US20160069707A1 - Remote access energy meter system and method - Google Patents
Remote access energy meter system and method Download PDFInfo
- Publication number
- US20160069707A1 US20160069707A1 US14/714,873 US201514714873A US2016069707A1 US 20160069707 A1 US20160069707 A1 US 20160069707A1 US 201514714873 A US201514714873 A US 201514714873A US 2016069707 A1 US2016069707 A1 US 2016069707A1
- Authority
- US
- United States
- Prior art keywords
- energy
- remote
- client module
- server
- meter system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 5
- 238000004519 manufacturing process Methods 0.000 claims abstract description 25
- 238000004891 communication Methods 0.000 claims abstract description 21
- 238000012544 monitoring process Methods 0.000 claims abstract description 14
- 230000005611 electricity Effects 0.000 claims description 14
- 238000003491 array Methods 0.000 claims description 6
- 230000001413 cellular effect Effects 0.000 claims description 5
- 230000008569 process Effects 0.000 claims description 2
- 238000009434 installation Methods 0.000 description 5
- 239000002803 fossil fuel Substances 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000003750 conditioning effect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D4/00—Tariff metering apparatus
- G01D4/002—Remote reading of utility meters
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D4/00—Tariff metering apparatus
- G01D4/002—Remote reading of utility meters
- G01D4/004—Remote reading of utility meters to a fixed location
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q9/00—Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q2209/00—Arrangements in telecontrol or telemetry systems
- H04Q2209/10—Arrangements in telecontrol or telemetry systems using a centralized architecture
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q2209/00—Arrangements in telecontrol or telemetry systems
- H04Q2209/40—Arrangements in telecontrol or telemetry systems using a wireless architecture
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/34—Smart metering supporting the carbon neutral operation of end-user applications in buildings
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/30—Smart metering, e.g. specially adapted for remote reading
Definitions
- the present invention relates to an energy monitoring system. More particularly, the present invention relates to a remote access energy monitoring system that remotely monitors energy production of an energy generating source.
- Energy generation systems are complex and costly to establish, operate, and maintain.
- a key component in the maintenance and operation of energy generation facilities is the accurate monitoring of the system's performance and health status. Accordingly, it is important to accurately and timely monitor and analyze key parameters of the energy generation facility's operating parameters. Such monitoring becomes increasingly vital in remotely located energy generation facilities.
- a remote energy meter system having a meter system server and a client module located remotely from the metering system server.
- the meter system server communicates with the client to recover energy production parameter values.
- the remote energy meter system preferably provides real-time and automated monitoring of, at least, energy production and system failure parameters.
- the present disclosure provides a remote energy meter system for detecting energy production parameters of an energy generation facility, comprising a client module operably connected the energy generation facility for collecting data representative of the energy production parameters, wherein the energy production parameters comprise system failure parameters for the energy generation facility, and wherein the client module is powered by a standard alternating current power source from the energy generation facility, a secondary energy source that provides secondary power to the client module, and a server located remotely from the client module, wherein the server communicates with the client module to recover the energy production parameters.
- the client module comprises a client remote interface that provides access to the client module from the server for monitoring the energy production parameters
- the server comprises a server remote interface for communicating with the client remote interface.
- the energy generation facility comprises a plurality of photovoltaic arrays that convert solar energy into electricity and generate direct current electricity.
- the server communicates with the client module via a communications link selected from the group consisting of a wireless link, a cellular link, a microwave link, and a satellite link.
- the remote energy meter system configures the communication between the server and the client module to occur only during a set period of time.
- FIG. 1 is an exemplary schematic diagram of the remote access energy meter system of the present invention.
- Remote access energy meter system 100 is also referred to herein as meter system.
- Meter system 100 includes, in general, a client module 5 and a meter server 10 .
- Client module 5 interfaces with and monitors a source of energy, such as an energy generation or production facility or installation. Various parameters related to the production of energy by the energy generation facility can be monitored by client module 5 .
- the energy source may vary.
- the energy source is an alternative energy source.
- the alternative energy sources can include solar, wind, geo-thermal, tidal, and other types of non-fossil fuel dependent energy generation facilities. It should be appreciated however that the particular type of energy source monitored by meter system 100 can vary.
- the energy source may be a conventional fossil fuel driven energy installation.
- meter server 10 that is located remotely, some distance apart from client module 5 . While alternative energy facilities may be located in sparsely populated areas or even dispersed over geographically large areas, any energy source can be monitored by remote meter system 100 .
