US20150211335A1 - Thermal regulating well completion devices and methods - Google Patents
Thermal regulating well completion devices and methods Download PDFInfo
- Publication number
- US20150211335A1 US20150211335A1 US14/167,564 US201414167564A US2015211335A1 US 20150211335 A1 US20150211335 A1 US 20150211335A1 US 201414167564 A US201414167564 A US 201414167564A US 2015211335 A1 US2015211335 A1 US 2015211335A1
- Authority
- US
- United States
- Prior art keywords
- stinger
- outlet port
- completion
- dsg
- bore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B36/00—Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2406—Steam assisted gravity drainage [SAGD]
Definitions
- a thermal regulating completion device in accordance to one or more embodiments includes an inner mandrel having a bore, an outer mandrel carrying a seal element, and a passage located between the inner and outer mandrels to circulate a cooling fluid between an inlet port and an outlet port.
- a completion in accordance to one or more embodiments includes a downhole steam generator (DSG) having a water inlet and a discharge to convey a hot effluent away from the DSG, a stinger having an inner mandrel forming a stinger bore in communication with the discharge and an outer mandrel carrying a seal element, and a passage located between the inner mandrel and the outer mandrel to circulate a cooling fluid from an inlet port to an outlet port.
- DSG downhole steam generator
- a method includes generating a hot effluent at a downhole steam generator, discharging the hot effluent through a bore of a stinger landed in a packer, and circulating water through a passage located proximate to the stinger seal.
- thermal regulating well completion devices systems and methods that follows may be better understood. Additional features and advantages of the thermal regulating well completion devices, systems and method will be described hereinafter which form the subject of the claims of the invention. This summary is not intended to identify key or essential features of the claimed subject matter, nor is it intended to be used as an aid in limiting the scope of claimed subject matter.
- FIG. 1 illustrates a well system and completion in which thermal regulating devices, systems and methods may be incorporated and utilized.
- FIG. 2 illustrates a well system and completion in which thermal regulating devices, systems and methods may be incorporated and utilized.
- FIG. 3 illustrates a thermal regulating device incorporated in a completion and discharging an outlet fluid to a downhole steam generator in accordance to one or more embodiments.
- FIG. 4 illustrates a thermal regulating device incorporated in a completion and discharging an outlet fluid through a lower completion in accordance to one or more embodiments.
- FIG. 5 illustrates a thermal regulating device incorporated in a completion having insulation and a cooling fluid passage in accordance to one or more embodiments.
- FIG. 6 illustrates a well completion incorporating thermal regulating devices and methods in accordance to one or more embodiments.
- connection As used herein, the terms “connect,” “connection,” “connected,” “in connection with,” and “connecting” are used to mean “in direct connection with” or “in connection with via one or more elements”; and the term “set” is used to mean “one element” or “more than one element”. Further, the terms “couple,” “coupling,” “coupled,” “coupled together,” and “coupled with” are used to mean “directly coupled together” or “coupled together via one or more elements”. As used herein, the terms “up” and “down”; “upper” and “lower”; “top” and “bottom”; and other like terms indicating relative positions to a given point or element are utilized to more clearly describe some elements.
- these terms relate to a reference point as the surface from which drilling operations are initiated as being the top point and the total depth being the lowest point, wherein the well (e.g., wellbore, borehole) is vertical, horizontal or slanted relative to the surface.
- the well e.g., wellbore, borehole
- FIG. 1 illustrates a well system 5 having a completion 10 in which thermal regulating devices, systems and methods may be incorporated and utilized.
- a wellbore 12 extends from a surface 14 to a formation 16 which is in communication with wellbore 12 . At least a portion of wellbore 12 may be lined with casing 18 .
- Completion 10 is illustrated in FIG. 1 as a steam injection and production completion. The thermal regulating devices, systems and method are not limited to the completion illustrated in FIG. 1 .
- Completion 10 includes a lower completion 20 installed downhole above formation 16 and an upper completion 22 deployed below wellhead 24 and landed in lower completion 20 .
- Lower completion 20 includes a packer 26 (i.e. production packer) having a polished bore receptacle (PBR) 28 and a tail pipe 30 extending below packer 26 .
- Lower completion 20 may include an isolation device 32 such as a valve (i.e. flow control device) located in tail pipe 30 below packer 26 .
- the thermal regulating devices, systems and methods may be utilized to protect temperature-sensitive components of the lower completion 20 (e.g. seal elements) from the downhole temperatures that may be elevated for example in response to hot effluent 74 (e.g., steam, gas, liquid) discharged from upper completion 22 .
- hot effluent 74 e.g., steam, gas, liquid
- Upper completion 22 includes a downhole steam generator (DSG) 36 (e.g. combustor) that utilizes a fuel such as natural gas or methane, and air to convert water to a hot effluent 74 , for example steam, for injection into formation 16 .
- DSG downhole steam generator
- Upper completion 22 may include a control line 38 extending from the surface to one or more downhole devices.
- Control line 38 may be a cable, or umbilical, having more than one conduit for transmitting power and or signals.
- control line 38 may include hydraulic conduits, electrical conductors, optic fibers and the like. Control line 38 is illustrated in FIG. 1 connecting a surface controller 40 with downhole steam generator 36 .
- Control line 38 may be connected for example to sensors, gauges, hydraulic and electrically operated flow control devices, and artificial lift devices (e.g. pumps).
- Controller 40 may include without limitation electronic circuits, processors, transmitters, receivers and power supplies (i.e. hydraulic, electric), and valves (valve manifolds).
- Upper completion 22 is deployed in the wellbore on a tubing 42 extending from the wellhead to a stinger 44 (seal assembly, stabber assembly) which is landed in PBR 28 of lower completion 20 .
- stinger 44 is configured as a thermal regulating device 44 to thermally regulate lower completion 20 , including stinger seals 84 .
- the systems and methods of the present disclosure can be used with any type of packer and with any type of lower completions component that may be sensitive to elevated temperatures.
- the thermal regulating systems and methods of the present disclosure distributes high-temperature fluids and low-temperature fluids as appropriate to protect such temperature-sensitive components and to efficiently selectively distribute thermal energy.
- Upper completion 22 includes a Y-tool 76 at a top end that separates or splits a second or bypass conduit 78 from tubing 42 .
- Bypass conduit 78 is connected back to or combined with tubing 42 downhole at a lower inverted Y-tool 46 .
- Tubing 42 is connected to thermal regulating stinger 44 below inverted Y-tool 46 .
- the section of tubing 42 located between Y-tool 76 and inverted Y-tool 46 is referred to as continuous conduit 80 from time to time.
- Downhole steam generator 36 is connected to bypass conduit 78 and it is in communication with air supply 60 or water supply 64 via tubing 42 to receive air or water during steaming operations.
- Hot effluent 74 e.g. steam and flue gas
- Discharge 48 of DSG 36 is connected to thermal regulating stinger 44 through inverted Y-tool 46 .
- a valve 50 e.g. check valve
- Tubing 42 may include a include a barrier 52 , for example a valve or nipple and plug, located in continuous conduit 80 to selectively close the conduit to divert supply fluid (i.e. water or air) to DSG 36 through bypass conduit 78 .
- a plug 53 is illustrated in FIG. 1 landed in barrier 52 blocking tubing 42 in continuous conduit 80 .
- Continuous conduit 80 can be blocked or closed for example during steam generating and injection operations so that a DSG operational fluid such as water or air can be supplied through tubing 42 into bypass conduit 78 .
- tubing 42 is opened so that formation fluid 72 can be produced to the surface.
- Upper completion 22 includes a fuel supply tubing 54 in communication between DSG 36 and a fuel supply 56 (e.g. natural gas, methane, hydrogen, etc.) located at the surface.
- Fuel supply 56 may include a compressor.
- Air is communicated to DSG 36 from air supply 60 for example via tubing 42 and bypass conduit 78 or through supply tubing 66 .
- Water may be supplied from water supply 64 for example via tubing 42 and bypass conduit 78 , via supply tubing 66 , or through the tubing-casing annulus (i.e. wellbore 12 ).
- the air and gas are combusted at DSG 36 to convert the supplied water into a hot effluent 74 which is discharged through the lower completion and into the formation.
- Hot effluent 74 may include the flue gas from the combustion at DSG 36 .
- Cooling or insulating fluid for example water
- the cooling fluid may be supplied (i.e. communicated) to a cooling inlet port 34 of regulating device 44 for example from water supply 64 .
- the cooling fluid may be communicated to regulating device 44 for example through a supply conduit or through wellbore 12 .
- the cooling fluid may be discharged below packer 26 (e.g. into tail pipe 30 ) or discharged above lower completion 20 and in some embodiments communicated to the inlet of DSG 36 .
- cooling fluid is communicated from water supply 64 through a supply conduit 58 to inlet port 34 of thermal regulating stinger device 44 .
- the cooling fluid may be discharged below packer 26 (e.g., FIG. 4 ) or communicated to DSG 36 .
- DSG supply water may be communicated directly to DSG 36 from the surface for example through tubing 42 and bypass 78 or via supply tubing 66 .
- DSG supply water may include the fluid discharged from the outlet of the thermal regulating device.
- FIG. 2 illustrates a steam completion 10 installed in wellbore 12 .
- upper completion 22 is configured to be deployed during steaming operations and then pulled out of the wellbore prior to placing the well on production.
- a production completion may be run into the wellbore for the production stage.
- Upper completion 22 includes a fuel supply conduit 54 and an air supply tubing 66 extending from the surface to DSG 36 .
- water 62 is supplied as cooling fluid from water supply 64 ( FIG. 1 ) into wellbore 12 and into cooling inlet port 34 of the seal element regulating device 44 .
- Inlet port 34 is open to and in communication with the annulus (i.e. wellbore 12 ) above packer 26 in FIG. 2 .
- Water 62 may be supplied to inlet port 34 through a supply conduit, such as supply tubing, for example tubing 58 ( FIG. 1 ), instead of through wellbore 12 .
- Water 62 is circulated through regulating device 44 and discharged as outlet or preheated water 63 through an outlet port 35 .
- Inlet port 34 and or outlet port 35 may include or be formed by a one-way flow control device (e.g., check valve) allowing in one direction from inlet port 34 to outlet port 35 and blocking flow in the reverse direction.
- a one-way flow control device e.g., check valve
- Outlet port 35 may be in communication with the water inlet of the DSG or the stinger bore.
- outlet water 63 is discharged above packer 26 and communicated to inlet 65 of DSG 36 via conduit 67 .
- outlet water 63 may be discharged back into wellbore 12 above packer 26 .
- outlet water 63 is discharged into wellbore 12 and communicated to DSG 36 through inlet 65 that is open to wellbore 12 .
- Water 62 may be heated when it is circulated through regulating device 44 and the preheated outlet water 63 communicated to DSG 36 may aid in generating higher quality steam.
- FIG. 3 illustrates a regulating device 44 utilized in a completion 10 in accordance to some embodiments.
- Packer 26 is deployed and set in the well with packer seal element 68 and slips 70 engaging casing 18 .
- Thermal regulating stinger 44 includes an outer mandrel or sleeve 82 carrying one or more seal elements 84 for sealing with polished bore receptacle 28 of packer 26 .
- Thermal regulating stinger 44 includes an inner sleeve or mandrel 86 forming a stinger bore 88 .
- Stinger bore 88 is in communication with discharge 48 of DSG 36 and tail pipe 30 .
- a passage 92 in communication with or connecting inlet port 34 and outlet port 35 is located between inner mandrel 86 and outer mandrel 82 .
- Inlet port 34 and or outlet port 35 may include or be formed by a one-way flow control device allowing one-way fluid flow in the direction from inlet port 34 to outlet port 35 and blocking fluid flow in the direction from outlet port 35 through inlet port 34 .
- Passage 92 may be formed by a member 90 (e.g. sleeve or coil) surrounding inner mandrel 86 .
- member 90 is illustrated as a coil member surrounding inner mandrel 86 (e.g.
