US20180034275A1 - Demand response implemented in an infrastructure having a dc link - Google Patents
Demand response implemented in an infrastructure having a dc link Download PDFInfo
- Publication number
- US20180034275A1 US20180034275A1 US15/548,803 US201615548803A US2018034275A1 US 20180034275 A1 US20180034275 A1 US 20180034275A1 US 201615548803 A US201615548803 A US 201615548803A US 2018034275 A1 US2018034275 A1 US 2018034275A1
- Authority
- US
- United States
- Prior art keywords
- electrical energy
- distribution network
- power distribution
- rate
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000004044 response Effects 0.000 title claims description 18
- 238000000034 method Methods 0.000 claims abstract description 37
- 238000010248 power generation Methods 0.000 claims abstract description 32
- 238000012546 transfer Methods 0.000 claims abstract description 31
- 230000037361 pathway Effects 0.000 claims abstract description 16
- 230000001105 regulatory effect Effects 0.000 claims abstract description 6
- 238000012545 processing Methods 0.000 claims description 18
- 230000006735 deficit Effects 0.000 claims description 10
- 230000001276 controlling effect Effects 0.000 claims description 4
- 208000018883 loss of balance Diseases 0.000 claims description 4
- 230000019491 signal transduction Effects 0.000 claims description 4
- 230000003292 diminished effect Effects 0.000 claims 1
- 238000005259 measurement Methods 0.000 abstract description 6
- 230000008569 process Effects 0.000 description 24
- 230000009467 reduction Effects 0.000 description 15
- 230000011664 signaling Effects 0.000 description 9
- 230000005611 electricity Effects 0.000 description 8
- 238000010586 diagram Methods 0.000 description 7
- 230000006854 communication Effects 0.000 description 5
- 230000001681 protective effect Effects 0.000 description 5
- 238000006243 chemical reaction Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 4
- 230000007257 malfunction Effects 0.000 description 4
- 230000021715 photosynthesis, light harvesting Effects 0.000 description 4
- 230000002829 reductive effect Effects 0.000 description 3
- 230000002441 reversible effect Effects 0.000 description 3
- 239000004065 semiconductor Substances 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009118 appropriate response Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 235000019577 caloric intake Nutrition 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000010267 cellular communication Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000003467 diminishing effect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/36—Arrangements for transfer of electric power between AC networks via a high-tension DC link
-
- B60L11/1844—
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/63—Monitoring or controlling charging stations in response to network capacity
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
- H02J3/322—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0013—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
-
- H02J7/0027—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/40—The network being an on-board power network, i.e. within a vehicle
- H02J2310/48—The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/12—Electric charging stations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/14—Plug-in electric vehicles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/16—Information or communication technologies improving the operation of electric vehicles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/16—Information or communication technologies improving the operation of electric vehicles
- Y02T90/167—Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/126—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S30/00—Systems supporting specific end-user applications in the sector of transportation
- Y04S30/10—Systems supporting the interoperability of electric or hybrid vehicles
- Y04S30/12—Remote or cooperative charging
Definitions
- the invention relates to systems, devices and methods for performing demand response in an electric power delivery infrastructure having a DC link.
- Electric power delivery infrastructures exist that are inherently AC based but involve some sort of DC link.
- An example is the DC interconnect between two AC power distribution networks.
- the DC link allows a power transfer between the two AC power distribution networks while allowing each AC power distribution network to maintain its own phase and frequency characteristics.
- the DC link has a rectifier stage to convert the incoming AC electrical energy in DC electrical energy and an inverter stage that converts the DC electrical energy back into AC electrical energy.
- the conversion of AC to DC is independent of the phase and the frequency in either AC power distribution network at any given moment.
- the conversion DC to AC needs to take into account the phase and frequency of the AC power distribution network that receives the electrical energy such that the energy injection is properly synchronized.
- the synchronization is performed by a controller that samples the phase and frequency of the receiving AC power distribution network and operates the inverter stage to generate an AC waveform that has the same frequency and phase as the receiving power distribution network.
- the DC link can be bi-directional allowing the electrical energy transfer to be reversed.
- each stage of the DC link can selectively operate as a rectifier stage and as an inverter stage.
- the controller is configured to sample the phase and frequency in both networks and uses the relevant phase/frequency information depending on the direction of the electrical energy transfer.
- the charging station receives AC electrical energy that is converted to DC and supplied in DC form to charge the battery of the vehicle.
- the rate at which the electrical energy is delivered to the electric vehicle is controlled to suit the needs of the charging process.
- a control module on the vehicle determines the rate at which the electrical energy needs to be delivered to the battery and communicates with the charging station that regulates it accordingly. The regulation is performed by changing the DC voltage; the lower the DC voltage supplied, the lower the rate at which the electrical energy is supplied. Conversely, the higher the DC voltage, the higher the rate of energy delivery.
- Demand response refers to a dynamic response that the demand, i.e., the entity that receives the electrical energy manifests, based on certain conditions in the AC power distribution network that supplies the electrical energy.
- One example of response is to reduce the consumption of electrical energy when the AC power distribution network experiences a power generation deficit.
- Another example is to increase the consumption of electrical energy when the AC power distribution network experiences a power generation excess. Examples of demand response strategies are described in PCT International Publication No. WO 2013/177689 A1 the contents of which is hereby incorporated by reference herein.
- a system for regulating electrical energy transfer over a pathway including a DC link includes a data processing device, which includes a machine readable storage encoded with non-transitory software for execution by a CPU, the software being configured for computing a rate of electrical energy flow through the DC link at least in part on a basis of a state of balance between power generation and load in an AC power distribution network to which the pathway connects and an output for generating a control signal for adjusting the rate of electrical energy flow through the DC link according to the computed rate.
- an electrical vehicle charger in accordance with another broad aspect, includes a power input for connection to an AC power distribution network, a power output for connection to an electric vehicle to supply electrical energy for charging a battery of the electric vehicle and a data processing device.
- the data processing device includes a machine readable storage encoded with non-transitory software for execution by a CPU, the software being configured for determining a rate of electrical energy flow through the power output by using as a factor a state of balance between power generation and load in an AC power distribution network to which the power input connects and an output for generating a message to a controller of the electrical vehicle to notify the controller that the rate of electrical energy flow is being adjusted on the basis of a loss of balance between power generation and load in the AC power distribution network.
- an electrical vehicle charger in accordance with yet another broad aspect, includes a power input for connection to an AC power distribution network and a power output for connection to an electric vehicle to supply electrical energy for charging a battery of the electric vehicle.
- the electrical vehicle charger also includes a data processing device, including a machine readable storage encoded with non-transitory software for execution by a CPU, the software being configured for determining a rate of electrical energy flow through the power output by using as a factor a state of balance between power generation and load in an AC power distribution network to which the power input connects.
- the data processing device is configured to negotiate with an electrical controller of the electric vehicle a rate of charge to be supplied to the electrical vehicle when a loss of balance occurs between power generation and load in the AC power distribution network.
- a method for regulating electrical energy transfer over a pathway including a DC link includes computing a rate of electrical energy flow through the DC link at least in part on a basis of a state of balance between power generation and load in an AC power distribution network to which the pathway connects and adjusting the rate of electrical energy flow through the DC link according to the computed rate.
- FIG. 1 is a diagram illustrating two AC power distribution networks connected by a DC link
- FIG. 2 is a more detailed diagram of the DC link shown in FIG. 1 ;
- FIG. 3 is a flowchart illustrating the decisional process implemented by the software controlling the operation of the DC link shown in FIGS. 1 and 2 ;
- FIG. 4 is a diagram of another example of implementation of the invention, illustrating an electric vehicle charging station to which is connected an electric vehicle and which has a battery that is charged by the charging station;
- FIG. 5 is a more detailed diagram of the vehicle charging station shown in FIG. 4 ;
- FIG. 6 is a flowchart illustrating the decisional process implemented by the software controlling the operation of the vehicle charging station shown in FIGS. 4 and 5 ;
- FIG. 7 is a flowchart illustrating the decisional process implemented by the software controlling the charging of the electric vehicle.
- FIG. 8 is a diagram of a DC link according to another embodiment of the invention, providing logging functions to account for electricity transfer between two networks and also recording occurrence of extraneous events such as under frequency conditions in either network.
- FIG. 1 illustrates two AC power distribution networks, namely network 1 and network 2 designated by reference numerals 10 and 12 , respectively, connected to each other by a DC link 14 .
- the purpose of the DC link 14 is to allow electric energy to be transferred from one network to the other while allowing each network to operate at its own phase and frequency. This way, there is no need to synchronize the networks so they operate at the same phase and frequency. In most instances, the frequency of the electrical energy in both networks will be the same, however the phase will be likely different.
- FIG. 2 A more detailed block diagram of the DC link is shown in FIG. 2 .
- the DC link has three identical DC channels 16 , 18 and 20 .
- Each DC channel handles a single electrical energy phase. Since the electrical energy is distributed in each network by a three-phase AC power stream, one DC channel handles each phase separately.
- DC channels 16 , 18 and 20 are identical in terms of structure and operate in the same manner, only one will be described for simplicity.
- the DC channel 16 has a rectifier/inverter stage 22 that is connected to another rectifier/inverter stage 24 via a DC connection 26 .
- the rectifier/inverter stages 22 , 24 operate as rectifier or inverter depending on the direction of power flow. For example, if network 10 is sending electrical energy to network 12 , the rectifier/inverter stage 22 operates as a rectifier while the rectifier/inverter stage 24 operates as an inverter. If the power flow direction was to be reversed, the rectifier/inverter stages 22 , 24 would operate in the reverse configuration.
- a simpler DC channel structure can be used that has a dedicated rectifier stage connected to the source network and a dedicated inverter stage connected to the receiving network.
- the rectifier stage 22 operates by converting the incoming electrical energy on a given phase from AC to DC.
- the rectifier stage 22 may use a solid state rectifier bridge that provides full-wave rectification.
- the output of the rectifier stage 22 is a rectified electrical energy flow, which for convenience is referred to in this specification as DC, although in some cases the flow will not necessarily be a pure DC one as some ripples are likely to be present.
- the inverter stage 24 receives the DC power flow generated by the rectifier stage 22 and converts it back into AC form. It is beyond the scope of this specification to provide details on how the DC to AC conversion is being performed. This is something known in the art and the reader is invited to refer to the relevant literature for more information. Generally, the DC to AC conversion is more complicated than the AC to DC one, because in the former case the AC wave needs to be output with a frequency and phase matching those in the receiving network.
- a controller 28 manages the operation of the rectifier/inverter stages 22 , 24 .
- the controller 28 is computer based, including a machine readable storage encoded with software for execution by one or more CPUs.
- the software defines logic, which determines how the rectifier/inverter stages 22 , 24 operate.
- the controller 28 outputs control signals 30 , directed to the respective rectifier/inverter stages 22 , 24 .
- the control signals which can be conveyed wirelessly or over physical signal pathways, convey commands that control the operation of components of the rectifier/inverter stages 22 , 24 .
- the controller 28 also receives as input information on the frequency of the AC electrical energy in the networks 10 and 12 .
- a frequency measurement unit 32 supplies frequency information to the controller 28 over input signal path 34 , which can be wireless or wireline, from the network 10 .
- frequency measurement unit 36 supplies the controller 28 with information on the frequency of the AC electrical energy in network 12 , over input signal path 38 , which again can be wireless or wireline.
- FIG. 2 shows the frequency measurement units 32 , 34 as being separate from the rectifier/inverter stages 22 , 24 , note that the frequency measurement units 32 , 34 can be physically incorporated in the rectifier/inverter stages 22 , 24 .
- FIG. 3 is a flowchart, which illustrates the operation of a single DC channel of the DC link 14 , it being understood that all the DC channels operate in the same way.
- the electrical energy flows from the network 10 to the network 12 .
- the rectifier/inverter stage 22 operates as a rectifier to convert the AC energy in DC form
- the rectifier/inverter stage operates as an inverter to convert the DC electrical energy into AC form and inject it into network 12 .
- the controller 28 gets information on the frequency of the AC energy in the source network 10 .
- the controller 28 determines on the basis of the received frequency information if the frequency in the source network 10 deviates from the nominal frequency of the network 10 . If a deviation exists, which signals an under frequency event or an over frequency event, the decision step 42 is answered in the affirmative and the process continues at step 44 .
- the DC channel 16 provides a response to the frequency deviation.
- the response will vary depending on a number of factors, such as the degree of deviation and the negativeness or the positiveness of the deviation, among others. Specific examples are provided below.
- the frequency of the AC electrical energy in the network 10 deviates negatively from the nominal frequency, in other words the frequency diminishes. Such deviation is an under frequency event, that may result from a power generation deficit.
- the network 10 is thus no longer in a state of balance between power generation and load and the response of the DC channel 16 of the DC link 14 is an attempt to lessen the imbalance by reducing the load on the network 10 .
- the load reduction is performed by diminishing the amount of electrical energy transferred to the receiving network 12 .
- the controller 28 computes the response based on a response strategy.
- the response strategy which is encoded in the machine readable storage of the controller 28 , reduces the electrical energy transfer to the receiving network 12 on the basis of the degree of power generation deficit. More specifically, the larger the frequency deviation, the larger the reduction of the electrical energy transfer will be. For instance, the reduction can be proportional to the deviation of the frequency from the nominal frequency. Alternatively the reduction can be non linear, as discussed again in PCT International Publication No. WO 2013/177689 A1.
- the controller 28 uses the frequency information to derive a rate of kinetic energy dissipation in network 10 .
- the rate of kinetic energy dissipation is related to the rate of variation of the frequency from the nominal frequency, as discussed in PCT International Publication No. WO 2013/177689 A1.
- the controller 28 thus reduces the transfer of electrical energy from network 10 to network 12 in relation to the determined rate of kinetic energy dissipation.
- the controller 28 sends out control signals which regulate the operation of the stages in order to obtain the desired electrical energy flow between the two networks.
- the rectifier stage can be operated such as to rectify only a portion of the incoming AC wave and inject over the DC connections a reduced amount of electrical energy.
- the rectifier stage is a full-wave rectifier. This means that during normal operation, the whole of the input waveform is converted to a constant polarity, either positive or negative. When it is desired to choke the electrical power flow, something less than the whole waveform is converted into constant polarity.
- the semiconductor power switches are operated by the controller 28 such as to lower the voltage of the AC output waveform injected in the network 12 ; the lower the voltage, the lower the electrical energy transfer.
- the deviation of the frequency from the nominal frequency is positive, in other words the frequency increases above the nominal frequency.
- Such an over frequency event is indicative of a power generation surplus; the power and the load are no longer in a state of dynamic balance, rather more electrical energy is being injected in the network 10 than what is being consumed.
- the appropriate response to an over frequency event is to increase the electrical energy transfer to the network 12 .
- That transfer can be performed according to any one of the response strategies discussed earlier, namely linearly varying the electrical energy transfer in relation to the variation of frequency with relation to the nominal frequency, in the over frequency domain.
- Another possibility is to vary the electrical energy transfer in relation to the kinetic energy buildup in the electric generators, namely to reduce that buildup.
- the rate of input or output of kinetic energy in the network is determined on the basis of the rate of frequency variation.
- rate of frequency variation is discussed in PCT International Publication No. WO 2013/177689 A1.
- a possible variant to the process illustrated in FIG. 2 is to vary the transfer of electrical energy through the DC link 14 not only on the basis of the frequency deviation in the source network 10 , rather on the basis of the frequency deviation occurring in the destination network 12 .
