RU2266996C2 - Bridge reinforcement device - Google Patents
Bridge reinforcement device Download PDFInfo
- Publication number
- RU2266996C2 RU2266996C2 RU2004106928/03A RU2004106928A RU2266996C2 RU 2266996 C2 RU2266996 C2 RU 2266996C2 RU 2004106928/03 A RU2004106928/03 A RU 2004106928/03A RU 2004106928 A RU2004106928 A RU 2004106928A RU 2266996 C2 RU2266996 C2 RU 2266996C2
- Authority
- RU
- Russia
- Prior art keywords
- bridge
- plate
- rests
- stops
- studs
- Prior art date
Links
- 230000002787 reinforcement Effects 0.000 title abstract description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 2
- 238000004873 anchoring Methods 0.000 abstract 1
- 239000002131 composite material Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 abstract 1
- 238000012423 maintenance Methods 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 239000004567 concrete Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Предложение относится к строительству и ремонту искусственных сооружений, преимущественно сталежелезобетонных конструкций мостов, а именно к устройствам усиления мостов.The proposal relates to the construction and repair of artificial structures, mainly steel-reinforced concrete bridge structures, namely, bridge reinforcement devices.
Известно устройство усиления моста, включающее пучки из прядей, анкерные элементы, упоры, шпильки крепления упоров к балке [1].A device for strengthening the bridge, including bundles of strands, anchor elements, stops, studs, fastening stops to the beam [1].
Однако известное устройства имеют следующее недостатки.However, the known devices have the following disadvantages.
При эксплуатации моста на шпильки действуют неравномерные динамические нагрузки, которые вызывают появление микротрещин в окружающем шпильке бетоне. При этом торцевая часть балки является ненагруженной. Все это уменьшает нагрузочную способность и надежность моста и увеличивает затраты на его эксплуатацию.During the operation of the bridge, uneven dynamic loads act on the studs, which cause microcracks in the concrete surrounding the stud. In this case, the end part of the beam is unloaded. All this reduces the load capacity and reliability of the bridge and increases the cost of its operation.
Технический результат, на достижение которого направлено данное техническое решение, заключается в повышении нагрузочной способности и надежности моста и уменьшении затрат на его эксплуатацию.The technical result, the achievement of which this technical solution is aimed, is to increase the load capacity and reliability of the bridge and reduce the cost of its operation.
Указанный результат достигается за счет того, что устройство усиления моста, включающее пучки из прядей, анкерные элементы, упоры, шпильки крепления упоров к балке, снабжено дополнительным упорами, состоящими из взаимодействующих с торцевыми частью балки пластин и скрепленных с соответственно с пластинами и шпильками предварительно напряженных тяг.This result is achieved due to the fact that the bridge reinforcing device, including bundles of strands, anchor elements, stops, studs for attaching the stops to the beam, is equipped with additional stops consisting of plates interacting with the end part of the beam and fastened to the prestressed plates and studs, respectively rods.
На фиг.1 и 2 представлено устройство усиления моста (соответственно вид сверху и сбоку).Figures 1 and 2 show a bridge reinforcement device (top and side views, respectively).
Устройство усиления моста включает пучки из прядей 1, упоры 2, анкерные элементы 3, шпильки 4 крепления упоров к балке 5. Устройство снабжено дополнительным упором, состоящим из взаимодействующей с торцевой частью балки пластины 6 и скрепленных соответственно с пластиной 6 и шпильками 4 предварительно напряженных тяг 7. Тяги 7 могут быть выполнены составными (в виде пластины 8 и сваренной с ней накладки 9).The bridge reinforcing device includes bundles of strands 1, stops 2,
При монтаже устройства предварительно в балке сверлят отверстия и при помощи шпилек закрепляют пластины 8. Затем устанавливают на торец балки 1 пластину 6 (предварительно выполняя в мосте (в случае необходимости) технологическое отверстие) и скрепляют ее посредством сварки с накладками 9, которые затем сваривают с пластинами 8, образуя тяги 7. При сварке происходит нагревание тяг 7, и при остывании происходит их предварительное напряжение. Затем технологическое отверстие заливают бетоном.When installing the device, holes are pre-drilled in the beam and the plates are fixed with pins 8. Then,
При установке дополнительного упора происходит напряжение торцевой части балки. При этом повышается ее нагрузочная способность, уменьшается вероятность разрушения бетона вокруг шпильки.When installing an additional stop, the end of the beam is stressed. At the same time, its load capacity increases, the probability of concrete destruction around the stud decreases.
Таким образом, данное техническое решение позволит:Thus, this technical solution will allow:
- повысить нагрузочную способность моста;- increase the load capacity of the bridge;
- увеличить надежность моста;- increase the reliability of the bridge;
- уменьшить затраты на эксплуатацию моста.- reduce the cost of operating the bridge.
Источник информацииSourse of information
1. Свидетельство на полезную модель РФ №33961, МКИ Е 04 С 5/16 от 10.07.2003.1. Certificate for utility model of the Russian Federation No. 33961, MKI E 04 C 5/16 of 07/10/2003.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2004106928/03A RU2266996C2 (en) | 2004-03-09 | 2004-03-09 | Bridge reinforcement device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2004106928/03A RU2266996C2 (en) | 2004-03-09 | 2004-03-09 | Bridge reinforcement device |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2004106928A RU2004106928A (en) | 2005-08-20 |
RU2266996C2 true RU2266996C2 (en) | 2005-12-27 |
Family
ID=35845942
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2004106928/03A RU2266996C2 (en) | 2004-03-09 | 2004-03-09 | Bridge reinforcement device |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2266996C2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2640855C1 (en) * | 2016-11-29 | 2018-01-12 | Общество с ограниченной ответственностью "НПП СК МОСТ" | Method for strengthening the bridge superstructure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2126475C1 (en) * | 1997-08-18 | 1999-02-20 | Хучбаров Загид Гаджиевич | Device for regulating forces in superstructure of bridge |
RU2172372C1 (en) * | 2000-02-21 | 2001-08-20 | Воронежская государственная архитектурно-строительная академия | Beam |
RU19858U1 (en) * | 2001-03-07 | 2001-10-10 | Ситников Сергей Львович | DEVICE FOR TENSIONING WIRE ROPES OF REINFORCED CONCRETE SPAN STRUCTURES OF BRIDGES |
US6523207B1 (en) * | 1998-12-24 | 2003-02-25 | Freyssinet International (Stup) | Fixing device and method between a structural element and a suspension cable |
RU33961U1 (en) * | 2003-07-10 | 2003-11-20 | Ситников Сергей Львович | Bridge reinforcement |
-
2004
- 2004-03-09 RU RU2004106928/03A patent/RU2266996C2/en not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2126475C1 (en) * | 1997-08-18 | 1999-02-20 | Хучбаров Загид Гаджиевич | Device for regulating forces in superstructure of bridge |
US6523207B1 (en) * | 1998-12-24 | 2003-02-25 | Freyssinet International (Stup) | Fixing device and method between a structural element and a suspension cable |
RU2172372C1 (en) * | 2000-02-21 | 2001-08-20 | Воронежская государственная архитектурно-строительная академия | Beam |
RU19858U1 (en) * | 2001-03-07 | 2001-10-10 | Ситников Сергей Львович | DEVICE FOR TENSIONING WIRE ROPES OF REINFORCED CONCRETE SPAN STRUCTURES OF BRIDGES |
RU33961U1 (en) * | 2003-07-10 | 2003-11-20 | Ситников Сергей Львович | Bridge reinforcement |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2640855C1 (en) * | 2016-11-29 | 2018-01-12 | Общество с ограниченной ответственностью "НПП СК МОСТ" | Method for strengthening the bridge superstructure |
Also Published As
Publication number | Publication date |
---|---|
RU2004106928A (en) | 2005-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101922237B (en) | Connector-type tensioning and anchoring system of reinforced concrete flexural piece with prestress steel strands | |
CN101942904B (en) | Steel plate-type tensioning and anchoring system for prestress steel stranded wire reinforced concrete flexural member | |
KR100895343B1 (en) | Ultra-high strength fiber reinforced concrete girder using pretension and posttension without shear rebar and its construction method and rapid construction method of bridge using the same | |
CN113062197B (en) | Assembly type stiffening large cantilever corrugated steel web PC combined box girder and construction method thereof | |
CN103388408A (en) | External pre-stressed tendon reinforcing steering block for building structure | |
CN101672070B (en) | Slowly-bonded prestressed prefabricated integral frame joint system | |
CN109296076B (en) | Hidden type connecting node of beam column with assembled frame structure | |
CN110846996A (en) | Construction method of continuous composite beam bridge and continuous composite beam bridge | |
CN101922238B (en) | Simple and convenient tensioned anchorage system of prestressing steel strand reinforced concrete flexural member | |
KR20120065218A (en) | The rahmen bridge construction technique for which tendon and the connection support stand was used | |
CN103981807B (en) | A kind of without bracket steel anchor beam | |
US20100170166A1 (en) | Spot footing | |
CN211340366U (en) | Continuous combined beam bridge | |
JP2001182016A (en) | Construction method of truss structure bridge | |
JP3611510B2 (en) | Half precast floor slab | |
RU2266996C2 (en) | Bridge reinforcement device | |
CN212335740U (en) | A jack-type corrugated steel web prestressed composite beam | |
CN206408542U (en) | A kind of novel in vitro prestressed reinforcement device | |
RU39607U1 (en) | BRIDGE REINFORCEMENT DEVICE | |
CN108729335B (en) | Steel-concrete combined section and installation method thereof | |
KR100541163B1 (en) | Composite Beam Stiffened with Prestressed Concrete Panel Having Embedded and Mechanically Connected Lower Flange and Constructing Method thereof | |
CN201581496U (en) | Retard-bonded prestressed assembling integral frame node system | |
CN113481819A (en) | Self-anchored suspension bridge steel-concrete combined section and construction method thereof | |
KR100734172B1 (en) | Fish beam | |
CN109695315A (en) | A kind of assembled steel tube bank prestressed concrete combination beam and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20100310 |