US20130047351A1 - Pipeline crossing bridge - Google Patents
Pipeline crossing bridge Download PDFInfo
- Publication number
- US20130047351A1 US20130047351A1 US13/223,235 US201113223235A US2013047351A1 US 20130047351 A1 US20130047351 A1 US 20130047351A1 US 201113223235 A US201113223235 A US 201113223235A US 2013047351 A1 US2013047351 A1 US 2013047351A1
- Authority
- US
- United States
- Prior art keywords
- pipeline
- ground contacting
- bridge
- ribs
- crossing bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 230000000087 stabilizing effect Effects 0.000 claims abstract description 9
- 238000000034 method Methods 0.000 claims description 4
- 239000000463 material Substances 0.000 description 3
- 239000010426 asphalt Substances 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000009408 flooring Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 241001465754 Metazoa Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000000356 contaminant Substances 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- -1 gravel Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003209 petroleum derivative Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000003381 stabilizer Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
- E01C9/083—Temporary pavings made of metal, e.g. plates, network
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
- E01D15/133—Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/10—Covering trenches for foundations
Definitions
- This document relates to pipeline crossing bridges.
- Bridges or roads are used to cross pipelines.
- a pipeline crossing bridge comprising: first and second ground contacting pads spaced apart from one another; plural ribs with lateral stabilizing elements between adjacent ribs of the plural ribs, each rib of the plural ribs being supported on both the first and second ground contacting pads and the ribs collectively forming an arch extending between the first and second ground contacting pads; and an upper crossing surface supported by the plural ribs.
- FIG. 1 is a perspective view of the top of a pipeline crossing bridge with the apron removed.
- FIG. 2 is a perspective view of the top of the pipeline crossing bridge of FIG. 1 with the apron in place.
- FIG. 3 is a perspective view of the bottom of the pipeline crossing bridge of FIG. 1 with the lower apron removed.
- FIG. 4 is a perspective view of the bottom of the pipeline crossing bridge of FIG. 1 with the lower apron in place.
- FIG. 5 is a top plan view of the pipeline crossing bridge of FIG. 1 in position over a buried pipeline.
- FIG. 6 is a side elevation view of the pipeline crossing bridge of FIG. 1
- FIG. 7 is a top plan view illustrating the lateral interconnection of adjacent mats, with the portion of the male member that is inserted within the female member of the adjacent mat shown in dashed lines.
- the support tubes that form the female member within the adjacent mat are also shown in dashed lines.
- Pipelines are used across North America and the rest of the world to transport fluids such as petroleum products a distance from source to sink. Pipelines may be buried underneath, laid upon, or supported in a raised position above terrain. Because of the distances travelled by such pipelines, and other factors, it is often necessary for a road or passage to cross a pipeline. For raised pipelines and pipelines lying on the ground, it may be possible to provide a road overtop of the pipeline, for example using a bridge. In some cases the road may be provided underneath the pipeline.
- the crossing passes over the pipeline, for example directly or indirectly above fill material above the pipeline. Regulations may determine the minimum depth of fill required between the pipeline and the road in some cases. Regardless, vibration and compression from multiple crossings over time may lead to damage and eventual failure of the buried pipeline. In some cases a thick layer of clay or other dampening material may be provided above the fill material. However, such layers may be expensive to construct, and may still transfer vibrational and compressional energy to the pipeline, ultimately leading to pipeline damage.
- a pipeline crossing bridge 10 comprising first and second ground contacting pads 12 and 14 , respectively ( FIGS. 1 , 2 , 4 , 6 ), plural ribs 16 ( FIGS. 1 and 3 ), and an upper crossing surface, such as an apron 18 ( FIGS. 2 , 4 , 5 , 6 ).
- the first and second ground contacting pads 12 , 14 are spaced apart from one another, and may be planar in shape to transfer load across a sufficiently wide ground area.
- the plural ribs 16 have lateral stabilizing elements 20 , such as one or more truss alignment bars 22 ( FIGS. 1 and 3 ), between adjacent ribs 16 of the plural ribs 16 .
- Elements 20 may extend between two or more of the plural ribs 16 .
- the truss alignment bar 22 spans all of the plural ribs 16 .
- Other components such as support tubes 24 may form lateral stabilizing elements 20 , for example by passing laterally through the entire set of plural ribs 16 for strength. Lateral stabilizing elements 20 prevent plural ribs 16 from folding under loading during use.
- Ribs 16 and stabilizing elements 20 may collectively form a skeleton or frame 21 , which may include other elements such as end plates 23 and side plates 25 , which may have the same shape as ribs 16 .
- Each rib 16 of the plural ribs 16 is supported on both the first and second ground contacting pads 12 , 14 .
- Ribs 16 may be spaced a suitable distance apart, for example one foot or less apart. Ribs 16 may run parallel to one another in the longitudinal direction as shown.
- pads 12 and 14 which each may include one or more feet (not shown), are provided by support plates 26 , 28 , respectively, connected to the plural longitudinal ribs 16 .
- Pads 12 and 14 may be positioned on a foundation (not shown) or on a ground surface 57 ( FIG. 6 ).
- the ribs 16 collectively form an arch 30 extending between the first and second ground contacting pads 12 , 14 .