- one network assists another when the latter experiences an under frequency event or an over frequency event.
- That variant works essentially along the same lines as the earlier example with the exception that the controller 28 takes frequency information from the destination network 12 instead of the source network 10 .
- the controller 28 operates the rectifier stage 22 and the inverter stage 24 such as to increase the rate of transfer of electrical energy from the source network 10 into the destination network 12 .
- the DC link 14 acts to reduce the imbalance in the destination network 12 by injecting additional electrical energy into it.
- the controller 28 operates the DC link such as to reduce the rate of electrical energy being injected in the destination network 12 , thus lessening the excess generation capacity in the destination network 12 .
- FIG. 8 illustrates another embodiment of the invention in which the DC link 100 is provided with accounting control functions to account for the electricity that is being sent from one network to the other.
- the accounting function is such that it takes into consideration the reduction of the electrical energy transfer occurring during an under frequency event.
- the accounting function also takes into consideration the increase of the electrical energy transfer occurring when the source network supports the destination network that experiences an under frequency condition.
- the structure of the DC link is the same as described earlier with the exception of the logging function that describes the various events and conditions that have occurred during the operation of the DC link.
- the controller 28 accounts for the amount of electricity that is being transferred from one network to the other, and sends that information over a data link connection to a server 102 .
- the server 102 resides remotely from the DC link 100 .
- the data link connection is performed through a data network such as the Internet.
- the electricity usage data is recorded by the server 102 on a machine-readable storage medium 104 .
- the machine-readable storage medium 104 thus stores a succession of records, each record being associated with electricity usage occurring over a certain time.
- the record also identifies the direction of the transfer and the circumstances under which the transfer occurred. For example, when the rate of electricity transfer was reduced as a result of an under frequency condition in the source network, the record provides this information since a monetary penalty may then apply to the utility company managing the source network.
- the record would also specify when an increase of electrical energy transfer was required to support the destination network in which an under frequency condition exists. That information can be used later on to compute an excess fee, stacking up on the regular electricity transfer fee, to support the receiving network.
- the server 102 runs accounting software that processes the records stored in the machine-readable storage 104 .
- the purpose of the accounting software is to generate debit or credit information as to what the utility companies, that own the source and the destination networks, owe each other for the transfer of electrical power.
- logging information on extraneous events occurring during the operation of the DC link 100 such as under frequency events in either network or adjustments to the rate of electrical energy transfer to handle those events, a more accurate debit or credit information can be produced.
- FIG. 4 illustrates another embodiment of the invention, which relates to a charger for an electric vehicle (EV).
- the electric vehicle 46 has a battery 48 that is charged by an EV charger 50 .
- the EV charger is supplied with AC power, which is converted in DC form to charge the battery 48 of the electric vehicle 46 .
- the EV charger 50 has a wall mounted housing 52 from which extends a cable 54 leading to a wireless transmission unit 56 .
- the wireless transmission unit 56 has two components; a fixed station 58 , and a movable station 60 , which is mounted to the vehicle 46 .
- the electrical energy received by the station 60 is conveyed to a controller unit 62 which, in addition to its control functions also converts the AC electrical energy in DC form such that it can be supplied to the battery 48 .
- the power path to the vehicle 46 includes a physical cable that is plugged in a receptacle on the vehicle's body.
- the driver needs to plug the cable extending from the wall mounted housing 52 in the receptacle. Once the vehicle 46 is charged, the cable is unplugged.
- the wall-mounted unit 52 receives electrical energy in AC form and converts it in DC form such that it is supplied in DC form over the cable. Accordingly, there is no need to perform any conversation from AC to DC at the vehicle.
- FIG. 5 is a block diagram illustrating in greater detail the structure of the EV charger 50 and also the controller in the vehicle 46 that regulates the battery charging process.
- FIG. 5 applies mostly to the latter embodiment where a physical power cable is connected to the vehicle 46 for charging it.
- the wireless variant works conceptually in a similar fashion.
- the EV charger 50 has a controller 64 and a power electronics stage 66 .
- the controller 64 is a computer-based platform with a machine readable storage encoded with software for execution by one or more CPUs.
- the structure of the software determines the operation of the controller 64 .
- the power electronics stage 66 performs rectification of the AC waveform into a DC. As discussed earlier, a full-wave rectifier arrangement can be used for this purpose.
- the controller 64 sends control signals to the power electronics stage 66 over a signal path 68 , which can be wireless or wireline. The signals are used to convey commands to the power electronics stage 66 such as to regulate the flow of electrical energy to the vehicle 46 , notably by decreasing it in the event of an wider frequency condition in the network supplying the EV charger 50 with electrical energy.
- the vehicle 46 has an EV controller 70 , which is connected to the battery 48 .
- the EV controller 70 is also software based and one of its functions is to regulate the charging process of the battery 48 .
- the battery 48 needs to be charged at a controlled rate rate. If the battery 48 is completely depleted an initial rapid charging rate is possible, however that rate needs to taper off when stage of charge of the battery increases, The EV controller 70 thus senses the stage of charge (SOC) of the battery and determines the charging rate, in other words the rate at which electrical energy can be safely injected in the battery.
- SOC stage of charge
- the EV controller 70 communicates with the EV charger 50 such as to regulate the rate at which electrical energy is supplied by the EV charger 50 .
- Such communication makes it possible to use the EV charger 50 with different electric vehicles that have different charging requirements.
- the communication process allows the EV charger 50 to adapt the charging rate to the specific charging requirements of the vehicle.
- the communication can be performed over a physical signaling path, such as an electrical connector that is integrated into the charging plug, which connects to the vehicle.
- the signaling path is shown at 72 in FIG. 5 .
- the integration of the signaling path into the plug makes it possible to close simultaneously both the power connections and the signaling connections once the plug is inserted in the receptacle on the vehicle.
- FIG. 5 shows the signaling path transiting through the power electronics stage 66 to arrive at the charging station controller 64 . This arrangement is used when the signaling path is integrated into the power cable. Otherwise, the signaling path may bypass the power electronics stage 66 .
- a possible variant is to use a wireless communication arrangement, where the EV controller 70 communicates with the charging station controller 64 by using any suitable wireless communication protocol. Wi-fi, bluetooth and cellular communication protocols are possible examples.
- FIG. 6 is a flowchart that illustrates the various steps of the process performed at the EV charger 50 during the charging process.
- the charging station controller 64 receives signals from the EV controller 70 that convey to the charging station controller 64 charging rate information. It is assumed that the power connection cable including the signaling path is connected to the plug at the vehicle such that all the power connections and the signaling connections are established. In addition to the charging rate information, the EV controller 70 and the charging station controller 64 can exchange other information as well, such as when the charging process is to begin (when delayed charging is desired), identification about the vehicle fir billing/credit purposes, etc.
- the charging station controller 64 triggers the current flow toward the vehicle at the desired charging rate.
- the charging rate can be determined on the basis of the intensity of the current or the voltage.
- the charging station controller 64 thus sends locally control signals to the power electronics stage 66 such that it outputs the desired charging rate.
- step 74 above is actually a repetitive step in the sense that the EV controller 70 constantly sends to the charging station controller 64 a target charging rate.
- the target charging rate changes during the charging process and it is based on factors such as the achieved degree of charge of the battery and its temperature, among others. Accordingly, step 76 constantly adjusts the charging rate based on the target charging rate received from the EV controller 70 .
- the charging station controller 64 measures the AC frequency of the AC power supply and at step 80 determines if an under-frequency event occurs.
- the measurement of the frequency and the assessment of weather an under frequency condition exists in the power distribution network is performed in the same fashion as discussed in connection with the previous example and also as discussed in the PCT International Publication No. WO 2013/177689 A1.
