host: add fallback in connectBootstrap #3
ci.yml
on: push
Lint
28s
Sanitizers
1m 24s
Docker Build
1m 20s
Check Dependencies
51s
Matrix: Build
Matrix: Test
Annotations
5 errors
|
Lint
Process completed with exit code 1.
|
|
Test (1.24.x)
Process completed with exit code 1.
|
|
Test (1.25.0)
The strategy configuration was canceled because "test._1_24_x" failed
|
|
Test (1.25.0)
The operation was canceled.
|
|
Sanitizers
Process completed with exit code 1.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
binaries
Expired
|
57.5 MB |
sha256:fe15c2f2f5761b9b1368e68c97d41759927966b4e01bbaf7b90ef8bad295c44b
|
|
|
gosuda~relaydns~O1P822.dockerbuild
|
45 KB |
sha256:8a2bf938a621c6d4707dc88bc434a13dffecd83da4bb1491fde30b0efac87543
|
|