- the bridge 10 may have an arcuate middle portion 32 as shown that in use is raised above ground 34 that is desired to be crossed, such as ground 34 that is directly above a buried pipeline 36 ( FIG. 6 ).
- the throat or arch 30 which may be segmental as shown, may be wider than a diameter 51 of the pipeline 36 as shown ( FIG. 6 ).
- a segmental arch may be used over a semi-circular arch to reduce the maximum vertical height of bridge 10 while increasing the arch 30 span distance between the pads 12 , 14 .
- arcuate middle portion 32 provides a convenient location for bridge 10 to be gripped and lifted during loading and unloading with suitable loading equipment such as a backhoe, crane, loader, or excavator.
- the upper crossing surface or apron 18 may be positioned at least partially over the ribs 16 and is supported directly or indirectly by the plural ribs 16 .
- Lateral supports such as cross beams 39 ( FIGS. 1 and 3 ) may be positioned between ribs 16 and apron 18 .
- the combination of ribs 16 with lateral stabilizer elements 20 may be easier to manufacture and more resistant to folding under loading than the longitudinal corrugations (not shown) used in existing bridges.
- the apron 18 may be adapted to increase traction, for example by use of one or more traction bars 38 . Other suitable methods may be used to increase traction, for example using a textured or divoted upper surface (not shown).
- a lower apron 40 ( FIGS. 1 , 2 , 4 , 6 ) may be secured at least partially under the plural ribs 16 , for example under the ribs 16 , over the arch 30 and between the ground contacting pads 12 , 14 .
- pipeline crossing bridge 10 is entirely enclosed to prevent unwanted incursion into the bridge interior by dirt, contaminants, animals, plants, or other undesired elements.
- bridge 10 may have plural holes 42 ( FIGS. 2 , 5 ) in apron 18 to allow air pressure equalization during loading, reduce bridge weight, allow evaporation of standing water or fluids within bridge 10 , and increase traction on apron 18 .
- Mats are currently used for temporary road and access track in many other industries as well. Such mats may be generally used as alternatives to asphalt and concrete road paving, or for temporary storage pads for supplies and equipment. In contrast with traditional surfaces made with asphalt, gravel, or concrete, temporary road mats: may cause less of a negative environmental impact, may be quicker and easier to set up, and may be easier to obtain required building permits for.
- bridge 10 may form part of a ground cover mat system (not shown).
- bridge 10 may interlock longitudinally with one or more ground cover mats (not shown) to form a temporary roadway for rig equipment.
- bridge 10 may be used as a standalone unit.
- Apron 18 may have a smooth and continuous tapered or arcuate shape as shown across the entire longitudinal length of the apron 18 , terminating at opposed ramp ends 41 .
- Ramp ends 41 may be sloped toward the ground or may terminate at an end height 43 sufficiently low to allow vehicular traffic to drive onto the apron 18 from the adjacent ground 57 or from an adjacent mat (not shown).
- the end height 43 may be five inches or less off the ground, thus lower than or equal to a standard curb height.
- the apron 18 may be designed to reduce or minimize disturbance to vehicular traffic over mat 10 , for example by ensuring that apron 18 has a maximum slope of 20 degrees or less relative to ground level.
- Bridge 10 may be formed as an arcuate mat as shown.
- a mat is understood to have a relatively constant vertical thickness, for example within 0-10 inches deviation from a mean vertical thickness, along the longitudinal length of the mat. Mat form allows bridge 10 to be effectively vertically stacked for example on a trailer bed, rail bed or other suitable cargo bed. After unloading, bridge 10 may be positioned directly upon ground surface 57 without burying bridge 10 fully or partially with fill ( FIG. 6 ). In some cases a radius of curvature 46 of the apron 18 is larger than a radius of curvature 48 of the arch 30 , for example so that a minimum vertical arch height 49 is present at the longitudinal center of the arch 30 as shown.
- the apron 18 may thus have a shallower slope than the arch 30 , thus reducing disturbance to traffic passing over bridge 10 while ensuring sufficient vertical spacing from ground 34 under arch 30 . If the arch 30 or apron 18 shapes have a degree of eccentricity, then the average radii of curvature should be used.
- the bridge 10 may be separable into two or more longitudinal portions 50 A, 50 B that interlock together with lateral alignment elements 52 , 54 in the longitudinal portions 50 A, 50 B, respectively.
- alignment elements 52 are male members 53 that extend laterally into female members 55 such as support tubes 24 .
- cutouts 56 may be provided in apron 18 to allow a user vertical access to holes 58 for securing male members 53 and thus portions 50 A, 50 B together in place with screws or bolts (not shown) for example.
- a bridge of a suitable width wider than a single longitudinal portion 50 may be conveniently assembled on site but transported to the site in separate, narrower, pieces.
- longitudinal portions 50 A, 50 B, or bridge 10 may be provided with a lateral width 60 ( FIG. 5 ) sufficiently narrow, for example twelve feet six inches or less, so as to allow horizontal transportation, for example on a truck bed (not shown), without the use of a pilot vehicle, thus saving on transportation costs. Widths of eight feet or less may also be used.
- bridge 10 may be used to span a gap defined by a river, gullet', or other uneven terrain to provide safe travel by heavy duty equipment or vehicles over the gap.