- the charger 50 responds by reducing the electrical consumption of the charger. This reduction can be made using one of the strategies discussed in connection with the inter-network DC link and also discussed in the PCT International Publication No. WO 2013/177689 A1. The reduction of the electrical consumption is shown at step 82 .
- steps 80 and 82 another conditional step that determines the current rate of charging and compares it to a threshold. If the rate of charging is low and below the threshold, no action is taken. A reduction of the charging rate occurs only if the current charging demand exceeds the threshold.
- the charging station controller 64 proceeds to step 84 at which the charging station controller 64 sends signals to the EV controller to notify the EV controller that the demanded charging rate cannot be met.
- the purpose of this signal is to avoid the EV controller 70 to trigger a malfunction condition. Since the EV controller 70 is unaware of the reason for the charging rate reduction, it may interpret the reduction as a malfunction of the charger 50 and in order to protect the vehicle it will take a protective action.
- the protective action may include interrupting the charging process and also logging an error code via the vehicle diagnostic system.
- the EV controller 70 is made aware that the reduction in the charging rate is deliberate and temporary, it will not interpret it as a malfunction and will not trigger a protective action.
- the way the charger 50 and the EV controller 70 handle the charging rate reduction may vary.
- One possibility is for the EV controller 70 to continue accepting whatever charging rate the charger 50 can offer.
- Another option is to temporarily terminate the charging process until the under frequency condition has subsided. In this instance, the charging process resumes at a later time.
- the charging station controller 64 and the EV controller 70 may trigger a timer at each end, programmed for a certain time delay, and once the timers expire, they attempt to re-establish the charging process.
- the EV controller 70 may be programmed to periodically send a signal to the charging station controller 64 to query the charging station controller 64 if it is ready to resume the charging process. While the under frequency condition is underway the charging station controller 64 denies the requests; only when the under frequency condition has passed it accepts the request and the charging process resumes.
- the charging station controller 64 to initiate the charging process; it sends a signal to the EV controller 70 to notify the EV controller that it is ready to resume the charging process.
- FIG. 7 illustrates the steps of the process implemented at the EV controller 70 . Some of those steps where described briefly above, however the following description will provide further details.
- the EV controller 70 determines the charging rate required based on the SOC of the battery and/or other parameters.
- the EV controller 70 sends signals to the charging station controller 64 to notify the charging station controller of the charging requirements. Steps 86 and 88 correspond to a normal state of operation.
- Step 90 is performed when an under frequency condition occurs.
- the EV controller 70 receives the signals from the charging station controller 64 indicating that a temporary discrepancy occurs between the commanded charging rate and the rate being delivered.
- the EV controller 70 refrains from triggering a malfunction condition and any associated protective action.
- the reduction of the electrical energy consumption response may thus be made when various frequency deviation conditions are recognized in the power distribution network.
- One of those conditions is a deviation of the frequency from a nominal frequency, where what is being tracked is the difference between the nominal frequency and the instant frequency.
- Another condition could be the rate of deviation of the frequency, which represents the rate of kinetic energy dissipation in the power distribution network.
- the frequency deviations could be negative (lowering of the frequency) or positive (over frequency).
- the reverse response is produced, which is to increase the electrical consumption.
- the charger 50 notifies the EV controller 70 of the event and of the desire to inject more electrical energy in the battery. If the EV controller accepts the additional energy intake, it sends an acknowledgment signal to the charger 50 that may include also a limit as to how much the electrical energy injection rate can be increased, to avoid damaging the battery of the vehicle.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
- This application claims priority from U.S. Provisional Patent Application No. 62/111,807 filed on Feb. 4, 2015, the contents of which is hereby incorporated by reference herein.
- The invention relates to systems, devices and methods for performing demand response in an electric power delivery infrastructure having a DC link.
- Electric power delivery infrastructures exist that are inherently AC based but involve some sort of DC link. An example is the DC interconnect between two AC power distribution networks. The DC link allows a power transfer between the two AC power distribution networks while allowing each AC power distribution network to maintain its own phase and frequency characteristics.
- The DC link has a rectifier stage to convert the incoming AC electrical energy in DC electrical energy and an inverter stage that converts the DC electrical energy back into AC electrical energy. The conversion of AC to DC is independent of the phase and the frequency in either AC power distribution network at any given moment. However, the conversion DC to AC needs to take into account the phase and frequency of the AC power distribution network that receives the electrical energy such that the energy injection is properly synchronized. The synchronization is performed by a controller that samples the phase and frequency of the receiving AC power distribution network and operates the inverter stage to generate an AC waveform that has the same frequency and phase as the receiving power distribution network.
- The DC link can be bi-directional allowing the electrical energy transfer to be reversed. In this instance, each stage of the DC link can selectively operate as a rectifier stage and as an inverter stage. The controller is configured to sample the phase and frequency in both networks and uses the relevant phase/frequency information depending on the direction of the electrical energy transfer.
- Another example of a power delivery infrastructure using a DC link is an electric vehicle charging station. The charging station receives AC electrical energy that is converted to DC and supplied in DC form to charge the battery of the vehicle. The rate at which the electrical energy is delivered to the electric vehicle is controlled to suit the needs of the charging process. A control module on the vehicle determines the rate at which the electrical energy needs to be delivered to the battery and communicates with the charging station that regulates it accordingly. The regulation is performed by changing the DC voltage; the lower the DC voltage supplied, the lower the rate at which the electrical energy is supplied. Conversely, the higher the DC voltage, the higher the rate of energy delivery.
- Demand response refers to a dynamic response that the demand, i.e., the entity that receives the electrical energy manifests, based on certain conditions in the AC power distribution network that supplies the electrical energy. One example of response is to reduce the consumption of electrical energy when the AC power distribution network experiences a power generation deficit. Another example is to increase the consumption of electrical energy when the AC power distribution network experiences a power generation excess. Examples of demand response strategies are described in PCT International Publication No. WO 2013/177689 A1 the contents of which is hereby incorporated by reference herein.
- In accordance with a broad aspect, a system for regulating electrical energy transfer over a pathway including a DC link is provided. The system includes a data processing device, which includes a machine readable storage encoded with non-transitory software for execution by a CPU, the software being configured for computing a rate of electrical energy flow through the DC link at least in part on a basis of a state of balance between power generation and load in an AC power distribution network to which the pathway connects and an output for generating a control signal for adjusting the rate of electrical energy flow through the DC link according to the computed rate.
- In accordance with another broad aspect, an electrical vehicle charger is provided. The electrical vehicle charger includes a power input for connection to an AC power distribution network, a power output for connection to an electric vehicle to supply electrical energy for charging a battery of the electric vehicle and a data processing device. The data processing device includes a machine readable storage encoded with non-transitory software for execution by a CPU, the software being configured for determining a rate of electrical energy flow through the power output by using as a factor a state of balance between power generation and load in an AC power distribution network to which the power input connects and an output for generating a message to a controller of the electrical vehicle to notify the controller that the rate of electrical energy flow is being adjusted on the basis of a loss of balance between power generation and load in the AC power distribution network.
- In accordance with yet another broad aspect, an electrical vehicle charger is provided. The electrical vehicle charger includes a power input for connection to an AC power distribution network and a power output for connection to an electric vehicle to supply electrical energy for charging a battery of the electric vehicle. The electrical vehicle charger also includes a data processing device, including a machine readable storage encoded with non-transitory software for execution by a CPU, the software being configured for determining a rate of electrical energy flow through the power output by using as a factor a state of balance between power generation and load in an AC power distribution network to which the power input connects. The data processing device is configured to negotiate with an electrical controller of the electric vehicle a rate of charge to be supplied to the electrical vehicle when a loss of balance occurs between power generation and load in the AC power distribution network.
- In accordance with a further broad aspect, a method for regulating electrical energy transfer over a pathway including a DC link is provided. The method includes computing a rate of electrical energy flow through the DC link at least in part on a basis of a state of balance between power generation and load in an AC power distribution network to which the pathway connects and adjusting the rate of electrical energy flow through the DC link according to the computed rate.
- These and other aspects of the invention will now become apparent to those of ordinary skill in the art upon review of the following description of embodiments of the invention in conjunction with the accompanying drawings.
- A detailed description of embodiments of the invention is provided below, by way of example only, with reference to the accompanying drawings, in which:
-
FIG. 1 is a diagram illustrating two AC power distribution networks connected by a DC link; -
FIG. 2 is a more detailed diagram of the DC link shown inFIG. 1 ; -
FIG. 3 is a flowchart illustrating the decisional process implemented by the software controlling the operation of the DC link shown inFIGS. 1 and 2 ; -
FIG. 4 is a diagram of another example of implementation of the invention, illustrating an electric vehicle charging station to which is connected an electric vehicle and which has a battery that is charged by the charging station; -
FIG. 5 is a more detailed diagram of the vehicle charging station shown inFIG. 4 ; -
FIG. 6 is a flowchart illustrating the decisional process implemented by the software controlling the operation of the vehicle charging station shown inFIGS. 4 and 5 ; -
FIG. 7 is a flowchart illustrating the decisional process implemented by the software controlling the charging of the electric vehicle; and -
FIG. 8 is a diagram of a DC link according to another embodiment of the invention, providing logging functions to account for electricity transfer between two networks and also recording occurrence of extraneous events such as under frequency conditions in either network. - It is to be expressly understood that the description and drawings are only for the purpose of illustrating certain embodiments of the invention and are an aid for understanding. They are not intended to be a definition of the limits of the invention.
-
FIG. 1 illustrates two AC power distribution networks, namelynetwork 1 andnetwork 2 designated by 10 and 12, respectively, connected to each other by areference numerals DC link 14. The purpose of theDC link 14 is to allow electric energy to be transferred from one network to the other while allowing each network to operate at its own phase and frequency. This way, there is no need to synchronize the networks so they operate at the same phase and frequency. In most instances, the frequency of the electrical energy in both networks will be the same, however the phase will be likely different. - A more detailed block diagram of the DC link is shown in
FIG. 2 . The DC link has three 16, 18 and 20. Each DC channel handles a single electrical energy phase. Since the electrical energy is distributed in each network by a three-phase AC power stream, one DC channel handles each phase separately.identical DC channels - Since the
16, 18 and 20 are identical in terms of structure and operate in the same manner, only one will be described for simplicity.DC channels - The
DC channel 16 has a rectifier/inverter stage 22 that is connected to another rectifier/inverter stage 24 via aDC connection 26. The rectifier/ 22, 24 operate as rectifier or inverter depending on the direction of power flow. For example, ifinverter stages network 10 is sending electrical energy tonetwork 12, the rectifier/inverter stage 22 operates as a rectifier while the rectifier/inverter stage 24 operates as an inverter. If the power flow direction was to be reversed, the rectifier/ 22, 24 would operate in the reverse configuration.inverter stages - Note that, for an electrical energy flow that is set once and will not change, a simpler DC channel structure can be used that has a dedicated rectifier stage connected to the source network and a dedicated inverter stage connected to the receiving network.
- The
rectifier stage 22 operates by converting the incoming electrical energy on a given phase from AC to DC. For example, therectifier stage 22 may use a solid state rectifier bridge that provides full-wave rectification. The output of therectifier stage 22 is a rectified electrical energy flow, which for convenience is referred to in this specification as DC, although in some cases the flow will not necessarily be a pure DC one as some ripples are likely to be present. - The
inverter stage 24 receives the DC power flow generated by therectifier stage 22 and converts it back into AC form. It is beyond the scope of this specification to provide details on how the DC to AC conversion is being performed. This is something known in the art and the reader is invited to refer to the relevant literature for more information. Generally, the DC to AC conversion is more complicated than the AC to DC one, because in the former case the AC wave needs to be output with a frequency and phase matching those in the receiving network. - A
controller 28 manages the operation of the rectifier/inverter stages 22, 24. Thecontroller 28 is computer based, including a machine readable storage encoded with software for execution by one or more CPUs. The software defines logic, which determines how the rectifier/inverter stages 22, 24 operate. Thecontroller 28 outputs control signals 30, directed to the respective rectifier/inverter stages 22, 24. The control signals, which can be conveyed wirelessly or over physical signal pathways, convey commands that control the operation of components of the rectifier/inverter stages 22, 24. - The
controller 28 also receives as input information on the frequency of the AC electrical energy in the 10 and 12. In particular, anetworks frequency measurement unit 32 supplies frequency information to thecontroller 28 overinput signal path 34, which can be wireless or wireline, from thenetwork 10. Similarly,frequency measurement unit 36, supplies thecontroller 28 with information on the frequency of the AC electrical energy innetwork 12, overinput signal path 38, which again can be wireless or wireline. - While
FIG. 2 shows the 32, 34 as being separate from the rectifier/inverter stages 22, 24, note that thefrequency measurement units 32, 34 can be physically incorporated in the rectifier/inverter stages 22, 24.frequency measurement units -
FIG. 3 is a flowchart, which illustrates the operation of a single DC channel of theDC link 14, it being understood that all the DC channels operate in the same way. - Assume for the purpose of this example that the electrical energy flows from the
network 10 to thenetwork 12. This means that the rectifier/inverter stage 22 operates as a rectifier to convert the AC energy in DC form, while the rectifier/inverter stage operates as an inverter to convert the DC electrical energy into AC form and inject it intonetwork 12. - At
step 40, thecontroller 28 gets information on the frequency of the AC energy in thesource network 10. Atstep 42, thecontroller 28 determines on the basis of the received frequency information if the frequency in thesource network 10 deviates from the nominal frequency of thenetwork 10. If a deviation exists, which signals an under frequency event or an over frequency event, thedecision step 42 is answered in the affirmative and the process continues atstep 44. - For more information on the way a deviation of the frequency from the nominal frequency is detected, reference may be made to PCT International Publication No. WO 2013/177689 A1.
- At
step 44 theDC channel 16 provides a response to the frequency deviation. The response will vary depending on a number of factors, such as the degree of deviation and the negativeness or the positiveness of the deviation, among others. Specific examples are provided below. - In a first scenario, the frequency of the AC electrical energy in the
network 10 deviates negatively from the nominal frequency, in other words the frequency diminishes. Such deviation is an under frequency event, that may result from a power generation deficit. Thenetwork 10 is thus no longer in a state of balance between power generation and load and the response of theDC channel 16 of theDC link 14 is an attempt to lessen the imbalance by reducing the load on thenetwork 10. The load reduction is performed by diminishing the amount of electrical energy transferred to the receivingnetwork 12. - Once the
controller 28 has determined that thenetwork 10 experiences a power generation deficit, it computes the response based on a response strategy. The response strategy, which is encoded in the machine readable storage of thecontroller 28, reduces the electrical energy transfer to the receivingnetwork 12 on the basis of the degree of power generation deficit. More specifically, the larger the frequency deviation, the larger the reduction of the electrical energy transfer will be. For instance, the reduction can be proportional to the deviation of the frequency from the nominal frequency. Alternatively the reduction can be non linear, as discussed again in PCT International Publication No. WO 2013/177689 A1. - In another example of implementation, the
controller 28 uses the frequency information to derive a rate of kinetic energy dissipation innetwork 10. The rate of kinetic energy dissipation is related to the rate of variation of the frequency from the nominal frequency, as discussed in PCT International Publication No. WO 2013/177689 A1. Thecontroller 28 thus reduces the transfer of electrical energy fromnetwork 10 to network 12 in relation to the determined rate of kinetic energy dissipation. - In terms of the actual implementation of the response by the rectifier; inverter stages 22, 24, the
controller 28 sends out control signals which regulate the operation of the stages in order to obtain the desired electrical energy flow between the two networks. For example, to reduce the flow of electrical energy between the 10, 12, the rectifier stage can be operated such as to rectify only a portion of the incoming AC wave and inject over the DC connections a reduced amount of electrical energy. As indicated previously, the rectifier stage is a full-wave rectifier. This means that during normal operation, the whole of the input waveform is converted to a constant polarity, either positive or negative. When it is desired to choke the electrical power flow, something less than the whole waveform is converted into constant polarity. This can be performed by using semiconductor power switches that are commanded to block a portion of the incoming waveform. Since a full cycle of the incoming waveform, including a positive half-cycle and a negative half-cycle spans 360 degrees, the semiconductor power switch can be commanded to block any portion of that 360 degree cycle, thus varying the RMS DC voltage output by thenetworks rectifier stage 22. By lowering the RMS DC voltage, the amount of electrical energy transferred to thenetwork 12 is effectively reduced. - Another method that can also be used to choke the electrical energy transfer to the
network 12 is at theinverter stage 24. Here, the semiconductor power switches are operated by thecontroller 28 such as to lower the voltage of the AC output waveform injected in thenetwork 12; the lower the voltage, the lower the electrical energy transfer. - It is also possible for the deviation of the frequency from the nominal frequency to be positive, in other words the frequency increases above the nominal frequency. Such an over frequency event is indicative of a power generation surplus; the power and the load are no longer in a state of dynamic balance, rather more electrical energy is being injected in the
network 10 than what is being consumed. - The appropriate response to an over frequency event is to increase the electrical energy transfer to the
network 12. That transfer can be performed according to any one of the response strategies discussed earlier, namely linearly varying the electrical energy transfer in relation to the variation of frequency with relation to the nominal frequency, in the over frequency domain. Another possibility is to vary the electrical energy transfer in relation to the kinetic energy buildup in the electric generators, namely to reduce that buildup. As indicated previously, the rate of input or output of kinetic energy in the network is determined on the basis of the rate of frequency variation. The notion of “rate of frequency variation” is discussed in PCT International Publication No. WO 2013/177689 A1. - A possible variant to the process illustrated in
FIG. 2 is to vary the transfer of electrical energy through the DC link 14 not only on the basis of the frequency deviation in thesource network 10, rather on the basis of the frequency deviation occurring in thedestination network 12. In this arrangement, one network assists another when the latter experiences an under frequency event or an over frequency event. - That variant works essentially along the same lines as the earlier example with the exception that the
controller 28 takes frequency information from thedestination network 12 instead of thesource network 10. - To elaborate, if the frequency information from the
destination network 12 indicates that a negative deviation exists between the network frequency and the nominal frequency, indicating the existence of a power generation deficit in thedestination network 12, thecontroller 28 operates therectifier stage 22 and theinverter stage 24 such as to increase the rate of transfer of electrical energy from thesource network 10 into thedestination network 12. In this fashion, the DC link 14 acts to reduce the imbalance in thedestination network 12 by injecting additional electrical energy into it. - In the case of an over frequency event in the
destination network 12, the reverse occurs, for instance thecontroller 28 operates the DC link such as to reduce the rate of electrical energy being injected in thedestination network 12, thus lessening the excess generation capacity in thedestination network 12. -
FIG. 8 illustrates another embodiment of the invention in which the DC link 100 is provided with accounting control functions to account for the electricity that is being sent from one network to the other. The accounting function is such that it takes into consideration the reduction of the electrical energy transfer occurring during an under frequency event. The accounting function also takes into consideration the increase of the electrical energy transfer occurring when the source network supports the destination network that experiences an under frequency condition. - The structure of the DC link is the same as described earlier with the exception of the logging function that describes the various events and conditions that have occurred during the operation of the DC link. During a normal mode of operation, the
controller 28 accounts for the amount of electricity that is being transferred from one network to the other, and sends that information over a data link connection to aserver 102. Typically, theserver 102 resides remotely from the DC link 100. As such, the data link connection is performed through a data network such as the Internet. - The electricity usage data is recorded by the
server 102 on a machine-readable storage medium 104. The machine-readable storage medium 104 thus stores a succession of records, each record being associated with electricity usage occurring over a certain time. In addition to specifying the amount of electricity transferred from one network to the other, the record also identifies the direction of the transfer and the circumstances under which the transfer occurred. For example, when the rate of electricity transfer was reduced as a result of an under frequency condition in the source network, the record provides this information since a monetary penalty may then apply to the utility company managing the source network. Similarly, the record would also specify when an increase of electrical energy transfer was required to support the destination network in which an under frequency condition exists. That information can be used later on to compute an excess fee, stacking up on the regular electricity transfer fee, to support the receiving network. - The
server 102 runs accounting software that processes the records stored in the machine-readable storage 104. The purpose of the accounting software is to generate debit or credit information as to what the utility companies, that own the source and the destination networks, owe each other for the transfer of electrical power. By logging information on extraneous events occurring during the operation of the DC link 100, such as under frequency events in either network or adjustments to the rate of electrical energy transfer to handle those events, a more accurate debit or credit information can be produced. -
FIG. 4 illustrates another embodiment of the invention, which relates to a charger for an electric vehicle (EV). Theelectric vehicle 46 has abattery 48 that is charged by anEV charger 50. The EV charger is supplied with AC power, which is converted in DC form to charge thebattery 48 of theelectric vehicle 46. - Different types of power connections with the
vehicle 46 are possible. In the specific example shown inFIG. 4 , a wireless connection is used which does not require any physical cable to be connected to thevehicle 46 for thebattery 48 to be charged. In this example, theEV charger 50 has a wall mountedhousing 52 from which extends acable 54 leading to awireless transmission unit 56. Thewireless transmission unit 56 has two components; a fixedstation 58, and amovable station 60, which is mounted to thevehicle 46. When thevehicle 46 is parked, such that themoveable station 60 registers with the fixedstation 58, electrical energy is transferred by induction between the 58 and 60.stations - The electrical energy received by the
station 60 is conveyed to acontroller unit 62 which, in addition to its control functions also converts the AC electrical energy in DC form such that it can be supplied to thebattery 48. - In a more traditional form of implementation, not shown in the drawings, the power path to the
vehicle 46 includes a physical cable that is plugged in a receptacle on the vehicle's body. To charge the vehicle, the driver needs to plug the cable extending from the wall mountedhousing 52 in the receptacle. Once thevehicle 46 is charged, the cable is unplugged. The wall-mountedunit 52 receives electrical energy in AC form and converts it in DC form such that it is supplied in DC form over the cable. Accordingly, there is no need to perform any conversation from AC to DC at the vehicle. -
FIG. 5 is a block diagram illustrating in greater detail the structure of theEV charger 50 and also the controller in thevehicle 46 that regulates the battery charging process.FIG. 5 applies mostly to the latter embodiment where a physical power cable is connected to thevehicle 46 for charging it. However, it will be noted that the wireless variant works conceptually in a similar fashion. - The
EV charger 50 has acontroller 64 and apower electronics stage 66. Thecontroller 64 is a computer-based platform with a machine readable storage encoded with software for execution by one or more CPUs. The structure of the software determines the operation of thecontroller 64. - The
power electronics stage 66 performs rectification of the AC waveform into a DC. As discussed earlier, a full-wave rectifier arrangement can be used for this purpose. Thecontroller 64 sends control signals to thepower electronics stage 66 over asignal path 68, which can be wireless or wireline. The signals are used to convey commands to thepower electronics stage 66 such as to regulate the flow of electrical energy to thevehicle 46, notably by decreasing it in the event of an wider frequency condition in the network supplying theEV charger 50 with electrical energy. - The
vehicle 46 has anEV controller 70, which is connected to thebattery 48. TheEV controller 70 is also software based and one of its functions is to regulate the charging process of thebattery 48. To avoid rapid battery degradation, thebattery 48 needs to be charged at a controlled rate rate. If thebattery 48 is completely depleted an initial rapid charging rate is possible, however that rate needs to taper off when stage of charge of the battery increases, TheEV controller 70 thus senses the stage of charge (SOC) of the battery and determines the charging rate, in other words the rate at which electrical energy can be safely injected in the battery. - The
EV controller 70 communicates with theEV charger 50 such as to regulate the rate at which electrical energy is supplied by theEV charger 50. Such communication makes it possible to use theEV charger 50 with different electric vehicles that have different charging requirements. The communication process allows theEV charger 50 to adapt the charging rate to the specific charging requirements of the vehicle. - The communication can be performed over a physical signaling path, such as an electrical connector that is integrated into the charging plug, which connects to the vehicle. The signaling path is shown at 72 in
FIG. 5 . The integration of the signaling path into the plug makes it possible to close simultaneously both the power connections and the signaling connections once the plug is inserted in the receptacle on the vehicle. -
FIG. 5 shows the signaling path transiting through thepower electronics stage 66 to arrive at the chargingstation controller 64. This arrangement is used when the signaling path is integrated into the power cable. Otherwise, the signaling path may bypass thepower electronics stage 66. - A possible variant is to use a wireless communication arrangement, where the
EV controller 70 communicates with the chargingstation controller 64 by using any suitable wireless communication protocol. Wi-fi, bluetooth and cellular communication protocols are possible examples. -
FIG. 6 is a flowchart that illustrates the various steps of the process performed at theEV charger 50 during the charging process. - At
step 74, the chargingstation controller 64 receives signals from theEV controller 70 that convey to the chargingstation controller 64 charging rate information. It is assumed that the power connection cable including the signaling path is connected to the plug at the vehicle such that all the power connections and the signaling connections are established. In addition to the charging rate information, theEV controller 70 and the chargingstation controller 64 can exchange other information as well, such as when the charging process is to begin (when delayed charging is desired), identification about the vehicle fir billing/credit purposes, etc. - At
step 76, the chargingstation controller 64 triggers the current flow toward the vehicle at the desired charging rate. The charging rate can be determined on the basis of the intensity of the current or the voltage. The chargingstation controller 64 thus sends locally control signals to thepower electronics stage 66 such that it outputs the desired charging rate. Note thatstep 74 above is actually a repetitive step in the sense that theEV controller 70 constantly sends to the charging station controller 64 a target charging rate. The target charging rate changes during the charging process and it is based on factors such as the achieved degree of charge of the battery and its temperature, among others. Accordingly, step 76 constantly adjusts the charging rate based on the target charging rate received from theEV controller 70. - At
step 78 the chargingstation controller 64 measures the AC frequency of the AC power supply and atstep 80 determines if an under-frequency event occurs. The measurement of the frequency and the assessment of weather an under frequency condition exists in the power distribution network is performed in the same fashion as discussed in connection with the previous example and also as discussed in the PCT International Publication No. WO 2013/177689 A1. - If an under frequency condition exists, the
charger 50 responds by reducing the electrical consumption of the charger. This reduction can be made using one of the strategies discussed in connection with the inter-network DC link and also discussed in the PCT International Publication No. WO 2013/177689 A1. The reduction of the electrical consumption is shown atstep 82. - In a possible variant, even if an under-frequency condition is noted to exist, a reduction may not be worth making when the demanded rate of charge is low. In such ease, the
charger 50 is a minimal load on the network and reducing it further would not yield any substantial benefit in terms of lessening imbalance between power generation and load. Accordingly, it is possible to provide between 80 and 82 another conditional step that determines the current rate of charging and compares it to a threshold. If the rate of charging is low and below the threshold, no action is taken. A reduction of the charging rate occurs only if the current charging demand exceeds the threshold.steps - Assuming a reduction of the charging rate is desirable, the charging
station controller 64 proceeds to step 84 at which the chargingstation controller 64 sends signals to the EV controller to notify the EV controller that the demanded charging rate cannot be met. The purpose of this signal is to avoid theEV controller 70 to trigger a malfunction condition. Since theEV controller 70 is unaware of the reason for the charging rate reduction, it may interpret the reduction as a malfunction of thecharger 50 and in order to protect the vehicle it will take a protective action. The protective action may include interrupting the charging process and also logging an error code via the vehicle diagnostic system. - The downside of triggering a protective action is twofold. First, the charging process is aborted, such that when the under frequency condition subsides, the charging does not resume. The vehicle will only be partially charged, which is an inconvenience. Second, an error code will show on the vehicle dash, which is an annoyance since the owner may have to clear that may require a mechanic intervention.
- However, if the
EV controller 70 is made aware that the reduction in the charging rate is deliberate and temporary, it will not interpret it as a malfunction and will not trigger a protective action. - The way the
charger 50 and theEV controller 70 handle the charging rate reduction may vary. One possibility is for theEV controller 70 to continue accepting whatever charging rate thecharger 50 can offer. Another option is to temporarily terminate the charging process until the under frequency condition has subsided. In this instance, the charging process resumes at a later time. - Resuming the charging process can be done at a specified time; since under frequency events are usually of short duration, typically less than 30 minutes, the charging
station controller 64 and theEV controller 70 may trigger a timer at each end, programmed for a certain time delay, and once the timers expire, they attempt to re-establish the charging process. - Alternatively, the
EV controller 70 may be programmed to periodically send a signal to the chargingstation controller 64 to query the chargingstation controller 64 if it is ready to resume the charging process. While the under frequency condition is underway the chargingstation controller 64 denies the requests; only when the under frequency condition has passed it accepts the request and the charging process resumes. - Yet another option is for the charging
station controller 64 to initiate the charging process; it sends a signal to theEV controller 70 to notify the EV controller that it is ready to resume the charging process. -
FIG. 7 illustrates the steps of the process implemented at theEV controller 70. Some of those steps where described briefly above, however the following description will provide further details. - At
step 86, theEV controller 70 determines the charging rate required based on the SOC of the battery and/or other parameters. Atstep 88, theEV controller 70 sends signals to the chargingstation controller 64 to notify the charging station controller of the charging requirements. 86 and 88 correspond to a normal state of operation.Steps -
Step 90 is performed when an under frequency condition occurs. TheEV controller 70 receives the signals from the chargingstation controller 64 indicating that a temporary discrepancy occurs between the commanded charging rate and the rate being delivered. Atstep 92, in response to the signals atstep 90, theEV controller 70 refrains from triggering a malfunction condition and any associated protective action. - The reduction of the electrical energy consumption response may thus be made when various frequency deviation conditions are recognized in the power distribution network. One of those conditions is a deviation of the frequency from a nominal frequency, where what is being tracked is the difference between the nominal frequency and the instant frequency. Another condition could be the rate of deviation of the frequency, which represents the rate of kinetic energy dissipation in the power distribution network. Also, the frequency deviations could be negative (lowering of the frequency) or positive (over frequency). In an over frequency situation, the reverse response is produced, which is to increase the electrical consumption. In that scenario, the
charger 50 notifies theEV controller 70 of the event and of the desire to inject more electrical energy in the battery. If the EV controller accepts the additional energy intake, it sends an acknowledgment signal to thecharger 50 that may include also a limit as to how much the electrical energy injection rate can be increased, to avoid damaging the battery of the vehicle. - Certain additional elements that may be needed for operation of some embodiments have not been described or illustrated as they are assumed to be within the purview of those of ordinary skill in the art. Moreover, certain embodiments may be free of, may lack and/or may function without any element that is not specifically disclosed herein.
- Any feature of any embodiment discussed herein may be combined with any feature of any other embodiment discussed herein in some examples of implementation.
- Although various embodiments and examples have been presented, this was for the purpose of describing, but not limiting, the invention. Various modifications and enhancements will become apparent to those of ordinary skill in the art and are within the scope of the invention, which is defined by the appended claims.
Claims (26)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/548,803 US20180034275A1 (en) | 2015-02-04 | 2016-02-04 | Demand response implemented in an infrastructure having a dc link |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201562111807P | 2015-02-04 | 2015-02-04 | |
| US15/548,803 US20180034275A1 (en) | 2015-02-04 | 2016-02-04 | Demand response implemented in an infrastructure having a dc link |
| PCT/IB2016/050591 WO2016125107A1 (en) | 2015-02-04 | 2016-02-04 | Demand response implemented in an infrastructure having a dc link |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/IB2016/050591 A-371-Of-International WO2016125107A1 (en) | 2015-02-04 | 2016-02-04 | Demand response implemented in an infrastructure having a dc link |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US17/188,576 Continuation US11437819B2 (en) | 2015-02-04 | 2021-03-01 | Demand response implemented in an infrastructure having a DC link |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20180034275A1 true US20180034275A1 (en) | 2018-02-01 |
Family
ID=55527594
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US15/548,803 Abandoned US20180034275A1 (en) | 2015-02-04 | 2016-02-04 | Demand response implemented in an infrastructure having a dc link |
| US17/188,576 Active US11437819B2 (en) | 2015-02-04 | 2021-03-01 | Demand response implemented in an infrastructure having a DC link |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US17/188,576 Active US11437819B2 (en) | 2015-02-04 | 2021-03-01 | Demand response implemented in an infrastructure having a DC link |
Country Status (3)
| Country | Link |
|---|---|
| US (2) | US20180034275A1 (en) |
| CA (2) | CA3199383A1 (en) |
| WO (1) | WO2016125107A1 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109272353B (en) * | 2018-09-10 | 2020-06-26 | 华北电力大学 | System dynamic probability energy flow analysis method considering comprehensive demand response uncertainty |
| CN111290292B (en) * | 2020-02-17 | 2023-11-21 | 云南电网有限责任公司电力科学研究院 | Method, system and device for correcting load frequency factor of direct current locking |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4517634A (en) * | 1981-12-26 | 1985-05-14 | Tokyo Shibaura Denki Kabushiki Kaisha | Power conversion equipment |
| US6060860A (en) * | 1998-04-03 | 2000-05-09 | Fuji Electric Co., Ltd. | Control apparatus for variably controlling speed induction motor |
| US20100157634A1 (en) * | 2008-12-19 | 2010-06-24 | Dachuan Yu | Power inverter control for grid-tie transition |
| US20110245987A1 (en) * | 2010-04-06 | 2011-10-06 | Battelle Memorial Institute | Grid regulation services for energy storage devices based on grid frequency |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5527534B2 (en) * | 1973-03-12 | 1980-07-21 | ||
| SE407497B (en) * | 1977-08-19 | 1979-03-26 | Asea Ab | POETRY POWER TRANSFER |
| DE69920424T2 (en) * | 1999-07-01 | 2006-02-23 | Abb Ab | Method for controlling an active power flow in a high voltage direct current transmission system |
| GB2419043A (en) * | 2004-09-27 | 2006-04-12 | Areva T & D Uk Ltd | DC transmission system with variable current and voltage |
| DE102008041634A1 (en) * | 2008-08-28 | 2010-03-04 | Zf Friedrichshafen Ag | Zero position positioning for sensor |
| CA2908222A1 (en) * | 2012-03-28 | 2013-10-03 | Aerovironment, Inc. | Frequency responsive charging system and method |
| CA2925490C (en) | 2012-06-01 | 2020-04-14 | Bipco-Soft R3 Inc. | Power control device |
-
2016
- 2016-02-04 US US15/548,803 patent/US20180034275A1/en not_active Abandoned
- 2016-02-04 CA CA3199383A patent/CA3199383A1/en active Pending
- 2016-02-04 CA CA2975965A patent/CA2975965C/en active Active
- 2016-02-04 WO PCT/IB2016/050591 patent/WO2016125107A1/en not_active Ceased
-
2021
- 2021-03-01 US US17/188,576 patent/US11437819B2/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4517634A (en) * | 1981-12-26 | 1985-05-14 | Tokyo Shibaura Denki Kabushiki Kaisha | Power conversion equipment |
| US6060860A (en) * | 1998-04-03 | 2000-05-09 | Fuji Electric Co., Ltd. | Control apparatus for variably controlling speed induction motor |
| US20100157634A1 (en) * | 2008-12-19 | 2010-06-24 | Dachuan Yu | Power inverter control for grid-tie transition |
| US20110245987A1 (en) * | 2010-04-06 | 2011-10-06 | Battelle Memorial Institute | Grid regulation services for energy storage devices based on grid frequency |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2975965A1 (en) | 2016-08-11 |
| WO2016125107A1 (en) | 2016-08-11 |
| US11437819B2 (en) | 2022-09-06 |
| CA2975965C (en) | 2023-07-18 |
| US20220021212A1 (en) | 2022-01-20 |
| CA3199383A1 (en) | 2016-08-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102121543B1 (en) | Balance circuit, charging standby device and charging control method | |
| JP6236391B2 (en) | Device for balancing the amount of charge for power batteries | |
| KR101573919B1 (en) | Rapid reversible charging device for an electric vehicle | |
| US8896263B2 (en) | Critical mode control discontinuous mode boost-buck charger | |
| JP5681069B2 (en) | Multi-power conditioner system | |
| WO2012043249A1 (en) | Discharge system and electric vehicle | |
| JP5874268B2 (en) | Charging apparatus and charging method | |
| EP2693598A1 (en) | System and method for controlling the charging of batteries from an electric rail system | |
| US20150165917A1 (en) | Method, system and charger for charging a battery of an electric vehicle | |
| US11437819B2 (en) | Demand response implemented in an infrastructure having a DC link | |
| JP2022510390A (en) | Methods for optimizing management of fleet charging of electric vehicles | |
| EP2501012B1 (en) | Charging device, system, and method of supplying power to at least one load | |
| CN110203100A (en) | The method for managing the energy demand of the charging station of electric vehicle | |
| TW201736159A (en) | Hybrid power delivery with improved power control | |
| US20130264868A1 (en) | Power supply system for vehicle | |
| KR20180003049A (en) | Power charging station and power management method thereof | |
| US9093859B2 (en) | DC power system having a power architecture for optimizing efficiency and a system controller of the system | |
| EP3689667A1 (en) | Electrical vehicle charging station with power management | |
| US20210370793A1 (en) | Electric vehicle charging station | |
| KR102113270B1 (en) | Energy Management System for Railway station and Hydrogen Fuel Cell Hybrid Railway Vehicle | |
| EP2744065B1 (en) | Electric vehicle charging system and electric vehicle charging apparatus | |
| KR20180136177A (en) | An energy storage system | |
| CN104937827B (en) | Converter system and wind-force or hydro-electric power generating equipment | |
| JP5999576B2 (en) | Power supply system for houses, houses and electric vehicles | |
| US12103423B2 (en) | Resilient charging station |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| AS | Assignment |
Owner name: BIPCO-SOFT R3 INC., BARBADOS Free format text: NUNC PRO TUNC ASSIGNMENT;ASSIGNOR:NORMANDIN, IRENE;REEL/FRAME:053256/0020 Effective date: 20200713 Owner name: BIPCO-SOFT R3 INC., BARBADOS Free format text: NUNC PRO TUNC ASSIGNMENT;ASSIGNOR:TRUDEL, GILLES;REEL/FRAME:053255/0898 Effective date: 20190815 Owner name: BIPCO-SOFT R3 INC., BARBADOS Free format text: NUNC PRO TUNC ASSIGNMENT;ASSIGNOR:JASMIN, SIMON;REEL/FRAME:053256/0160 Effective date: 20190816 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |