这是indexloc提供的服务,不要输入任何密码
Skip to content

SocketPanda improvements #14204

SocketPanda improvements

SocketPanda improvements #14204

Triggered via pull request October 28, 2025 16:11
Status Cancelled
Total duration 7m 20s
Artifacts

test.yaml

on: pull_request
Matrix: ./test.sh
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 2 warnings
MISRA C:2012 Linter
Canceling since a higher priority waiting request for tests-refs/pull/2297/merge-pull_request exists
MISRA C:2012 Linter
The operation was canceled.
tests
Canceling since a higher priority waiting request for tests-refs/pull/2297/merge-pull_request exists
./test.sh (macos-latest)
gcc@13 13.4.0 is already installed and up-to-date. To reinstall 13.4.0, run: brew reinstall gcc@13
./test.sh (macos-latest)
python@3.14 3.14.0 is already installed and up-to-date. To reinstall 3.14.0, run: brew reinstall python@3.14