US20160045268A1 - Surgical plan options for robotic machining - Google Patents
Surgical plan options for robotic machining Download PDFInfo
- Publication number
- US20160045268A1 US20160045268A1 US14/461,002 US201414461002A US2016045268A1 US 20160045268 A1 US20160045268 A1 US 20160045268A1 US 201414461002 A US201414461002 A US 201414461002A US 2016045268 A1 US2016045268 A1 US 2016045268A1
- Authority
- US
- United States
- Prior art keywords
- bone
- guide
- hole
- surgery
- robotically controlled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- A61B19/2203—
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B17/00—Surgical instruments, devices or methods
- A61B17/14—Surgical saws
- A61B17/15—Guides therefor
- A61B17/154—Guides therefor for preparing bone for knee prosthesis
- A61B17/155—Cutting femur
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B17/00—Surgical instruments, devices or methods
- A61B17/32—Surgical cutting instruments
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B17/00—Surgical instruments, devices or methods
- A61B17/14—Surgical saws
- A61B17/15—Guides therefor
- A61B17/154—Guides therefor for preparing bone for knee prosthesis
- A61B17/157—Cutting tibia
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B17/00—Surgical instruments, devices or methods
- A61B17/16—Instruments for performing osteoclasis; Drills or chisels for bones; Trepans
- A61B17/1662—Instruments for performing osteoclasis; Drills or chisels for bones; Trepans for particular parts of the body
- A61B17/1675—Instruments for performing osteoclasis; Drills or chisels for bones; Trepans for particular parts of the body for the knee
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B34/00—Computer-aided surgery; Manipulators or robots specially adapted for use in surgery
- A61B34/30—Surgical robots
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B17/00—Surgical instruments, devices or methods
- A61B17/16—Instruments for performing osteoclasis; Drills or chisels for bones; Trepans
- A61B17/17—Guides or aligning means for drills, mills, pins or wires
- A61B17/1739—Guides or aligning means for drills, mills, pins or wires specially adapted for particular parts of the body
- A61B17/1764—Guides or aligning means for drills, mills, pins or wires specially adapted for particular parts of the body for the knee
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B17/00—Surgical instruments, devices or methods
- A61B17/32—Surgical cutting instruments
- A61B2017/320052—Guides for cutting instruments
-
- A61B2019/2207—
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61B—DIAGNOSIS; SURGERY; IDENTIFICATION
- A61B90/00—Instruments, implements or accessories specially adapted for surgery or diagnosis and not covered by any of the groups A61B1/00 - A61B50/00, e.g. for luxation treatment or for protecting wound edges
- A61B90/10—Instruments, implements or accessories specially adapted for surgery or diagnosis and not covered by any of the groups A61B1/00 - A61B50/00, e.g. for luxation treatment or for protecting wound edges for stereotaxic surgery, e.g. frame-based stereotaxis
- A61B90/11—Instruments, implements or accessories specially adapted for surgery or diagnosis and not covered by any of the groups A61B1/00 - A61B50/00, e.g. for luxation treatment or for protecting wound edges for stereotaxic surgery, e.g. frame-based stereotaxis with guides for needles or instruments, e.g. arcuate slides or ball joints
Definitions
- the present invention relates to surgical options for navigated and/or robotic bone machining and in particular relates to having the option of completing joint arthroplasty procedures with conventional instruments following the use of navigated and/or robot based applications.
- a traditional joint arthroplasty procedure such as a total knee arthroplasty (“TKA”) surgery
- diseased bone and/or cartilage of a patient is generally removed and replaced with a prosthetic implant.
- a surgeon may resect the bone using a hand-held oscillating saw blade which results in a series of planar bone surfaces.
- the surgeon may use a drill, broach or tamp instrument to make cylindrical holes into the bone in order to accommodate fixation features on the implant.
- the planar bone surfaces and cylindrical bone holes are generally oriented to interface with flat surfaces and pegs or keels of a prosthetic implant.
- the cartilage and/or bone of a patient may be prepared by a surgeon using conventional manual instrumentation.
- the instrumentation used may include, for example, planar resection guides, oscillating saws, drills, chisels, punches and reamers.
- Robotic surgery may also be used in arthroplasty procedures, as well as in many different medical applications.
- the use of robotically controlled bone preparation systems allows for preoperatively planned bone preparation to be carried out with increased accuracy and repeatability. Further, when a milling or burring cutting tool is used, there may be opportunity to evolve to non-planar and non-cylindrical bone resections. Therefore, robotic preparation may be used with prosthetic implants having bone contacting geometries designed to optimize contacting surfaces and/or clearances with bone. Such implants generally have an increased ability to improve the load transfer through the implant-bone interface while considering patient kinematics and articular surface geometries.
- Robot assisted arthroplasty may include the use of the following, for example: implant specific software, milling/burring or other rotational cutting instruments and various levels of surgeon interface.
- the robot may perform the cartilage/bone preparation with the surgeon observing.
- the surgeon may actually guide a cutting tool, such as a rotational cutting tool or saw, such as an oscillating or reciprocating saw, within a predetermined boundary or within a constrained boundary where manual milling is contained. In all modes, the surgeon must be able to stop the robotic preparation if required.
- Robotic technology may include that described in U.S. Pat. Nos.
- a robot-specific plan is created for a particular patient.
- This plan may involve, for example, precise non-planar cuts that would be difficult or even impossible for a surgeon to make manually. While such a robotic plan may provide for potential advantages over traditional manual plans using conventional tools and planar cuts, there is always a possibility that the robot may fail at any point during surgery.
- the guidance system also known as a navigation or “NAV” system
- NAV navigation or “NAV” system
- the present invention includes contingency plans available for use in robotic surgical procedures to facilitate the surgeon quickly and easily completing the surgery according to the original plan if the robot fails mid-surgery. It should also be noted, as described in detail below, that the contingency plans may also be used when the surgeon intends to complete the procedure manually after a robot has performed some initial machining.
- a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to prepare the bone according to a preoperative surgical plan such that an implant can be coupled to the prepared bone in a preoperatively planned position and orientation.
- the preoperative surgical plan includes determining the location and orientation of one or more guide holes in the bone in order to complete the procedure with conventional instrumentation.
- navigated and/or robot machining is used to create the one or more guide holes in the bone.
- One or more conventional instruments such as an alignment rod, for example, is then located and oriented with respect to the bone using the one or more guide holes.
- the conventional instruments are not being used based on a contingency plan, but are rather being used according to the preoperative plan.
- a method of performing surgery on a bone includes providing a robotically controlled bone preparation system and creating at least one hole in the bone with the robotically controlled bone preparation system prior to machining the bone, wherein the at least one bone hole in the bone aligns with at least one hole or post in a guide for a manual cutting tool.
- the method may further include the step of initiating a debulking phase of the surgery with the robotically controlled bone preparation system after the step of creating at least one hole in the bone.
- the method may still further include the step of attaching the guide to the bone after aligning the at least one guide hole or post with the at least one bone hole.
- the method may include the step of completing the surgery manually after the step of attaching the guide to the bone, wherein the robotically controlled bone preparation system is not used after the guide is attached to the bone.
- the guide may include a tracker for use with a surgical navigation system.
- the completed surgery may be a total knee arthroplasty.
- the step of creating at least one hole in the bone may include creating at least two holes in a femur and at least two holes in a tibia.
- the step of attaching the guide to the bone may include attaching a femoral resection guide to the femur and/or attaching a tibial resection guide to the tibia.
- the completed surgical procedure may be a partial knee arthroplasty.
- the step of creating at least one hole in the bone may include creating at least two holes in a femur and at least two holes in a tibia.
- the step of attaching the guide to the bone may include attaching a femoral resection guide to the femur and/or attaching a tibial resection guide to the tibia.
- the step of completing the surgery manually may include manually debulking the femur facilitated by a surgical navigation system and/or manually debulking the tibia facilitated by a surgical navigation system.
- the method includes the step of manually completing the surgery without further use of the robotically controlled bone preparation system after the robotically controlled bone preparation system creates the at least one bone hole.
- a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to prepare the bone according to a preoperative surgical plan such that an implant can be coupled to the prepared bone in a preoperatively planned position and orientation.
- the method may also include creating at least one contingency hole in the bone with the robotically controlled bone preparation system prior to preparing the bone according to the preoperative surgical plan, wherein the position of the at least one contingency hole in the bone corresponds to at least one hole or post in a guide for guiding a manual cutting tool that could be used to prepare the bone according to the preoperative surgical plan.
- the method may further include removing at least one anatomical landmark of the bone after the step of creating at least one contingency hole in the bone, wherein the at least one anatomical landmark would have been used in determining a position and orientation of the guide with respect to the bone.
- the method may also include attaching the guide to the bone after aligning the at least one guide hole or post with the at least one contingency hole.
- the guide may include a tracker for use with a surgical navigation system.
- the surgery may be completed manually after the step of attaching the guide to the bone, wherein the robotically controlled bone preparation system is not used after the guide is attached to the bone.
- the method may also include manually debulking the femur and tibia facilitated by a surgical navigation system.
- the step of creating at least one contingency hole in the bone may include creating at least one contingency hole in a femur and at least one contingency hole in a tibia.
- a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to prepare the bone according to a preoperative surgical plan.
- the method may also include operating the robotically controlled bone preparation system to machine the bone to have features corresponding to features of a manual cutting guide, and coupling the manual cutting guide to the bone.
- the method may also include operating the robotically controlled bone preparation system to further machine the bone such that at least one anatomical landmark is modified prior to coupling the manual cutting guide to the bone.
- the step of coupling the manual cutting guide to the bone may occur after the robotically controlled bone preparation system has at least partially failed to machine the bone according to the preoperative surgical plan.
- the step of operating the robotically controlled bone preparation system to machine the bone may include creating at least one hole in the bone.
- the at least one hole in the bone may correspond to at least one hole or post in the manual cutting guide.
- the method may also include attaching the manual cutting guide to the bone after aligning the at least one guide hole or post with the at least one hole in the bone.
- the guide may include a tracker for use with a surgical navigation system.
- the method may also include the step of completing the surgery manually after the step of attaching the guide to the bone, wherein the robotically controlled bone preparation system is not used after the guide is attached to the bone.
- the step of completing the surgery manually may include manually debulking the femur and tibia facilitated by a surgical navigation system.
- a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to make bone resections, operating the robotically controlled bone preparation system to machine the bone to have features corresponding to features of a guide for guiding a manual cutting tool, coupling the guide to the bone, and resecting the bone with the manual cutting tool guided by the guide.
- the step of operating the robotically controlled bone preparation system to machine the bone may include creating at least one hole in the bone.
- the at least one hole in the bone may correspond to at least one hole or post in the guide.
- the method may also include attaching the guide to the bone after aligning the at least one guide hole or post with the at least one hole in the bone.
- the surgery may be completed manually after the step of attaching the guide to the bone, wherein the robotically controlled bone preparation system is not used in the surgery after the guide is attached to the bone.
- the guide may include a tracker for use with a surgical navigation system.
- the completed surgery may be a total knee arthroplasty.
- the step of creating at least one hole in the bone may include creating at least two holes in a femur and at least two holes in a tibia.
- the step of attaching the guide to the bone may include attaching a femoral resection guide to the femur and/or a tibial resection guide to the tibia.
- the completed surgery may also be a partial knee arthroplasty.
- the step of creating at least one hole in the bone may include creating at least two holes in a femur and at least two holes in a tibia.
- the step of completing the surgery manually may include manually resecting the femur and/or manually resecting the tibia facilitated by a surgical navigation system.
- a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to make bone resections.
- the method may also include operating the robotically controlled bone preparation system to machine the bone to have features corresponding to features of a surgical instrument, wherein the robotic machining has at least one of increased accuracy, reproducibility, and speed compared to manual resections.
- the method may further include manually completing the surgery on the bone without further use of the robotically controlled bone preparation system, including the step of manually coupling the surgical instrument to the bone.
- FIG. 1 is a partial perspective view of a robot preparing contingency or bailout holes in a femur and tibia.
- FIG. 2A is a flow chart representing steps of a contingency planning phase in a TKA procedure with a TKA contingency plan.
- FIG. 2B is a flow chart representing steps of a debulking phase in a robotic TKA procedure.
- FIG. 2C is a flow chart representing steps of a finishing pass phase in a robotic TKA procedure.
