这是indexloc提供的服务,不要输入任何密码
Skip to content

cleanup panda connect #14082

cleanup panda connect

cleanup panda connect #14082

Triggered via pull request September 10, 2025 17:03
Status Cancelled
Total duration 1m 53s
Artifacts

test.yaml

on: pull_request
Matrix: ./test.sh
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
MISRA C:2012 Mutation
The operation was canceled.
MISRA C:2012 Mutation
Canceling since a higher priority waiting request for tests-refs/pull/2274/merge-pull_request exists
./test.sh (ubuntu-latest)
The operation was canceled.
./test.sh (ubuntu-latest)
Canceling since a higher priority waiting request for tests-refs/pull/2274/merge-pull_request exists
tests
Canceling since a higher priority waiting request for tests-refs/pull/2274/merge-pull_request exists
./test.sh (macos-latest)
gcc@13 13.4.0 is already installed and up-to-date. To reinstall 13.4.0, run: brew reinstall gcc@13
./test.sh (macos-latest)
python@3.13 3.13.7 is already installed and up-to-date. To reinstall 3.13.7, run: brew reinstall python@3.13