refactor: enhance user connection management and improve roster handling #13
ci.yml
on: push
Lint
22s
Sanitizers
1m 37s
Docker Build
1m 35s
Check Dependencies
36s
Matrix: Build
Matrix: Test
Annotations
5 errors
|
Lint
Process completed with exit code 1.
|
|
Test (1.24.x)
Process completed with exit code 1.
|
|
Test (1.25.0)
The strategy configuration was canceled because "test._1_24_x" failed
|
|
Test (1.25.0)
The operation was canceled.
|
|
Sanitizers
Process completed with exit code 1.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
binaries
Expired
|
61.6 MB |
sha256:0f554efbb9203c23f829b0f8351984f1d94393fbb3ab303d495ac04f418a2865
|
|
|
gosuda~relaydns~SNMLQS.dockerbuild
|
47.6 KB |
sha256:a6e3b153149f2fb386196d5f9a7744aaa27d63511b62c3d14467006d548c6f42
|
|