US20120090249A1 - System for protecting a building - Google Patents
System for protecting a building Download PDFInfo
- Publication number
- US20120090249A1 US20120090249A1 US13/090,434 US201113090434A US2012090249A1 US 20120090249 A1 US20120090249 A1 US 20120090249A1 US 201113090434 A US201113090434 A US 201113090434A US 2012090249 A1 US2012090249 A1 US 2012090249A1
- Authority
- US
- United States
- Prior art keywords
- mesh
- secured
- frame
- cables
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 230000007246 mechanism Effects 0.000 claims description 10
- 229920000049 Carbon (fiber) Polymers 0.000 claims description 8
- 239000004917 carbon fiber Substances 0.000 claims description 8
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 claims description 8
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 4
- 229910052782 aluminium Inorganic materials 0.000 claims description 4
- 229910001335 Galvanized steel Inorganic materials 0.000 claims description 3
- 239000008397 galvanized steel Substances 0.000 claims description 3
- 238000009826 distribution Methods 0.000 description 11
- 238000005452 bending Methods 0.000 description 9
- 230000007423 decrease Effects 0.000 description 8
- 239000000463 material Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 210000004906 toe nail Anatomy 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 210000000282 nail Anatomy 0.000 description 2
- 239000011120 plywood Substances 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 241000218657 Picea Species 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000002301 combined effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- JTJMJGYZQZDUJJ-UHFFFAOYSA-N phencyclidine Chemical class C1CCCCN1C1(C=2C=CC=CC=2)CCCCC1 JTJMJGYZQZDUJJ-UHFFFAOYSA-N 0.000 description 1
- 229920000728 polyester Polymers 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/14—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against other dangerous influences, e.g. tornadoes, floods
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
Definitions
- the disclosure relates to a system for protecting a building, such as a home. Particularly, the disclosure relates to a system for reinforcing a building during a hurricane or other high wind event.
- United States Patent Application Publication No. 2007/0022672 discloses a hurricane protection harness apparatus for protecting homes, buildings and other assets from the destructive forces of high winds such as from hurricanes, tornadoes, cyclones and typhoons is disclosed.
- the disclosure presents an apparatus for mooring and securing a building roof and the underlying structure during periods of high winds, as well as a means of deflecting flying debris from windows and doors.
- the harness covers 40% to 90% of the home or building from the roof to the ground, covering the doors, windows and other vulnerable areas against breaking windows and damage from flying debris.
- the mesh material of the harness has small holes therethrough for permitting the wind to pass through the mesh while blocking flying debris.
- the harness forms an “A” frame shaped hip style roof shape, thereby preventing the wind from forming a vortex and lifting the roof from the structure.
- the harness helps to protect the roof from wind damage including the lifting and removing of shingles, and lifting and removal of sheathing.
- the mesh harness is moored to ground anchors by tensioned straps, thereby holding the building structure together and on the foundation during hurricane strength winds.
- the harness is removable after the threat has passed.
- a system for protecting a building comprising a building on the ground surface, and may have a roof.
- the system comprises a mesh positionable over the roof of the building.
- the mesh comprises a plurality of edge portions.
- a frame is secured to the edge portions of the mesh.
- the frame comprises a plurality of elongate rigid members extending along the edge portions of the mesh.
- the system further comprises a plurality of connectors. Each connector has a first end portion securable to the frame, and a second end portion removably securable to the ground surface.
- the system may further comprise a plurality of piles secured in the ground.
- the connectors may be removably secured to the piles.
- the mesh may comprise steel filaments.
- the steel filaments may have a filament diameter of 2 mm or greater.
- the mesh may comprise longitudinal filaments extending in a first direction, and lateral filaments extending in a second direction transverse to the first direction.
- the longitudinal filaments may be spaced apart by a distance of 480 mm or less, and the lateral filaments may be spaced apart by a distance of 300 mm or less.
- the rods may comprise carbon fiber.
- the rods may be made from aluminum galvanized steel.
- the rods may each have a rod diameter of 2 inches or greater when made from carbon fiber.
- the mesh may comprise a first edge portion and an opposed second edge portion, and a third edge portion and an opposed fourth edge portion.
- the frame may comprise a first rod and a second rod secured to the first edge portion, a third rod and a fourth rod secured to the second edge portion, a fifth rod secured to the third edge portion, and a sixth rod secured to the fourth edge portion.
- the connectors may comprise cables.
- the system may comprise ten cables. When secured to the frame and the ground, the cables may each be at an angle of approximately 45 degrees with respect to the horizontal.
- the cables may have a cable diameter of at least 0.75 inches.
- the cables may comprise steel.
- the system may further comprise a tightening mechanism operatively connected to at least one of the cables for tightening the cables.
- a system for protecting a building with a roof and standing on a surface includes a mesh positionable over the roof of the building, where the mesh comprises a plurality of loops along an edge of the mesh.
- the system also includes a frame positioned along the edge of the mesh, where the frame is secured within the loops of the mesh.
- the frame comprises a plurality of elongate rigid members.
- the system also includes a plurality of anchors securable to the surface, as well as a plurality of cables. Each cable comprises a first end and an opposing second end, where each cable is removably securable to the frame at the first end and to one of the anchors at the second end.
- the system also includes a tightening mechanism connected to a least one of the cables. The tightening mechanism controls the tautness of the cable.
- the elongate rigid members are rods and the tightening mechanism is a turnbuckle.
- FIG. 1 is a perspective illustration of an exemplary system for reinforcing a home
- FIG. 2 is an elevation view of the system and home of FIG. 1 ;
- FIG. 3 is a top plan view of the system and home of FIG. 1 ;
- FIG. 4 is an enlarged view of the region shown in box 4 in FIG. 3 ;
- FIG. 5 is an illustration showing a cross section taken along line 5 - 5 in FIG. 1 showing the tie of FIG. 1 , and also showing a side plan view of a connector of FIG. 1 ;
- FIG. 6 is a top plan view of the tie shown in FIG. 5 ;
- FIG. 7 is a side view of the turnbuckle shown in FIG. 5 ;
- FIG. 8 is a perspective illustration of a test home used to model the system of FIG. 1 ;
- FIG. 9 is a graph showing the average deflection curve for a toe-nail connection.
- FIG. 10 is a schematic diagram showing the double node concept as applied at the connections between the cable elements simulating the mesh and the shell elements simulating the sheathing;
- FIG. 11 is a schematic diagram showing the studied locations for sheathing deformation
- FIG. 12 is a graph showing the effect of the system of FIG. 1 on plywood sheathing deformation
- FIG. 13 is a graph showing axial tension distribution on link elements of a standard house model
- FIG. 14 is a graph showing axial tension distribution on link elements of a house model using the system of FIG. 1 ;
- FIG. 15 is a graph showing axial tension distribution on gable end wall studs of a standard house model
- FIG. 16 is a graph showing axial tension distribution on side wall studs of the standard house model
- FIG. 17 is a graph showing axial tension distribution on gable end wall studs of a house model using the system of FIG. 1 ;
- FIG. 18 is a graph showing axial tension distribution on side wall studs of a house model using the system of FIG. 1 ;
- FIG. 19 is a plot showing bending moments on the rods of the system of FIG. 1 ;
- FIG. 20 is a plot showing axial forces on the rods of the system of FIG. 1 .
- Hurricanes and other strong wind-events can cause significant damage, both to the structure and to the contents of a building through a breach in the building envelope.
- uplift pressures are applied to the roof of a building, causing a net uplift force on the building.
- An exemplary system is described herein for reinforcing a building during a high wind event.
- building means any structure that could be susceptible to wind damage. It is believed that the system described herein may prevent or reduce damage to the building, preferably by providing the uplift forces with a vertical load path from the roof of the building to the foundation.
- the system 100 may be removably assemblable to the building 102 , or permanently secured to the building 102 , and may be used to protect the building 102 during a hurricane or other high wind event such as a typhoon, a tornado, or a tropical storm.
- the building 102 is a single storey home 104 , which has a generally rectangular footprint, and which includes a gabled roof 106 .