- FIG. 2D is a partial perspective view of an exemplary configuration of bailout holes created in a femur in the contingency planning phase of FIG. 2A .
- FIG. 2E is a partial perspective view of an alternate configuration of bailout holes created in a femur in the contingency planning phase of FIG. 2A .
- FIG. 2F is a partial perspective view of an exemplary configuration of bailout holes created in a tibia in the contingency planning phase of FIG. 2A .
- FIG. 2G is a perspective view of a J-block resection guide.
- FIG. 2H is a perspective view of an alternate embodiment of a monolithic J-block resection guide.
- FIG. 2I is a front perspective view of a 4-in-1 cutting guide.
- FIG. 2J is a rear perspective view of the 4-in-1 cutting guide of FIG. 2I .
- FIG. 2K is a perspective view of a universal resection guide.
- FIG. 2L is a perspective view of an alternate embodiment of a monolithic universal resection guide.
- FIG. 3A is a flow chart representing steps of a contingency planning phase in a bicruciate retaining (“BCR”) procedure with a TKA contingency plan.
- BCR bicruciate retaining
- FIG. 3B is a flow chart representing steps of a debulking phase in a robotic BCR procedure.
- FIG. 3C is a flow chart representing steps of a finishing pass phase in a robotic BCR procedure.
- FIG. 3D is a partial perspective view of bailout holes created in a tibia in the contingency planning phase of FIG. 3A .
- FIG. 4A is a flow chart representing steps of a contingency planning phase in a partial knee replacement (“PKR”) procedure with a TKA contingency procedure.
- PLR partial knee replacement
- FIG. 4B is a flow chart representing steps of a debulking phase in a robotic PKR procedure.
- FIG. 4C is a flow chart representing steps of a finishing pass phase in a robotic PKR procedure.
- FIG. 4D is a partial perspective view of bailout holes created in a femur in the contingency planning phase of FIG. 4A .
- FIG. 4E is a partial perspective view of an alternate configuration of bailout holes created in a femur in the contingency planning phase of FIG. 4A .
- FIG. 4F is a perspective view of a femur and tibia after a robot failed during a robotic PKR procedure.
- FIG. 4G is a perspective view of a distal femoral cut being manually performed using bailout holes.
- FIG. 4H is a perspective view of the distal femur after completion of the manual cut illustrated in FIG. 4F .
- FIG. 4I is a perspective view of a proximal tibial cut being manually performed on the tibia of FIG. 4E using bailout holes.
- FIG. 4J is a perspective view of a one embodiment of a navigated MIS resection guide with a tracker attached by a tracker adapter.
- FIG. 4K is a perspective view of the navigated MIS resection guide of FIG. 4I attached to a femur.
- distal means more distant from the heart and the term “proximal” means closer to the heart.
- proximal means closer to the heart.
- inferior means toward the feet and the term “superior” means towards the head.
- anterior means towards the front part of the body or the face and the term “posterior” means towards the back of the body.
- medial means toward the midline of the body and the term “lateral” means away from the midline of the body. Terms including “debulking,” “resecting,” “machining,” “finishing,” and “bone preparation,” are used interchangeably herein, and all generally refer to the removal and/or reshaping of bone.
- a step enclosed in a hexagon indicates a tool-change step
- a step enclosed in a trapezoid indicates a knee-positioning step
- a step in a parallelogram indicates a registration step
- a step enclosed in a diamond may indicate a step which branches into multiple other possible steps
- a step enclosed in a rectangle indicates a bone preparation or trialing/implantation step, unless otherwise indicated.
- a step or group of steps enclosed in a broken rectangle indicates that the steps contained therein may be alternative or optional steps.
- FIG. 1 An exemplary robotically controlled bone preparation system, or robot 100 for short, that may be used in various joint arthroplasty procedures is illustrated in FIG. 1 . Only a portion of the robot 100 —an arm 110 and a cutting tool 120 —is illustrated in FIG. 1 . The robot 100 is shown after having drilled a number of holes 150 into the femur 130 and tibia 140 .
- the holes 150 are referred to herein interchangeably as “contingency” or “bailout” holes, as the holes may only need to be used if the robot 100 fails and the surgeon needs to manually complete the procedure, using the bailout holes 150 as reference points.
- holes 150 may also be interchangeably referred to herein as “plan” points because, as is described in greater detail below, the bailout holes or plan points 150 may be useful in situations other than after failure of the robot 100 .
- plan points 150 may include varying trajectories such that each hole has a unique angle with respect to a plane of a joint.
- each hole may have a unique (x, y, z) coordinate as an origin point located on the articular surface of a joint, while the hole also includes a unique (x′, y′, z′) coordinate where it terminates in bone.
- Each hole therefore has a central axis, in which the central axes of the holes may be parallel or not parallel to one another.
- the holes generally have a unique position on the articular surface of bone, the position defining a location and orientation. Because of the general manner in which the holes are produced, the holes are generally cylindrically shaped along their length. The diameter and length or depth of the holes may vary as well depending on the desired dimensions of the pins or posts that may be coupled to the holes if required. Further still, as explained in more detail below, such holes may be used in procedures on other joints, including ball-and-socket joints, such as the shoulder or hip. As illustrated in FIG. 1 , the robot 100 is in the process of drilling plan points 150 in preparation for a total knee arthroplasty (“TKA”) procedure in which a J-block resection guide is to be used. As is described in greater below, other configurations of plan points 150 may be used for other procedures and for other instruments.
- TKA total knee arthroplasty
- exemplary joint procedures that may be performed with surgical plan options geared toward manual completion of the procedure.
- a number of knee procedures may be planned with options or contingencies to the same or alternate knee procedures.
- PKA partial knee replacement
- different surgical plans may facilitate a surgeon completing the procedure manually as a PKR, or transitioning to a TKA procedure, if such a transition to manual surgery is desired or required.
- a patellofemoral joint (“PFJ”) procedure may include different surgical plans that facilitate a surgeon completing the procedure manually as a PFJ, or transitioning to a TKA procedure, if such a transition to manual surgery is desired or required.
- a PFJ-PKR procedure may include a surgical plan to facilitate a surgeon completing the procedure as a TKA.
- a TKA procedure may include a surgical plan that facilitates a surgeon completing the procedure as a TKA.
- contingency plans may be applicable, for example, to bi-cruciate retaining procedures, posterior-cruciate retaining procedures, and cruciate sacrificing procedures.
- Table 1 lists a number of exemplary contingency procedures for different intended procedures that may be possible for knee joints. It should be noted that the list is non-exhaustive and other combinations of intended and contingency procedures, such as BCR to TKA or BCR to BCR, are contemplated within the scope of the disclosure.
- FIGS. 2A-C Steps of a TKA procedure such as in cruciate retaining or posterior stabilized procedures, for example, are illustrated in flow charts in FIGS. 2A-C .
- FIG. 2A shows a contingency preparation phase 200 a
- FIG. 2B shows a debulking phase 200 b
- FIG. 2C shows a finishing phase 200 c .
- the particular contingency preparation phase 200 a illustrated in FIG. 2A takes the form of creating plan points 150 .
- the contingency preparation phase 200 a begins with step 202 , which includes loading a cutting tool 120 , such as a burr or router, on the robot 100 .
- the cutting tool 120 may be a 2.5 mm burr or router, but other sizes, such as approximately 1 ⁇ 8 inch or approximately 3.175 mm, and other cutting tools may be appropriate.
- the knee is put into flexion, and retractors are positioned in the surgical site to protect the anterior cruciate ligament (“ACL”) and posterior cruciate ligament (“PCL”), for example.
- ACL anterior cruciate ligament
- PCL posterior cruciate ligament
- registration is performed with tracker pins, for example.
- the positions of anatomical landmarks and axes are digitized as reference for the alignment of instruments, bone cuts, and the leg. Registration may be performed on the femur 130 and tibia 140 using trackers 540 (see FIGS. 4J-K ) that are fixed to the bone to allow the NAV system to guide the robot 100 . As part of the registration, for example, the surgeon may touch off key anatomical landmarks, for example, by using a pointer tool of the NAV system to mark the medial and lateral epicondyles such that the NAV system is able to track the location of the key anatomical landmarks during the procedure.
- the surgeon may then verify the registration, for example, by reviewing and confirming the digitized mechanical axes and analyzing initial leg alignment with respect to range of motion, varus/valgus misalignment and laxity, and flexion contracture or hyperextension. Once verified, the surgeon may accept the surgical plan in step 208 .
- the robot 100 drills four plain points 150 , for example, into the femur 130 in step 210 .
- the number and position of the plan points 150 may also depend on the particular instruments intended for use with the procedure.
- a different configuration of plan points 150 may be used if a femoral resection is to be guided by a J-block resection guide, a universal resection guide, a navigated MIS guide, or any other suitable guide.
- the four plan points 150 in the femur 130 may include two anterolateral plan points 150 a and two distal plan points 150 b .
- step 210 may entail drilling two anterior plan points 150 a and two distal plan points 150 b as illustrated in FIG. 2E .
- the robot 100 may drill four plan points 150 into the tibia 140 .
- the plan points 150 may include two proximal plan points 150 c .
- Step 212 may also include the robot 100 drilling two proximal-anterior plan points 150 d in the tibia 150 .
- the robot 100 may create the plan points 150 , it is contemplated that the plan points 150 may be created manually for all the surgical plans described herein.
- the plan points 150 may provide references for the surgeon to use if the robot 100 should fail later in the procedure, or to otherwise aid a surgeon in manually completing a procedure.
- the two anterolateral plan points 150 a may be configured to align with guide holes 650 a in a J-block resection guide 600 as illustrated in FIG. 2G .
- Fixation pins may be placed through each of a pair of guide holes 650 a and further into plan points 150 a to fix the J-block 600 to the bone.
- J-block resection guide 600 may be generally “J”-shaped and include a number of sets or pairs of guide holes, each set being a different distance from a cutting slot 610 .
- J-block resection guide 600 may also include additional holes, such as cross-pin hole 620 , to provide additional stability when fixing the resection guide to the bone.
- An alternate monolithic J-block 600 ′ as illustrated in FIG. 2H may be used instead of J-block 600 .
- J-block 600 ′ has a pair of posts 650 a ′ that are configured to be inserted into plan points 150 a .
- the two distal femoral plan points 150 b may be sized and configured to mate with a 4-in-1 cutting block 700 , as illustrated in FIGS. 2I-J and as is known in the art.
- posts 750 b may be used to attach the 4-in-1 cutting block 700 to the femur 130 .
- plan points 150 illustrated in FIG. 2E may be configured to align with guide holes 850 a in a universal resection guide 800 , as illustrated in FIG. 8K .
- Fixation pins may be placed through each of a pair of guide holes 850 a and further into plan points 150 a to fix the universal resection guide 800 to the bone.
- Universal resection guide 800 may include a number of sets or pairs of guide holes 850 a , each set being a different distance from a top surface 810 .
- Universal resection guide 800 may also include additional holes, such as cross-pin holes 820 , to provide additional stability when fixing the resection guide to the bone.
- universal resection guide 800 may be used instead of universal resection guide 800 .
- universal resection guide 800 ′ has a pair of posts 850 a ′ that are configured to be inserted into plan points 150 a .
- the two distal femoral plan points 150 b may be sized and configured to mate with 4-in-1 cutting block 700 .
- the two proximal-anterior tibial plan points 150 d may be sized and positioned to mate with a proximal tibial resection guide to facilitate the proximal tibial cut.
- the two proximal tibial plan points 150 c which may be optional, may be sized and shaped to mate with a tibial template for rotation assessment and trial reduction.
- the first step 214 is to load (or switch to) a cutting tool, such as a barrel burr, onto the robot 100 .
- the cutting tool may be, for example, a 6, 8, or 10 mm barrel burr. However, other sizes and other cutting tools may also be appropriate.
- the posterior and distal femur 130 are debulked with chamfer cuts and the proximal tibia is debulked. The debulking may be done simultaneously or sequentially. Tissue balancing may be done in step 218 if required.
- the surgeon may move to the baseplate step 220 .
- the surgeon may perform tissue or ligament balancing as is known in the art. For example, the surgeon may check the tensioning of the knee in flexion and extension, and check the alignment of the mechanical axis using a manual distractor and/or the graphic user interface of the NAV system. If the intraoperative measurements are acceptable, the surgeon may move to the baseplate step 220 . If they are not acceptable, the surgeon may perform soft tissue release. Following the soft tissue release, the surgeon may repeat step 218 for other degrees of freedom of the knee. Alternately, if additional bone surface preparation is required, the surgeon may return to the debulking step 216 after performing the tissue release. Once the surgeon is satisfied with the tissue balancing step 218 , he may advance to the baseplate step 220 .
- the surgeon may check and verify rotation using a tibial template in step 222 .
- the tibia 140 may need to be further prepared prior to approving rotation.
- the surgeon may debulk the tibia for accepting the universal stem of the baseplate.
- the surgeon may move directly from baseplate step 220 to step 222 to approve rotation using a tibial template.
- the knee is placed in extension in step 224 and retractors and a patella clamp are positioned in the surgical site as necessary and as is known in the art.
- step 226 the surgeon removes the tibial tracker 540 and attached the patella clamp with its associated tracker and performs registration for the NAV system, as is also known in the art.
- step 228 the patella is debulked, bringing the debulking phase 200 b to an end.
- a cutting tool such as a finishing router
- the router may be, for example, a 2.5 mm router, but other sizes and other cutting tools may be appropriate.
- the patella is finished by the robot, and fixation holes for the pegs in the patellar implant are created in the patella.
- the patella clamp and tracker 540 are removed and the tibial tracker is turned on.
- the anterior femoral surface is finished in step 236 with the robot. Alternatively, the anterior femoral surface may be finished earlier with the larger cutting tool.
- the knee is put into flexion in step 238 and retractors are positioned in the surgical site.
- the distal/posterior femur and proximal tibia are posed in flexion, between approximately 90 and approximately 110 degrees.
- Femoral preparation is completed, including, for example, preparing the “box” for posterior stabilized TKA procedures.
- the tibial insert thickness is selected using the tibial template. Once selected, the tibial keel is prepared in step 244 .
- the tibial keel may be, for example, prepared at full depth in step 246 if cement is used, or at partial depth in step 248 if the implantation will be cementless.
- One the tibial keel is prepared the surgeon may complete the procedure by trialing the implant components in step 250 to verify proper size and position, create the femoral pegs using the robot 100 in step 252 , and implanting the components in step 254 .
- plan points 150 may attach a distal femoral resection guide to the femur.
- the surgeon may attach a J-block resection guide 600 or 600 ′ to the femur 130 using anterolateral femoral plan points 150 a .
- This or a similar configuration of plan points 150 may also allow use of a navigated MIS jig 500 , illustrated in FIGS.
- the surgeon may attach a universal resection guide 800 or 800 ′ to the femur 130 using anterior plan points 150 a . Once attached, the surgeon may make the femoral distal cut using the guide. Referring to FIGS. 2D-E , following the femoral distal cut, the surgeon may attach, for example, a 4-in-1 cutting block 700 to the femur using the distal femoral plan points 150 b . Once attached, the surgeon may make additional femoral cuts including, for example, an anterior cut, a posterior cut, and anterior and posterior chamfer cuts using the aforementioned 4-in-1 guide 700 .
- the surgeon may attach a tibial resection guide to the tibia 140 using the proximal-anterior tibial plan points 150 d .
- the tibial template may be attached to the tibia 140 using proximal tibial plan points 150 c for rotation assessment and trial reduction.
- plan points 150 are created to correspond to traditional components used in manual TKA procedures, a surgeon will be able to relatively seamlessly transition from a robotic TKA procedure to a manual TKA procedure in the case the robot 100 fails.
- the robot 100 may even be used to create the plan points 150 when the surgeon intends to perform a manual TKA procedure and has no intention to use the robot 100 after the plan points 150 are created.
- a surgeon may prefer to have the robot 100 pre-drill the plan points 150 , which would be used not as “bailout” holes in case a contingency plan needs implementation, but rather in a case in which a manual procedure is intended after the robot pre-drills the holes.
- This may be preferred, for example, because the plan points 150 made by the robot 100 may provide a way to set up highly accurate cuts using a jig, such as the J-block or universal resection guides 600 (or 600 ′), 800 (or 800 ′).
- robot 100 may machine the bone to have any number of features that correspond to a surgical instrument or implant.
- the robot 100 may machine the bone to have a precisely curved surface to correspond to a curved surface of an implant. Machining such a curved surface without the use of a robot may be impossible to accurately reproduce by hand.
- the robot 100 may machine the curved surface such that the machined surface of the bone corresponds to an axis of rotation of an implant to be implanted onto the bone.
- the user may manually complete the procedure by attaching the implant to the bone and performing any additional required steps.
- the robot 100 may create curved holes in the bone to accept, for example, a curved keel of a prosthetic implant. It may only be possible to accurately reproduce such a curved hole that corresponds to a curved structure of an implant via the robot 100 , which may be impossible to create manually.
- the machining by the robot 100 is not used strictly as a contingency plan. Rather, the robot 100 is being used to provide a benefit of robotic machining including, for example accuracy, speed, and/or reproducibility.
- the intent from the outset is to manually complete the procedure without further use of the robot 100 after the initial machining of the bone by the robot 100 .
- Plan points 150 may also provide other benefits, such as confirming or rescuing registration.
- a user may perform registration to digitize the positions of anatomical landmarks and axes as reference for the alignment of instruments, bone cuts, and the leg. Subsequent to registration, a user may reference plan points 150 to check the accuracy of registration and also to rescue a compromised registration, for example in the event a tracker 540 has been moved inadvertently. To accomplish this, the user may place the pointer tool in the desired plan point 150 and visualize the location of the hole and pointer tool on the NAV screen as it relates to the physical anatomy in situ.
- the user may determine that the tracker 540 likely moved subsequent to the step of verifying the registration.
- the user may then direct the guidance system to calculate the difference between the altered tracker location and/or coordinate system and the previous registration, and adjust accordingly so that the altered tracker location and/or coordinate system can be used to complete the procedure successfully.
- the procedure can be completed as planned.
- the above described procedure of registration verification, as well as registration rescue, may apply with equal force to the other specific surgical plans described herein.
- FIGS. 3A-C Steps of a BCR procedure with a contingency plan of a TKA procedure are illustrated in flow charts in FIGS. 3A-C .
- FIG. 3A shows a contingency preparation phase 300 a
- FIG. 3B shows a debulking phase 300 b
- FIG. 3C shows a finishing phase 300 c.
- the particular contingency preparation phase 300 a illustrated in FIG. 3A takes the form of creating plan points 150 .
- the configuration of the femoral plan points 150 may be, for example, the same as illustrated in FIG. 2D or FIG. 2E , depending on the particular instrumentation desired for use.
- the configuration of the tibial plan points 150 may be, for example, the same as illustrated in FIG. 2F or may take the configuration illustrated in FIG. 3D .
- the contingency preparation phase 300 a begins with step 302 , which includes loading a cutting tool 120 , such as a router, on the robot 100 .
- the cutting tool 120 may be a 2.5 mm router, but other sizes, such as approximately 1 ⁇ 8 inch or approximately 3.175 mm, and other cutting tools may be appropriate.
- the knee is put into flexion, and retractors are positioned in the surgical site to protect the ACL and PCL.
- step 306 registration is performed using femur 130 and tibia 140 trackers 540 to allow the NAV system to guide the robot 100 .
- the surgeon may accept the surgical plan in step 308 if satisfied, touching off key landmarks and verifying placement.
- the robot 100 drills four plan points 150 into the femur 130 in step 310 .
- the four plan points 150 in the femur 130 may include two anterolateral plan points 150 a and two distal plan points 150 b ( FIG. 2D ) or two anterior plan points 150 a and two distal plan points 150 b ( FIG. 2E ).
- the robot 100 may drill two proximal-anterior plan points 150 d into the tibia 140 .
- the robot 100 may drill two proximal-anterior plan points 150 d and two proximal plan points 150 c in the tibia 140 , as illustrated in, and described in relation to, FIG. 2F .
- the plan points 150 for the BCR to TKA procedure may provide references for the surgeon to use if the robot 100 should fail later in the procedure and the procedure is to be completed as a TKA, or if the surgeon otherwise decides to complete the procedure manually as a TKA.
- the first step 314 is to load (or switch to) a cutting tool, such as a barrel burr, onto the robot 100 .
- the cutting tool may be, for example, a 6, 8, or 10 mm barrel burr. However, other sizes and other cutting tools may also be appropriate.
- the posterior and distal femur 130 are debulked with chamfer cuts and the proximal tibia is debulked. The debulking may be done simultaneously or sequentially.
- Tissue balancing may be done in step 318 if required, although balancing may not be recommended in a BCR procedure.
- the surgeon may perform an intraoperative assessment of the surgical plan and make changes if necessary in step 320 .
- the surgeon may put the knee in flexion in step 322 , attaching retractors and positioning a patella clamp as necessary.
- the tibial tracker 540 is turned off in step 324 and the patella clamp with tracker is attached and registered for the NAV system.
- the robot 100 debulks the patella in step 326 , bringing the debulking phase 300 b to an end.
- a cutting tool such as a finishing router
- the router may be, for example, a 2.5 mm router, but other sizes and other cutting tools may be appropriate.
- the patella is finished by the robot, and fixation holes for the pegs in the patellar implant are created in the patella.
- the patella clamp and tracker 540 are removed and the tibial tracker is reattached.
- the anterior femoral surface is finished in step 334 with the robot.
- femoral preparation is completed, including, for example, preparation of femoral pegs.
- Tibial preparation is also completed step 338 , including, for example, preparation of the tibial plateau, the tibial eminence periphery, and the tibial keel.
- the tibial insert thickness is selected using the tibial template, as is known in the art. Once selected, the surgeon may complete the procedure by trialing the implant components in step 342 to verify proper size and position, and implanting the components in step 344 .
- the surgeon may continue the procedure manually as a TKA using the plan points as bailout holes 150 .
- This contingency procedure would be essentially the same as described for the TKA to TKA procedure above.
- the BCR procedure may be planned with plan points 150 such that the contingency procedure is also a BCR procedure. Similar as to what is described above, plan points 150 may be used for completing a procedure manually, even in cases where the robot 100 does not fail and the original plan includes manual completion.
- FIGS. 4A-C Steps of a PKR procedure are illustrated in flow charts in FIGS. 4A-C .
- FIG. 4A shows a contingency preparation phase 400 a
- FIG. 4B shows a debulking phase 400 b
- FIG. 4C shows a finishing phase 400 c.
- the particular contingency preparation phase 400 a illustrated in FIG. 4A takes the form of creating plan points 150 , such that a PKR procedure may be completed as a TKA procedure. It should be noted that a different configuration of plan points 150 may be used such that an intended PKR procedure may still be completed as a PKR procedure if the robot 100 fails during the procedure, or if the surgeon otherwise desires to complete the procedure manually. For example, for a PKR to PKR procedure, four plan points may be created in the femur (not illustrated) to interact with a distal resection guide and a 2-in-1 cutting block. For the PKR to TKA procedure, the plan points may take the configurations, for example, as illustrated in FIG. 4D or FIG. 4E .
- the contingency preparation phase 400 a begins with step 402 , which includes loading a cutting tool 120 , such as a router, on the robot 100 .
- the cutting tool 120 may be a 2.5 mm burr, but other sizes, such as approximately 1 ⁇ 8 inch or approximately 3.175 mm, and other cutting tools may be appropriate.
- step 404 the knee is put into flexion, and retractors are positioned in the surgical site.
- step 406 registration is performed using femur 130 and tibia 140 trackers 540 to allow the NAV system to guide the robot 100 . The surgeon may accept the surgical plan in step 408 if satisfied, touching off key landmarks and verifying placement.
- the robot 100 drills three plan points 150 into the femur 130 in step 410 .
- the particular configuration of plan points 150 may depend on the instruments to be used if the procedure is to be completed manually.
- the three plan points 150 in the femur 130 may include two anterolateral plan points 150 a and a distal plan point 150 b . All three plan points 150 in the femur 130 are drilled in the particular compartment being replaced.
- step 410 may entail drilling two anterior plan points 150 a and a distal plan point 150 b , as illustrated in FIG. 4E .
- the robot 100 drills two ( FIG. 3D ) or four ( FIG. 2F ) plan points 150 into the tibia 140 , depending on the preference of the surgeon.
- the plan points 150 for the PKR procedure may provide references for the surgeon to use if the robot 100 should fail later in the procedure, or if the surgeon otherwise desires to complete the surgical plan manually.
- the two anterolateral femoral plan points 150 a ( FIG. 4D ) may be sized and positioned to mate with a J-block resection guide 600 or 600 ′, or with a navigated MIS resection guide 500 , as shown in FIGS. 4F-K , for example.
- J-block resection guides 600 are known in the art and described more fully in U.S. Patent Publication No.
- two anterior plan points may be configured to facilitate attachment of a universal resection guide 800 or 800 ′ to the femur 130 .
- a distal plan point 150 b may be configured to mate with 2-in-1 resection guide (not illustrated).
- the two anterior tibial plan points 150 d may be sized and positioned to mate with a proximal tibial resection guide.
- the first step 414 is to load (or switch to) a cutting tool, such as a barrel burr, onto the robot 100 .
- the cutting tool may be, for example, a 6, 8, or 10 mm barrel burr. However, other sizes and other cutting tools may also be appropriate.
- the distal and posterior chamfer cuts are made on the femur 130 . Following these cuts, the proximal tibia 140 and the posterior femur are sequentially debulked. Tissue balancing may be done in step 418 if required.
- the surgeon may move to the finishing pass phase 400 c .
- the surgeon may perform tissue balancing as is known in the art. For example, the surgeon may check the tensioning of the knee in flexion and extension, and check the alignment of the mechanical axis using a manual distractor and/or the graphic user interface of the NAV system. If the intraoperative force measurements are acceptable, the surgeon may move to the finishing pass phase 400 c . If they are not acceptable, the surgeon may perform soft tissue release. Following the soft tissue release, the surgeon may repeat step 418 for other degrees of freedom of the knee. Alternately, if additional bone surface preparation is required, the surgeon may return to the debulking step 416 after performing the tissue release. Once the surgeon is satisfied with the tissue balancing step 418 , he may advance to the finishing pass phase 400 c.
- a cutting tool such as a finishing router
- the router may be, for example, a 2.5 mm router, but other sizes and other cutting tools may be appropriate.
- a finishing pass on the femur 130 is completed, for example with the distal/posterior femur and proximal tibia being posed in flexion, between approximately 90 and approximately 110 degrees.
- the proximal tibial preparation is completed, including, for example, preparation of tibial pegs.
- the surgeon may complete the procedure by trialing the implant components in step 426 to verify proper size and position, and implanting the components in step 428 .
- the surgeon may continue the procedure manually using the plan points 150 as bailout holes, for example as illustrated in FIG. 4D or 4 E.
- a femur 130 and tibia 140 are illustrated after plan points 150 are created and at a point which the surgeon decides to complete the procedure manually, in the illustrated case because of a failure of the robot 100 .
- FIG. 4F illustrates the position of the femur 130 , with distal femoral plan point 150 b visible.
- Anterolateral plan points configured to mate with a navigated MIS resection guide similar to the anterolateral plan points 150 a of FIG. 4D , are not visible, but fixation pins 510 extend through the navigated MIS resection guide 500 and into the anterolateral plan points 150 a .
- Partially visible in FIG. 4F is another navigated MIS resection guide 500 with tracker adapter 502 (see FIGS. 4J-K ) attached to the tibia 140 , described in greater detail below.
- FIG. 4G illustrates a cutting blade 520 being used in conjunction with the navigated MIS resection guide 500 which is held in place by the fixation pins 510 inserted into the anterolateral plan points 150 a .
- FIG. 4I illustrates the tibia 140 with a navigated MIS resection guide 500 attached. Fixation pins 510 are inserted into tibial bailout holes to hold the navigated MIS resection guide 500 in place while a cutting blade 520 is used to resect the proximal tibia 130 .
- the intended PKR robotic procedure can seamlessly be transitioned into a successful manual TKA procedure by use of the plan points 150 created during the contingency planning phase 400 a.
- plan points are, at least in part, dictated by the particular jigs, resection guides, or other instruments that need to be attached to the bone using the bailout holes.
- the methods described herein may be expanded to be used with many other particular resection guides, for example, without departing from the spirit of the invention.
- FIG. 4J illustrates navigated MIS resection guide 500 with a tracker adapter 502 and tracker 540 attached.
- the assembly attached to the femur 130 with fixation pins 510 is illustrated in FIG. 4K .
- the surgery would be completed much as described directly above, but with the additional aid of the NAV system facilitating, for example, the location of the resections.
- plan points or bailout holes 150 may be positioned differently than shown herein to match with the intended location of fixation pins of any appropriate jig to be used in the case of robotic failure.
- plan points 150 may also be used in the case in which robotic surgery is not contemplated, but rather wherein a surgeon desires a robot 100 to create plan points 150 that correspond to one or more jigs to be used with the intended manual surgical procedure.
Landscapes
- Health & Medical Sciences (AREA)
- Surgery (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- General Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- Heart & Thoracic Surgery (AREA)
- Medical Informatics (AREA)
- Molecular Biology (AREA)
- Animal Behavior & Ethology (AREA)
- Nuclear Medicine, Radiotherapy & Molecular Imaging (AREA)
- Public Health (AREA)
- Veterinary Medicine (AREA)
- Orthopedic Medicine & Surgery (AREA)
- Dentistry (AREA)
- Oral & Maxillofacial Surgery (AREA)
- Physical Education & Sports Medicine (AREA)
- Transplantation (AREA)
- Robotics (AREA)
- Prostheses (AREA)
- Surgical Instruments (AREA)
Abstract
Description
- The present invention relates to surgical options for navigated and/or robotic bone machining and in particular relates to having the option of completing joint arthroplasty procedures with conventional instruments following the use of navigated and/or robot based applications.
- In a traditional joint arthroplasty procedure, such as a total knee arthroplasty (“TKA”) surgery, diseased bone and/or cartilage of a patient is generally removed and replaced with a prosthetic implant. A surgeon may resect the bone using a hand-held oscillating saw blade which results in a series of planar bone surfaces. Additionally, the surgeon may use a drill, broach or tamp instrument to make cylindrical holes into the bone in order to accommodate fixation features on the implant. The planar bone surfaces and cylindrical bone holes, for example, are generally oriented to interface with flat surfaces and pegs or keels of a prosthetic implant.
- In such arthroplasty surgeries, the cartilage and/or bone of a patient may be prepared by a surgeon using conventional manual instrumentation. The instrumentation used may include, for example, planar resection guides, oscillating saws, drills, chisels, punches and reamers.
- Robotic surgery may also be used in arthroplasty procedures, as well as in many different medical applications. The use of robotically controlled bone preparation systems allows for preoperatively planned bone preparation to be carried out with increased accuracy and repeatability. Further, when a milling or burring cutting tool is used, there may be opportunity to evolve to non-planar and non-cylindrical bone resections. Therefore, robotic preparation may be used with prosthetic implants having bone contacting geometries designed to optimize contacting surfaces and/or clearances with bone. Such implants generally have an increased ability to improve the load transfer through the implant-bone interface while considering patient kinematics and articular surface geometries.
- Cartilage and/or bone may be prepared with the assistance of a robot in arthroplasty procedures. Robot assisted arthroplasty may include the use of the following, for example: implant specific software, milling/burring or other rotational cutting instruments and various levels of surgeon interface. For example, in one robot mode, the robot may perform the cartilage/bone preparation with the surgeon observing. In another robot mode, the surgeon may actually guide a cutting tool, such as a rotational cutting tool or saw, such as an oscillating or reciprocating saw, within a predetermined boundary or within a constrained boundary where manual milling is contained. In all modes, the surgeon must be able to stop the robotic preparation if required. Robotic technology may include that described in U.S. Pat. Nos. 6,676,669, 7,892,243, 6,702,805, 6,723,106, and 7,950,306 as well as U.S. Patent Application Nos. 2010/0268249, 2010/0268250, 2010/0275718, and 2003/0005786, the disclosures of all of which are hereby incorporated by reference in their entireties. Using robotic preparation may enable the development of new implant designs having substantially non-planar bone contacting geometries and improved fixation features, but potential drawbacks may exist. For example, current robotic surgical techniques may leave the surgeon without a contingency plan if the robotic device fails mid-surgery. In such a case, the surgeon may need to resort to using standard instruments to complete the particular procedure. However, the transition to standard instrumentation mid-procedure may be difficult, particularly if bony landmarks have already been resected. It would thus be desirable to have apparatus and methods to facilitate a surgeon transitioning from a robotic to manual procedure during a surgical procedure.
- In one exemplary surgical procedure, a robot-specific plan is created for a particular patient. This plan may involve, for example, precise non-planar cuts that would be difficult or even impossible for a surgeon to make manually. While such a robotic plan may provide for potential advantages over traditional manual plans using conventional tools and planar cuts, there is always a possibility that the robot may fail at any point during surgery. For example, the guidance system (also known as a navigation or “NAV” system) may stop working, or the robot itself may stop working properly.
- If the robot fails mid-surgery, for example, the surgeon may need to use conventional instrumentation to complete the particular procedure. However, this may be difficult as bone has already been removed by the robot, generally with non-planar cuts. While conventional instrumentation is generally used in conjunction with planar cuts and with pre-drilled reference points, making the use of conventional instruments to finish the surgery with non-planar cuts at this point would be difficult. Even if the surgeon is able to complete the procedure after the robot has failed, the results are likely to be different than the preoperatively planned or originally intended results with the robot performing the procedure. With the foregoing in mind, the present invention includes contingency plans available for use in robotic surgical procedures to facilitate the surgeon quickly and easily completing the surgery according to the original plan if the robot fails mid-surgery. It should also be noted, as described in detail below, that the contingency plans may also be used when the surgeon intends to complete the procedure manually after a robot has performed some initial machining.
- In one embodiment of the present invention, a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to prepare the bone according to a preoperative surgical plan such that an implant can be coupled to the prepared bone in a preoperatively planned position and orientation. The preoperative surgical plan includes determining the location and orientation of one or more guide holes in the bone in order to complete the procedure with conventional instrumentation. According to this method, once the preoperative plan is created, navigated and/or robot machining is used to create the one or more guide holes in the bone. One or more conventional instruments such as an alignment rod, for example, is then located and oriented with respect to the bone using the one or more guide holes. In this embodiment, the conventional instruments are not being used based on a contingency plan, but are rather being used according to the preoperative plan.
- In one embodiment of the present invention, a method of performing surgery on a bone includes providing a robotically controlled bone preparation system and creating at least one hole in the bone with the robotically controlled bone preparation system prior to machining the bone, wherein the at least one bone hole in the bone aligns with at least one hole or post in a guide for a manual cutting tool. The method may further include the step of initiating a debulking phase of the surgery with the robotically controlled bone preparation system after the step of creating at least one hole in the bone. The method may still further include the step of attaching the guide to the bone after aligning the at least one guide hole or post with the at least one bone hole. Still further, the method may include the step of completing the surgery manually after the step of attaching the guide to the bone, wherein the robotically controlled bone preparation system is not used after the guide is attached to the bone. The guide may include a tracker for use with a surgical navigation system.
- In one embodiment, the completed surgery may be a total knee arthroplasty. The step of creating at least one hole in the bone may include creating at least two holes in a femur and at least two holes in a tibia. The step of attaching the guide to the bone may include attaching a femoral resection guide to the femur and/or attaching a tibial resection guide to the tibia.
- In another embodiment, the completed surgical procedure may be a partial knee arthroplasty. The step of creating at least one hole in the bone may include creating at least two holes in a femur and at least two holes in a tibia. The step of attaching the guide to the bone may include attaching a femoral resection guide to the femur and/or attaching a tibial resection guide to the tibia. The step of completing the surgery manually may include manually debulking the femur facilitated by a surgical navigation system and/or manually debulking the tibia facilitated by a surgical navigation system.
- In a further embodiment, the method includes the step of manually completing the surgery without further use of the robotically controlled bone preparation system after the robotically controlled bone preparation system creates the at least one bone hole.
- In yet another embodiment of the invention, a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to prepare the bone according to a preoperative surgical plan such that an implant can be coupled to the prepared bone in a preoperatively planned position and orientation. The method may also include creating at least one contingency hole in the bone with the robotically controlled bone preparation system prior to preparing the bone according to the preoperative surgical plan, wherein the position of the at least one contingency hole in the bone corresponds to at least one hole or post in a guide for guiding a manual cutting tool that could be used to prepare the bone according to the preoperative surgical plan. The method may further include removing at least one anatomical landmark of the bone after the step of creating at least one contingency hole in the bone, wherein the at least one anatomical landmark would have been used in determining a position and orientation of the guide with respect to the bone. The method may also include attaching the guide to the bone after aligning the at least one guide hole or post with the at least one contingency hole. The guide may include a tracker for use with a surgical navigation system. The surgery may be completed manually after the step of attaching the guide to the bone, wherein the robotically controlled bone preparation system is not used after the guide is attached to the bone. The method may also include manually debulking the femur and tibia facilitated by a surgical navigation system. The step of creating at least one contingency hole in the bone may include creating at least one contingency hole in a femur and at least one contingency hole in a tibia.
- In still another embodiment of the invention a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to prepare the bone according to a preoperative surgical plan. The method may also include operating the robotically controlled bone preparation system to machine the bone to have features corresponding to features of a manual cutting guide, and coupling the manual cutting guide to the bone. The method may also include operating the robotically controlled bone preparation system to further machine the bone such that at least one anatomical landmark is modified prior to coupling the manual cutting guide to the bone. The step of coupling the manual cutting guide to the bone may occur after the robotically controlled bone preparation system has at least partially failed to machine the bone according to the preoperative surgical plan. The step of operating the robotically controlled bone preparation system to machine the bone may include creating at least one hole in the bone. The at least one hole in the bone may correspond to at least one hole or post in the manual cutting guide. The method may also include attaching the manual cutting guide to the bone after aligning the at least one guide hole or post with the at least one hole in the bone. The guide may include a tracker for use with a surgical navigation system. The method may also include the step of completing the surgery manually after the step of attaching the guide to the bone, wherein the robotically controlled bone preparation system is not used after the guide is attached to the bone. The step of completing the surgery manually may include manually debulking the femur and tibia facilitated by a surgical navigation system.
- In still a further embodiment of the invention, a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to make bone resections, operating the robotically controlled bone preparation system to machine the bone to have features corresponding to features of a guide for guiding a manual cutting tool, coupling the guide to the bone, and resecting the bone with the manual cutting tool guided by the guide. The step of operating the robotically controlled bone preparation system to machine the bone may include creating at least one hole in the bone. The at least one hole in the bone may correspond to at least one hole or post in the guide. The method may also include attaching the guide to the bone after aligning the at least one guide hole or post with the at least one hole in the bone. The surgery may be completed manually after the step of attaching the guide to the bone, wherein the robotically controlled bone preparation system is not used in the surgery after the guide is attached to the bone. The guide may include a tracker for use with a surgical navigation system. The completed surgery may be a total knee arthroplasty. The step of creating at least one hole in the bone may include creating at least two holes in a femur and at least two holes in a tibia. The step of attaching the guide to the bone may include attaching a femoral resection guide to the femur and/or a tibial resection guide to the tibia. The completed surgery may also be a partial knee arthroplasty. The step of creating at least one hole in the bone may include creating at least two holes in a femur and at least two holes in a tibia. The step of completing the surgery manually may include manually resecting the femur and/or manually resecting the tibia facilitated by a surgical navigation system.
- In yet another embodiment of the invention, a method of performing surgery on a bone includes providing a robotically controlled bone preparation system to make bone resections. The method may also include operating the robotically controlled bone preparation system to machine the bone to have features corresponding to features of a surgical instrument, wherein the robotic machining has at least one of increased accuracy, reproducibility, and speed compared to manual resections. The method may further include manually completing the surgery on the bone without further use of the robotically controlled bone preparation system, including the step of manually coupling the surgical instrument to the bone.
-
FIG. 1 is a partial perspective view of a robot preparing contingency or bailout holes in a femur and tibia. -
FIG. 2A is a flow chart representing steps of a contingency planning phase in a TKA procedure with a TKA contingency plan. -
FIG. 2B is a flow chart representing steps of a debulking phase in a robotic TKA procedure. -
FIG. 2C is a flow chart representing steps of a finishing pass phase in a robotic TKA procedure. -
FIG. 2D is a partial perspective view of an exemplary configuration of bailout holes created in a femur in the contingency planning phase ofFIG. 2A . -
FIG. 2E is a partial perspective view of an alternate configuration of bailout holes created in a femur in the contingency planning phase ofFIG. 2A . -
FIG. 2F is a partial perspective view of an exemplary configuration of bailout holes created in a tibia in the contingency planning phase ofFIG. 2A . -
FIG. 2G is a perspective view of a J-block resection guide. -
FIG. 2H is a perspective view of an alternate embodiment of a monolithic J-block resection guide. -
FIG. 2I is a front perspective view of a 4-in-1 cutting guide. -
FIG. 2J is a rear perspective view of the 4-in-1 cutting guide ofFIG. 2I . -
FIG. 2K is a perspective view of a universal resection guide. -
FIG. 2L is a perspective view of an alternate embodiment of a monolithic universal resection guide. -
FIG. 3A is a flow chart representing steps of a contingency planning phase in a bicruciate retaining (“BCR”) procedure with a TKA contingency plan. -
FIG. 3B is a flow chart representing steps of a debulking phase in a robotic BCR procedure. -
FIG. 3C is a flow chart representing steps of a finishing pass phase in a robotic BCR procedure. -
FIG. 3D is a partial perspective view of bailout holes created in a tibia in the contingency planning phase ofFIG. 3A . -
FIG. 4A is a flow chart representing steps of a contingency planning phase in a partial knee replacement (“PKR”) procedure with a TKA contingency procedure. -
FIG. 4B is a flow chart representing steps of a debulking phase in a robotic PKR procedure. -
FIG. 4C is a flow chart representing steps of a finishing pass phase in a robotic PKR procedure. -
FIG. 4D is a partial perspective view of bailout holes created in a femur in the contingency planning phase ofFIG. 4A . -
FIG. 4E is a partial perspective view of an alternate configuration of bailout holes created in a femur in the contingency planning phase ofFIG. 4A . -
FIG. 4F is a perspective view of a femur and tibia after a robot failed during a robotic PKR procedure. -
FIG. 4G is a perspective view of a distal femoral cut being manually performed using bailout holes. -
FIG. 4H is a perspective view of the distal femur after completion of the manual cut illustrated inFIG. 4F . -
FIG. 4I is a perspective view of a proximal tibial cut being manually performed on the tibia ofFIG. 4E using bailout holes. -
FIG. 4J is a perspective view of a one embodiment of a navigated MIS resection guide with a tracker attached by a tracker adapter. -
FIG. 4K is a perspective view of the navigated MIS resection guide ofFIG. 4I attached to a femur. - As used herein, the term “distal” means more distant from the heart and the term “proximal” means closer to the heart. The term “inferior” means toward the feet and the term “superior” means towards the head. The term “anterior” means towards the front part of the body or the face and the term “posterior” means towards the back of the body. The term “medial” means toward the midline of the body and the term “lateral” means away from the midline of the body. Terms including “debulking,” “resecting,” “machining,” “finishing,” and “bone preparation,” are used interchangeably herein, and all generally refer to the removal and/or reshaping of bone.
- In the figures, with particular reference to the flow charts contained therein, a step enclosed in a hexagon indicates a tool-change step, a step enclosed in a trapezoid indicates a knee-positioning step, a step in a parallelogram indicates a registration step, a step enclosed in a diamond may indicate a step which branches into multiple other possible steps, and a step enclosed in a rectangle indicates a bone preparation or trialing/implantation step, unless otherwise indicated. Further, a step or group of steps enclosed in a broken rectangle indicates that the steps contained therein may be alternative or optional steps.
- An exemplary robotically controlled bone preparation system, or
robot 100 for short, that may be used in various joint arthroplasty procedures is illustrated inFIG. 1 . Only a portion of therobot 100—anarm 110 and acutting tool 120—is illustrated inFIG. 1 . Therobot 100 is shown after having drilled a number ofholes 150 into thefemur 130 andtibia 140. Theholes 150 are referred to herein interchangeably as “contingency” or “bailout” holes, as the holes may only need to be used if therobot 100 fails and the surgeon needs to manually complete the procedure, using the bailout holes 150 as reference points. However, holes 150 may also be interchangeably referred to herein as “plan” points because, as is described in greater detail below, the bailout holes or plan points 150 may be useful in situations other than after failure of therobot 100. Moreover, such plan points 150 may include varying trajectories such that each hole has a unique angle with respect to a plane of a joint. For example, each hole may have a unique (x, y, z) coordinate as an origin point located on the articular surface of a joint, while the hole also includes a unique (x′, y′, z′) coordinate where it terminates in bone. Each hole therefore has a central axis, in which the central axes of the holes may be parallel or not parallel to one another. Therefore, the holes generally have a unique position on the articular surface of bone, the position defining a location and orientation. Because of the general manner in which the holes are produced, the holes are generally cylindrically shaped along their length. The diameter and length or depth of the holes may vary as well depending on the desired dimensions of the pins or posts that may be coupled to the holes if required. Further still, as explained in more detail below, such holes may be used in procedures on other joints, including ball-and-socket joints, such as the shoulder or hip. As illustrated inFIG. 1 , therobot 100 is in the process of drilling plan points 150 in preparation for a total knee arthroplasty (“TKA”) procedure in which a J-block resection guide is to be used. As is described in greater below, other configurations of plan points 150 may be used for other procedures and for other instruments. - Without limiting the surgical planning described herein to a particular joint or a particular procedure for a joint, there are a number of exemplary joint procedures that may be performed with surgical plan options geared toward manual completion of the procedure. For example, a number of knee procedures may be planned with options or contingencies to the same or alternate knee procedures. For a partial knee replacement (“PKR”) different surgical plans may facilitate a surgeon completing the procedure manually as a PKR, or transitioning to a TKA procedure, if such a transition to manual surgery is desired or required. Similarly, a patellofemoral joint (“PFJ”) procedure may include different surgical plans that facilitate a surgeon completing the procedure manually as a PFJ, or transitioning to a TKA procedure, if such a transition to manual surgery is desired or required. A PFJ-PKR procedure may include a surgical plan to facilitate a surgeon completing the procedure as a TKA. Similarly, a TKA procedure may include a surgical plan that facilitates a surgeon completing the procedure as a TKA. The intended procedure and the desired contingency procedure influence the particular configuration of holes prepared during the procedure, as does the particular jigs, resection guides or other instruments intended to be used to complete the contingency procedure, both of which are described in greater detail below. For knee procedures, contingency plans may be applicable, for example, to bi-cruciate retaining procedures, posterior-cruciate retaining procedures, and cruciate sacrificing procedures. Table 1 below lists a number of exemplary contingency procedures for different intended procedures that may be possible for knee joints. It should be noted that the list is non-exhaustive and other combinations of intended and contingency procedures, such as BCR to TKA or BCR to BCR, are contemplated within the scope of the disclosure.
-
TABLE 1 Intended Procedure Contingency Procedure Uni-compartmental PKR PKR TKA PFJ PFJ TKA Bi-compartmental PFJ-PKR TKA Tri-compartmental TKA TKA - Steps of a TKA procedure such as in cruciate retaining or posterior stabilized procedures, for example, are illustrated in flow charts in
FIGS. 2A-C . SpecificallyFIG. 2A shows acontingency preparation phase 200 a,FIG. 2B shows adebulking phase 200 b, andFIG. 2C shows afinishing phase 200 c. In this particular example, the contingency procedure—a TKA procedure—is the same as the intended procedure. - The particular
contingency preparation phase 200 a illustrated inFIG. 2A takes the form of creating plan points 150. Specifically, thecontingency preparation phase 200 a begins withstep 202, which includes loading acutting tool 120, such as a burr or router, on therobot 100. In one example, thecutting tool 120 may be a 2.5 mm burr or router, but other sizes, such as approximately ⅛ inch or approximately 3.175 mm, and other cutting tools may be appropriate. Instep 204, the knee is put into flexion, and retractors are positioned in the surgical site to protect the anterior cruciate ligament (“ACL”) and posterior cruciate ligament (“PCL”), for example. Instep 206, registration is performed with tracker pins, for example. Generally, with registration, the positions of anatomical landmarks and axes are digitized as reference for the alignment of instruments, bone cuts, and the leg. Registration may be performed on thefemur 130 andtibia 140 using trackers 540 (seeFIGS. 4J-K ) that are fixed to the bone to allow the NAV system to guide therobot 100. As part of the registration, for example, the surgeon may touch off key anatomical landmarks, for example, by using a pointer tool of the NAV system to mark the medial and lateral epicondyles such that the NAV system is able to track the location of the key anatomical landmarks during the procedure. The surgeon may then verify the registration, for example, by reviewing and confirming the digitized mechanical axes and analyzing initial leg alignment with respect to range of motion, varus/valgus misalignment and laxity, and flexion contracture or hyperextension. Once verified, the surgeon may accept the surgical plan instep 208. - The
robot 100 drills fourplain points 150, for example, into thefemur 130 instep 210. As described above, in addition to the intended and the contingency procedure, the number and position of the plan points 150 may also depend on the particular instruments intended for use with the procedure. For example, a different configuration of plan points 150 may be used if a femoral resection is to be guided by a J-block resection guide, a universal resection guide, a navigated MIS guide, or any other suitable guide. As illustrated inFIG. 2D , the fourplan points 150 in thefemur 130 may include two anterolateral plan points 150 a and two distal plan points 150 b. In another embodiment, step 210 may entail drilling two anterior plan points 150 a and two distal plan points 150 b as illustrated inFIG. 2E . Instep 212, therobot 100 may drill fourplan points 150 into thetibia 140. Specifically, as illustrated inFIG. 2F , the plan points 150 may include two proximal plan points 150 c. Step 212 may also include therobot 100 drilling two proximal-anterior plan points 150 d in thetibia 150. Although it is preferred for therobot 100 to create the plan points 150, it is contemplated that the plan points 150 may be created manually for all the surgical plans described herein. - The plan points 150 may provide references for the surgeon to use if the
robot 100 should fail later in the procedure, or to otherwise aid a surgeon in manually completing a procedure. For example, in the configuration illustrated inFIG. 2D , the two anterolateral plan points 150 a may be configured to align withguide holes 650 a in a J-block resection guide 600 as illustrated inFIG. 2G . Fixation pins may be placed through each of a pair of guide holes 650 a and further into plan points 150 a to fix the J-block 600 to the bone. J-block resection guide 600 may be generally “J”-shaped and include a number of sets or pairs of guide holes, each set being a different distance from acutting slot 610. J-block resection guide 600 may also include additional holes, such ascross-pin hole 620, to provide additional stability when fixing the resection guide to the bone. An alternate monolithic J-block 600′ as illustrated inFIG. 2H , may be used instead of J-block 600. Rather than having pairs or sets ofholes 650 a, J-block 600′ has a pair ofposts 650 a′ that are configured to be inserted into plan points 150 a. The two distal femoral plan points 150 b may be sized and configured to mate with a 4-in-1cutting block 700, as illustrated inFIGS. 2I-J and as is known in the art. In particular, posts 750 b may be used to attach the 4-in-1cutting block 700 to thefemur 130. - The configuration of plan points 150 illustrated in
FIG. 2E may be configured to align withguide holes 850 a in auniversal resection guide 800, as illustrated inFIG. 8K . Fixation pins may be placed through each of a pair of guide holes 850 a and further into plan points 150 a to fix theuniversal resection guide 800 to the bone.Universal resection guide 800 may include a number of sets or pairs of guide holes 850 a, each set being a different distance from atop surface 810.Universal resection guide 800 may also include additional holes, such ascross-pin holes 820, to provide additional stability when fixing the resection guide to the bone. An alternate monolithicuniversal resection guide 800′ as illustrated inFIG. 2L , may be used instead ofuniversal resection guide 800. Rather than having pairs or sets ofholes 850 a,universal resection guide 800′ has a pair ofposts 850 a′ that are configured to be inserted into plan points 150 a. As in the previous embodiment, the two distal femoral plan points 150 b may be sized and configured to mate with 4-in-1cutting block 700. - Referring again to
FIG. 2F , the two proximal-anterior tibial plan points 150 d may be sized and positioned to mate with a proximal tibial resection guide to facilitate the proximal tibial cut. The two proximal tibial plan points 150 c, which may be optional, may be sized and shaped to mate with a tibial template for rotation assessment and trial reduction. - The remaining steps in the cruciate retaining or posterior stabilized TKA procedure are described immediately below according to a successful procedure in which the
robot 100 completes the procedure. In thedebulking phase 200 b, illustrated inFIG. 2B , thefirst step 214 is to load (or switch to) a cutting tool, such as a barrel burr, onto therobot 100. The cutting tool may be, for example, a 6, 8, or 10 mm barrel burr. However, other sizes and other cutting tools may also be appropriate. Instep 216, the posterior anddistal femur 130 are debulked with chamfer cuts and the proximal tibia is debulked. The debulking may be done simultaneously or sequentially. Tissue balancing may be done instep 218 if required. If not required, the surgeon may move to thebaseplate step 220. If required, the surgeon may perform tissue or ligament balancing as is known in the art. For example, the surgeon may check the tensioning of the knee in flexion and extension, and check the alignment of the mechanical axis using a manual distractor and/or the graphic user interface of the NAV system. If the intraoperative measurements are acceptable, the surgeon may move to thebaseplate step 220. If they are not acceptable, the surgeon may perform soft tissue release. Following the soft tissue release, the surgeon may repeatstep 218 for other degrees of freedom of the knee. Alternately, if additional bone surface preparation is required, the surgeon may return to thedebulking step 216 after performing the tissue release. Once the surgeon is satisfied with thetissue balancing step 218, he may advance to thebaseplate step 220. - From the
baseplate step 220, the surgeon may check and verify rotation using a tibial template instep 222. Depending on the type of baseplate being used, thetibia 140 may need to be further prepared prior to approving rotation. For example, if a universal baseplate is to be used, the surgeon may debulk the tibia for accepting the universal stem of the baseplate. Alternatively, if a primary baseplate is to be used, the surgeon may move directly frombaseplate step 220 to step 222 to approve rotation using a tibial template. Once rotation is approved, the knee is placed in extension instep 224 and retractors and a patella clamp are positioned in the surgical site as necessary and as is known in the art. Instep 226, the surgeon removes thetibial tracker 540 and attached the patella clamp with its associated tracker and performs registration for the NAV system, as is also known in the art. Finally, instep 228, the patella is debulked, bringing thedebulking phase 200 b to an end. - In the
first step 230 of the finishingpass phase 200 c, as illustrated inFIG. 2C , a cutting tool, such as a finishing router, is loaded onto therobot 100. The router may be, for example, a 2.5 mm router, but other sizes and other cutting tools may be appropriate. Instep 232, the patella is finished by the robot, and fixation holes for the pegs in the patellar implant are created in the patella. At this point, instep 234, the patella clamp andtracker 540 are removed and the tibial tracker is turned on. The anterior femoral surface is finished instep 236 with the robot. Alternatively, the anterior femoral surface may be finished earlier with the larger cutting tool. - After the femoral surface is finished, the knee is put into flexion in
step 238 and retractors are positioned in the surgical site. Once in position, instep 240, the distal/posterior femur and proximal tibia are posed in flexion, between approximately 90 and approximately 110 degrees. Femoral preparation is completed, including, for example, preparing the “box” for posterior stabilized TKA procedures. Next, instep 242, the tibial insert thickness is selected using the tibial template. Once selected, the tibial keel is prepared instep 244. The tibial keel may be, for example, prepared at full depth instep 246 if cement is used, or at partial depth instep 248 if the implantation will be cementless. One the tibial keel is prepared, the surgeon may complete the procedure by trialing the implant components instep 250 to verify proper size and position, create the femoral pegs using therobot 100 instep 252, and implanting the components instep 254. - In the procedure described above for cruciate retaining or posterior stabilized TKA, if the
robot 100 and NAV system fail during the procedure after the robot has entered thedebulking phase 200 b, the surgeon may continue the procedure manually using the plan points (or bailout holes) 150. Specifically, depending on the configuration of plan points 150 prepared, the surgeon may attach a distal femoral resection guide to the femur. For example, with reference toFIG. 2D , the surgeon may attach a J-block resection guide femur 130 using anterolateral femoral plan points 150 a. This or a similar configuration of plan points 150 may also allow use of a navigatedMIS jig 500, illustrated inFIGS. 4F-K . Alternately, with reference toFIG. 2E , the surgeon may attach auniversal resection guide femur 130 using anterior plan points 150 a. Once attached, the surgeon may make the femoral distal cut using the guide. Referring toFIGS. 2D-E , following the femoral distal cut, the surgeon may attach, for example, a 4-in-1cutting block 700 to the femur using the distal femoral plan points 150 b. Once attached, the surgeon may make additional femoral cuts including, for example, an anterior cut, a posterior cut, and anterior and posterior chamfer cuts using the aforementioned 4-in-1guide 700. Similarly, the surgeon may attach a tibial resection guide to thetibia 140 using the proximal-anterior tibial plan points 150 d. Finally, the tibial template may be attached to thetibia 140 using proximal tibial plan points 150 c for rotation assessment and trial reduction. A number of intermediate steps to those described directly above are not explicitly detailed here, as they may be similar to those described above with relation to the complete successful robotic procedure, or are otherwise known in the art. Because the plan points 150 are created to correspond to traditional components used in manual TKA procedures, a surgeon will be able to relatively seamlessly transition from a robotic TKA procedure to a manual TKA procedure in the case therobot 100 fails. - In fact, the
robot 100 may even be used to create the plan points 150 when the surgeon intends to perform a manual TKA procedure and has no intention to use therobot 100 after the plan points 150 are created. For example, a surgeon may prefer to have therobot 100 pre-drill the plan points 150, which would be used not as “bailout” holes in case a contingency plan needs implementation, but rather in a case in which a manual procedure is intended after the robot pre-drills the holes. This may be preferred, for example, because the plan points 150 made by therobot 100 may provide a way to set up highly accurate cuts using a jig, such as the J-block or universal resection guides 600 (or 600′), 800 (or 800′). Further, the use of therobot 100 to implement these plan points 150 may allow a predetermined surgical plan to be used to determine the location of the holes and thus the positioning of the jigs and ultimately the precise location of the cuts. And this is not limited to drilling holes. For example,robot 100 may machine the bone to have any number of features that correspond to a surgical instrument or implant. For example, therobot 100 may machine the bone to have a precisely curved surface to correspond to a curved surface of an implant. Machining such a curved surface without the use of a robot may be impossible to accurately reproduce by hand. For example, therobot 100 may machine the curved surface such that the machined surface of the bone corresponds to an axis of rotation of an implant to be implanted onto the bone. Once the surface is machined by therobot 100, the user may manually complete the procedure by attaching the implant to the bone and performing any additional required steps. Still further, therobot 100 may create curved holes in the bone to accept, for example, a curved keel of a prosthetic implant. It may only be possible to accurately reproduce such a curved hole that corresponds to a curved structure of an implant via therobot 100, which may be impossible to create manually. In each of the above examples, the machining by therobot 100 is not used strictly as a contingency plan. Rather, therobot 100 is being used to provide a benefit of robotic machining including, for example accuracy, speed, and/or reproducibility. Despite use of therobot 100, the intent from the outset is to manually complete the procedure without further use of therobot 100 after the initial machining of the bone by therobot 100. - Plan points 150 may also provide other benefits, such as confirming or rescuing registration. As noted above in connection with
step 206 ofFIG. 2A , a user may perform registration to digitize the positions of anatomical landmarks and axes as reference for the alignment of instruments, bone cuts, and the leg. Subsequent to registration, a user may reference plan points 150 to check the accuracy of registration and also to rescue a compromised registration, for example in the event atracker 540 has been moved inadvertently. To accomplish this, the user may place the pointer tool in the desiredplan point 150 and visualize the location of the hole and pointer tool on the NAV screen as it relates to the physical anatomy in situ. If the screen image does not match the tangible anatomy under direct visualization the user may determine that thetracker 540 likely moved subsequent to the step of verifying the registration. The user may then direct the guidance system to calculate the difference between the altered tracker location and/or coordinate system and the previous registration, and adjust accordingly so that the altered tracker location and/or coordinate system can be used to complete the procedure successfully. After the calculations are completed and the coordinate systems are adjusted, the procedure can be completed as planned. The above described procedure of registration verification, as well as registration rescue, may apply with equal force to the other specific surgical plans described herein. - Steps of a BCR procedure with a contingency plan of a TKA procedure are illustrated in flow charts in
FIGS. 3A-C . SpecificallyFIG. 3A shows acontingency preparation phase 300 a,FIG. 3B shows adebulking phase 300 b, andFIG. 3C shows afinishing phase 300 c. - The particular
contingency preparation phase 300 a illustrated inFIG. 3A takes the form of creating plan points 150. The configuration of the femoral plan points 150 may be, for example, the same as illustrated inFIG. 2D orFIG. 2E , depending on the particular instrumentation desired for use. The configuration of the tibial plan points 150 may be, for example, the same as illustrated inFIG. 2F or may take the configuration illustrated inFIG. 3D . Specifically, thecontingency preparation phase 300 a begins withstep 302, which includes loading acutting tool 120, such as a router, on therobot 100. In one example, thecutting tool 120 may be a 2.5 mm router, but other sizes, such as approximately ⅛ inch or approximately 3.175 mm, and other cutting tools may be appropriate. Instep 304, the knee is put into flexion, and retractors are positioned in the surgical site to protect the ACL and PCL. Instep 306, registration is performed usingfemur 130 andtibia 140trackers 540 to allow the NAV system to guide therobot 100. The surgeon may accept the surgical plan instep 308 if satisfied, touching off key landmarks and verifying placement. - The
robot 100 drills fourplan points 150 into thefemur 130 instep 310. Specifically, as illustrated in, and described in relation to,FIGS. 2D-E , the fourplan points 150 in thefemur 130 may include two anterolateral plan points 150 a and two distal plan points 150 b (FIG. 2D ) or two anterior plan points 150 a and two distal plan points 150 b (FIG. 2E ). In step 312, therobot 100 may drill two proximal-anterior plan points 150 d into thetibia 140. Alternately, therobot 100 may drill two proximal-anterior plan points 150 d and two proximal plan points 150 c in thetibia 140, as illustrated in, and described in relation to,FIG. 2F . - As described with relation to the
contingency preparation phase 200 a for the posterior stabilized of cruciate retaining TKA procedure, the plan points 150 for the BCR to TKA procedure may provide references for the surgeon to use if therobot 100 should fail later in the procedure and the procedure is to be completed as a TKA, or if the surgeon otherwise decides to complete the procedure manually as a TKA. - The remaining steps in the BCR to TKA procedure are described immediately below according to a successful BCR procedure in which the
robot 100 completes the procedure. In thedebulking phase 300 b, illustrated inFIG. 3B , the first step 314 is to load (or switch to) a cutting tool, such as a barrel burr, onto therobot 100. The cutting tool may be, for example, a 6, 8, or 10 mm barrel burr. However, other sizes and other cutting tools may also be appropriate. In step 316, the posterior anddistal femur 130 are debulked with chamfer cuts and the proximal tibia is debulked. The debulking may be done simultaneously or sequentially. Tissue balancing may be done in step 318 if required, although balancing may not be recommended in a BCR procedure. Following the tissue balancing step 318, the surgeon may perform an intraoperative assessment of the surgical plan and make changes if necessary instep 320. Afterstep 320, or after step 316 if tissue balancing is not required, the surgeon may put the knee in flexion in step 322, attaching retractors and positioning a patella clamp as necessary. Thetibial tracker 540 is turned off in step 324 and the patella clamp with tracker is attached and registered for the NAV system. Therobot 100 debulks the patella in step 326, bringing thedebulking phase 300 b to an end. - In the
first step 328 of the finishingpass phase 300 c, as illustrated inFIG. 3C , a cutting tool, such as a finishing router, is loaded onto therobot 100. The router may be, for example, a 2.5 mm router, but other sizes and other cutting tools may be appropriate. Instep 330, the patella is finished by the robot, and fixation holes for the pegs in the patellar implant are created in the patella. At this point, instep 332, the patella clamp andtracker 540 are removed and the tibial tracker is reattached. The anterior femoral surface is finished instep 334 with the robot. - After the femoral surface is finished, the knee is put into flexion in
step 336 and retractors are positioned in the surgical site to protect the ACL and PCL. Once in position, instep 240, the distal/posterior femur and proximal tibia are posed in flexion, between approximately 90 and approximately 110 degrees. Instep 338, femoral preparation is completed, including, for example, preparation of femoral pegs. Tibial preparation is also completedstep 338, including, for example, preparation of the tibial plateau, the tibial eminence periphery, and the tibial keel. Next, instep 340, the tibial insert thickness is selected using the tibial template, as is known in the art. Once selected, the surgeon may complete the procedure by trialing the implant components instep 342 to verify proper size and position, and implanting the components instep 344. - In the procedure described above for BCR to TKA, if the
robot 100 and NAV system fail during the procedure after the robot has entered thedebulking phase 300 b, the surgeon may continue the procedure manually as a TKA using the plan points as bailout holes 150. This contingency procedure would be essentially the same as described for the TKA to TKA procedure above. It should be noted that the BCR procedure may be planned with plan points 150 such that the contingency procedure is also a BCR procedure. Similar as to what is described above, plan points 150 may be used for completing a procedure manually, even in cases where therobot 100 does not fail and the original plan includes manual completion. - Steps of a PKR procedure are illustrated in flow charts in
FIGS. 4A-C . SpecificallyFIG. 4A shows acontingency preparation phase 400 a,FIG. 4B shows adebulking phase 400 b, andFIG. 4C shows afinishing phase 400 c. - The particular
contingency preparation phase 400 a illustrated inFIG. 4A takes the form of creating plan points 150, such that a PKR procedure may be completed as a TKA procedure. It should be noted that a different configuration of plan points 150 may be used such that an intended PKR procedure may still be completed as a PKR procedure if therobot 100 fails during the procedure, or if the surgeon otherwise desires to complete the procedure manually. For example, for a PKR to PKR procedure, four plan points may be created in the femur (not illustrated) to interact with a distal resection guide and a 2-in-1 cutting block. For the PKR to TKA procedure, the plan points may take the configurations, for example, as illustrated inFIG. 4D orFIG. 4E . Specifically, thecontingency preparation phase 400 a begins withstep 402, which includes loading acutting tool 120, such as a router, on therobot 100. In one example, thecutting tool 120 may be a 2.5 mm burr, but other sizes, such as approximately ⅛ inch or approximately 3.175 mm, and other cutting tools may be appropriate. Instep 404, the knee is put into flexion, and retractors are positioned in the surgical site. Instep 406, registration is performed usingfemur 130 andtibia 140trackers 540 to allow the NAV system to guide therobot 100. The surgeon may accept the surgical plan instep 408 if satisfied, touching off key landmarks and verifying placement. - The
robot 100 drills threeplan points 150 into thefemur 130 instep 410. As described above, the particular configuration of plan points 150 may depend on the instruments to be used if the procedure is to be completed manually. As illustrated inFIG. 4D , the threeplan points 150 in thefemur 130 may include two anterolateral plan points 150 a and adistal plan point 150 b. All threeplan points 150 in thefemur 130 are drilled in the particular compartment being replaced. In another embodiment, step 410 may entail drilling two anterior plan points 150 a and adistal plan point 150 b, as illustrated inFIG. 4E . Instep 412, therobot 100 drills two (FIG. 3D ) or four (FIG. 2F ) plan points 150 into thetibia 140, depending on the preference of the surgeon. - As described with relation to the contingency preparation phases 200 a and 300 b for the different TKA procedures, the plan points 150 for the PKR procedure may provide references for the surgeon to use if the
robot 100 should fail later in the procedure, or if the surgeon otherwise desires to complete the surgical plan manually. For example, the two anterolateral femoral plan points 150 a (FIG. 4D ) may be sized and positioned to mate with a J-block resection guide MIS resection guide 500, as shown inFIGS. 4F-K , for example. J-block resection guides 600 are known in the art and described more fully in U.S. Patent Publication No. 2005/0171545, the entire contents of which are hereby incorporated by reference herein. Also as described in relation to other embodiments herein, according to the configuration of plan points 150 illustrated inFIG. 4E , two anterior plan points may be configured to facilitate attachment of auniversal resection guide femur 130. In the configuration of plan points 150 illustrated in bothFIGS. 4D-E , adistal plan point 150 b may be configured to mate with 2-in-1 resection guide (not illustrated). The two anterior tibial plan points 150 d may be sized and positioned to mate with a proximal tibial resection guide. - The remaining steps in the PKR procedure are described immediately below according to a successful procedure in which the
robot 100 completes the procedure. In thedebulking phase 400 b, illustrated inFIG. 4B , thefirst step 414 is to load (or switch to) a cutting tool, such as a barrel burr, onto therobot 100. The cutting tool may be, for example, a 6, 8, or 10 mm barrel burr. However, other sizes and other cutting tools may also be appropriate. Instep 416, the distal and posterior chamfer cuts are made on thefemur 130. Following these cuts, theproximal tibia 140 and the posterior femur are sequentially debulked. Tissue balancing may be done instep 418 if required. If not required, the surgeon may move to the finishingpass phase 400 c. If required, the surgeon may perform tissue balancing as is known in the art. For example, the surgeon may check the tensioning of the knee in flexion and extension, and check the alignment of the mechanical axis using a manual distractor and/or the graphic user interface of the NAV system. If the intraoperative force measurements are acceptable, the surgeon may move to the finishingpass phase 400 c. If they are not acceptable, the surgeon may perform soft tissue release. Following the soft tissue release, the surgeon may repeatstep 418 for other degrees of freedom of the knee. Alternately, if additional bone surface preparation is required, the surgeon may return to thedebulking step 416 after performing the tissue release. Once the surgeon is satisfied with thetissue balancing step 418, he may advance to the finishingpass phase 400 c. - In the
first step 420 of the finishingpass phase 400 c, as illustrated inFIG. 4C , a cutting tool, such as a finishing router, is loaded onto therobot 100. The router may be, for example, a 2.5 mm router, but other sizes and other cutting tools may be appropriate. Instep 422, a finishing pass on thefemur 130 is completed, for example with the distal/posterior femur and proximal tibia being posed in flexion, between approximately 90 and approximately 110 degrees. Instep 424, the proximal tibial preparation is completed, including, for example, preparation of tibial pegs. Finally, the surgeon may complete the procedure by trialing the implant components instep 426 to verify proper size and position, and implanting the components instep 428. - In the procedure described above for PKR, if the
robot 100 and NAV system fail during the procedure after the robot has entered thedebulking phase 400 b, the surgeon may continue the procedure manually using the plan points 150 as bailout holes, for example as illustrated inFIG. 4D or 4E. Specifically, with reference toFIG. 4F , afemur 130 andtibia 140 are illustrated after plan points 150 are created and at a point which the surgeon decides to complete the procedure manually, in the illustrated case because of a failure of therobot 100.FIG. 4F illustrates the position of thefemur 130, with distalfemoral plan point 150 b visible. Anterolateral plan points configured to mate with a navigated MIS resection guide, similar to the anterolateral plan points 150 a ofFIG. 4D , are not visible, but fixation pins 510 extend through the navigatedMIS resection guide 500 and into the anterolateral plan points 150 a. Partially visible inFIG. 4F is another navigatedMIS resection guide 500 with tracker adapter 502 (seeFIGS. 4J-K ) attached to thetibia 140, described in greater detail below.FIG. 4G illustrates acutting blade 520 being used in conjunction with the navigatedMIS resection guide 500 which is held in place by the fixation pins 510 inserted into the anterolateral plan points 150 a. Thecutting blade 520 is used to manually complete the distal femoral cut, as illustrated inFIG. 4H .FIG. 4I illustrates thetibia 140 with a navigatedMIS resection guide 500 attached. Fixation pins 510 are inserted into tibial bailout holes to hold the navigatedMIS resection guide 500 in place while acutting blade 520 is used to resect theproximal tibia 130. As can be seen despite the transition from a robotic to manual procedure mid-surgery, the intended PKR robotic procedure can seamlessly be transitioned into a successful manual TKA procedure by use of the plan points 150 created during thecontingency planning phase 400 a. - It should be noted that, although particular configurations of plan points are illustrated herein for use with particular types of resection guides, the configuration of the plan points are, at least in part, dictated by the particular jigs, resection guides, or other instruments that need to be attached to the bone using the bailout holes. As such, the methods described herein may be expanded to be used with many other particular resection guides, for example, without departing from the spirit of the invention.
- It may also be the case that the
robot 100 fails mid-surgery, but the NAV system continues functioning properly. In this scenario, the surgeon may complete the surgery in a similar manner as described directly above, with the aid of the NAV system. For example,FIG. 4J illustrates navigatedMIS resection guide 500 with atracker adapter 502 andtracker 540 attached. The assembly attached to thefemur 130 withfixation pins 510 is illustrated inFIG. 4K . Essentially, after therobot 100 fails, the surgery would be completed much as described directly above, but with the additional aid of the NAV system facilitating, for example, the location of the resections. Although surgical procedures using guidance from NAV systems is known in the art, for example in U.S. Pat. Nos. 7,392,076 and 8,382,765, the entire contents of which are hereby incorporated by reference herein, it would be desirable for a surgeon to be able to seamlessly transition from a robotic surgical procedure to a NAV guided manual procedure in the case therobot 100 fails but the NAV system is still operational. - It should be noted that, throughout this disclosure, reference has been made to particular configurations of plan points or bailout holes 150. It should be understood that other configurations are possible, depending on the particular surgical procedure being performed and the particular device to be used with the plan points 150. For example, the plan points 150 may be positioned differently than shown herein to match with the intended location of fixation pins of any appropriate jig to be used in the case of robotic failure. However, as described above, the plan points 150 may also be used in the case in which robotic surgery is not contemplated, but rather wherein a surgeon desires a
robot 100 to create plan points 150 that correspond to one or more jigs to be used with the intended manual surgical procedure. - Although the invention herein has been described with reference to particular embodiments, it is to be understood that these embodiments are merely illustrative of the principles and applications of the present invention. It is therefore to be understood that numerous modifications may be made to the illustrative embodiments and that other arrangements may be devised without departing from the spirit and scope of the present invention as defined by the appended claims.
Claims (35)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/461,002 US20160045268A1 (en) | 2014-08-15 | 2014-08-15 | Surgical plan options for robotic machining |
US16/877,714 US11627979B2 (en) | 2014-08-15 | 2020-05-19 | Surgical plan options for robotic machining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/461,002 US20160045268A1 (en) | 2014-08-15 | 2014-08-15 | Surgical plan options for robotic machining |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/877,714 Continuation US11627979B2 (en) | 2014-08-15 | 2020-05-19 | Surgical plan options for robotic machining |
Publications (1)
Publication Number | Publication Date |
---|---|
US20160045268A1 true US20160045268A1 (en) | 2016-02-18 |
Family
ID=55301251
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/461,002 Abandoned US20160045268A1 (en) | 2014-08-15 | 2014-08-15 | Surgical plan options for robotic machining |
US16/877,714 Active 2035-04-10 US11627979B2 (en) | 2014-08-15 | 2020-05-19 | Surgical plan options for robotic machining |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/877,714 Active 2035-04-10 US11627979B2 (en) | 2014-08-15 | 2020-05-19 | Surgical plan options for robotic machining |
Country Status (1)
Country | Link |
---|---|
US (2) | US20160045268A1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170151019A1 (en) * | 2014-02-28 | 2017-06-01 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
WO2017218928A1 (en) * | 2016-06-16 | 2017-12-21 | Pierre Couture | Soft tissue balancing in articular surgery |
WO2018102527A1 (en) * | 2016-11-30 | 2018-06-07 | Blue Belt Technologies, Inc. | Implant cutting block pin placement |
US10251706B2 (en) | 2014-02-28 | 2019-04-09 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US11229489B2 (en) | 2016-06-16 | 2022-01-25 | Zimmer, Inc. | Soft tissue balancing in articular surgery |
US11291512B2 (en) | 2019-05-20 | 2022-04-05 | Think Surgical, Inc. | Robot specific implant designs with contingent manual instrumentation |
US11564744B2 (en) | 2018-12-27 | 2023-01-31 | Mako Surgical Corp. | Systems and methods for surgical planning using soft tissue attachment points |
US11723732B2 (en) | 2015-05-19 | 2023-08-15 | Mako Surgical Corp. | System and method for manipulating an anatomy |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3213697B1 (en) | 2011-09-02 | 2020-03-11 | Stryker Corporation | Surgical instrument including a housing, a cutting accessory that extends from the housing and actuators that establish the position of the cutting accessory relative to the housing |
WO2017095870A2 (en) | 2015-11-30 | 2017-06-08 | Stryker Corporation | Surgical instrument with telescoping nose mechanism |
CN114375183A (en) | 2019-07-15 | 2022-04-19 | 史赛克公司 | Robotic handheld surgical instrument system and method |
AU2022432843A1 (en) | 2022-01-12 | 2024-08-01 | Mako Surgical Corp. | Systems and methods for guiding movement of a hand-held medical robotic instrument |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060142657A1 (en) * | 2002-03-06 | 2006-06-29 | Mako Surgical Corporation | Haptic guidance system and method |
US20110029093A1 (en) * | 2001-05-25 | 2011-02-03 | Ray Bojarski | Patient-adapted and improved articular implants, designs and related guide tools |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000030557A1 (en) | 1998-11-23 | 2000-06-02 | Microdexterity Systems, Inc. | Surgical manipulator |
US6702805B1 (en) | 1999-11-12 | 2004-03-09 | Microdexterity Systems, Inc. | Manipulator |
US7635390B1 (en) * | 2000-01-14 | 2009-12-22 | Marctec, Llc | Joint replacement component having a modular articulating surface |
US7892243B2 (en) | 2001-01-16 | 2011-02-22 | Microdexterity Systems, Inc. | Surgical manipulator |
AU2002248360A1 (en) | 2001-01-16 | 2002-08-19 | Microdexterity Systems, Inc. | Surgical manipulator |
US20030005786A1 (en) | 2001-07-05 | 2003-01-09 | Microdexterity Systems, Inc. | Parallel mechanism |
US7950306B2 (en) | 2007-02-23 | 2011-05-31 | Microdexterity Systems, Inc. | Manipulator |
US20100268249A1 (en) | 2009-04-17 | 2010-10-21 | Microdexterity Systems, Inc. | Surgical system with medical manipulator and sterile barrier |
US20100268250A1 (en) | 2009-04-17 | 2010-10-21 | Microdexterity Systems, Inc. | Surgical system with medical manipulator and sterile barrier |
US20100275718A1 (en) | 2009-04-29 | 2010-11-04 | Microdexterity Systems, Inc. | Manipulator |
-
2014
- 2014-08-15 US US14/461,002 patent/US20160045268A1/en not_active Abandoned
-
2020
- 2020-05-19 US US16/877,714 patent/US11627979B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110029093A1 (en) * | 2001-05-25 | 2011-02-03 | Ray Bojarski | Patient-adapted and improved articular implants, designs and related guide tools |
US20060142657A1 (en) * | 2002-03-06 | 2006-06-29 | Mako Surgical Corporation | Haptic guidance system and method |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10918440B2 (en) | 2014-02-28 | 2021-02-16 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US10251706B2 (en) | 2014-02-28 | 2019-04-09 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US10939961B2 (en) | 2014-02-28 | 2021-03-09 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US10098649B2 (en) | 2014-02-28 | 2018-10-16 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US10105152B2 (en) | 2014-02-28 | 2018-10-23 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US10130428B2 (en) * | 2014-02-28 | 2018-11-20 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US11020185B2 (en) | 2014-02-28 | 2021-06-01 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US20170151019A1 (en) * | 2014-02-28 | 2017-06-01 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US10912614B2 (en) | 2014-02-28 | 2021-02-09 | Blue Belt Technologies, Inc. | Systems and methods for patient-based computer aided surgical procedures |
US10925673B2 (en) | 2014-02-28 | 2021-02-23 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US10667865B2 (en) | 2014-02-28 | 2020-06-02 | Blue Belt Technologies, Inc. | Systems and methods for patient-based computer aided surgical procedures |
US10898269B2 (en) | 2014-02-28 | 2021-01-26 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US10912613B2 (en) | 2014-02-28 | 2021-02-09 | Blue Belt Technologies, Inc. | System and methods for positioning bone cut guide |
US11723732B2 (en) | 2015-05-19 | 2023-08-15 | Mako Surgical Corp. | System and method for manipulating an anatomy |
US12035986B2 (en) | 2015-05-19 | 2024-07-16 | Mako Surgical Corp. | System and method for manipulating an anatomy |
US12274520B2 (en) | 2015-05-19 | 2025-04-15 | Mako Surgical Corp. | System and method for manipulating an anatomy |
US11135021B2 (en) | 2016-06-16 | 2021-10-05 | Zimmer, Inc. | Soft tissue balancing in articular surgery |
WO2017218928A1 (en) * | 2016-06-16 | 2017-12-21 | Pierre Couture | Soft tissue balancing in articular surgery |
EP3471649A1 (en) * | 2016-06-16 | 2019-04-24 | Zimmer, Inc. | Soft tissue balancing in articular surgery |
US11229489B2 (en) | 2016-06-16 | 2022-01-25 | Zimmer, Inc. | Soft tissue balancing in articular surgery |
US11707333B2 (en) | 2016-06-16 | 2023-07-25 | Zimmer, Inc. | Soft tissue balancing in articular surgery |
CN109640862A (en) * | 2016-06-16 | 2019-04-16 | 捷迈有限公司 | Soft tissue balance in joint surgery |
US10136952B2 (en) | 2016-06-16 | 2018-11-27 | Zimmer, Inc. | Soft tissue balancing in articular surgery |
US11051830B2 (en) | 2016-11-30 | 2021-07-06 | Smith & Nephew, Inc. | Implant cutting block pin placement |
US11197679B2 (en) | 2016-11-30 | 2021-12-14 | Smith & Nephew, Inc. | Implant cutting block pin placement |
WO2018102527A1 (en) * | 2016-11-30 | 2018-06-07 | Blue Belt Technologies, Inc. | Implant cutting block pin placement |
US11564744B2 (en) | 2018-12-27 | 2023-01-31 | Mako Surgical Corp. | Systems and methods for surgical planning using soft tissue attachment points |
US12076090B2 (en) | 2018-12-27 | 2024-09-03 | Mako Surgical Corp. | Systems and methods for surgical planning based on bone density |
US11291512B2 (en) | 2019-05-20 | 2022-04-05 | Think Surgical, Inc. | Robot specific implant designs with contingent manual instrumentation |
Also Published As
Publication number | Publication date |
---|---|
US20200275943A1 (en) | 2020-09-03 |
US11627979B2 (en) | 2023-04-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11627979B2 (en) | Surgical plan options for robotic machining | |
EP2623045B1 (en) | Surgical instrumentation set | |
US9707086B2 (en) | Total knee arthroplasty methods, systems, and instruments | |
CN107252338B (en) | Method and apparatus for performing knee arthroplasty | |
EP1958575B1 (en) | Device or system for positioning or preparing the positioning of a medical operating instrument, especially an incision block or a cutting block or a ligament balancing device | |
US11065015B2 (en) | Navigated patella clamp | |
US20140364857A1 (en) | Joint Arthroplasty Devices, Systems, and Methods | |
US20060195111A1 (en) | Universal positioning block assembly | |
US20070219559A1 (en) | Indicator device for use with a surgical guide instrument | |
US12036133B2 (en) | Method and system for preparing bone for receiving an implant | |
CN108348340B (en) | Patient-specific instruments and methods for patellar resurfacing surgery | |
US10426550B2 (en) | Rotatable curved bit and robotic cutting in orthopaedic applications | |
WO2019222728A1 (en) | System and method for tracking resection planes | |
JP2019098050A (en) | Patient suitable type guide installation appliance | |
KR20160067858A (en) | A surgical jig | |
Jaramaz et al. | Naviopfs for unicondylar knee replacement: early cadaver validation | |
JP7244178B2 (en) | Guide system for supporting artificial joint placement surgery and its equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: STRYKER CORPORATION, MICHIGAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KEPPLER, LOU;PRABAHARAN, SATHIYA;HAMPP, EMILY;AND OTHERS;SIGNING DATES FROM 20140813 TO 20140814;REEL/FRAME:033588/0119 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
STCV | Information on status: appeal procedure |
Free format text: NOTICE OF APPEAL FILED |
|
STCV | Information on status: appeal procedure |
Free format text: APPEAL BRIEF (OR SUPPLEMENTAL BRIEF) ENTERED AND FORWARDED TO EXAMINER |
|
STCV | Information on status: appeal procedure |
Free format text: EXAMINER'S ANSWER TO APPEAL BRIEF MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- AFTER EXAMINER'S ANSWER OR BOARD OF APPEALS DECISION |