- Cooling fluid 62 e.g. water
- passage 92 is illustrated in FIGS. 4 and 5 formed by a sleeve member 90 .
- Cooling fluid 62 e.g. water
- Circulating the water through passage 92 may provide a thermal regulating layer between hot effluent 74 and the stinger seal elements 84 and packer 26 .
- FIG. 3 illustrates water 62 being supplied to inlet port 34 through supply tubing 58 and outlet water 63 communicated from outlet port 35 to DSG inlet 65 through a conduit 67 .
- Outlet port 35 is located at an upper end 43 of thermal regulating stinger device 44 in FIG. 3 .
- FIG. 4 illustrates thermal regulating stinger 44 discharging the cooling fluid through lower completion 20 in accordance to one or more embodiments.
- Passage 92 is illustrated in FIG. 4 formed by sleeve member 90 .
- Cooling fluid 62 is supplied via wellbore 12 or supply tubing, for example tubing 58 , to inlet port 34 of thermal regulating stinger 44 and is circulated through passage 92 from inlet port 34 located at an upper end 43 of thermal regulating device 44 to outlet port 35 , which is in communication with bore 88 , located at a lower end 45 of thermal regulating device.
- Fluid flow through passage 92 may be limited to one-way fluid flow from inlet port 34 through discharge port 35 .
- inlet port 34 and or outlet port 35 may include or be formed by a one-way flow control device allowing one-way fluid flow in the direction from inlet port 34 to outlet port 35 and blocking fluid flow in the direction from outlet port 35 through inlet port 34 .
- the circulated fluid 62 may remove heat (i.e. conduction) and thermally regulate elements such as seal elements 84 and 68 that are exterior of passage 92 from the hot effluent 74 passing from DSG 36 through stinger bore 88 of thermal regulating device 44 .
- the cooling fluid is discharged as outlet fluid 63 at outlet port 35 into wellbore 12 below lower completion 20 for example into stinger bore 88 and tail pipe 30 .
- Outlet fluid 63 may mix with hot effluent 74 .
- water 62 may be supplied to inlet 65 of DSG 36 through wellbore 12 or through a supply conduit, for example supply tubing 42 .
- FIG. 5 illustrates thermal regulating stinger device 44 having thermal insulation 94 located with passage 92 between outer mandrel 82 and inner mandrel 86 .
- insulation 94 is illustrated as a tubular member (e.g. sleeve) located concentrically about inner mandrel 86 .
- Insulation 94 may be made of various materials including solids, gases and liquids and constructed in various configurations to provide thermal insulation between hot effluent 74 and the exterior elements such as seal elements 84 , 68 .
- Insulation 94 may be constructed of one or more materials that have a low thermal conductivity and or to reflect thermal radiation.
- Insulation 94 may include a material or fluid disposed in a wall portion of insulation sleeve 94 .
- Passage 92 extends between inlet port 34 and outlet port 35 for example spiraling about inner mandrel 86 . Passage 92 is illustrated in FIG. 5 formed by sleeve member 90 .
- Water 62 may be communicated into inlet port 34 through wellbore 12 .
- inlet port 34 may be open to the annulus (wellbore 12 ) above packer 26 and water 62 may be supplied through wellhead 24 ( FIG. 1 ) into wellbore 12 and communicated into open inlet port 34 .
- Water 62 may be communicated for example from the surface through supply tubing, for example tubing 58 , through inlet port 34 and into passage 92 .
- Water 62 may be discharged from outlet port 35 as outlet water 63 into wellbore 12 above packer 26 , below packer 26 into tail pipe 30 or stinger bore 88 for example as illustrated in FIG. 4 , or directly into DSG 36 for example as illustrated in FIGS. 2 and 3 .
- fluid flow may be restricted to one-way flow through passage 92 in the direction from inlet port 34 to outlet port 35 .
- DSG supply water may be communicated to DSG 36 for conversion to hot effluent 74 from the surface through supply tubing and or through wellbore 12 .
- the water supplied to the DSG inlet may include outlet water 63 discharged from the thermal insulating device.
- water inlet 65 of DSG 36 may be open to wellbore 12 , i.e. in communication with the wellbore annulus, above packer 26 to receive water for conversion to hot effluent 74 .
- Surface water supply 64 ( FIG. 1 ) may be communicated through the wellhead into the wellbore and communicated to DSG 36 for example through inlet 65 .
- Outlet water 63 may be discharged into wellbore 12 above packer 26 and supplied to DSG 36 through open inlet 65 .
- Outlet water 63 may be discharged from outlet port 35 and communicated directly into DSG 36 for example through a conduit (e.g., FIGS. 2 and 3 ).
- Water inlet 65 may be in communication with surface water supply 64 ( FIG. 1 ) for example through a supply conduit for example as illustrated in FIGS. 1 and 4 .
- thermal insulating stinger 44 may include inner mandrel 86 , insulation 94 formed as a sleeve surrounding inner mandrel 86 , passage 92 formed by member 90 surrounding insulation 94 and outer mandrel 82 resisting the external pressure and supporting stinger seals 84 .
- FIG. 6 illustrates an example of a completion 10 incorporating thermal insulating stinger 44 and a thermal regulating device 144 .
- thermal regulating stinger 44 includes insulation 94 disposed between outer mandrel 82 and inner mandrel 86 .
- thermal regulating stinger 44 does not include cooling fluid passage 92 .
- Thermal regulating device 144 includes a coil shaped member 90 forming a cooling passage 92 ( FIGS. 3-5 ) in communication between inlet port 34 and outlet port 35 .
- Thermal regulating device 144 is deployed proximate to thermal insulating stinger 44 and packer 26 . Thermal insulating device 144 may be in contact with stinger 44 and or packer 26 .
- Cooling fluid 62 may be supplied from water supply 64 ( FIG. 1 ) for example through wellbore 12 or supply tubing 58 and circulated through coil member 90 of thermal insulating device 144 and discharged through outlet port 35 .
- the water may be discharged as outlet water 63 into wellbore 12 or into a conduit 67 and communicated to inlet 65 of DSG 36 .
- the supply tubing 58 can discharge fluid such as water into a space 91 above the stinger 44 through openings 93 in the supply tubing.
