置との間の再生動作を円滑化するため の補間された目標位置の演算を行う第 2 の工程と、 前記目標位置を 順次指令する第 3 の工程と、 前記目標位置の う ち 当該教示位置に相 当する最終目標位置を指令 したか否かを判定し、 前記最終目標位置 を指令 していないと判定したときは、 前記最終目標位置が指令され る まで前記第 3 の工程を実行する第 4 の工程と、 前記第 4 の工程に おいて、 前記最終目標位置を指令 したと判定されたときは、 当該教 示位置における前記位置決め精度が所定値以上であるか否かを判定 する第 5 の工程と、 前記第 5 の工程において、 所定値以上である と 判定された ときは、 現在位置が前記位置決め精度に基づく 所定の位 置決め範囲内に到達したか否かを判定し、 到達していないと判定さ れたときは、 到達する まで当該判定を繰り 返す第 6 の工程と、 前記 第 5 の工程において、 所定値以上である と判定されないとき、 また は前記第 6 の工程において、 現在位置が前記所定の位置決め範囲内 に到達したと判定されたときは、 当該教示位置の次の教示位置、 お よび次の教示位置における再生動作速度と位置決め精度を指令する 第 7 の工程と、 か ら構成されている こ とを特徴とする 自動運転シ ョ ベルにおける 自動運転方法。
1 0 . 油圧シ ョ ベルと、 該油圧シ ョ ベルに設け られ、 教示された掘 削か ら放土までの一巡する動作を当該油圧シ ョ ベルに再生動作させ る 自動運転コ ン ト ローラ と、 か ら構成される 自動運転シ ョ ベルにお いて、 前記自動運転コ ン ト ローラ に、 掘削開始か ら掘削終了間の再 生動作において、 教示された教示点を 目標位置データ と して出力後、 所定時間経過してか ら次の 目標位置データ を出力させるための遅延 手段を設けた こ とを特徴とする 自動運転シ ョ ベル。
1 1 . 少な く と も、 ブーム、 アームおよびバケ ツ ト を作動する油圧 シ リ ン ダ並びに旋回体を作動する油圧モー夕 を作動する電磁切換弁 と、 前記旋回体と前記ブーム間、 前記ブーム と前記アーム間、 前記 アーム と前記パケッ ト間のそれぞれの角度を検出する角度検出器と を備える油圧シ ョ ベルと、 教示して記憶された教示位置データ を逐 次読み出 して目標位置データ と して出力する 目標位置出力手段と、 前記目標位置データ を入力 して前記目標位置データ を出力する と共 に当該油圧シ ョ ベルが円滑に動作するよ う に補間した目標位置デー 夕 を出力するサーボ前処理手段と、 前記各目標位置データ を入力 し て当該油圧シ ョ ベルを 目標位置に制御するために前記電磁切換弁に 制御信号を出力するサーボ制御手段とを備える 自動運転コ ン 卜 ロー ラ と、 か ら構成される 自動運転シ ョ ベルにおいて、 前記目標位置出 力手段に、 掘削開始か ら掘削終了間の再生動作において、 前記サー ボ前処理手段か ら、 教示された教示点が目標位置データ と してサ一 ボ制御部に出力後、 所定時間経過してか ら次の目標位置データを出 力させるための遅延手段を設けた こ とを特徴とする 自動運転シ ョ べ ル。
1 2 . 請求項 1 0 ない しは請求項 1 1 のいずれカゝ 1 つの請求項にお いて、 前記遅延手段において設定される前記所定時間は、 軽負荷ま たは無負荷時において、 前記教示された教示点を 目標位置データ と して出力後、 当該油圧ショ ベルが前記目標位置データの目標位置に 到達するまでの時間に設定される こ とを特徴とする 自動運転シ ョ べ ル。
1 3 . 砕石を生成する碎石処理システムにおいて、 採石が搬入され る搬入面よ り 下方に投下される採石を貯留する砕石貯留部と、 この 砕石貯留部に貯留された採石を掬い取って排出する掘削機と、 この 掘削機によ り 排出される採石を破碎して碎石を生成する ク ラ ッ シャ とを備えた こ とを特徴とする砕石処理システム。
1 4 . 碎石を生成する碎石処理システムにおいて、 採石を運搬する 採石運搬機と、 この採石運搬機によって搬入される搬入面よ り 下方 に投下される採石を貯留する碎石貯留部と、 この砕石貯留部に貯留 された採石を掬い取って排出する掘削機と、 この掘削機によ り排出 される採石を破砕して碎石を生成する ク ラ ッ シャ とを備えた こ とを 特徴とする枠石処理システム。
1 5 . 砕石を生成する砕石処理システムにおいて、 採石を運搬する 採石運搬機と、 この採石運搬機によって搬入される搬入面よ り 下方 に投下される採石を貯留するための碎石貯留部と、 この砕石貯留部 に貯留された採石を掬い取って排出する作業を 自動運転する掘削機 と、 この掘削機によ り 排出される採石を破碎して砕石を生成する ク ラ ッ シャ と、 前記掘削機の 自動運転を遠隔操作制御する遠隔操作装 置とを備えた こ とを特徴とする砕石処理システム。
1 6 . 請求項 1 3 ない しは請求項 1 5 のいずれか 1 つの請求項にお いて、 前記枠石貯留部の底面が前記掘削機の設置面よ り 下方に位置 している こ と を特徴とする碎石処理システム。
1 7 . 請求項 1 3 ない しは請求項 1 5 のいずれか 1 つの請求項にお いて、 前記砕石貯留部の底面が前記掘削機の設置面と略同面に位置 している こ とを特徴とする碎石処理システム。
1 8 . 砕石を生成する碎石処理システムの碎石貯留部において、 採 石を貯留する底部と、 採石運搬機によ っ て投下される採石を前記底 部に案内する第 1 の案内面と、 ク ラ ッ シャ に前記採石を移送するた めの掘削機による前記採石の掬い取 り後の残余の採石が前記底部に 戻るよ う に案内するための第 2 の案内面とを備えた こ とを特徴とす る砕石処理システムの砕石貯留部。
1 9 . 請求項 1 8 において、 前記底部の底面が前記掘削機の設置面 よ り下方に位置 している こ とを特徴とする枠石処理システムの砕石 貯留部。
2 0 . 碎石を生成する碎石処理システムの砕石貯留部において、 採 石を貯留する底部と、 採石運搬機によっ て投下される採石を前記底 部に案内する案内面と を備えた こ とを特徴とする碎石処理システム の砕石貯留部。
2 1 . 碎石を生成する砕石処理方法において、 砕石運搬機によ って 搬入された採石を、 掘削機の設置面よ り 下方に底面を有する碎石貯 留部に投下する工程と、 前記砕石貯留部に堆積された採石を掘削機 によって掬い取ってク ラ ッ シャ に排出する工程と、 前記ク ラ ッ シャ によって前記採石を破碎して枠石を生成する工程とか らなる こ とを 特徴とする砕石処理方法。
PCT/JP1999/001363 1998-03-18 1999-03-18 Excavatrice a commande automatique et systeme concasseur de pierres la comportant WO1999047759A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP19990909235 EP0990739A4 (en) 1998-03-18 1999-03-18 AUTOMATICALLY CONTROLLED EXCAVATOR AND STONE CRUSHING DEVICE THAT IS EQUIPPED WITH IT
US09/424,061 US6523765B1 (en) 1998-03-18 1999-03-18 Automatically operated shovel and stone crushing system comprising the same
AU28534/99A AU740949B2 (en) 1998-03-18 1999-03-18 Automatically operated shovel and stone crushing system comprising the same

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP10/68733 1998-03-18
JP06873398A JP3926464B2 (ja) 1998-03-18 1998-03-18 自動運転ショベル
JP10/190806 1998-07-06
JP10190806A JP2000015135A (ja) 1998-07-06 1998-07-06 砕石処理システム、砕石処理方法およびこれに用いる砕石貯留部

Publications (1)

Publication Number Publication Date
WO1999047759A1 true WO1999047759A1 (fr) 1999-09-23

Family

ID=26409933

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP1999/001363 WO1999047759A1 (fr) 1998-03-18 1999-03-18 Excavatrice a commande automatique et systeme concasseur de pierres la comportant

Country Status (6)

Country Link
US (2) US6523765B1 (ja)
EP (1) EP0990739A4 (ja)
KR (1) KR100404437B1 (ja)
CN (1) CN1166841C (ja)
AU (1) AU740949B2 (ja)
WO (1) WO1999047759A1 (ja)

Families Citing this family (53)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2817574B1 (fr) * 2000-12-04 2003-10-10 Faucheux Ind Soc Dispositif chargeur frontal pour engin porteur
CN101057043B (zh) * 2004-09-01 2012-07-18 西门子工业公司 自主装载铲系统
CN101057044B (zh) * 2004-11-17 2012-08-29 株式会社小松制作所 回转控制装置以及建筑机械
US7489254B2 (en) * 2005-04-07 2009-02-10 Damian Rodriguez System and method for monitoring a vertical shaft impact crusher
US7631445B2 (en) * 2006-07-14 2009-12-15 Raymond E. Bergeron Underwater dredging system
US7634863B2 (en) * 2006-11-30 2009-12-22 Caterpillar Inc. Repositioning assist for an excavating operation
US7753132B2 (en) * 2006-11-30 2010-07-13 Caterpillar Inc Preparation for machine repositioning in an excavating operation
US7726048B2 (en) * 2006-11-30 2010-06-01 Caterpillar Inc. Automated machine repositioning in an excavating operation
US7694442B2 (en) * 2006-11-30 2010-04-13 Caterpillar Inc. Recommending a machine repositioning distance in an excavating operation
US7748147B2 (en) 2007-04-30 2010-07-06 Deere & Company Automated control of boom or attachment for work vehicle to a present position
US7752778B2 (en) 2007-04-30 2010-07-13 Deere & Company Automated control of boom or attachment for work vehicle to a preset position
US7810260B2 (en) * 2007-12-21 2010-10-12 Caterpillar Trimble Control Technologies Llc Control system for tool coupling
JP5059953B2 (ja) * 2011-02-22 2012-10-31 株式会社小松製作所 油圧ショベルの作業可能範囲表示装置とその制御方法
US8272467B1 (en) * 2011-03-04 2012-09-25 Staab Michael A Remotely controlled backhoe
CL2012000933A1 (es) 2011-04-14 2014-07-25 Harnischfeger Tech Inc Un metodo y una pala de cable para la generacion de un trayecto ideal, comprende: un motor de oscilacion, un motor de izaje, un motor de avance, un cucharon para excavar y vaciar materiales y, posicionar la pala por medio de la operacion del motor de izaje, el motor de avance y el motor de oscilacion y; un controlador que incluye un modulo generador de un trayecto ideal.
PL3199751T3 (pl) * 2011-08-03 2019-05-31 Joy Global Underground Mining Llc Zautomatyzowane operacje maszyny górniczej
US8620533B2 (en) 2011-08-30 2013-12-31 Harnischfeger Technologies, Inc. Systems, methods, and devices for controlling a movement of a dipper
CN102433909B (zh) * 2011-12-07 2013-11-27 三一重机有限公司 挖掘机遥控系统及容错处理方法及包括该系统的挖掘机
US9206587B2 (en) 2012-03-16 2015-12-08 Harnischfeger Technologies, Inc. Automated control of dipper swing for a shovel
US20140172246A1 (en) * 2012-12-14 2014-06-19 Caterpillar Inc. Automatic Swing and Radius Control System and Method for a Machine Implement
US20140166362A1 (en) * 2012-12-14 2014-06-19 Caterpillar Inc. Implement Pose Control System and Method
US9014925B2 (en) * 2013-03-15 2015-04-21 Caterpillar Inc. System and method for determining a ripping path
US9002593B2 (en) 2013-05-10 2015-04-07 Caterpillar Inc. System and method for re-directing a ripping path
JP5929861B2 (ja) * 2013-09-27 2016-06-08 ダイキン工業株式会社 建設機械
JP5595618B1 (ja) * 2013-12-06 2014-09-24 株式会社小松製作所 油圧ショベル
WO2015109392A1 (en) * 2014-01-24 2015-07-30 Atlas Copco Rock Drills Ab Autonomous loading vehicle controller
JP6962667B2 (ja) * 2014-03-27 2021-11-05 住友建機株式会社 ショベル及びその制御方法
US9404237B2 (en) 2014-06-13 2016-08-02 Caterpillar Inc. Operator assist algorithm for an earth moving machine
GB2527795B (en) * 2014-07-02 2019-11-13 Bamford Excavators Ltd Automation of a material handling machine digging cycle
CN105960492B (zh) * 2015-02-02 2017-10-20 株式会社小松制作所 作业车辆及作业车辆的控制方法
AU2016268856B2 (en) * 2015-05-28 2020-10-29 Joy Global Longview Operations Llc Systems, methods, and apparatuses for storing energy in a mining machine
CN105259888B (zh) * 2015-10-29 2018-04-03 上海华兴数字科技有限公司 一种挖掘机示教控制系统、方法及挖掘机
CN105544627B (zh) * 2016-02-01 2018-10-16 潍柴动力股份有限公司 一种基于循迹模式的挖掘机及其自动控制方法
JP6697955B2 (ja) * 2016-05-26 2020-05-27 株式会社クボタ 作業車及び作業車に適用される時間ベース管理システム
CN106245706B (zh) * 2016-08-02 2018-07-20 福州大学 装载机智能控制方法
CA2978389A1 (en) 2016-09-08 2018-03-08 Harnischfeger Technologies, Inc. System and method for semi-autonomous control of an industrial machine
US10106951B2 (en) * 2016-09-21 2018-10-23 Deere & Company System and method for automatic dump control
CA3050718C (en) 2017-01-23 2021-04-27 Built Robotics Inc. Excavating earth from a dig site using an excavation vehicle
CN110168173B (zh) * 2017-03-02 2021-09-24 株式会社小松制作所 作业车辆的控制系统、工作装置的轨迹设定方法以及作业车辆
US10648160B2 (en) 2017-04-27 2020-05-12 Cnh Industrial America Llc Work machine with bucket monitoring
CN110945187B (zh) 2017-09-08 2022-08-16 住友重机械工业株式会社 挖土机
JP7266371B2 (ja) * 2018-06-29 2023-04-28 株式会社小松製作所 作業機械、および作業機械を含むシステム
JP7107771B2 (ja) 2018-06-29 2022-07-27 株式会社小松製作所 作業機械、および作業機械を含むシステム
US11372405B2 (en) 2018-08-06 2022-06-28 Clark Equipment Company Augmented loader controls
US11738643B2 (en) 2019-02-27 2023-08-29 Clark Equipment Company Display integrated into door
KR102700865B1 (ko) * 2018-10-31 2024-08-29 스미토모 겐키 가부시키가이샤 쇼벨, 쇼벨지원시스템
JP7120332B2 (ja) 2019-01-30 2022-08-17 日本電気株式会社 軌道追従システム、軌道追従方法、及び、プログラム
JP7149205B2 (ja) * 2019-03-05 2022-10-06 日立建機株式会社 自動運転作業機械
KR20220003514A (ko) * 2019-05-07 2022-01-10 클라크 이큅먼트 컴파니 동력기계용 국지적 내비게이션 시스템 제어기
JP7276046B2 (ja) * 2019-09-26 2023-05-18 コベルコ建機株式会社 作業機械の動作教示システム
KR20220097381A (ko) 2019-11-12 2022-07-07 클라크 이큅먼트 컴파니 도어에 통합된 디스플레이
CN113325732B (zh) * 2021-06-30 2023-09-29 三一重机有限公司 破碎锤打击控制方法、装置、作业机械及存储介质
CN116335230B (zh) * 2023-04-21 2024-08-06 中国矿业大学 一种基于视觉辅助的矿用电铲自动挖掘作业方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5751338A (en) * 1980-09-11 1982-03-26 Komatsu Ltd Corrector for bucket of loading shovel
JPS5781203U (ja) * 1980-11-05 1982-05-19
JPH02101229A (ja) * 1988-10-07 1990-04-13 Komatsu Ltd 作業機の制御装置
JPH04126914A (ja) * 1990-09-19 1992-04-27 Ebara Corp 供給設備
JPH0966244A (ja) * 1995-09-01 1997-03-11 Yoichi Hasegawa 残土のリサイクル方法及び設備
JPH0988355A (ja) * 1995-09-27 1997-03-31 Jiyakutei Eng Kk ロータリークラッシャ
JPH09195321A (ja) * 1996-01-18 1997-07-29 Shin Caterpillar Mitsubishi Ltd 移動式自動砕石プラントおよび自動油圧ショベル
JPH10212740A (ja) * 1997-01-30 1998-08-11 Komatsu Ltd 油圧ショベルの自動掘削方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5824572B2 (ja) * 1980-04-28 1983-05-21 国土開発工業株式会社 破砕岩石の土採工法
JPS56153016A (en) * 1980-04-28 1981-11-26 Touparu Gijutsu Kenkyusho:Kk Application of reinforced foundation pile
JPS5781203A (en) * 1980-11-08 1982-05-21 Nippon Telegr & Teleph Corp <Ntt> Corner protector for optical interior wiring
US5065326A (en) * 1989-08-17 1991-11-12 Caterpillar, Inc. Automatic excavation control system and method
DE4030954C2 (de) * 1990-09-29 1994-08-04 Danfoss As Verfahren zur Steuerung der Bewegung eines hydraulisch bewegbaren Arbeitsgeräts und Bahnsteuereinrichtung zur Durchführung des Verfahrens
GB2251232B (en) * 1990-09-29 1995-01-04 Samsung Heavy Ind Automatic actuating system for actuators of excavator
JP3063940B2 (ja) * 1992-07-07 2000-07-12 株式会社坂戸工作所 天然砕石塊破砕システム
US5835874A (en) * 1994-04-28 1998-11-10 Hitachi Construction Machinery Co., Ltd. Region limiting excavation control system for construction machine
KR0173835B1 (ko) * 1994-06-01 1999-02-18 오까다 하지모 건설기계의 영역제한 굴삭제어장치
JPH08155326A (ja) * 1994-12-07 1996-06-18 Hitachi Constr Mach Co Ltd 破砕装置
US5682311A (en) * 1995-11-17 1997-10-28 Clark; George J. Apparatus and method for controlling a hydraulic excavator
DE19621666C2 (de) * 1996-05-30 1998-12-17 Hartsteinwerke Sooneck Gmbh Anordnung zum Abwärtsfördern von mineralischem Schüttgut mittels Schwerkraft
US5911373A (en) * 1996-08-21 1999-06-15 Reid; Donald W. Self-propelled rock crushing machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5751338A (en) * 1980-09-11 1982-03-26 Komatsu Ltd Corrector for bucket of loading shovel
JPS5781203U (ja) * 1980-11-05 1982-05-19
JPH02101229A (ja) * 1988-10-07 1990-04-13 Komatsu Ltd 作業機の制御装置
JPH04126914A (ja) * 1990-09-19 1992-04-27 Ebara Corp 供給設備
JPH0966244A (ja) * 1995-09-01 1997-03-11 Yoichi Hasegawa 残土のリサイクル方法及び設備
JPH0988355A (ja) * 1995-09-27 1997-03-31 Jiyakutei Eng Kk ロータリークラッシャ
JPH09195321A (ja) * 1996-01-18 1997-07-29 Shin Caterpillar Mitsubishi Ltd 移動式自動砕石プラントおよび自動油圧ショベル
JPH10212740A (ja) * 1997-01-30 1998-08-11 Komatsu Ltd 油圧ショベルの自動掘削方法