- the system 100 may be used with any other suitable type of building, such as a home of an alternate configuration, a garage, a storage shed, or an office building, for example.
- the system includes a mesh 108 which is positionable over the roof 106 such that it rests on the roof 106 , a frame 130 for the mesh, and a plurality of connectors 136 for securing the frame 130 to the ground 105 .
- the mesh is made up of filaments 110 .
- the filaments 110 may be steel, such as FY50 steel having a diameter of 2 mm or greater. In alternate examples, an alternate grade of steel, such as a higher grade of steel, may be used.
- the filaments 110 are woven together. More specifically, the mesh includes longitudinal filaments 112 , and lateral filaments 114 .
- the longitudinal filaments 112 may be spaced apart by a longitudinal spacing 116 , which may be, for example, 300 mm or less.
- the lateral filaments 114 may be spaced apart by a lateral spacing 118 , which may be, for example, 480 mm or less. In one specific example, the longitudinal spacing 116 is 100 mm, and the lateral spacing 114 is 480 mm.
- the mesh filaments 110 are made from steel.
- the mesh 108 may be made from another suitable material having another suitable configuration.
- the mesh 108 when the mesh 108 rests on the roof 106 (shown in FIG. 1 ), the mesh includes two portions.
- a first portion 172 sits on the roof 106 .
- a second portion 174 overhangs the roof.
- the second portion may overhang the roof by 200 mm or greater.
- the mesh 108 when the mesh 108 rests on the roof 106 , the mesh 108 may include only a first portion 172 .
- the mesh includes a plurality of edge portions 120 .
- the mesh 108 is generally rectangular when viewed in top plan view, and includes a first edge portion 120 a and an opposed second edge portion 120 b, and a third edge portion 120 c, and an opposed fourth edge portion 120 d.
- the mesh folds along a fold-line 122 (seen in FIG. 1 ) preferably aligned with the peak 124 of the roof 106 .
- the first edge portion 120 a is folded into a first portion 126 a and a second portion 128 a.
- the second edge portion 120 b is folded into a first portion 126 b and a second portion 128 b.
- the frame 130 is secured to the edge portions 120 of the mesh 108 .
- the frame 130 includes a plurality of elongate members, such as rods 132 , which extend along the edge portions 120 of the mesh.
- the frame 130 includes a first rod 132 a secured to the first portion 126 a of the first edge portion 120 a, a second rod 132 b secured to the second portion 128 a of the first edge portion 120 a, a third rod 132 c secured to the first portion 126 b of the second edge portion 120 b, a fourth rod 132 d secured to the second portion 128 b of the second edge portion 120 b, a fifth rod 132 e secured to the third edge portion 120 c, and a sixth rod 132 f secured to the fourth edge portion 120 d.
- the rods 132 are preferably rigid, and more specifically, are rigid in bending. Further, the rods 132 are preferably relatively lightweight. Without being limited by the following theory, it is believed that during a high wind event, such as a hurricane, uplift forces act on the home. The uplift forces may cause the mesh 108 to stretch, developing tensile forces. It is believed that by using rigid rods 132 , the mesh 108 will stretch more uniformly, and the tensile forces will be transferred from the mesh 108 to the rods 132 , and from the rods 132 to the ground via the connectors 136 . This will provide the uplift forces with a load transfer path that is an alternative to the frame of the home.
- rods 132 One specific material suitable for rods 132 is carbon fiber, which has a modulus of elasticity similar to that of steel, but has a specific weight that is approximately one-fifth of that of steel.
- the rods 132 may be aluminum galvanized steel. In further alternate examples, the rods may be another suitable material.
- Rods 132 made from carbon fiber may have a circular cross section with a diameter of 2 inches or less.
- the carbon fiber rods may be a hollow bar having a 3′′ by 3′′ square cross-sectional shape.
- the rods may be aluminum bars having a hollow rectangular cross-section of 2′′ by 4′′ with a thickness of 1 ⁇ 4′′
- the rods 132 may be secured to the edge portions 120 of the mesh 108 in any suitable fashion.
- the filaments 110 of the mesh 108 may include loops 134 in which the rods 132 are received.
- each connector 136 secures the mesh 108 and frame 130 to the ground 105 .
- each connector 136 includes a cable 138 .
- the cables 138 may be made from steel and may have a cable diameter of approximately 0.75 inches or greater. Specifically, the cables 138 may be made from FY50 steel having a modulus of elasticity of 200,000 MPa.
- the cables may be made from another suitable material.
- the cables may be replaced with NylonTM (polyester) ratchet straps.
- the straps are two inches wide and exhibit no more than 3% elongation under a force of 4000 lbs.
- each cable 138 has a first end portion 140 that is securable to the frame 130 , and a second end portion 142 that is removably securable to the ground 105 .
- the system 100 includes ten cables 138 .
- a first cable 138 a is secured to the frame 130 at a first junction 144 a between the first rod 132 a and the fifth rod 132 e.
- a second cable 138 b is secured to the frame 130 at a second junction 144 b between the first rod 132 a and the second rod 132 b.
- a third cable 138 c is secured to the frame 130 at a junction 144 c between the second rod 132 b and the sixth rod 132 f.
- a fourth cable 138 d is secured to the frame 130 at a junction 144 d between the sixth rod 132 f and the fourth rod 132 d.
- a fifth cable 138 e is secured to the frame 130 at a junction 144 e between the third rod 132 c and the fourth rod 132 d.
- a sixth cable 138 f is secured to the frame at a junction 144 f between the third rod 132 c and the fifth rod 132 e.
- a seventh cable 138 g and an eighth cable 138 h are secured to the frame between the third cable 138 c and fourth cable 138 d.
- a ninth cable 138 i and a tenth cable 138 j are secured to the frame between the first cable 138 a and the sixth cable 138 f.
- a plurality of ties 148 may be used to secure the first end portion 140 of each cable 138 to the frame 130 .
- a first tie 148 a is shown.
- the first tie 148 a secures the first end portion 140 of the first cable 138 a to the frame 130 .
- the first tie 148 a includes a tube 150 which is bent to form a first portion 152 , and a second portion 154 at an angle to the first portion. An end of the first rod 132 a is received is received in the first portion 152 , and an end of the sixth rod 132 f is received in the second portion 154 .
- the tube 150 is received in the loops 134 of the filaments 110 that end adjacent to the tube.
- the first tie 148 a further includes a ring 156 , which is secured to the tube.
- the tube 150 and ring 156 may each be made from steel, and may be welded together.
- the first end portion 140 of the first cable 138 a includes a first loop 158 that is threaded through the ring 156 .
- the first loop 158 is held together using clips 159 .
- the first loop may also include a thimble 161 (shown in FIG. 5 ).
- Second to sixth ties 148 that are substantially the same as the first tie 148 a may be used to connect the second to sixth cables ( 138 b to 138 f ) to the frame 130 .
- Seventh to tenth ties 148 may be used to connect the seventh to tenth cables ( 138 g to 138 j ) to the frame 130 .
- the seventh to tenth ties 148 may be similar to the to the first tie 148 a. However, rather including a tube 150 that is bent to form a first portion 152 and a second portion 154 , the seventh to tenth ties 148 may include a straight tube.
- each cable 138 is removably securable to the ground 105 using any suitable type of anchor.
- a plurality of piles 160 may be permanently installed in the ground adjacent the home 104 , and secured in the ground.
- the cables 138 may be removably secured to the piles 160 .
- the piles 160 may each include an upwardly extending hook 162 .
- the second end portion 142 of each cable 138 is connected to a turnbuckle 170 , which includes a second loop 164 .
- the hook 162 is inserted into the second loop 164 to removably secure the second end portion 142 of each cable 138 to the ground.
- Turnbuckles 170 may be used in order to maintain tautness in the cables 138 when secured between the frame 130 and the piles 160 .
- alternate tightening devices may be used to maintain tautness in the cables 138 .
- the second end portion 142 of the cables may be connected directly to the piles 160 .
- the piles 160 are preferably installed in the ground such that when the system 100 is assembled to the home 104 , the cables 138 are at an angle of approximately 45 degrees with respect to the horizontal.
- the system 100 may be assembled to the home 104 in response to a weather warning, such as a hurricane warning.
- a weather warning such as a hurricane warning.
- the mesh 108 may be draped over the roof 106 , and oriented such that the rods 132 generally align with the edges of the roof 106 .
- the second end 140 of each cable 138 may then each be secured to a hook 162 of one of the piles 160 .
- the turnbuckle 170 of each cable 138 may then be tightened.
- system 100 may be permanently or semi-permanently secured to the roof 106 .
- the system 100 was modeled numerically using the Finite Element Method.
- a test home 800 used in the modeling is shown.
- the test home is 9 meters long by 9 meters wide.
- the test home includes a frame 802 .
- the frame 802 includes 2 inch by 4 inch wall studs 804 that are spaced apart by 24 inches.
- the frame 802 includes a roof 806 that includes trusses 808 that are spaced 24 inches apart.
- the trusses 808 include 2 inch by 3 inch boards and 2 inch by 4 inch boards.
- the trusses 808 are joined to the wall studs 804 by top plates 810 .
- the top plates 810 include 2 inch by 4 inch boards.
- the trusses 808 are joined to the top plates using 16 d toe-nails.
- the roof further includes a ridge beam 814 , and connecting beams 816 .
- the test home further includes a sheathing (not shown) mounted to the trusses 808 .
- the sheathing includes spruce plywood having a thickness of 0.5 inches.
- the sheathing has a slope of approximately 30 degrees.
- the system 100 that was modeled included a mesh 108 , rods 132 , and connectors 136 , described above.
- the mesh 108 included FY50 steel filaments having a diameter of 2 mm.
- the longitudinal filaments 112 were spaced apart by a longitudinal spacing 116 of 300 mm, and lateral filaments 114 were spaced apart by a lateral spacing 118 of 480 mm.
- the frame 130 included eight carbon fiber rods 132 , which were circular in cross section, and had diameter of 2 inches.
- the rods were arranged as shown in FIG. 3 .
- the connectors 136 included ten cables 138 which were made from FY50 steel having a modulus of elasticity of 200,000 MPa and having a cable diameter of 0.75 inches. The cables were arranged as shown in FIG. 3 , and had an inclination of 45 degrees with respect to the horizontal.
- link elements were used at the connection locations. These elements allow describing a nonlinear generalized force-deflection relation simulating the characteristics of the nails.
- a typical average load-deflection curve for a toe-nail connection consisting of three common nails utilized in the analysis is shown in FIG. 9 .
- the cables 138 as well as the mesh 108 were simulated using nonlinear cable elements, which can describe the catenary behaviour of slender cables under their own self-weight and strain loading.
- the rods 132 were modeled using three-dimensional linear frame elements. The rods were assumed to the same orientation as the roof edge portions, and to overhang from the home by 200 mm.
- the double node concept was applied at the connections between the cable elements simulating the mesh 108 and the shell elements simulating the sheathing as shown in FIG. 10 .
- the degrees of freedom at similar locations are constrained in order to achieve compatibility of the displacements in the direction perpendicular to the roof for both the sheathing and the mesh 108 .
- No compatibility in the displacements along the two perpendicular in-plane axes of the roof is assumed. In reality, such compatibility will be governed by the friction that develops between the mesh 108 and the sheathing.
- Such an assumption is conservative, since the in-plane compatibility between the mesh 108 and the sheathing will tend to increase the in-plane stiffness of the sheathing, which can decrease their deflections.
- the modeled roof 806 was analyzed under the effect of a static uniform pressure having an intensity of 2 kPa acting perpendicular to the roof 806 in the upward direction. A uniform wind pressure was applied, despite the spatial variation of the uplift wind pressure observed during wind storms. This is justifiable since the purpose of the test was to assess the uplift performance of the roof 806 with and without the system 100 .
- a plan view of the roof 806 is provided in FIG. 11 showing the x and y axes used to define the coordinates of these points.
- the z-axis is along the vertical direction.
- the three points are labelled as 1 , 2 and 3 in FIG. 12 .
- the coordinates of points 1 , 2 and 3 are ( ⁇ 3.15 m, 7.44 m, 0.45 m), ( ⁇ 3.15 m, 5.03 m, 0.45 m) and ( ⁇ 1.35 m, 5.03 m, 1.05 m), respectively.
- the three points are located in between the trusses 808 . None of the three points is in close proximity to a cable 138 to avoid the stress concentration confusion.
- FIG. 12 shows a comparison between the deflections of the three points with and without the system 100 .
- basic model and cable roof model refer to the home 800 without the system 100 , and the home 800 with the system 100 , respectively.
- the decrease in the deformation values at locations away from the cables 138 gives an indication that the entire mesh 108 has been stressed during the application of the uplift pressure. This will tend to limit the upward deformations of the mesh 108 and the sheathing panels.
- the analysis shows an average reduction of 40% in the structure's deflection due to the addition of the system 100 .
- FIG. 13 shows the distribution of the tensile axial forces acting on all the link elements simulating the roof to wall connections for the case of the home 800 without the system 100 .
- the connection starts to behave in a nonlinear manner and loses its stiffness significantly at a critical axial force.
- the maximum value of such a critical axial force obtained from various test did not exceed 2.5 kN.
- the capacity of the connection can be set as 2.5 kN.
- the results shown in FIG. 13 indicate that many of the connections are subjected to axial loads that exceed this capacity. In fact, about 68% of the links are subjected to an axial tension value exceeding 2.5 kN. Also, 42% of the links experiences an axial tension value of more than 3 kN.
- FIG. 14 The corresponding distribution of axial forces associated with the home 800 with the system 100 is shown in FIG. 14 , and shows significantly lower axial tension forces on the roof to wall connections.
- the stretched mesh 108 decreases the average tension force to a value of 0.88 kN.
- the maximum tension force does not exceed 1.32 kN, which is almost half the designated capacity of the used connection.
- About 63% of the links are even subjected to an axial tension value less than 1.0 kN as shown in FIG. 15 .
- FIG. 15 The distributions of axial tensile forces acting on the wall studs 804 located along the end gable and along the sides of the home 800 are shown in FIG. 15 and FIG. 16 , respectively.
- the analysis shows that for the basic model, the average axial tension value on all studs is 1.711 kN with almost 75% of the values below 2 kN. However, the two middle wall studs at both gable ends experience very high tension value that exceed 11 kN as shown in FIG. 15 .
- FIG. 17 and FIG. 18 The corresponding distributions of axial forces resulting from the analysis of the cable model are provided in FIG. 17 and FIG. 18 .
- the figures show that the effect of the system 100 on the wall studs 804 is also noticeable.
- the average axial tension value on the wall studs 804 decreases by 26% after using the system 100 , as it reaches 1.31 kN.
- the axial tension forces on cables 138 b, g, d, e, i , and j reach values of 7 kN and 6.2 kN, respectively.
- Cables 138 a, c, g , and h experience a maximum axial tensile force of only 1.4 kN.
- the ultimate strength capacity of each cable 138 is 99.75 kN. The above capacity is significantly higher than the resulting straining actions, which may allow decreasing the cable diameter of the cables 138 .
- the mesh 108 was considered to consist of two portions 172 , and 174 , as described hereinabove.
- the first portion 172 is sits on the roof.
- the second portion 174 overhangs the roof and is directly connected to the rods 132 .
- the analysis shows that the first portion 172 is subjected to axial forces that are less than those acting on the second portion 174 .
- the largest tension force in the first portion 172 is 0.75 kN, while it reaches 2.5 kN in the second portion 174 .
- the mesh 108 was assumed to have an ultimate strength capacity of 1.1 kN.
- the results indicate that the assumed configuration of 2 mm diameter steel filaments 110 having a longitudinal spacing of 300 mm may not be adequate in certain conditions. This can be solved by either increasing the diameter of the filaments 110 , reducing the spacing 116 or using higher strength steel. A reduction of the longitudinal spacing 116 by a factor of 3, to 100 mm, will reduce the maximum forces in the individual filament by the same factor and will satisfy the strength capacity requirement.