- the supply tubing 58 can include one-way valves or other mechanisms to control flow of fluid into and out of the supply tubing 58 .
- the loose fluid cools temperature-sensitive components, such as seal elements 68 .
- the loose water discharged can be left in the well or removed through the supply tubing 58 or another conduit.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Muffle Furnaces And Rotary Kilns (AREA)
- Furnace Details (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
A well completion includes a downhole steam generator (DSG) having a water inlet and a discharge to convey a hot effluent away from the DSG, a stinger having an inner mandrel forming a stinger bore in communication with the discharge and an outer mandrel carrying a seal element, and a passage located between the inner mandrel and the outer mandrel to circulate a cooling fluid from an inlet port to an outlet port. The outlet port may be in communication with the water inlet of the DSG or the stinger bore.
Description
- A thermal regulating completion device in accordance to one or more embodiments includes an inner mandrel having a bore, an outer mandrel carrying a seal element, and a passage located between the inner and outer mandrels to circulate a cooling fluid between an inlet port and an outlet port. A completion in accordance to one or more embodiments includes a downhole steam generator (DSG) having a water inlet and a discharge to convey a hot effluent away from the DSG, a stinger having an inner mandrel forming a stinger bore in communication with the discharge and an outer mandrel carrying a seal element, and a passage located between the inner mandrel and the outer mandrel to circulate a cooling fluid from an inlet port to an outlet port. A method includes generating a hot effluent at a downhole steam generator, discharging the hot effluent through a bore of a stinger landed in a packer, and circulating water through a passage located proximate to the stinger seal.
- The foregoing has outlined some of the features and technical advantages in order that the detailed description of thermal regulating well completion devices, systems and methods that follows may be better understood. Additional features and advantages of the thermal regulating well completion devices, systems and method will be described hereinafter which form the subject of the claims of the invention. This summary is not intended to identify key or essential features of the claimed subject matter, nor is it intended to be used as an aid in limiting the scope of claimed subject matter.
- Embodiments of thermal regulating well completion devices, systems and methods are described with reference to the following figures. The same numbers are used throughout the figures to reference like features and components. It is emphasized that, in accordance with standard practice in the industry, various features are not necessarily drawn to scale. In fact, the dimensions of various features may be arbitrarily increased or reduced for clarity of discussion.
-
FIG. 1 illustrates a well system and completion in which thermal regulating devices, systems and methods may be incorporated and utilized. -
FIG. 2 illustrates a well system and completion in which thermal regulating devices, systems and methods may be incorporated and utilized. -
FIG. 3 illustrates a thermal regulating device incorporated in a completion and discharging an outlet fluid to a downhole steam generator in accordance to one or more embodiments. -
FIG. 4 illustrates a thermal regulating device incorporated in a completion and discharging an outlet fluid through a lower completion in accordance to one or more embodiments. -
FIG. 5 illustrates a thermal regulating device incorporated in a completion having insulation and a cooling fluid passage in accordance to one or more embodiments. -
FIG. 6 illustrates a well completion incorporating thermal regulating devices and methods in accordance to one or more embodiments. - It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments. Specific examples of components and arrangements are described below to simplify the disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.
- As used herein, the terms “connect,” “connection,” “connected,” “in connection with,” and “connecting” are used to mean “in direct connection with” or “in connection with via one or more elements”; and the term “set” is used to mean “one element” or “more than one element”. Further, the terms “couple,” “coupling,” “coupled,” “coupled together,” and “coupled with” are used to mean “directly coupled together” or “coupled together via one or more elements”. As used herein, the terms “up” and “down”; “upper” and “lower”; “top” and “bottom”; and other like terms indicating relative positions to a given point or element are utilized to more clearly describe some elements. Commonly, these terms relate to a reference point as the surface from which drilling operations are initiated as being the top point and the total depth being the lowest point, wherein the well (e.g., wellbore, borehole) is vertical, horizontal or slanted relative to the surface.
-
FIG. 1 illustrates awell system 5 having acompletion 10 in which thermal regulating devices, systems and methods may be incorporated and utilized. Awellbore 12 extends from asurface 14 to aformation 16 which is in communication withwellbore 12. At least a portion ofwellbore 12 may be lined withcasing 18.Completion 10 is illustrated inFIG. 1 as a steam injection and production completion. The thermal regulating devices, systems and method are not limited to the completion illustrated inFIG. 1 .Completion 10 includes alower completion 20 installed downhole aboveformation 16 and anupper completion 22 deployed belowwellhead 24 and landed inlower completion 20. -
Lower completion 20 includes a packer 26 (i.e. production packer) having a polished bore receptacle (PBR) 28 and atail pipe 30 extending belowpacker 26.Lower completion 20 may include anisolation device 32 such as a valve (i.e. flow control device) located intail pipe 30 belowpacker 26. The thermal regulating devices, systems and methods may be utilized to protect temperature-sensitive components of the lower completion 20 (e.g. seal elements) from the downhole temperatures that may be elevated for example in response to hot effluent 74 (e.g., steam, gas, liquid) discharged fromupper completion 22. -
Upper completion 22 includes a downhole steam generator (DSG) 36 (e.g. combustor) that utilizes a fuel such as natural gas or methane, and air to convert water to ahot effluent 74, for example steam, for injection intoformation 16.Upper completion 22 may include acontrol line 38 extending from the surface to one or more downhole devices.Control line 38 may be a cable, or umbilical, having more than one conduit for transmitting power and or signals. For example,control line 38 may include hydraulic conduits, electrical conductors, optic fibers and the like.Control line 38 is illustrated inFIG. 1 connecting asurface controller 40 withdownhole steam generator 36.Control line 38 may be connected for example to sensors, gauges, hydraulic and electrically operated flow control devices, and artificial lift devices (e.g. pumps).Controller 40 may include without limitation electronic circuits, processors, transmitters, receivers and power supplies (i.e. hydraulic, electric), and valves (valve manifolds). -
Upper completion 22 is deployed in the wellbore on atubing 42 extending from the wellhead to a stinger 44 (seal assembly, stabber assembly) which is landed in PBR 28 oflower completion 20. In accordance to one or more embodiments stinger 44 is configured as a thermal regulatingdevice 44 to thermally regulatelower completion 20, includingstinger seals 84. The systems and methods of the present disclosure can be used with any type of packer and with any type of lower completions component that may be sensitive to elevated temperatures. The thermal regulating systems and methods of the present disclosure distributes high-temperature fluids and low-temperature fluids as appropriate to protect such temperature-sensitive components and to efficiently selectively distribute thermal energy. -
Upper completion 22 includes a Y-tool 76 at a top end that separates or splits a second orbypass conduit 78 fromtubing 42.Bypass conduit 78 is connected back to or combined withtubing 42 downhole at a lower inverted Y-tool 46. Tubing 42 is connected to thermal regulatingstinger 44 below inverted Y-tool 46. The section oftubing 42 located between Y-tool 76 and inverted Y-tool 46 is referred to as continuous conduit 80 from time to time. -
Downhole steam generator 36 is connected tobypass conduit 78 and it is in communication withair supply 60 orwater supply 64 viatubing 42 to receive air or water during steaming operations. Hot effluent 74 (e.g. steam and flue gas) is discharged from DSG 36 into a section ofbypass conduit 78 referred to asdischarge 48.Discharge 48 of DSG 36 is connected to thermal regulatingstinger 44 through inverted Y-tool 46. In accordance with some embodiments a valve 50 (e.g. check valve) is connected withinsteam discharge 48 between DSG 36 and inverted Y-tool 46 to prevent back flow intoDSG 36 from belowlower completion 20, e.g. formation fluid. Tubing 42 may include a include abarrier 52, for example a valve or nipple and plug, located in continuous conduit 80 to selectively close the conduit to divert supply fluid (i.e. water or air) to DSG 36 throughbypass conduit 78. A plug 53 is illustrated inFIG. 1 landed inbarrier 52 blockingtubing 42 in continuous conduit 80. Continuous conduit 80 can be blocked or closed for example during steam generating and injection operations so that a DSG operational fluid such as water or air can be supplied throughtubing 42 intobypass conduit 78. Duringproduction operations tubing 42 is opened so thatformation fluid 72 can be produced to the surface. -
Upper completion 22 includes afuel supply tubing 54 in communication between DSG 36 and a fuel supply 56 (e.g. natural gas, methane, hydrogen, etc.) located at the surface.Fuel supply 56 may include a compressor. Air is communicated to DSG 36 fromair supply 60 for example viatubing 42 andbypass conduit 78 or throughsupply tubing 66. Water may be supplied fromwater supply 64 for example viatubing 42 andbypass conduit 78, viasupply tubing 66, or through the tubing-casing annulus (i.e. wellbore 12). The air and gas are combusted at DSG 36 to convert the supplied water into ahot effluent 74 which is discharged through the lower completion and into the formation.Hot effluent 74 may include the flue gas from the combustion atDSG 36. - Cooling or insulating fluid, for example water, may be supplied (i.e. communicated) to a
cooling inlet port 34 of regulatingdevice 44 for example fromwater supply 64. The cooling fluid may be communicated to regulatingdevice 44 for example through a supply conduit or throughwellbore 12. The cooling fluid may be discharged below packer 26 (e.g. into tail pipe 30) or discharged abovelower completion 20 and in some embodiments communicated to the inlet ofDSG 36. For example, with reference toFIG. 1 , cooling fluid is communicated fromwater supply 64 through asupply conduit 58 toinlet port 34 of thermalregulating stinger device 44. The cooling fluid may be discharged below packer 26 (e.g.,FIG. 4 ) or communicated toDSG 36. In theFIG. 1 illustration, DSG supply water may be communicated directly toDSG 36 from the surface for example throughtubing 42 andbypass 78 or viasupply tubing 66. In accordance to some embodiments, DSG supply water may include the fluid discharged from the outlet of the thermal regulating device. -
FIG. 2 illustrates asteam completion 10 installed inwellbore 12. In this embodimentupper completion 22 is configured to be deployed during steaming operations and then pulled out of the wellbore prior to placing the well on production. A production completion may be run into the wellbore for the production stage.Upper completion 22 includes afuel supply conduit 54 and anair supply tubing 66 extending from the surface toDSG 36. In the depicted completion,water 62 is supplied as cooling fluid from water supply 64 (FIG. 1 ) intowellbore 12 and intocooling inlet port 34 of the sealelement regulating device 44.Inlet port 34 is open to and in communication with the annulus (i.e. wellbore 12) abovepacker 26 inFIG. 2 .Water 62 may be supplied toinlet port 34 through a supply conduit, such as supply tubing, for example tubing 58 (FIG. 1 ), instead of throughwellbore 12.Water 62 is circulated through regulatingdevice 44 and discharged as outlet orpreheated water 63 through anoutlet port 35.Inlet port 34 and oroutlet port 35 may include or be formed by a one-way flow control device (e.g., check valve) allowing in one direction frominlet port 34 tooutlet port 35 and blocking flow in the reverse direction. -
Outlet port 35 may be in communication with the water inlet of the DSG or the stinger bore. InFIG. 2 ,outlet water 63 is discharged abovepacker 26 and communicated toinlet 65 ofDSG 36 viaconduit 67. In accordance to some embodiments,outlet water 63 may be discharged back intowellbore 12 abovepacker 26. In some embodiments,outlet water 63 is discharged intowellbore 12 and communicated toDSG 36 throughinlet 65 that is open towellbore 12.Water 62 may be heated when it is circulated through regulatingdevice 44 and thepreheated outlet water 63 communicated toDSG 36 may aid in generating higher quality steam. -
FIG. 3 illustrates a regulatingdevice 44 utilized in acompletion 10 in accordance to some embodiments.Packer 26 is deployed and set in the well withpacker seal element 68 and slips 70 engagingcasing 18. Thermal regulatingstinger 44 includes an outer mandrel orsleeve 82 carrying one ormore seal elements 84 for sealing withpolished bore receptacle 28 ofpacker 26. Thermal regulatingstinger 44 includes an inner sleeve ormandrel 86 forming a stinger bore 88. Stinger bore 88 is in communication withdischarge 48 ofDSG 36 andtail pipe 30. - In accordance to one or more embodiments, a
passage 92 in communication with or connectinginlet port 34 andoutlet port 35 is located betweeninner mandrel 86 andouter mandrel 82.Inlet port 34 and oroutlet port 35 may include or be formed by a one-way flow control device allowing one-way fluid flow in the direction frominlet port 34 tooutlet port 35 and blocking fluid flow in the direction fromoutlet port 35 throughinlet port 34.Passage 92 may be formed by a member 90 (e.g. sleeve or coil) surroundinginner mandrel 86. For example, with reference toFIG. 3 ,member 90 is illustrated as a coil member surrounding inner mandrel 86 (e.g. co-axially aligned) and providingpassage 92 as a helical path around the inner mandrel.Passage 92 is illustrated inFIGS. 4 and 5 formed by asleeve member 90. Cooling fluid 62 (e.g. water) is circulated throughpassage 92 and discharged as apreheated outlet fluid 63 and supplied intoDSG 36 and converted tohot effluent 74 inFIG. 3 . Circulating the water throughpassage 92 may provide a thermal regulating layer betweenhot effluent 74 and thestinger seal elements 84 andpacker 26.FIG. 3 illustrateswater 62 being supplied toinlet port 34 throughsupply tubing 58 andoutlet water 63 communicated fromoutlet port 35 toDSG inlet 65 through aconduit 67.Outlet port 35 is located at anupper end 43 of thermalregulating stinger device 44 inFIG. 3 . -
FIG. 4 illustrates thermal regulatingstinger 44 discharging the cooling fluid throughlower completion 20 in accordance to one or more embodiments.Passage 92 is illustrated inFIG. 4 formed bysleeve member 90. Coolingfluid 62 is supplied viawellbore 12 or supply tubing, forexample tubing 58, toinlet port 34 of thermal regulatingstinger 44 and is circulated throughpassage 92 frominlet port 34 located at anupper end 43 ofthermal regulating device 44 tooutlet port 35, which is in communication withbore 88, located at alower end 45 of thermal regulating device. Fluid flow throughpassage 92 may be limited to one-way fluid flow frominlet port 34 throughdischarge port 35. For example,inlet port 34 and oroutlet port 35 may include or be formed by a one-way flow control device allowing one-way fluid flow in the direction frominlet port 34 tooutlet port 35 and blocking fluid flow in the direction fromoutlet port 35 throughinlet port 34. The circulatedfluid 62 may remove heat (i.e. conduction) and thermally regulate elements such asseal elements passage 92 from thehot effluent 74 passing fromDSG 36 through stinger bore 88 ofthermal regulating device 44. The cooling fluid is discharged asoutlet fluid 63 atoutlet port 35 intowellbore 12 belowlower completion 20 for example into stinger bore 88 andtail pipe 30.Outlet fluid 63 may mix withhot effluent 74. In this example,water 62 may be supplied toinlet 65 ofDSG 36 throughwellbore 12 or through a supply conduit, forexample supply tubing 42. -
FIG. 5 illustrates thermalregulating stinger device 44 havingthermal insulation 94 located withpassage 92 betweenouter mandrel 82 andinner mandrel 86. In this example,insulation 94 is illustrated as a tubular member (e.g. sleeve) located concentrically aboutinner mandrel 86.Insulation 94 may be made of various materials including solids, gases and liquids and constructed in various configurations to provide thermal insulation betweenhot effluent 74 and the exterior elements such asseal elements Insulation 94 may be constructed of one or more materials that have a low thermal conductivity and or to reflect thermal radiation.Insulation 94 may include a material or fluid disposed in a wall portion ofinsulation sleeve 94. -
Passage 92 extends betweeninlet port 34 andoutlet port 35 for example spiraling aboutinner mandrel 86.Passage 92 is illustrated inFIG. 5 formed bysleeve member 90.Water 62 may be communicated intoinlet port 34 throughwellbore 12. For example with additional reference toFIG. 2 ,inlet port 34 may be open to the annulus (wellbore 12) abovepacker 26 andwater 62 may be supplied through wellhead 24 (FIG. 1 ) intowellbore 12 and communicated intoopen inlet port 34.Water 62 may be communicated for example from the surface through supply tubing, forexample tubing 58, throughinlet port 34 and intopassage 92.Water 62 may be discharged fromoutlet port 35 asoutlet water 63 intowellbore 12 abovepacker 26, belowpacker 26 intotail pipe 30 or stinger bore 88 for example as illustrated inFIG. 4 , or directly intoDSG 36 for example as illustrated inFIGS. 2 and 3 . In accordance to some embodiments, fluid flow may be restricted to one-way flow throughpassage 92 in the direction frominlet port 34 tooutlet port 35. - DSG supply water may be communicated to
DSG 36 for conversion tohot effluent 74 from the surface through supply tubing and or throughwellbore 12. The water supplied to the DSG inlet may includeoutlet water 63 discharged from the thermal insulating device. For example, in someembodiments water inlet 65 ofDSG 36 may be open towellbore 12, i.e. in communication with the wellbore annulus, abovepacker 26 to receive water for conversion tohot effluent 74. Surface water supply 64 (FIG. 1 ) may be communicated through the wellhead into the wellbore and communicated to DSG 36 for example throughinlet 65.Outlet water 63 may be discharged intowellbore 12 abovepacker 26 and supplied toDSG 36 throughopen inlet 65.Outlet water 63 may be discharged fromoutlet port 35 and communicated directly intoDSG 36 for example through a conduit (e.g.,FIGS. 2 and 3 ).Water inlet 65 may be in communication with surface water supply 64 (FIG. 1 ) for example through a supply conduit for example as illustrated inFIGS. 1 and 4 . -
Insulation 94 is illustrated inFIG. 5 located betweeninner mandrel 86 andpassage 92; however, it may be located betweenpassage 92 andouter mandrel 82. In accordance to an embodiment, thermal insulatingstinger 44 may includeinner mandrel 86,insulation 94 formed as a sleeve surroundinginner mandrel 86,passage 92 formed bymember 90 surroundinginsulation 94 andouter mandrel 82 resisting the external pressure and supporting stinger seals 84. -
FIG. 6 illustrates an example of acompletion 10 incorporating thermal insulatingstinger 44 and a thermal regulating device 144. In this example, thermal regulatingstinger 44 includesinsulation 94 disposed betweenouter mandrel 82 andinner mandrel 86. In accordance to embodiments, thermal regulatingstinger 44 does not include coolingfluid passage 92. Thermal regulating device 144 includes a coil shapedmember 90 forming a cooling passage 92 (FIGS. 3-5 ) in communication betweeninlet port 34 andoutlet port 35. Thermal regulating device 144 is deployed proximate to thermal insulatingstinger 44 andpacker 26. Thermal insulating device 144 may be in contact withstinger 44 and orpacker 26. Coolingfluid 62 may be supplied from water supply 64 (FIG. 1 ) for example throughwellbore 12 orsupply tubing 58 and circulated throughcoil member 90 of thermal insulating device 144 and discharged throughoutlet port 35. For example, the water may be discharged asoutlet water 63 intowellbore 12 or into aconduit 67 and communicated toinlet 65 ofDSG 36. Thesupply tubing 58 can discharge fluid such as water into a space 91 above thestinger 44 through openings 93 in the supply tubing. Thesupply tubing 58 can include one-way valves or other mechanisms to control flow of fluid into and out of thesupply tubing 58. The loose fluid cools temperature-sensitive components, such asseal elements 68. The loose water discharged can be left in the well or removed through thesupply tubing 58 or another conduit. - The foregoing outlines features of several embodiments so that those skilled in the art may better understand the aspects of the disclosure. Those skilled in the art should appreciate that they may readily use the disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. Those skilled in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the disclosure, and that they may make various changes, substitutions and alterations herein without departing from the spirit and scope of the disclosure. The scope of the invention should be determined only by the language of the claims that follow. The term “comprising” within the claims is intended to mean “including at least” such that the recited listing of elements in a claim are an open group. The terms “a,” “an” and other singular terms are intended to include the plural forms thereof unless specifically excluded.
Claims (24)
1. A thermal regulating device, comprising:
a downhole steam generator;
a supply line to the downhole steam generator configured to deliver fluid to the downhole steam generator from which the downhole steam generator is configured to generate a hot effluent;
a temperature-sensitive completion component in the well; and
a heat sink configured to insulate the temperature-sensitive completion component from thermal energy in the hot effluent.
2. The thermal regulating device of claim 1 wherein the heat sink includes the fluid from the supply line before reaching the downhole steam generator.
3. The thermal regulating device of claim 1 wherein the temperature-sensitive completion component is in thermal contact with a formation in a well.
4. The thermal regulating device of claim 1 wherein the supply line is configured to discharge at least a portion of the fluid out of the supply line and into thermal contact with the temperature-sensitive completion component.
5. A thermal regulating completion device, the device comprising:
an inner mandrel having a bore;
an outer mandrel surrounding the inner mandrel and carrying a seal element; and
a passage located between the inner mandrel and the inner mandrel and the outer mandrel to circulate a cooling fluid from an inlet port to an outlet port.
6. The device of claim 5 , wherein the inlet port and the outlet port are located at an upper end the device.
7. The device of claim 5 , wherein the inlet port is located at an upper end of the device and the outlet port is in communication with the bore.
8. The device of claim 5 , comprising an insulation located between the inner mandrel and the outer mandrel.
9. The device of claim 5 , comprising an insulation located between the inner mandrel and the outer mandrel; and
the inlet port and the outlet port are located at an upper end the device.
10. The device of claim 5 , comprising an insulation located between the inner mandrel and the outer mandrel; and
the inlet port is located at an upper end of the device and the outlet port is in communication with the bore.
11. A completion, comprising:
a downhole steam generator (DSG) having a water inlet and a discharge to convey a hot effluent away from the DSG;
a stinger having an inner mandrel forming a stinger bore in communication with the discharge and an outer mandrel carrying a seal element; and
a passage located between the inner mandrel and the outer mandrel to circulate a cooling fluid from an inlet port to an outlet port.
12. The completion of claim 11 , wherein the outlet port is in communication with the stinger bore.
13. The completion of claim 11 , wherein the outlet port is in communication with the water inlet of the DSG.
14. The completion of claim 11 , wherein the stinger includes an insulation located between the inner mandrel and the outer mandrel.
15. The completion of claim 11 , wherein:
the stinger is landed in a packer set in a wellbore;
the inlet port is located at an upper end of the stinger above the packer; and
the outlet port is located at an upper end of the stinger above the packer.
16. The completion of claim 15 , wherein the outlet port is in communication with the water inlet of the DSG.
17. The completion of claim 11 , wherein:
the stinger is landed in a packer set in a wellbore;
the inlet port is located at an upper end of the stinger above the packer; and
the outlet port is in communication with the stinger bore.
18. A method, comprising:
generating a hot effluent at a downhole steam generator (DSG) incorporated in an upper completion that is deployed in a wellbore;
discharging the hot effluent through a bore of a stinger landed in a packer, the stinger carrying a seal element; and
circulating a water through a passage from an inlet port to an outlet port, the passage located proximate to the stinger seal.
19. The method of claim 18 , wherein the outlet port is in communication with one of the stinger bore and a water inlet to the DSG.
20. The method of claim 18 , wherein the passage is located between an inner mandrel forming the stinger bore and an outer mandrel carrying the seal element.
21. The method of claim 18 , wherein:
the circulating the water includes communicating the water from the wellbore through the inlet port into the passage; and
the outlet port is in communication with one of the stinger bore and a water inlet to the DSG.
22. The method of claim 18 , wherein:
the circulating the water includes communicating the water through a supply tubing to the inlet port into the passage; and
the outlet port is in communication with one of the stinger bore and a water inlet to the DSG.
23. The method of claim 18 , wherein the stinger comprises:
an inner mandrel forming the stinger bore;
an outer mandrel carrying the seal element; and
an insulation located between the inner mandrel and the mandrel.
24. The method of claim 18 , wherein:
the passage is located between an inner mandrel forming the stinger bore and an outer mandrel carrying the seal element;
the outlet port is in communication with one of the stinger bore and a water inlet to the DSG; and
the circulating the water includes communicating the water to the inlet port through one selected from the wellbore and a supply tubing.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/167,564 US20150211335A1 (en) | 2014-01-29 | 2014-01-29 | Thermal regulating well completion devices and methods |
CA2880115A CA2880115C (en) | 2014-01-29 | 2015-01-27 | Thermal regulating well completion devices and methods |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/167,564 US20150211335A1 (en) | 2014-01-29 | 2014-01-29 | Thermal regulating well completion devices and methods |
Publications (1)
Publication Number | Publication Date |
---|---|
US20150211335A1 true US20150211335A1 (en) | 2015-07-30 |
Family
ID=53678559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/167,564 Abandoned US20150211335A1 (en) | 2014-01-29 | 2014-01-29 | Thermal regulating well completion devices and methods |
Country Status (2)
Country | Link |
---|---|
US (1) | US20150211335A1 (en) |
CA (1) | CA2880115C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017086974A1 (en) * | 2015-11-19 | 2017-05-26 | Halliburton Energy Services, Inc. | Thermal management system for downhole tools |
CN110185424A (en) * | 2019-05-27 | 2019-08-30 | 淮安市井神钻采机具有限公司 | A kind of prestressing force multistage heat insulation compensator |
US20230143015A1 (en) * | 2020-07-02 | 2023-05-11 | Schlumberger Technology Corporation | Completion isolation system with tubing movement compensator |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4272383A (en) * | 1978-03-17 | 1981-06-09 | Mcgrew Jay Lininger | Method and apparatus for effecting subsurface, controlled, accelerated chemical reactions |
US4930454A (en) * | 1981-08-14 | 1990-06-05 | Dresser Industries, Inc. | Steam generating system |
US20070284107A1 (en) * | 2006-06-02 | 2007-12-13 | Crichlow Henry B | Heavy Oil Recovery and Apparatus |
US20140033727A1 (en) * | 2012-08-03 | 2014-02-06 | K2Technologies, LLC | Method of cooling a downhole gas generator |
-
2014
- 2014-01-29 US US14/167,564 patent/US20150211335A1/en not_active Abandoned
-
2015
- 2015-01-27 CA CA2880115A patent/CA2880115C/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4272383A (en) * | 1978-03-17 | 1981-06-09 | Mcgrew Jay Lininger | Method and apparatus for effecting subsurface, controlled, accelerated chemical reactions |
US4930454A (en) * | 1981-08-14 | 1990-06-05 | Dresser Industries, Inc. | Steam generating system |
US20070284107A1 (en) * | 2006-06-02 | 2007-12-13 | Crichlow Henry B | Heavy Oil Recovery and Apparatus |
US20140033727A1 (en) * | 2012-08-03 | 2014-02-06 | K2Technologies, LLC | Method of cooling a downhole gas generator |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017086974A1 (en) * | 2015-11-19 | 2017-05-26 | Halliburton Energy Services, Inc. | Thermal management system for downhole tools |
US10605052B2 (en) * | 2015-11-19 | 2020-03-31 | Halliburton Energy Services, Inc. | Thermal management system for downhole tools |
CN110185424A (en) * | 2019-05-27 | 2019-08-30 | 淮安市井神钻采机具有限公司 | A kind of prestressing force multistage heat insulation compensator |
US20230143015A1 (en) * | 2020-07-02 | 2023-05-11 | Schlumberger Technology Corporation | Completion isolation system with tubing movement compensator |
US12018544B2 (en) * | 2020-07-02 | 2024-06-25 | Schlumberger Technology Corporation | Completion isolation system with tubing movement compensator |
Also Published As
Publication number | Publication date |
---|---|
CA2880115A1 (en) | 2015-07-29 |
CA2880115C (en) | 2022-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9133697B2 (en) | Producing resources using heated fluid injection | |
AU2017336309B2 (en) | Downhole completion system | |
EP3025016B1 (en) | System and method for harvesting energy down-hole from an isothermal segment of a wellbore | |
US8186445B2 (en) | System, method and apparatus for thermal wellhead having high power cable for in-situ upgrading processing | |
US20150041126A1 (en) | Bypass steam injection and production completion system | |
US10273785B2 (en) | Process for remediating hydrates from subsea flowlines | |
US20110067399A1 (en) | Geothermal power system | |
US20140209327A1 (en) | Single trip completion system and method | |
US20130048307A1 (en) | Completion for downhole applications | |
BR102012025237A2 (en) | METHOD, AND SYSTEM FOR USE IN A MULTILATERAL WELL HAVING SIDE RAMALS | |
CN103703212A (en) | Pipe-in-pipe apparatus, and methods and systems | |
US9051807B2 (en) | Subsea completion with a tubing spool connection system | |
CA2880115C (en) | Thermal regulating well completion devices and methods | |
US20130168101A1 (en) | Vertical subsea tree assembly control | |
US8955591B1 (en) | Methods and systems for delivery of thermal energy | |
NO324145B1 (en) | System and method for regulating a gasket in a production well | |
US10612353B2 (en) | Downhole flow control apparatus | |
US20150041129A1 (en) | Steam injection and production completion system | |
BR102012012972A2 (en) | WELL HEAD, WELL HEAD ASSEMBLY AND FLUID HYDRATE FORMATION PREVENTION METHOD | |
AU2017423857B2 (en) | Annular bypass packer | |
US12132422B2 (en) | Electrical power system for a resource extraction system | |
US11851990B2 (en) | System and process for installing a hydrocarbon production system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: SCHLUMBERGER TECHNOLOGY CORPORATION, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BOYLE, BRUCE;MANI, SAIKUMAR;VERZWYVELT, DAVID;SIGNING DATES FROM 20140217 TO 20140221;REEL/FRAME:032411/0144 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |