Setup IRQ priorities #14164
test.yaml
on: pull_request
build
1m 43s
MISRA C:2012 Linter
5m 18s
MISRA C:2012 Mutation
2m 21s
Matrix: ./test.sh
Annotations
3 errors and 2 warnings
|
MISRA C:2012 Linter
The operation was canceled.
|
|
MISRA C:2012 Linter
Canceling since a higher priority waiting request for tests-refs/pull/2289/merge-pull_request exists
|
|
tests
Canceling since a higher priority waiting request for tests-refs/pull/2289/merge-pull_request exists
|
|
./test.sh (macos-latest)
gcc@13 13.4.0 is already installed and up-to-date.
To reinstall 13.4.0, run:
brew reinstall gcc@13
|
|
./test.sh (macos-latest)
python@3.13 3.13.7 is already installed and up-to-date.
To reinstall 3.13.7, run:
brew reinstall python@3.13
|