RU2305064C1 - Jib crane - Google Patents
Jib crane Download PDFInfo
- Publication number
- RU2305064C1 RU2305064C1 RU2006104792/11A RU2006104792A RU2305064C1 RU 2305064 C1 RU2305064 C1 RU 2305064C1 RU 2006104792/11 A RU2006104792/11 A RU 2006104792/11A RU 2006104792 A RU2006104792 A RU 2006104792A RU 2305064 C1 RU2305064 C1 RU 2305064C1
- Authority
- RU
- Russia
- Prior art keywords
- boom
- platform
- crane
- trusses
- jib
- Prior art date
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
Изобретение относится к конструкциям специальных кранов с неизменяемым углом наклона стрелы и предназначено для использования при перегрузке различных грузов, преимущественно металлического лома, а также для погрузки и выгрузки подвижного состава.The invention relates to the construction of special cranes with an unchanged angle of inclination of the boom and is intended for use in transshipment of various cargoes, mainly scrap metal, as well as for loading and unloading rolling stock.
Известна конструкция крано-манипуляторной установки, которая содержит опорно-поворотное устройство, выносные аутригеры, односекционную стрелу, грузоподъемную лебедку и крюковую подвеску (Пат. RU №2240971, МПК 7 В66С 23/00, опубл. 20.03.2004).A known design of a crane-manipulator installation, which contains a slewing ring, remote outriggers, a single-section boom, a hoisting winch and a hook suspension (Pat. RU No. 2240971, IPC 7 V66C 23/00, publ. 20.03.2004).
Недостатком данной конструкции при погрузке и выгрузке вагонов является весьма ограниченная видимость с места управления установки пространства вагона и возможная потеря устойчивости при сбросе груза.The disadvantage of this design when loading and unloading wagons is very limited visibility from the control point of the installation of the wagon space and a possible loss of stability when dumping the cargo.
Известна конструкция крана с поворотной платформой и подъемной стрелой, имеющей специальный канатный расчал, связанный с полиспастом, имеющим подвижные и неподвижные обоймы, между которыми установлены тяги из жестких шарнирно соединенных звеньев, соединенных с обоймами (Пат. RU №2254285, МПК 7 В66С 23/26, опубл. 20.06.2005).A known construction of a crane with a rotary platform and a lifting boom having a special wire rope calculation associated with a chain hoist having movable and fixed clips, between which traction is made of rigid articulated links connected to the clips (Pat. RU No. 2254285, IPC 7 В66С 23 / 26, publ. 06/20/2005).
При погрузочно-разгрузочных работах со сбросом груза данным краном канатный расчал стрелы не обеспечивает необходимую жесткость стрелы, что может приводить к ее раскачиванию.During loading and unloading operations with the dumping of cargo by this crane, the rope calculation of the boom does not provide the necessary rigidity of the boom, which can lead to its swinging.
Известна конструкция перегрузочного портального крана, включающая портал в виде пространственной рамы, опирающийся на ходовые тележки, поворотную часть, которая состоит из платформы с размещенными на ней механизмами подъема, поворота, изменения вылета стрелы, электрооборудованием и кабиной управления, колонны и стрелового устройства, выполненного прямым или шарнирно-сочлененным (см. Гохберг М.М. Справочник по кранам. Т.2. Л.: Машиностроение. 1988, с.106, рис.IY.4.1).A known design of a reloading portal crane, comprising a portal in the form of a spatial frame, supported by running trolleys, a rotary part, which consists of a platform with hoisting, turning, boom change, electrical equipment and control cabs, columns and boom mounted directly or articulated (see Gokhberg M.M. Handbook of cranes. T.2. L .: Mechanical engineering. 1988, p.106, fig .IY.4.1).
Данные краны широко используются для погрузки и выгрузки подвижного состава, причем вагоны перемещаются между колоннами портала крана. Однако в стесненных условиях ломозаготовительных площадок применение кранов данной конструкции имеет существенные ограничения, связанные с низкой маневренностью и громоздкостью крана и отсутствием в его конструкции механизмов гашения колебаний, возникающих при резком сбросе груза.These cranes are widely used for loading and unloading rolling stock, and cars move between the columns of the portal of the crane. However, in the cramped conditions of scrap collecting sites, the use of cranes of this design has significant limitations associated with the low maneuverability and bulkiness of the crane and the absence in its design of vibration damping mechanisms that occur during a sudden discharge of cargo.
Наиболее близким к заявляемому является кран-погрузчик, включающий портал с балансирными ходовыми тележками, цилиндрическую башню, выполненную из листа, противовесную консоль с прикрепленными к ней снизу противовесами, грузовую лебедку, механизм поворота, стрелу, выполненную в виде пространственной решетчатой конструкции, и кабину, расположенную на уровне стрелы крана (Пат. RU №2172291, МПК 7 В66С 23/00, опубл. 20.08.2001).Closest to the claimed one is a loader crane, including a portal with balanced chassis trolleys, a cylindrical tower made of sheet, a counterweight console with counterweights attached to it from below, a load winch, a swing mechanism, an arrow made in the form of a spatial lattice structure, and a cabin, located at the level of the boom of the crane (Pat. RU No. 2172291, IPC 7 В66С 23/00, publ. 08.20.2001).
Недостатками данной конструкции крана являются:The disadvantages of this design of the crane are:
- выполнение стрелы пространственно-решетчатой конструкции без механизмов гашения колебаний при сбросе груза, что приводит к раскачиванию крана при резком сбросе груза, например пачки или брикета лома;- the implementation of the arrows of the spatial-lattice structure without damping mechanisms when dumping the load, which leads to the swinging of the crane with a sharp dumping of the load, for example a pack or briquette of scrap;
- подвешивание противовесов снизу под противовесной консолью, что уменьшает габарит от рельсов до нижней точки противовеса и может привести при повороте крана к задеванию противовесов о вагон или другие конструкции, а также снижает безопасность работы людей в зоне действия крана;- hanging the balances from the bottom under the counterweight console, which reduces the size from the rails to the lower point of the counterweight and can cause the counterweights to hit the wagon or other structures when turning the crane, and also reduces the safety of people working in the crane operating area;
- нахождение кабины управления на уровне стрелы непосредственно на платформе затрудняет обзор крановщику и зачастую требует наличия внизу стропальщика.- finding the control cabin at the boom level directly on the platform makes it difficult for the crane operator to see and often requires a slinger at the bottom.
Целью данного изобретения является повышение надежности, эффективности и безопасности работы крана в условиях ломозаготовительных площадок путем совершенствования его конструктивных элементов и их взаиморасположения.The aim of this invention is to increase the reliability, efficiency and safety of the crane in the conditions of scrap platforms by improving its structural elements and their relative position.
Указанная цель достигается тем, что кран стрелового типа, включающий ходовую тележку с механизмом перемещения, на которой установлена опора поворотной платформы, непосредственно платформу с грузовой лебедкой, механизм поворота платформы, вертикальные и горизонтальные фермы крепления стрелы, противовесы и кабину управления, закрепленные на платформе, стрелу с растяжками и грузовой подвеской, связанную с фермами, выполнен со стрелой в виде плоской конструкции из цельнотянутых труб, шарнирно соединенной с вертикальными фермами, образуя с их вертикальной осью угол 72°, которая оснащена двумя нижними раскосами, выполненными в виде стальных штанг с амортизаторами, шарнирно соединенными с платформой и стрелой, а противовесы имеют в сечении Г-образную форму, установлены вертикально в гнезда, выполненные в виде жесткой рамы из двутавровых балок, соединенной с верхней платформой, и выступом опираются на раму.This goal is achieved by the fact that the crane is a jib type, including a traveling trolley with a movement mechanism, on which the support of the turntable is mounted, directly the platform with a cargo winch, the mechanism of rotation of the platform, vertical and horizontal boom mounts, counterweights and a control cabin fixed to the platform, the boom with stretch marks and the cargo suspension connected with the trusses is made with the boom in the form of a flat structure from seamless pipes, pivotally connected to vertical trusses, forming their vertical axis has an angle of 72 °, which is equipped with two lower braces, made in the form of steel rods with shock absorbers, pivotally connected to the platform and the boom, and the balances are L-shaped in cross section, mounted vertically in sockets made in the form of a rigid frame made of I-beams beams connected to the upper platform and the protrusion rest on the frame.
Кроме того, амортизатор нижнего раскоса стрелы выполнен в виде цельносварной вилки с упором, в которую плотно посажены полые втулки из эластичного материала, и проходящего внутри втулок цилиндрического штока с пружиной, имеющего возможность возвратно-поступательного движения и связанного с пружиной посредством гаек через тарельчатые шайбы.In addition, the shock absorber of the lower boom of the boom is made in the form of an all-welded fork with a stop, in which hollow bushings of elastic material are tightly fitted and a cylindrical rod with a spring passing inside the bushings, which has the possibility of reciprocating movement and connected to the spring by means of nuts through plate washers.
Нижние раскосы соединены со стрелой на расстоянии 0,3-0,4 вылета стрелы от оси ее крепления к фермам платформы.The lower braces are connected to the boom at a distance of 0.3-0.4 departure of the boom from the axis of its attachment to the trusses of the platform.
Кабина управления установлена непосредственно под стрелой таким образом, что расстояние от передней стенки кабины до оси грузового блока стрелы составляет не более 0,8 вылета стрелы.The control cabin is installed directly below the boom in such a way that the distance from the front wall of the cabin to the axis of the boom cargo block is not more than 0.8 boom outreach.
Сущность изобретения поясняется чертежами, где на фиг.1 показан общий вид крана, а на фиг.2 - конструкция амортизатора нижних раскосов стрелы. Дополнительно сущность изобретения иллюстрируется фотографиями, где на фиг.3 и 4 представлен общий вид крана и расположение противовесов, на фиг.5 - внешний вид амортизаторов нижних раскосов стрелы, на фиг.6 - фрагмент стрелы с местами крепления к ней штанг нижних раскосов, на фиг.7 - кабина управления краном и вид из нее.The invention is illustrated by drawings, where figure 1 shows a General view of the crane, and figure 2 - design of a shock absorber lower braces of the boom. In addition, the invention is illustrated by photographs, where Figs. 3 and 4 show a general view of the crane and the location of the balances, Fig. 5 is an external view of the shock absorbers of the lower brackets of the boom, Fig. 6 is a fragment of the boom with the points of attachment of the rods of the lower braces to it, 7 is a crane control cabin and a view from it.
Кран состоит из ходовой тележки 1 (см. фиг.1), которая изготовлена в виде жесткой рамы из продольных балок коробчатого сечения, соединенных сваркой. Поверх рамы приварен настил из стального листа, на котором закреплена кольцевая опора колонны крана. На площадке ходовой тележки 1 размещен механизм передвижения крана 2, состоящий из приводных и холостых колес с ребордами, редуктора, валов и электродвигателя с тормозом. К кольцевой опоре ходовой тележки 1 болтами жестко закреплена колонна 3, выполненная из листа в виде трубы с внутренними ребрами и фланцами крепления колонны 3 к раме тележки и опорно-поворотному устройству 4. Опорно-поворотное устройство 4 выполнено в виде опоры качения с верхним и нижним дисками и роликами между ними. Нижний диск устройства 4 выполнен неподвижным и имеет внутреннюю зубчатку, обеспечивающую поворот платформы 5 крана, к которой болтами прикреплен верхний диск. Поворотная платформа 5 выполнена в виде жесткой рамы из балок с ребрами жесткости для крепления верхнего диска опорно-поворотного устройства 4, соединенных сваркой, и закрытой настилом из листа, приваренным к балкам. На платформе 5 установлены: грузовые лебедки 6, механизм поворота 7, пространственная рама 8 из горизонтальных 9, вертикальных 10 и наклонных 11 ферм, а также кабина 12 управления краном, которая установлена под стрелой 13 на определенном расстоянии от ее головки. К задней части платформы 5 прикреплена рама 14 из двутавровых балок с гнездами, в которых размещены противовесы 15, в виде залитых бетоном металлических коробов, имеющих в поперечном сечении Г-образную форму. По периметру платформы 5 установлено ограждение 16, снаружи к ней стационарно прикреплена лестница 17 для подъема на платформу и спуска с нее. На настиле платформы 5 размещены шкафы с электрооборудованием крана. Стрела крана 13, выполненная в виде рамной трубчатой конструкции, в головке которой установлен грузовой блок 18, шарнирно соединена с вертикальными фермами 10. Стационарное положение стрелы 13 и определенный угол ее наклона обеспечивают верхние канатные растяжки 19, соединенные с наклонными фермами 11 рамы 8. Снизу стрела 13 шарнирно соединена посредством раскосов 20, выполненных в виде стальных штанг с амортизаторами 21, с вертикальными фермами 10, что обеспечивает дополнительную устойчивость и жесткость ее положения. Шарниры 22 соединения раскосов 20 со стрелой крана расположены на расстоянии 0,3-0,4 вылета стрелы 17 от оси ее крепления к вертикальным фермам 10. В ручьях грузового блока 18 уложены канаты, соединяющие грузовую лебедку 6 и крюковую подвеску 23, состоящую из блока, крюка, установленного в траверсе, и корпуса.The crane consists of a running trolley 1 (see figure 1), which is made in the form of a rigid frame from longitudinal box-section beams connected by welding. On top of the frame, a steel sheet floor is welded onto which the annular support of the crane column is fixed. On the platform of the undercarriage 1 there is a mechanism for moving the crane 2, consisting of drive and idle wheels with flanges, a gearbox, shafts and an electric motor with a brake. A column 3 made of a sheet in the form of a pipe with inner ribs and flanges for fastening the column 3 to the frame of the carriage and the slewing device 4 is rigidly bolted to the annular support of the undercarriage 1 with bolts. The slewing device 4 is made in the form of a rolling support with upper and lower discs and rollers between them. The lower disk of the device 4 is made stationary and has an internal gear providing rotation of the crane platform 5 to which the upper disk is bolted. The rotary platform 5 is made in the form of a rigid frame of beams with stiffeners for attaching the upper disk of the slewing ring 4 connected by welding and covered by a sheet floor welded to the beams. On the platform 5 are installed: cargo winches 6, a rotation mechanism 7, a spatial frame 8 of horizontal 9, vertical 10 and inclined 11 farms, as well as a crane control cabin 12, which is installed under the boom 13 at a certain distance from its head. A frame 14 of I-beams with nests, in which counterweights 15 are placed, is attached to the rear of the platform 5 in the form of concrete boxes filled with concrete, having a L-shaped cross section. A fence 16 is installed around the perimeter of the platform 5, and a ladder 17 is permanently attached to it from the outside to raise and lower the platform. On the platform deck 5, cabinets with electric equipment of the crane are placed. The boom of the crane 13, made in the form of a tubular frame structure, in the head of which a cargo block 18 is mounted, is pivotally connected to the vertical trusses 10. The stationary position of the boom 13 and a certain angle of its inclination are provided by the upper cable ties 19 connected to the inclined trusses 11 of the frame 8. Bottom the boom 13 is pivotally connected by braces 20, made in the form of steel rods with shock absorbers 21, to vertical trusses 10, which provides additional stability and rigidity of its position. The hinges 22 of the connection of the braces 20 to the crane arm are located at a distance of 0.3-0.4 of the boom 17 from the axis of its attachment to the vertical trusses 10. In the streams of the cargo block 18 there are ropes connecting the cargo winch 6 and the hook suspension 23, consisting of a block , hook mounted in the traverse, and the body.
Амортизаторы 21 (см. фиг.1) выполнены в виде цельносварной вилки 24 (см.фиг.2) с упором, в которой плотно установлены эластичные полые втулки 25 квадратного сечения. Внутри втулок 25 проходит цилиндрический шток 26 с надетой на него пружиной 27. Определенное положение пружины 27 относительно штока 26 обеспечивается путем ее фиксации гайками 28 через тарельчатые шайбы 29. С помощью гаек 28 можно изменять жесткость амортизаторов 21 (см. фиг.1). Цилиндрический шток 26 (см. фиг.2) жестко соединен со стальной штангой 30, которая в свою очередь через проушины шарнирно соединена со стрелой 13 крана (см.фиг.1). Вилка 24 (см. фиг.2) через проушины шарнирно соединена с платформой 5 (см. фиг.1).Shock absorbers 21 (see FIG. 1) are made in the form of an all-welded fork 24 (see FIG. 2) with a stop in which elastic
Работает данный кран следующим образом. Ходовая тележка 1 (см. фиг.1) крана устанавливается на подкрановые пути. Перемещение осуществляется за счет пары приводных колес, вращение которым передается от общего редуктора механизма передвижения 3 крана через промежуточные валы с зубчатыми муфтами. В свою очередь привод редуктора осуществляется через муфту и вал от электродвигателя. В механизме передвижения также имеется электрогидравлический тормоз. Возможно выполнение привода передвижения крана с передачей вращающего момента на каждое приводное колесо от отдельного электродвигателя с редуктором.This crane works as follows. The undercarriage 1 (see figure 1) of the crane is installed on the crane tracks. The movement is carried out by a pair of drive wheels, the rotation of which is transmitted from a common gearbox of the crane movement mechanism 3 through intermediate shafts with gear couplings. In turn, the gear drive is carried out through the coupling and shaft from the electric motor. The movement mechanism also has an electro-hydraulic brake. It is possible to carry out a crane movement drive with a torque transmission to each drive wheel from a separate electric motor with a gearbox.
Поворот платформы 5 крана и стрелы 13 с грузом осуществляется от вертикально установленного электродвигателя через редуктор с электромагнитным тормозом. На выходном валу редуктора имеется шестерня, находящаяся в зацеплении с зубчатым венцом опорно-поворотного устройства 4. Вращение шестерни обеспечивает необходимый угол поворота стрелы 13. Поворотное устройство снабжено ограничителем угла поворота платформы 5.The rotation of the platform 5 of the crane and the boom 13 with the load is carried out from a vertically mounted electric motor through a gearbox with an electromagnetic brake. On the output shaft of the gearbox there is a gear engaged with the ring gear of the slewing ring 4. The rotation of the pinion provides the necessary angle of rotation of the boom 13. The rotary device is equipped with a limiter of the angle of rotation of the platform 5.
Подъем груза осуществляется передачей вращающего момента от электродвигателя на барабан грузовой лебедки 6, на котором нарезаны винтовые канавки и с помощью крепежных элементов закреплены концы каната. Полиспаст грузовой лебедки 6 однократный одноветьевой. Канат грузовой лебедки 6 проходит через блоки, установленные на раме 8 платформы 5, в головке стрелы 13 и в крюковой подвеске 25. При вращении барабана лебедки 6 происходит наматывание или сматывание каната, тем самым обеспечивается подъем или опускание груза.The load is lifted by transmitting torque from the electric motor to the drum of the cargo winch 6, on which helical grooves are cut and the ends of the rope are fixed with fasteners. The half hoist of the cargo winch is 6 single-branch. The rope of the cargo winch 6 passes through the blocks mounted on the frame 8 of the platform 5, in the boom head 13 and in the
В условиях ломозаготовительных площадок данный кран работает преимущественно с электромагнитом или грейфером. На платформе 5 крана для работы с механическим грейфером установлена дополнительная лебедка 6, работающая на закрытие и раскрытие грейфера. Возможно использование на данном кране электрогрейфера. При погрузке и разгрузке подвижного состава кран может работать с крюковой подвеской.In the conditions of scrap platforms, this crane works mainly with an electromagnet or a grab. An additional winch 6 is installed on the platform 5 of the crane for working with a mechanical grab, working to close and open the grab. It is possible to use an electric grab on this crane. When loading and unloading rolling stock, the crane can work with a hook suspension.
При перегрузке металлолома в брикетах или россыпью (см. фиг.3 и 4) кран подъезжает к месту складирования лома, электромагнитом или грейфером захватывает и поднимает груз и по подкрановым путям движется к месту его погрузки в полувагоны, складирования или брикетирования. Высоко расположенные на платформе 5 (см. фиг.1) крана противовесы 15 (см. фиг.1 и фиг.4) оригинальной формы позволяют ему беспрепятственно двигаться с возможностью поворота стрелы 13 в довольно стесненных условиях площадки. При подъеме и перевозке груза штанги 30 (см. фиг.2) нижних раскосов 20 (см. фиг.1) стрелы 13 за счет регулировочных гаек 28 (см. фиг.2) амортизаторов соосны с вилкой 24. В момент размыкания грейфера или обесточивания электромагнита груз резко сбрасывается, при этом стрела 13 (см. фиг.1) стремится двигаться вверх. Однако за счет того, что нижние раскосы 20 стрелы 13 имеют амортизаторы 21, происходит движение штанги 30 (см. фиг.1) раскоса и штока 26 амортизатора, жестко связанного с ней (см. фиг.5), которое смягчают пружина и эластичные втулки. Таким образом колебательное движение стрелы гасится, что повышает устойчивость крана в целом и способствует повышению ресурса работы и сохранности верхних канатных растяжек и стрелы. При грузоподъемности крана 5 тонн, что вполне достаточно для перегрузки металлолома, вылет стрелы составляет 13 метров при массе противовесов 14 тонн. Для крана с такими параметрами максимальное гашение колебаний стрелы происходит при расположении шарниров крепления нижнего раскоса к стреле на расстоянии 3,9-5,2 метра от оси крепления стрелы к вертикальным фермам рамы поворотной платформы (см. фиг.6).When overloading scrap metal in briquettes or in bulk (see Figures 3 and 4), the crane drives up to the place of scrap storage, picks up and lifts the load with an electromagnet or grab and moves along crane tracks to the place of its loading into open wagons, storage or briquetting. Highly located on the platform 5 (see Fig. 1) of the crane, the counterweights 15 (see Fig. 1 and Fig. 4) of the original form allow it to move freely with the possibility of rotation of the boom 13 in rather cramped conditions of the site. When lifting and transporting the load, the rods 30 (see FIG. 2) of the lower braces 20 (see FIG. 1) of the boom 13 due to the adjusting nuts 28 (see FIG. 2) of the shock absorbers are coaxial with the
При погрузке и выгрузке вагонов, например, с металлоломом при данном вылете стрелы и расположении передней части (остекления) кабины управления на расстоянии не более 10,4 метров от оси грузового блока стрелы крановщик имеет хороший обзор (см. фиг.7) и может видеть полностью пространство вагона и работать без помощников внизу.When loading and unloading wagons, for example, with scrap metal for a given boom reach and location of the front part (glazing) of the control cabin at a distance of no more than 10.4 meters from the axis of the boom cargo block, the crane operator has a good overview (see Fig. 7) and can see fully carriage space and work without helpers below.
Таким образом, результатом данного изобретения является повышение надежности, эффективности и безопасности работы кранов стрелового типа в условиях ломозаготовительных площадок путем изменения его конструктивных элементов и оптимизации их взаиморасположения.Thus, the result of this invention is to increase the reliability, efficiency and safety of jib cranes in the conditions of scrap platforms by changing its structural elements and optimizing their relative position.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2006104792/11A RU2305064C1 (en) | 2006-02-15 | 2006-02-15 | Jib crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2006104792/11A RU2305064C1 (en) | 2006-02-15 | 2006-02-15 | Jib crane |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2305064C1 true RU2305064C1 (en) | 2007-08-27 |
Family
ID=38597072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2006104792/11A RU2305064C1 (en) | 2006-02-15 | 2006-02-15 | Jib crane |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2305064C1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109626210A (en) * | 2019-01-08 | 2019-04-16 | 青岛海西重机有限责任公司 | A kind of gantry crane computer room component and method for arranging |
RU205900U1 (en) * | 2021-03-09 | 2021-08-11 | Общество с ограниченной ответственностью "ЛУКОЙЛ-ПЕРМЬ" | Device for installation of equipment for cleaning the tubing string from asphalt-resin-paraffin deposits |
-
2006
- 2006-02-15 RU RU2006104792/11A patent/RU2305064C1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109626210A (en) * | 2019-01-08 | 2019-04-16 | 青岛海西重机有限责任公司 | A kind of gantry crane computer room component and method for arranging |
CN109626210B (en) * | 2019-01-08 | 2020-02-14 | 青岛海西重机有限责任公司 | Portal crane machine room assembly and arrangement method |
RU205900U1 (en) * | 2021-03-09 | 2021-08-11 | Общество с ограниченной ответственностью "ЛУКОЙЛ-ПЕРМЬ" | Device for installation of equipment for cleaning the tubing string from asphalt-resin-paraffin deposits |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5478192A (en) | Boom operated fork truck | |
KR850000819B1 (en) | Gantry crane | |
CN105947898B (en) | A kind of lifting mechanism and its method for arranging of container crane dispersed placement | |
CN105936477B (en) | A kind of lightweight Multifunctional container gantry crane and its anti-shake method | |
JP2009007164A (en) | Self-traveling lift crane having variable position counterweight | |
WO2014043995A1 (en) | Split type crane | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
KR101239990B1 (en) | Mini crane | |
CN105883635A (en) | Travel trolley of container gantry crane and method for quickly changing wheels | |
CN201560066U (en) | Novel light loading and unloading gantry crane | |
CN104085798A (en) | Rubber tire container gantry crane | |
CN100436300C (en) | Wire rope reeving support system for cargo container handling gantry cranes | |
CN202658902U (en) | Hoisting and distributing dual-purpose concrete distributing machine | |
CN211998570U (en) | Telescopic arm type truck-mounted crane | |
RU2305064C1 (en) | Jib crane | |
RU101440U1 (en) | DEVICE FOR LIFTING LARGE-TUBE PIPES | |
EP2895419B1 (en) | System for reducing the counterweight of a crane | |
EP3551497A2 (en) | Tow truck capable to rotate vehicle in air | |
KR20090009424U (en) | Utility Tower Crane | |
KR100833970B1 (en) | Slewing device for tower crane | |
CN103253602A (en) | Liftable self-propelled tracked vehicle superlift device and crane | |
CN102718155A (en) | Electric tyre hoist | |
CN210458947U (en) | Bridge concrete guardrail pouring trolley | |
US137737A (en) | Improvement in steam-cranes | |
CN2775020Y (en) | Crane small cart |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20120216 |