+

WO1995006799A1 - Procede et systeme de regulation destines a la production d'un fluide a partir d'un puits - Google Patents

Procede et systeme de regulation destines a la production d'un fluide a partir d'un puits Download PDF

Info

Publication number
WO1995006799A1
WO1995006799A1 PCT/GB1994/001891 GB9401891W WO9506799A1 WO 1995006799 A1 WO1995006799 A1 WO 1995006799A1 GB 9401891 W GB9401891 W GB 9401891W WO 9506799 A1 WO9506799 A1 WO 9506799A1
Authority
WO
WIPO (PCT)
Prior art keywords
control system
well
fluid
gas
processing device
Prior art date
Application number
PCT/GB1994/001891
Other languages
English (en)
Inventor
Charles Edward Moncur
Original Assignee
Well Management Systems Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Well Management Systems Limited filed Critical Well Management Systems Limited
Priority to GB9603001A priority Critical patent/GB2296110B/en
Priority to AU75056/94A priority patent/AU7505694A/en
Publication of WO1995006799A1 publication Critical patent/WO1995006799A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift

Definitions

  • the invention relates to a control system and in particular, a control system for controlling the production of fluid from a well.
  • equipment for such an operation comprises a tubing string which extends into the well and which has a plunger movable within the tubing string between a bottom position and an upper position.
  • a gas injection valve is located in the tubing so that gas injected into the annulus between the casing and the tubing at the surface can enter the tubing string below the plunger.
  • a control system for controlling the production of fluid from a well by gaslift injection comprises cycle monitoring means for monitoring the number of cycles performed by a plunger in the well, volume metering means to meter the produced volume of fluid, and a processing device coupled to the cycle monitoring means and the volume metering means to receive output signals from the cycle monitoring means and the volume metering means, the processing device controlling the number of cycles and the amount of gas injected in response to the output signals received in order to control the volume of fluid produced from the well.
  • a method of controlling the production of fluid from a well by gaslift injection comprises monitoring the number of cycles performed by a plunger in the well and metering the volume of produced fluid from the well, analysing these variables and controlling the number of cycles and the amount of gas injected in response to the result obtained from the analysis, to control the volume of fluid produced from the well.
  • the invention has the advantage of metering the produced volume of fluid from the well, as well as the number of cycles of the plunger, in order to control the volume of fluid produced from the well.by controlling the number of cycles and the amount of gas injected into the well.
  • control system may also include gas injection metering means to meter the amount of gas injected to produce the fluid, and the processing device receives an output signal from the gas injection metering means and also uses this output signal to control the volume of fluid produced.
  • the gas is injected via a surface located gas lift control valve and a downhole gas lift injection valve.
  • control system may also comprise pressure sensing means coupled to the processing device to permit the processing device to monitor the casing and/or tubing pressures in the well.
  • pressuring sensing means are analogue devices and the processing device may monitor the rate of change of pressure.
  • control system also controls a flowline valve to control the amount of fluid produced from the well and typically, the flowline valve is closed by the control system when the plunger reaches its upper position in the tubing.
  • processing device may also control the upward velocity of the plunger per cycle, the time of commencement of gaslift injection and/or the well blowdown time.
  • the upward velocity of the plunger per cycle is controlled by varying the injected volume of gas. Typically, this may be accomplished by overriding the downhole gas lift valve by sustaining sufficient pressure in the annulus between the casing and tubing to maintain the downhole gas lift valve in an open position.
  • the flowline valve and the surface located gas lift valve may be opened to intermediate positions to permit the flow through the valves to be varied.
  • control system may have a number of pre-set boundary conditions which may include one or more of maximum gaslift consumption, maximum gas/oil ratio in the produced fluid, minimum gaslift supply pressure, maximum and minimum allowable casing pressure, maximum flowline pressure and minimum flowline pressure and rate of drawdown of gas lift supply pressure.
  • the processing device may include a pre-set safety shutdown procedure which is initiated by the control system if it detects an unacceptable or unsafe condition in the production system.
  • control system can optimise production from more than one well, and typically, controls production so that no two wells produce simultaneously. This helps reduce the possibility of production facilities becoming overloaded.
  • the processing device can log data from each of the wells simultaneously.
  • the other wells are provided with slave control systems controlled by the control system on one of the wells.
  • control system also includes communication means to permit the control system to communicate with a base station and/or to communicate with the control systems of other wells.
  • control system controls the volume of fluid produced from the well to optimise the production cycle (i.e. produced volume of fluid verses gas injected) and provides safety shutdown should the system pressure parameters be violated.
  • Fig. 1 is a schematic diagram of a production system for use with a control system
  • Fig. 2 is a schematic diagram showing a control system for use with the production system shown in Fig. 1
  • Fig. 3 is a flow diagram showing the main operational procedure of the control system
  • Fig. 1 shows a typical production system 1 for a well which is lined with casing 2.
  • the production system comprises a tubing string 3 located within the casing 2 which extends from a surface located wellhead 4 to a no-go standing valve 5 which is adjacent perforations 6 in the casing 2 of the well.
  • the perforations 6 permit production fluid to flow from the surrounding geological formations into the casing 2 and enter the tubing 3 via the no-go standing valve 5.
  • Located above the no-go standing valve 5 is a sliding door 7 which is optional and above that is located a production packer 8.
  • the packer 8 prevents production fluid rising to the surface through the annulus between the tubing string 3 and casing 2.
  • a side pocket mandrel 9 is located in the tubing string and the side pocket mandrel 9 has a downhole gaslift valve 10 to permit gas injected into the annulus between the tubing 3 and casing 2 to enter the tubing 3.
  • a lower bumper spring 11 and a stop collar 12 which define the lowest position possible of a plunger 13 which can slide up and down the tubing string 3.
  • a master valve 14 Above the wellhead 4 is located a master valve 14 and a swab valve 15. Above the swab valve 15 is located a receiver/lubricator 24 with a manual plunger catcher 16 and a plunger sensor 33.
  • a side outlet 17 diverts production fluid from the well into a flowline 18 through an elbow adapter 19 and a flowline valve 20. The production fluid passes from the flowline 18 through a check valve 21 and manual valve 22 before entering the main product line 23.
  • a bumper sub 26 which defines the uppermost position of the plunger in the production system 1.
  • the receiver/lubricator 24 is connected to the bumper sub 26 by a wireline access union 25.
  • the gas injection line 27 is coupled to the annulus between the tubing 3 and casing 2 just below the wellhead 4 and the injection of gas into the annulus is controlled by a gas lift valve 28.
  • Gas to the gas injection line 27 passes from a main reservoir 29 through a manual valve 30, check valve 31 and gas choke 32.
  • Fig. 2 shows a control system 35 for controlling the production system 1 shown in Fig. 1.
  • the control system 35 comprises a micro-processor unit 36 which receives power from a power source 37 and power supply unit 38.
  • the processor 36 is coupled to a communications unit 39 and to a data logging unit 40.
  • the data logging unit 40 is coupled to a data extract unit 41 which supplies data to a data storage display and design unit 42.
  • the micro-processor 36 receives inputs on input lines 43 and controls the flowline valve 20, the gaslift valve 28, the plunger catcher (receiver/lubricator) 24 and the downhole gaslift valve 10 via respective output control lines 44, 45, 46, 47.
  • the inputs 43 to the micro-processor unit 36 take outputs from transducers and sensors on the production system 1 which correspond to tubing head pressure, casing head pressure, flowline pressure, gaslift differential pressure, wellhead sensor, ball valve limit switches and ball valve position transmitters. '
  • the main procedure for the control system 35 is shown as a flow diagram in Fig. 3.
  • the power is switched on 50 and the micro-processor unit 36 closes 51 the flowline valve 20, gaslift valve 28 and downhole gaslift valve 10 via output lines 44, 45, 47 and resets 51 its internal timers.
  • the control system waits for a start command 52 and on receiving the start command 52 starts 53 the main procedure. If the inputs received on the input lines 43 are all within the preset boundaries, the procedure waits for a signal 54 to confirm that the plunger 13 is its lowermost position within the tubing 3. When this is confirmed the processor 36 starts 55 a plunger fall back counter T5 and executes a plunger on bottom procedure 56.
  • the plunger on bottom procedure 56 calculates when the plunger is at the desired depth in the tubing 3. It can designed to be used in conjunction with a downhole pressure transmitter (DPT gauge) and calculates the fluid level by the intersection of two gradient lines, the oil gradient line and the gas gradient line.
  • DPT gauge downhole pressure transmitter
  • the free fall velocities of the plunger in the oil and gas are input values in the calculations and are a function of oil and gas viscosity, geometry of the well and type of plunger.
  • the next stage is the execution of a slug optimisation procedure 65.
  • the slug optimisation procedure 65 calculates the optimum time at which to initiate the producing phase of the well cycle. After arrival of the plunger at the stop collar 12 the well is in a position to produce. This can commence immediately or be delayed until in-flow into the well ceases to meet a critical value.
  • the rate of increase in bottom hole pressure is indicative of beneficial in-flow of hydrocarbons into the casing 2.
  • back pressure is applied to the reservoir and in-flow decreases.
  • the point where in-flow ceases to be linear is the time to initiate the producing phase of the well cycles.
  • a gaslift open timer can be modified to adjust the plunger upward velocity to its optimum value. Optimisation is done by comparing upward velocity against produced volume for a fixed number of cycles.
  • the function of the produced volume procedure 72 is to calculate the produced volume from the well by gauging the volume delivered by each cycle of the plunger 13 on its upward journey.
  • the absolute value is not important to the optimisation routine as the prime function is to achieve a maximum value.
  • the metering calculation should be accurate to field management requirements and is typically of the order of +/-5%.
  • the procedure checks for a condition that the tubing head pressure at a distinct part of the well cycle exceeds a pre-set value (P2). This value P2 is set for each individual well as experience dictates.
  • the system assumes that liquid is being delivered by the system and commences to compute and accumulate the volume delivered to a data register Al in the data logging unit 40.
  • the computed volume is the integral of the differential pressure with respect to the duration of the differential.
  • the main procedure starts 79 a blowdown counter T4. If counter T4 is up 80, the flowline valve is closed 81 and when it is confirmed that the flowline valve is closed 82, an optimisation procedure 83 is run and the operational cycle repeats itself starting from step 54 on the main procedure.
  • the optimisation procedure 83 compares the current cycle produced volume with the previous cycle produced volume and alters the necessary parameters to try to obtain optimisation of the produced volume.
  • a safety shutdown routine 84 can be commenced.
  • the invention has the advantage of extending the scope and capability of this type of production systems.
  • the optimisation in the system can reduce the gaslift requirement by as much as 60% and production rates can be increased by up to 50% or more through the improved gaslift performance.
  • control system should be self optimising and should self adjust as reservoir performances change.
  • control system also has the advantage that production can be controlled by using suitably modified procedures in order to control the production to that required. Modifications and improvements may be incorporated without departing from the scope of the invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Remote Sensing (AREA)
  • Pipeline Systems (AREA)
  • Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)

Abstract

Procédé de régulation de la production d'un fluide à partir d'un puits par injection d'un gaz d'extraction, et système de régulation (35) permettant de réguler la production de fluide à partir d'un puits par injection de gaz. Ledit système (35) comprend un moyen de surveillance de cycle destiné à surveiller le nombre de cycles effectués par un piston plongeur dans le puits, ainsi qu'un moyen de mesure de volume permettant de mesurer le volume de fluide produit. Un processeur (36) est également prévu et couplé au moyen de surveillance de cycle et au moyen de mesure de volume afin de recevoir des signaux de sortie à partir desdits moyens. Le processeur (36) régule le nombre de cycles et la quantité de gaz injecté en réponse aux signaux de sortie reçus afin de réguler le volume de fluide produit à partir du puits.
PCT/GB1994/001891 1993-09-01 1994-09-01 Procede et systeme de regulation destines a la production d'un fluide a partir d'un puits WO1995006799A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB9603001A GB2296110B (en) 1993-09-01 1994-09-01 A method and a control system for the production of fluid fropm a well
AU75056/94A AU7505694A (en) 1993-09-01 1994-09-01 A method and a control system for the production of fluid from a well

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB9318114.7 1993-09-01
GB939318114A GB9318114D0 (en) 1993-09-01 1993-09-01 A control system

Publications (1)

Publication Number Publication Date
WO1995006799A1 true WO1995006799A1 (fr) 1995-03-09

Family

ID=10741327

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB1994/001891 WO1995006799A1 (fr) 1993-09-01 1994-09-01 Procede et systeme de regulation destines a la production d'un fluide a partir d'un puits

Country Status (3)

Country Link
AU (1) AU7505694A (fr)
GB (2) GB9318114D0 (fr)
WO (1) WO1995006799A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006102496A3 (fr) * 2005-03-23 2007-10-11 Scallen Richard Nouvelles vannes de tete de puits
WO2021046330A1 (fr) * 2019-09-05 2021-03-11 Flowco Productions Solutions, Llc Système et procédé de commande de pompe à piston plongeur à gaz

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2188451A (en) * 1983-12-05 1987-09-30 Otis Eng Co Well production controller system
GB2201261A (en) * 1987-02-20 1988-08-24 Delta X Corp Gas lift optimization for oil well
US4921048A (en) * 1988-09-22 1990-05-01 Otis Engineering Corporation Well production optimizing system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2188451A (en) * 1983-12-05 1987-09-30 Otis Eng Co Well production controller system
GB2188751A (en) * 1983-12-05 1987-10-07 Otis Eng Co Well production controller system
GB2201261A (en) * 1987-02-20 1988-08-24 Delta X Corp Gas lift optimization for oil well
US4921048A (en) * 1988-09-22 1990-05-01 Otis Engineering Corporation Well production optimizing system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006102496A3 (fr) * 2005-03-23 2007-10-11 Scallen Richard Nouvelles vannes de tete de puits
US7377311B2 (en) 2005-03-23 2008-05-27 Scallen Richard E Wellhead valves
WO2021046330A1 (fr) * 2019-09-05 2021-03-11 Flowco Productions Solutions, Llc Système et procédé de commande de pompe à piston plongeur à gaz

Also Published As

Publication number Publication date
GB2296110B (en) 1997-11-19
AU7505694A (en) 1995-03-22
GB9603001D0 (en) 1996-04-10
GB9318114D0 (en) 1993-10-20
GB2296110A (en) 1996-06-19

Similar Documents

Publication Publication Date Title
CN100507208C (zh) 使用压力随钻测量的井控制方法
US6516879B1 (en) Liquid level detection for artificial lift system control
CA2989674C (fr) Systeme de compression de gaz destine a une injection dans un puits de forage, et methode d'optimisation de soulevement de gaz intermittent
CN100535380C (zh) 用于控制地层压力的系统和方法
US4374544A (en) Technique for control of injection wells
US6873267B1 (en) Methods and apparatus for monitoring and controlling oil and gas production wells from a remote location
EA015325B1 (ru) Способ определения существования события управления скважиной
US6454002B1 (en) Method and apparatus for increasing production from a well system using multi-phase technology in conjunction with gas-lift
US20070289740A1 (en) Apparatus and Method for Managing Supply of Additive at Wellsites
US7681641B2 (en) Plunger lift controller and method
WO2012122470A1 (fr) Procédé de caractérisation de formations souterraines utilisant une réponse de pression de fluide pendant des opérations de forage
AU2002235526A1 (en) Optimization of reservoir, well and surface network systems
EP1358394A1 (fr) Optimisation de systemes de reseaux de gisement, de forage et de surface
US10941639B2 (en) Multi-stage hydrocarbon lifting
US11746628B2 (en) Multi-stage downhole tool movement control system and method of use
RU2636842C1 (ru) Способ и компоновка для регулируемой закачки жидкости по пластам
US11686177B2 (en) Subsurface safety valve system and method
US6142229A (en) Method and system for producing fluids from low permeability formations
WO2019226595A9 (fr) Procédé d'optimisation d'ascension au gaz
WO1995006799A1 (fr) Procede et systeme de regulation destines a la production d'un fluide a partir d'un puits
AU2016401674B2 (en) Operation of electronic inflow control device without electrical connection
US20220275711A1 (en) Lifting hydrocarbons in stages with side chambers
RU2670814C1 (ru) Способ управления процессом закачки рабочего агента для поддержания давления среды в многопластовой скважине
Okoro et al. Production Optimisation in the Niger Delta Basin by Continuous Gas Lift–A Case Study of Iduo-Well-A06
AU735581B2 (en) Producing well artificial lift system control

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AT AU BB BG BR BY CA CH CN CZ DE DK ES FI GB HU JP KP KR KZ LK LU LV MG MN MW NL NO NZ PL PT RO RU SD SE SK UA US UZ VN

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: CA

点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载