- FIG. 19 and FIG. 20 show the distribution of the bending moments and axial forces along the rods 132 .
- the high negative bending moment values shown in FIG. 14 occur at the vicinity of the cables 138 d, e, i , and j .
- the analysis shows that the maximum values for the bending moment and axial forces are 0.46 kN ⁇ m and 9 kN, respectively.
- the stresses associated with the combined effects of bending moment and axial forces are calculated. This leads to maximum compression and maximum tension stresses of 41 MPa and 36 MPa, respectively, which are significantly less than the ultimate strength of carbon fiber.
- the exemplary system 100 of the model reduced bending and axial stresses on the rods 132 .
- Resulting axial tension forces on the cables 138 d, e, i , and j as well as on the first portion 172 of the mesh 108 were reasonably below the section capacity.
- Higher axial forces are noticed on the second portion 174 of the mesh 108 .
- this may be overcome by increasing the diameter of the filaments 110 , reducing the spacing 116 , or using higher strength steel.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Tents Or Canopies (AREA)
Abstract
A system for protecting a building is disclosed. The building may stand on the ground surface, and may have a roof. The system comprises a mesh positionable over the roof of the building. The mesh includes a number of edge portions. A frame is secured to the edge portions of the mesh. The frame is composed of a number of elongate rigid members extending along the edge portions of the mesh. The system further includes a number of connectors. Each connector has a first end portion securable to the frame, and a second end portion removably securable to the ground surface.
Description
- This application claims priority to U.S. Provisional Application No. 61/327,842 filed on Apr. 26, 2010, which is incorporated by reference herein in its entirety.
- The disclosure relates to a system for protecting a building, such as a home. Particularly, the disclosure relates to a system for reinforcing a building during a hurricane or other high wind event.
- United States Patent Application Publication No. 2007/0022672 (Bachynski) discloses a hurricane protection harness apparatus for protecting homes, buildings and other assets from the destructive forces of high winds such as from hurricanes, tornadoes, cyclones and typhoons is disclosed. The disclosure presents an apparatus for mooring and securing a building roof and the underlying structure during periods of high winds, as well as a means of deflecting flying debris from windows and doors. The harness covers 40% to 90% of the home or building from the roof to the ground, covering the doors, windows and other vulnerable areas against breaking windows and damage from flying debris. The mesh material of the harness has small holes therethrough for permitting the wind to pass through the mesh while blocking flying debris. The harness forms an “A” frame shaped hip style roof shape, thereby preventing the wind from forming a vortex and lifting the roof from the structure. The harness helps to protect the roof from wind damage including the lifting and removing of shingles, and lifting and removal of sheathing. The mesh harness is moored to ground anchors by tensioned straps, thereby holding the building structure together and on the foundation during hurricane strength winds. The harness is removable after the threat has passed.
- The following summary is provided to introduce the reader to the more detailed discussion to follow. The summary is not intended to limit or define the claims.
- According to one aspect, a system for protecting a building is disclosed. The building may stand on the ground surface, and may have a roof. The system comprises a mesh positionable over the roof of the building. The mesh comprises a plurality of edge portions. A frame is secured to the edge portions of the mesh. The frame comprises a plurality of elongate rigid members extending along the edge portions of the mesh. The system further comprises a plurality of connectors. Each connector has a first end portion securable to the frame, and a second end portion removably securable to the ground surface.
- The system may further comprise a plurality of piles secured in the ground. The connectors may be removably secured to the piles.
- The mesh may comprise steel filaments. The steel filaments may have a filament diameter of 2 mm or greater. The mesh may comprise longitudinal filaments extending in a first direction, and lateral filaments extending in a second direction transverse to the first direction. The longitudinal filaments may be spaced apart by a distance of 480 mm or less, and the lateral filaments may be spaced apart by a distance of 300 mm or less.
- The rods may comprise carbon fiber. Alternately, the rods may be made from aluminum galvanized steel. The rods may each have a rod diameter of 2 inches or greater when made from carbon fiber.
- The mesh may comprise a first edge portion and an opposed second edge portion, and a third edge portion and an opposed fourth edge portion. The frame may comprise a first rod and a second rod secured to the first edge portion, a third rod and a fourth rod secured to the second edge portion, a fifth rod secured to the third edge portion, and a sixth rod secured to the fourth edge portion.
- The connectors may comprise cables. For example, the system may comprise ten cables. When secured to the frame and the ground, the cables may each be at an angle of approximately 45 degrees with respect to the horizontal. The cables may have a cable diameter of at least 0.75 inches. The cables may comprise steel.
- The system may further comprise a tightening mechanism operatively connected to at least one of the cables for tightening the cables.
- According to another aspect, a system for protecting a building with a roof and standing on a surface is disclosed. The system includes a mesh positionable over the roof of the building, where the mesh comprises a plurality of loops along an edge of the mesh. The system also includes a frame positioned along the edge of the mesh, where the frame is secured within the loops of the mesh. The frame comprises a plurality of elongate rigid members. The system also includes a plurality of anchors securable to the surface, as well as a plurality of cables. Each cable comprises a first end and an opposing second end, where each cable is removably securable to the frame at the first end and to one of the anchors at the second end. The system also includes a tightening mechanism connected to a least one of the cables. The tightening mechanism controls the tautness of the cable.
- Preferably, the elongate rigid members are rods and the tightening mechanism is a turnbuckle.
- Reference is made in the detailed description to the accompanying drawings, in which:
-
FIG. 1 is a perspective illustration of an exemplary system for reinforcing a home; -
FIG. 2 is an elevation view of the system and home ofFIG. 1 ; -
FIG. 3 is a top plan view of the system and home ofFIG. 1 ; -
FIG. 4 is an enlarged view of the region shown inbox 4 inFIG. 3 ; -
FIG. 5 is an illustration showing a cross section taken along line 5-5 inFIG. 1 showing the tie ofFIG. 1 , and also showing a side plan view of a connector ofFIG. 1 ; -
FIG. 6 is a top plan view of the tie shown inFIG. 5 ; -
FIG. 7 is a side view of the turnbuckle shown inFIG. 5 ; -
FIG. 8 is a perspective illustration of a test home used to model the system ofFIG. 1 ; -
FIG. 9 is a graph showing the average deflection curve for a toe-nail connection; -
FIG. 10 is a schematic diagram showing the double node concept as applied at the connections between the cable elements simulating the mesh and the shell elements simulating the sheathing; -
FIG. 11 is a schematic diagram showing the studied locations for sheathing deformation; -
FIG. 12 is a graph showing the effect of the system ofFIG. 1 on plywood sheathing deformation; -
FIG. 13 is a graph showing axial tension distribution on link elements of a standard house model; -
FIG. 14 is a graph showing axial tension distribution on link elements of a house model using the system ofFIG. 1 ; -
FIG. 15 is a graph showing axial tension distribution on gable end wall studs of a standard house model; -
FIG. 16 is a graph showing axial tension distribution on side wall studs of the standard house model; -
FIG. 17 is a graph showing axial tension distribution on gable end wall studs of a house model using the system ofFIG. 1 ; -
FIG. 18 is a graph showing axial tension distribution on side wall studs of a house model using the system ofFIG. 1 ; -
FIG. 19 is a plot showing bending moments on the rods of the system ofFIG. 1 ; and -
FIG. 20 is a plot showing axial forces on the rods of the system ofFIG. 1 . - Hurricanes and other strong wind-events can cause significant damage, both to the structure and to the contents of a building through a breach in the building envelope. During a high-wind event, uplift pressures are applied to the roof of a building, causing a net uplift force on the building. An exemplary system is described herein for reinforcing a building during a high wind event. As used herein, “building” means any structure that could be susceptible to wind damage. It is believed that the system described herein may prevent or reduce damage to the building, preferably by providing the uplift forces with a vertical load path from the roof of the building to the foundation.
- Referring to
FIG. 1 , anexemplary system 100 for protecting abuilding 102 is shown. Thesystem 100 may be removably assemblable to thebuilding 102, or permanently secured to thebuilding 102, and may be used to protect thebuilding 102 during a hurricane or other high wind event such as a typhoon, a tornado, or a tropical storm. - In the example shown, the
building 102 is asingle storey home 104, which has a generally rectangular footprint, and which includes agabled roof 106. In alternate examples, thesystem 100 may be used with any other suitable type of building, such as a home of an alternate configuration, a garage, a storage shed, or an office building, for example. - Continuing to refer to
FIG. 1 , the system includes amesh 108 which is positionable over theroof 106 such that it rests on theroof 106, aframe 130 for the mesh, and a plurality ofconnectors 136 for securing theframe 130 to theground 105. - Continuing to refer to
FIG. 1 , in the example shown, the mesh is made up offilaments 110. For simplicity, all of thefilaments 110 of themesh 108 are not shown inFIG. 1 . Thefilaments 110 may be steel, such as FY50 steel having a diameter of 2 mm or greater. In alternate examples, an alternate grade of steel, such as a higher grade of steel, may be used. - In the example shown, the
filaments 110 are woven together. More specifically, the mesh includeslongitudinal filaments 112, andlateral filaments 114. Thelongitudinal filaments 112 may be spaced apart by alongitudinal spacing 116, which may be, for example, 300 mm or less. Thelateral filaments 114 may be spaced apart by alateral spacing 118, which may be, for example, 480 mm or less. In one specific example, thelongitudinal spacing 116 is 100 mm, and thelateral spacing 114 is 480 mm. - Preferably, the
mesh filaments 110 are made from steel. In alternate examples, themesh 108 may be made from another suitable material having another suitable configuration. - Referring to
FIG. 2 , in the example shown, when themesh 108 rests on the roof 106 (shown inFIG. 1 ), the mesh includes two portions. Afirst portion 172 sits on theroof 106. Asecond portion 174 overhangs the roof. For example, the second portion may overhang the roof by 200 mm or greater. - In alternate examples, when the
mesh 108 rests on theroof 106, themesh 108 may include only afirst portion 172. - Referring to
FIG. 3 , the mesh includes a plurality ofedge portions 120. Specifically, in the example shown, themesh 108 is generally rectangular when viewed in top plan view, and includes afirst edge portion 120 a and an opposedsecond edge portion 120 b, and athird edge portion 120 c, and an opposed fourth edge portion 120 d. As theroof 106 of the home is gabled, when themesh 108 rests on theroof 106, the mesh folds along a fold-line 122 (seen inFIG. 1 ) preferably aligned with the peak 124 of theroof 106. Thefirst edge portion 120 a is folded into afirst portion 126 a and asecond portion 128 a. Thesecond edge portion 120 b is folded into afirst portion 126 b and asecond portion 128 b. - Referring to
FIGS. 1 and 3 , theframe 130 is secured to theedge portions 120 of themesh 108. Theframe 130 includes a plurality of elongate members, such asrods 132, which extend along theedge portions 120 of the mesh. Specifically, in the example shown, theframe 130 includes afirst rod 132 a secured to thefirst portion 126 a of thefirst edge portion 120 a, asecond rod 132 b secured to thesecond portion 128 a of thefirst edge portion 120 a, athird rod 132 c secured to thefirst portion 126 b of thesecond edge portion 120 b, afourth rod 132 d secured to thesecond portion 128 b of thesecond edge portion 120 b, afifth rod 132 e secured to thethird edge portion 120 c, and a sixth rod 132 f secured to the fourth edge portion 120 d. - The
rods 132 are preferably rigid, and more specifically, are rigid in bending. Further, therods 132 are preferably relatively lightweight. Without being limited by the following theory, it is believed that during a high wind event, such as a hurricane, uplift forces act on the home. The uplift forces may cause themesh 108 to stretch, developing tensile forces. It is believed that by usingrigid rods 132, themesh 108 will stretch more uniformly, and the tensile forces will be transferred from themesh 108 to therods 132, and from therods 132 to the ground via theconnectors 136. This will provide the uplift forces with a load transfer path that is an alternative to the frame of the home. - One specific material suitable for
rods 132 is carbon fiber, which has a modulus of elasticity similar to that of steel, but has a specific weight that is approximately one-fifth of that of steel. In an alternate example, therods 132 may be aluminum galvanized steel. In further alternate examples, the rods may be another suitable material. -
Rods 132 made from carbon fiber may have a circular cross section with a diameter of 2 inches or less. In another example, the carbon fiber rods may be a hollow bar having a 3″ by 3″ square cross-sectional shape. Alternatively the rods may be aluminum bars having a hollow rectangular cross-section of 2″ by 4″ with a thickness of ¼″ - The
rods 132 may be secured to theedge portions 120 of themesh 108 in any suitable fashion. For example, as shown inFIG. 4 , thefilaments 110 of themesh 108 may includeloops 134 in which therods 132 are received. - Referring now to
FIGS. 1 and 5 , a plurality ofconnectors 136 secure themesh 108 andframe 130 to theground 105. In the example shown, eachconnector 136 includes acable 138. Thecables 138 may be made from steel and may have a cable diameter of approximately 0.75 inches or greater. Specifically, thecables 138 may be made from FY50 steel having a modulus of elasticity of 200,000 MPa. - In alternate examples, the cables may be made from another suitable material. According to another alternative, the cables may be replaced with Nylon™ (polyester) ratchet straps. Preferably, the straps are two inches wide and exhibit no more than 3% elongation under a force of 4000 lbs.
- Continuing to refer to
FIGS. 1 and 5 , eachcable 138 has afirst end portion 140 that is securable to theframe 130, and asecond end portion 142 that is removably securable to theground 105. - Referring again
FIG. 3 , in the example shown, thesystem 100 includes tencables 138. Afirst cable 138 a is secured to theframe 130 at afirst junction 144 a between thefirst rod 132 a and thefifth rod 132 e. Asecond cable 138 b is secured to theframe 130 at asecond junction 144 b between thefirst rod 132 a and thesecond rod 132 b. Athird cable 138 c is secured to theframe 130 at ajunction 144 c between thesecond rod 132 b and the sixth rod 132 f. Afourth cable 138 d is secured to theframe 130 at ajunction 144 d between the sixth rod 132 f and thefourth rod 132 d. Afifth cable 138 e is secured to theframe 130 at ajunction 144 e between thethird rod 132 c and thefourth rod 132 d. Asixth cable 138 f is secured to the frame at ajunction 144 f between thethird rod 132 c and thefifth rod 132 e. Further a seventh cable 138 g and aneighth cable 138 h are secured to the frame between thethird cable 138 c andfourth cable 138 d. Finally, aninth cable 138 i and atenth cable 138 j are secured to the frame between thefirst cable 138 a and thesixth cable 138 f. - A plurality of
ties 148 may be used to secure thefirst end portion 140 of eachcable 138 to theframe 130. Referring toFIGS. 4 to 6 , afirst tie 148 a is shown. Thefirst tie 148 a secures thefirst end portion 140 of thefirst cable 138 a to theframe 130. Thefirst tie 148 a includes atube 150 which is bent to form afirst portion 152, and asecond portion 154 at an angle to the first portion. An end of thefirst rod 132 a is received is received in thefirst portion 152, and an end of the sixth rod 132 f is received in thesecond portion 154. Thetube 150 is received in theloops 134 of thefilaments 110 that end adjacent to the tube. Thefirst tie 148 a further includes aring 156, which is secured to the tube. For example, thetube 150 andring 156 may each be made from steel, and may be welded together. Thefirst end portion 140 of thefirst cable 138 a includes afirst loop 158 that is threaded through thering 156. Thefirst loop 158 is held together usingclips 159. The first loop may also include a thimble 161 (shown inFIG. 5 ). - Second to
sixth ties 148 that are substantially the same as thefirst tie 148 a may be used to connect the second to sixth cables (138 b to 138 f) to theframe 130. - Seventh to
tenth ties 148 may be used to connect the seventh to tenth cables (138 g to 138 j) to theframe 130. The seventh totenth ties 148 may be similar to the to thefirst tie 148 a. However, rather including atube 150 that is bent to form afirst portion 152 and asecond portion 154, the seventh totenth ties 148 may include a straight tube. - As mentioned above, the
second end portion 142 of eachcable 138 is removably securable to theground 105 using any suitable type of anchor. In one example, a plurality ofpiles 160 may be permanently installed in the ground adjacent thehome 104, and secured in the ground. Thecables 138 may be removably secured to thepiles 160. Specifically, referring toFIG. 5 , thepiles 160 may each include an upwardly extendinghook 162. Thesecond end portion 142 of eachcable 138 is connected to aturnbuckle 170, which includes asecond loop 164. Thehook 162 is inserted into thesecond loop 164 to removably secure thesecond end portion 142 of eachcable 138 to the ground. - A
turnbuckle 170 is shown in more detail inFIG. 7 .Turnbuckles 170 may be used in order to maintain tautness in thecables 138 when secured between theframe 130 and thepiles 160. In alternate examples, alternate tightening devices may be used to maintain tautness in thecables 138. In further alternate examples, thesecond end portion 142 of the cables may be connected directly to thepiles 160. - Referring again to
FIG. 2 , thepiles 160 are preferably installed in the ground such that when thesystem 100 is assembled to thehome 104, thecables 138 are at an angle of approximately 45 degrees with respect to the horizontal. - In use, the
system 100 may be assembled to thehome 104 in response to a weather warning, such as a hurricane warning. In order to assemble thesystem 100 to the home, themesh 108 may be draped over theroof 106, and oriented such that therods 132 generally align with the edges of theroof 106. Thesecond end 140 of eachcable 138 may then each be secured to ahook 162 of one of thepiles 160. Theturnbuckle 170 of eachcable 138 may then be tightened. - Alternately, the
system 100 may be permanently or semi-permanently secured to theroof 106. - Various apparatuses or methods are described above to provide an example of each claimed invention. No example described above limits any claimed invention and any claimed invention may cover processes or apparatuses that are not described above. The claimed inventions are not limited to apparatuses or processes having all of the features of any one apparatus or process described above or to features common to multiple or all of the apparatuses described above. It is possible that an apparatus or process described above is not an embodiment of any claimed invention. Applicant reserves the right to claim such apparatuses or processes in other applications.
