Add comma body firmware #14171
Triggered via pull request
October 15, 2025 21:33
Status
Cancelled
Total duration
1m 56s
Artifacts
–
test.yaml
on: pull_request
build
1m 27s
MISRA C:2012 Linter
1m 37s
MISRA C:2012 Mutation
41s
Matrix: ./test.sh
Annotations
9 errors and 2 warnings
|
MISRA C:2012 Mutation
Process completed with exit code 2.
|
|
./test.sh (macos-latest)
Process completed with exit code 2.
|
|
build
Canceling since a higher priority waiting request for tests-refs/pull/2291/merge-pull_request exists
|
|
build
The operation was canceled.
|
|
./test.sh (ubuntu-latest)
Canceling since a higher priority waiting request for tests-refs/pull/2291/merge-pull_request exists
|
|
./test.sh (ubuntu-latest)
The operation was canceled.
|
|
MISRA C:2012 Linter
Canceling since a higher priority waiting request for tests-refs/pull/2291/merge-pull_request exists
|
|
MISRA C:2012 Linter
The operation was canceled.
|
|
tests
Canceling since a higher priority waiting request for tests-refs/pull/2291/merge-pull_request exists
|
|
./test.sh (macos-latest)
gcc@13 13.4.0 is already installed and up-to-date.
To reinstall 13.4.0, run:
brew reinstall gcc@13
|
|
./test.sh (macos-latest)
python@3.13 3.13.7 is already installed and up-to-date.
To reinstall 3.13.7, run:
brew reinstall python@3.13
|