- Other natural or manmade formations such as above ground pipelines or partially buried drainage culverts may be spanned by bridge 10 .
- the upper crossing surface may be planar, for example horizontally planar.
- Bridge 10 may be rated to support loads of 60 000 pounds or more. In some embodiments bridge 10 is adapted to facilitate the passage of heavy duty equipment and vehicles over wet or disturbed ground. All dimensions are exemplary and other dimensions may be used, for example dimensions greater or smaller than the exemplary dimensional ranges provided. In addition, the use of directional language such as vertical and horizontal in this document illustrate directions that are relative to a ground surface 57 ( FIG. 6 ) that bridge 10 is placed upon. Although not illustrated in the Figures, supports that are angled relative to the longitudinal, vertical, and lateral directions may be used in the construction of bridge 10 .
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Road Paving Structures (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
A bridge comprising a first ground contacting pad and a second ground contacting pad spaced apart from one another, three or more ribs with lateral stabilizing elements extending between adjacent ribs of the three or more ribs, and an upper crossing surface supported by the three or more ribs. Each rib of the three or more ribs is supported on the first and second ground contacting pads. Each of the first and second ground contacting pads extends underneath each rib of the three or more ribs. The ribs collectively form an arch extending between the first and second ground contacting pads.
Description
- This document relates to pipeline crossing bridges.
- Bridges or roads are used to cross pipelines.
- A pipeline crossing bridge comprising: first and second ground contacting pads spaced apart from one another; plural ribs with lateral stabilizing elements between adjacent ribs of the plural ribs, each rib of the plural ribs being supported on both the first and second ground contacting pads and the ribs collectively forming an arch extending between the first and second ground contacting pads; and an upper crossing surface supported by the plural ribs.
- These and other aspects of the device and method are set out in the claims, which are incorporated here by reference.
- Embodiments will now be described with reference to the figures, in which like reference characters denote like elements, by way of example, and in which:
-
FIG. 1 is a perspective view of the top of a pipeline crossing bridge with the apron removed. -
FIG. 2 is a perspective view of the top of the pipeline crossing bridge ofFIG. 1 with the apron in place. -
FIG. 3 is a perspective view of the bottom of the pipeline crossing bridge ofFIG. 1 with the lower apron removed. -
FIG. 4 is a perspective view of the bottom of the pipeline crossing bridge ofFIG. 1 with the lower apron in place. -
FIG. 5 is a top plan view of the pipeline crossing bridge ofFIG. 1 in position over a buried pipeline. -
FIG. 6 is a side elevation view of the pipeline crossing bridge ofFIG. 1 -
FIG. 7 is a top plan view illustrating the lateral interconnection of adjacent mats, with the portion of the male member that is inserted within the female member of the adjacent mat shown in dashed lines. The support tubes that form the female member within the adjacent mat are also shown in dashed lines. - Immaterial modifications may be made to the embodiments described here without departing from what is covered by the claims.
- Pipelines are used across North America and the rest of the world to transport fluids such as petroleum products a distance from source to sink. Pipelines may be buried underneath, laid upon, or supported in a raised position above terrain. Because of the distances travelled by such pipelines, and other factors, it is often necessary for a road or passage to cross a pipeline. For raised pipelines and pipelines lying on the ground, it may be possible to provide a road overtop of the pipeline, for example using a bridge. In some cases the road may be provided underneath the pipeline.
- For buried pipelines, the crossing passes over the pipeline, for example directly or indirectly above fill material above the pipeline. Regulations may determine the minimum depth of fill required between the pipeline and the road in some cases. Regardless, vibration and compression from multiple crossings over time may lead to damage and eventual failure of the buried pipeline. In some cases a thick layer of clay or other dampening material may be provided above the fill material. However, such layers may be expensive to construct, and may still transfer vibrational and compressional energy to the pipeline, ultimately leading to pipeline damage.
- Referring to
FIGS. 1-6 , apipeline crossing bridge 10 is provided comprising first and second ground contacting pads 12 and 14, respectively (FIGS. 1 , 2, 4, 6), plural ribs 16 (FIGS. 1 and 3 ), and an upper crossing surface, such as an apron 18 (FIGS. 2 , 4, 5, 6). The first and second ground contacting pads 12, 14, are spaced apart from one another, and may be planar in shape to transfer load across a sufficiently wide ground area. - The
plural ribs 16 have lateral stabilizing elements 20, such as one or more truss alignment bars 22 (FIGS. 1 and 3 ), betweenadjacent ribs 16 of theplural ribs 16. Elements 20 may extend between two or more of theplural ribs 16. In the example shown, thetruss alignment bar 22 spans all of theplural ribs 16. Other components such assupport tubes 24 may form lateral stabilizing elements 20, for example by passing laterally through the entire set ofplural ribs 16 for strength. Lateral stabilizing elements 20 preventplural ribs 16 from folding under loading during use.Ribs 16 and stabilizing elements 20 may collectively form a skeleton or frame 21, which may include other elements such asend plates 23 andside plates 25, which may have the same shape asribs 16. - Each
rib 16 of theplural ribs 16 is supported on both the first and second ground contacting pads 12, 14.Ribs 16 may be spaced a suitable distance apart, for example one foot or less apart.Ribs 16 may run parallel to one another in the longitudinal direction as shown. In the example shown, pads 12 and 14, which each may include one or more feet (not shown), are provided by support plates 26, 28, respectively, connected to the plurallongitudinal ribs 16. Pads 12 and 14 may be positioned on a foundation (not shown) or on a ground surface 57 (FIG. 6 ). Theribs 16 collectively form anarch 30 extending between the first and second ground contacting pads 12, 14. Thebridge 10 may have anarcuate middle portion 32 as shown that in use is raised aboveground 34 that is desired to be crossed, such asground 34 that is directly above a buried pipeline 36 (FIG. 6 ). The throat orarch 30, which may be segmental as shown, may be wider than adiameter 51 of thepipeline 36 as shown (FIG. 6 ). A segmental arch may be used over a semi-circular arch to reduce the maximum vertical height ofbridge 10 while increasing thearch 30 span distance between the pads 12, 14. By positioningbridge 10 overpipeline 36 so that thearcuate middle portion 32 is spaced above theground 34, bridge loading is transferred away fromground 34 directly above thepipeline 36, thus reducing or eliminating damage topipeline 36 that may otherwise occur over multiple crossings. In addition,arcuate middle portion 32 provides a convenient location forbridge 10 to be gripped and lifted during loading and unloading with suitable loading equipment such as a backhoe, crane, loader, or excavator. - The upper crossing surface or apron 18 (
FIGS. 2 , 3, 4, 5, and 6) may be positioned at least partially over theribs 16 and is supported directly or indirectly by theplural ribs 16. Lateral supports such as cross beams 39 (FIGS. 1 and 3 ) may be positioned betweenribs 16 and apron 18. The combination ofribs 16 with lateral stabilizer elements 20 may be easier to manufacture and more resistant to folding under loading than the longitudinal corrugations (not shown) used in existing bridges. Theapron 18 may be adapted to increase traction, for example by use of one ormore traction bars 38. Other suitable methods may be used to increase traction, for example using a textured or divoted upper surface (not shown). A lower apron 40 (FIGS. 1 , 2, 4, 6) may be secured at least partially under theplural ribs 16, for example under theribs 16, over thearch 30 and between the ground contacting pads 12, 14. In some cases,pipeline crossing bridge 10 is entirely enclosed to prevent unwanted incursion into the bridge interior by dirt, contaminants, animals, plants, or other undesired elements. In other cases,bridge 10 may have plural holes 42 (FIGS. 2 , 5) inapron 18 to allow air pressure equalization during loading, reduce bridge weight, allow evaporation of standing water or fluids withinbridge 10, and increase traction onapron 18. - In the oil and gas industry, it is sometimes necessary to provide ground cover mats with sufficient strength to support heavy equipment and transport trucks over wet or disturbed ground. Oil field exploration and drilling operations are often undertaken in geographic areas that are, in their natural state, inaccessible to vehicles and equipment necessary for such exploration. These areas include swamps, marshlands, riverbeds, snow covered regions, and areas with soft or sandy soil. In order to explore for oil in such areas, it is necessary to locate heavy drilling rigs, vehicles and other equipment for some period of time on or adjacent to the location where the well is to be drilled. In order to transport this heavy equipment to the site and to support the equipment at the site, the industry has used for many years temporary roads leading to and from the site and flooring systems or pads at the particular site.
- Existing flooring systems may involve a series of prefabricated mats. Mats are currently used for temporary road and access track in many other industries as well. Such mats may be generally used as alternatives to asphalt and concrete road paving, or for temporary storage pads for supplies and equipment. In contrast with traditional surfaces made with asphalt, gravel, or concrete, temporary road mats: may cause less of a negative environmental impact, may be quicker and easier to set up, and may be easier to obtain required building permits for.