- The
system 100 was modeled numerically using the Finite Element Method. Referring toFIG. 8 , atest home 800 used in the modeling is shown. The test home is 9 meters long by 9 meters wide. The test home includes aframe 802. Theframe 802 includes 2 inch by 4inch wall studs 804 that are spaced apart by 24 inches. - Referring still to
FIG. 8 , theframe 802 includes aroof 806 that includestrusses 808 that are spaced 24 inches apart. Thetrusses 808 include 2 inch by 3 inch boards and 2 inch by 4 inch boards. Thetrusses 808 are joined to thewall studs 804 bytop plates 810. Thetop plates 810 include 2 inch by 4 inch boards. Thetrusses 808 are joined to the top plates using 16 d toe-nails. The roof further includes aridge beam 814, and connectingbeams 816. - The test home further includes a sheathing (not shown) mounted to the
trusses 808. The sheathing includes spruce plywood having a thickness of 0.5 inches. The sheathing has a slope of approximately 30 degrees. - The
system 100 that was modeled included amesh 108,rods 132, andconnectors 136, described above. Specifically, themesh 108 included FY50 steel filaments having a diameter of 2 mm. Thelongitudinal filaments 112 were spaced apart by alongitudinal spacing 116 of 300 mm, andlateral filaments 114 were spaced apart by alateral spacing 118 of 480 mm. Theframe 130 included eightcarbon fiber rods 132, which were circular in cross section, and had diameter of 2 inches. The rods were arranged as shown inFIG. 3 . Theconnectors 136 included tencables 138 which were made from FY50 steel having a modulus of elasticity of 200,000 MPa and having a cable diameter of 0.75 inches. The cables were arranged as shown inFIG. 3 , and had an inclination of 45 degrees with respect to the horizontal. - Two models were developed for the test home, one with the
system 100, and one without thesystem 100. Material properties were modified for both models to account for the adopted Spruce-Pine-Fir (SPF) wood used in the home construction.Trusses 808,wall studs 804 and connectingbeams 816 were modeled using three-dimensional “frame” elements to account for the effects of biaxial bending, torsion, axial and biaxial shear deformations. A total number of 720 Shell elements were used to model the sheathing. Shell elements have membrane and bending capabilities allowing them to deflect in and out-of-plane simulating the realistic behavior of the sheathing. - To simulate the true behavior of the
roof 806 towall stud 808 connection, link elements were used at the connection locations. These elements allow describing a nonlinear generalized force-deflection relation simulating the characteristics of the nails. A typical average load-deflection curve for a toe-nail connection consisting of three common nails utilized in the analysis is shown inFIG. 9 . - In the model, the
cables 138 as well as themesh 108 were simulated using nonlinear cable elements, which can describe the catenary behaviour of slender cables under their own self-weight and strain loading. Similar to the home components, therods 132 were modeled using three-dimensional linear frame elements. The rods were assumed to the same orientation as the roof edge portions, and to overhang from the home by 200 mm. - The double node concept was applied at the connections between the cable elements simulating the
mesh 108 and the shell elements simulating the sheathing as shown inFIG. 10 . This means that two nodes simulating each one of these two components exist at the same location with different and independent degrees of freedom. However, the degrees of freedom at similar locations are constrained in order to achieve compatibility of the displacements in the direction perpendicular to the roof for both the sheathing and themesh 108. No compatibility in the displacements along the two perpendicular in-plane axes of the roof is assumed. In reality, such compatibility will be governed by the friction that develops between themesh 108 and the sheathing. Such an assumption is conservative, since the in-plane compatibility between themesh 108 and the sheathing will tend to increase the in-plane stiffness of the sheathing, which can decrease their deflections. - The modeled
roof 806 was analyzed under the effect of a static uniform pressure having an intensity of 2 kPa acting perpendicular to theroof 806 in the upward direction. A uniform wind pressure was applied, despite the spatial variation of the uplift wind pressure observed during wind storms. This is justifiable since the purpose of the test was to assess the uplift performance of theroof 806 with and without thesystem 100. - Deformation of the roof sheathing in the direction of the load is observed at the three different points of the roof. A plan view of the
roof 806 is provided inFIG. 11 showing the x and y axes used to define the coordinates of these points. The z-axis is along the vertical direction. The three points are labelled as 1, 2 and 3 inFIG. 12 . The coordinates ofpoints trusses 808. None of the three points is in close proximity to acable 138 to avoid the stress concentration confusion. -
FIG. 12 shows a comparison between the deflections of the three points with and without thesystem 100. In this figure, basic model and cable roof model refer to thehome 800 without thesystem 100, and thehome 800 with thesystem 100, respectively. Despite being located almost halfway between twocables 138, a significant decrease in the roof deformation values at the three locations is reached in case of the cable roof model compared to the basic model. The decrease in the deformation values at locations away from thecables 138 gives an indication that theentire mesh 108 has been stressed during the application of the uplift pressure. This will tend to limit the upward deformations of themesh 108 and the sheathing panels. In general, the analysis shows an average reduction of 40% in the structure's deflection due to the addition of thesystem 100. -
FIG. 13 shows the distribution of the tensile axial forces acting on all the link elements simulating the roof to wall connections for the case of thehome 800 without thesystem 100. As shown inFIG. 9 , the connection starts to behave in a nonlinear manner and loses its stiffness significantly at a critical axial force. The maximum value of such a critical axial force obtained from various test did not exceed 2.5 kN. As such, the capacity of the connection can be set as 2.5 kN. The results shown inFIG. 13 indicate that many of the connections are subjected to axial loads that exceed this capacity. In fact, about 68% of the links are subjected to an axial tension value exceeding 2.5 kN. Also, 42% of the links experiences an axial tension value of more than 3 kN. - The corresponding distribution of axial forces associated with the
home 800 with thesystem 100 is shown inFIG. 14 , and shows significantly lower axial tension forces on the roof to wall connections. The stretchedmesh 108 decreases the average tension force to a value of 0.88 kN. The maximum tension force does not exceed 1.32 kN, which is almost half the designated capacity of the used connection. About 63% of the links are even subjected to an axial tension value less than 1.0 kN as shown inFIG. 15 . - As the
wall studs 804 are spaced at 16 inches (0.4 m), while the roof trusses 808 are spaced at 24 inches (0.6 m), axial tension forces acting on the link elements are expected to be greater than those on thewall studs 804 under the applied wind loading. The distributions of axial tensile forces acting on thewall studs 804 located along the end gable and along the sides of thehome 800 are shown inFIG. 15 andFIG. 16 , respectively. The analysis shows that for the basic model, the average axial tension value on all studs is 1.711 kN with almost 75% of the values below 2 kN. However, the two middle wall studs at both gable ends experience very high tension value that exceed 11 kN as shown inFIG. 15 . - The corresponding distributions of axial forces resulting from the analysis of the cable model are provided in
FIG. 17 andFIG. 18 . The figures show that the effect of thesystem 100 on thewall studs 804 is also noticeable. By comparing the results with those of the basic model, it is found that the average axial tension value on thewall studs 804 decreases by 26% after using thesystem 100, as it reaches 1.31 kN. - It is also noticeable that the large tension force experienced by the two middle wall studs has decreased from 11 kN to 5.5 kN as shown in
FIG. 17 . - The analysis indicates that the
cables 138 b, g, d, e, i, and j experience axial tensile forces that are significantly higher than those experienced bycables 138 a, c, g, and h. The axial tension forces oncables 138 b, g, d, e, i, and j reach values of 7 kN and 6.2 kN, respectively.Cables 138 a, c, g, and h experience a maximum axial tensile force of only 1.4 kN. Based on the geometric and material properties of thecables 138, the ultimate strength capacity of eachcable 138 is 99.75 kN. The above capacity is significantly higher than the resulting straining actions, which may allow decreasing the cable diameter of thecables 138. - The
mesh 108 was considered to consist of twoportions first portion 172 is sits on the roof. Thesecond portion 174 overhangs the roof and is directly connected to therods 132. The analysis shows that thefirst portion 172 is subjected to axial forces that are less than those acting on thesecond portion 174. The largest tension force in thefirst portion 172 is 0.75 kN, while it reaches 2.5 kN in thesecond portion 174. - The
mesh 108 was assumed to have an ultimate strength capacity of 1.1 kN. The results indicate that the assumed configuration of 2 mmdiameter steel filaments 110 having a longitudinal spacing of 300 mm may not be adequate in certain conditions. This can be solved by either increasing the diameter of thefilaments 110, reducing the spacing 116 or using higher strength steel. A reduction of thelongitudinal spacing 116 by a factor of 3, to 100 mm, will reduce the maximum forces in the individual filament by the same factor and will satisfy the strength capacity requirement. -
FIG. 19 andFIG. 20 show the distribution of the bending moments and axial forces along therods 132. The high negative bending moment values shown inFIG. 14 , occur at the vicinity of thecables 138 d, e, i, and j. The analysis shows that the maximum values for the bending moment and axial forces are 0.46 kN·m and 9 kN, respectively. The stresses associated with the combined effects of bending moment and axial forces are calculated. This leads to maximum compression and maximum tension stresses of 41 MPa and 36 MPa, respectively, which are significantly less than the ultimate strength of carbon fiber. - The use of the
exemplary system 100 resulted in significant improvement in the behavior of thehome 800. Comparing the results of ahome 800 without thesystem 100 and ahome 800 with thesystem 100 show that: -
- Deformation of the roof sheathing at three different critical locations is reduced by 42%.
- The average axial tension force on the roof to wall connections decreases from 2.7 to 0.88 kN with a peak value of 1.325 kN which is almost half the designated capacity of the used connection.
- Average axial tension on the
wall studs 804 decreases by 26% after using thesystem 100. Also, axial tension on the two middle wall studs at each gable end decreases from 11 to 5.5 kN.
- Based on the experimental results set out above, the
exemplary system 100 of the model reduced bending and axial stresses on therods 132. Resulting axial tension forces on thecables 138 d, e, i, and j as well as on thefirst portion 172 of themesh 108 were reasonably below the section capacity. Higher axial forces are noticed on thesecond portion 174 of themesh 108. However, this may be overcome by increasing the diameter of thefilaments 110, reducing thespacing 116, or using higher strength steel. - In the light of these findings, it can be concluded that using the
exemplary system 100 can significantly enhance the behavior of a home in high wind events.
Claims (27)
1. A system for protecting a building standing on a ground surface, the building having a roof, the system comprising:
a) a mesh positionable over the roof of the building, the mesh comprising a plurality of edge portions;
b) a frame secured to the edge portions of the mesh, the frame comprising a plurality of elongate rigid members extending along the edge portions;
c) a plurality of connectors, each connector having a first end portion securable to the frame, and a second end portion removably securable to the ground.
2. The system of claim 1 , further comprising a plurality of piles secured in the ground, wherein the connectors are removably secured to the piles.
3. The system of claim 1 , wherein the mesh comprises steel filaments.
4. The system of claim 3 , wherein the steel filaments have a filament diameter of 2 mm of greater.
5. The system of claim 3 , wherein the mesh comprises longitudinal filaments extending in a first direction, and lateral filaments extending in a second direction transverse to the first direction; wherein the longitudinal filaments are spaced apart by a distance of 300 mm or less; wherein the lateral filaments are spaced apart by a distance of 480 mm or less.
6. The system of claim 1 , wherein at least a portion of the elongate rigid members are rods.
7. The system of claim 6 , wherein the rods are made from carbon fiber.
8. The system of claim 6 , wherein the plurality of rods have a rod diameter of 2 inches or greater.
9. The system of claim 1 , wherein the rods are made from aluminum galvanized steel.
10. The system of claim 1 , wherein:
a) the mesh comprises a first edge portion and an opposed second edge, and a third edge portion and an opposed fourth edge portion; and
b) the frame comprises a first rod and a second rod secured to the first edge portion, a third rod and a fourth rod secured to the second edge portion, a fifth rod secured to the third edge portion, and a sixth rod secured to the fourth edge portion.
11. The system of claim 1 , wherein the mesh comprises a plurality of mesh loops connected to at least one edge of the mesh, wherein at least a portion of the elongate members are received within the plurality of mesh loops.
12. The system of claim 1 , wherein the connectors comprise cables.
13. The system of claim 12 , wherein the system comprises ten cables.
14. The system of claim 12 , wherein when secured to the frame and the ground, the cables are each at an angle of approximately 45 degrees with respect to the horizontal.
15. The system of claim 12 , wherein the cables have a cable diameter of 0.75 inches or less.
16. The system of claim 12 , wherein the cables comprise steel.
17. The system of claim 11 , further comprising a tightening mechanism operatively connected to at least one of the cables for tightening the cable.
18. The system of claim 11 , further comprising:
a) at least one tie secured to a pair of adjacent elongate members, and
b) a ring secured to the tie, wherein a first end portion of at least one of the connectors comprises a first loop threaded to the ring, thereby securing the connector to the frame.
19. The system of claim 18 , wherein the tie defines a passage therethrough, wherein an end of each of the pair of elongate members is received within the passage.
20. The system of claim 19 , wherein the tie has an angled shape, wherein the pair of elongate members are positioned at an angle to each other.
21. The system of claim 18 , further comprising a pile secured within the ground surface, the pile comprising a hook projecting from an upper end of the pile, wherein a second end portion of the connector comprises a second loop removably securable to the hook.
22. The system of claim 21 , wherein the connector comprises a tightening mechanism.
23. The system of claim 22 , wherein the connector comprises a cable, wherein the tightening mechanism comprises a turnbuckle.
24. The system of claim 1 , wherein the mesh comprises a first portion and a second portion, wherein the second portion overhangs the roof.
25. A system for protecting a building standing on a surface, the building having a roof, the system comprising:
a) a mesh positionable over the roof of the building, the mesh comprising a plurality of loops along an edge of the mesh;
b) a frame positioned along the edge of the mesh, the frame being secured within the loops of the mesh, the frame comprising a plurality of elongate rigid members;
c) a plurality of anchors securable to the surface;
d) a plurality of cables, each cable comprising a first end and an opposing second end, wherein the first end of each cable is securable to the frame, and the second end of each cable is removably securable to one of the anchors; and
e) a tightening mechanism connected to a least one of the cables, the tightening mechanism being adapted to control tautness of the cable.
26. The system of claim 25 , wherein the rigid members are rods.
27. The system of claim 26 , wherein the tightening mechanism is a turnbuckle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/090,434 US20120090249A1 (en) | 2010-04-26 | 2011-04-20 | System for protecting a building |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US32784210P | 2010-04-26 | 2010-04-26 | |
US13/090,434 US20120090249A1 (en) | 2010-04-26 | 2011-04-20 | System for protecting a building |
Publications (1)
Publication Number | Publication Date |
---|---|
US20120090249A1 true US20120090249A1 (en) | 2012-04-19 |
Family
ID=45932857
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/090,434 Abandoned US20120090249A1 (en) | 2010-04-26 | 2011-04-20 | System for protecting a building |
Country Status (1)
Country | Link |
---|---|
US (1) | US20120090249A1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9212500B2 (en) | 2014-04-25 | 2015-12-15 | Stefan Siegmund | Device and method for wind loss prevention |
US9279270B1 (en) * | 2014-01-08 | 2016-03-08 | John Christian Treister | System for affixing a blanket to ground |
US9506268B1 (en) * | 2014-11-18 | 2016-11-29 | Michael W. Bright | Roofing tent |
US9995054B1 (en) * | 2017-07-17 | 2018-06-12 | Robert Nellis | Pool enclosure anchor kit |
FR3078724A1 (en) * | 2018-03-09 | 2019-09-13 | Ruddy Severin | DEVICE FOR SECURING A ROOF |
US10597889B1 (en) * | 2018-08-02 | 2020-03-24 | GG & CR Investments, LLC | Roof securing system and method for providing additional strength to roofs during adverse climatic conditions |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4558713A (en) * | 1982-10-29 | 1985-12-17 | American Canvas Company | Frame system and connectors for portable shelters |
US5522184A (en) * | 1995-01-12 | 1996-06-04 | Oviedo-Reyes; Alfonso | Apparatus for strengthening building structures |
US5579794A (en) * | 1993-04-01 | 1996-12-03 | Sporta; Joseph | Apparatus and method for securing an object against gale-force winds |
US5791090A (en) * | 1993-11-19 | 1998-08-11 | Gitlin; Harris M. | Variable tension roofing and structural protective harness |
US20020134414A1 (en) * | 1997-05-21 | 2002-09-26 | Ted Gower | Flexible wind abatement system |
US20020148176A1 (en) * | 2001-04-12 | 2002-10-17 | Shelton Andrew B. | Weather shelter |
US20020166289A1 (en) * | 2001-05-11 | 2002-11-14 | Alfonso Oviedo-Reyes | Building tie down kit for securing roofs, doors, and windows against storm wind damage and method of assembly |
US20080016786A1 (en) * | 2006-07-24 | 2008-01-24 | Vasileios Bougioukos | Shading systems |
US20080040981A1 (en) * | 2006-08-15 | 2008-02-21 | Mikael Lindstrom | Emergency structure restraint system |
US20080083169A1 (en) * | 2006-10-10 | 2008-04-10 | Sicurella Daniel J | Structural wind protective system and method |
US7392620B1 (en) * | 2006-10-16 | 2008-07-01 | Watson Jr Arthur D | Roof securing system |
-
2011
- 2011-04-20 US US13/090,434 patent/US20120090249A1/en not_active Abandoned
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4558713A (en) * | 1982-10-29 | 1985-12-17 | American Canvas Company | Frame system and connectors for portable shelters |
US5579794A (en) * | 1993-04-01 | 1996-12-03 | Sporta; Joseph | Apparatus and method for securing an object against gale-force winds |
US5791090A (en) * | 1993-11-19 | 1998-08-11 | Gitlin; Harris M. | Variable tension roofing and structural protective harness |
US5522184A (en) * | 1995-01-12 | 1996-06-04 | Oviedo-Reyes; Alfonso | Apparatus for strengthening building structures |
US20020134414A1 (en) * | 1997-05-21 | 2002-09-26 | Ted Gower | Flexible wind abatement system |
US6865852B2 (en) * | 1997-05-21 | 2005-03-15 | Targus International, Inc. | Flexible wind abatement system |
US20020148176A1 (en) * | 2001-04-12 | 2002-10-17 | Shelton Andrew B. | Weather shelter |
US20020166289A1 (en) * | 2001-05-11 | 2002-11-14 | Alfonso Oviedo-Reyes | Building tie down kit for securing roofs, doors, and windows against storm wind damage and method of assembly |
US20080016786A1 (en) * | 2006-07-24 | 2008-01-24 | Vasileios Bougioukos | Shading systems |
US20080040981A1 (en) * | 2006-08-15 | 2008-02-21 | Mikael Lindstrom | Emergency structure restraint system |
US20080083169A1 (en) * | 2006-10-10 | 2008-04-10 | Sicurella Daniel J | Structural wind protective system and method |
US7392620B1 (en) * | 2006-10-16 | 2008-07-01 | Watson Jr Arthur D | Roof securing system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9279270B1 (en) * | 2014-01-08 | 2016-03-08 | John Christian Treister | System for affixing a blanket to ground |
US9212500B2 (en) | 2014-04-25 | 2015-12-15 | Stefan Siegmund | Device and method for wind loss prevention |
US9506268B1 (en) * | 2014-11-18 | 2016-11-29 | Michael W. Bright | Roofing tent |
US9995054B1 (en) * | 2017-07-17 | 2018-06-12 | Robert Nellis | Pool enclosure anchor kit |
FR3078724A1 (en) * | 2018-03-09 | 2019-09-13 | Ruddy Severin | DEVICE FOR SECURING A ROOF |
US10597889B1 (en) * | 2018-08-02 | 2020-03-24 | GG & CR Investments, LLC | Roof securing system and method for providing additional strength to roofs during adverse climatic conditions |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20120090249A1 (en) | System for protecting a building | |
CA2280569C (en) | Structural tie-down apparatus | |
US5535561A (en) | Cable hold down and bracing system | |
Reed et al. | Uplift capacity of light-frame rafter to top plate connections | |
US6226945B1 (en) | Safety mesh roof facing system | |
US20090094916A1 (en) | Masonry wall tension device and method for installing same | |
JPS5830977B2 (en) | tension upholstered structure | |
JP6865467B2 (en) | Tensile structure building | |
BR112020004715A2 (en) | modular building system quickly implantable | |
US5761863A (en) | Method of reinforcing a building | |
US20130180184A1 (en) | Method for forming a double-curved structure and double-curved structure formed using the same | |
CN103114671A (en) | Chord tensioning truss structure capable of preventing collapsing caused by cable breakage | |
CN209443666U (en) | Column Bound Stirrups for Seismic Strengthening of Steel Reinforced Concrete Structures | |
CN205531511U (en) | Hyperbola appearance lattice frame adds bracing steel construction cooling tower | |
CN210439560U (en) | Stirrup arrangement structure of steel reinforced concrete beam column member | |
JP5468878B2 (en) | Truss string beam | |
CN209194819U (en) | A kind of intersection beam string unit and intersect beam string roof system | |
CN109184309A (en) | A kind of anti-earthquake support construction and support system | |
JP6445963B2 (en) | Connector | |
JP6490291B1 (en) | String beam structure | |
CN110878518B (en) | Cable-stayed arch bridge | |
US9850673B1 (en) | Cable system for a disaster-resistant structure and method for constructing cable system | |
US20060236617A1 (en) | Latticed net stretching and fixing structure | |
CN109138251A (en) | A kind of intersection beam string unit and intersect beam string roof system and its construction method | |
WO2014049101A1 (en) | Netting for a slope-stabilisation system or for a protection kit against landslides |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |