WO1992009747A1 - Kerbing structure - Google Patents
Kerbing structure Download PDFInfo
- Publication number
- WO1992009747A1 WO1992009747A1 PCT/GB1991/002135 GB9102135W WO9209747A1 WO 1992009747 A1 WO1992009747 A1 WO 1992009747A1 GB 9102135 W GB9102135 W GB 9102135W WO 9209747 A1 WO9209747 A1 WO 9209747A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- kerbing
- structure according
- structures
- section
- site
- Prior art date
Links
- 239000000463 material Substances 0.000 claims abstract description 15
- 239000004033 plastic Substances 0.000 claims abstract description 8
- 229920003023 plastic Polymers 0.000 claims abstract description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 5
- 238000010276 construction Methods 0.000 claims description 4
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 239000002352 surface water Substances 0.000 claims 1
- 239000004575 stone Substances 0.000 description 7
- 239000010410 layer Substances 0.000 description 4
- 239000002344 surface layer Substances 0.000 description 4
- 239000007787 solid Substances 0.000 description 3
- 239000003795 chemical substances by application Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 239000003063 flame retardant Substances 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/223—Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/222—Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F9/00—Arrangement of road signs or traffic signals; Arrangements for enforcing caution
- E01F9/50—Road surface markings; Kerbs or road edgings, specially adapted for alerting road users
- E01F9/535—Kerbs or road edgings specially adapted for alerting road users
- E01F9/547—Kerbs or road edgings specially adapted for alerting road users illuminated
Definitions
- the present invention relates in general to kerbing as used to define the boundary between a first area of a site, such as a roadway, and a second area of the site, such as a pavement.
- kerbing is made up of from short lengths of kerb stones made of solid concrete.
- the kerb stones are heavy and difficult to transport and manoeuvre into place.
- kerbing defining a boundary between a first area, such as a roadway and a second area, such as a pavement is made up from at least partly hollow light weight kerbing structures.
- Each kerbing structure can be composed of synthetic plastics materials.
- each kerbing structure can be left empty or partly filled with some other material. Alternatively, or additionally the interior of each kerbing structure can be used to accommodate service conduits and/or for drainage.
- the kerbing structure of the invention can also be adapted to provide better visual identification for traffic e.g. by directly incorporating fluorescent or reflective material or materials on an exterior surface. Alternatively or additionally light sources, or reflective elements can be mounted on or within the exterior surface.
- the kerbing structure can be a one-piece construction with a generally rectangular cross-section defined by a base wall, a pair of side walls and one or more top walls.
- the kerbing structure can be of modular form.
- One embodiment of modular form has at least a base section and a separate top section, the base section defining an open channel for receiving the top section and having an internal cavity.
- the top section can be solid or hollow.
- the kerbing structure or one of the sections thereof has holes for passing rainwater into the kerbing structure for drainage.
- As upper wall of the kerbing structure can also be configured as a drainage gutter.
- the invention also extends to sites incorporating kerbing with one or more kerbing structures in accordance with the invention.
- FIG. 1 is a schematic perspective view of a site incorporating a kerbing structure in accordance with the invention
- Figure 2 is a sectional end view of the kerbing structure of Figure 1 in situ;
- Figures 3, 4, 5 and 6 are sectional end views of sites with alternative kerbing structures in accordance with the invention.
- Figure 7 depicts various additional components usable with the kerbing structure of Figure 5 for example;
- Figure 8 is a schematic perspective view of the kerbing structure of Figures 1 and 2 when shaped to a curved profile;
- Figure 9 is a schematic perspective view of another site incorporating a modified kerbing structure in accordance with the invention.
- Figure 10 is a schematic perspective view of the kerbing structure shown in Figure 9 but taken in the opposite direction;
- Figure 11 is a schematic perspective view of a further site incorporating a modified form of kerbing structure of Figure 9;
- Figure 12 is a perspective exploded view of another kerbing structure constructed in accordance with the invention.
- Figures 13 to 16 are sectional end views of sites with further examples of kerbing structures in accordance with the invention.
- Figure 17 is a schematic perspective view of a site incorporating another kerbing structure in accordance with the invention.