- Referring to
FIG. 6 ,bridge 10 may form part of a ground cover mat system (not shown). For example,bridge 10 may interlock longitudinally with one or more ground cover mats (not shown) to form a temporary roadway for rig equipment. In other embodiments,bridge 10 may be used as a standalone unit.Apron 18 may have a smooth and continuous tapered or arcuate shape as shown across the entire longitudinal length of theapron 18, terminating at opposed ramp ends 41. Ramp ends 41 may be sloped toward the ground or may terminate at anend height 43 sufficiently low to allow vehicular traffic to drive onto theapron 18 from theadjacent ground 57 or from an adjacent mat (not shown). In one example, theend height 43 may be five inches or less off the ground, thus lower than or equal to a standard curb height. Theapron 18 may be designed to reduce or minimize disturbance to vehicular traffic overmat 10, for example by ensuring thatapron 18 has a maximum slope of 20 degrees or less relative to ground level. -
Bridge 10 may be formed as an arcuate mat as shown. A mat is understood to have a relatively constant vertical thickness, for example within 0-10 inches deviation from a mean vertical thickness, along the longitudinal length of the mat. Mat form allowsbridge 10 to be effectively vertically stacked for example on a trailer bed, rail bed or other suitable cargo bed. After unloading,bridge 10 may be positioned directly uponground surface 57 without buryingbridge 10 fully or partially with fill (FIG. 6 ). In some cases a radius ofcurvature 46 of theapron 18 is larger than a radius ofcurvature 48 of the arch 30, for example so that a minimum verticalarch height 49 is present at the longitudinal center of the arch 30 as shown. Theapron 18 may thus have a shallower slope than the arch 30, thus reducing disturbance to traffic passing overbridge 10 while ensuring sufficient vertical spacing fromground 34 underarch 30. If the arch 30 orapron 18 shapes have a degree of eccentricity, then the average radii of curvature should be used. - Referring to
FIG. 7 , thebridge 10 may be separable into two or morelongitudinal portions 50A, 50B that interlock together with lateral alignment elements 52, 54 in thelongitudinal portions 50A, 50B, respectively. In the example shown, alignment elements 52 are male members 53 that extend laterally into female members 55 such assupport tubes 24. Referring toFIGS. 2 and 5 ,cutouts 56 may be provided inapron 18 to allow a user vertical access toholes 58 for securing male members 53 and thusportions 50A, 50B together in place with screws or bolts (not shown) for example. By providingbridge 10 in two or more separablelongitudinal portions 50A and 50B, a bridge of a suitable width wider than a single longitudinal portion 50 may be conveniently assembled on site but transported to the site in separate, narrower, pieces. In addition, in some embodimentslongitudinal portions 50A, 50B, orbridge 10 may be provided with a lateral width 60 (FIG. 5 ) sufficiently narrow, for example twelve feet six inches or less, so as to allow horizontal transportation, for example on a truck bed (not shown), without the use of a pilot vehicle, thus saving on transportation costs. Widths of eight feet or less may also be used. - Although described above for use in spanning buried pipelines, in some
cases bridge 10 may be used to span a gap defined by a river, gullet', or other uneven terrain to provide safe travel by heavy duty equipment or vehicles over the gap. Other natural or manmade formations such as above ground pipelines or partially buried drainage culverts may be spanned bybridge 10. In some cases the upper crossing surface may be planar, for example horizontally planar. -
Bridge 10 may be rated to support loads of 60 000 pounds or more. In someembodiments bridge 10 is adapted to facilitate the passage of heavy duty equipment and vehicles over wet or disturbed ground. All dimensions are exemplary and other dimensions may be used, for example dimensions greater or smaller than the exemplary dimensional ranges provided. In addition, the use of directional language such as vertical and horizontal in this document illustrate directions that are relative to a ground surface 57 (FIG. 6 ) thatbridge 10 is placed upon. Although not illustrated in the Figures, supports that are angled relative to the longitudinal, vertical, and lateral directions may be used in the construction ofbridge 10. - In the claims, the word “comprising” is used in its inclusive sense and does not exclude other elements being present. The indefinite article “a” before a claim feature does not exclude more than one of the feature being present. Each one of the individual features described here may be used in one or more embodiments and is not, by virtue only of being described here, to be construed as essential to all embodiments as defined by the claims.
Claims (18)
1. A pipeline crossing bridge for vehicles comprising:
a first ground contacting pad and a second ground contacting pad spaced apart from one another;
plural ribs with lateral stabilizing elements extending between adjacent ribs of the plural ribs, in which each rib of the plural ribs is supported on the first ground contacting pad and the second ground contacting pad and the ribs collectively form a raised arch extending between the first ground contacting pad and the second ground contacting pad, and in which each of the first ground contacting pad and the second ground contacting pad extends underneath each rib of the plural ribs;
an upper crossing surface supported by the plural ribs; and
one or more lateral alignment elements on each side of the pipeline crossing bridge for interlocking with one or more lateral alignment elements of one or more adjacent pipeline crossing bridges.
2. The pipeline crossing bridge of claim 1 positioned over a pipeline, in which the pipeline has a diameter and the first ground contacting pad and the second ground contacting pad are spaced apart wider than the diameter of the pipeline.
3-4. (canceled)
5. The pipeline crossing bridge of claim 1 in which the pipeline crossing bridge has a lateral width of twelve feet six inches or less.
6. The pipeline crossing bridge of claim 1 further comprising a lower apron secured under the ribs, over the arch and between the ground contacting pads.
7. The pipeline crossing bridge of claim 1 in which the upper crossing surface has a first longitudinal radius of curvature, the raised arch has a second longitudinal radius of curvature, and the first longitudinal radius of curvature is larger than the second longitudinal radius of curvature.
8. The pipeline crossing bridge of claim 1 in which the bridge has a lateral width sufficiently narrow to allow horizontal transportation without the use of a pilot vehicle.
9. The pipeline crossing bridge of claim 8 in which the bridge has a lateral width of twelve feet six inches or less.
10. The pipeline crossing bridge of claim 1 further comprising a plurality of lateral supports positioned between the plural ribs and the upper crossing surface.
11. The pipeline crossing bridge of claim 1 formed as an arcuate mat.
12. The pipeline crossing bridge of claim 1 in which the raised arch is a segmental arch.
13. The pipeline crossing bridge of claim 6 in which the lower apron and upper crossing surface define a hollow interior containing the plural ribs and lateral stabilizing elements.