Also Published As

Publication number Publication date
KR100404437B1 (ko) 2003-11-03
AU740949B2 (en) 2001-11-15
EP0990739A4 (en) 2002-11-05
US6523765B1 (en) 2003-02-25
US6732458B2 (en) 2004-05-11
US20030019132A1 (en) 2003-01-30
KR20010012677A (ko) 2001-02-26
CN1262716A (zh) 2000-08-09
EP0990739A1 (en) 2000-04-05
CN1166841C (zh) 2004-09-15
AU2853499A (en) 1999-10-11

Similar Documents

Publication Publication Date Title
WO1999047759A1 (fr) Excavatrice a commande automatique et systeme concasseur de pierres la comportant
CN107794967B (zh) 机器的控制系统
JP5110741B2 (ja) 自律掘削及びトラック載荷システム
WO2020026522A1 (ja) 作業機械
US6618967B2 (en) Work machine control for improving cycle time
JP3286143B2 (ja) 移動式自動砕石プラントおよび自動油圧ショベル
CN102797461B (zh) 用于监控线缆铲机的操作的方法和系统
WO2020026521A1 (ja) 作業機械
JP2024508916A (ja) 土工機械における周期的動作の自動制御方法
JP2001090120A (ja) 自動運転ショベル
JP3686750B2 (ja) 自動運転ショベル
JP3926464B2 (ja) 自動運転ショベル
CN117418577A (zh) 用于在挖掘任务期间处理折断线的无缝渡越的系统
JP2002115271A (ja) 自動運転ショベル
WO2021182297A1 (ja) 運搬車両を制御するためのシステム及び方法
JP3874543B2 (ja) 砕石処理システム
JP2001182091A (ja) 自動運転ショベルおよびショベルの自動運転方法
JP3663270B2 (ja) 自動運転ショベル
JP2000017692A (ja) 自動運転ショベルおよびその運転方法
JP2002129600A (ja) 砕石処理システム
JPH11324027A (ja) 自動運転ショベル
JP3707921B2 (ja) 自動運転ショベル
JP2000015135A (ja) 砕石処理システム、砕石処理方法およびこれに用いる砕石貯留部
JP2000015134A (ja) 砕石処理システムおよびそれに使用する土石供給手段
JPH11286969A (ja) 自動運転ショベル

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 99800329.8

Country of ref document: CN

AK Designated states

Kind code of ref document: A1

Designated state(s): AU CN KR US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 1019997010638

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 09424061

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 1999909235

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 28534/99

Country of ref document: AU

WWP Wipo information: published in national office

Ref document number: 1999909235

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 1019997010638

Country of ref document: KR

WWG Wipo information: grant in national office

Ref document number: 28534/99

Country of ref document: AU

WWG Wipo information: grant in national office

Ref document number: 1019997010638

Country of ref document: KR

WWW Wipo information: withdrawn in national office

Ref document number: 1999909235

Country of ref document: EP

点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载