+

US20150211762A1 - Heat source system control device - Google Patents

Heat source system control device Download PDF

Info

Publication number
US20150211762A1
US20150211762A1 US14/430,521 US201314430521A US2015211762A1 US 20150211762 A1 US20150211762 A1 US 20150211762A1 US 201314430521 A US201314430521 A US 201314430521A US 2015211762 A1 US2015211762 A1 US 2015211762A1
Authority
US
United States
Prior art keywords
heat source
source units
section
load
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/430,521
Inventor
Tetsuyuki Kondo
Haruyuki Yamamori
Shunichi Kawamura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Assigned to DAIKIN INDUSTRIES, LTD. reassignment DAIKIN INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KAWAMURA, SHUNICHI, YAMAMORI, Haruyuki, KONDO, TETSUYUKI
Publication of US20150211762A1 publication Critical patent/US20150211762A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/02
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/06Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/50Load
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/003Indoor unit with water as a heat sink or heat source
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/13Pump speed control
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • the present invention relates to a heat source system control device.
  • Patent Literature 1 Japanese Unexamined Patent Application Publication No. 2005-114295
  • the system according to Patent Literature 1 measures the temperature of the hot/cold water which is supplied to the heat source units and implements starting and stopping of operation of each of the heat source units, controlling of the loads of compressors in each of the heat source units, and controlling of a flow amount of the hot/cold water in each of the heat source units so as to maximize a coefficient of performance (COP) over the entirety of the heat source system based on the measured temperatures.
  • COP coefficient of performance
  • the plurality of heat source units controlled by the heat source system control device includes both the heat source units where it is possible to control the loads of the compressors and the heat source units where it is not possible to control the loads of the compressor.
  • each of the heat source units where it is possible to control the loads of the compressors has the same capacity and load characteristic with each other.
  • the heat source system control device according to Patent Literature 1 performs control of the compressors of each of the heat source units such that the coefficient of performance over the entirety of the heat source system is maximized with regard to the plurality of heat source units which have the same capacity and load characteristic.
  • Some heat source systems have a plurality of heat source units where the capacities and/or the load characteristics are different.
  • a method for controlling a heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different there is a method where the heat source system control device preferentially drives the heat source units with good efficiency and stops driving of the heat source units with poor efficiency according to the load over the entirety of the system.
  • the heat source system control device preferentially drives the heat source units with good efficiency and stops driving of the heat source units with poor efficiency according to the load over the entirety of the system.
  • setting of the loads of the heat source units which are preferentially driven is the optimal coefficient of performance for all of the heat source units.
  • the coefficient of performance for the entirety of the heat source system is not optimized so as to be maximized.
  • the present invention is carried out in consideration of the points described above and the problem of the present invention is to provide a heat source system control device which performs control for improving efficiency such that the coefficient of performance for the entirety of the heat source system is optimized as part of the control of the heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different.
  • a heat source system control device is a heat source system control device controlling a heat source system and is provided with a set temperature memory section, a header temperature detecting section, and a control section.
  • the heat source system has heat source units, a header, and a header temperature sensor.
  • the heat source units include a plurality of heat source units where the capacities and/or load characteristics are different.
  • the header aggregates hot/cold water which is supplied from the plurality of heat source units.
  • the header temperature sensor measures the temperature of the hot/cold water which is aggregated by the header.
  • the set temperature memory section stores a set temperature of the hot/cold water in the header.
  • the header temperature detecting section detects output values from the header temperature sensor.
  • the control section performs a control for improving efficiency on the plurality of heat source units based on the respective capacities and/or load characteristics and brings the temperature of the hot/cold water close to the set temperature.
  • the control section controls the heat source units such that the temperature of the hot/cold water which is aggregated by the header becomes the set temperature of the hot/cold water stored in the set temperature memory section.
  • the heat source system control device performs the control for improving efficiency such that operating efficiency of the heat source units over the entirety of the heat source system is maximized based on the capacities and/or the load characteristics of the respective heat source units.
  • the “coefficient of performance (COP)” is represented by cooling capacity (kW) per 1 kW of power consumption.
  • “load” is energy which is actually consumed by the heat source unit.
  • the load of the heat source unit is a number which is equivalent to a step of the compressor (a step equivalent number).
  • a heat source system control device is the heat source system control device according to the first aspect of the present invention, where the control section performs at least one of an individual control of driving and stopping of each of the plurality of heat source units and an individual control of the load of each of the plurality of heat source units.
  • This heat source system control device controls the loads of the heat source units individually.
  • the individual control of the load for each of the heat source units includes driving and stopping of each of the heat source units. It is thereby possible to flexibly perform the control for improving efficiency over the entirety of the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • a heat source system control device is the heat source system control device according to the first aspect or the second aspect of the present invention which is further provided with a coefficient of performance memory section.
  • the coefficient of performance memory section stores information, which relates to a coefficient of performance according to the load of each of the plurality of heat source units, as coefficient of performance information.
  • the control section references the coefficient of performance information stored in the coefficient of performance memory section and drives each of the plurality of heat source units with the load where the coefficient of performance is high.
  • the control section drives each of the heat source units with the load with the high coefficient of performance based on information which relates to the coefficient of performance of each of the heat source units with regard to the heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different. As such, it is possible to easily and reliably perform the control for improving efficiency such that the coefficient of performance over the entirety of the heat source system is maximized.
  • a heat source system control device is the heat source system control device according to any of the first aspect to the third aspect of the present invention which is further provided with a rated capacity memory section.
  • the rated capacity memory section stores information, which relates to a rated capacity of each of the plurality of heat source units, as rated capacity information.
  • the control section determines the heat source units which are driven or stopped based on the rated capacity information stored in the rated capacity memory section.
  • the heat source units which are driven or stopped are selected based on the rated capacity information of the respective heat source units in the heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different. Due to this, it is possible to perform the control for improving efficiency such that the efficiency is maximized with regard to the total energy consumption over the entirety of the heat source system.
  • a heat source system control device is the heat source system control device according to any of the first aspect to the fourth aspect of the present invention, where the heat source system further has a plurality of pumps.
  • the plurality of pumps supply the hot/cold water to each of the plurality of heat source units.
  • the control section adjusts the temperature of the hot/cold water which is aggregated by the header by controlling a flow amount of the hot/cold water supplied from the plurality of pumps.
  • the control for improving efficiency is preformed on the loads of the respective heat source units and the flow amount of the hot/cold water which is supplied to the respective heat source units based on the temperature of the hot/cold water which is aggregated by the header. Due to this, it is possible to bring the efficiency of the total energy consumption over the entirety of the heat source system close to the maximum more easily in the heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different.
  • a heat source system control device is the heat source system control device according to the fifth aspect of the present invention, where the heat source system further has a plurality of outlet temperature sensors.
  • the plurality of outlet temperature sensors are arranged in the vicinity of respective outlets of the plurality of heat source units.
  • the plurality of outlet temperature sensors measure outlet temperatures which are the temperatures of the hot/cold water which is supplied to the header.
  • the heat source system control device is further provided with an outlet temperature detecting section.
  • the outlet temperature detecting section detects output values from the plurality of outlet temperature sensors.
  • the control section adjusts the temperature of the hot/cold water in the header by controlling the load of each of the plurality of heat source units and the flow amount of the hot/cold water which is supplied from the plurality of pumps based on the outlet temperatures of each of the plurality of heat source units and the flow amount of the hot/cold water which is supplied from each of the plurality of heat source units.
  • the control section detects the outlet temperature of the hot/cold water from each of the heat source units using the outlet temperature detecting section. In addition, the control section controls the flow amount of the hot/cold water from each of the heat source units. The control section controls the load and the flow amount of the hot/cold water in each of the heat source units based on the outlet temperature and flow amount of the hot/cold water from each of the heat source units. Due to this, it is possible to more easily and reliably control the temperature and the flow amount of the hot/cold water in the header.
  • the heat source system control device it is possible to maximize the coefficient of performance over the entirety of the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • the heat source system control device it is possible to flexibly perform the control for improving efficiency over the entirety of the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • the heat source system control device it is possible to more easily and reliably perform the control for improving efficiency so as to maximize the coefficient of performance over the entirety of the heat source system with regard to the total energy consumption over the entirety of the heat source system and the efficiency with regard to the total energy consumption, based on information which relates to the coefficient of performance of each of the heat source units with regard to the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • the heat source units which are driven or stopped are selected based on the rated capacity information on the respective heat source units in the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different. Due to this, it is possible to perform the control for improving efficiency such that the efficiency is maximized with regard to the total energy consumption over the entirety of the heat source system.
  • the heat source system control device it is possible to more easily perform the control for improving efficiency so that the efficiency of the total energy consumption over the entirety of the heat source system approaches to the maximum in the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • the heat source system control device it is possible to more easily and reliably control the temperature and the flow amount of the hot/cold water in the header.
  • FIG. 1 is a schematic configuration diagram of an energy management system according to an embodiment of the present invention.
  • FIG. 2 is a schematic configuration diagram of a heat source system control device.
  • FIG. 3( a ) is a graph expressing the relationship between the load and the coefficient of performance of a heat source unit.
  • FIG. 3( b ) is a graph expressing the relationship between the load and the coefficient of performance of a heat source unit which is different to the heat source unit in FIG. 3( a ).
  • FIG. 4 is a table of load and coefficient of performance.
  • FIG. 5 is a table of rated capacity of heat source unit.
  • FIG. 6 is a flow diagram illustrating the flow of a process in a heat source system control device.
  • FIG. 7 is a flow diagram illustrating the flow of a process in a heat source system control device according to the modified example A.
  • FIG. 8 is a schematic configuration diagram of an energy management system according to modified example B.
  • FIG. 9 is a schematic configuration diagram of a heat source system control device according to modified example B.
  • FIG. 10 is a flow diagram illustrating the flow of a process in a heat source system control device according to modified example B.
  • An energy management system 200 which includes a heat source system control device 10 according to the present invention will be described below with reference to the drawings.
  • FIG. 1 illustrates the energy management system 200 .
  • the energy management system 200 is a system which manages energy consumed in a building.
  • the energy management system 200 includes a heat source system 100 and the heat source system control device 10 .
  • the energy management system 200 manages energy which is consumed in a building by controlling heat source units 50 a, 50 b, and 50 c, which are included in the heat source system 100 , using the heat source system control device 10 .
  • the configuration of the heat source system 100 and the heat source system control device 10 will be described below.
  • the heat source system 100 has a plurality of heat source units 50 a, 50 b, and 50 c, air conditioners 32 a, 32 b, and 32 c, primary pumps 41 a, 41 b, and 41 c, and a first header (a header) 20 , a second header 21 , and a header temperature sensor 60 .
  • Each of the plurality of heat source units 50 a, 50 b, and 50 c has different capacity and/or different load characteristic.
  • the heat source units 50 a, 50 b, and 50 c are inverter type heat source units.
  • the heat source units 50 a, 50 b, and 50 c are, for example, air cooled inverter chillers or air cooled screw chillers.
  • the primary pumps 41 a, 41 b, and 41 c send hot/cold water to the heat source units 50 a, 50 b, and 50 c with a certain flow amount.
  • Hot/cold water sent from the heat source units 50 a, 50 b, and 50 c is aggregated by the first header 20 .
  • Water which is returned from the air conditioners 32 a, 32 b, and 32 c is aggregated by the second header 21 .
  • hot/cold water is sent to the heat source units 50 a, 50 b, and 50 c using the primary pumps 41 a, 41 b, and 41 c in the heat source system 100 .
  • Hot/cold water which is sent out from the heat source units 50 a, 50 b, and 50 c is aggregated by the first header 20 .
  • the water aggregated by the first header 20 is sent to the air conditioners 32 a, 32 b, and 32 c through an upstream side pipe 70 .
  • the header temperature sensor 60 is provided at a portion of the first header 20 where hot/cold water is aggregated.
  • the header temperature sensor 60 measures the temperature of the hot/cold water.
  • Hot/cold water aggregated by the first header 20 exchanges heat with indoor air in the air conditioners 32 a, 32 b, and 32 c.
  • Hot/cold water sent from the air conditioners 32 a, 32 b, and 32 c is aggregated by the second header 21 through a downstream side pipe 71 .
  • Hot/cold water aggregated by the second header 21 is sent to the primary pumps 41 a, 41 b, and 41 c.
  • FIG. 1 three heat source units and three air conditioners are described as being in the heat source system 100 , but the number of heat source units and air conditioners is not limited to three.
  • the heat source system control device 10 controls the heat source units 50 a, 50 b, and 50 c which are included in the heat source system 100 as described above.
  • the heat source system control device 10 is connected to the header temperature sensor 60 using a communication line.
  • the heat source system control device 10 detects an output value from the header temperature sensor 60 via the communication tine.
  • the heat source system control device 10 controls the load of each of the heat source units 50 a, 50 b, and 50 c via, for example, a communication network such as a LAN.
  • FIG. 2 is a schematic configuration diagram of the heat source system control device 10 .
  • the heat source system control device 10 will be described below using FIG. 2 .
  • the heat source system control device 10 mainly has an input section 11 , an output section 12 ., a time management section 13 , a header temperature detecting section 14 , a memory section 15 , and a control section 16 .
  • the input section 11 is mainly configured from an operation button, a keyboard, a mouse, and the like.
  • the input section 11 receives from a user a set temperature of hot/cold water which is aggregated by the first header 20 .
  • the set temperature which is received by the input section 11 is stored in a set temperature memory section 15 a described later.
  • the output section 12 is mainly configured from a display.
  • a management screen which shows various types of information which are stored in the memory section 15 described later, is displayed on the output section 12 .
  • the output section 12 sends control commands for an initial load described later and for an adjustment load described later, which are generated by a load command generating section 16 f described later, to each of the heat source units 50 a, 50 b, and 50 c.
  • the time management section 13 performs time management for various types of control which are executed by the heat source system control device 10 .
  • the header temperature detecting section 14 detects output values from the header temperature sensor 60 .
  • the memory section 15 is configured from a hard disk or the like and has the set temperature memory section 15 a, a coefficient of performance memory section 15 b, and a rated capacity memory section 15 c.
  • the “coefficient of performance” is represented by cooling capacity (kW) per 1 kW of power consumption.
  • “load” is energy which is actually consumed by the heat source unit.
  • the load of the heat source unit is a numbers which is equivalent to a step of the compressor (a step equivalent number).
  • the set temperature memory section 15 a stores the set temperature of hot/cold water in the first header 20 which the input section 11 receives from a user.
  • the coefficient of performance memory section 15 b stores information, which relates to the coefficient of performance according to the load, for each of the heat source units 50 a, 50 , and 50 c. Specifically, the coefficient of performance memory section 15 b stores a table of toad and coefficient of performance (refer to FIG. 4 ).
  • the table of load and coefficient of performance is a table which shows the coefficient of performance according to the loads of each of the heat source units 50 a, 50 b, and 50 c. In detail, as shown in FIG.
  • heat source unit number which correspond to each of the heat source units 50 a, 50 b, and 50 c and the coefficient of performance which corresponds to the loads of each of the heat source units 50 a, 50 b, and 50 c are associated in the table of load and coefficient of performance.
  • the table of load and coefficient of performance defines the coefficient of performance in a case where each of the heat source units 50 a, 50 b, and 50 c is operated at predetermined loads (10 to 100).
  • the rated capacity memory section 15 c stores rated capacity information with regard to the heat source units 50 a, 50 b, and 50 c (refer to FIG. 5 ). Specifically, a table of rated capacity such as shown in FIG. 5 is stored in the rated capacity memory section 15 c. In the table of rated capacity, the heat source unit number which corresponds to each of the heat source units 50 a, 50 b, and 50 c and the rated capacity for each of the heat source units 50 a, 50 b, and 50 c are associated.
  • the control section 16 is configured from a CPU, a ROM, a RAM, and the like.
  • the control section 16 reads out and executes a program which is stored in the memory section 15 described above.
  • the control section 16 performs a control for improving efficiency based on the capacities and/or the load characteristics of the respective heat source units 50 a, 50 b, and 50 c by executing the program.
  • the control for improving efficiency is a control for maintaining a high coefficient of performance for the entirety of the heat source system 100 .
  • the coefficient of performance over the entirety of the heat source system 100 is increased in the control for improving efficiency by performing a number of driving units adjusting process and an adjustment load setting process which will be described later.
  • control section 16 mainly functions as an initial load setting section 16 a, a temperature difference calculating section 16 b, a change necessity determining section 16 c, a load changing section 16 d, a number of driving units adjusting section 16 e, and a load command generating section 16 f.
  • the initial load setting section 16 a sets an initial toad with regard to each of the heat source units 50 a, 50 b, and 50 c (an initial load setting process).
  • the initial load is a load which is initially set with regard to each of the heat source units 50 a, 50 b, and 50 c and is the load with the optimal coefficient of performance.
  • the initial load setting section 16 a sets the load which indicates the optimal coefficient of performance with regard to each of the heat source units 50 a, 50 b, and 50 c based on the table of load and coefficient of performance which is stored in the coefficient of performance memory section 15 b.
  • the temperature difference calculating section 16 b calculates the temperature difference between the temperature of the hot/cold water inside the first header 20 and a set temperature (a temperature difference calculation process).
  • the temperature difference calculating section 16 b calculates the temperature difference by comparing an output value which is detected by the header temperature detecting section 14 and the set temperature which is stored in the set temperature memory section 15 a.
  • the temperature difference calculating section 16 b calculates the temperature difference by subtracting the set temperature which is stored in the set temperature memory section 15 a from the temperature (actual measurement temperature) of the hot/cold water in the first header 20 .
  • the temperature difference which is calculated by the temperature difference calculating section 16 b is stored in the memory section described above.
  • the change necessity determining section 16 c determines the necessity for changing the load at a predetermined timing (an adjustment necessity determining process).
  • the predetermined timing is after the temperature difference calculation process is performed or the like.
  • the change necessity determining section 16 c determines the necessity for changing the load based on the temperature difference which is calculated by the temperature difference calculating section 16 b.
  • the change necessity determining section 16 c determines the necessity for changing the initial load in a case where the initial load is set with regard to each of the heat source units 50 a, 50 b, and 50 c.
  • the change necessity determining section 16 c determines the necessity for changing the adjustment load in a case where the adjustment load is set with regard to each of the heat source units 50 a, 50 b, and 50 c.
  • the initial load is the load with the optimal coefficient of performance which is initially set with regard to each of the heat source units 50 a, 50 b, and 50 c as described above.
  • the adjustment load is a load which is set by the load changing section 16 d described later and is a load which is set by adjusting an initial setting.
  • the change necessity determining section 16 c determines that it is not necessary to change the initial load in a case where the temperature difference between the actual measurement temperature and the set temperature is included in a predetermined range. On the other hand, the change necessity determining section 16 c determines that it is necessary to change the initial load or the adjustment load in a case where the temperature difference between the actual measurement temperature and the set temperature is outside of the predetermined range.
  • the change necessity determining section 16 c determines whether the temperature difference is a positive value or a negative value. In a case where the temperature difference is a positive value, the actual measurement temperature is higher than the set temperature. On the other hand, in a case where the temperature difference is a negative value, the actual measurement temperature is lower than the set temperature.
  • the change necessity determining section 16 c determines that changing of the load in the positive direction is necessary (increment of the load is necessary) in a case where the temperature difference is a positive value. In addition, the change necessity determining section 16 c determines that changing of the load in the negative direction is necessary (reduction of the load is necessary) in a case where the temperature difference is a negative value.
  • the load changing section 16 d changes the load which is set with regard to each of the heat source units 50 a, 50 b, and 50 c.
  • the load changing section 16 d sets the adjustment load (an adjustment load setting process).
  • the load changing section 16 d sets the adjustment load with regard to each of the heat source units 50 a, 50 b, and 50 c when the change necessity determining section 16 c described above determines that changing of the initial load is necessary.
  • the load changing section 16 d sets a new adjustment load for each of the heat source units 50 a, 50 b, and 50 c in a case where it is determined that changing of the adjustment load is necessary.
  • the adjustment load is a load for each of the heat source units 50 a, 50 b, and 50 c which is adjusted based on the temperature difference which is calculated by the temperature difference calculating section 16 b.
  • the adjustment load is a load which is adjusted in order to bring the temperature of the hot/cold water in the first header 20 close to the set temperature.
  • the new adjustment load is an adjustment load which is newly set based on the temperature difference after the adjustment load is set.
  • the load changing section 16 d selects the load where each of the heat source units 50 a, 50 b, and 50 c is controlled from a range of loads which has a high coefficient of performance. Specifically, the load changing section 16 d determines the load which has a high coefficient of performance with regard to each of the heat source units 50 a, 50 b, and 50 c based on the table of load and coefficient of performance which is stored in the coefficient of performance memory section 15 b.
  • FIGS. 3( a ) and 3 ( b ) respectively illustrate a relationship between the load and the coefficient of performance of the first heat source unit 50 a and a relationship between the load and the coefficient of performance of the second heat source unit 50 b.
  • the horizontal axis expresses the loads of the heat source units 50 a and 50 b
  • the vertical axis expresses the coefficient of performance of the heat source units 50 a and 50 b. That is, curved lines which are shown in FIGS. 3( a ) and 3 ( b ) express the coefficient of performance which changes according to the loads of the heat source units 50 a and 50 b.
  • the loads of the first heat source unit 50 a and the second heat source unit 50 b indicate step equivalent numbers of the compressors. That is, the step equivalent number is increased or decreased in order to increase or decrease the load.
  • the first heat source unit 50 a has capacity and load characteristic which are different from those of the second heat source unit 50 b.
  • the coefficient of performance in the first heat source unit 50 a shows values which are close to the maximum when the loads are in a range of 15% to 50%.
  • the control section 16 sets a lower limit value (35%) as a lower limit target value in a range of the loads in which the coefficient of performance is close to the maximum.
  • the control section 16 sets an upper limit value (50%) as an upper limit target value in the range of the loads in which the coefficient of performance is close to the maximum.
  • the control section 16 sets a middle value (42.5%) as a medium target value the range of the loads in which the coefficient of performance is close to the maximum.
  • the control section 16 controls the first heat source unit 50 a at any one stage out of the three stages of load of the lower limit target value, the medium target value, or the upper limit target value.
  • the load is set to 42.5% in a case of reducing the energy consumption of the first heat source unit 50 a when the initial load of the first heat source unit 50 a is 50%. Furthermore, the control section 16 reduces the target value of the load by one stage at a time when the energy consumption of the first heat source unit 50 a is reduced. On the other hand, the load is changed to 42.5% in a case of increasing the energy consumption of the first heat source unit 50 a when the initial setting of the first heat source unit 50 a is 35%. That is, the control section 16 increases the energy consumption by raising the target value of the load by one stage at a time.
  • the coefficient of performance in the second heat source unit 50 b shows values which are close to the maximum when the loads are in a range of 50% to 100%.
  • the control section 16 sets a lower limit value (50%) as a lower limit target value in a range of the loads in which the coefficient of performance is close to the maximum.
  • the control section 16 sets an upper limit value (100%) as an upper limit target value in the range of the loads in which the coefficient of performance is close to the maximum.
  • the control section 16 sets a middle value (75%) as a medium target value in the range of the loads in which the coefficient of performance is close to the maximum.
  • the control section 16 controls the second heat source unit 50 b at any one stage out of the three stages of load of the lower limit target value, the medium target value, and the upper limit target value.
  • the load is set to 75% in a case of reducing the energy consumption of the second heat source unit 50 b when the initial load of the second heat source unit 50 b is 100%. Furthermore, the control section 16 reduces the target value of the load by one stage at a time when the energy consumption of the second heat source unit 50 b is reduced. On the other hand, the load is changed to 75% in a case of increasing the energy consumption of the second heat source unit 50 b when the initial setting of the second heat source unit 50 b is 50%. That is, the control section 16 increases the energy consumption by raising the target value of the load by one stage at a time.
  • the number of driving units adjusting section 16 e adjusts the number of the driving heat source units (the number of driving units adjusting process). Specifically, in a case where it is determined that changing of the initial load or the adjustment load is necessary by the change necessity determining section 16 c but it is not possible to change the adjustment load, the number of driving units adjusting section 16 e adjusts the number of the driving heat source units 50 a, 50 b, and 50 c.
  • the number of driving units adjusting section 16 e increases the number of the driving heat source units in a case where the step equivalent numbers of the compressors of all of the heat source units 50 a, 50 b, and 50 c which are driven is the upper limit target value and the change necessity determining section 16 c determines that increment of the load is necessary.
  • the number of driving units adjusting section 16 e reduces the number of the driving heat source units 50 a, 50 b, and 50 c in a case where the step equivalent numbers of all of the compressors which are driven is the lower limit target value and the change necessity determining section 16 c determines that reduction of the load is necessary.
  • the number of driving units adjusting section 16 e compares the rated capacities of the respective heat source units 50 a, 50 b, and 50 c (a rated capacity comparison process) and determines the heat source units 50 a, 50 b, and 50 c which are to be driven and the heat source units 50 a, 50 b, and 50 c which are to be stopped. For example, in a case where the first heat source unit 50 a of the rated capacity of 30 horsepower and the second heat source unit 50 b of the rated capacity of 50 horsepower shown in the table in FIG. 5 are not driven and the number of the driving heat source units is to be increased as a result of the number of driving units adjusting process, the first heat source unit 50 a of the smaller rated capacity is driven. This is to avoid a rapid change of output from the heat source units 50 a, 50 b, and 50 c in the heat source system 100 .
  • the load command generating section 16 f generates control commands based on the adjustment load with regard to each of the heat source units 50 a, 50 b, and 50 c. In detail, when the adjustment load is set by the load changing section 16 d, the load command generating section 16 f sends the control commands each of the heat source units 50 a, 50 b, and 50 c via the output section 12 .
  • the initial load setting section 16 a performs the initial load setting process in step S 101 .
  • the number of the driving heat source units 50 a, 50 b, and 50 c is set to two being close to half of the number of units of the heat source units, since the heat source system 100 has three heat source units 50 a, 50 b, and 50 c.
  • step S 102 the header temperature detecting section 14 measures the actual measurement temperature.
  • the header temperature detecting section 14 detects output value from the header temperature sensor 60 and stores the value in the memory section 15 .
  • step S 103 the temperature difference calculating section 16 b performs the temperature difference calculation process.
  • the control section 16 stores the temperature difference, which is calculated, in the memory section 15 .
  • step S 104 the change necessity determining section 16 c performs the adjustment necessity determining process.
  • the change necessity determining section 16 c performs determining of whether increment of the load is necessary or whether reduction of the load is necessary in a case where there is a temperature difference as a result of the temperature difference calculation process.
  • step S 105 the process transitions to step S 106 in a case where it is determined that the above mentioned increment of the load is necessary. In other cases, the process transitions to step S 116 .
  • step S 106 the load changing section 16 d performs the adjustment load setting process so as to increase the loads of the heat source units 50 a and 50 b which are currently being driven based on the information on temperature differences stored in the memory section 15 and the table of load and coefficient of performance stored in the coefficient of performance memory section 15 b.
  • the loads of the heat source units 50 a and 50 b are increased by raising the step numbers of the compressors.
  • control section 16 controls the load of each of the heat source units 50 a and 50 b in three stages of the lower limit target value, the medium target value, and the upper limit target value.
  • the control section 16 determines the heat source units 50 a and 50 b where the loads are to be increased and the target values of the loads out of the three stages for the heat source units 50 a and 50 b based on the temperature difference stored in the memory section 15 and the table of load and coefficient of performance stored in the coefficient of performance memory section 15 b.
  • the load command generating section 16 f generates control commands based on the adjustment loads with regard to the heat source units 50 a and 50 b.
  • the output section 12 sends the control commands generated by the load command generating section 16 f to the heat source units 50 a and 50 b.
  • step S 107 the control section 16 determines whether the loads of all of the driving heat source units 50 a and 50 b are the upper limit target values. In a case where the loads of all of the heat source units 50 a and 50 b are not the upper limit target values, an upper limit flag is stored as OFF in the memory section 15 and the process returns to step S 102 . In a case where the loads of all of the heat source units 50 a and 50 b are the upper limit target values, the upper limit flag is stored as ON in the memory section 15 and the process transitions to step S 108 .
  • step S 108 the time management section 13 starts measuring time for a predetermined waiting time of, for example, five minutes or the like.
  • the temperature difference calculating section 16 b performs the temperature difference calculation process after the predetermined waiting time elapses.
  • the change necessity determining section 16 c performs the adjustment necessity determining process.
  • the process transitions to step S 109 . In other cases, the process returns to step S 102 .
  • step S 109 the number of driving units adjusting section 16 e performs the number of driving units adjusting process and determines the number of the heat source units which are to be driven. After this, the number of driving units adjusting section 16 e performs the rated capacity comparison process and determines the heat source units which are newly to be driven.
  • the load of the third heat source unit 50 c where driving is started is the lower limit target value.
  • the lower limit target value is chosen so as not to change the output of the heat source units 50 a, 50 b, and 50 c rapidly in the heat source system 100 .
  • a control command is generated by the load command generating section 16 f and is sent to the third heat source unit 50 c via the output section 12 .
  • Driving of the third heat source unit 50 c is started and the process returns to step S 102 .
  • step S 116 the process transitions to step S 117 in a case where it is determined that the reduction of the load is necessary in step S 104 . In a case where it is determined that it is not necessary to increase the load and it is not necessary to reduce the load, the process transitions to step S 102 .
  • step S 117 the load changing section 16 d performs the adjustment load setting process so as to reduce the loads of the heat source units 50 a and 50 b which arc currently being driven based on the information on temperature differences stored in the memory section 15 and the table of load and coefficient of performance stored in the coefficient of performance memory section 15 b.
  • the loads of the heat source units 50 a and 50 b are reduced by lowering the step numbers of the compressors.
  • control section 16 controls the load of each of the heat source units 50 a and 50 b in three stages of the lower limit target value, the medium target value, and the upper limit target value.
  • the control section 16 determines the heat source units 50 a and 50 b where the loads are to be reduced and the target values of the loads out of the three stages for the heat source units 50 a and 50 b based on temperature differences stored in the memory section 15 and the table of load and coefficient of performance stored in the coefficient of performance memory section 15 b.
  • the load command generating section 16 f generates control commands based on the adjustment loads with regard to the heat source units 50 a and 50 b.
  • the output section 12 sends the control commands generated by the load command generating section 16 f to the heat source units 50 a and 50 b.
  • step S 118 the control section 16 determines whether the loads of all of the driving heat source units 50 a and 50 b are the lower limit target values. In a case where the loads of all of the heat source units 50 a and 50 b which are currently being driven are not the lower limit target values, a lower limit flag is stored as OFF in the memory section 15 and the process returns to step S 102 . In a case where the loads of all of the heat source units 50 a and 50 b are the lower limit target values, the lower limit flag is stored as ON in the memory section 15 and the process transitions to step S 119 .
  • step S 119 the time management section 13 starts measuring time for a predetermined waiting time of, for example, five minutes or the like.
  • the temperature difference calculating section 16 b performs the temperature difference calculation process after the predetermined waiting time elapses.
  • the change necessity determining section 16 c performs the adjustment necessity determining process.
  • the process transitions to step S 120 . In other cases, the process returns to step S 102 .
  • step S 120 the number of driving units adjusting section 16 e performs the number of driving units adjusting process and determines the number of units of the heat source units which are to be driven.
  • the driving units adjusting section 16 e performs the rated capacity comparison process and determines the heat source units which are to be stopped.
  • the heat source units which are being driven are the first heat source unit 50 a and the second heat source unit 50 b, and driving of the first heat source unit 50 a is stopped since the rated capacity of the first heat source unit 50 a is smaller when the rated capacities of the respective heat source units 50 a and 50 b, shown in FIG. 5 , are compared.
  • a control command is generated by the load command generating section 16 f and is sent to the first heat source unit 50 a via the output section 12 .
  • the first heat source unit 50 a is stopped and the process returns to step S 102 .
  • the control section 16 controls the heat source units 50 a, 50 b, and 50 c such that the temperature of the hot/cold water inside the first header 20 , which is detected by the header temperature detecting section 14 , becomes the set temperature of the hot/cold water which is stored in the set temperature memory section 15 a.
  • the control for improving efficiency is performed based on the respective capacities and load characteristics of the heat source units 50 a, 50 b, and 50 c such that the coefficient of performance of each of the heat source units 50 a, 50 b, and 50 c is maximized.
  • control section 16 controls the heat source units 50 a, 50 b, and 50 c of the heat source system 100 with the loads of the tower limit target value, the medium target value, or the upper limit target value which are three stages where the coefficient of performance is high with regard to each of the heat source units 50 a, 50 b, and 50 c.
  • the control section 16 controls the heat source units 50 a, 50 b, and 50 c of the heat source system 100 with the loads of the tower limit target value, the medium target value, or the upper limit target value which are three stages where the coefficient of performance is high with regard to each of the heat source units 50 a, 50 b, and 50 c.
  • control section 16 controls the load of each of the heat source units 50 a, 50 b, and 50 c including driving and stopping of the heat source units 50 a, 50 b, and 50 c.
  • the control section 16 controls the load of each of the heat source units 50 a, 50 b, and 50 c including driving and stopping of the heat source units 50 a, 50 b, and 50 c.
  • the heat source system control device 10 it is possible for the heat source system control device 10 to more easily and reliably perform the control for improving efficiency such that the coefficient of performance for the entirety of the heat source system is maximized with regard to the total energy consumption of the entirety of the heat source system based on information which relates to the coefficient of performance of each of the heat source units 50 a, 50 b, and 50 c in the heat source system 100 which has the plurality of heat source units 50 a, 50 b, and 50 c where the capacities and/or the load characteristics are different.
  • the heat source system control device 10 select the optimal heat source units 50 a, 50 b, and 50 c, perform driving or stopping of the heat source units 50 a, 50 b, and 50 c, and perform the control for improving efficiency so as to maximize the coefficient of performance for the entirety of the heat source system 100 based on the rated capacity information of each of the heat source units 50 a, 50 b, and 50 c in a case where it is necessary to carry out controlling by driving or stopping the heat source units in the heat source system 100 which has the plurality of heat source units 50 a, 50 b, and 50 c where the capacities and/or the load characteristics are different,
  • the heat source system control device 10 may bring the temperature of the hot/cold water, which is aggregated by the first header 20 , close to the set temperature by controlling the flow amount of the hot/cold water which is sent from the primary pumps 41 a, 41 b, and 41 c to the heat source units 50 a, 50 b, and 50 c.
  • the control section 16 of the heat source system control device 10 controls the flow amount from the primary pumps 41 a, 41 b, and 41 c via a communication network of a signal line or the like.
  • control section 16 controls the load of each of the heat source units 50 a, 50 b, and 50 c.
  • the amount of heat which is output by each of the heat source units 50 a, 50 b, and 50 c is perceived, in the present modified example, the amount of heat which is outputted by the heat source units 50 a, 50 b, and 50 c is kept constant by keeping the load of each of the heat source units 50 a, 50 b, and 50 c constant.
  • the initial load setting section 16 a performs the initial load setting process in step S 201 .
  • the number of the driving heat source units 50 a, 50 b, and 50 c all of the heat source units 50 a, 50 b, and 50 c are driven in order to bring the temperature of the hot/cold water which is aggregated by the first header 20 close to the set temperature by controlling the flow amount of the hot/cold water.
  • step S 202 the header temperature detecting section 14 measures the actual measurement temperature.
  • the header temperature detecting section 14 detects output value from the header temperature sensor 60 and stores the values in the memory section 15 .
  • step 5203 the temperature difference calculating section 16 b performs the temperature difference calculation process.
  • the control section 16 stores the temperature difference, which is calculated, in the memory section 15 .
  • step S 204 the control section 16 determines that it is necessary to reduce the flow amount of the hot/cold water which is sent to the heat source units 50 a, 50 b, and 50 c (a reduction in flow amount is necessary) in a case where the temperature difference described above is a positive value. In addition, the control section 16 determines that it is necessary to increase the flow amount of the hot/cold water which is sent to the heat source units 50 a, 50 b, and 50 c (an increment in flow amount is necessary) in a case where the temperature difference described above is a negative value.
  • step S 205 the process transitions to step S 206 in a case where it is determined that a reduction in the flow amount is necessary as described above. In other cases, the process transitions to step S 216 .
  • step S 206 the control section 16 reduces the flow amount of the hot/cold water, which is sent out to each of the heat source units 50 a, 50 b, and 50 c. It is possible for the control section 16 to reduce the flow amount by controlling the primary pumps 41 a, 41 b, and 41 c. By doing this, the temperature of the hot/cold water which is discharged from each of the heat source units 50 a, 50 b, and 50 c is lowered. In the present modified example, the loads of the heat source units 50 a, 50 b, and 50 c are constant, but it is further possible for the temperature of the hot/cold water to be lowered by increasing the loads of the heat source units 50 a, 50 b, and 50 c. When the process of step S 206 is completed, the process returns to step S 202 .
  • step S 216 the process transitions to step S 217 in a case where it is determined that an increment in the flow amount is necessary in step S 204 . In other cases, the process returns to step S 202 .
  • step S 217 the control section 16 increases the flow amount of the hot/cold water, which is sent out to each of the heat source units 50 a, 50 b, and 50 c. It is possible for the control section 16 to increase the flow amount by controlling the primary pumps 41 a, 41 b, and 41 c. By doing this, the temperature of the hot/cold water which is discharged from each of the heat source units 50 a, 50 b, and 50 c is raised. In the present modified example, the loads of the heat source units 50 a, 50 b, and 50 c are constant, but it is further possible for the temperature of the hot/cold water to be raised by reducing the loads of the heat source units 50 a, 50 b, and 50 c. When the process of step S 217 is completed, the process returns to step S 202 .
  • the flow amount of the hot/cold water which is supplied to each of the heat source units 50 a, 50 b, and 50 c and the load of each of the heat source units 50 a, 50 b, and 50 c are controlled such that the temperature of the hot/cold water which is aggregated by the first header 20 is brought close to the set temperature.
  • control section 16 brings the temperature of the hot/cold water which is aggregated by the first header 20 close to the set temperature by controlling the flow amount of the hot/cold water which is sent to each of the heat source units 50 a, 50 b, and 50 c by the primary pumps 41 a, 41 b, and 41 c but modified examples are not limited to this.
  • outlet temperature sensors 61 a, 61 b, and 61 c which detect the temperature of the hot/cold water which is discharged from each of the heat source units 50 a, 50 b, and 50 c may be further provided as shown in. FIG. 8 .
  • the heat source system control device 10 may be further provided with an outlet temperature detecting section 17 as shown in FIG. 9 .
  • the outlet temperature detecting section 17 detects output values from the outlet temperature sensors 61 a, 61 b, and 61 c via a communication network such as a signal line.
  • the heat source system control device 10 controls the load of each of the heat source units 50 a, 50 b, and 50 c and the flow amount of the hot/cold water. It is possible for the control section 16 to perceive the flow amounts of the hot/cold water which are respectively discharged from the heat source units 50 a, 50 b, and 50 c by controlling the primary pumps 41 a, 41 b, and 41 c. In addition, it is possible for the control section 16 to perceive the temperature of the hot/cold water which is discharged from each of the heat source units 50 a, 50 b, and 50 c with the outlet temperature sensors 61 a, 61 b, and 61 c.
  • the control section 16 controls each of the heat source units 50 a, 50 b, and 50 c so as to bring the coefficient of performance of the heat source system 100 close to the maximum by controlling the primary pumps 41 a, 41 b, and 411 c and the loads of the heat source units 50 a, 50 b, and 50 c. Accordingly, the temperature of the hot/cold water which is aggregated by the first header 20 may be brought close to the set temperature.
  • the initial load setting section 16 a performs the initial load setting process in step S 301 .
  • all of the heat source units 50 a, 50 b, and 50 c are driven in order to bring the temperature of the hot/cold water which is aggregated by the first header 20 close to the set temperature by controlling the flow amount of the hot/cold water and the loads of the heat source units 50 a, 50 b, and 50 c.
  • step S 302 the header temperature detecting section 14 measures the actual measurement temperature.
  • the header temperature detecting section 14 detects output value from the header temperature sensor 60 and stores the output values in the memory section 15 .
  • step S 303 the temperature difference calculating section 16 b performs the temperature difference calculation process.
  • the control section 16 stores the temperature difference, which is calculated, in the memory section 15 .
  • step S 304 the change necessity determining section 16 c performs the adjustment necessity determining process.
  • the change necessity determining section 16 c performs determining of whether increment of the load is necessary or reduction of the load is necessary in a case where there is a temperature difference as a result of the temperature difference calculation process.
  • step S 305 the process transitions to step S 306 in a case where it is determined that the above mentioned increment of the load is necessary. In other cases, the process transitions to step S 316 .
  • step S 306 the outlet temperature detecting section 17 detects the outlet temperatures which are the output values from the respective outlet temperature sensors 61 a, 61 b, and 61 c.
  • the outlet temperature detecting section 17 stores the outlet temperatures, which are detected, in the memory section 15 .
  • step S 307 the control section 16 determines the outlet temperatures of the respective heat source units 50 a, 50 b, and 50 c and the flow amounts which are discharged from the respective heat source units 50 a, 50 b, and 50 c.
  • the outlet temperatures and the flow amounts described above are determined so that the actual measurement temperature becomes close to the set temperature and the flow amount of the hot/cold water becomes the flow amount of the hot/cold water which is necessary for the heat source system 100 .
  • the control section 16 increases the load of each of the heat source units 50 a, 50 b, and 50 c based on the temperature difference between the outlet temperature of each of the heat source units 50 a, 50 b, and 50 c and the outlet temperature of each of the heat source units 50 a, 50 b, and 50 c which is determined by the control section 16 as it is determined in step S 304 that increment of the load is necessary. Furthermore, controlling of the flow amounts of the discharged hot/cold water is performed. Then, the control section 16 sets the outlet temperatures to the respective outlet temperatures of the heat source units 50 a, 50 b, and 50 c which are determined by the control section 16 .
  • control section 16 sets the flow amounts to the flow amounts which are discharged respectively from the heat source units 50 a, 50 b, and 50 c described above which are determined by the control section 16 .
  • the process of step S 307 is completed, the process returns to step S 302 .
  • step S 316 the process transitions to step S 317 in a case where it is determined that reduction of the load is necessary as described above. In other cases, the process transitions to step S 302 .
  • step S 317 the outlet temperature detecting section 17 detects the outlet temperatures which are the output values from the respective outlet temperature sensors 61 a, 61 b, and 61 c.
  • the outlet temperature detecting section 17 stores the outlet temperatures, which are detected, in the memory section 15 .
  • step S 318 the control section 16 determines the outlet temperatures of the respective heat source units 50 a, 50 b, and 50 c and the flow amounts which are discharged from the respective heat source units 50 a, 50 b, and 50 c.
  • the outlet temperatures and the flow amounts described above are determined so that the actual measurement temperature become close to the set temperature and the flow amount of the hot/cold water becomes the flow amount of the hot/cold water which is necessary for the heat source system 100 .
  • the control section 16 reduces the load of each of the heat source units 50 a, 50 b, and 50 c based on the temperature difference between the outlet temperature of each of the heat source units 50 a, 50 b, and 50 c and the outlet temperature of each of the heat source units 50 a, 50 b, and 50 c which is determined by the control section 16 as it is determined in step S 304 that reduction of the load is necessary. Furthermore, controlling of the flow amounts of the discharged hot/cold water is performed. Then, the control section 16 sets the outlet temperatures to the respective outlet temperatures of the heat source units 50 a, 50 b, and 50 c which are determined by the control section 16 .
  • control section 16 sets the flow amounts to the flow amounts which are discharged respectively from the heat source units 50 a, 50 b, and 50 c described above which are determined by the control section 16 .
  • the process of step S 318 returns to step S 302 .
  • the outlet temperature detecting section 17 detects the outlet temperatures of the hot/cold water respectively from the heat source units 50 a, 50 b, and 50 c and the control section 16 controls the flow amounts of the hot/cold water of the respective heat source units 50 a, 50 b, and 50 c.
  • the control section 16 controls the load and the flow amount of the hot/cold water in each of the heat source units 50 a, 50 b, and 50 c based on the outlet temperature and the flow amount of the hot/cold water in each of the heat source units 50 a, 50 b, and 50 c.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Air Conditioning Control Device (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)

Abstract

A heat source system control device controls a heat source system and has a plurality of heat source units with capacities and/or the load characteristics that are different, a first header which aggregates hot/cold water supplied from the plurality of heat source units, and a header temperature sensor which measures the temperature of the hot/cold water aggregated by the first header. The heat source system control device includes a set temperature memory section storing a set temperature of the hot/cold water in the header, a header temperature detecting section detecting output values from the header temperature sensor, a coefficient of performance memory section storing coefficient of performance information, and a control section performing a control for improving efficiency on the plurality of heat source units based on the respective capacities and/or load characteristics and bringing the temperature of the hot/cold water close to the set temperature.

Description

    TECHNICAL FIELD
  • The present invention relates to a heat source system control device.
  • BACKGROUND ART
  • In the prior art, an device which is shown in Patent Literature 1 (Japanese Unexamined Patent Application Publication No. 2005-114295) is known as an example of a heat source system control device which controls the number of heat source units included in a heat source system. The system according to Patent Literature 1 measures the temperature of the hot/cold water which is supplied to the heat source units and implements starting and stopping of operation of each of the heat source units, controlling of the loads of compressors in each of the heat source units, and controlling of a flow amount of the hot/cold water in each of the heat source units so as to maximize a coefficient of performance (COP) over the entirety of the heat source system based on the measured temperatures. In the heat source system according to Patent Literature 1, the plurality of heat source units controlled by the heat source system control device includes both the heat source units where it is possible to control the loads of the compressors and the heat source units where it is not possible to control the loads of the compressor. In addition, each of the heat source units where it is possible to control the loads of the compressors has the same capacity and load characteristic with each other. The heat source system control device according to Patent Literature 1 performs control of the compressors of each of the heat source units such that the coefficient of performance over the entirety of the heat source system is maximized with regard to the plurality of heat source units which have the same capacity and load characteristic.
  • SUMMARY OF THE INVENTION Technical Problems
  • Some heat source systems have a plurality of heat source units where the capacities and/or the load characteristics are different. As a method for controlling a heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different, there is a method where the heat source system control device preferentially drives the heat source units with good efficiency and stops driving of the heat source units with poor efficiency according to the load over the entirety of the system. In this method for controlling, it is not necessarily the case that setting of the loads of the heat source units which are preferentially driven is the optimal coefficient of performance for all of the heat source units. As such, there is a possibility that the coefficient of performance for the entirety of the heat source system is not optimized so as to be maximized.
  • The present invention is carried out in consideration of the points described above and the problem of the present invention is to provide a heat source system control device which performs control for improving efficiency such that the coefficient of performance for the entirety of the heat source system is optimized as part of the control of the heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different.
  • Solution to Problem
  • A heat source system control device according to a first aspect of the present invention is a heat source system control device controlling a heat source system and is provided with a set temperature memory section, a header temperature detecting section, and a control section. The heat source system has heat source units, a header, and a header temperature sensor. The heat source units include a plurality of heat source units where the capacities and/or load characteristics are different. The header aggregates hot/cold water which is supplied from the plurality of heat source units. The header temperature sensor measures the temperature of the hot/cold water which is aggregated by the header. The set temperature memory section stores a set temperature of the hot/cold water in the header. The header temperature detecting section detects output values from the header temperature sensor. The control section performs a control for improving efficiency on the plurality of heat source units based on the respective capacities and/or load characteristics and brings the temperature of the hot/cold water close to the set temperature.
  • In the heat source system control device, the control section controls the heat source units such that the temperature of the hot/cold water which is aggregated by the header becomes the set temperature of the hot/cold water stored in the set temperature memory section. At this time, the heat source system control device performs the control for improving efficiency such that operating efficiency of the heat source units over the entirety of the heat source system is maximized based on the capacities and/or the load characteristics of the respective heat source units.
  • As a result, it is possible to maximize the coefficient of performance over the entirety of the heat source system in the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • Here, the “coefficient of performance (COP)” is represented by cooling capacity (kW) per 1 kW of power consumption. In addition, “load” is energy which is actually consumed by the heat source unit. In a case where the heat source unit has an inverter type compressor, the load of the heat source unit is a number which is equivalent to a step of the compressor (a step equivalent number).
  • A heat source system control device according to a second aspect of the present invention is the heat source system control device according to the first aspect of the present invention, where the control section performs at least one of an individual control of driving and stopping of each of the plurality of heat source units and an individual control of the load of each of the plurality of heat source units.
  • This heat source system control device controls the loads of the heat source units individually. The individual control of the load for each of the heat source units includes driving and stopping of each of the heat source units. It is thereby possible to flexibly perform the control for improving efficiency over the entirety of the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • A heat source system control device according to a third aspect of the present invention is the heat source system control device according to the first aspect or the second aspect of the present invention which is further provided with a coefficient of performance memory section. The coefficient of performance memory section stores information, which relates to a coefficient of performance according to the load of each of the plurality of heat source units, as coefficient of performance information. The control section references the coefficient of performance information stored in the coefficient of performance memory section and drives each of the plurality of heat source units with the load where the coefficient of performance is high.
  • In the heat source system control device, the control section drives each of the heat source units with the load with the high coefficient of performance based on information which relates to the coefficient of performance of each of the heat source units with regard to the heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different. As such, it is possible to easily and reliably perform the control for improving efficiency such that the coefficient of performance over the entirety of the heat source system is maximized.
  • A heat source system control device according to a fourth aspect of the present invention is the heat source system control device according to any of the first aspect to the third aspect of the present invention which is further provided with a rated capacity memory section. The rated capacity memory section stores information, which relates to a rated capacity of each of the plurality of heat source units, as rated capacity information. The control section determines the heat source units which are driven or stopped based on the rated capacity information stored in the rated capacity memory section.
  • In the heat source system control device, the heat source units which are driven or stopped are selected based on the rated capacity information of the respective heat source units in the heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different. Due to this, it is possible to perform the control for improving efficiency such that the efficiency is maximized with regard to the total energy consumption over the entirety of the heat source system.
  • A heat source system control device according to a fifth aspect of the present invention is the heat source system control device according to any of the first aspect to the fourth aspect of the present invention, where the heat source system further has a plurality of pumps. The plurality of pumps supply the hot/cold water to each of the plurality of heat source units. The control section adjusts the temperature of the hot/cold water which is aggregated by the header by controlling a flow amount of the hot/cold water supplied from the plurality of pumps.
  • In the heat source system control device, the control for improving efficiency is preformed on the loads of the respective heat source units and the flow amount of the hot/cold water which is supplied to the respective heat source units based on the temperature of the hot/cold water which is aggregated by the header. Due to this, it is possible to bring the efficiency of the total energy consumption over the entirety of the heat source system close to the maximum more easily in the heat source system which has a plurality of heat source units where the capacities and/or the load characteristics are different.
  • A heat source system control device according to a sixth aspect of the present invention is the heat source system control device according to the fifth aspect of the present invention, where the heat source system further has a plurality of outlet temperature sensors. The plurality of outlet temperature sensors are arranged in the vicinity of respective outlets of the plurality of heat source units. The plurality of outlet temperature sensors measure outlet temperatures which are the temperatures of the hot/cold water which is supplied to the header. The heat source system control device is further provided with an outlet temperature detecting section. The outlet temperature detecting section detects output values from the plurality of outlet temperature sensors. The control section adjusts the temperature of the hot/cold water in the header by controlling the load of each of the plurality of heat source units and the flow amount of the hot/cold water which is supplied from the plurality of pumps based on the outlet temperatures of each of the plurality of heat source units and the flow amount of the hot/cold water which is supplied from each of the plurality of heat source units.
  • In the heat source system control device, the control section detects the outlet temperature of the hot/cold water from each of the heat source units using the outlet temperature detecting section. In addition, the control section controls the flow amount of the hot/cold water from each of the heat source units. The control section controls the load and the flow amount of the hot/cold water in each of the heat source units based on the outlet temperature and flow amount of the hot/cold water from each of the heat source units. Due to this, it is possible to more easily and reliably control the temperature and the flow amount of the hot/cold water in the header.
  • Advantageous Effects of Invention
  • In the heat source system control device according to the first aspect, it is possible to maximize the coefficient of performance over the entirety of the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • In the heat source system control device according to the second aspect, it is possible to flexibly perform the control for improving efficiency over the entirety of the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • In the heat source system control device according to the third aspect, it is possible to more easily and reliably perform the control for improving efficiency so as to maximize the coefficient of performance over the entirety of the heat source system with regard to the total energy consumption over the entirety of the heat source system and the efficiency with regard to the total energy consumption, based on information which relates to the coefficient of performance of each of the heat source units with regard to the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • In the heat source system control device according to the fourth aspect, the heat source units which are driven or stopped are selected based on the rated capacity information on the respective heat source units in the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different. Due to this, it is possible to perform the control for improving efficiency such that the efficiency is maximized with regard to the total energy consumption over the entirety of the heat source system.
  • In the heat source system control device according to the fifth aspect, it is possible to more easily perform the control for improving efficiency so that the efficiency of the total energy consumption over the entirety of the heat source system approaches to the maximum in the heat source system which has the plurality of heat source units where the capacities and/or the load characteristics are different.
  • In the heat source system control device according to the sixth aspect, it is possible to more easily and reliably control the temperature and the flow amount of the hot/cold water in the header.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 is a schematic configuration diagram of an energy management system according to an embodiment of the present invention.
  • FIG. 2 is a schematic configuration diagram of a heat source system control device.
  • FIG. 3( a) is a graph expressing the relationship between the load and the coefficient of performance of a heat source unit. FIG. 3( b) is a graph expressing the relationship between the load and the coefficient of performance of a heat source unit which is different to the heat source unit in FIG. 3( a).
  • FIG. 4 is a table of load and coefficient of performance.
  • FIG. 5 is a table of rated capacity of heat source unit.
  • FIG. 6 is a flow diagram illustrating the flow of a process in a heat source system control device.
  • FIG. 7 is a flow diagram illustrating the flow of a process in a heat source system control device according to the modified example A.
  • FIG. 8 is a schematic configuration diagram of an energy management system according to modified example B.
  • FIG. 9 is a schematic configuration diagram of a heat source system control device according to modified example B.
  • FIG. 10 is a flow diagram illustrating the flow of a process in a heat source system control device according to modified example B.
  • DESCRIPTION OF EMBODIMENTS
  • An energy management system 200 which includes a heat source system control device 10 according to the present invention will be described below with reference to the drawings.
  • (1) ENERGY MANAGEMENT SYSTEM
  • FIG. 1 illustrates the energy management system 200. The energy management system 200 is a system which manages energy consumed in a building.
  • The energy management system 200 includes a heat source system 100 and the heat source system control device 10. The energy management system 200 manages energy which is consumed in a building by controlling heat source units 50 a, 50 b, and 50 c, which are included in the heat source system 100, using the heat source system control device 10. The configuration of the heat source system 100 and the heat source system control device 10 will be described below.
  • (1-1) Heat Source System
  • The heat source system 100 has a plurality of heat source units 50 a, 50 b, and 50 c, air conditioners 32 a, 32 b, and 32 c, primary pumps 41 a, 41 b, and 41 c, and a first header (a header) 20, a second header 21, and a header temperature sensor 60. Each of the plurality of heat source units 50 a, 50 b, and 50 c has different capacity and/or different load characteristic. The heat source units 50 a, 50 b, and 50 c are inverter type heat source units. The heat source units 50 a, 50 b, and 50 c are, for example, air cooled inverter chillers or air cooled screw chillers. The primary pumps 41 a, 41 b, and 41 c send hot/cold water to the heat source units 50 a, 50 b, and 50 c with a certain flow amount. Hot/cold water sent from the heat source units 50 a, 50 b, and 50 c is aggregated by the first header 20. Water which is returned from the air conditioners 32 a, 32 b, and 32 c is aggregated by the second header 21.
  • Specifically, hot/cold water is sent to the heat source units 50 a, 50 b, and 50 c using the primary pumps 41 a, 41 b, and 41 c in the heat source system 100. Hot/cold water which is sent out from the heat source units 50 a, 50 b, and 50 c is aggregated by the first header 20. The water aggregated by the first header 20 is sent to the air conditioners 32 a, 32 b, and 32 c through an upstream side pipe 70. The header temperature sensor 60 is provided at a portion of the first header 20 where hot/cold water is aggregated. The header temperature sensor 60 measures the temperature of the hot/cold water. Hot/cold water aggregated by the first header 20 exchanges heat with indoor air in the air conditioners 32 a, 32 b, and 32 c. Hot/cold water sent from the air conditioners 32 a, 32 b, and 32 c is aggregated by the second header 21 through a downstream side pipe 71. Hot/cold water aggregated by the second header 21 is sent to the primary pumps 41 a, 41 b, and 41 c. In FIG. 1, three heat source units and three air conditioners are described as being in the heat source system 100, but the number of heat source units and air conditioners is not limited to three.
  • (1-2) Heat Source System Control Device
  • The heat source system control device 10 controls the heat source units 50 a, 50 b, and 50 c which are included in the heat source system 100 as described above. The heat source system control device 10 is connected to the header temperature sensor 60 using a communication line. The heat source system control device 10 detects an output value from the header temperature sensor 60 via the communication tine. In addition, the heat source system control device 10 controls the load of each of the heat source units 50 a, 50 b, and 50 c via, for example, a communication network such as a LAN.
  • FIG. 2 is a schematic configuration diagram of the heat source system control device 10. The heat source system control device 10 will be described below using FIG. 2. As shown in FIG. 2, the heat source system control device 10 mainly has an input section 11, an output section 12., a time management section 13, a header temperature detecting section 14, a memory section 15, and a control section 16.
  • (1-2-1) Input Section
  • The input section 11 is mainly configured from an operation button, a keyboard, a mouse, and the like. The input section 11 receives from a user a set temperature of hot/cold water which is aggregated by the first header 20. The set temperature which is received by the input section 11 is stored in a set temperature memory section 15 a described later.
  • (1-2-2) Output Section
  • The output section 12 is mainly configured from a display. A management screen, which shows various types of information which are stored in the memory section 15 described later, is displayed on the output section 12. In addition, the output section 12 sends control commands for an initial load described later and for an adjustment load described later, which are generated by a load command generating section 16 f described later, to each of the heat source units 50 a, 50 b, and 50 c.
  • (1-2-3) Time Management Section
  • The time management section 13 performs time management for various types of control which are executed by the heat source system control device 10.
  • (1-2-4) Header Temperature Detecting Section
  • The header temperature detecting section 14 detects output values from the header temperature sensor 60.
  • (1-2-5) Memory Section
  • The memory section 15 is configured from a hard disk or the like and has the set temperature memory section 15 a, a coefficient of performance memory section 15 b, and a rated capacity memory section 15 c.
  • Here, the “coefficient of performance” is represented by cooling capacity (kW) per 1 kW of power consumption. In addition, “load” is energy which is actually consumed by the heat source unit. In a case where the heat source unit has an inverter type of compressor, the load of the heat source unit is a numbers which is equivalent to a step of the compressor (a step equivalent number).
  • (1-2-5-1) Set Temperature Memory Section
  • The set temperature memory section 15 a stores the set temperature of hot/cold water in the first header 20 which the input section 11 receives from a user.
  • (1-2-5-2) Coefficient of Performance Memory Section
  • The coefficient of performance memory section 15 b stores information, which relates to the coefficient of performance according to the load, for each of the heat source units 50 a, 50, and 50 c. Specifically, the coefficient of performance memory section 15 b stores a table of toad and coefficient of performance (refer to FIG. 4). The table of load and coefficient of performance is a table which shows the coefficient of performance according to the loads of each of the heat source units 50 a, 50 b, and 50 c. In detail, as shown in FIG. 4, heat source unit number which correspond to each of the heat source units 50 a, 50 b, and 50 c and the coefficient of performance which corresponds to the loads of each of the heat source units 50 a, 50 b, and 50 c are associated in the table of load and coefficient of performance. In other words, the table of load and coefficient of performance defines the coefficient of performance in a case where each of the heat source units 50 a, 50 b, and 50 c is operated at predetermined loads (10 to 100).
  • (1-2-5-3) Rated Capacity Memory Section
  • The rated capacity memory section 15 c stores rated capacity information with regard to the heat source units 50 a, 50 b, and 50 c (refer to FIG. 5). Specifically, a table of rated capacity such as shown in FIG. 5 is stored in the rated capacity memory section 15 c. In the table of rated capacity, the heat source unit number which corresponds to each of the heat source units 50 a, 50 b, and 50 c and the rated capacity for each of the heat source units 50 a, 50 b, and 50 c are associated.
  • (1-2-6) Control Section
  • The control section 16 is configured from a CPU, a ROM, a RAM, and the like. The control section 16 reads out and executes a program which is stored in the memory section 15 described above. The control section 16 performs a control for improving efficiency based on the capacities and/or the load characteristics of the respective heat source units 50 a, 50 b, and 50 c by executing the program. Here, the control for improving efficiency is a control for maintaining a high coefficient of performance for the entirety of the heat source system 100. Specifically, the coefficient of performance over the entirety of the heat source system 100 is increased in the control for improving efficiency by performing a number of driving units adjusting process and an adjustment load setting process which will be described later.
  • In order to execute the control for improving efficiency, the control section 16 mainly functions as an initial load setting section 16 a, a temperature difference calculating section 16 b, a change necessity determining section 16 c, a load changing section 16 d, a number of driving units adjusting section 16 e, and a load command generating section 16 f.
  • (1-2-6-1)
  • The initial load setting section 16 a sets an initial toad with regard to each of the heat source units 50 a, 50 b, and 50 c (an initial load setting process). The initial load is a load which is initially set with regard to each of the heat source units 50 a, 50 b, and 50 c and is the load with the optimal coefficient of performance. In detail, the initial load setting section 16 a sets the load which indicates the optimal coefficient of performance with regard to each of the heat source units 50 a, 50 b, and 50 c based on the table of load and coefficient of performance which is stored in the coefficient of performance memory section 15 b.
  • (1-2-6-2)
  • The temperature difference calculating section 16 b calculates the temperature difference between the temperature of the hot/cold water inside the first header 20 and a set temperature (a temperature difference calculation process). The temperature difference calculating section 16 b calculates the temperature difference by comparing an output value which is detected by the header temperature detecting section 14 and the set temperature which is stored in the set temperature memory section 15 a. In detail, the temperature difference calculating section 16 b calculates the temperature difference by subtracting the set temperature which is stored in the set temperature memory section 15 a from the temperature (actual measurement temperature) of the hot/cold water in the first header 20. The temperature difference which is calculated by the temperature difference calculating section 16 b is stored in the memory section described above.
  • The change necessity determining section 16 c determines the necessity for changing the load at a predetermined timing (an adjustment necessity determining process). Here, the predetermined timing is after the temperature difference calculation process is performed or the like. In detail, the change necessity determining section 16 c determines the necessity for changing the load based on the temperature difference which is calculated by the temperature difference calculating section 16 b. The change necessity determining section 16 c determines the necessity for changing the initial load in a case where the initial load is set with regard to each of the heat source units 50 a, 50 b, and 50 c. On the other hand, the change necessity determining section 16 c determines the necessity for changing the adjustment load in a case where the adjustment load is set with regard to each of the heat source units 50 a, 50 b, and 50 c. The initial load is the load with the optimal coefficient of performance which is initially set with regard to each of the heat source units 50 a, 50 b, and 50 c as described above. In addition, the adjustment load is a load which is set by the load changing section 16 d described later and is a load which is set by adjusting an initial setting.
  • (1-2-6-3)
  • The change necessity determining section 16 c determines that it is not necessary to change the initial load in a case where the temperature difference between the actual measurement temperature and the set temperature is included in a predetermined range. On the other hand, the change necessity determining section 16 c determines that it is necessary to change the initial load or the adjustment load in a case where the temperature difference between the actual measurement temperature and the set temperature is outside of the predetermined range.
  • In a case where it is determined that changing of the load is necessary, the change necessity determining section 16 c determines whether the temperature difference is a positive value or a negative value. In a case where the temperature difference is a positive value, the actual measurement temperature is higher than the set temperature. On the other hand, in a case where the temperature difference is a negative value, the actual measurement temperature is lower than the set temperature. The change necessity determining section 16 c determines that changing of the load in the positive direction is necessary (increment of the load is necessary) in a case where the temperature difference is a positive value. In addition, the change necessity determining section 16 c determines that changing of the load in the negative direction is necessary (reduction of the load is necessary) in a case where the temperature difference is a negative value.
  • (1-2-6-4)
  • The load changing section 16 d changes the load which is set with regard to each of the heat source units 50 a, 50 b, and 50 c. In other words, the load changing section 16 d sets the adjustment load (an adjustment load setting process). The load changing section 16 d sets the adjustment load with regard to each of the heat source units 50 a, 50 b, and 50 c when the change necessity determining section 16 c described above determines that changing of the initial load is necessary. In addition, the load changing section 16 d sets a new adjustment load for each of the heat source units 50 a, 50 b, and 50 c in a case where it is determined that changing of the adjustment load is necessary. Here, the adjustment load is a load for each of the heat source units 50 a, 50 b, and 50 c which is adjusted based on the temperature difference which is calculated by the temperature difference calculating section 16 b. In other words, the adjustment load is a load which is adjusted in order to bring the temperature of the hot/cold water in the first header 20 close to the set temperature. In addition, the new adjustment load is an adjustment load which is newly set based on the temperature difference after the adjustment load is set.
  • The load changing section 16 d selects the load where each of the heat source units 50 a, 50 b, and 50 c is controlled from a range of loads which has a high coefficient of performance. Specifically, the load changing section 16 d determines the load which has a high coefficient of performance with regard to each of the heat source units 50 a, 50 b, and 50 c based on the table of load and coefficient of performance which is stored in the coefficient of performance memory section 15 b.
  • The adjustment load determining process by the load changing section 16 d will be described in detail using FIGS. 3( a) and 3(b).
  • FIGS. 3( a) and 3(b) respectively illustrate a relationship between the load and the coefficient of performance of the first heat source unit 50 a and a relationship between the load and the coefficient of performance of the second heat source unit 50 b. In detail, in FIGS. 3( a) and 3(b), the horizontal axis expresses the loads of the heat source units 50 a and 50 b and the vertical axis expresses the coefficient of performance of the heat source units 50 a and 50 b. That is, curved lines which are shown in FIGS. 3( a) and 3(b) express the coefficient of performance which changes according to the loads of the heat source units 50 a and 50 b.
  • The loads of the first heat source unit 50 a and the second heat source unit 50 b indicate step equivalent numbers of the compressors. That is, the step equivalent number is increased or decreased in order to increase or decrease the load. The first heat source unit 50 a has capacity and load characteristic which are different from those of the second heat source unit 50 b.
  • As shown in FIG. 3( a), the coefficient of performance in the first heat source unit 50 a shows values which are close to the maximum when the loads are in a range of 15% to 50%. The control section 16 sets a lower limit value (35%) as a lower limit target value in a range of the loads in which the coefficient of performance is close to the maximum. In the same manner, the control section 16 sets an upper limit value (50%) as an upper limit target value in the range of the loads in which the coefficient of performance is close to the maximum. Furthermore, the control section 16 sets a middle value (42.5%) as a medium target value the range of the loads in which the coefficient of performance is close to the maximum. The control section 16 controls the first heat source unit 50 a at any one stage out of the three stages of load of the lower limit target value, the medium target value, or the upper limit target value.
  • In detail, the load is set to 42.5% in a case of reducing the energy consumption of the first heat source unit 50 a when the initial load of the first heat source unit 50 a is 50%. Furthermore, the control section 16 reduces the target value of the load by one stage at a time when the energy consumption of the first heat source unit 50 a is reduced. On the other hand, the load is changed to 42.5% in a case of increasing the energy consumption of the first heat source unit 50 a when the initial setting of the first heat source unit 50 a is 35%. That is, the control section 16 increases the energy consumption by raising the target value of the load by one stage at a time.
  • On the other hand, as shown in FIG. 3( b), the coefficient of performance in the second heat source unit 50 b shows values which are close to the maximum when the loads are in a range of 50% to 100%. The control section 16 sets a lower limit value (50%) as a lower limit target value in a range of the loads in which the coefficient of performance is close to the maximum. In the same manner, the control section 16 sets an upper limit value (100%) as an upper limit target value in the range of the loads in which the coefficient of performance is close to the maximum. Furthermore, the control section 16 sets a middle value (75%) as a medium target value in the range of the loads in which the coefficient of performance is close to the maximum. The control section 16 controls the second heat source unit 50 b at any one stage out of the three stages of load of the lower limit target value, the medium target value, and the upper limit target value.
  • In detail, the load is set to 75% in a case of reducing the energy consumption of the second heat source unit 50 b when the initial load of the second heat source unit 50 b is 100%. Furthermore, the control section 16 reduces the target value of the load by one stage at a time when the energy consumption of the second heat source unit 50 b is reduced. On the other hand, the load is changed to 75% in a case of increasing the energy consumption of the second heat source unit 50 b when the initial setting of the second heat source unit 50 b is 50%. That is, the control section 16 increases the energy consumption by raising the target value of the load by one stage at a time.
  • (1-2-6-5)
  • The number of driving units adjusting section 16 e adjusts the number of the driving heat source units (the number of driving units adjusting process). Specifically, in a case where it is determined that changing of the initial load or the adjustment load is necessary by the change necessity determining section 16 c but it is not possible to change the adjustment load, the number of driving units adjusting section 16 e adjusts the number of the driving heat source units 50 a, 50 b, and 50 c. In detail, the number of driving units adjusting section 16 e increases the number of the driving heat source units in a case where the step equivalent numbers of the compressors of all of the heat source units 50 a, 50 b, and 50 c which are driven is the upper limit target value and the change necessity determining section 16 c determines that increment of the load is necessary. In addition, the number of driving units adjusting section 16 e reduces the number of the driving heat source units 50 a, 50 b, and 50 c in a case where the step equivalent numbers of all of the compressors which are driven is the lower limit target value and the change necessity determining section 16 c determines that reduction of the load is necessary.
  • The number of driving units adjusting section 16 e compares the rated capacities of the respective heat source units 50 a, 50 b, and 50 c (a rated capacity comparison process) and determines the heat source units 50 a, 50 b, and 50 c which are to be driven and the heat source units 50 a, 50 b, and 50 c which are to be stopped. For example, in a case where the first heat source unit 50 a of the rated capacity of 30 horsepower and the second heat source unit 50 b of the rated capacity of 50 horsepower shown in the table in FIG. 5 are not driven and the number of the driving heat source units is to be increased as a result of the number of driving units adjusting process, the first heat source unit 50 a of the smaller rated capacity is driven. This is to avoid a rapid change of output from the heat source units 50 a, 50 b, and 50 c in the heat source system 100.
  • (1-2-6-6)
  • The load command generating section 16 f generates control commands based on the adjustment load with regard to each of the heat source units 50 a, 50 b, and 50 c. In detail, when the adjustment load is set by the load changing section 16 d, the load command generating section 16 f sends the control commands each of the heat source units 50 a, 50 b, and 50 c via the output section 12.
  • (2) CONTROL PROCESS PERFORMED BY HEAT SOURCE SYSTEM CONTROL DEVICE
  • The flow of a process for controlling the heat source system in the heat source system control device 10 will be described below using FIG. 6.
  • First, the initial load setting section 16 a performs the initial load setting process in step S101. The number of the driving heat source units 50 a, 50 b, and 50 c is set to two being close to half of the number of units of the heat source units, since the heat source system 100 has three heat source units 50 a, 50 b, and 50 c.
  • In step S102, the header temperature detecting section 14 measures the actual measurement temperature. The header temperature detecting section 14 detects output value from the header temperature sensor 60 and stores the value in the memory section 15.
  • In step S103, the temperature difference calculating section 16 b performs the temperature difference calculation process. The control section 16 stores the temperature difference, which is calculated, in the memory section 15.
  • In step S104, the change necessity determining section 16 c performs the adjustment necessity determining process. The change necessity determining section 16 c performs determining of whether increment of the load is necessary or whether reduction of the load is necessary in a case where there is a temperature difference as a result of the temperature difference calculation process.
  • In step S105, the process transitions to step S106 in a case where it is determined that the above mentioned increment of the load is necessary. In other cases, the process transitions to step S116.
  • In step S106, the load changing section 16 d performs the adjustment load setting process so as to increase the loads of the heat source units 50 a and 50 b which are currently being driven based on the information on temperature differences stored in the memory section 15 and the table of load and coefficient of performance stored in the coefficient of performance memory section 15 b. In detail, the loads of the heat source units 50 a and 50 b are increased by raising the step numbers of the compressors. In addition, it is possible to implement the control for improving efficiency where a high coefficient of performance is maintained over the entirety of the heat source system 100 by controlling the heat source units 50 a and 50 b in a range where the coefficient of performance of each of the heat source units 50 a and 50 b is high as shown in FIG. 3. In detail, the control section 16 controls the load of each of the heat source units 50 a and 50 b in three stages of the lower limit target value, the medium target value, and the upper limit target value. The control section 16 determines the heat source units 50 a and 50 b where the loads are to be increased and the target values of the loads out of the three stages for the heat source units 50 a and 50 b based on the temperature difference stored in the memory section 15 and the table of load and coefficient of performance stored in the coefficient of performance memory section 15 b.
  • The load command generating section 16 f generates control commands based on the adjustment loads with regard to the heat source units 50 a and 50 b.
  • The output section 12 sends the control commands generated by the load command generating section 16 f to the heat source units 50 a and 50 b.
  • In step S107, the control section 16 determines whether the loads of all of the driving heat source units 50 a and 50 b are the upper limit target values. In a case where the loads of all of the heat source units 50 a and 50 b are not the upper limit target values, an upper limit flag is stored as OFF in the memory section 15 and the process returns to step S102. In a case where the loads of all of the heat source units 50 a and 50 b are the upper limit target values, the upper limit flag is stored as ON in the memory section 15 and the process transitions to step S108.
  • In step S108, the time management section 13 starts measuring time for a predetermined waiting time of, for example, five minutes or the like. The temperature difference calculating section 16 b performs the temperature difference calculation process after the predetermined waiting time elapses. After this, the change necessity determining section 16 c performs the adjustment necessity determining process. Here, in a case where the upper limit flag which is in the memory section 15 is ON and it is determined that increment of the load is necessary in the adjustment necessity determining process, the process transitions to step S109. In other cases, the process returns to step S102.
  • In step S109, the number of driving units adjusting section 16 e performs the number of driving units adjusting process and determines the number of the heat source units which are to be driven. After this, the number of driving units adjusting section 16 e performs the rated capacity comparison process and determines the heat source units which are newly to be driven. Here, since the only heat source unit where driving is currently stopped is the third heat source unit 50 c, driving of the third heat source unit 50 c is started. The load of the third heat source unit 50 c where driving is started is the lower limit target value. The lower limit target value is chosen so as not to change the output of the heat source units 50 a, 50 b, and 50 c rapidly in the heat source system 100. A control command is generated by the load command generating section 16 f and is sent to the third heat source unit 50 c via the output section 12. Driving of the third heat source unit 50 c is started and the process returns to step S102.
  • In step S116, the process transitions to step S117 in a case where it is determined that the reduction of the load is necessary in step S104. In a case where it is determined that it is not necessary to increase the load and it is not necessary to reduce the load, the process transitions to step S102.
  • In step S117, the load changing section 16 d performs the adjustment load setting process so as to reduce the loads of the heat source units 50 a and 50 b which arc currently being driven based on the information on temperature differences stored in the memory section 15 and the table of load and coefficient of performance stored in the coefficient of performance memory section 15 b. In detail, the loads of the heat source units 50 a and 50 b are reduced by lowering the step numbers of the compressors. In addition, it is possible to implement the control for improving efficiency where a high coefficient of performance is maintained over the entirety of the heat source system 100 by controlling the heat source units 50 a and 50 b in a range where the coefficient of performance of each of the heat source units 50 a and 50 b is high as shown in FIG. 3. In detail, the control section 16 controls the load of each of the heat source units 50 a and 50 b in three stages of the lower limit target value, the medium target value, and the upper limit target value. The control section 16 determines the heat source units 50 a and 50 b where the loads are to be reduced and the target values of the loads out of the three stages for the heat source units 50 a and 50 b based on temperature differences stored in the memory section 15 and the table of load and coefficient of performance stored in the coefficient of performance memory section 15 b.
  • The load command generating section 16 f generates control commands based on the adjustment loads with regard to the heat source units 50 a and 50 b.
  • The output section 12 sends the control commands generated by the load command generating section 16 f to the heat source units 50 a and 50 b.
  • In step S118, the control section 16 determines whether the loads of all of the driving heat source units 50 a and 50 b are the lower limit target values. In a case where the loads of all of the heat source units 50 a and 50 b which are currently being driven are not the lower limit target values, a lower limit flag is stored as OFF in the memory section 15 and the process returns to step S102. In a case where the loads of all of the heat source units 50 a and 50 b are the lower limit target values, the lower limit flag is stored as ON in the memory section 15 and the process transitions to step S119.
  • In step S119, the time management section 13 starts measuring time for a predetermined waiting time of, for example, five minutes or the like. The temperature difference calculating section 16 b performs the temperature difference calculation process after the predetermined waiting time elapses. After this, the change necessity determining section 16 c performs the adjustment necessity determining process. Here, in a case where the tower limit flag which is in the memory section 15 is ON and it is determined that reduction of the load is necessary in the adjustment necessity determining process, the process transitions to step S120. In other cases, the process returns to step S102.
  • In step S120, the number of driving units adjusting section 16 e performs the number of driving units adjusting process and determines the number of units of the heat source units which are to be driven. After this, the driving units adjusting section 16 e performs the rated capacity comparison process and determines the heat source units which are to be stopped. Here, the heat source units which are being driven are the first heat source unit 50 a and the second heat source unit 50 b, and driving of the first heat source unit 50 a is stopped since the rated capacity of the first heat source unit 50 a is smaller when the rated capacities of the respective heat source units 50 a and 50 b, shown in FIG. 5, are compared. A control command is generated by the load command generating section 16 f and is sent to the first heat source unit 50 a via the output section 12. The first heat source unit 50 a is stopped and the process returns to step S102.
  • (3) CHARACTERISTICS (3-1)
  • In the heat source system control device according to the present embodiment, the control section 16 controls the heat source units 50 a, 50 b, and 50 c such that the temperature of the hot/cold water inside the first header 20, which is detected by the header temperature detecting section 14, becomes the set temperature of the hot/cold water which is stored in the set temperature memory section 15 a. At this time, the control for improving efficiency is performed based on the respective capacities and load characteristics of the heat source units 50 a, 50 b, and 50 c such that the coefficient of performance of each of the heat source units 50 a, 50 b, and 50 c is maximized.
  • As a result, it is possible to maximize the coefficient of performance over the entirety of the heat source system 100 which has the plurality of heat source units 50 a, 50 b, and 50 c where the capacities and/or the load characteristics are different.
  • (3-2)
  • In the present embodiment, the control section 16 controls the heat source units 50 a, 50 b, and 50 c of the heat source system 100 with the loads of the tower limit target value, the medium target value, or the upper limit target value which are three stages where the coefficient of performance is high with regard to each of the heat source units 50 a, 50 b, and 50 c. As such, it is possible to perform the control for improving efficiency such that the coefficient of performance over the entirety of the heat source system 100 is brought close to the maximum.
  • (3-3)
  • In the present embodiment, the control section 16 controls the load of each of the heat source units 50 a, 50 b, and 50 c including driving and stopping of the heat source units 50 a, 50 b, and 50 c. As such, it is possible to flexibly perform the control for improving efficiency over the entirety of the heat source system which has the plurality of heat source units 50 a, 50 b, and 50 c where the capacities and/or the load characteristics are different.
  • (3-4)
  • In the present embodiment, it is possible for the heat source system control device 10 to more easily and reliably perform the control for improving efficiency such that the coefficient of performance for the entirety of the heat source system is maximized with regard to the total energy consumption of the entirety of the heat source system based on information which relates to the coefficient of performance of each of the heat source units 50 a, 50 b, and 50 c in the heat source system 100 which has the plurality of heat source units 50 a, 50 b, and 50 c where the capacities and/or the load characteristics are different.
  • (3-5)
  • In the present embodiment, it is possible for the heat source system control device 10 to select the optimal heat source units 50 a, 50 b, and 50 c, perform driving or stopping of the heat source units 50 a, 50 b, and 50 c, and perform the control for improving efficiency so as to maximize the coefficient of performance for the entirety of the heat source system 100 based on the rated capacity information of each of the heat source units 50 a, 50 b, and 50 c in a case where it is necessary to carry out controlling by driving or stopping the heat source units in the heat source system 100 which has the plurality of heat source units 50 a, 50 b, and 50 c where the capacities and/or the load characteristics are different,
  • (4) MODIFIED EXAMPLES
  • An embodiment of the present invention is described above based on the drawings, but the detailed configuration is not limited to the embodiment described above and modifications are possible within a range which does not depart from the gist of the present invention. Modified examples of the present embodiment are shown below. A plurality of the modified examples may be appropriately combined.
  • (4-1) Modified Example A
  • In the heat source system 100 according to the embodiment described above, a certain amount of hot/cold water is sent from the primary pumps 41 a, 41 b, and 41 c. Here, the heat source system control device 10 may bring the temperature of the hot/cold water, which is aggregated by the first header 20, close to the set temperature by controlling the flow amount of the hot/cold water which is sent from the primary pumps 41 a, 41 b, and 41 c to the heat source units 50 a, 50 b, and 50 c. The control section 16 of the heat source system control device 10 controls the flow amount from the primary pumps 41 a, 41 b, and 41 c via a communication network of a signal line or the like.
  • Here, the control section 16 controls the load of each of the heat source units 50 a, 50 b, and 50 c. As such, the amount of heat which is output by each of the heat source units 50 a, 50 b, and 50 c is perceived, in the present modified example, the amount of heat which is outputted by the heat source units 50 a, 50 b, and 50 c is kept constant by keeping the load of each of the heat source units 50 a, 50 b, and 50 c constant.
  • (4-1-1) Control Process Performed by Heat Source System Control Device in Modified Example A
  • The flow of the process for controlling the heat source system in the heat source system control device 10 in modified example A will be described below using FIG. 7.
  • First, the initial load setting section 16 a performs the initial load setting process in step S201. With regard to the number of the driving heat source units 50 a, 50 b, and 50 c, all of the heat source units 50 a, 50 b, and 50 c are driven in order to bring the temperature of the hot/cold water which is aggregated by the first header 20 close to the set temperature by controlling the flow amount of the hot/cold water.
  • In step S202, the header temperature detecting section 14 measures the actual measurement temperature. The header temperature detecting section 14 detects output value from the header temperature sensor 60 and stores the values in the memory section 15.
  • In step 5203, the temperature difference calculating section 16 b performs the temperature difference calculation process. The control section 16 stores the temperature difference, which is calculated, in the memory section 15.
  • In step S204, the control section 16 determines that it is necessary to reduce the flow amount of the hot/cold water which is sent to the heat source units 50 a, 50 b, and 50 c (a reduction in flow amount is necessary) in a case where the temperature difference described above is a positive value. In addition, the control section 16 determines that it is necessary to increase the flow amount of the hot/cold water which is sent to the heat source units 50 a, 50 b, and 50 c (an increment in flow amount is necessary) in a case where the temperature difference described above is a negative value.
  • In step S205, the process transitions to step S206 in a case where it is determined that a reduction in the flow amount is necessary as described above. In other cases, the process transitions to step S216.
  • In step S206, the control section 16 reduces the flow amount of the hot/cold water, which is sent out to each of the heat source units 50 a, 50 b, and 50 c. It is possible for the control section 16 to reduce the flow amount by controlling the primary pumps 41 a, 41 b, and 41 c. By doing this, the temperature of the hot/cold water which is discharged from each of the heat source units 50 a, 50 b, and 50 c is lowered. In the present modified example, the loads of the heat source units 50 a, 50 b, and 50 c are constant, but it is further possible for the temperature of the hot/cold water to be lowered by increasing the loads of the heat source units 50 a, 50 b, and 50 c. When the process of step S206 is completed, the process returns to step S202.
  • In step S216, the process transitions to step S217 in a case where it is determined that an increment in the flow amount is necessary in step S204. In other cases, the process returns to step S202.
  • In step S217, the control section 16 increases the flow amount of the hot/cold water, which is sent out to each of the heat source units 50 a, 50 b, and 50 c. It is possible for the control section 16 to increase the flow amount by controlling the primary pumps 41 a, 41 b, and 41 c. By doing this, the temperature of the hot/cold water which is discharged from each of the heat source units 50 a, 50 b, and 50 c is raised. In the present modified example, the loads of the heat source units 50 a, 50 b, and 50 c are constant, but it is further possible for the temperature of the hot/cold water to be raised by reducing the loads of the heat source units 50 a, 50 b, and 50 c. When the process of step S217 is completed, the process returns to step S202.
  • (4-1-2) Characteristics
  • In the present modified example, the flow amount of the hot/cold water which is supplied to each of the heat source units 50 a, 50 b, and 50 c and the load of each of the heat source units 50 a, 50 b, and 50 c are controlled such that the temperature of the hot/cold water which is aggregated by the first header 20 is brought close to the set temperature. As such, it is possible to more easily perform the control for improving efficiency so as to bring the efficiency of the total energy consumption over the entirety of the heat source system close to the maximum in the heat source system which has the plurality of heat source units 50 a, 50 b, and 50 c where the capacities and/or the load characteristics are different.
  • (4-2) Modified Example B
  • In modified example A, the control section 16 brings the temperature of the hot/cold water which is aggregated by the first header 20 close to the set temperature by controlling the flow amount of the hot/cold water which is sent to each of the heat source units 50 a, 50 b, and 50 c by the primary pumps 41 a, 41 b, and 41 c but modified examples are not limited to this.
  • In modified example B, outlet temperature sensors 61 a, 61 b, and 61 c which detect the temperature of the hot/cold water which is discharged from each of the heat source units 50 a, 50 b, and 50 c may be further provided as shown in. FIG. 8. The heat source system control device 10 may be further provided with an outlet temperature detecting section 17 as shown in FIG. 9. The outlet temperature detecting section 17 detects output values from the outlet temperature sensors 61 a, 61 b, and 61 c via a communication network such as a signal line.
  • The heat source system control device 10 controls the load of each of the heat source units 50 a, 50 b, and 50 c and the flow amount of the hot/cold water. It is possible for the control section 16 to perceive the flow amounts of the hot/cold water which are respectively discharged from the heat source units 50 a, 50 b, and 50 c by controlling the primary pumps 41 a, 41 b, and 41 c. In addition, it is possible for the control section 16 to perceive the temperature of the hot/cold water which is discharged from each of the heat source units 50 a, 50 b, and 50 c with the outlet temperature sensors 61 a, 61 b, and 61 c. As such, it is possible to perceive the flow amount of the hot/cold water which is aggregated by the first header 20 and the temperature of the hot/cold water without using the output values from the header temperature sensor 60. Due to this, the control section 16 controls each of the heat source units 50 a, 50 b, and 50 c so as to bring the coefficient of performance of the heat source system 100 close to the maximum by controlling the primary pumps 41 a, 41 b, and 411 c and the loads of the heat source units 50 a, 50 b, and 50 c. Accordingly, the temperature of the hot/cold water which is aggregated by the first header 20 may be brought close to the set temperature.
  • (4-2-1) Control Process Performed by Heat Source System Control Device in Modified Example B
  • The flow of the process for controlling the heat source system in the heat source system control device 10 in modified example B will be described below using FIG. 10. First, the initial load setting section 16 a performs the initial load setting process in step S301. With regard to the number of the driving heat source units 50 a, 50 b, and 50 c, all of the heat source units 50 a, 50 b, and 50 c are driven in order to bring the temperature of the hot/cold water which is aggregated by the first header 20 close to the set temperature by controlling the flow amount of the hot/cold water and the loads of the heat source units 50 a, 50 b, and 50 c.
  • In step S302, the header temperature detecting section 14 measures the actual measurement temperature. The header temperature detecting section 14 detects output value from the header temperature sensor 60 and stores the output values in the memory section 15.
  • In step S303, the temperature difference calculating section 16 b performs the temperature difference calculation process. The control section 16 stores the temperature difference, which is calculated, in the memory section 15.
  • In step S304, the change necessity determining section 16 c performs the adjustment necessity determining process. The change necessity determining section 16 c performs determining of whether increment of the load is necessary or reduction of the load is necessary in a case where there is a temperature difference as a result of the temperature difference calculation process.
  • In step S305, the process transitions to step S306 in a case where it is determined that the above mentioned increment of the load is necessary. In other cases, the process transitions to step S316.
  • In step S306, the outlet temperature detecting section 17 detects the outlet temperatures which are the output values from the respective outlet temperature sensors 61 a, 61 b, and 61 c. The outlet temperature detecting section 17 stores the outlet temperatures, which are detected, in the memory section 15.
  • In step S307, the control section 16 determines the outlet temperatures of the respective heat source units 50 a, 50 b, and 50 c and the flow amounts which are discharged from the respective heat source units 50 a, 50 b, and 50 c. The outlet temperatures and the flow amounts described above are determined so that the actual measurement temperature becomes close to the set temperature and the flow amount of the hot/cold water becomes the flow amount of the hot/cold water which is necessary for the heat source system 100. The control section 16 increases the load of each of the heat source units 50 a, 50 b, and 50 c based on the temperature difference between the outlet temperature of each of the heat source units 50 a, 50 b, and 50 c and the outlet temperature of each of the heat source units 50 a, 50 b, and 50 c which is determined by the control section 16 as it is determined in step S304 that increment of the load is necessary. Furthermore, controlling of the flow amounts of the discharged hot/cold water is performed. Then, the control section 16 sets the outlet temperatures to the respective outlet temperatures of the heat source units 50 a, 50 b, and 50 c which are determined by the control section 16. Furthermore, the control section 16 sets the flow amounts to the flow amounts which are discharged respectively from the heat source units 50 a, 50 b, and 50 c described above which are determined by the control section 16. When the process of step S307 is completed, the process returns to step S302.
  • In step S316, the process transitions to step S317 in a case where it is determined that reduction of the load is necessary as described above. In other cases, the process transitions to step S302.
  • In step S317, the outlet temperature detecting section 17 detects the outlet temperatures which are the output values from the respective outlet temperature sensors 61 a, 61 b, and 61 c. The outlet temperature detecting section 17 stores the outlet temperatures, which are detected, in the memory section 15.
  • In step S318, the control section 16 determines the outlet temperatures of the respective heat source units 50 a, 50 b, and 50 c and the flow amounts which are discharged from the respective heat source units 50 a, 50 b, and 50 c. The outlet temperatures and the flow amounts described above are determined so that the actual measurement temperature become close to the set temperature and the flow amount of the hot/cold water becomes the flow amount of the hot/cold water which is necessary for the heat source system 100. The control section 16 reduces the load of each of the heat source units 50 a, 50 b, and 50 c based on the temperature difference between the outlet temperature of each of the heat source units 50 a, 50 b, and 50 c and the outlet temperature of each of the heat source units 50 a, 50 b, and 50 c which is determined by the control section 16 as it is determined in step S304 that reduction of the load is necessary. Furthermore, controlling of the flow amounts of the discharged hot/cold water is performed. Then, the control section 16 sets the outlet temperatures to the respective outlet temperatures of the heat source units 50 a, 50 b, and 50 c which are determined by the control section 16. Furthermore, the control section 16 sets the flow amounts to the flow amounts which are discharged respectively from the heat source units 50 a, 50 b, and 50 c described above which are determined by the control section 16. When the process of step S318 is completed, the process returns to step S302.
  • (4-2-2) Characteristics
  • In the present modified example, the outlet temperature detecting section 17 detects the outlet temperatures of the hot/cold water respectively from the heat source units 50 a, 50 b, and 50 c and the control section 16 controls the flow amounts of the hot/cold water of the respective heat source units 50 a, 50 b, and 50 c. As such, the control section 16 controls the load and the flow amount of the hot/cold water in each of the heat source units 50 a, 50 b, and 50 c based on the outlet temperature and the flow amount of the hot/cold water in each of the heat source units 50 a, 50 b, and 50 c. As such, it is possible to more easily and reliably control the temperature and the flow amount of the hot/cold water in the first header 20. In addition, it is possible to perform the control for improving efficiency with regard to the heat source system such that the coefficient of performance of the entirety of the heat source system 100 becomes close to the maximum.
  • INDUSTRIAL APPLICABILITY
  • It is possible to apply the present invention to a heat source system which has a plurality of heat source units and a header which aggregates hot/cold water which is supplied from heat source units.
  • REFERENCE SIGNS LIST
    • 10 HEAT SOURCE SYSTEM CONTROL DEVICE
    • 20 FIRST HEADER (HEADER)
    • 21 SECOND HEADER
    • 32 a FIRST AIR CONDITIONER
    • 32 b SECOND AIR CONDITIONER
    • 32 c THIRD AIR CONDITIONER
    • 41 a FIRST PRIMARY PUMP
    • 41 b SECOND PRIMARY PUMP
    • 41 c TRIM PRIMARY PUMP
    • 50 a FIRST HEAT SOURCE UNIT
    • 50 b SECOND HEAT SOURCE UNIT
    • 50 c THIRD HEAT SOURCE UNIT
    • 60 HEADER TEMPERATURE SENSOR
    • 70 UPSTREAM SIDE PIPE
    • 71 DOWNSTREAM SIDE PIPE
    • 100 HEAT SOURCE SYSTEM
    • 200 ENERGY MANAGEMENT SYSTEM
    CITATION LIST Patent Literature
    • Patent Literature 1: Japanese Unexamined Patent Application Publication No. 2005-114295

Claims (11)

1. A heat source system control device configured to control a heat source system having a plurality of heat source units with at least one of different capacities and different load characteristics, a header which aggregates hot/cold water supplied from the plurality of heat source units, and a header temperature sensor which measures a temperature of hot/cold water which is aggregated by the header, the heat source system control device comprising:
a set temperature memory section storing a set temperature of the hot/cold water in the header;
a header temperature detecting section detecting output values from the header temperature sensor; and
a coefficient of performance memory section storing information, which relates to a coefficient of performance according to a load of each of the plurality of eat source units, as coefficient of performance information,
a control section performing a control in order to improve efficiency of the plurality of heat source units based on respective capacities and/or load characteristics and to bring the temperature of the hot/cold water close to the set temperature,
the control section including an initial load setting section setting, an upper limit value in a range of load in which the coefficient of performance is close to a maximum with regard to the plurality of heat source units based on the coefficient of performance information stored in the coefficient of performance memory section, and
the control section driving each of the plurality of heat sources with the upper limit value.
2. The heat source system control device according to claim 1, wherein
the control section further includes
a change necessity determining section which determines whether it is necessary to change values of the load which are set to the plurality of the heat source units, and
a load changing section which changes the values of the load when it is determined that change of the values of the load is necessary, and
the load changing section changes the values of the load from values which are currently set to another values in the range of load.
3. The heat source system control device according to claim 2, wherein
the initial load setting section sets the upper limit value for a plurality of predetermined heat source units of the plurality of the heat source units,
the control section further includes a number of driving units adjusting section which adjusts a number of heat source units being driven,
the number of driving units adjusting section drives the heat source units other than the plurality of the predetermined heat source units in a case when the upper limit value is set to each of the plurality of the predetermined heat source units and it is determined that further change of the values of the load is necessary by the change necessity determining section, and
the number of driving units adjusting section stops the plurality of the predetermined heat source units in a case when a lower limit value is set to each of the plurality of the predetermined heat source units and it is determined that further change of the values of the load is necessary by the change necessity determining section.
4. The heat source system control device according to claim 1, further comprising:
a rated capacity memory section storing information, which relates to a rated capacity of each of the plurality of heat source units, as rated capacity information,
the control section determining the heat source units which are driven or stopped based on the rated capacity information stored in the rated capacity memory section.
5. The heat source system control device according to claim 1, wherein
the heat source system further has a plurality of pumps which supply the hot/cold water to each of the plurality of heat source units, and
the control section adjusts the temperature of the hot/cold water which is aggregated by the header by controlling a flow amount of the hot/cold water supplied from the plurality of pumps.
6. The heat source system control device according to claim 5, wherein
the heat source system further has a plurality of outlet temperature sensors which are arranged in a vicinity of respective outlets of the plurality of heat source units and measure outlet temperatures of the hot/cold water which is supplied to the header,
an outlet temperature detecting section, which detects output values from the plurality of outlet temperature sensors, is further provided, and
the control section adjusts the temperature of the hot/cold water in the header by controlling the load of each of the plurality of heat source units and the flow amount of the hot/cold water which is supplied from the plurality of pumps based on the outlet temperature of each of the plurality of heat source units and the flow amount of the hot/cold water which is supplied from each of the plurality of heat source units.
7. The heat source system control device according to claim 2, further comprising:
a rated capacity memory section storing information, which relates to a rated capacity of each of the plurality of heat source units, as rated capacity information,
the control section determining the heat source units which are driven or stopped based on the rated capacity information stored in the rated capacity memory section.
8. The heat source system control device according to claim 2, wherein
the heat source system further has a plurality of pumps which supply the hot/cold water to each of the plurality of heat source units, and
the control section adjusts the temperature of the hot/cold water which is aggregated by the header by controlling a flow amount of the hot/cold water supplied from the plurality of pumps.
9. The heat source system control device according to claim 3, further comprising:
a rated capacity memory section storing information, which relates to a rated capacity of each of the plurality of heat source units, as rated capacity information,
the control section determining the heat source units which are driven or stopped based on the rated capacity information stored in the rated capacity memory section.
10. The heat source system control device according to claim 3, wherein
the heat source system further has a plurality of pumps which supply the hot/cold water to each of the plurality of heat source units, and
the control section adjusts the temperature of the hot/cold water which is aggregated by the header by controlling a flow amount of the hot/cold water supplied from the plurality of pumps.
11. The heat source system control device according to claim 4, wherein
the heat source system further has a plurality of pumps which supply the hot/cold water to each of the plurality of heat source units, and
the control section adjusts the temperature of the hot/cold water which is aggregated by the header by controlling a flow amount of the hot/cold water supplied from the plurality of pumps.
US14/430,521 2012-09-26 2013-05-15 Heat source system control device Abandoned US20150211762A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2012212567A JP5447627B1 (en) 2012-09-26 2012-09-26 Heat source system controller
JP2012-212567 2012-09-26
PCT/JP2013/063544 WO2014050200A1 (en) 2012-09-26 2013-05-15 Heat source system control device

Publications (1)

Publication Number Publication Date
US20150211762A1 true US20150211762A1 (en) 2015-07-30

Family

ID=50387619

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/430,521 Abandoned US20150211762A1 (en) 2012-09-26 2013-05-15 Heat source system control device

Country Status (5)

Country Link
US (1) US20150211762A1 (en)
EP (1) EP2918933A4 (en)
JP (1) JP5447627B1 (en)
CN (1) CN104736939A (en)
WO (1) WO2014050200A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6345088B2 (en) * 2014-04-07 2018-06-20 積水化学工業株式会社 Air conditioning system and building
JP6676490B2 (en) * 2016-07-12 2020-04-08 東芝キヤリア株式会社 Heat source device and control method thereof
CN108626923B (en) * 2017-03-15 2021-10-22 约克广州空调冷冻设备有限公司 Control structure and control method of air conditioning system
JP7583291B2 (en) * 2022-03-18 2024-11-14 ダイキン工業株式会社 Heat Source System

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0002427A1 (en) * 1977-10-25 1979-06-13 United Technologies Corporation Apparatus and method for temperature control of chill water and steam in heating, ventilating, air conditioning (HVAC) systems
US4210957A (en) * 1978-05-08 1980-07-01 Honeywell Inc. Operating optimization for plural parallel connected chillers
US4463574A (en) * 1982-03-15 1984-08-07 Honeywell Inc. Optimized selection of dissimilar chillers
EP1156286A2 (en) * 2000-05-17 2001-11-21 Carrier Corporation Advanced starting control for heating/cooling systems
US20080053115A1 (en) * 2006-09-01 2008-03-06 Flow Design, Inc. Electronically Based Control Valve with Feedback to a Building Management System (BMS)
US20100319378A1 (en) * 2008-02-01 2010-12-23 Hideo Chikami Hot-water storage type hot-water supply device and hot-water storage type heating and hot-water supply device
WO2013019537A2 (en) * 2011-07-29 2013-02-07 Carrier Corporation Hvac systems
US20130240172A1 (en) * 2012-03-13 2013-09-19 Victaulic Company Hydronic System and Control Method
US20130274948A1 (en) * 2011-03-30 2013-10-17 Mitsubishi Heavy Industries, Ltd. Heat source system and method for controlling the number of operated devices in heat source system
US8713951B2 (en) * 2009-05-08 2014-05-06 Mitsubishi Electric Corporation Air conditioning apparatus
US20140358253A1 (en) * 2012-02-29 2014-12-04 Mitsubishi Heavy Industries, Ltd. Number-of-machines control device for heat source system, method therefor, and heat source system
US20140360714A1 (en) * 2012-02-28 2014-12-11 Mitsubishi Heavy Industries, Ltd. Heat source system and method of controlling flow rate of heating medium thereof
US20140374497A1 (en) * 2012-03-30 2014-12-25 Mitsubishi Heavy Industries, Ltd. Heat source system, control device thereof, and control method thereof
US20150005969A1 (en) * 2012-01-13 2015-01-01 Daikin Industries, Ltd Energy control device
US8939196B2 (en) * 2009-02-13 2015-01-27 Toshiba Carrier Corporation Secondary pump type heat source and secondary pump type heat source control method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5195329A (en) * 1991-11-12 1993-03-23 Carrier Corporation Automatic chiller plant balancing
JPH10311585A (en) * 1997-05-12 1998-11-24 Chubu Electric Power Co Inc Demand control device of regenerative air conditioner
JP4435533B2 (en) 2003-10-09 2010-03-17 高砂熱学工業株式会社 Heat source system and control device
DE102008057730A1 (en) * 2008-11-17 2010-05-20 Brüning, Olaf Method for operating a system for transporting thermal energy over a liquid medium
JP5132813B2 (en) * 2009-03-30 2013-01-30 三菱電機株式会社 Fluid heating system, fluid heating method, fluid heating control system, control apparatus, and control method
IT1399586B1 (en) * 2009-05-15 2013-04-26 Rhoss S P A METHOD AND SYSTEM TO CHECK A PLURALITY OF REFRIGERATING MACHINES OF A CLIMATE CONTROL SYSTEM
JP5404333B2 (en) * 2009-11-13 2014-01-29 三菱重工業株式会社 Heat source system
JP5627234B2 (en) * 2009-12-28 2014-11-19 三洋電機株式会社 Heat source machine, heat source system, and heat source machine operation control method
JP2012145263A (en) * 2011-01-11 2012-08-02 Hitachi Plant Technologies Ltd Heat source system, control method therefor, and program therefor

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0002427A1 (en) * 1977-10-25 1979-06-13 United Technologies Corporation Apparatus and method for temperature control of chill water and steam in heating, ventilating, air conditioning (HVAC) systems
US4210957A (en) * 1978-05-08 1980-07-01 Honeywell Inc. Operating optimization for plural parallel connected chillers
US4463574A (en) * 1982-03-15 1984-08-07 Honeywell Inc. Optimized selection of dissimilar chillers
EP1156286A2 (en) * 2000-05-17 2001-11-21 Carrier Corporation Advanced starting control for heating/cooling systems
US20080053115A1 (en) * 2006-09-01 2008-03-06 Flow Design, Inc. Electronically Based Control Valve with Feedback to a Building Management System (BMS)
US20100319378A1 (en) * 2008-02-01 2010-12-23 Hideo Chikami Hot-water storage type hot-water supply device and hot-water storage type heating and hot-water supply device
US8939196B2 (en) * 2009-02-13 2015-01-27 Toshiba Carrier Corporation Secondary pump type heat source and secondary pump type heat source control method
US8713951B2 (en) * 2009-05-08 2014-05-06 Mitsubishi Electric Corporation Air conditioning apparatus
US20130274948A1 (en) * 2011-03-30 2013-10-17 Mitsubishi Heavy Industries, Ltd. Heat source system and method for controlling the number of operated devices in heat source system
WO2013019537A2 (en) * 2011-07-29 2013-02-07 Carrier Corporation Hvac systems
US20150005969A1 (en) * 2012-01-13 2015-01-01 Daikin Industries, Ltd Energy control device
US20140360714A1 (en) * 2012-02-28 2014-12-11 Mitsubishi Heavy Industries, Ltd. Heat source system and method of controlling flow rate of heating medium thereof
US20140358253A1 (en) * 2012-02-29 2014-12-04 Mitsubishi Heavy Industries, Ltd. Number-of-machines control device for heat source system, method therefor, and heat source system
US20130240172A1 (en) * 2012-03-13 2013-09-19 Victaulic Company Hydronic System and Control Method
US20140374497A1 (en) * 2012-03-30 2014-12-25 Mitsubishi Heavy Industries, Ltd. Heat source system, control device thereof, and control method thereof

Also Published As

Publication number Publication date
JP2014066453A (en) 2014-04-17
EP2918933A4 (en) 2016-07-13
EP2918933A1 (en) 2015-09-16
CN104736939A (en) 2015-06-24
JP5447627B1 (en) 2014-03-19
WO2014050200A1 (en) 2014-04-03

Similar Documents

Publication Publication Date Title
CN108375175B (en) air conditioning system control method and device
CN103912957B (en) Control method and control device of air conditioning unit and air conditioning unit
CN104613651B (en) Frequency conversion air source hot pump water heater frequency adjustment method
CN104913445B (en) Control method, the control system of blower fan gear and the air conditioner of blower fan gear
CN104501421B (en) A kind of control method of frequency conversion two-stage compression heat pump water heater
CN105318494B (en) Air regulator and its control method
CN106440594B (en) A kind of outdoor fan control method, system and air conditioner
CN112880115B (en) Control method of multi-unit air conditioning system
CN110567127A (en) air conditioner frequency control method and air conditioner
US20150211762A1 (en) Heat source system control device
CN105299824B (en) Air regulator and its control method
CN107883553B (en) A frequency conversion compressor frequency reduction control method and device
CN113701321B (en) Energy-saving frequency conversion control method for central air-conditioning water pump
CN112665132B (en) Air conditioning system, energy-saving control method and device for cooling side of air conditioning system and controller
CN104534628A (en) Control method and system of variable-frequency cooling water pump
CN109323371A (en) A control method and an air conditioner in a heating mode of an air conditioner
CN107314505B (en) An adaptive control method for an inverter air conditioner unit
CN113432354A (en) Air source heat pump control method and device, air source heat pump and storage medium
CN113007829B (en) Air conditioner control method, device, and air conditioner
CN114413458B (en) Water pump parallel operation control method, device, equipment and medium of air-conditioning water system
CN112728724B (en) Energy adjusting mode of central air conditioning system
WO2020024528A1 (en) Outdoor fan control method and device, and outdoor fan and air conditioner system
JP2015045444A (en) Control device and method, and program, and air conditioning device including the same
CN113865016A (en) Air conditioning system control method and device and air conditioning system
CN114061076A (en) Air conditioner function compensation control method and device and air conditioning system

Legal Events

Date Code Title Description
AS Assignment

Owner name: DAIKIN INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KONDO, TETSUYUKI;YAMAMORI, HARUYUKI;KAWAMURA, SHUNICHI;SIGNING DATES FROM 20130618 TO 20130621;REEL/FRAME:035234/0736

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION

点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载