- Client module 5 is preferably powered from the energy generation facility's standard AC service. Client module 5 may be non-functional during blackout and severe brownout conditions. If a power failure exceeds a predetermined period of time, for example two hours, then meter system 100 preferably automatically reports the failure to meter sever 10 upon resumption of net power.
- an uninterruptible power source or alternative power source 6 preferably including a backup power management system, can be used to provide an alternative or secondary power source for client module 5 .
- Client module 5 preferably provides real-time monitoring of operating parameters in order to detect, for example, system production, status, and failures.
- client 5 is shown monitoring a solar energy facility 1 .
- a number of photovoltaic (PV) arrays 15 , 20 , 25 are provided to directly convert solar energy (e.g., sunlight) into electricity.
- PV arrays 15 , 20 , and 25 generate DC electricity.
- AC current is monitored using, for example, external toroidal sensor coils (not shown). Energy totals are preferably registered and stored in a non-volatile memory in case of power failure.
- DC voltmeter 30 monitors the output voltage of the individual PV array strings 15 , 20 , 25 .
- Data processor 60 monitors the AC and DC inputs to the client module 5 in order to detect system failure and status.
- Client module 5 preferably detects and reports, at least, PV array string failures and power inverter failures to sever 10 .
- the DC electricity is converted to AC electricity by one of a number of inverters 35 .
- DC electricity is an input to inverter 35 and AC electricity is an output of inverter 35 .
- AC meter 55 accepts current and voltage data from the AC output of each inverter 35 .
- the output of inverter 35 includes a phase A 40 , phase B 45 , and a ground potential 50 .
- the output of the inverter is monitored by an AC meter 55 .
- AC meter 55 accepts current and voltage data from the AC output of each inverter 35 .
- AC meter 55 preferably measures various parameters of AC electricity output by inverter 35 .
- AC meter 55 measures the currents and voltages of the AC electricity output by inverter 35 . It should be appreciated that additional characteristic parameters of the AC energy can be monitored and measured by AC meter 55 .
- Client module 5 further includes a data processor 50 for processing the data measured by DC voltmeter 30 and AC multifunction meter 55 .
- the processes can include formatting, reading, storing, and determining various relationships between the measured parameters and/or relative to desired or preset values for the parameters.
- Remote interface 65 provides access to client module 5 from the server for monitoring energy produced. Remote interface 65 can be used by client module 5 to report system failure to meter server 10 . Remote interface 65 provides a communication gateway for communicating data processed by data processor 60 to remotely located meter server 10 . Remote interface 65 may perform numerous functions, including converting data from data processor 60 into a format suitable for transmitting to server 10 . The output of remote interface 65 is preferably in a condition for transmission over communication link 75 without the need of further signal conditioning by communications link 75 .
- communication link 75 is preferably a wireless communication system such as a cellular link, microwave link, a satellite communication link and any combinations including these and other wireless communication links. It should be appreciated that at least a portion of communication link 75 may not be wireless since, for example, cellular and satellite communication links may interface with terrestrial communication systems such as a PSTN that includes non-wireless communication links.
- Meter server 10 is an automated data retrieval system.
- Meter server 10 includes, generally, a remote interface 80 that provides a communication gateway for communicating data received over communications link 75 .
- Remote interface 80 may perform numerous functions, including converting data from communications link 75 into a format suitable for being received and processed by meter system server 85 .
- Meter system server 85 preferably maintains a database of meter system 100 client data. The processing can be done via a microprocessor.
- a primary client identification is the remote energy generation facility's access number.
- the primary client identification can be the eleven digit phone number.
- the primary client identification can be a twelve digit fixed system IP address.
- Meter server 10 can regularly and automatically access the remote client module(s) 5 to recover and record current energy totals. Current energy totals can be compared to previously retrieved data to calculate energy production.
- Client access can be configured to occur daily, weekly, monthly or any other customized time period. Automated remote access can be scheduled to occur, for example, between 11:00 AM and 1:00 PM at the remote site.
- Remote client module(s) 5 can be non-functional during blackout and severe brownout conditions.
- meter server 10 fails to connect to a client module 5 then site access is rescheduled, as an example, for the following day.
- an error report is transmitted (e.g., by email) a system administrator of meter system 100 .
- meter system 100 assumes a utility power failure or brownout and logs the event.
- Sites suspected or known to have frequent power failures can be flagged for more frequent contact. If the problem persists the site history logs can be used to document the utility failures to the power authority responsible for the client's site.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Power Engineering (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Selective Calling Equipment (AREA)
Abstract
A remote energy meter system and method is provided having a meter server and a client module located remotely from the meter server. The meter server communicates with the client via a wireless communications link to recover energy production parameter values. The remote energy meter system preferably provides real-time and automated monitoring of, at least, energy production and system failure parameters.
Description
- The present application is a continuation of U.S. patent application Ser. No. 12/070925, filed on Feb. 22, 2008, which is in turn a continuation of U.S. patent application Ser. No. 11/177,035 filed on Jul. 8, 2005, now U.S. Pat. No. 7,336,201, which claims priority of U.S. Provisional Patent Application No. 60/586,993 filed on Jul. 9, 2004. The aforementioned applications are hereby incorporated herein by reference in their entirety.
- 1. Field of the Invention
- The present invention relates to an energy monitoring system. More particularly, the present invention relates to a remote access energy monitoring system that remotely monitors energy production of an energy generating source.
- 2. Description of the Related Art
- Energy generation systems are complex and costly to establish, operate, and maintain. A key component in the maintenance and operation of energy generation facilities is the accurate monitoring of the system's performance and health status. Accordingly, it is important to accurately and timely monitor and analyze key parameters of the energy generation facility's operating parameters. Such monitoring becomes increasingly vital in remotely located energy generation facilities.
- Thus, there exists a need to provide an efficient and reliable system and method of remotely accessing and monitoring energy generation installations.
- It is an object of the present invention to provide a remote access energy meter system that provides remote monitoring of an energy generation facility.
- It is another object of the present invention to provide such a remote access energy meter system that provides real-time monitoring of the energy generation facility.
- It is still another object of the present invention to provide such a remote access energy meter system that can automatically monitor a number of energy production parameters of the energy generation facility.
- It is yet another object of the present invention to provide such a remote access energy meter system that facilitates detection of energy production parameters indicative of system failure and/or system degradation.
- These and other objects and advantages of the present invention are achieved by a remote energy meter system having a meter system server and a client module located remotely from the metering system server. The meter system server communicates with the client to recover energy production parameter values. The remote energy meter system preferably provides real-time and automated monitoring of, at least, energy production and system failure parameters.
- In another embodiment, the present disclosure provides a remote energy meter system for detecting energy production parameters of an energy generation facility, comprising a client module operably connected the energy generation facility for collecting data representative of the energy production parameters, wherein the energy production parameters comprise system failure parameters for the energy generation facility, and wherein the client module is powered by a standard alternating current power source from the energy generation facility, a secondary energy source that provides secondary power to the client module, and a server located remotely from the client module, wherein the server communicates with the client module to recover the energy production parameters. The client module comprises a client remote interface that provides access to the client module from the server for monitoring the energy production parameters, and the server comprises a server remote interface for communicating with the client remote interface. The energy generation facility comprises a plurality of photovoltaic arrays that convert solar energy into electricity and generate direct current electricity. The server communicates with the client module via a communications link selected from the group consisting of a wireless link, a cellular link, a microwave link, and a satellite link. The remote energy meter system configures the communication between the server and the client module to occur only during a set period of time.
-
FIG. 1 is an exemplary schematic diagram of the remote access energy meter system of the present invention. - Referring to
FIG. 1 , there is shown a remote access energy meter system generally represented byreference numeral 100. Remote accessenergy meter system 100 is also referred to herein as meter system. -
Meter system 100 includes, in general, aclient module 5 and ameter server 10.Client module 5 interfaces with and monitors a source of energy, such as an energy generation or production facility or installation. Various parameters related to the production of energy by the energy generation facility can be monitored byclient module 5. - The energy source may vary. In one aspect of the present invention, the energy source is an alternative energy source. The alternative energy sources can include solar, wind, geo-thermal, tidal, and other types of non-fossil fuel dependent energy generation facilities. It should be appreciated however that the particular type of energy source monitored by
meter system 100 can vary. The energy source may be a conventional fossil fuel driven energy installation. - Notwithstanding the particular energy source being monitored by
meter system 100, data received byclient 5 can be communicated tometer server 10 that is located remotely, some distance apart fromclient module 5. While alternative energy facilities may be located in sparsely populated areas or even dispersed over geographically large areas, any energy source can be monitored byremote meter system 100. -