- a roadway/pavement site is composed of a first area or roadway 9 composed of a surface layer 10 laid out on a base 11 with one or more intermediate sub-layers 2 and a second area or pavement 8 composed of a surface layer 12 laid onto a base 13.
- the pavement surface layer 12 can be made up from paving slabs, bricks or the like or from a continuous concretious or asphaltic layer.
- the upper surface 14 of the pavement 8 is above the adjacent upper surface 15 of the roadway 9 and kerbing 16 separates the pavement 8 and the roadway 9.
- the kerbing 16 is made up from individual lengths or sections of kerbing structure 17 joined end to end.
- the kerbing structures 17 may have the same or different lengths.
- Each kerbing structure 17 is hollow and preferably made from synthetic plastics material. Conveniently, the end regions of the individual structures 17 abut one another as at 6 and are bonded together, e.g. by heat or inter- engage with shaped end regions.
- each kerbing structure 17 can be laid into concrete 30 in an open trench 4 at the juncture between the roadway 9 and the pavement 8.
- the kerbing structures 17 can also be secured to the pavement base 13 by pins or screws once the structures 17 are levelled and upright.
- each kerbing structure 17 is of generally rectangular one-piece unitary configuration with side walls 18, 19 a base wall 20 and a top wall 21.
- the top wall 21 merges with an inclined wall 22 extending to the side wall 18 adjacent the roadway 9 to conform with a camber 31 on the roadway surface 15.
- the interior of the structure 17 is sub-divided by internal partition walls 23 to form a plurality of internal cavities 25.
- Figures 3, 4, 5 and 6 show alternative designs based on the one-piece structure 17 shown in Figures 1 and 2 in which like reference numerals denote like features.
- the flat top wall 21 is omitted entirely and the inclined wall 22 extends between the upper region ends of the side walls 18, 19.
- the inclined wall 22 is omitted.
- the' top wall 21 is concave to form an exterior drainage gutter 7 and in Figure 5 the top wall 21 is flat and extends between the side walls 18, 19 at the level of the pavement upper surface 14.
- the top wall 21 is omitted and the inclined wall 22 is also outwardly convex.
- the basic kerbing structure 17 of Figures 1 and 2 can be provided with drainage bores 36.
- the bores 36 can be created when the structure 17 is in situ or otherwise and allow water on the road surface layer 10 to pass into one or more of the interior cavities 25 which then serve as drainage channels.
- water in the kerbing structure 17 can be drained away via an outlet pipe 37 communicating with the drainage cavity 25 and mounted to the wall 19 adjacent the pavement 8.
- One or more other cavities 25 can accommodate services such as conduits, pipes, cables and the like.
- the kerbing structure 17 can be stiffened and rigidified by introducing material such as fluid or liquid or a particulate substance into the cavities 25. This can be done once the kerbing structure 17 is laid.
- the internal walls 23 also act to strengthen the structure 17 but the kerbing structure 17 is at least flexible along its length enabling the kerbing structure 17 to follow a curve. This is depicted in Figure 8 where the kerbing structure 17 of Figures 1 and 2 or Figures 9 and 10 is held with stakes 38 until the concrete sets.
- Figure 11 depicts a site incorporating a kerbing structure 17 with drainage bores 36 as described and illustrated in Figures 9 and 10. Assuming it is desired to resurface the road a fresh layer of material such as asphalt is laid and this raises the road surface 10. The original bores 36 are sealed off with a plastics strip or tape 35 and the new layer 80 laid over the strip or tape 35. Fresh drainage bores 39 are then provided above the new road surface 10.
- each kerbing structure 17 would be composed of a rectangular base part (say resembling Figure 5) with side walls 18, 19 a top wall 21 and a base wall 20 and a complementary top part 32, such as is shown in Figure 7, used as an accessory.
- the top part 32 may have depending pegs 33 which locate within bores in the top wall 21 of the base part. It is possible to vary the overall height of the kerbing structure by using separate top parts 32 of various sizes. It is also possible to build up the height of the base part by installing a stack of upper parts 32 fitting on to another. In case of wear the upper parts 32 can be replaced without disturbing the base parts.
- Figures 12 to 17 depict further forms of kerbing structure 17 of modular design.
- the basic structure 17 is composed of a base section 40 an intermediate section 41 and a top section 42.
- the base section 40 has a pair of inclined lower side walls 43 a base wall 44 and a top wall 45 defining a cavity 49. Upstanding parallel upper side walls 46, 47 project up from the top wall 45 to provide an open channel 48.
- the top section 42 may resemble the structure 17 of Figures 1 and 2 i.e. it has a base wall 20, side walls 18, 19 a flat top wall 21 and an inclined wall 22.
- the intermediate section 41 is of rectangular configuration.
- the base section 40 is set in concrete 30 in an open trench 4 at the juncture between the roadway 9 and the pavement 8.
- the open channel 48 is then capable of receiving the top section 42. If it is desired to raise the height of the kerbing structure 17 of modular form during re-surfacing then one or more of the intermediate sections 41 are positioned in the channel 48 as shown in Figure 16. This raising can take place several times by leaving the base section 40 in place.
- the base section 40 can accommodate services e.g. pipes, conduits cables and the like in the cavity 49.
- the top section 42 can be used for drainage in the manner described in connection with Figures 9 and 10.
- Figures 14 and 15 depict alternative kerbing structures of modular form in which the top section 42 has a different shape to Figures 12, 13 and 16.
- the top section 42 has a flat top wall 21 and a side wall 18 with a bulbous lower portion 50.
- top wall 21 of the top section 42 is of extended concave form to form an external drainage gutter 7.
- Figure 17 depicts a site utilising the modular kerbing structure 17 as shown in Figures 12, 13 and 16 and showing water draining into the cavity 25 of the top section 42 through bores (not shown) and services 50 in the cavity 49 of the base section 40.
- top section 42 is a solid concrete kerb stone of conventional type.
- kerbing structures 17 constructed in accordance with the invention are lighter and easier to transport and lay than conventional kerb stones. Nevertheless, it is generally desirable to ensure the kerbing structure has a shape to conform with conventional concrete kerb stones so that it can be abutted thereto or in the case of the modular design to receive such kerb stones.
- the kerbing structures 17 in accordance with the invention can be made generally longer than conventional kerb stones and can be extruded or injection moulded to any length say up to about 15 metres. It is possible to preform some of the kerbing structures 17 to adopt a set curvature and to use a mixture of straight and curved sections to separate the site areas (9, 8). Generally the plastics material used to fabricate the structures 17 should be durable, impact resistant and fire retardant. P.v.c, nylon or synthetic resins are suitable alone or in a mixture with one or more other materials or agents.
- plastics material coloured or fluorescent or reflective by adding appropriate materials or agents to the plastics base.
- Light sources of various kinds and/or reflective elements can be mounted on or in the kerbing structure 17 so as to be visible exteriorly from one or more directions.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
Kerbing between a roadway (9) and a pavement (8) is composed of individual runs of kerbing structure (17) formed from light-weight plastics material having internal cavities (25, 49) for accommodating service conduits and/or water drainage.
Description
KERBING STRUCTURE TECHNICAL FIELD
The present invention relates in general to kerbing as used to define the boundary between a first area of a site, such as a roadway, and a second area of the site, such as a pavement.
BACKGROUND TO THE INVENTION
Conventionally, kerbing is made up of from short lengths of kerb stones made of solid concrete. The kerb stones are heavy and difficult to transport and manoeuvre into place.
DISCLOSURE OF THE INVENTION
In accordance with the invention kerbing defining a boundary between a first area, such as a roadway and a second area, such as a pavement, is made up from at least partly hollow light weight kerbing structures. Each kerbing structure can be composed of synthetic plastics materials.
The interior of each kerbing structure can be left empty or partly filled with some other material. Alternatively, or additionally the interior of each kerbing structure can be used to accommodate service conduits and/or for drainage.
The kerbing structure of the invention can also be adapted to provide better visual identification for traffic e.g. by directly incorporating fluorescent or reflective material or materials on an exterior surface.
Alternatively or additionally light sources, or reflective elements can be mounted on or within the exterior surface.
The kerbing structure can be a one-piece construction with a generally rectangular cross-section defined by a base wall, a pair of side walls and one or more top walls. Alternatively the kerbing structure can be of modular form. One embodiment of modular form has at least a base section and a separate top section, the base section defining an open channel for receiving the top section and having an internal cavity. The top section can be solid or hollow.
Preferably the kerbing structure or one of the sections thereof has holes for passing rainwater into the kerbing structure for drainage. As upper wall of the kerbing structure can also be configured as a drainage gutter.
The invention also extends to sites incorporating kerbing with one or more kerbing structures in accordance with the invention.
The invention may be understood more readily, and various other aspects and features of the invention may become apparent, from consideration of the following description.
BRIEF DESCRIPTION OF DRAWINGS
Embodiments of the invention will now be described, by way of example only, with reference to the accompanying drawings, wherein:-
Figure 1 is a schematic perspective view of a site incorporating a kerbing structure in accordance with the invention;
Figure 2 is a sectional end view of the kerbing structure of Figure 1 in situ;
Figures 3, 4, 5 and 6 are sectional end views of sites with alternative kerbing structures in accordance with the invention;
Figure 7 depicts various additional components usable with the kerbing structure of Figure 5 for example;
Figure 8 is a schematic perspective view of the kerbing structure of Figures 1 and 2 when shaped to a curved profile;
Figure 9 is a schematic perspective view of another site incorporating a modified kerbing structure in accordance with the invention;
Figure 10 is a schematic perspective view of the kerbing structure shown in Figure 9 but taken in the opposite direction;
Figure 11 is a schematic perspective view of a further site incorporating a modified form of kerbing structure of Figure 9;
Figure 12 is a perspective exploded view of another kerbing structure constructed in accordance with the invention;
Figures 13 to 16 are sectional end views of sites with further examples of kerbing structures in accordance
with the invention; and
Figure 17 is a schematic perspective view of a site incorporating another kerbing structure in accordance with the invention.
BEST MODES OF CARRYING OUT THE INVENTION
As shown in Figure 1, a roadway/pavement site is composed of a first area or roadway 9 composed of a surface layer 10 laid out on a base 11 with one or more intermediate sub-layers 2 and a second area or pavement 8 composed of a surface layer 12 laid onto a base 13. The pavement surface layer 12 can be made up from paving slabs, bricks or the like or from a continuous concretious or asphaltic layer. As is known, the upper surface 14 of the pavement 8 is above the adjacent upper surface 15 of the roadway 9 and kerbing 16 separates the pavement 8 and the roadway 9. In accordance with the invention, the kerbing 16 is made up from individual lengths or sections of kerbing structure 17 joined end to end. The kerbing structures 17 may have the same or different lengths. Each kerbing structure 17 is hollow and preferably made from synthetic plastics material. Conveniently, the end regions of the individual structures 17 abut one another as at 6 and are bonded together, e.g. by heat or inter- engage with shaped end regions.
The kerbing structures 17 can be laid into concrete 30 in an open trench 4 at the juncture between the roadway 9 and the pavement 8. The kerbing structures 17 can also
be secured to the pavement base 13 by pins or screws once the structures 17 are levelled and upright. In the specific example as shown each kerbing structure 17 is of generally rectangular one-piece unitary configuration with side walls 18, 19 a base wall 20 and a top wall 21. As shown in the example of Figures 1 and 2, the top wall 21 merges with an inclined wall 22 extending to the side wall 18 adjacent the roadway 9 to conform with a camber 31 on the roadway surface 15. The interior of the structure 17 is sub-divided by internal partition walls 23 to form a plurality of internal cavities 25.
Figures 3, 4, 5 and 6 show alternative designs based on the one-piece structure 17 shown in Figures 1 and 2 in which like reference numerals denote like features. In Figure 3, the flat top wall 21 is omitted entirely and the inclined wall 22 extends between the upper region ends of the side walls 18, 19. In Figures 4 and 5, the inclined wall 22 is omitted. In Figure 4 the' top wall 21 is concave to form an exterior drainage gutter 7 and in Figure 5 the top wall 21 is flat and extends between the side walls 18, 19 at the level of the pavement upper surface 14. In Figure 6 the top wall 21 is omitted and the inclined wall 22 is also outwardly convex.
As shown in Figure 9 the basic kerbing structure 17 of Figures 1 and 2 can be provided with drainage bores 36. The bores 36 can be created when the structure 17 is in situ or otherwise and allow water on the road surface layer 10 to pass into one or more of the interior cavities
25 which then serve as drainage channels. As shown in Figure 10, water in the kerbing structure 17 can be drained away via an outlet pipe 37 communicating with the drainage cavity 25 and mounted to the wall 19 adjacent the pavement 8. One or more other cavities 25 can accommodate services such as conduits, pipes, cables and the like.
If desired, the kerbing structure 17 can be stiffened and rigidified by introducing material such as fluid or liquid or a particulate substance into the cavities 25. This can be done once the kerbing structure 17 is laid. The internal walls 23 also act to strengthen the structure 17 but the kerbing structure 17 is at least flexible along its length enabling the kerbing structure 17 to follow a curve. This is depicted in Figure 8 where the kerbing structure 17 of Figures 1 and 2 or Figures 9 and 10 is held with stakes 38 until the concrete sets.
Figure 11 depicts a site incorporating a kerbing structure 17 with drainage bores 36 as described and illustrated in Figures 9 and 10. Assuming it is desired to resurface the road a fresh layer of material such as asphalt is laid and this raises the road surface 10. The original bores 36 are sealed off with a plastics strip or tape 35 and the new layer 80 laid over the strip or tape 35. Fresh drainage bores 39 are then provided above the new road surface 10.
In other designs, each kerbing structure 17 would be composed of a rectangular base part (say resembling Figure
5) with side walls 18, 19 a top wall 21 and a base wall 20 and a complementary top part 32, such as is shown in Figure 7, used as an accessory. The top part 32 may have depending pegs 33 which locate within bores in the top wall 21 of the base part. It is possible to vary the overall height of the kerbing structure by using separate top parts 32 of various sizes. It is also possible to build up the height of the base part by installing a stack of upper parts 32 fitting on to another. In case of wear the upper parts 32 can be replaced without disturbing the base parts.
Figures 12 to 17 depict further forms of kerbing structure 17 of modular design. As shown in Figure 12 the basic structure 17 is composed of a base section 40 an intermediate section 41 and a top section 42. The base section 40 has a pair of inclined lower side walls 43 a base wall 44 and a top wall 45 defining a cavity 49. Upstanding parallel upper side walls 46, 47 project up from the top wall 45 to provide an open channel 48. The top section 42 may resemble the structure 17 of Figures 1 and 2 i.e. it has a base wall 20, side walls 18, 19 a flat top wall 21 and an inclined wall 22. The intermediate section 41 is of rectangular configuration.
As shown in Figure 13 the base section 40 is set in concrete 30 in an open trench 4 at the juncture between the roadway 9 and the pavement 8. The open channel 48 is then capable of receiving the top section 42. If it is desired to raise the height of the kerbing structure 17 of
modular form during re-surfacing then one or more of the intermediate sections 41 are positioned in the channel 48 as shown in Figure 16. This raising can take place several times by leaving the base section 40 in place. The base section 40 can accommodate services e.g. pipes, conduits cables and the like in the cavity 49. The top section 42 can be used for drainage in the manner described in connection with Figures 9 and 10.
Figures 14 and 15 depict alternative kerbing structures of modular form in which the top section 42 has a different shape to Figures 12, 13 and 16. Thus in Figure 14 the top section 42 has a flat top wall 21 and a side wall 18 with a bulbous lower portion 50.
In Figure 15 the top wall 21 of the top section 42 is of extended concave form to form an external drainage gutter 7.
Figure 17 depicts a site utilising the modular kerbing structure 17 as shown in Figures 12, 13 and 16 and showing water draining into the cavity 25 of the top section 42 through bores (not shown) and services 50 in the cavity 49 of the base section 40.
It is also possible to create a modular kerbing structure in which the top section 42 is a solid concrete kerb stone of conventional type.
In general, kerbing structures 17 constructed in accordance with the invention are lighter and easier to transport and lay than conventional kerb stones.
Nevertheless, it is generally desirable to ensure the kerbing structure has a shape to conform with conventional concrete kerb stones so that it can be abutted thereto or in the case of the modular design to receive such kerb stones.
The kerbing structures 17 in accordance with the invention can be made generally longer than conventional kerb stones and can be extruded or injection moulded to any length say up to about 15 metres. It is possible to preform some of the kerbing structures 17 to adopt a set curvature and to use a mixture of straight and curved sections to separate the site areas (9, 8). Generally the plastics material used to fabricate the structures 17 should be durable, impact resistant and fire retardant. P.v.c, nylon or synthetic resins are suitable alone or in a mixture with one or more other materials or agents.
It is also possible to render the plastics material coloured or fluorescent or reflective by adding appropriate materials or agents to the plastics base.
Light sources of various kinds and/or reflective elements can be mounted on or in the kerbing structure 17 so as to be visible exteriorly from one or more directions.
Claims
1. Kerbing structure usable to define a boundary between a first site area, such as a pavement, and a second site area, such as roadway; characterized in that the kerbing structure (17) is of light weight partly hollow construe ion.
2. A kerbing structure according to Claim 1 and made from synthetic plastics material.
3. A kerbing structure according to Claim 1 or 2 wherein at least an external surface of the structure incorporates fluorescent or reflective material or is provided with one or more light sources or light reflective elements.
4. A kerbing structure according to Claim 1, 2 or 3 and of one-piece elongate construction with a generally rectangular cross-section defined by a base wall (20), a pair of side walls (18, 19) and an upper wall or walls (21, 22).
5. A kerbing structure according to ' Claim 4 wherein there are one or more interior walls (23) between the side walls and dividing the interior into cavities (25).
-6. A kerbing structure according to Claim 4 or 5, wherein at least one of the side walls (18, 19) has water drainage holes (36, 39) leading to the interior.
7. A kerbing structure according to Claim 1, 2 or 3 and of modular construction with at least a base section (40) and a separate top section (42), the base section defining an open channel (48) for receiving the top section (42) and having an internal cavity (49) .
8. A kerbing structure according to Claim 7 wherein the top section (42) has an internal cavity (25).
9. A kerbing structure according to Claim 7 or 8 and further comprising one or more additional intermediate sections (41) positioned between the top section (42) and the base section (40).
10. A kerbing structure according to Claim 1, 2 and 3 and of modular construction with a base section of generally rectangular configuration (18, 19, 21, 20) and a top section (32) fitted to the base section.
11. A kerbing structure according to any of the preceding claims and flexible along its length to adopt a curved profile.
12. A site comprised of a first area, such as a pavement (8) and a second area, such as a roadway (9) separated by kerbing (16) composed of kerbing structures (17) according to any one of the preceding claims disposed end-to-end.
13. A site according to Claim 12, wherein the kerbing structures (17) are set into concrete (30) in a trench (4), drainage (36, 39, 25) for surface water is provided within the kerbing structures (17) and service conduits (50) or the like are also accommodated within the kerbing structures (17).
14. A site according to Claim 12 or 13, wherein stiffening material is present in the kerbing structures (17) and is introduced in situ.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB9026268.4 | 1990-12-03 | ||
GB909026268A GB9026268D0 (en) | 1990-12-03 | 1990-12-03 | Kerbing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
WO1992009747A1 true WO1992009747A1 (en) | 1992-06-11 |
Family
ID=10686403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/GB1991/002135 WO1992009747A1 (en) | 1990-12-03 | 1991-12-03 | Kerbing structure |
Country Status (2)
Country | Link |
---|---|
GB (1) | GB9026268D0 (en) |
WO (1) | WO1992009747A1 (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2280464A (en) * | 1993-07-29 | 1995-02-01 | Joan Otterson | Kerb system and method of installing a kerb |
GB2298882A (en) * | 1995-03-14 | 1996-09-18 | Simon Conway | Road kerb |
GB2301132A (en) * | 1995-09-15 | 1996-11-27 | Cooper Clarke Group Plc | Drainage unit |
GB2305200A (en) * | 1995-09-15 | 1997-04-02 | Cooper Clarke Group Plc | Drainage unit |
EP0790360A1 (en) * | 1996-02-14 | 1997-08-20 | Walter Schiewe | Drainage channel |
GB2365049A (en) * | 2000-07-28 | 2002-02-13 | Graham Eccleson | Synthetic kerbs and method of use |
EP1528153A2 (en) | 2003-10-28 | 2005-05-04 | Jason Storey | Two part kerb |
GB2409699A (en) * | 2004-03-20 | 2005-07-06 | Brabco 329 Ltd | Kerbstone |
EP1640500A1 (en) * | 2004-09-15 | 2006-03-29 | Cooper Clarke Group Ltd. | A drainage unit |
WO2009090388A1 (en) * | 2008-01-17 | 2009-07-23 | Pipeline & Drainage Systems Plc | Kerb block and system |
WO2010097058A1 (en) * | 2009-02-27 | 2010-09-02 | Tomas Kubica | The method for installing a line, the ground construction element for performing this method, and its application |
GB2474776B (en) * | 2009-10-26 | 2015-12-16 | Durakerb Ltd | Lightweight combined kerb drainage element |
CN111636274A (en) * | 2020-05-28 | 2020-09-08 | 浙江士高环境建设工程有限公司 | Town road drainage structures |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE517820A (en) * | ||||
GB294420A (en) * | 1927-12-05 | 1928-07-26 | Henry Kenelm Bates | Improvements in artificial stone, reinforced concrete or the like road kerbs |
FR1435342A (en) * | 1965-05-05 | 1966-04-15 | Gincan Anstalt | Edging of sidewalks and road verges with plastic outer sheath |
CH535328A (en) * | 1972-03-21 | 1973-03-31 | Buergi Robert | Shaped stone |
US3788756A (en) * | 1971-01-31 | 1974-01-29 | S Ito | Curb and drain unit |
DE2827743A1 (en) * | 1978-06-23 | 1980-01-10 | Retter Hans | Replaceable road or paving kerbstone - has slot, deformable dividing layer, grooved bedding stone and mortar filling |
FR2436216A1 (en) * | 1978-09-18 | 1980-04-11 | Le Ray Gildas | Concrete carriageway kerb and channel - has high kerb face and lower pavement section to protect pedestrians |
US4367974A (en) * | 1981-01-30 | 1983-01-11 | West Yorkshire Metropolitan County Council | Surface drainage system and cover member for use therein |
US4594021A (en) * | 1984-04-23 | 1986-06-10 | Schaefer Hartmut | Marker block for divisions on trafficways in form of an oblong beam-like body and having reflective means |
-
1990
- 1990-12-03 GB GB909026268A patent/GB9026268D0/en active Pending
-
1991
- 1991-12-03 WO PCT/GB1991/002135 patent/WO1992009747A1/en unknown
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE517820A (en) * | ||||
GB294420A (en) * | 1927-12-05 | 1928-07-26 | Henry Kenelm Bates | Improvements in artificial stone, reinforced concrete or the like road kerbs |
FR1435342A (en) * | 1965-05-05 | 1966-04-15 | Gincan Anstalt | Edging of sidewalks and road verges with plastic outer sheath |
US3788756A (en) * | 1971-01-31 | 1974-01-29 | S Ito | Curb and drain unit |
CH535328A (en) * | 1972-03-21 | 1973-03-31 | Buergi Robert | Shaped stone |
DE2827743A1 (en) * | 1978-06-23 | 1980-01-10 | Retter Hans | Replaceable road or paving kerbstone - has slot, deformable dividing layer, grooved bedding stone and mortar filling |
FR2436216A1 (en) * | 1978-09-18 | 1980-04-11 | Le Ray Gildas | Concrete carriageway kerb and channel - has high kerb face and lower pavement section to protect pedestrians |
US4367974A (en) * | 1981-01-30 | 1983-01-11 | West Yorkshire Metropolitan County Council | Surface drainage system and cover member for use therein |
US4594021A (en) * | 1984-04-23 | 1986-06-10 | Schaefer Hartmut | Marker block for divisions on trafficways in form of an oblong beam-like body and having reflective means |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2280464A (en) * | 1993-07-29 | 1995-02-01 | Joan Otterson | Kerb system and method of installing a kerb |
GB2280464B (en) * | 1993-07-29 | 1996-11-27 | Joan Otterson | Kerb sytem |
GB2298882A (en) * | 1995-03-14 | 1996-09-18 | Simon Conway | Road kerb |
GB2301132A (en) * | 1995-09-15 | 1996-11-27 | Cooper Clarke Group Plc | Drainage unit |
GB2305200A (en) * | 1995-09-15 | 1997-04-02 | Cooper Clarke Group Plc | Drainage unit |
GB2301132B (en) * | 1995-09-15 | 1997-04-09 | Cooper Clarke Group Plc | Drainage unit |
GB2305200B (en) * | 1995-09-15 | 2000-03-22 | Cooper Clarke Group Plc | A roadway having an associated drainage unit |
EP0790360A1 (en) * | 1996-02-14 | 1997-08-20 | Walter Schiewe | Drainage channel |
GB2365049A (en) * | 2000-07-28 | 2002-02-13 | Graham Eccleson | Synthetic kerbs and method of use |
EP1528153A2 (en) | 2003-10-28 | 2005-05-04 | Jason Storey | Two part kerb |
EP1528153A3 (en) * | 2003-10-28 | 2006-01-04 | Jason Storey | Two part kerb |
GB2409699A (en) * | 2004-03-20 | 2005-07-06 | Brabco 329 Ltd | Kerbstone |
GB2409699B (en) * | 2004-03-20 | 2008-01-09 | Brabco 329 Ltd | Synthetic kerbs and method of installation |
EP1753917B1 (en) * | 2004-03-20 | 2018-12-12 | Durakerb Limited | Synthetic kerbs |
EP1640500A1 (en) * | 2004-09-15 | 2006-03-29 | Cooper Clarke Group Ltd. | A drainage unit |
WO2009090388A1 (en) * | 2008-01-17 | 2009-07-23 | Pipeline & Drainage Systems Plc | Kerb block and system |
WO2010097058A1 (en) * | 2009-02-27 | 2010-09-02 | Tomas Kubica | The method for installing a line, the ground construction element for performing this method, and its application |
GB2474776B (en) * | 2009-10-26 | 2015-12-16 | Durakerb Ltd | Lightweight combined kerb drainage element |
CN111636274A (en) * | 2020-05-28 | 2020-09-08 | 浙江士高环境建设工程有限公司 | Town road drainage structures |
Also Published As
Publication number | Publication date |
---|---|
GB9026268D0 (en) | 1991-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3854292A (en) | Irrigation ditch liner and method for making same | |
WO1992009747A1 (en) | Kerbing structure | |
US4995759A (en) | Drainage tube construction | |
JP2007138707A (en) | Boundary block between sidewalk and roadway for water permeable pavement and drainage structure of water permeable pavement | |
US6203245B1 (en) | Culvert end guard | |
US2148773A (en) | Highway paving construction | |
KR102563746B1 (en) | Prefabricated support plate for sidewalk block and prevention of weeds growth | |
EP0819197B1 (en) | A drainage installation for roads | |
KR101913602B1 (en) | Permeable block | |
JP4080269B2 (en) | Drainage structure of the sidewalk | |
JP3396458B2 (en) | Precast concrete slab and its installation structure | |
JP2005097999A (en) | Protrusion sidewalk structure and foundation part block used for the same | |
JPH09111853A (en) | Construction member | |
JP3475906B2 (en) | Free slope type ditch | |
JP2597076B2 (en) | Gutter and method of manufacturing gutter | |
EP1520942A1 (en) | Suface drainage | |
JP2000179034A (en) | Side ditch, cover member for side ditch, and boundary block | |
KR102790772B1 (en) | Drainage trench | |
JP2002212909A (en) | Boundary block between sidewalk and roadway for water permeable pavement and drainage structure of the water permeable pavement | |
JP2000345508A (en) | Sidewalk and roadway boundary block for water permeable paving and drainage structure of water permeable pavement | |
WO2008090392A1 (en) | Crossings, especially home driveway crossings | |
JPH06116905A (en) | Structure of multi-purpose flat bar | |
KR101778586B1 (en) | a color boudary stone of sidewalk and street passing rainwater and packageing construction method using the color boudary stone | |
KR200228770Y1 (en) | Assemblage watercourse for side concave of road | |
KR200233587Y1 (en) | A Concrete Watershoot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): GB JP US |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK ES FR GB GR IT LU MC NL SE |