client: init e2ee envelopes #20
ci.yml
on: push
Lint
19s
Sanitizers
1m 38s
Docker Build
1m 22s
Check Dependencies
28s
Matrix: Build
Matrix: Test
Annotations
8 errors
|
Lint
Process completed with exit code 1.
|
|
Build (1.24.x)
Process completed with exit code 1.
|
|
Build (1.25.0)
The strategy configuration was canceled because "build._1_24_x" failed
|
|
Build (1.25.0)
The operation was canceled.
|
|
Test (1.24.x)
Process completed with exit code 1.
|
|
Test (1.25.0)
The strategy configuration was canceled because "test._1_24_x" failed
|
|
Test (1.25.0)
The operation was canceled.
|
|
Sanitizers
Process completed with exit code 1.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
gosuda~relaydns~0CFSA9.dockerbuild
|
45.4 KB |
sha256:d85d00e3f1ae7a5bbdd22c51d81096edc45a2586806c362c341d266a3ae94c15
|
|