14. The pipeline crossing bridge of claim 1 in which the plural ribs comprise three or more ribs.
15. A method comprising placing the pipeline crossing bridge of claim 1 over a buried pipeline.
16. A method comprising placing the pipeline crossing bridge of claim 1 over a ground surface lacking a foundation.
17. A pipeline crossing bridge for vehicles comprising:
a first ground contacting pad and a second ground contacting pad spaced apart from one another;
plural ribs with lateral stabilizing elements extending between adjacent ribs of the plural ribs, in which each rib of the plural ribs is supported on the first ground contacting pad and the second ground contacting pad and the ribs collectively form a raised arch extending between the first ground contacting pad and the second ground contacting pad, and in which each of the first ground contacting pad and the second ground contacting pad extends underneath each rib of the plural ribs;
an upper crossing surface supported by the plural ribs, the upper crossing surface being arcuate and having a maximum slope of twenty degrees relative to a ground surface;
one or more lateral alignment elements on each side of the pipeline crossing bridge for interlocking with one or more lateral alignment elements of one or more adjacent pipeline crossing bridges;
a lower apron secured under the ribs, over the arch and between the ground contacting pads; and
the pipeline crossing bridge being formed as an arcuate mat having a range of vertical thicknesses, from a first end of the pipeline crossing bridge to a second end of the pipeline crossing bridge, with ten inches or less deviation from a mean vertical thickness.
18. The pipeline crossing bridge of claim 17 in which the upper crossing surface has a first longitudinal radius of curvature from the first pipeline crossing bridge end to the second pipeline crossing bridge end, the raised arch has a second longitudinal radius of curvature, and the first longitudinal radius of curvature is larger than the second longitudinal radius of curvature.
19. The pipeline crossing bridge of claim 17 in which the pipeline crossing bridge is positioned over a pipeline, in which the pipeline has a diameter, and the first ground contacting pad and the second ground contacting pad are spaced apart wider than the diameter of the pipeline.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/223,235 US20130047351A1 (en) | 2011-08-31 | 2011-08-31 | Pipeline crossing bridge |
US14/054,736 US8973195B2 (en) | 2011-08-31 | 2013-10-15 | Pipeline crossing bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/223,235 US20130047351A1 (en) | 2011-08-31 | 2011-08-31 | Pipeline crossing bridge |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/054,736 Continuation US8973195B2 (en) | 2011-08-31 | 2013-10-15 | Pipeline crossing bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
US20130047351A1 true US20130047351A1 (en) | 2013-02-28 |
Family
ID=47741528
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/223,235 Abandoned US20130047351A1 (en) | 2011-08-31 | 2011-08-31 | Pipeline crossing bridge |
US14/054,736 Active US8973195B2 (en) | 2011-08-31 | 2013-10-15 | Pipeline crossing bridge |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/054,736 Active US8973195B2 (en) | 2011-08-31 | 2013-10-15 | Pipeline crossing bridge |
Country Status (1)
Country | Link |
---|---|
US (2) | US20130047351A1 (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110114389A1 (en) * | 2008-06-30 | 2011-05-19 | Harold Dean Mathena | Ecologically sensitive mud-gas containment system |
US8973195B2 (en) * | 2011-08-31 | 2015-03-10 | Marc Breault | Pipeline crossing bridge |
US9279221B1 (en) * | 2014-05-13 | 2016-03-08 | Michael Cardona Orona | Pedestrian bridge |
US9353586B2 (en) | 2012-05-11 | 2016-05-31 | Mathena, Inc. | Control panel, and digital display units and sensors therefor |
USD763414S1 (en) * | 2013-12-10 | 2016-08-09 | Mathena, Inc. | Fluid line drive-over |
CN108222010A (en) * | 2018-03-20 | 2018-06-29 | 南京市测绘勘察研究院股份有限公司 | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method |
GB2561384A (en) * | 2017-04-13 | 2018-10-17 | Oxford Plastic Sys Ltd | Cover |
US20180313042A1 (en) * | 2017-04-27 | 2018-11-01 | Busby Enterprises Ltd | System, Apparatus and Related Method for Raised Ground Cover Mat |
US10160913B2 (en) | 2011-04-12 | 2018-12-25 | Mathena, Inc. | Shale-gas separating and cleanout system |
CN112681106A (en) * | 2020-12-29 | 2021-04-20 | 中铁二院工程集团有限责任公司 | Pneumatic structure for inhibiting wind-induced vibration of steel arch bridge |
CN113627697A (en) * | 2020-05-06 | 2021-11-09 | 中国石油化工股份有限公司 | Failure grade obtaining method and device for oil and gas pipeline crossing section |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
USD735435S1 (en) * | 2013-12-01 | 2015-07-28 | Nicholas A. Guido, III | Wet area bridge |
CN106284059A (en) * | 2016-10-31 | 2017-01-04 | 中铁二院工程集团有限责任公司 | A kind of variable diameters arch rib being applicable to bridge |
CN106968256B (en) * | 2017-03-22 | 2019-02-22 | 深圳市福田建安建设集团有限公司 | Foundation pit assembled steel trestle construction method |
US10179979B1 (en) * | 2017-07-12 | 2019-01-15 | Tidy Site Services, LLC | Bridge span and methods of moving a bridge span |
CN107806018B (en) * | 2017-10-31 | 2019-01-22 | 信阳师范学院 | Quick-assembled small-span arch bridge and construction technology for emergency repair and construction |
CN112095435B (en) * | 2020-09-27 | 2022-04-12 | 广州市第二市政工程有限公司 | Construction method for prepressing large-span steel arch frame |
US20230119877A1 (en) * | 2021-10-19 | 2023-04-20 | Ty-Crop Manufacturing Ltd. | Portable bridge |
US11970825B1 (en) * | 2023-10-12 | 2024-04-30 | Best Cart, Inc | Structurally stable garden bridge and its method of use |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US227834A (en) * | 1880-05-18 | Aaeon k | ||
US2208080A (en) * | 1938-06-17 | 1940-07-16 | Elvin W Overdorff | Protector for highway markings |
US2690821A (en) * | 1949-10-17 | 1954-10-05 | Thomas I Holley | Working platform base |
US3768108A (en) * | 1972-01-03 | 1973-10-30 | B Wadsworth | Arched bridge construction |
US4965903A (en) * | 1989-02-17 | 1990-10-30 | Kitchener Forging Ltd. | Modular bridge |
US5590433A (en) * | 1995-09-15 | 1997-01-07 | Fricke; Obed M. | Monolithic cast bridge |
US5603134A (en) * | 1995-06-27 | 1997-02-18 | Coastal Lumber Company | Portable bridge system |
USD406364S (en) * | 1997-02-17 | 1999-03-02 | Industries AL-13 Ltee | Bridge module |
US6611982B2 (en) * | 2001-06-02 | 2003-09-02 | General Dynamics Santa Bárbara Sistemas GmbH | Military quick launching bridge system |
US6722814B2 (en) * | 1999-09-17 | 2004-04-20 | David Vincent Byrne | Trench cover element |
US6799345B2 (en) * | 2003-01-02 | 2004-10-05 | David Occhiolini | Footbridge support |
USD511215S1 (en) * | 2004-11-19 | 2005-11-01 | Con/Span Bridge Systems Ltd. | Precast concrete bridge unit |
US7240387B1 (en) * | 2005-03-01 | 2007-07-10 | Berggren John A | Ornamental bridge kit |
US20100031454A1 (en) * | 2006-05-31 | 2010-02-11 | Ets A. Deschamps Et Fils | Temporary bridge |
US20110142539A1 (en) * | 2008-08-22 | 2011-06-16 | Meiwa Kogyo Co., Ltd. | Member for temporarily restoring road surface and method for temporarily restoring road surface |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3638434A (en) | 1970-01-20 | 1972-02-01 | Davum | Flexible structural plate pipes and the like |
US4118816A (en) * | 1977-10-06 | 1978-10-10 | Aurora Equipment Company | Crossover or bridge |
US4141666A (en) | 1978-02-16 | 1979-02-27 | Kaiser Aluminum & Chemical Corporation | Low headroom culvert |
CA1189332A (en) | 1984-08-02 | 1985-06-25 | Leonid Mikhailovsky | Concrete arch buried bridge |
DE3814502C3 (en) | 1988-04-29 | 1995-08-03 | Dornier Gmbh | bridge |
US5118218A (en) | 1991-06-24 | 1992-06-02 | Syro Steel Company | Box culvert without rib stiffeners |
CA2366241C (en) * | 2001-12-28 | 2005-08-16 | Roy Smysniuk | Pipeline crossing ramp |
US7861346B2 (en) | 2005-06-30 | 2011-01-04 | Ail International Inc. | Corrugated metal plate bridge with composite concrete structure |
CA2528749A1 (en) | 2005-12-02 | 2007-06-02 | Maxximat Inc. | Interlocking ground cover mats |
US7546654B2 (en) | 2006-03-23 | 2009-06-16 | Mordehay Carmel | Mobile compression and tension bridge and shelter structure |
US20130047351A1 (en) * | 2011-08-31 | 2013-02-28 | Marc Breault | Pipeline crossing bridge |
-
2011
- 2011-08-31 US US13/223,235 patent/US20130047351A1/en not_active Abandoned
-
2013
- 2013-10-15 US US14/054,736 patent/US8973195B2/en active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US227834A (en) * | 1880-05-18 | Aaeon k | ||
US2208080A (en) * | 1938-06-17 | 1940-07-16 | Elvin W Overdorff | Protector for highway markings |
US2690821A (en) * | 1949-10-17 | 1954-10-05 | Thomas I Holley | Working platform base |
US3768108A (en) * | 1972-01-03 | 1973-10-30 | B Wadsworth | Arched bridge construction |
US4965903A (en) * | 1989-02-17 | 1990-10-30 | Kitchener Forging Ltd. | Modular bridge |
US5603134A (en) * | 1995-06-27 | 1997-02-18 | Coastal Lumber Company | Portable bridge system |
US5590433A (en) * | 1995-09-15 | 1997-01-07 | Fricke; Obed M. | Monolithic cast bridge |
USD406364S (en) * | 1997-02-17 | 1999-03-02 | Industries AL-13 Ltee | Bridge module |
US6722814B2 (en) * | 1999-09-17 | 2004-04-20 | David Vincent Byrne | Trench cover element |
US6611982B2 (en) * | 2001-06-02 | 2003-09-02 | General Dynamics Santa Bárbara Sistemas GmbH | Military quick launching bridge system |
US6799345B2 (en) * | 2003-01-02 | 2004-10-05 | David Occhiolini | Footbridge support |
USD511215S1 (en) * | 2004-11-19 | 2005-11-01 | Con/Span Bridge Systems Ltd. | Precast concrete bridge unit |
US7240387B1 (en) * | 2005-03-01 | 2007-07-10 | Berggren John A | Ornamental bridge kit |
US20100031454A1 (en) * | 2006-05-31 | 2010-02-11 | Ets A. Deschamps Et Fils | Temporary bridge |
US20110142539A1 (en) * | 2008-08-22 | 2011-06-16 | Meiwa Kogyo Co., Ltd. | Member for temporarily restoring road surface and method for temporarily restoring road surface |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8641811B2 (en) | 2008-06-30 | 2014-02-04 | Mathena, Inc. | Ecologically sensitive mud-gas containment system |
US20110114389A1 (en) * | 2008-06-30 | 2011-05-19 | Harold Dean Mathena | Ecologically sensitive mud-gas containment system |
US10160913B2 (en) | 2011-04-12 | 2018-12-25 | Mathena, Inc. | Shale-gas separating and cleanout system |
US8973195B2 (en) * | 2011-08-31 | 2015-03-10 | Marc Breault | Pipeline crossing bridge |
US9353586B2 (en) | 2012-05-11 | 2016-05-31 | Mathena, Inc. | Control panel, and digital display units and sensors therefor |
USD763414S1 (en) * | 2013-12-10 | 2016-08-09 | Mathena, Inc. | Fluid line drive-over |
US9279221B1 (en) * | 2014-05-13 | 2016-03-08 | Michael Cardona Orona | Pedestrian bridge |
US10774496B2 (en) * | 2017-04-13 | 2020-09-15 | Oxford Plastic Systems Limited | Cover |
GB2561384A (en) * | 2017-04-13 | 2018-10-17 | Oxford Plastic Sys Ltd | Cover |
WO2018189552A1 (en) * | 2017-04-13 | 2018-10-18 | Oxford Plastic Systems Limited | Cover |
US20180313042A1 (en) * | 2017-04-27 | 2018-11-01 | Busby Enterprises Ltd | System, Apparatus and Related Method for Raised Ground Cover Mat |
US10689811B2 (en) * | 2017-04-27 | 2020-06-23 | Busby Enterprises Ltd | System, apparatus and related method for raised ground cover mat |
CN108222010A (en) * | 2018-03-20 | 2018-06-29 | 南京市测绘勘察研究院股份有限公司 | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method |
CN113627697A (en) * | 2020-05-06 | 2021-11-09 | 中国石油化工股份有限公司 | Failure grade obtaining method and device for oil and gas pipeline crossing section |
CN112681106A (en) * | 2020-12-29 | 2021-04-20 | 中铁二院工程集团有限责任公司 | Pneumatic structure for inhibiting wind-induced vibration of steel arch bridge |
Also Published As
Publication number | Publication date |
---|---|
US20140041135A1 (en) | 2014-02-13 |
US8973195B2 (en) | 2015-03-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8973195B2 (en) | Pipeline crossing bridge | |
US7404690B2 (en) | Temporary road element | |
US4051570A (en) | Road bridge construction with precast concrete modules | |
TWI542758B (en) | Module and assembly for managing the flow of water beneath a ground surface | |
AU2016231474B2 (en) | Rail Track Sleeper Support | |
US5087149A (en) | Interlocking wooden mat roadway | |
CN110670433B (en) | Construction structure for constructing road on soft soil foundation | |
US20120060306A1 (en) | Damage resistant bridge construction | |
CN102182332B (en) | Seam type intercepting drain system on ground in front of garage door with track | |
KR101301728B1 (en) | Lining board for temporary road of marshy land | |
JP3851539B2 (en) | Block-type traffic roads, split-bridge-type traffic roads, and bridge traffic roads | |
CA2750775C (en) | Pipeline crossing bridge | |
US9088142B2 (en) | Systems and apparatus for protecting subsurface conduit and methods of making and using the same | |
US10689811B2 (en) | System, apparatus and related method for raised ground cover mat | |
CN111287088A (en) | Special steel temporary bridge for protecting crossing pipeline and construction method thereof | |
RU2589138C2 (en) | Automobile road | |
CN113944107A (en) | Land short pier bridge roadbed filling type bridge-climbing channel and construction method thereof | |
CN202482727U (en) | Temporary road surface pavement structure for ultra-shallow burying excavation underground project | |
JP3940587B2 (en) | Construction method of divided bridge type traffic route | |
KR20000006907U (en) | A duplex highway | |
CN220079617U (en) | Heavy-duty drainage level crossing structure for highway | |
JP6095967B2 (en) | Ground settlement measures | |
CN116289583A (en) | Beam moving and beam lifting method arranged in bridge precast yard in middle of bridge | |
RU2241797C1 (en) | Mountable-and-dismountable pavement | |
CA2751088C (en) | Mat with indented grapple receiver |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |