EP3263795B1 - Composite structural wall and method of construction thereof - Google Patents
Composite structural wall and method of construction thereof Download PDFInfo
- Publication number
- EP3263795B1 EP3263795B1 EP17175623.2A EP17175623A EP3263795B1 EP 3263795 B1 EP3263795 B1 EP 3263795B1 EP 17175623 A EP17175623 A EP 17175623A EP 3263795 B1 EP3263795 B1 EP 3263795B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pair
- wall
- wall panels
- grout
- prefabricated construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2/8611—Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf
- E04B2/8617—Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf with spacers being embedded in both form leaves
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34815—Elements not integrated in a skeleton
- E04B1/34823—Elements not integrated in a skeleton the supporting structure consisting of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
- E04B1/043—Connections specially adapted therefor
- E04B1/046—Connections specially adapted therefor using reinforcement loops protruding from the elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
Definitions
- the present invention relates to composite structural walls, methods to construct composite structural walls, prefabricated construction modules, e.g. Prefabricated Prefinished Volumetric Construction (PPVC), and building structures constructed therefrom.
- prefabricated construction modules e.g. Prefabricated Prefinished Volumetric Construction (PPVC)
- PPVC Prefinished Volumetric Construction
- precast concrete walls and prefabricated construction modules have been developed and used in the construction industry.
- the prefabricated walls and modules are produced in a factory and transported to the building site as needed. This allows for better control, and reduces variations in the curing process of the concrete due to environmental factors (e.g. weather and temperature) at the building site.
- existing methods of joining two side-by-side precast concrete walls would result in the precast walls functioning as twin or two individual walls rather than as a single or monolithic wall.
- joining precast concrete walls of side-by-side prefabricated construction modules would result in combined twin walls that function as individual walls rather than as a single or monolithic wall.
- the combined twin walls i.e. a combined width of individual walls joined by existing cast-in situ method would have to be thicker than the monolithic wall.
- vertical load bearing limit of the combined twin walls as well as the height limit of the building structure, would have to be reduced. Either way poses a restriction to design and construction of the building, and prevents the building owner from maximising value from the constructed building.
- a building construction in which walls are formed of prefabricated elements. These elements consist of standard elements of predetermined width and fitting elements of substantially lesser width. The standard and fitting elements are provided with identical joint configurations so that the elements can be connected together to form walls of discrete length. The elements are provided on their abutting edges with longitudinal recesses which cooperatively form a hollow space into which a sealing compound can be inserted.
- a prefabricated concrete building module comprises two pre-cast concrete end panels interconnected and interlinked to a pre-cast bridging panel providing a utility channel at at least one corner thereof, the channel aligning with a reinforcement formation on each side edge of each end panel.
- FR 2670523 A1 describes a prefabricated reinforced concrete wall element that can be manufactured flat in a mould.
- US4107886 describes a prefabricated building module. This document discloses the features of the preamble of claim 1, respectively claim 6.
- the method further comprises: vertically-stacking a second pair of adjacently arranged wall panels on the first pair of wall panels, wherein each wall panel of the second pair of wall panels includes a second panel body, and at least one second guide attached thereto and protruding from a second groove formed in the second panel body, wherein vertically-stacking a second pair of adjacently arranged wall panels on the first pair of wall panels includes overlapping the second guides of the second pair of wall panels to form a second channel; inserting a vertical securement rod into the first and the second channel such that the vertical securement rod have opposite end portions at least partially inserted into the first and the second channel respectively; dispensing a second grout into a second gap between the second pair of wall panels, wherein dispensing a second grout into a second gap includes dispensing the second grout into the second channel; and curing the second grout to join the second pair of wall panels.
- the method further comprises: inserting a second linking rod into the second channel.
- the vertical securement rod is integral with the first and/or the second linking rod.
- dispensing the first grout includes dispensing the first grout to a level below where the vertical securement rod is to be inserted to.
- each wall panel of the first and the second pair of wall panels is provided by separate prefabricated construction modules, adjacently arranging a first pair of wall panels includes adjacently arranging a first pair of prefabricated construction modules, and vertically stacking a second pair of adjacently arranged wall panels on the first pair of wall panels includes vertically stacking a second pair of adjacently arranged prefabricated construction modules on the first pair of prefabricated construction modules.
- each wall panel of the first and the second pair of wall panels includes a bottom end portion attached to a floor slab, the method further comprising: inserting a plurality of backing rods between of the first pair of prefabricated construction modules and floor slabs of the second pair of prefabricated construction modules to provide a third gap which intersects the first and the second channel, wherein dispensing a second grout into a second gap includes dispensing the second grout into the third gap, wherein curing the second grout to join the second pair of wall panels includes curing the second grout to join the second pair of prefabricated construction modules to the first pair of prefabricated construction modules.
- each floor slab of the second pair of prefabricated construction modules includes at least one floor slab guide attached to each respective floor slab and protruding from each respective floor slab, wherein overlapping the second guides of the second pair of wall panels to form a second channel includes overlapping the floor slab guides of the second pair of prefabricated construction modules to provide the second channel.
- the at least one first guide includes a wire attached to a reinforcement structure embedded in each wall panel.
- the wall panel further comprises a reinforcement structure embedded in the panel body, wherein the guide is attached to the reinforcement structure.
- the reinforcement structure is any one selected from the group consisting of a plurality of steel bars, a plurality of corrugated pipes each adapted to receive a steel bar of a vertically stacked wall panel, a mesh of steel bars, a mesh of steel wires, and a plurality of steel bars each attached to a splice connector adapted to receive a steel bar of a vertically stacked wall panel.
- a surface of the panel body, which includes the groove formed therein, is roughened.
- the prefabricated construction module may include a floor slab attached to a bottom end portion of the wall panel.
- the floor slab may comprise a floor slab guide attached thereto and protruding therefrom, wherein the floor slab guide is adapted to form the channel.
- each wall panel of the first and the second pair of wall panels is provided by separate prefabricated construction modules.
- each wall panel of the first and the second pair of wall panels includes a top end portion attached to a ceiling slab and a bottom end portion attached to a floor slab
- the building structure further comprising: a plurality of backing rods interposed between ceiling slabs of the first pair of prefabricated construction modules and floor slabs of the second pair of prefabricated construction modules to provide a third gap, wherein the second grout is further disposed in the third gap and joins the second pair of prefabricated construction modules to the first pair of prefabricated construction modules.
- each floor slab of the second pair of prefabricated construction modules includes at least one floor slab guide attached to each respective floor slab and protruding from each respective floor slab, and wherein the floor slab guides of the second pair of prefabricated construction modules overlap to provide the second channel.
- the vertical securement rod is integral with the first and/or the second linking rod.
- the building structure further comprises a reinforcement structure embedded in each of the first and the second panel body, wherein the first and the second guide is attached to the respective reinforcement structure.
- the reinforcement structure is any one selected from the group consisting of a plurality of steel bars, a plurality of corrugated pipes each adapted to receive a steel bar of a vertically stacked wall panel, a mesh of steel bars, a mesh of steel wires, and a plurality of steel bars each attached to a splice connector adapted to receive a steel bar of a vertically stacked wall panel.
- the composite structural wall joined from the individual wall panels, functions as a single or monolithic wall and retains the advantages of both existing cast-in situ and prefabrication methods.
- the composite structural wall provides the benefits of precast wall panels including controllable curing of the wall panel, and reduced time required to construct the composite structural wall and/or join adjacent modules both horizontally and vertically.
- the dimensions of the composite structural wall are similar to a monolithic wall constructed from existing cast-in situ methods and yet the composite wall of the invention is capable of providing a similar vertical load bearing capacity as the monolithic wall constructed from existing cast-in situ methods.
- Embodiments described in the context of one of the methods or devices are analogously valid for the other methods or devices. Similarly, embodiments described in the context of a method are analogously valid for a device, and vice versa.
- each other denotes a reciprocal relation between two or more objects, depending on the number of objects involved.
- each connecting wall panel 100, 200 is provided with guides 105, 205 (for example, steel wire loops, or steel wire ropes, or J-connection loop as shown in Figure 14 ) at intervals or spaced apart from each other.
- guides 105, 205 for example, steel wire loops, or steel wire ropes, or J-connection loop as shown in Figure 14 .
- a portion of each guide 105, 205 is embedded within the wall panel 100, 200 while another portion protrudes from the jointing surface.
- a groove 110, 210 is formed or provided in the jointing surface of the wall panel 100, 200 to accommodate the guides 105, 205.
- the two connecting wall panels 100, 200 are brought close to each other (leaving a gap 30 between the wall panels 100, 200) such that the guides 105, 205 of the wall panels 100, 200 are disposed or overlap to form a channel 25.
- a linking rod 40 (for example, a steel bar) is inserted into the channel 25 formed by the guides 105, 205 of the connecting wall panels 100, 200.
- the gap 30 between the wall panels 100, 200 is subsequently in-filled with concrete or grout and cured to form a composite structural wall 55.
- the grout should be of a high strength and non-shrink type. High strength grout is a fluid form of concrete, and is generally made from a mixture of cement, water, graded fillers and chemical additives.
- the two wall panels 100, 200 are held in position, by the linking rod 40 coupling the guides 105, 205, while the grout is dispensed and cured. This makes it easier for the composite wall 55 to be constructed in a faster and more efficient manner.
- Embodiments of the present invention provide an innovative connection system to connect or join two adjacently-arranged wall panels 100, 200 by using guides 105, 205, with in-fill concrete or grouting 50 to form a composite structural wall system instead of forming a cast-in situ concrete shear wall in the conventional way.
- This allows wall panels 100, 200 to be joined in a horizontal and vertical direction.
- the wall panels 100, 200 may be part of separate prefabricated construction modules 5 and provide a connection means to join a plurality of prefabricated construction modules 5 to construct a structure.
- the constructed structure could be a single storey or a multi storey building with different compartments or modules.
- Each prefabricated construction module 5 could be a single habitable unit, e.g. apartment, or part of a single habitable unit.
- Figure 1A shows an elevated perspective view of a construction site at which a building structure is being constructed from a plurality of prefabricated construction modules 5, an example of which is shown in Figure 2.
- Figure 1B shows a multi-storey structure that may be constructed by vertical stacking of the prefabricated construction modules 5. At least one wall panel 100 of each prefabricated construction module 5 is joined to another wall panel 200 of an adjacently-arranged prefabricated construction module 5, by in-situ grouting in the middle joint between the wall panels 100, 200, to form a composite structural wall 55.
- the composite structural wall 55 is designed to be built to the Standard Number SS EN 1992-1-1:2008, titled “Eurocode 2: Design of concrete structures, Part 1-1 General rules and rules for buildings", which is incorporated by reference herein.
- the composite structural wall 55 may be built to other relevant national standards as well without deviating from the methods and wall panels 100, 200 disclosed herein.
- a bedding joint is formed between the upper and lower composite walls 55.
- the composite wall 55 is to be designed for an assumed eccentricity or imperfection of 20 mm.
- Key or linking bars are placed along the center line of the composite wall 55 and are designed to take moment due to this eccentricity.
- Each composite wall 55 may be a shear wall of the building structure.
- Each composite wall 55 is designed as one element to take into account the design value of the applied axial or vertical force in the z-direction (N Ed ), bending moment in the x-direction (M Ed,xx ), and y-direction (M Ed,yy ), as shown in Figures 3A - 3D .
- the illustrated x, y, and z directions are perpendicular to each other to represent a three-dimensional axis.
- a wall panel 100 is shown.
- the wall panel 100 comprises a panel body 101 which is provided with at least one groove 110 (on a surface of the panel body 101), and at least one guide 105 protruding from the at least one groove 110.
- the wall panel 100 in Figure 3A is shown to have two grooves 110 each having three guides 105, but it is to be appreciated that other number of grooves 110 and/or guides 105 are possible in various embodiments. The position and number of grooves 110 and guides 105 are dependent on the required load bearing capacity and dimensions of the composite structural wall 55.
- the wall panel 100 has two grooves 110, wherein two guides 105 protrude from each groove.
- the guides 105 may be arranged near the ends of each groove 110 (i.e. top and bottom of the panel body) or at other suitable positions.
- a third guide 105 may be provided near the middle portion of the panel body.
- a single groove 110 and guide 105 may suffice.
- the wall panel 100, 200 may be a precast concrete wall, i.e. the wall panel 100, 200 is fabricated at a site other than the actual site for constructing a building structure e.g. multi-storey building.
- a pair of wall panels 100, 200 is shown and includes wall panel 100 of Figure 3A and another wall panel 200.
- Wall panel 200 comprises a panel body 201 which is provided with at least one groove 210 formed on a surface of the panel body 201, and at least one guide 205 protruding from the at least one groove 210.
- Both wall panels 100, 200 may have similar or complementary structure and features.
- guides 105, 205 of both wall panels 100, 200 overlap to form a channel 25 which allows one or more linking bars 40 to be subsequently inserted there into (see Figures 4A, 4B and 6 ).
- the guides 105, 205 may have some flexibility to allow bending to form the channel 25 when the wall panels 100, 200 are adjacently arranged as shown in Figure 3B .
- the guides 105, 205 may be arranged in overlapping contact when wall panels 100, 200 are adjacently arranged as shown in Figure 3B .
- the overlapping guides 105, 205 may have a vertical gap therebetween.
- the guides 105, 205 are fabricated from flexible high strength steel wires.
- the guides 105, 205 are attached to the wall panel 100, 200 with a portion, e.g. circular, semi-circular, arc, loop, protruding from the wall panel 100, 200.
- the semi-circular portion of the guides 105, 205 is adapted to form the channel 25 and receive a first linking rod 40 and vertical securement rod 45.
- the guides 105, 205 may be attached to the wall panel 100, 200 during the fabrication of the wall panel.
- the guides 105, 205 may be formed by making a loop with a steel wire, with a portion of the loop embedded in the wall panel 100, 200 and the remaining portion protruding from the surface of the wall panel 100, 200 as shown in Figures 4A and 4B .
- Two ends of the steel wire may be joined by a connector or cramp to form the loop.
- the two ends are tied together, or placed in close proximity, as shown in the J-connection loop of Figure 14 , to be embedded within the wall panel with the loop or circular or oval portion of the steel wire protruding from the wall panel to form the channel 25.
- the steel wires may have a tensile strength equal to at least 2.5% of the induced vertical load of the wall panel 100, 200.
- the tensile strength of the wall panels 100, 200 depends, at least in part, on the number of guides 105, and may be varied accordingly.
- FIG. 3A - 3D A method for constructing a composite structural wall 55 and/or building structure, is shown in Figures 3A - 3D and described below.
- the method comprises providing a wall panel 100 ( Figure 3A ), adjacently arranging a first pair of wall panels 100, 200 with a first gap 30 therebetween ( Figure 3B ).
- This step includes overlapping the guides 105, 205 (or first guides) of the first pair of wall panels 100, 200 to form a first channel 25.
- the first gap 30 includes the space provided by the grooves 110, 210 (or first grooves) facing each other and the first channel 25 as seen most clearly in Figures 4A and 4B .
- the first gap 30 further includes a space formed between facing non-grooved surfaces of the wall panels 100, 200.
- the method further comprises inserting a first linking rod 40 into each first channel 25 ( Figure 3C ) to couple the wall panels 100, 200.
- the first linking rods 40 should be of sufficient length to pass through the guides 105, 205 of both wall panels 100, 200.
- the length of the first linking rod 40 is approximately or at least the whole longitudinal length of the at least one groove 110, 210.
- the method further comprises dispensing a first grout into the first gap 30 ( Figure 3D ) while the first linking rods 40 couple the wall panels 100, 200.
- the method further comprises curing and/or hardening the first grout 50 to form a sealant to join the first 100 and second wall panel 200 and thereby forming the composite structural wall 55 ( Figure 3D ).
- the composite structural wall 55 constructed therefrom would behave as a monolithic structural wall and has increased load bearing capacity as compared to a similarly dimensioned combined twin walls formed from two precast concrete walls using traditional cast-in situ methods.
- Figure 4A shows a top cross-sectional view of the first pair of wall panels 100, 200 corresponding to Figure 3C while Figure 4B shows an expanded view of Figure 4A , particularly the grooves 110, 210 and first channels 25 with the first linking rod 40 inserted.
- the above-described method according to the invention produces a horizontal connection between adjacent wall panels 100, 200 to form a composite structural wall 55.
- the invention allows horizontal securement or joining of horizontally adjacent prefabricated construction modules 5.
- the invention further allows vertical securement or joining of vertically adjacent composite structural walls 55 or prefabricated construction modules 5. Accordingly, the above-described method for constructing a composite structural wall 55 and/or building structure, as shown in Figures 3A - 3D may be suitably modified as described below and shown in Figure 5A .
- the method further comprises vertically stacking a second pair of adjacently arranged wall panels on the first pair of wall panels (see Figure 5A ).
- This step includes overlapping the guides (or second guides) of the second pair of wall panels to form a second channel.
- the wall panels of the second pair may have similar or identical configuration as the wall panels of the first pair and therefore the details of wall panels 100, 200 would apply correspondingly to the second pair of wall panels.
- the method further comprises inserting a vertical securement rod 45, through the second channel and partially into the first channel 25, such that a lower end of the vertical securement rod 45 is at least partially inserted into the first channel and overlaps with a portion of the first linking rod 40 (see Figure 5A ).
- the overlapped portion is known as the lap length and allows for the vertical loads to be transferred between the first linking rod 40 and vertical securement rod 45.
- the grooves and channels of the first and of the second pair of wall panels 100, 200 should preferably be aligned in a substantially linear manner for greatest structural strength.
- Figure 5A shows the vertical securement rod 45 disposed in the second channel while the second pair of wall panels, together with vertical securement rod 45, are being stacked upon the first pair of wall panels.
- the vertical securement rod 45 may be inserted into the second and first channels after the second pair of wall panels are stacked on the first pair wall panels.
- the method further comprises dispensing a second grout into a second gap between the second pair of wall panels, wherein dispensing a second grout into a second gap includes dispensing the second grout into the second channel.
- the method further comprises inserting a second linking rod 47 into the second channel.
- the second linking rod 47 may be of sufficient length to pass through the second guides of the second pair of wall panels. In an embodiment, the length of the second linking rod 47 is approximately or at least the whole longitudinal length of the second channel.
- the vertical securement bar 45 is inserted into the first channel 25 prior to dispensing and curing the first grout, and also prior to vertically stacking the second pair of adjacently arranged wall panels on the first pair of wall panels.
- a second linking rod 47 may be present in the second channel at the second pair of wall panels while the second pair of wall panels, together with second linking rods 47, are being stacked on the first pair of wall panels.
- second linking rods 47 may be absent in the second channel at the second pair of wall panels while the second pair of wall panels are being stacked on the first pair of wall panels. Thereafter, the second linking rods 47 may be inserted into the second channel.
- the vertical securement bar 45 may be inserted into the first channel 25 after the first grout is dispensed but before the first grout has cured completely.
- the first grout is dispensed to a level below where the vertical securement rod 45 is to be inserted to, e.g. below the lap length.
- the overlapping portion of the first linking rod 40, i.e. lap length, and the corresponding portion with respect to the first channel 25 and the first gap 30 remain ungrouted for the time being.
- first grout dispensed may be allowed to cure without a need to quickly or immediately stack the second pair of wall panels and insert the vertical securement rod 45 into the first channel 25 before the first grout cures completely.
- the vertical securement rod 45 is inserted into the second channel, a second grout is dispensed into the portion of the first channel 25 and gap 30 not filled by the first grout previously, and also into the second channel.
- the second channel may be partially filled with the second grout, e.g. dispensed to a level below a subsequent overlap length to accommodate the third or subsequent pair of wall panels and its vertical securement rod.
- the vertical securement rod 45 may additionally serve as the first 40 and/or second linking rod 47.
- the vertical securement rod 45 is integral with or forms part of the first linking rod 40.
- the vertical securement rod 40 is integral with or forms part of the second linking rod 47.
- the vertical securement rod 45 is integral with or forms part of both the first 40 and the second linking rod 47.
- the vertical securement rod 45 is only inserted partially into both the first channel 25 and the second channel.
- the first linking rod 40, second linking rod 47, and/or vertical securement rod 45 may be steel rods.
- further pairs of wall panels can be vertically stacked as described above, i.e., a third pair of adjacently arranged wall panels are stacked, in a vertical or upward direction, upon the second pair of joined wall panels, a fourth pair of adjacently arranged wall panels are vertically stacked on the third pair of joined wall panels, and so on.
- the wall panels 100, 200 form part of separate prefabricated construction modules 5. Accordingly, references to adjacently arranging wall panels 100, 200 and vertically stacking adjacently arranged wall panels include, respectively, adjacently arranging prefabricated construction modules and vertically stacking adjacently arranged prefabricated construction modules.
- the first channel 25 formed by the guides 105, 205 should be suitably sized to receive the first linking rod 40 as well as the vertical securement rod 45 to allow a second set of wall panels to be vertically stacked upon the first pair of wall panels.
- Figure 6 shows a top cross-sectional view of the composite structural wall 55 with the first linking rod 40 and vertical securement rod 45 in the first channel 25.
- the at least one groove 110, 210 may be of suitable dimensions to at least accommodate the protruded portion of the at least one guide 105, 205.
- the combined depth of facing grooves 110, 210 ( Figure 6 , two of w 2 ) and the size of the gap 30 ( Figure 6 , w 3 ) may be slightly larger than the protruded portion of the at least one guide 105, 205. This minimises the dimensions of the structural composite wall 55 and the amount of grouting needed.
- each wall panel 100, 200 is attached to a floor slab 15 ( Figure 7A and 8 ).
- Each floor slab 15 may further comprise a slab guide 115 or 215.
- the slab guide 115, 215 is similar to the guides 105, 205 in that the slab guides 115, 215 of adjacent floor slabs 15 are disposed in an overlapping arrangement to form the channel e.g. first channel 25.
- a portion of each slab guide 115, 215 is embedded within a substantial length of the floor slab to provide the continuity of slab reinforcement.
- the slab guide 115, 215 may be a high strength steel wire rope.
- the slab guide 115, 215 has a higher tensile strength than the guide 105, 205 to provide reinforcement for the floor slab 15.
- the floor slab 15 is further attached to a beam structure 17 to provide additional structural strength as shown in Figure 7B.
- Figure 7B shows the composite structural wall 55 formed with attached floor slabs 15 and beam structures 17.
- each wall panel 100, 200 in respective prefabricated construction modules 5 is further attached to a ceiling slab 10.
- opposed end portions of each wall panel are respectively attached to a ceiling slab 10 and a floor slab 15 ( Figure 2 ).
- the floor slab 15 of the upper module 5 may serve as the ceiling of the lower module.
- backing rods 130, 230 are inserted or interposed between the first pair of prefabricated construction modules (optionally, ceiling slab 10 thereof) and floor slabs 15 of the second pair of prefabricated construction modules to provide a third gap which intersects the first and the second channel ( Figure 8 ).
- Grout is dispensed to fill the third gap to join the first to the second pair of prefabricated construction module or floor slab 15 of the second pair of prefabricated construction module to the ceiling slab 10 of the first pair of prefabricated construction module.
- the backing rods 130, 230 prevent leakage of grout and when the grout is cured, the bedding joint is formed.
- the backing rods 130, 230, the first pair of prefabricated construction module or ceiling slab 10 thereof and floor slab 15 of second pair of prefabricated construction module may form an enclosed space for receiving grout.
- the wall panel 100, 200 may further comprise a reinforcement structure to provide structural strength, in particular tensile strength, to the wall panel.
- the reinforcement structure may also serve as an attachment or anchoring point for the guide 105, 205 to be attached to, for example by welding or tying.
- the reinforcement structure may be embedded within the wall panel 100, 200 during the pre-fabrication process.
- the reinforcement structure may be provided as a plurality of steel bars 125, 225, a mesh of steel bars or wires, or a plurality of corrugated pipes wherein each corrugated pipe is adapted to receive a steel bar.
- Figures 4A and 4B show a reinforcement structure being a plurality of steel bars 125, 225 embedded in the wall panel.
- Figure 9 shows a composite wall 55 which is joined from two wall panels 100, 200, each being embedded with a reinforcement structure comprising of a mesh of steel bars.
- the mesh comprises an arrangement of intersecting vertical steel bars 125, 225 and horizontal steel bars 135, 235.
- Figure 10 shows a top cross-sectional view of the composite wall 55 in Figure 9 .
- Figures 11, 12A and 12B show a plurality of non-intersecting corrugated pipes 140, 240 embedded in the wall panel, wherein each corrugated pipe is adapted or sized to receive a steel bar.
- a splice connector 145 may be provided to receive steel bars 125 of vertically stacked wall panels.
- Figure 13 shows a composite structural wall 55 wherein in each wall panel, a splice connector 145 is attached to each steel bar 125 and is adapted to receive and secure to another steel bar of a vertically stacked wall panel.
- the attachment of the splice connector 145 to the steel bars 125 may be by any suitable means, for example by a taper-threaded design, by welding, or by using grout.
- Figure 13 shows the splice connector 145, which is arranged near the upper end of the wall panel 100, attached e.g.welded, to a vertical steel bar 125 of the wall panel 100 and positioned to receive a vertical steel bar 125 of a vertically stacked or upper wall panel (not shown).
- a second (upper) pair of wall panels are being stacked on a first (lower) pair of wall panels, each vertical steel bar 125 from the upper wall panel is inserted into a splice connector and may be secured by a tapered design, welding or grout.
- the splice connector 145 may alternatively be arranged at the lower end of the wall panel to receive steel bars of a lower wall panel.
- reinforcement structures may also be used alone or in conjunction with the non-limiting examples described herein. It may be seen from the top cross-sectional view of the various embodiments that the reinforcement structure would not affect the method for joining the wall panels.
- a shear resistance check may be performed to determine the structural integrity of the composite wall 55.
- the shear resistance would be checked at the interface between the wall panel 100, 200 and the in-fill grout.
- the shear resistance could be due to:
- the surface of the wall panel 100, 200 with the at least one groove 110, 210 may be roughened to provide surface roughness for interface shear transfer.
- the wall panel 100 is part of a prefabricated construction module 5 as shown in Figure 2 .
- the prefabricated construction module 5 comprises a floor slab 15, at least one wall panel 100 as described herein, and optionally a ceiling 10 and/or a beam structure 17.
- the prefabricated construction module 5 may further comprise at least one end wall 20.
- the prefabricated construction module is to be joined to an adjacent prefabricated construction module using the wall panels 100, 200 and the method described herein.
- the at least one wall panel 100 serves as the connection means between adjacent prefabricated construction modules 5.
- Additional prefabricated construction modules 5 may be stacked on top of a lower pair of prefabricated construction modules 5 to stack the modules 5 and extend the building structure vertically upwards as per the addition of the wall panels vertically.
- the channel 25 formed from the wall panels 100, 200 of adjacent prefabricated construction modules should be able to receive a vertical securement rod 45.
- prefabricated construction modules 5 need not be identical, in particular for the horizontally adjoining prefabricated construction modules 5.
- a prefabricated construction module 5 placed at an end of the structure will typically have one wall panel 100 and two or three end walls 20, whereas a prefabricated construction module in the center portion of the structure may have two or three wall panels 100, 200, and one or two end walls 20.
- the wall panels 100, 200 serve as a connection means to join the adjoining prefabricated construction modules 5.
- a prefabricated construction module 5 to be placed in the middle of a structure may have four wall panels 100, 200 for attachment to four other prefabricated construction modules 5. It will be apparent that other shapes for the prefabricated construction module 5 could be similarly designed and applied.
- the end wall 20 and wall panel 100 may take on any shape or dimensions as required and/or have openings for door and/or window fittings as required.
- the prefabricated construction module 5 may have an exposed side (i.e. no end wall or wall panel) as well to allow for different design structures.
- a plurality of prefabricated construction modules 5 as described may be joined together to form a structure.
- the structure may be a single or multi storey building.
- the structure may be employed as buildings for private or commercial use.
- the structure may possibly be of use as temporary buildings in events and disaster relief operations, where ease and speed of construction at the site is important.
- a building structure comprises one or more composite structural walls 55 arranged as a single-storey or multi-storey arrangement.
- Each composite structural wall 55 may comprise joined wall panels 100, 200 as described above, and therefore the corresponding description of wall panels 100, 200 and their features, including additions, combinations, alternatives, attachments, may be omitted here.
- Each of the wall panels 100, 200 may form part of separate construction modules 5 as described above and therefore the corresponding description of their features, including additions, combinations, alternatives, attachments, may be omitted here.
- a first 100 and second wall panel 200 is each constructed with a horizontal length ( l 1 ) of 1200 mm, a width (w 1 ) of 90 mm ( Figure 6 ).
- the groove has a depth (w 2 ) 25 mm and length ( l 3 ) of 100 mm.
- the wall panel 100 comprises two grooves 110 with centres which are 800 mm apart ( l 2 ).
- a gap 30 of 20 mm (w 3 ) between the first 100 and second wall panel 200 is used to illustrate this example of the composite structural wall 55.
- the reinforcement structure in the wall panels 100, 200 are steel bars 125, 225 embedded in the panel body 101, 201 along the longitudinal height of the wall panels 100, 200.
- the composite structural wall of Example 1 has a width or thickness of 200 mm (assuming grouting width is 20 mm) and has a load bearing capacity similar to a conventional cast- in situ wall of similar width or thickness. It is to be appreciated that other grouting width or gap width is equally possible.
- the reinforcement structure in the wall panels 100, 200 is a mesh of horizontal 135, 235 and vertical steel bars 125, 225 ( Figure 9 and 10 ).
- the wall panels 100, 200 constructed with a length ( l 1 ) of 1000 mm, a width (w 1 ) of 140 mm, and a similar groove as in Example 1.
- the wall panel 100 comprises two grooves 110 with centres which are 600 mm apart ( l 2 ).
- the gap 30 between the first 100 and second wall panel 200 is 20 mm.
- corrugated pipes 140, 240 or splice connectors 145 may be used in combination with the steel bars 125.
- a prefabricated construction module 5 is constructed as in Figure 2 with a wall panel 100 as in Example 1, a floor slab 15 with a thickness of 130 mm, an end wall 20 with a width of 150 mm, and a ceiling slab 10 with a 50 mm x 50 mm hollow section size spaced at 600 mm centre to centre.
- Embodiments of the invention as described herein allow for horizontally adjacent wall panels or prefabricated construction modules to be supported relative to each other via linking rods while grouting is dispensed and cured. This reduces construction time and labour requirements and therefore reduces construction costs.
- Embodiments of the invention allow vertically stacked wall panels or prefabricated construction modules to be supported relative to each other via a vertical securement rod while grouting is dispensed and cured.
- pre-cast wall panels 100, 200 and prefabrication construction modules 5 can be assembled into a building structure more quickly and efficiently at a construction site.
- the wall panels 100, 200 and construction modules 5 may be fabricated in the factory while the foundation works at the construction site are on-going, thereby reducing the construction cycle time and leading to increased productivity.
- the quality of the wall panels 100, 200 and construction modules 5 are improved due to the controlled environment they are prepared in.
- a composite structural wall 55 constructed using the present invention would behave as a monolithic wall and therefore would be able to achieve similar load-bearing capacity as a monolithic wall constructed from existing cast-in situ method and having similar width dimensions or thickness. Accordingly, it will be appreciated that the invention will lead to reduction in construction costs while increasing productivity and economic benefits.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Joining Of Building Structures In Genera (AREA)
Description
- The present invention relates to composite structural walls, methods to construct composite structural walls, prefabricated construction modules, e.g. Prefabricated Prefinished Volumetric Construction (PPVC), and building structures constructed therefrom.
- Construction of buildings with shear walls cast-in situ on site is known, and widely used in the industry. As it is a cast-in situ process, formwork and reinforcement of the shear wall has to be erected before casting with concrete. The curing of concrete on site is time-consuming and dependent on environmental conditions (e.g. weather and temperature). After curing the concrete, it is further necessary to remove formwork. While the cast-in situ method generally provides a monolithic concrete wall that can withstand high loads and is applicable for most, if not all, types of buildings, this method is a time and labour intensive construction activity.
- To improve productivity, precast concrete walls and prefabricated construction modules have been developed and used in the construction industry. The prefabricated walls and modules are produced in a factory and transported to the building site as needed. This allows for better control, and reduces variations in the curing process of the concrete due to environmental factors (e.g. weather and temperature) at the building site. However, existing methods of joining two side-by-side precast concrete walls would result in the precast walls functioning as twin or two individual walls rather than as a single or monolithic wall. Similarly, joining precast concrete walls of side-by-side prefabricated construction modules would result in combined twin walls that function as individual walls rather than as a single or monolithic wall.
- Consequently, in order to achieve same vertical loading capacity provided by a monolithic wall constructed from existing cast-in situ methods, the combined twin walls, i.e. a combined width of individual walls joined by existing cast-in situ method would have to be thicker than the monolithic wall. Alternatively, in order to ensure the width of the combined twin walls, i.e. combined width of individual walls, is no more than the monolithic wall constructed from cast-in situ methods, vertical load bearing limit of the combined twin walls, as well as the height limit of the building structure, would have to be reduced. Either way poses a restriction to design and construction of the building, and prevents the building owner from maximising value from the constructed building.
- In
US 3,803,788 A , a building construction is provided in which walls are formed of prefabricated elements. These elements consist of standard elements of predetermined width and fitting elements of substantially lesser width. The standard and fitting elements are provided with identical joint configurations so that the elements can be connected together to form walls of discrete length. The elements are provided on their abutting edges with longitudinal recesses which cooperatively form a hollow space into which a sealing compound can be inserted. - In
US 2011/023383 A1 , a prefabricated concrete building module comprises two pre-cast concrete end panels interconnected and interlinked to a pre-cast bridging panel providing a utility channel at at least one corner thereof, the channel aligning with a reinforcement formation on each side edge of each end panel. -
FR 2670523 A1 -
US4107886 describes a prefabricated building module. This document discloses the features of the preamble of claim 1, respectively claim 6. - In a first aspect of the invention, there is provided a method for constructing a composite structural wall as defined by claim 1.
- In an embodiment of the first aspect of the invention, the method further comprises: vertically-stacking a second pair of adjacently arranged wall panels on the first pair of wall panels, wherein each wall panel of the second pair of wall panels includes a second panel body, and at least one second guide attached thereto and protruding from a second groove formed in the second panel body, wherein vertically-stacking a second pair of adjacently arranged wall panels on the first pair of wall panels includes overlapping the second guides of the second pair of wall panels to form a second channel; inserting a vertical securement rod into the first and the second channel such that the vertical securement rod have opposite end portions at least partially inserted into the first and the second channel respectively; dispensing a second grout into a second gap between the second pair of wall panels, wherein dispensing a second grout into a second gap includes dispensing the second grout into the second channel; and curing the second grout to join the second pair of wall panels.
- In an embodiment of the first aspect of the invention, the method further comprises: inserting a second linking rod into the second channel.
- In an embodiment of the first aspect of the invention, the vertical securement rod is integral with the first and/or the second linking rod.
- In an embodiment of the first aspect of the invention, dispensing the first grout includes dispensing the first grout to a level below where the vertical securement rod is to be inserted to.
- In an embodiment of the first aspect of the invention, each wall panel of the first and the second pair of wall panels is provided by separate prefabricated construction modules, adjacently arranging a first pair of wall panels includes adjacently arranging a first pair of prefabricated construction modules, and vertically stacking a second pair of adjacently arranged wall panels on the first pair of wall panels includes vertically stacking a second pair of adjacently arranged prefabricated construction modules on the first pair of prefabricated construction modules.
- In an embodiment of the first aspect of the invention, each wall panel of the first and the second pair of wall panels includes a bottom end portion attached to a floor slab, the method further comprising: inserting a plurality of backing rods between of the first pair of prefabricated construction modules and floor slabs of the second pair of prefabricated construction modules to provide a third gap which intersects the first and the second channel, wherein dispensing a second grout into a second gap includes dispensing the second grout into the third gap, wherein curing the second grout to join the second pair of wall panels includes curing the second grout to join the second pair of prefabricated construction modules to the first pair of prefabricated construction modules.
- In an embodiment of the first aspect of the invention, each floor slab of the second pair of prefabricated construction modules includes at least one floor slab guide attached to each respective floor slab and protruding from each respective floor slab, wherein overlapping the second guides of the second pair of wall panels to form a second channel includes overlapping the floor slab guides of the second pair of prefabricated construction modules to provide the second channel.
- In an embodiment of the first aspect of the invention, the at least one first guide includes a wire attached to a reinforcement structure embedded in each wall panel.
- In a second aspect of the invention, there is provided a prefabricated construction module as defined by claim 6.
- In an embodiment of the second aspect of the invention, the wall panel further comprises a reinforcement structure embedded in the panel body, wherein the guide is attached to the reinforcement structure.
- In an embodiment of the second aspect of the invention, the reinforcement structure is any one selected from the group consisting of a plurality of steel bars, a plurality of corrugated pipes each adapted to receive a steel bar of a vertically stacked wall panel, a mesh of steel bars, a mesh of steel wires, and a plurality of steel bars each attached to a splice connector adapted to receive a steel bar of a vertically stacked wall panel.
- In an embodiment of the second aspect of the invention, a surface of the panel body, which includes the groove formed therein, is roughened.
- The prefabricated construction module may include a floor slab attached to a bottom end portion of the wall panel.
- The floor slab may comprise a floor slab guide attached thereto and protruding therefrom, wherein the floor slab guide is adapted to form the channel.
- In a third aspect of the invention, there is provided a building as defined by
claim 10. - In an embodiment of the third aspect of the invention, each wall panel of the first and the second pair of wall panels is provided by separate prefabricated construction modules.
- In an embodiment of the third aspect of the invention, each wall panel of the first and the second pair of wall panels includes a top end portion attached to a ceiling slab and a bottom end portion attached to a floor slab, the building structure further comprising: a plurality of backing rods interposed between ceiling slabs of the first pair of prefabricated construction modules and floor slabs of the second pair of prefabricated construction modules to provide a third gap, wherein the second grout is further disposed in the third gap and joins the second pair of prefabricated construction modules to the first pair of prefabricated construction modules.
- In an embodiment of the third aspect of the invention, each floor slab of the second pair of prefabricated construction modules includes at least one floor slab guide attached to each respective floor slab and protruding from each respective floor slab, and wherein the floor slab guides of the second pair of prefabricated construction modules overlap to provide the second channel.
- In an embodiment of the third aspect of the invention, the vertical securement rod is integral with the first and/or the second linking rod.
- In an embodiment of the third aspect of the invention, the building structure further comprises a reinforcement structure embedded in each of the first and the second panel body, wherein the first and the second guide is attached to the respective reinforcement structure.
- In an embodiment of the third aspect of the invention, the reinforcement structure is any one selected from the group consisting of a plurality of steel bars, a plurality of corrugated pipes each adapted to receive a steel bar of a vertically stacked wall panel, a mesh of steel bars, a mesh of steel wires, and a plurality of steel bars each attached to a splice connector adapted to receive a steel bar of a vertically stacked wall panel.
- The composite structural wall, joined from the individual wall panels, functions as a single or monolithic wall and retains the advantages of both existing cast-in situ and prefabrication methods. The composite structural wall provides the benefits of precast wall panels including controllable curing of the wall panel, and reduced time required to construct the composite structural wall and/or join adjacent modules both horizontally and vertically. The dimensions of the composite structural wall are similar to a monolithic wall constructed from existing cast-in situ methods and yet the composite wall of the invention is capable of providing a similar vertical load bearing capacity as the monolithic wall constructed from existing cast-in situ methods.
- The embodiments are described further with the following figures:
-
Figure 1A shows a perspective view of a construction site with prefabricated construction modules; -
Figure 1B shows a perspective view of a multi-storey building constructed from prefabricated construction modules; -
Figure 2 shows a prefabricated construction module; -
Figures 3A - 3D show a method for constructing a composite structural wall; -
Figure 4A shows a top cross-sectional view of the adjacent wall panels inFigure 3C ; -
Figure 4B is a partial close-up view ofFigure 4A ; -
Figures 5A - 5C show perspective views of two pairs of wall panels being vertically stacked with different sequences of construction; -
Figure 6 shows a top cross-sectional view of the composite structural wall with two rods in each channel; -
Figure 7A shows a perspective view of a composite structural wall having an opening for a door, a floor slab, and a beam structure; -
Figure 7B shows an expanded view of the bottom portion ofFigure 7A ; -
Figure 8 shows a side cross-sectional view of a junction at four wall panels, e.g. bedding joint between two pairs of wall panel in a vertically stacked arrangement; -
Figure 9 shows a perspective view of a composite structural wall with an example of a reinforcement structure in the wall panel; -
Figure 10 shows a top cross-sectional view of the composite structural wall inFigure 9 ; -
Figure 11 shows a perspective view of a composite structural wall with embedded corrugated pipes adapted to receive steel bars into the composite structural wall; -
Figure 12A shows a top cross-sectional view of the composite structural wall inFigure 11 ; -
Figure 12B shows a partial close-up view ofFigure 12A ; -
Figure 13 shows a perspective view of a composite structural with splice connectors which are adapted to receive and connect to vertical steel bars; -
Figure 14 shows an example of a wire rope suitable to be used as a guide. - In the following description, numerous specific details are set forth in order to provide a thorough understanding of various illustrative embodiments of the invention. It will be understood, however, to one skilled in the art, that embodiments of the invention may be practiced without some or all of these specific details. It is understood that the terminology used herein is for the purpose of describing particular embodiments only, and is not intended to limit the scope of the invention. In the drawings, like reference numerals refer to same or similar functionalities or features throughout the several views.
- Embodiments described in the context of one of the methods or devices are analogously valid for the other methods or devices. Similarly, embodiments described in the context of a method are analogously valid for a device, and vice versa.
- Features that are described in the context of an embodiment may correspondingly be applicable to the same or similar features in the other embodiments. Features that are described in the context of an embodiment may correspondingly be applicable to the other embodiments, even if not explicitly described in these other embodiments. Furthermore, additions and/or combinations and/or alternatives as described for a feature in the context of an embodiment may correspondingly be applicable to the same or similar feature in the other embodiments.
- As used herein, the articles "a", "an" and "the" as used with regard to a feature or element include a reference to one or more of the features or elements.
- As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
- As used herein, the terms "first," "second," and "third," etc. are used merely as labels, and are not intended to impose numerical requirements on their objects.
- As used herein, the term "each other" denotes a reciprocal relation between two or more objects, depending on the number of objects involved.
- The embodiments of the present invention provide a mechanism to connect or join two (or a pair of) adjacently-arranged
wall panels structural wall 55. In an embodiment, each connectingwall panel guides 105, 205 (for example, steel wire loops, or steel wire ropes, or J-connection loop as shown inFigure 14 ) at intervals or spaced apart from each other. A portion of eachguide wall panel groove wall panel guides wall panels gap 30 between thewall panels 100, 200) such that theguides wall panels channel 25. A linking rod 40 (for example, a steel bar) is inserted into thechannel 25 formed by theguides wall panels gap 30 between thewall panels structural wall 55. The grout should be of a high strength and non-shrink type. High strength grout is a fluid form of concrete, and is generally made from a mixture of cement, water, graded fillers and chemical additives. The twowall panels rod 40 coupling theguides composite wall 55 to be constructed in a faster and more efficient manner. - Embodiments of the present invention provide an innovative connection system to connect or join two adjacently-arranged
wall panels guides grouting 50 to form a composite structural wall system instead of forming a cast-in situ concrete shear wall in the conventional way. This allowswall panels wall panels prefabricated construction modules 5 and provide a connection means to join a plurality ofprefabricated construction modules 5 to construct a structure. The constructed structure could be a single storey or a multi storey building with different compartments or modules. Eachprefabricated construction module 5 could be a single habitable unit, e.g. apartment, or part of a single habitable unit. -
Figure 1A shows an elevated perspective view of a construction site at which a building structure is being constructed from a plurality ofprefabricated construction modules 5, an example of which is shown inFigure 2. Figure 1B shows a multi-storey structure that may be constructed by vertical stacking of theprefabricated construction modules 5. At least onewall panel 100 of eachprefabricated construction module 5 is joined to anotherwall panel 200 of an adjacently-arrangedprefabricated construction module 5, by in-situ grouting in the middle joint between thewall panels structural wall 55. - Briefly, without being limited by theory, the composite
structural wall 55 is designed to be built to the Standard Number SS EN 1992-1-1:2008, titled "Eurocode 2: Design of concrete structures, Part 1-1 General rules and rules for buildings", which is incorporated by reference herein. -
- The composite
structural wall 55 may be built to other relevant national standards as well without deviating from the methods andwall panels - In an embodiment where two
composite walls 55 are stacked vertically, a bedding joint is formed between the upper and lowercomposite walls 55. At the bedding joint, thecomposite wall 55 is to be designed for an assumed eccentricity or imperfection of 20 mm. Key or linking bars are placed along the center line of thecomposite wall 55 and are designed to take moment due to this eccentricity. - Each
composite wall 55 may be a shear wall of the building structure. Eachcomposite wall 55 is designed as one element to take into account the design value of the applied axial or vertical force in the z-direction (NEd), bending moment in the x-direction (MEd,xx), and y-direction (MEd,yy), as shown inFigures 3A - 3D . The illustrated x, y, and z directions are perpendicular to each other to represent a three-dimensional axis. - In
Figure 3A , awall panel 100 is shown. Thewall panel 100 comprises apanel body 101 which is provided with at least one groove 110 (on a surface of the panel body 101), and at least oneguide 105 protruding from the at least onegroove 110. Thewall panel 100 inFigure 3A is shown to have twogrooves 110 each having threeguides 105, but it is to be appreciated that other number ofgrooves 110 and/or guides 105 are possible in various embodiments. The position and number ofgrooves 110 and guides 105 are dependent on the required load bearing capacity and dimensions of the compositestructural wall 55. - In an example, the
wall panel 100 has twogrooves 110, wherein twoguides 105 protrude from each groove. Theguides 105 may be arranged near the ends of each groove 110 (i.e. top and bottom of the panel body) or at other suitable positions. In another example, in addition to having two guides in each groove, athird guide 105 may be provided near the middle portion of the panel body. In another example where the composite structural wall may be of a smaller dimension and load bearing capacity, asingle groove 110 and guide 105 may suffice. - In various embodiments, the
wall panel wall panel - In
Figure 3B , a pair ofwall panels wall panel 100 ofFigure 3A and anotherwall panel 200.Wall panel 200 comprises apanel body 201 which is provided with at least onegroove 210 formed on a surface of thepanel body 201, and at least oneguide 205 protruding from the at least onegroove 210. Bothwall panels wall panels Figure 3B , guides 105, 205 of bothwall panels channel 25 which allows one or more linking bars 40 to be subsequently inserted there into (seeFigures 4A, 4B and6 ). - In an embodiment where guides 105, 205 are arranged at the same height, the
guides channel 25 when thewall panels Figure 3B . - In an embodiment where guides 105, 205 are arranged at different heights, the
guides wall panels Figure 3B . Alternatively, the overlapping guides 105, 205 may have a vertical gap therebetween. - In an embodiment, the
guides guides wall panel wall panel guides channel 25 and receive afirst linking rod 40 andvertical securement rod 45. Theguides wall panel guides wall panel wall panel Figures 4A and 4B . Two ends of the steel wire may be joined by a connector or cramp to form the loop. Alternatively, the two ends are tied together, or placed in close proximity, as shown in the J-connection loop ofFigure 14 , to be embedded within the wall panel with the loop or circular or oval portion of the steel wire protruding from the wall panel to form thechannel 25. The steel wires may have a tensile strength equal to at least 2.5% of the induced vertical load of thewall panel wall panels guides 105, and may be varied accordingly. - A method for constructing a composite
structural wall 55 and/or building structure, is shown inFigures 3A - 3D and described below. - The method comprises providing a wall panel 100 (
Figure 3A ), adjacently arranging a first pair ofwall panels first gap 30 therebetween (Figure 3B ). This step includes overlapping theguides 105, 205 (or first guides) of the first pair ofwall panels first channel 25. Thefirst gap 30 includes the space provided by thegrooves 110, 210 (or first grooves) facing each other and thefirst channel 25 as seen most clearly inFigures 4A and 4B . Thefirst gap 30 further includes a space formed between facing non-grooved surfaces of thewall panels - The method further comprises inserting a
first linking rod 40 into each first channel 25 (Figure 3C ) to couple thewall panels first linking rods 40 should be of sufficient length to pass through theguides wall panels first linking rod 40 is approximately or at least the whole longitudinal length of the at least onegroove - The method further comprises dispensing a first grout into the first gap 30 (
Figure 3D ) while thefirst linking rods 40 couple thewall panels - The method further comprises curing and/or hardening the
first grout 50 to form a sealant to join the first 100 andsecond wall panel 200 and thereby forming the composite structural wall 55 (Figure 3D ). The compositestructural wall 55 constructed therefrom would behave as a monolithic structural wall and has increased load bearing capacity as compared to a similarly dimensioned combined twin walls formed from two precast concrete walls using traditional cast-in situ methods. -
Figure 4A shows a top cross-sectional view of the first pair ofwall panels Figure 3C whileFigure 4B shows an expanded view ofFigure 4A , particularly thegrooves first channels 25 with thefirst linking rod 40 inserted. The above-described method according to the invention produces a horizontal connection betweenadjacent wall panels structural wall 55. When thewall panels prefabricated construction modules 5, the invention allows horizontal securement or joining of horizontally adjacentprefabricated construction modules 5. - The invention further allows vertical securement or joining of vertically adjacent composite
structural walls 55 orprefabricated construction modules 5. Accordingly, the above-described method for constructing a compositestructural wall 55 and/or building structure, as shown inFigures 3A - 3D may be suitably modified as described below and shown inFigure 5A . - Continuing from the above-described method with reference to
Figures 3A to 3C , the method further comprises vertically stacking a second pair of adjacently arranged wall panels on the first pair of wall panels (seeFigure 5A ). This step includes overlapping the guides (or second guides) of the second pair of wall panels to form a second channel. At least in some embodiments, the wall panels of the second pair may have similar or identical configuration as the wall panels of the first pair and therefore the details ofwall panels - The method further comprises inserting a
vertical securement rod 45, through the second channel and partially into thefirst channel 25, such that a lower end of thevertical securement rod 45 is at least partially inserted into the first channel and overlaps with a portion of the first linking rod 40 (seeFigure 5A ). The overlapped portion is known as the lap length and allows for the vertical loads to be transferred between thefirst linking rod 40 andvertical securement rod 45. The grooves and channels of the first and of the second pair ofwall panels Figure 5A shows thevertical securement rod 45 disposed in the second channel while the second pair of wall panels, together withvertical securement rod 45, are being stacked upon the first pair of wall panels. Alternatively, thevertical securement rod 45 may be inserted into the second and first channels after the second pair of wall panels are stacked on the first pair wall panels. - The method further comprises dispensing a second grout into a second gap between the second pair of wall panels, wherein dispensing a second grout into a second gap includes dispensing the second grout into the second channel.
- Modifications may be made to the above-described method described with reference to
Figure 5A and possible modifications are described but are not limited to the following. - In one embodiment, after stacking the second pair of wall panels on the first pair of wall panels and after inserting a
vertical securement rod 45 through the second channel and partially into thefirst channel 25, but before dispensing the second grout into the second gap, the method further comprises inserting asecond linking rod 47 into the second channel. Thesecond linking rod 47 may be of sufficient length to pass through the second guides of the second pair of wall panels. In an embodiment, the length of thesecond linking rod 47 is approximately or at least the whole longitudinal length of the second channel. - In one embodiment, the
vertical securement bar 45 is inserted into thefirst channel 25 prior to dispensing and curing the first grout, and also prior to vertically stacking the second pair of adjacently arranged wall panels on the first pair of wall panels. In one example of this embodiment (seeFigure 5B ), asecond linking rod 47 may be present in the second channel at the second pair of wall panels while the second pair of wall panels, together withsecond linking rods 47, are being stacked on the first pair of wall panels. In another example of this embodiment (seeFigure 5C ), second linkingrods 47 may be absent in the second channel at the second pair of wall panels while the second pair of wall panels are being stacked on the first pair of wall panels. Thereafter, thesecond linking rods 47 may be inserted into the second channel. - In one embodiment, the
vertical securement bar 45 may be inserted into thefirst channel 25 after the first grout is dispensed but before the first grout has cured completely. Whereas in another embodiment, the first grout is dispensed to a level below where thevertical securement rod 45 is to be inserted to, e.g. below the lap length. In other words, only the non-overlapping portion of thefirst linking rod 40 or non-lap length portion is grouted; the overlapping portion of thefirst linking rod 40, i.e. lap length, and the corresponding portion with respect to thefirst channel 25 and thefirst gap 30 remain ungrouted for the time being. This has an advantage that the first grout dispensed may be allowed to cure without a need to quickly or immediately stack the second pair of wall panels and insert thevertical securement rod 45 into thefirst channel 25 before the first grout cures completely. In due course, after the first grout has cured, the second pair of adjacently arranged wall panels are stacked onto the first pair of wall panels, thevertical securement rod 45 is inserted into the second channel, a second grout is dispensed into the portion of thefirst channel 25 andgap 30 not filled by the first grout previously, and also into the second channel. It will be apparent that the second channel may be partially filled with the second grout, e.g. dispensed to a level below a subsequent overlap length to accommodate the third or subsequent pair of wall panels and its vertical securement rod. - In one embodiment, the
vertical securement rod 45 may additionally serve as the first 40 and/or second linkingrod 47. In one example, thevertical securement rod 45 is integral with or forms part of thefirst linking rod 40. In another example, thevertical securement rod 40 is integral with or forms part of thesecond linking rod 47. In yet another example, thevertical securement rod 45 is integral with or forms part of both the first 40 and thesecond linking rod 47. Whereas in another embodiment, thevertical securement rod 45 is only inserted partially into both thefirst channel 25 and the second channel. In various embodiments, thefirst linking rod 40, second linkingrod 47, and/orvertical securement rod 45 may be steel rods. - To further increase the height of the building structure, further pairs of wall panels can be vertically stacked as described above, i.e., a third pair of adjacently arranged wall panels are stacked, in a vertical or upward direction, upon the second pair of joined wall panels, a fourth pair of adjacently arranged wall panels are vertically stacked on the third pair of joined wall panels, and so on.
- In some embodiments, the
wall panels prefabricated construction modules 5. Accordingly, references to adjacently arrangingwall panels - In an embodiment, the
first channel 25 formed by theguides first linking rod 40 as well as thevertical securement rod 45 to allow a second set of wall panels to be vertically stacked upon the first pair of wall panels.Figure 6 shows a top cross-sectional view of the compositestructural wall 55 with thefirst linking rod 40 andvertical securement rod 45 in thefirst channel 25. - In an embodiment, the at least one
groove guide grooves 110, 210 (Figure 6 , two of w2) and the size of the gap 30 (Figure 6 , w3) may be slightly larger than the protruded portion of the at least oneguide composite wall 55 and the amount of grouting needed. - In an embodiment, each
wall panel Figure 7A and8 ). Eachfloor slab 15 may further comprise aslab guide slab guide guides adjacent floor slabs 15 are disposed in an overlapping arrangement to form the channel e.g.first channel 25. A portion of eachslab guide guides slab guide slab guide guide floor slab 15. In an embodiment, thefloor slab 15 is further attached to abeam structure 17 to provide additional structural strength as shown inFigure 7B. Figure 7B shows the compositestructural wall 55 formed with attachedfloor slabs 15 andbeam structures 17. - In an embodiment, each
wall panel prefabricated construction modules 5 is further attached to aceiling slab 10. In other words, opposed end portions of each wall panel are respectively attached to aceiling slab 10 and a floor slab 15 (Figure 2 ). Alternatively, thefloor slab 15 of theupper module 5 may serve as the ceiling of the lower module. - In an embodiment, backing
rods ceiling slab 10 thereof) andfloor slabs 15 of the second pair of prefabricated construction modules to provide a third gap which intersects the first and the second channel (Figure 8 ). Grout is dispensed to fill the third gap to join the first to the second pair of prefabricated construction module orfloor slab 15 of the second pair of prefabricated construction module to theceiling slab 10 of the first pair of prefabricated construction module. The backingrods rods ceiling slab 10 thereof andfloor slab 15 of second pair of prefabricated construction module may form an enclosed space for receiving grout. - The
wall panel guide wall panel steel bars Figures 4A and 4B show a reinforcement structure being a plurality ofsteel bars Figure 9 shows acomposite wall 55 which is joined from twowall panels -
Figure 10 shows a top cross-sectional view of thecomposite wall 55 inFigure 9 .Figures 11, 12A and 12B show a plurality of non-intersectingcorrugated pipes - In an embodiment, a splice connector 145 (mechanical rebar connector) may be provided to receive
steel bars 125 of vertically stacked wall panels.Figure 13 shows a compositestructural wall 55 wherein in each wall panel, asplice connector 145 is attached to eachsteel bar 125 and is adapted to receive and secure to another steel bar of a vertically stacked wall panel. The attachment of thesplice connector 145 to the steel bars 125 may be by any suitable means, for example by a taper-threaded design, by welding, or by using grout.Figure 13 shows thesplice connector 145, which is arranged near the upper end of thewall panel 100, attached e.g.welded, to avertical steel bar 125 of thewall panel 100 and positioned to receive avertical steel bar 125 of a vertically stacked or upper wall panel (not shown). As a second (upper) pair of wall panels are being stacked on a first (lower) pair of wall panels, eachvertical steel bar 125 from the upper wall panel is inserted into a splice connector and may be secured by a tapered design, welding or grout. Thesplice connector 145 may alternatively be arranged at the lower end of the wall panel to receive steel bars of a lower wall panel. - Other types of reinforcement structures may also be used alone or in conjunction with the non-limiting examples described herein. It may be seen from the top cross-sectional view of the various embodiments that the reinforcement structure would not affect the method for joining the wall panels.
- A shear resistance check may be performed to determine the structural integrity of the
composite wall 55. The shear resistance would be checked at the interface between thewall panel
- (a) Induced shear force from lateral load in wall minor direction;
- (b) Induced shear force from differential lateral load in wall major direction;
- (c) Induced shear force from frame action in wall minor direction.
Claims (14)
- A method for constructing a composite structural wall, the method comprising:adjacently arranging a first pair of prefabricated construction modules (5) which provide a first pair of wall panels (100, 200), wherein each wall panel (100, 200) of the first pair of wall panels (100, 200) includes:a first panel body (101, 201) having a first width (w1), a first length (l1), a first height, and a first surface defined by the first length (l1) and the first height wherein the first length (l1) and the first height have larger dimensions than the first width (w1); andat least one first guide (105, 205) attached to the first panel body (101, 201),wherein adjacently arranging the first pair of prefabricated construction modules (5) includes adjacently arranging the first pair of wall panels (100, 200),dispensing a first grout (50) into a first gap (30) between the first pair of wall panels (100, 200); andcuring the first grout (50) to join the first pair of prefabricated construction modules (5), wherein curing the first grout (50) includes joining the first surfaces of the first pair of wall panels (100, 200) to form a first composite structural wall (55) having a width at least twice the first width (w1) of the first panel body (101, 201),characterised in thatthe at least one first guide (105, 205) is protruding from a first groove (110, 210) formed in the first surface,adjacently arranging the first pair of prefabricated construction modules (5) includes overlapping the first guides (105, 205) of the first pair of wall panels (100, 200) to form a first channel (25);inserting a first linking rod (40) into the first channel (25);wherein dispensing the first grout (50) into the first gap (30) includes dispensing the first grout (50) into the first channel (25); and wherein a width of the first grout (50) between the non-grooved portions of the first surfaces of the first pair of wall panels (100, 200) is smaller than the first width (w1) of the first panel body (101, 201).
- The method according to claim 1 further comprising:vertically stacking a second pair of adjacently arranged prefabricated construction modules (5), including vertically stacking a second pair of adjacently arranged wall panels (100, 200), which are respectively provided by the second pair of adjacently arranged prefabricated construction modules (5) on the first pair of wall panels (100, 200), wherein each wall panel (100, 200) of the second pair of wall panels (100, 200) includes:a second panel body (101, 201) having a second width (w1), a second length (l1), a second height, and a second surface defined by the second length (l1) and the second height, wherein the second length (l1) and the second height have larger dimensions than the second width (w1); andat least one second guide (105, 205) attached to the second panel body (101, 201) and protruding from a second groove (110, 210) formed in the second surface, wherein vertically stacking a second pair of adjacently arranged wall panels (100, 200) on the first pair of wall panels (100, 200) includes overlapping the second guides (105, 205) of the second pair of wall panels (100, 200) to form a second channel (25);inserting a vertical securement rod (45) into the first and the second channels (25) such that the vertical securement rod (45) has opposite end portions at least partially inserted into the first and the second channels (25) respectively;dispensing a second grout into a second gap (30) between the second pair of wall panels (100, 200), wherein dispensing the second grout into the second gap includes dispensing the second grout into the second channel (25); andcuring the second grout to join the prefabricated construction modules (5), wherein curing the second grout includes joining the second surfaces of the second pair of wall panels (100, 200) to form a second composite structural wall (55) having a width at least twice the second width of the second panel body (101, 201), wherein a width of the second grout between non-grooved portions of the second surfaces of the second pair of wall panels (100, 200) is smaller than the second width of the second panel body (101,201).
- The method according to claim 2, further comprising:
inserting a second linking rod (47) into the second channel (25). - The method according to claim 2 or claim 3,
wherein the first and/or the second surface includes an opening therethrough for a door and/or a window fitting. - The method according to claim 4,
wherein each wall panel (100, 200) of the first and the second pair of wall panels (100, 200) includes a bottom end portion attached to a floor slab (15),
the method further comprising:inserting a plurality of backing rods (130, 230) between the first pair of prefabricated construction modules (5) and floor slabs (15) of the second pair of prefabricated construction modules (5) to provide a third gap which intersects the first and the second channels (25),wherein dispensing a second grout into a second gap (30) includes dispensing the second grout into the third gap,wherein curing the second grout includes curing the second grout to join the second pair of prefabricated construction modules (5) to the first pair of prefabricated construction modules (5). - A composite structural wall (55) formed of a first pair of joined prefabricated construction modules (5), comprising:a first pair of wall panels (100, 200), wherein each panel is provided by one of the prefabricated construction modules (5) of the first pair of prefabricated construction modules (5), each wall panel of the first pair of wall panels (100, 200) comprising:a first panel body (101, 201) having a first width (w1), a first length (l1), a first height, and a first surface defined by the first length (l1) and the first height, wherein the first length (l1) and the first height have larger dimensions than the first width (w1); and the first pair of prefabricated construction modules (5) are arranged adjacent to each other and further comprise:
at least one first guide (105, 205) attached to the first panel body (101, 201);a first grout disposed in a first gap (30) between the first pair of wall panels (100, 200), wherein the first grout joins the first surfaces of the first pair of the wall panels (100, 200) to form the composite structural wall having a width at least twice the first width of the first panel body (101, 201),characterised in thatthe at least one first guide (105, 205) is protruding from a first groove (110) formed in the first surface,wherein the first guides (105, 205) of the first pair of wall panels (100, 200) overlap to provide a first channel (25);a first linking rod (40) inserted into the first channel (25);the first gap (30) includes the first channel (25); wherein a width of the first grout between non-grooved portions of the first surfaces of the first pair of wall panels (100, 200) is smaller than the first width of the first panel body (101, 201). - The composite structural wall (55) according to claim 6 further comprising:
a reinforcement structure embedded in the first panel body (101, 201), wherein the first guide (105) is attached to the reinforcement structure, wherein the reinforcement structure is any one selected from the group consisting of a plurality of steel bars (125), a plurality of corrugated pipes (140) each adapted to receive a steel bar of a vertically stacked wall panel (100), a mesh of steel bars (125, 135), a mesh of steel wires, and a plurality of steel bars each attached to a splice connector (145) adapted to receive a steel bar (125) of a vertically stacked wall panel (100). - The composite structural wall (55) according to claim 6 or claim 7, wherein the first surface of the first panel body is roughened.
- The composite structural wall (55) according to claim 6, claim 7 or claim 8 further comprising:
a floor slab attached to a bottom end portion of the first wall panel (101, 201). - A building structure constructed from a plurality of prefabricated construction modules (5) comprising:a first composite wall (55) being the composite structural wall (55) of any of claim 6, claim 7, or claim 8;a second pair of prefabricated construction modules (5) joined together by a second composite structural wall (55) which is vertically stacked on the first composite structural wall (55), wherein the second composite structural wall (55) comprises:a second pair of wall panels (100, 200) respectively provided by the second pair of prefabricated construction modules (5) and arranged adjacent to each other, each of the second pair of wall panels (100, 200) comprises:a second panel body (101, 201) having a second width (w1), a second length (l1), a second height, and a second surface defined by the second length (l1) and the second height, wherein the second length (l1) and the second height have larger dimensions than the second width (w1); andat least one second guide (105, 205) attached to the second panel body (101, 201) and protruding from a second groove (110) formed in the second surface, wherein the second pair of guides (105, 205) of the second pair of prefabricated construction modules (5) overlap to provide a second channel (25);a second linking rod (47) inserted into the second channel (25);a vertical securement rod (47) having opposite end portions at least partially inserted into the first channel (25) and the second channel (25) respectively; anda second grout disposed in a second gap (30), including the second channel (25), between the second pair of wall panels (100, 200), wherein the second grout joins the second surfaces of the second pair of wall panels (100, 200) to form the second composite structural wall (55), wherein a width of the second composite structural wall (55) is at least twice the second width of the second panel body (101, 201), wherein a width of the second grout between non-grooved portions of the second surfaces of the second pair of wall panels (100, 200) is smaller than the second width of the second panel body (101, 201).
- The building structure according to claim 10, wherein the first and/or the second surface includes at least one opening therethrough for a door and/or a window fitting.
- The building structure according to claim 11,
wherein each wall panel (100, 200) of the first and the second pair of the wall panels (100, 200) includes a top end portion attached to a ceiling slab (10) and a bottom end portion attached to a floor slab (15),
the building structure further comprising:a plurality of backing rods (130, 230) interposed between the ceiling slabs (10) of the first pair of prefabricated construction modules (5) and the floor slabs (15) of the second pair of prefabricated construction modules (5) to provide a third gap,wherein the second grout is further disposed in the third gap and joins the second pair of prefabricated construction modules (5) to the first pair of prefabricated construction modules (5). - The building structure according to claim 12,
wherein each floor slab (15) of the second pair of prefabricated construction modules (5) includes at least one floor slab guide (115, 215) attached to each respective floor slab (15) and protruding from each respective floor slab (15), and
wherein the floor slab guides (115, 215) of the second pair of prefabricated construction modules (5) overlap with the second channel (25). - The building structure according to claim 10, claim 11, claim 12, or claim 13, wherein the vertical securement rod (45) is integral with the first (40) and/or the second linking rod (47).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL17175623T PL3263795T3 (en) | 2016-06-28 | 2017-06-13 | Composite structural wall and method of construction thereof |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG10201605306W | 2016-06-28 | ||
SG10201703972WA SG10201703972WA (en) | 2016-06-28 | 2017-05-15 | Composite structural wall and method of construction thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3263795A1 EP3263795A1 (en) | 2018-01-03 |
EP3263795B1 true EP3263795B1 (en) | 2019-05-15 |
Family
ID=61024018
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17175623.2A Active EP3263795B1 (en) | 2016-06-28 | 2017-06-13 | Composite structural wall and method of construction thereof |
Country Status (9)
Country | Link |
---|---|
EP (1) | EP3263795B1 (en) |
CN (2) | CN111622374B (en) |
DK (1) | DK3263795T3 (en) |
ES (1) | ES2733309T3 (en) |
HK (2) | HK1244857B (en) |
MY (1) | MY190080A (en) |
PL (1) | PL3263795T3 (en) |
PT (1) | PT3263795T (en) |
SG (3) | SG10201703972WA (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102023126648A1 (en) * | 2023-09-29 | 2025-04-03 | Peter Aurnhammer | Prefabricated basement |
Families Citing this family (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SG10201707313XA (en) * | 2017-09-08 | 2019-04-29 | Dragages Singapore Pte Ltd | A method for constructing a building |
CN112135948B (en) * | 2018-05-17 | 2022-05-24 | Kcl设计顾问有限公司 | PPVC connector |
WO2019221665A1 (en) * | 2018-05-17 | 2019-11-21 | Kcl Consultants Pte Ltd | Ppvc connector |
CN108678279A (en) * | 2018-07-13 | 2018-10-19 | 中国建筑标准设计研究院有限公司 | Based on the built-in assembled architecture and its construction method for leading to high bellows prefabricated panel |
CN109296088A (en) * | 2018-09-29 | 2019-02-01 | 宁波普利凯建筑科技有限公司 | A kind of precast light self-heat conserving out-hung panel and preparation method thereof |
SG10201809917TA (en) * | 2018-11-08 | 2020-06-29 | Wenjun Vincent Lin | Prefabricated volumetric module design, fabrication, assembly and installation method |
WO2020096525A1 (en) * | 2018-11-08 | 2020-05-14 | Lin Wenjun Vincent | Prefabricated profiled wall and fabrication, assembly thereof |
CN113195841A (en) * | 2018-11-16 | 2021-07-30 | 俊和建筑工程有限公司 | Method for interconnecting prefabricated modules for modular buildings |
SG10201903653UA (en) * | 2019-04-16 | 2020-11-27 | Integrated Precast Solutions Pte Ltd | Precast building |
DE102019126609A1 (en) * | 2019-10-02 | 2021-04-08 | Technische Universität Dresden | Tubular reinforcement element, process for its production, use, global reinforcement, printer description file and concrete component |
CN110905120A (en) * | 2019-11-27 | 2020-03-24 | 成都福仕特科技有限责任公司 | Wall body of prefabricated house and construction method thereof |
WO2021127739A1 (en) * | 2019-12-24 | 2021-07-01 | Structural Connections IP Pty Ltd | Method and apparatus for connecting precast concrete elements |
WO2021247502A1 (en) * | 2020-06-02 | 2021-12-09 | Slade Justin | Hybrid system for modular construction of concrete buildings |
WO2022124981A1 (en) * | 2020-12-08 | 2022-06-16 | Dragages Singapore Pte. Ltd. | Prefabricated prefinished volumetric construction (ppvc) modules and methods of manufacture thereof |
CN113175151A (en) * | 2021-03-27 | 2021-07-27 | 慈溪市庵东建筑安装工程有限公司 | Assembly type environment-friendly building wall and construction method thereof |
CN113502941B (en) * | 2021-07-23 | 2022-08-09 | 北京建筑大学 | Connecting structure, building structure and preparation method of building structure |
CN113622512A (en) * | 2021-08-17 | 2021-11-09 | 湖北茂捷建筑有限公司 | Novel light gauge steel wall of being in milk |
CN114427267B (en) * | 2021-12-23 | 2023-11-28 | 浙江环宇建设集团有限公司 | Prefabricated outer wall of assembled building and wall body quick connecting component thereof |
CN114525891B (en) * | 2022-02-24 | 2024-01-19 | 山东长箭建设集团有限公司 | Assembled building wall connection structure |
CN115928874B (en) * | 2023-02-03 | 2024-09-24 | 河南省第二建设集团有限公司 | Full-prefabricated assembly type structural system based on prefabricated hollow slab and construction method thereof |
CN117306681A (en) * | 2023-09-25 | 2023-12-29 | 广东晋华建设工程有限公司 | Assembled building |
CN118855157B (en) * | 2024-09-28 | 2024-12-20 | 浙江江鑫建设有限公司 | A kind of assembled floor structure with fireproof performance and installation method |
Citations (48)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1240492A (en) | 1915-02-10 | 1917-09-18 | Frank Mcmurray Sawyer | Building construction. |
DE865652C (en) | 1949-08-30 | 1953-02-02 | Hermann Josef Boeyng | Building, in particular residential house, garage, makeshift home or the like. |
FR1448310A (en) | 1965-06-25 | 1966-08-05 | Planning and construction of school groups | |
US3394522A (en) | 1966-03-11 | 1968-07-30 | Maurer Fritz | Connecting apparatus for prefabricated structural elements |
US3550334A (en) | 1966-10-31 | 1970-12-29 | Patent Concern Nv | Plural story building comprising superimposed box-shaped dwelling units |
US3564795A (en) | 1968-07-25 | 1971-02-23 | Jesse Vernon Henton | Pre-cast modular building units with utility ducts |
US3710534A (en) | 1970-03-16 | 1973-01-16 | Namara J Mc | Method of forming building units and assembling same with lateral displacement |
US3772835A (en) | 1971-10-21 | 1973-11-20 | Hb Zachry Co | Housing |
US3812637A (en) | 1972-01-03 | 1974-05-28 | Y Yang | Method for erecting a reinforced concrete building |
US3890748A (en) | 1973-06-13 | 1975-06-24 | Miroslav Fencl | Structure of coordinated modular building construction |
JPS537911A (en) | 1976-07-09 | 1978-01-24 | Daisue Kensetsu Kk | Method of construction of wall system precast reinforce concrete with intermediate skeleton structure |
JPS537911B2 (en) | 1972-12-29 | 1978-03-23 | ||
US4107886A (en) | 1974-03-25 | 1978-08-22 | Systems Concept, Inc. | Prefabricated building module |
US4136492A (en) | 1973-06-04 | 1979-01-30 | Willingham John H | Industrialized building construction |
US4211043A (en) | 1978-01-06 | 1980-07-08 | Coday Jerry F | Precast concrete building module form |
US4696698A (en) | 1985-10-15 | 1987-09-29 | American Colloid Company | Flexible grout composition and method |
WO1991002862A1 (en) | 1989-08-25 | 1991-03-07 | Thorleif Ausdal | A method of manufacturing an insulated/insulatable reinforced building element in concrete |
FR2670523A1 (en) * | 1990-12-18 | 1992-06-19 | Maison Bleue Sa | Prefabricated reinforced-concrete wall element |
JPH07166601A (en) | 1993-12-14 | 1995-06-27 | Taisei Corp | How to join precast reinforced concrete wallboard |
US5440845A (en) | 1991-09-13 | 1995-08-15 | The Board Of Regents Of The University Of Nebraska | Precast concrete sandwich panels |
NZ264597A (en) | 1994-10-03 | 1997-01-29 | Engineering Certifiers Ltd Sub | Construction of multi-storsey building with precast slabs; bar in cavity in wall connects with tie in floor slab |
JPH09203143A (en) | 1996-01-29 | 1997-08-05 | Tokyu Koken Kk | Connection method of perpendicular part of wall plate of wall precast reinforced concrete |
DE19835900A1 (en) | 1997-08-07 | 1999-03-11 | Martin Dipl Ing Wochner | Prefabricated concrete construction elements for buildings |
US6070380A (en) | 1999-01-28 | 2000-06-06 | Meilleur; Serge | Concrete wall formwork module |
WO2001090499A1 (en) | 2000-05-19 | 2001-11-29 | Scallan L Joe | Construction of high-rise building with large modular units |
DE10046138A1 (en) | 2000-09-15 | 2002-04-11 | Glatthaar Fertigkeller Ag Beri | Method for manufacture of rectangular building floors from prefabricated modules includes dividing floor perpendicularly to inner wall into individual modules with edge modules with end face segment and adjoining side wall segments |
WO2003008737A2 (en) | 2001-07-18 | 2003-01-30 | Pfeifer Holding Gmbh & Co. Kg | Device for joining precast concrete parts |
FR2829778A1 (en) | 2001-09-17 | 2003-03-21 | Eddie Vigon | Positioning and fixing system for prefabricated partitions and central post uses reinforcing elements projecting from partition edges and post |
US6658799B1 (en) | 1998-10-20 | 2003-12-09 | William Richard Charles Stoodley | Volumetric modular building system |
DE20319471U1 (en) | 2003-12-16 | 2005-01-20 | Pfeifer Holding Gmbh & Co. Kg | Joint for prefabricated concrete sections has grooves in joint faces to receive connectors armatures with wire loops to receive tension forces |
GB2410126A (en) | 2004-01-09 | 2005-07-20 | Dainippon Printing Co Ltd | Light emitting element and process for producing the same |
GB2420126A (en) | 2004-11-12 | 2006-05-17 | Laing O Rourke Group Services | A prefabricated unit for a building |
WO2006131396A1 (en) | 2005-06-10 | 2006-12-14 | D.L.C. S.R.L. | Walls made with prefabricated elements with vertical holes |
DE202006007316U1 (en) | 2006-05-05 | 2007-09-06 | Betomax Kunststoff- Und Metallwarenfabrik Gmbh & Co Kg | Connecting device for concrete components and reinforcing element for this purpose for establishing a connection of adjoining concrete components |
DE102006057134A1 (en) | 2006-12-01 | 2008-06-05 | Philipp Gmbh | Wire loop box for receiving wire loop, has base body, which has rectangular base plate, and one of side wall section forms angle greater than ninety degree with base plate |
CN101208489A (en) | 2005-06-27 | 2008-06-25 | 法尔福控股合资有限公司 | Connecting device |
US7681368B1 (en) | 2007-08-21 | 2010-03-23 | Edward Rubio | Concrete composite wall panel |
DE202008017065U1 (en) | 2008-12-23 | 2010-05-12 | Pfeifer Holding Gmbh & Co. Kg | connecting device |
EP2224075A2 (en) | 2009-02-26 | 2010-09-01 | Philipp GmbH | Storage device for anchoring loops and method for producing concrete parts |
WO2012175802A1 (en) | 2011-06-20 | 2012-12-27 | Peikko Group Oy | Connecting device for joining adjacent pre-cast concrete sections and method for joining a first and a second pre-cast concrete section |
JP2013117104A (en) | 2011-12-01 | 2013-06-13 | Taisei Ulec Kk | Wall panel joint structure |
AU2008280579B2 (en) | 2007-07-26 | 2014-01-09 | Philipp Gmbh | Cable-loop rail |
KR101389203B1 (en) | 2013-03-06 | 2014-04-24 | 도시구조안전(주) | Method for constructing residential building using precast concrete and modular unit |
US20140341654A1 (en) | 2009-03-05 | 2014-11-20 | Stormtrap Llc | Assembly for the Detention or Retention of Water and Other Fluids |
EP1471192B1 (en) | 2003-04-22 | 2016-11-09 | Pfeifer Holding GmbH & Co. KG | Connecting device for concrete components |
JP2017031721A (en) | 2015-08-04 | 2017-02-09 | 旭トステム外装株式会社 | Wall Panel |
KR101776129B1 (en) | 2016-07-26 | 2017-09-07 | 김태균 | Built-up type precast double structure for slab and wall and double precast wall construction method using the same |
US20190169844A1 (en) | 2016-07-26 | 2019-06-06 | Ario Yousefi DARESTANI | Pre-cast concrete formwork, wall system and method of construction |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3803788A (en) * | 1968-06-19 | 1974-04-16 | P Artmann | Building construction and process for producing structural elements for such construction |
EP2239397B1 (en) * | 2009-03-12 | 2013-08-21 | Peikko Group Oy | Device for connecting ready-mixed concrete sections |
US20110023383A1 (en) * | 2009-07-29 | 2011-02-03 | Alain Brouillard | Prefabricated concrete building module and a method for the production thereof |
CN201762847U (en) * | 2010-04-08 | 2011-03-16 | 叶翼翔 | Prefabricated spliced concrete slab wall body |
DE102012219209A1 (en) * | 2012-10-22 | 2014-04-24 | Areva Gmbh | Wall element for prefabricated buildings |
CN103334519B (en) * | 2013-07-26 | 2016-08-10 | 黑龙江宇辉新型建筑材料有限公司 | Overlaid plate type concrete shear wall and longitudinally connected method |
CN204983162U (en) * | 2015-06-19 | 2016-01-20 | 中民筑友有限公司 | Soft all alone connecting piece, prefab and wallboard |
CN205206132U (en) * | 2015-11-20 | 2016-05-04 | 刘斌 | Thermal insulation assembled wallboard structure |
-
2017
- 2017-05-15 SG SG10201703972WA patent/SG10201703972WA/en unknown
- 2017-05-15 SG SG10202107902RA patent/SG10202107902RA/en unknown
- 2017-05-15 SG SG10201908614W patent/SG10201908614WA/en unknown
- 2017-06-13 EP EP17175623.2A patent/EP3263795B1/en active Active
- 2017-06-13 ES ES17175623T patent/ES2733309T3/en active Active
- 2017-06-13 PL PL17175623T patent/PL3263795T3/en unknown
- 2017-06-13 DK DK17175623.2T patent/DK3263795T3/en active
- 2017-06-13 PT PT17175623T patent/PT3263795T/en unknown
- 2017-06-14 MY MYPI2017702193A patent/MY190080A/en unknown
- 2017-06-28 CN CN202010263656.8A patent/CN111622374B/en active Active
- 2017-06-28 CN CN201710511556.0A patent/CN107542190B/en active Active
-
2018
- 2018-03-23 HK HK18104091.0A patent/HK1244857B/en unknown
- 2018-03-23 HK HK18104092.9A patent/HK1244858A1/en unknown
Patent Citations (48)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1240492A (en) | 1915-02-10 | 1917-09-18 | Frank Mcmurray Sawyer | Building construction. |
DE865652C (en) | 1949-08-30 | 1953-02-02 | Hermann Josef Boeyng | Building, in particular residential house, garage, makeshift home or the like. |
FR1448310A (en) | 1965-06-25 | 1966-08-05 | Planning and construction of school groups | |
US3394522A (en) | 1966-03-11 | 1968-07-30 | Maurer Fritz | Connecting apparatus for prefabricated structural elements |
US3550334A (en) | 1966-10-31 | 1970-12-29 | Patent Concern Nv | Plural story building comprising superimposed box-shaped dwelling units |
US3564795A (en) | 1968-07-25 | 1971-02-23 | Jesse Vernon Henton | Pre-cast modular building units with utility ducts |
US3710534A (en) | 1970-03-16 | 1973-01-16 | Namara J Mc | Method of forming building units and assembling same with lateral displacement |
US3772835A (en) | 1971-10-21 | 1973-11-20 | Hb Zachry Co | Housing |
US3812637A (en) | 1972-01-03 | 1974-05-28 | Y Yang | Method for erecting a reinforced concrete building |
JPS537911B2 (en) | 1972-12-29 | 1978-03-23 | ||
US4136492A (en) | 1973-06-04 | 1979-01-30 | Willingham John H | Industrialized building construction |
US3890748A (en) | 1973-06-13 | 1975-06-24 | Miroslav Fencl | Structure of coordinated modular building construction |
US4107886A (en) | 1974-03-25 | 1978-08-22 | Systems Concept, Inc. | Prefabricated building module |
JPS537911A (en) | 1976-07-09 | 1978-01-24 | Daisue Kensetsu Kk | Method of construction of wall system precast reinforce concrete with intermediate skeleton structure |
US4211043A (en) | 1978-01-06 | 1980-07-08 | Coday Jerry F | Precast concrete building module form |
US4696698A (en) | 1985-10-15 | 1987-09-29 | American Colloid Company | Flexible grout composition and method |
WO1991002862A1 (en) | 1989-08-25 | 1991-03-07 | Thorleif Ausdal | A method of manufacturing an insulated/insulatable reinforced building element in concrete |
FR2670523A1 (en) * | 1990-12-18 | 1992-06-19 | Maison Bleue Sa | Prefabricated reinforced-concrete wall element |
US5440845A (en) | 1991-09-13 | 1995-08-15 | The Board Of Regents Of The University Of Nebraska | Precast concrete sandwich panels |
JPH07166601A (en) | 1993-12-14 | 1995-06-27 | Taisei Corp | How to join precast reinforced concrete wallboard |
NZ264597A (en) | 1994-10-03 | 1997-01-29 | Engineering Certifiers Ltd Sub | Construction of multi-storsey building with precast slabs; bar in cavity in wall connects with tie in floor slab |
JPH09203143A (en) | 1996-01-29 | 1997-08-05 | Tokyu Koken Kk | Connection method of perpendicular part of wall plate of wall precast reinforced concrete |
DE19835900A1 (en) | 1997-08-07 | 1999-03-11 | Martin Dipl Ing Wochner | Prefabricated concrete construction elements for buildings |
US6658799B1 (en) | 1998-10-20 | 2003-12-09 | William Richard Charles Stoodley | Volumetric modular building system |
US6070380A (en) | 1999-01-28 | 2000-06-06 | Meilleur; Serge | Concrete wall formwork module |
WO2001090499A1 (en) | 2000-05-19 | 2001-11-29 | Scallan L Joe | Construction of high-rise building with large modular units |
DE10046138A1 (en) | 2000-09-15 | 2002-04-11 | Glatthaar Fertigkeller Ag Beri | Method for manufacture of rectangular building floors from prefabricated modules includes dividing floor perpendicularly to inner wall into individual modules with edge modules with end face segment and adjoining side wall segments |
WO2003008737A2 (en) | 2001-07-18 | 2003-01-30 | Pfeifer Holding Gmbh & Co. Kg | Device for joining precast concrete parts |
FR2829778A1 (en) | 2001-09-17 | 2003-03-21 | Eddie Vigon | Positioning and fixing system for prefabricated partitions and central post uses reinforcing elements projecting from partition edges and post |
EP1471192B1 (en) | 2003-04-22 | 2016-11-09 | Pfeifer Holding GmbH & Co. KG | Connecting device for concrete components |
DE20319471U1 (en) | 2003-12-16 | 2005-01-20 | Pfeifer Holding Gmbh & Co. Kg | Joint for prefabricated concrete sections has grooves in joint faces to receive connectors armatures with wire loops to receive tension forces |
GB2410126A (en) | 2004-01-09 | 2005-07-20 | Dainippon Printing Co Ltd | Light emitting element and process for producing the same |
GB2420126A (en) | 2004-11-12 | 2006-05-17 | Laing O Rourke Group Services | A prefabricated unit for a building |
WO2006131396A1 (en) | 2005-06-10 | 2006-12-14 | D.L.C. S.R.L. | Walls made with prefabricated elements with vertical holes |
CN101208489A (en) | 2005-06-27 | 2008-06-25 | 法尔福控股合资有限公司 | Connecting device |
DE202006007316U1 (en) | 2006-05-05 | 2007-09-06 | Betomax Kunststoff- Und Metallwarenfabrik Gmbh & Co Kg | Connecting device for concrete components and reinforcing element for this purpose for establishing a connection of adjoining concrete components |
DE102006057134A1 (en) | 2006-12-01 | 2008-06-05 | Philipp Gmbh | Wire loop box for receiving wire loop, has base body, which has rectangular base plate, and one of side wall section forms angle greater than ninety degree with base plate |
AU2008280579B2 (en) | 2007-07-26 | 2014-01-09 | Philipp Gmbh | Cable-loop rail |
US7681368B1 (en) | 2007-08-21 | 2010-03-23 | Edward Rubio | Concrete composite wall panel |
DE202008017065U1 (en) | 2008-12-23 | 2010-05-12 | Pfeifer Holding Gmbh & Co. Kg | connecting device |
EP2224075A2 (en) | 2009-02-26 | 2010-09-01 | Philipp GmbH | Storage device for anchoring loops and method for producing concrete parts |
US20140341654A1 (en) | 2009-03-05 | 2014-11-20 | Stormtrap Llc | Assembly for the Detention or Retention of Water and Other Fluids |
WO2012175802A1 (en) | 2011-06-20 | 2012-12-27 | Peikko Group Oy | Connecting device for joining adjacent pre-cast concrete sections and method for joining a first and a second pre-cast concrete section |
JP2013117104A (en) | 2011-12-01 | 2013-06-13 | Taisei Ulec Kk | Wall panel joint structure |
KR101389203B1 (en) | 2013-03-06 | 2014-04-24 | 도시구조안전(주) | Method for constructing residential building using precast concrete and modular unit |
JP2017031721A (en) | 2015-08-04 | 2017-02-09 | 旭トステム外装株式会社 | Wall Panel |
KR101776129B1 (en) | 2016-07-26 | 2017-09-07 | 김태균 | Built-up type precast double structure for slab and wall and double precast wall construction method using the same |
US20190169844A1 (en) | 2016-07-26 | 2019-06-06 | Ario Yousefi DARESTANI | Pre-cast concrete formwork, wall system and method of construction |
Non-Patent Citations (7)
Title |
---|
"Simple, robust, fast - the complete wall connecting system", PFEIFER VS@ WIRE ROPE LOOP SYSTEM BROCHURE, October 2007 (2007-10-01), pages 1 - 22, XP055715976 |
ANONYMOUS: "Eurocode 2: Design of concrete structures - Part 1-1 : General rules and rules for buildings", EUROPEAN STANDARD EN 1992-1-1, 1 December 2004 (2004-12-01), pages 1 - 227 |
ANONYMOUS: "Symmetrical economical prefabricated part connections; prepare to be thrilled …", PFEIFER, 1 May 2015 (2015-05-01), pages 1 - 32, XP055743138, Retrieved from the Internet <URL:https://www.pfeifer.info/out/assets/PFEIFER_VS-SYSTEM-APPROVED_PPEN.PDF> [retrieved on 20201023] |
ANONYMUS: "Symmetrical economical prefabricated part connections", PFEIFER SEIL- UND HEBETECHNIK GMBH, 1 May 2015 (2015-05-01), XP055690596 |
BROOKER ET AL.: "Residential Cellular Concrete Buildings - A guide for the design and specification of concrete buildings using tunnel form, crosswall or twinwall systems", THE CONCRETE CENTER BROCHURE, September 2008 (2008-09-01), pages 1 - 70, XP055715993 |
EUROCODE 2: DESIGN OF CONCRETE STRUCTURES, PART 1-1 GENERAL RULES AND RULES FOR BUILDINGS, XP055674836 |
WHITTLE ET AL.: "Design of Hybrid Concrete Buildings - A guide to the design of buildings combining in-situ and precast concrete", THE CONCRETE CENTER BROCHURE, January 2009 (2009-01-01), pages 1 - 116, XP055715999 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102023126648A1 (en) * | 2023-09-29 | 2025-04-03 | Peter Aurnhammer | Prefabricated basement |
Also Published As
Publication number | Publication date |
---|---|
HK1244858A1 (en) | 2018-08-17 |
PT3263795T (en) | 2019-07-25 |
ES2733309T3 (en) | 2019-11-28 |
SG10201908614WA (en) | 2019-10-30 |
DK3263795T3 (en) | 2019-06-17 |
CN107542190B (en) | 2020-05-01 |
CN107542190A (en) | 2018-01-05 |
CN111622374A (en) | 2020-09-04 |
PL3263795T3 (en) | 2019-10-31 |
HK1244857B (en) | 2020-01-17 |
SG10201703972WA (en) | 2018-01-30 |
SG10202107902RA (en) | 2021-09-29 |
EP3263795A1 (en) | 2018-01-03 |
MY190080A (en) | 2022-03-25 |
CN111622374B (en) | 2022-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3263795B1 (en) | Composite structural wall and method of construction thereof | |
CN108678218B (en) | Assembly type concrete shear wall based on multipurpose thin-wall steel pipe and construction method thereof | |
KR101225661B1 (en) | Concrete shear key strengthened with steel cover plate and tension member and the construction method therewith | |
CN108678220B (en) | Concrete shear wall with integrally installed reinforcing steel bar templates | |
CN215802289U (en) | Module connecting system for lightweight concrete modular integrated structure | |
CN108999288B (en) | Prefabricated assembled beam column node | |
WO2020214086A1 (en) | Precast building | |
CN106760036A (en) | A kind of prefabricated steel combined concrete shear wall | |
CN215054263U (en) | L-shaped connecting joint of prefabricated wall panel | |
CN212453065U (en) | Assembled building frame structure member | |
CN114482289A (en) | Precast concrete module building | |
CN110984367B (en) | Prefabricated building frame structure component and construction method thereof | |
KR102620765B1 (en) | Construction method of expandable load-bearing structure for modular building | |
JP2024045350A (en) | Seismic reinforcement structure for existing building using clt | |
CN217500558U (en) | Precast concrete module building | |
CN217439239U (en) | Building steel bar bundle house mixed structure | |
CN215716246U (en) | A assembled composite wall for horizontally connect | |
CN215978589U (en) | Masonry structure's prefabricated wallboard reinforced structure | |
CN214614884U (en) | Hidden beam type bolt connection full-prefabricated reinforced concrete slab structure | |
KR100301305B1 (en) | Composite floor structure of high-rise building and its construction method | |
CN110670716B (en) | Prefabricated beam type balcony, connection structure of prefabricated beam type balcony and prefabricated wallboard and construction method | |
CN113530014A (en) | A prefabricated composite wall for horizontal connection and construction method thereof | |
CN115419196B (en) | UHPC wet joint prefabricated double-sided superimposed shear wall for nuclear power plant and method | |
CN212506888U (en) | Cross precast concrete wall connection structure | |
CN217299267U (en) | Full-assembly type building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20180309 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: WONG, SENG Owner name: LEOW, GEOK MUI Owner name: HENG, KIM HUAT |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: WONG, SENG Inventor name: HENG, KIM HUAT Inventor name: LEOW, GEOK MUI |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180611 |
|
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1244857 Country of ref document: HK |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04B 1/348 20060101ALI20190207BHEP Ipc: E04B 1/04 20060101ALI20190207BHEP Ipc: E04G 21/14 20060101ALN20190207BHEP Ipc: E04B 2/86 20060101AFI20190207BHEP |
|
INTG | Intention to grant announced |
Effective date: 20190226 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: LEOW, GEOK MUI Inventor name: WONG, SENG |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017003831 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20190613 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: COSMOVICI INTELLECTUAL PROPERTY SARL, CH |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Ref document number: 3263795 Country of ref document: PT Date of ref document: 20190725 Kind code of ref document: T Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20190718 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190815 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2733309 Country of ref document: ES Kind code of ref document: T3 Effective date: 20191128 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190815 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1133602 Country of ref document: AT Kind code of ref document: T Effective date: 20190515 |
|
REG | Reference to a national code |
Ref country code: GR Ref legal event code: EP Ref document number: 20190402343 Country of ref document: GR Effective date: 20191128 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 602017003831 Country of ref document: DE |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: MDE Opponent name: LIN, SIHE Ref country code: FI Ref legal event code: MDE Opponent name: INTEGRATED PRECAST SOLUTIONS PTE. LTD |
|
26 | Opposition filed |
Opponent name: LIN, SIHE Effective date: 20200213 Opponent name: INTEGRATED PRECAST SOLUTIONS PTE. LTD Effective date: 20200217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190613 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210315 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190915 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20170613 Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210315 |
|
PGRI | Patent reinstated in contracting state [announced from national office to epo] |
Ref country code: PT Effective date: 20210524 |
|
PLAB | Opposition data, opponent's data or that of the opponent's representative modified |
Free format text: ORIGINAL CODE: 0009299OPPO |
|
R26 | Opposition filed (corrected) |
Opponent name: INTEGRATED PRECAST SOLUTIONS PTE. LTD Effective date: 20200217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211213 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R100 Ref document number: 602017003831 Country of ref document: DE |
|
PLCK | Communication despatched that opposition was rejected |
Free format text: ORIGINAL CODE: EPIDOSNREJ1 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190515 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211213 |
|
PGRI | Patent reinstated in contracting state [announced from national office to epo] |
Ref country code: PT Effective date: 20220530 |
|
PLBN | Opposition rejected |
Free format text: ORIGINAL CODE: 0009273 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: OPPOSITION REJECTED |
|
27O | Opposition rejected |
Effective date: 20220406 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230515 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20240617 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240614 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240613 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20240621 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GR Payment date: 20240611 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240613 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240617 Year of fee payment: 8 Ref country code: FI Payment date: 20240613 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20240604 Year of fee payment: 8 Ref country code: PT Payment date: 20240602 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20240524 Year of fee payment: 8 Ref country code: BE Payment date: 20240613 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20240618 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20240701 Year of fee payment: 8 Ref country code: ES Payment date: 20240802 Year of fee payment: 8 |