Client module 5 is preferably powered from the energy generation facility's standard AC service.Client module 5 may be non-functional during blackout and severe brownout conditions. If a power failure exceeds a predetermined period of time, for example two hours, thenmeter system 100 preferably automatically reports the failure to metersever 10 upon resumption of net power. In certain embodiments hereof, an uninterruptible power source oralternative power source 6, preferably including a backup power management system, can be used to provide an alternative or secondary power source forclient module 5. -
Client module 5 preferably provides real-time monitoring of operating parameters in order to detect, for example, system production, status, and failures. Referring toFIG. 1 ,client 5 is shown monitoring asolar energy facility 1. A number of photovoltaic (PV)arrays PV arrays DC voltmeter 30 monitors the output voltage of the individualPV array strings Data processor 60 monitors the AC and DC inputs to theclient module 5 in order to detect system failure and status.Client module 5 preferably detects and reports, at least, PV array string failures and power inverter failures to sever 10. - The DC electricity is converted to AC electricity by one of a number of
inverters 35. DC electricity is an input to inverter 35 and AC electricity is an output ofinverter 35.AC meter 55 accepts current and voltage data from the AC output of eachinverter 35. - The output of
inverter 35 includes aphase A 40,phase B 45, and aground potential 50. The output of the inverter is monitored by anAC meter 55.AC meter 55 accepts current and voltage data from the AC output of eachinverter 35.AC meter 55 preferably measures various parameters of AC electricity output byinverter 35. For example,AC meter 55 measures the currents and voltages of the AC electricity output byinverter 35. It should be appreciated that additional characteristic parameters of the AC energy can be monitored and measured byAC meter 55. -
Client module 5 further includes adata processor 50 for processing the data measured byDC voltmeter 30 and AC multifunctionmeter 55. The processes can include formatting, reading, storing, and determining various relationships between the measured parameters and/or relative to desired or preset values for the parameters. -
Remote interface 65 provides access toclient module 5 from the server for monitoring energy produced.Remote interface 65 can be used byclient module 5 to report system failure tometer server 10.Remote interface 65 provides a communication gateway for communicating data processed bydata processor 60 to remotely locatedmeter server 10.Remote interface 65 may perform numerous functions, including converting data fromdata processor 60 into a format suitable for transmitting toserver 10. The output ofremote interface 65 is preferably in a condition for transmission overcommunication link 75 without the need of further signal conditioning by communications link 75. - In some embodiments hereof,
communication link 75 is preferably a wireless communication system such as a cellular link, microwave link, a satellite communication link and any combinations including these and other wireless communication links. It should be appreciated that at least a portion ofcommunication link 75 may not be wireless since, for example, cellular and satellite communication links may interface with terrestrial communication systems such as a PSTN that includes non-wireless communication links. -
Meter server 10 is an automated data retrieval system.Meter server 10 includes, generally, aremote interface 80 that provides a communication gateway for communicating data received over communications link 75.Remote interface 80 may perform numerous functions, including converting data from communications link 75 into a format suitable for being received and processed bymeter system server 85.Meter system server 85 preferably maintains a database ofmeter system 100 client data. The processing can be done via a microprocessor. - In an embodiment hereof, a primary client identification is the remote energy generation facility's access number. For an installation using a dedicated telephone line or cellular modern, the primary client identification can be the eleven digit phone number. For installations using LAN or WiFi, the primary client identification can be a twelve digit fixed system IP address.
Meter server 10 can regularly and automatically access the remote client module(s) 5 to recover and record current energy totals. Current energy totals can be compared to previously retrieved data to calculate energy production. - Client access can be configured to occur daily, weekly, monthly or any other customized time period. Automated remote access can be scheduled to occur, for example, between 11:00 AM and 1:00 PM at the remote site. Remote client module(s) 5 can be non-functional during blackout and severe brownout conditions. In the
instance meter server 10 fails to connect to aclient module 5 then site access is rescheduled, as an example, for the following day. In the event a second no connect condition occurs then an error report is transmitted (e.g., by email) a system administrator ofmeter system 100. In the instance subsequent contact is successful thenmeter system 100 assumes a utility power failure or brownout and logs the event. - Sites suspected or known to have frequent power failures can be flagged for more frequent contact. If the problem persists the site history logs can be used to document the utility failures to the power authority responsible for the client's site.
- While the instant disclosure has been described with reference to one or more exemplary embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the scope thereof. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the disclosure without departing from the scope thereof. Therefore, it is intended that the disclosure not be limited to the particular embodiment(s) disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope of the appended claims.
Claims (13)
1. A remote energy meter system for detecting energy production parameters of an energy generation facility, comprising:
a client module operably connected the energy generation facility for collecting data representative of the energy production parameters, wherein the energy production parameters comprise system failure parameters for the energy generation facility, and wherein said client module is powered by a standard alternating current power source from the energy generation facility;
a secondary energy source that provides secondary power to the client module; and
a server located remotely from the client module, wherein the server communicates with the client module to recover the energy production parameters,
wherein said client module comprises a client remote interface that provides access to said client module from the server for monitoring the energy production parameters, and said server comprises a server remote interface for communicating with the client remote interface,
wherein the energy generation facility comprises a plurality of photovoltaic arrays that convert solar energy into electricity and generate direct current electricity,
wherein the server communicates with the client module via a communications link selected from the group consisting of a wireless link, a cellular link, a microwave link, and a satellite link, and
wherein the remote energy meter system configures said communication between said server and said client module to occur only during a set period of time.
2. The remote energy meter system of claim 1 , wherein the client module monitors said energy production parameters in real-time, and transmits said real-time energy production parameters to the server.
3. The remote energy meter system of claim 2 , wherein said real-time energy productions parameters further comprise parameters selected from the group consisting of system production, system status, and a combination thereof.
4. The remote energy meter system of claim 1 , wherein the DC electricity is converted to an AC output by one or more inverters.
5. The remote energy meter system of claim 4 , wherein the AC output is comprised of a current and a voltage.
6. The remote energy meter system of claim 4 , further comprising an AC meter that measures the AC output from the one or more inverters.
7. The remote energy meter system of claim 6 , further comprising a DC voltmeter that measures the DC electricity generated by the photovoltaic arrays.
8. The remote energy meter system of claim 7 , wherein the client module further comprises a data processor that processes data measured by the DC voltmeter and the AC meter.
9. The remote energy meter system of claim 1 , wherein said set period of time is a daily set period of time.
10. The remote energy meter system of claim 1 , wherein said system failure parameters comprise string failures for said plurality of photovoltaic arrays.
11. The remote energy meter system of claim 4 , wherein said system failure parameters comprise power failures for said one or more inverters.
12. The remote energy system of claim 1 , wherein said server comprises a remote interface that communicates with client module via said communications link.
13. The remote energy system of claim 12 , wherein said remote interface converts data received via said communications link into a format suitable for being received and processed by said server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/714,873 US20160069707A1 (en) | 2004-07-09 | 2015-05-18 | Remote access energy meter system and method |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US58699304P | 2004-07-09 | 2004-07-09 | |
US11/177,035 US7336201B2 (en) | 2004-07-09 | 2005-07-08 | Remote access energy meter system and method |
US12/070,925 US20080143554A1 (en) | 2004-07-09 | 2008-02-22 | Remote access energy meter system and method |
US14/714,873 US20160069707A1 (en) | 2004-07-09 | 2015-05-18 | Remote access energy meter system and method |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/070,925 Continuation US20080143554A1 (en) | 2004-07-09 | 2008-02-22 | Remote access energy meter system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
US20160069707A1 true US20160069707A1 (en) | 2016-03-10 |
Family
ID=35785771
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/177,035 Expired - Fee Related US7336201B2 (en) | 2004-07-09 | 2005-07-08 | Remote access energy meter system and method |
US12/070,925 Abandoned US20080143554A1 (en) | 2004-07-09 | 2008-02-22 | Remote access energy meter system and method |
US14/714,873 Abandoned US20160069707A1 (en) | 2004-07-09 | 2015-05-18 | Remote access energy meter system and method |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/177,035 Expired - Fee Related US7336201B2 (en) | 2004-07-09 | 2005-07-08 | Remote access energy meter system and method |
US12/070,925 Abandoned US20080143554A1 (en) | 2004-07-09 | 2008-02-22 | Remote access energy meter system and method |
Country Status (6)
Country | Link |
---|---|
US (3) | US7336201B2 (en) |
EP (1) | EP1774487B1 (en) |
CN (1) | CN101014986B (en) |
CA (1) | CA2573365C (en) |
HK (1) | HK1110679A1 (en) |
WO (1) | WO2006010060A2 (en) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8588830B2 (en) * | 2007-02-02 | 2013-11-19 | Inovus Solar, Inc | Wireless autonomous solar-powered outdoor lighting and energy and information management network |
US8587949B2 (en) * | 2007-03-27 | 2013-11-19 | Electro Industries/Gauge Tech | Electronic meter having user-interface and central processing functionality on a single printed circuit board |
US8249902B2 (en) * | 2008-02-29 | 2012-08-21 | Solarcity Corporation | Methods of processing information in solar energy system |
US7904382B2 (en) * | 2008-03-11 | 2011-03-08 | Solarcity Corporation | Methods for financing renewable energy systems |
US7925552B2 (en) * | 2008-03-13 | 2011-04-12 | Solarcity Corporation | Renewable energy system monitor |
US20090234685A1 (en) * | 2008-03-13 | 2009-09-17 | Ben Tarbell | Renewable energy system maintenance business model |
US20100010939A1 (en) * | 2008-07-12 | 2010-01-14 | David Arfin | Renewable energy system business tuning |
US20100057480A1 (en) * | 2008-08-27 | 2010-03-04 | David Arfin | Energy Services |
US20100057544A1 (en) * | 2008-09-03 | 2010-03-04 | Ben Tarbell | Renewable energy employee and employer group discounting |
CA2740238A1 (en) * | 2008-10-16 | 2010-04-22 | Enphase Energy, Inc. | Method and apparatus for determining an operating voltage for preventing photovoltaic cell reverse breakdown during power conversion |
US8676390B2 (en) * | 2009-02-25 | 2014-03-18 | Robert Joseph Berry, JR. | Universal remote machinery controller and monitor |
WO2011088028A1 (en) * | 2010-01-12 | 2011-07-21 | Sunreports, Inc. | Monitoring interface device and method |
US20120232915A1 (en) * | 2011-03-11 | 2012-09-13 | Seth Bromberger | System and method for monitoring a utility meter network |
US11143680B2 (en) | 2012-12-28 | 2021-10-12 | Locus Energy, Inc. | Estimation of energy losses due to partial equipment failure for photovoltaic systems from measured and modeled inputs |
US10962576B2 (en) | 2012-12-28 | 2021-03-30 | Locus Energy, Inc. | Estimation of shading losses for photovoltaic systems from measured and modeled inputs |
US10956629B2 (en) | 2012-12-28 | 2021-03-23 | Locus Energy, Inc. | Estimation of soiling losses for photovoltaic systems from measured and modeled inputs |
EP2985731A1 (en) * | 2014-08-11 | 2016-02-17 | Siemens Aktiengesellschaft | Method, assembly, use of the method and computer program product for an evaluation of energy technology data |
CN206283425U (en) * | 2015-12-17 | 2017-06-27 | Abb瑞士股份有限公司 | Inverter and renewable energy power generation facility |
DE102016113214A1 (en) * | 2016-07-18 | 2018-01-18 | Prominent Gmbh | Dosing device with communication interface |
US10508987B2 (en) | 2016-09-12 | 2019-12-17 | Also Energy, Inc. | System and method for remote calibration of irradiance sensors of a solar photovoltaic system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6111767A (en) * | 1998-06-22 | 2000-08-29 | Heliotronics, Inc. | Inverter integrated instrumentation having a current-voltage curve tracer |
US6240337B1 (en) * | 1998-04-02 | 2001-05-29 | Bell Atlantic Network Services, Inc. | Flywheel reserve power for outside plant of a communication network |
US6650249B2 (en) * | 1998-05-01 | 2003-11-18 | Elster Electricity, Llc | Wireless area network communications module for utility meters |
US20030218549A1 (en) * | 2002-04-26 | 2003-11-27 | Oleg Logvinov | Powerline communications system for providing multiple services to isolated power generating plants |
US20040122833A1 (en) * | 2001-02-23 | 2004-06-24 | Forth J. Bradford | Intelligent electronic device having network access |
Family Cites Families (37)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3697953A (en) | 1970-12-28 | 1972-10-10 | Honeywell Inc | System for monitoring abnormal system operations in a system having a central station and a plurality of remote stations |
US4155252A (en) | 1978-01-11 | 1979-05-22 | Morrill Ralph A | Wind energy metering and recording systems |
US4400783A (en) | 1980-09-05 | 1983-08-23 | Westinghouse Electric Corp. | Event-logging system |
US4783748A (en) | 1983-12-09 | 1988-11-08 | Quadlogic Controls Corporation | Method and apparatus for remote measurement |
US4649287A (en) * | 1984-07-31 | 1987-03-10 | The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration | Bidirectional control system for energy flow in solar powered flywheel |
JPH0637853B2 (en) * | 1989-09-29 | 1994-05-18 | いすゞ自動車株式会社 | Controller for turbocharger with rotating electric machine |
US5301122A (en) | 1992-02-12 | 1994-04-05 | Measuring And Monitoring, Inc. | Measuring and monitoring system |
US6671663B1 (en) * | 1997-06-30 | 2003-12-30 | Texas Instruments Incorporated | Time domain noise analysis |
IES970641A2 (en) | 1997-08-28 | 1999-02-24 | Electricity Supply Board | Fault detection apparatus and method of detecting faults in an electrical distribution network |
JP2000068537A (en) * | 1998-06-12 | 2000-03-03 | Canon Inc | Solar cell module, string, system and management method |
JP3533090B2 (en) * | 1998-06-30 | 2004-05-31 | 松下電工株式会社 | Solar power system |
US6954701B2 (en) | 1998-12-17 | 2005-10-11 | Watereye, Inc. | Method for remote monitoring of water treatment systems |
US20040095237A1 (en) | 1999-01-09 | 2004-05-20 | Chen Kimball C. | Electronic message delivery system utilizable in the monitoring and control of remote equipment and method of same |
US7206646B2 (en) * | 1999-02-22 | 2007-04-17 | Fisher-Rosemount Systems, Inc. | Method and apparatus for performing a function in a plant using process performance monitoring with process equipment monitoring and control |
US6714000B2 (en) | 1999-06-14 | 2004-03-30 | Genscape, Inc. | Method for monitoring power and current flow |
DE10007680A1 (en) | 2000-02-19 | 2001-08-30 | Hoerner Jens | Method for remote monitoring of devices and systems and computer unit for this |
JP2001326375A (en) | 2000-03-10 | 2001-11-22 | Sanyo Electric Co Ltd | Method and apparatus for diagnosis of solar light power generation system |
US6556956B1 (en) | 2000-06-30 | 2003-04-29 | General Electric Company | Data acquisition unit for remote monitoring system and method for remote monitoring |
DE10033691A1 (en) * | 2000-07-11 | 2002-01-24 | Alstom Power Nv | Condenser neck used to feed steam from steam turbine to condenser has two level cover plates and two side walls that widen in flow direction of steam and have favorable shape with respect to flow technology |
JP3689767B2 (en) | 2000-09-22 | 2005-08-31 | 株式会社日立製作所 | Thermal power plant maintenance service provision method |
US6940421B2 (en) | 2000-12-05 | 2005-09-06 | Becs Technology | Method and apparatus for efficient use of communication channels for remote telemetry |
JP2002236626A (en) | 2000-12-06 | 2002-08-23 | Site Rock Corp | Method and system for monitoring site |
CN2501941Y (en) * | 2001-01-02 | 2002-07-24 | 上海交大国飞绿色能源有限公司 | Intelligent solar energy roof |
US20020095269A1 (en) | 2001-01-17 | 2002-07-18 | Francesco Natalini | System for monitoring and servicing appliances |
US7133807B2 (en) | 2001-01-22 | 2006-11-07 | Tokyo Electron Limited | Apparatus productivity improving system and its method |
US6671635B1 (en) | 2001-02-23 | 2003-12-30 | Power Measurement Ltd. | Systems for improved monitoring accuracy of intelligent electronic devices |
US6766279B2 (en) | 2001-03-01 | 2004-07-20 | Parkinelmer Instruments Llc | System for remote monitoring and control of an instrument |
JP4160399B2 (en) | 2001-03-01 | 2008-10-01 | フィッシャー−ローズマウント システムズ, インコーポレイテッド | Creating and displaying indicators in the process plant |
US6542856B2 (en) * | 2001-06-15 | 2003-04-01 | General Electric Company | System and method for monitoring gas turbine plants |
US7126294B2 (en) * | 2002-01-31 | 2006-10-24 | Ebara Corporation | Method and device for controlling photovoltaic inverter, and feed water device |
US6671633B2 (en) | 2002-05-13 | 2003-12-30 | Entek Ird International Corporation | Modular monitoring and protection system with automatic device programming |
US6898557B2 (en) | 2002-05-17 | 2005-05-24 | Hewlett-Packard Development Company, Lp. | System and method for remote testing of components |
US6845336B2 (en) | 2002-06-25 | 2005-01-18 | Prasad S. Kodukula | Water treatment monitoring system |
US6788214B2 (en) | 2002-08-05 | 2004-09-07 | Michael Lelecas | Power outage alert electronic device |
CN1397776A (en) * | 2002-09-05 | 2003-02-19 | 新疆新能源股份有限公司 | Remote control system for solar heat collecting engineering |
JP4095449B2 (en) | 2003-01-10 | 2008-06-04 | キヤノン株式会社 | Monitoring device, monitoring method, and program |
US7227278B2 (en) * | 2004-01-21 | 2007-06-05 | Nextek Power Systems Inc. | Multiple bi-directional input/output power control system |
-
2005
- 2005-07-08 EP EP05772363.7A patent/EP1774487B1/en not_active Not-in-force
- 2005-07-08 WO PCT/US2005/024382 patent/WO2006010060A2/en active Application Filing
- 2005-07-08 CN CN2005800231490A patent/CN101014986B/en not_active Expired - Fee Related
- 2005-07-08 US US11/177,035 patent/US7336201B2/en not_active Expired - Fee Related
- 2005-07-08 CA CA2573365A patent/CA2573365C/en not_active Expired - Fee Related
-
2008
- 2008-02-01 HK HK08101279.2A patent/HK1110679A1/en not_active IP Right Cessation
- 2008-02-22 US US12/070,925 patent/US20080143554A1/en not_active Abandoned
-
2015
- 2015-05-18 US US14/714,873 patent/US20160069707A1/en not_active Abandoned
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6240337B1 (en) * | 1998-04-02 | 2001-05-29 | Bell Atlantic Network Services, Inc. | Flywheel reserve power for outside plant of a communication network |
US6650249B2 (en) * | 1998-05-01 | 2003-11-18 | Elster Electricity, Llc | Wireless area network communications module for utility meters |
US6111767A (en) * | 1998-06-22 | 2000-08-29 | Heliotronics, Inc. | Inverter integrated instrumentation having a current-voltage curve tracer |
US20040122833A1 (en) * | 2001-02-23 | 2004-06-24 | Forth J. Bradford | Intelligent electronic device having network access |
US20030218549A1 (en) * | 2002-04-26 | 2003-11-27 | Oleg Logvinov | Powerline communications system for providing multiple services to isolated power generating plants |
Also Published As
Publication number | Publication date |
---|---|
HK1110679A1 (en) | 2008-07-18 |
CA2573365C (en) | 2016-05-24 |
EP1774487A2 (en) | 2007-04-18 |
US20060028354A1 (en) | 2006-02-09 |
WO2006010060A2 (en) | 2006-01-26 |
US7336201B2 (en) | 2008-02-26 |
WO2006010060A9 (en) | 2006-03-16 |
WO2006010060A3 (en) | 2007-03-08 |
CN101014986B (en) | 2010-08-18 |
EP1774487B1 (en) | 2016-03-16 |
CN101014986A (en) | 2007-08-08 |
EP1774487A4 (en) | 2012-10-10 |
US20080143554A1 (en) | 2008-06-19 |
CA2573365A1 (en) | 2006-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20160069707A1 (en) | Remote access energy meter system and method | |
AU2013257529B2 (en) | Monitoring system | |
CN108011584B (en) | Photovoltaic cell on-line monitoring and intelligent management system | |
US7283916B2 (en) | Distributed utility monitoring, such as for monitoring the quality or existence of a electrical, gas, or water utility | |
US8471408B2 (en) | Photovoltaic array systems, methods, and devices with bidirectional converter | |
KR200402282Y1 (en) | Monitering apparatus of solar photo condensing array | |
KR102077530B1 (en) | Intelligent fault diagnosis apparatus of photovoltaic module | |
JPH11206038A (en) | Network system connected to solar power generation system | |
KR101803919B1 (en) | Appratus and method for monitoring energy | |
KR200457335Y1 (en) | Smart solar power system | |
CN101917137A (en) | Network monitor and management platform of solar photovoltaic generation system | |
KR102137775B1 (en) | Data Monitoring & Deciding Apparatus for Photovoltaic Data with Remote Function and Photovoltaic Data Monitoring System using It | |
US6671636B2 (en) | Apparatus, method and article of manufacture for utility monitoring | |
JP2004138293A (en) | Abnormality monitoring method, monitoring device, and abnormality monitoring system | |
KR20240132136A (en) | Intelligent integrated control system for real time detection and predictive control of renewable energy | |
KR20220051514A (en) | Solar photovoltaic power station monitoring method | |
KR102068014B1 (en) | Monitoring system for communicating different type of channels | |
KR101000734B1 (en) | A device that detects shadows and failures on photovoltaic cell lines / modules / groups and monitors the status of photovoltaic power generation | |
JPWO2013105628A1 (en) | Solar power system | |
JP5461722B1 (en) | Method and information processing apparatus for diagnosing soundness of photovoltaic power generation apparatus | |
US11770644B2 (en) | Modular data concentrator device for public utility metering systems and method for gathering and managing information | |
JP2013157409A (en) | Photovoltaic power generation system | |
KR102521644B1 (en) | Solar photovoltaic power station monitoring system | |
JP2014052325A (en) | Photovoltaic power generation system | |
KR20120131706A (en) | Smart solar power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: CARBON 612 CORPORATION, NEW YORK Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:GREEN, EZRA;DOCKWEILER, ROBERT;O'CONNOR, WILLIAM;REEL/FRAME:037141/0351 Effective date: 20151125 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |