US20100307766A1 - Rigless well intervention apparatus and method - Google Patents
Rigless well intervention apparatus and method Download PDFInfo
- Publication number
- US20100307766A1 US20100307766A1 US12/804,420 US80442010A US2010307766A1 US 20100307766 A1 US20100307766 A1 US 20100307766A1 US 80442010 A US80442010 A US 80442010A US 2010307766 A1 US2010307766 A1 US 2010307766A1
- Authority
- US
- United States
- Prior art keywords
- level
- well
- cylinder mechanism
- well component
- rigless
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 60
- 230000007246 mechanism Effects 0.000 claims description 30
- 241000239290 Araneae Species 0.000 claims description 12
- 238000012544 monitoring process Methods 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 14
- 230000008569 process Effects 0.000 description 16
- 238000005553 drilling Methods 0.000 description 13
- 230000000694 effects Effects 0.000 description 5
- 230000008439 repair process Effects 0.000 description 5
- 239000012530 fluid Substances 0.000 description 3
- 150000003839 salts Chemical class 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 2
- 238000002386 leaching Methods 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 238000011282 treatment Methods 0.000 description 2
- 241000282693 Cercopithecidae Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000003657 drainage water Substances 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- OJGQFYYLKNCIJD-UHFFFAOYSA-N miroprofen Chemical group C1=CC(C(C(O)=O)C)=CC=C1C1=CN(C=CC=C2)C2=N1 OJGQFYYLKNCIJD-UHFFFAOYSA-N 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 210000002445 nipple Anatomy 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000000246 remedial effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/02—Rod or cable suspensions
- E21B19/06—Elevators, i.e. rod- or tube-gripping devices
Definitions
- the present invention relates generally to a rigless well intervention apparatus and method. Specifically, the present invention relates to a rigless well intervention apparatus and method for performing various well workover and intervention operations that pertains to a range of products, services and techniques designed to be run through, or conducted within, the production tubing of an oil or gas well ranging from the ability to operate within a restricted diameter tubular with live-well intervention particularly, for running or pulling pipe on salt leaching, geothermal or suspended wells.
- Oil well completion is a generic term used to describe the assembly of downhole tubulars and equipment required to enable the safe and efficient production from an oil or gas well.
- the point at which the completion process begins may depend on the type and design of the well. However, there are many options applied or actions performed during the construction phase of a well that have significant impact on the productivity of the well.
- the drilling completion hardware is used to optimize the production of hydrocarbons from the well. This may range from nothing but a packer on tubing above an openhole completion, sometimes referred to as barefoot completion, to a system of mechanical filtering elements outside of the perforated pipe, to a fully automated measurement and control system that optimizes reservoir economics without human intervention, sometimes referred to as an intelligent completion.
- the drilling completion hardware typically, requires a drilling rig.
- a drilling rig is the machine used to drill a wellbore. In onshore operations, the rig includes virtually everything except living quarters. Major components of the rig include the mud tanks, the mud pumps, the derrick or mast, the drawworks, the rotary table or topdrive, the drilistring, the power generation equipment and auxiliary equipment.
- the rig includes the same components as onshore, but not those of the vessel or drilling platform itself. The rig is sometimes referred to as the drilling package, particularly offshore.
- the rigless operation of a well completion process is defined as the well-intervention operation conducted with equipment and support facilities that precludes the requirement for a rig over the wellbore.
- examples of rigless well completion operations are coiled tubing, slickline and snubbing activities.
- the use of the present invention provides for the use of a rigless operation that can encompass essentially all well completion processes.
- snubbing is the act of putting drillpipe into the wellbore when the blowout preventers (BOPs) are closed and pressure is contained in the well. Snubbing is necessary when a kick is taken, since well kill operations should always be conducted with the drillstring on bottom, and not somewhere up the wellbore. If only the annular blowout preventer has been closed, the drillpipe may be slowly and carefully lowered into the wellbore, and the blowout preventer itself will open slightly to permit the larger diameter tool joints to pass through. If the well has been closed with the use of ram blowout preventers, the tool joints will not pass by the closed ram element.
- BOPs blowout preventers
- Through-tubing well completion operations pertain to any reservoir or wellbore treatment performed through the tubing string.
- Through-tubing treatments are generally associated with live-well operations, thereby causing minimal interruption to production and eliminating the need to kill the well.
- Well workover and intervention operations pertain to a range of products, services and techniques designed to be run through, or conducted within, the production tubing of an oil or gas well.
- the term implies an ability to operate within a restricted diameter tubular and is often associated with live-well intervention since the tubing is in place.
- the rigging-up process includes setting up the substructure of the rig, setting up rig floor, setting up the mast or derrick, installing handrails, guardrails, stairs, walkways, and ladders, installing the power systems, rigging up the circulating system, installing the auxiliary equipment, and inspecting the rig.
- the rigging-down procedure is begun.
- the rigging down procedure is, typically, the opposite procedure from the rigging-up procedure.
- Equipping the cellar begins but can be done throughout the rigging up process. Equipping the cellar includes welding on a drilling nipple to the conductor pipe and attaching a flow line.
- the cellar is a pit in the ground to provide additional height between the rig floor and the well head to accommodate the installation of blowout preventers, ratholes, mouseholes, and so forth.
- the cellar also collects drainage water and other fluids for disposal.
- Setting up the rig floor begins by installing stairways and guardrails to allow access to the rig floor. Then, the drawworks is set in place and secured to the substructure. On mechanical rigs, the engines are set in place and the compound and associated equipment connected to the drawworks. On electric rigs, the electric cables or lines are strung to the drawworks.
- the bottom of the mast is raised to the rig floor and pinned in place.
- the crown section is then raised into place on the derrick stand.
- the “A-legs” are raised and pinned into place.
- the monkey board is pinned in place on the mast and all lines and cables are laid out to prevent tangling when the mast is raised.
- the mast is now ready to be raised.
- the engines are started, and the drilling line is spooled onto the drawworks drum. Once the mast has been raised and pinned, the remaining floor equipment can be set into place. If the rig has safety guylines, they must be attached to the anchors and properly tensioned prior to continuing the rigging up process.
- a derrick emergency escape device is installed on the mast. Handrails, guardrails, stairways, walkways, and ladders are installed where they are needed for safety and access.
- the power system is usually installed simultaneously with setting up the rig floor, because power is needed to operate the equipment.
- a mechanical rig is powered by engines and compound.
- An electric rig is powered by engines and generators. This type supplies power to electric motors, which drive the machinery. All power cords, belts, and chains are connected to the machinery from their associated power source. Also, the fuel lines and tanks are hooked up, and the engines are started.
- the circulating system is rigged up. Rigging up the circulating system requires that the mud tanks and mud pumps are set into the predetermined location. The mud lines are then connected and electric cords are strung.
- the rigging down process is similar to, but the opposite of, the rigging up process.
- Workover activities include one or more of a variety of remedial operations on a producing well to try to increase production. For example, sand cleanout operations are performed to remove buildup of sand in the wellbore. Repair is required for the liners and casing. The liners and casing are essentially the same and repair procedures are the same for both. Casing can be damaged by corrosion, abrasion, pressure, or other forces that create holes or splits. A packer is run down the well to locate the hole in the casing. Fluid is pumped into the casing above the packer. A loss of pressure indicates a hole in the casing. Examples of just some of the principal methods for repairing casing is squeeze cementing, patching a liner, replacing casing, adding a liner, and opening collapsed casing.
- Sidetracking is the workover term for drilling a directional hole to bypass an obstruction in the well that cannot be removed or causes damage to the well, such as a collapsed casing that cannot be repaired. Sidetracking is also done to deepen a well or to relocate the bottom of the well in a more productive zone, which is horizontally removed from the original well. To sidetrack, a hole called a window is made in the casing above the obstruction. The well is then plugged with cement below the window. Special drill tools, such as a whipstock, bent housing, or bent sub are used to drill off at an angle from the main well. This new hole is completed in the same manner as any well after a liner is set.
- Plug-back places a cement plug at one or more locations in a well to shut off flow from below the plug. Plug-back is also used before abandoning a well or before sidetracking is done.
- a pulling unit or production rig is a well-servicing outfit used in pulling rods and tubing from the well.
- the production rig is a portable servicing or workover unit, usually mounted on wheels and self-propelled.
- a well servicing unit consists of a hoist and engine mounted on a wheeled chassis with a self-erecting mast.
- a workover rig is basically the same, with the addition of a substructure with rotary, pump, pits, and auxiliaries to permit handling and working a drill string.
- Pulling rods refers to the process of removing rods from the well.
- Running rods refers to the process of replacing rods in the well.
- the wellhead or casing head is a heavy, flanged steel fitting connected to the first string of casing.
- the casing head provides a housing for slips and packing assemblies, allows suspension of intermediate and production strings of casing, and supplies the means for the annulus to be sealed off. It may also be called a spool.
- FIG. 1 is an elevation view of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention.
- FIG. 2 is an elevation view of the preferred embodiment of the rigless well intervention apparatus encompassed by the present invention at a 90 degree angle from the view in FIG. 1 .
- FIG. 3 is an plan view of the preferred embodiment of the rigless well intervention apparatus encompassed by the present invention as illustrated in FIGS. 1 and 2 .
- FIG. 4 is an plan view of the upper level of the preferred embodiment of the rigless well intervention apparatus encompassed by the present invention as illustrated in FIGS. 1 , 2 and 3 .
- FIG. 5 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing a landing joint about to engage a hanger.
- FIG. 6 is an illustration of the preferred embodiment of the rigless well intervention apparatus in FIG. 5 showing the hanger being removed.
- FIG. 7 is an illustration of the preferred embodiment of the rigless well intervention apparatus in FIGS. 5 and 6 showing the hanger being removed and the cylinders and gauges.
- FIG. 8 is an illustration of the preferred embodiment of the rigless well intervention apparatus in FIGS. 5 , 6 and 7 showing the hanger removed.
- FIG. 9 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing a spider on the second level with the spider in ant open position.
- FIG. 10 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing the spider on the second level as shown in FIG. 9 with the spider in an engaged position.
- FIG. 11 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing the rigless well intervention apparatus being lifted and placed on a well.
- FIG. 12 is flow chart of a preferred embodiment of the rigless well intervention method encompassed by the present invention.
- FIG. 13 is flow chart of another preferred embodiment of the rigless well intervention method encompassed by the present invention.
- FIG. 14 is flow chart of another preferred embodiment of the rigless well intervention method encompassed by the present invention.
- the rigless intervention apparatus of the present invention is a substructure frame created to handle pipe and perform many and varied well workover and intervention operations. Such operations can pertain to a range of products, services and techniques associated with running or pulling pipe, or alternately, associated with the servicing or repair of the production tubing or other aspects of an oil or gas well.
- the rigless intervention apparatus of the present invention is especially adapted for running or pulling pipe on salt leaching, geothermal, or suspended wells.
- the substructure frame of the rigless intervention apparatus and method of the present invention includes hydraulic jacks and strain gauges for accurately controlling the positioning and movement of the pipe or other well components.
- the rigless intervention apparatus of the present invention provides a moveable framework adapted for movement mechanically, hydraulically, using any type of fluid pressure, or any other way to move the parts of the frame to enable lifting or moving tubulars, pipe, and other components.
- the framework of the rigless intervention apparatus of the present invention has three levels: a upper level, a mid level and a base level.
- the top level has a gallows-type device for lifting.
- the mid level has a spider elevator.
- the base level is configured to any height required to accommodate the ground covered.
- the rigless intervention apparatus of the present invention has a lifting capacity of several hundred tons. Strain gauges are incorporated into the rigless intervention apparatus of the present invention to determine and to monitor the exact weight to be lifted or being lifted.
- the strain gauges are preferably in operative association with or located in the lifting mechanism. However, it is appreciated by one skilled in the art that the strain gauges can be adapted for use with respect to any part of the rigless intervention apparatus of the present invention.
- the rigless intervention apparatus of the present invention can determine, for example, the weight of the pipe of the old string hanging on the hook, or, what the weight is before initiating the pull to make sure that the weigh of the string will not exceed the pulling weight.
- the rigless intervention method and apparatus of the present invention replaces the conventional rig and incorporates the ability to monitor the lifting process.
- Activities for which the rigless intervention apparatus of the present invention is adapted particularly includes, without limitation, running completions, running and pulling casing for measuring the cavern cavities, pulling damaged pipe, jacking of the hanger prior to pulling, drilling salt with a mud motor, repair cavity leakage by pumping synthetic resin, drilling a synthetic plug, testing with an inflatable plug system, change over of the P-Seals on the well head without pulling the casing, pull testing on the packer down hole, setting completion in tension, cavern acceptance testing, changing seals on the wellhead.
- Examples of the varied and different activities for which the rigless intervention apparatus of the present invention is adapted are jacking the hanger free, running pipe and running a control line.
- the rigless intervention apparatus of the present invention can be built, transported and lifted into place on the well head.
- the rigless intervention apparatus and method of the present invention is designed for leached activities, it is safe to operate, has low transportation cost, has low rig movement cost, has low cost during the rig-up and rig-down process, the capacity can be above a conventional workover rig, it has minimum equipment requirements, no highly qualified personnel are required, it has minimum certification requirements, and all operations are PC monitored. Additional features and advantages of the invention will be set forth in part in this description, and in part will become apparent from the description, or may be learned by practice of the invention. The features and advantages of the invention may be realized by means of the combinations and steps particularly pointed out in the appended claims.
- FIG. 1 is an elevation view of a preferred embodiment of the rigless well intervention apparatus 100 encompassed by the present invention.
- the rigless well intervention apparatus 100 comprises a base level 110 , an intermediate level 120 and an upper level 130 .
- the upper level 130 has a gallows structure 132 for lifting components.
- the upper level 130 has a ladder 134 for accessing the upper level 130 .
- FIG. 2 is an elevation view of the preferred embodiment of the rigless well intervention apparatus 200 encompassed by the present invention.
- the rigless well intervention apparatus 200 in FIG. 2 is shown at a 90 degree angle from the view in FIG. 1 .
- the rigless well intervention apparatus 200 comprises a base level 210 , an intermediate level 220 and an upper level 230 .
- FIG. 3 is an elevation view of an embodiment of the cylinder 316 A, 316 B and strain gauge 318 A, 318 B arrangement of a preferred embodiment of the rigless well intervention apparatus 300 encompassed by the present invention.
- the rigless well intervention apparatus 300 is shown with a base level 310 and an intermediate level 320 .
- Intermediate between the base level 310 and the intermediate level 320 are a rotating member 311 A, 311 B, an exterior cylinder 312 A, 312 B, a cylinder mechanism 316 A, 316 B, a strain gauge 318 A, 318 B, a shaft 314 A, 314 B and a second rotating member 314 A, 314 B.
- FIG. 4 is an plan view of an upper level 402 of the preferred embodiment of the rigless well intervention apparatus 400 encompassed by the present invention.
- FIG. 5 is an illustration of a preferred embodiment of the rigless well intervention apparatus 500 encompassed by the present invention showing a landing joint 12 about to engage a hanger 14 .
- the landing joint 12 and the hanger 14 are disposed between the base level 510 and the intermediate level 520 .
- FIG. 6 is an illustration of the preferred embodiment of the rigless well intervention apparatus 600 in FIG. 5 showing the hanger 12 being removed from the well head 16 .
- FIG. 6 also illustrates the base level 610 , the intermediate level 620 and the upper level 630 . Between the base level 610 and the intermediate level 620 , the rotating member 611 , the exterior cylinder 312 , and the shaft 314 are shown.
- FIG. 7 is an illustration of the preferred embodiment of the rigless well intervention apparatus 700 in FIGS. 5 and 6 showing the hanger 12 being removed from the well head 16 via the landing joint 14 .
- the intermediate level 720 is supported by the combination of the exterior cylinder 712 , the rod 714 and the rotating member 713 . Also illustrated is the connection 718 C in the cylinder 712 for the strain gauge.
- the rod 714 is shown extended from the cylinder 712 .
- FIG. 8 is an illustration of the preferred embodiment of the rigless well intervention apparatus 800 in FIGS. 5 , 6 and 7 showing the hanger 12 removed. Between the base level 810 and the intermediate level 820 , the rotating member 811 , the exterior cylinder 812 , and the shaft 814 are shown. The rod 814 is shown withdrawn into the cylinder 812 .
- FIG. 9 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing the spider 932 on the second level 920 and below the upper level 930 .
- the spider 932 is in a disengaged, open position.
- FIG. 10 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing the spider 1032 on the second level 1020 and below the upper level 1030 .
- the spider 1032 is in an engaged, closed position.
- FIG. 11 is an illustration of a preferred embodiment of the rigless well intervention apparatus 1100 encompassed by the present invention showing the rigless well intervention apparatus 1100 being lifted and placed on a well by a crane 18 .
- FIG. 12 is flow chart of a preferred embodiment of the rigless well intervention method 1200 encompassed by the present invention.
- the method is for performing various well completion, recompletion, servicing, workover and intervention operations that pertain to a range of products, services and techniques applied to a well having a wellbore, and particularly, associated with a pipe string.
- the method comprises the steps of maintaining a structure in association with the wellbore such that the structure has a maximum string pulling capacity 1202 , measuring the weight of the pipe string in the wellbore 1204 , determining whether the weight of the pipe string in the wellbore exceeds the maximum string pulling capacity of the structure 1206 , if the weight of the pipe string in the wellbore exceeds the maximum string pulling capacity of the structure then, terminating the pull of the pipe string in the wellbore 1208 , and, if the weight of the pipe string in the wellbore does not exceed the maximum string pulling capacity of the structure then, commencing the pull of the pipe string in the wellbore 1210 .
- FIG. 13 is flow chart of another preferred embodiment of the rigless well intervention method 1300 encompassed by the present invention for performing various well completion, recompletion, servicing, workover and intervention operations that pertains to a range of products, services and techniques applied to a well having a wellbore and a component associated with the well.
- the method comprising the steps of maintaining a structure in association with the wellbore such that the structure has a maximum lifting capacity 1302 , measuring the weight of the component associated with the well 1304 , determining whether the weight of the component associated with the well exceeds the maximum lifting capacity of the structure 1306 , if the weight of the component associated with the well exceeds the maximum lifting capacity of the structure then, terminating the lift of the component associated with the well 1308 , and if the weight of the component associated with the well does not exceed the maximum lifting capacity of the structure then, commencing the lift of the component associated with the well 1310 .
- FIG. 14 is flow chart of another preferred embodiment of the rigless well intervention method 1400 encompassed by the present invention for performing various well completion, recompletion, servicing, workover and intervention operations that pertains to a range of products, services and techniques applied to a well having a wellbore and a component associated with the well.
- the method comprising the steps of maintaining a structure in association with the wellbore such that the structure has a maximum lifting capacity 1402 , measuring the weight of the component associated with the well 1404 , determining whether the weight of the component associated with the well exceeds the maximum lifting capacity of the structure 1406 , if the weight of the component associated with the well exceeds the maximum lifting capacity of the structure then, terminating the lift of the component associated with the well 1408 , if the weight of the component associated with the well does not exceed the maximum lifting capacity of the structure then, commencing the lift of the component associated with the well 1410 , monitoring the weight of the component during the lift 1412 , if the weight of the component exceeds the maximum lifting capacity of the structure during the lifting process then, terminating the lift of the component and secure the component 1414 , and if the weight of the component does not exceed the maximum lifting capacity of the structure during the lifting process then, continuing the lift of the component to completion 1416 .
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
The present invention relates generally to a rigless well intervention apparatus and method for well completion, recompletion, servicing, workover and intervention. Specifically, the present invention relates to a rigless well intervention apparatus and method for performing various well completion, recompletion, servicing, workover and intervention operations that pertains to a range of products, services and techniques whether designed to be run through, or conducted within, the production tubing of an oil or gas well, or not, ranging from the ability to operate within a restricted diameter tubular with live-well intervention when the tubing is in place to the ability to drill the well.
Description
- The present invention relates generally to a rigless well intervention apparatus and method. Specifically, the present invention relates to a rigless well intervention apparatus and method for performing various well workover and intervention operations that pertains to a range of products, services and techniques designed to be run through, or conducted within, the production tubing of an oil or gas well ranging from the ability to operate within a restricted diameter tubular with live-well intervention particularly, for running or pulling pipe on salt leaching, geothermal or suspended wells.
- Oil well completion is a generic term used to describe the assembly of downhole tubulars and equipment required to enable the safe and efficient production from an oil or gas well. The point at which the completion process begins may depend on the type and design of the well. However, there are many options applied or actions performed during the construction phase of a well that have significant impact on the productivity of the well.
- The drilling completion hardware is used to optimize the production of hydrocarbons from the well. This may range from nothing but a packer on tubing above an openhole completion, sometimes referred to as barefoot completion, to a system of mechanical filtering elements outside of the perforated pipe, to a fully automated measurement and control system that optimizes reservoir economics without human intervention, sometimes referred to as an intelligent completion.
- The drilling completion hardware, typically, requires a drilling rig. A drilling rig is the machine used to drill a wellbore. In onshore operations, the rig includes virtually everything except living quarters. Major components of the rig include the mud tanks, the mud pumps, the derrick or mast, the drawworks, the rotary table or topdrive, the drilistring, the power generation equipment and auxiliary equipment. Offshore, the rig includes the same components as onshore, but not those of the vessel or drilling platform itself. The rig is sometimes referred to as the drilling package, particularly offshore.
- The rigless operation of a well completion process is defined as the well-intervention operation conducted with equipment and support facilities that precludes the requirement for a rig over the wellbore. By way of example, and without limitation, examples of rigless well completion operations are coiled tubing, slickline and snubbing activities. However, it can be appreciated by those skilled in the art that the use of the present invention provides for the use of a rigless operation that can encompass essentially all well completion processes.
- With respect to drilling a well, snubbing is the act of putting drillpipe into the wellbore when the blowout preventers (BOPs) are closed and pressure is contained in the well. Snubbing is necessary when a kick is taken, since well kill operations should always be conducted with the drillstring on bottom, and not somewhere up the wellbore. If only the annular blowout preventer has been closed, the drillpipe may be slowly and carefully lowered into the wellbore, and the blowout preventer itself will open slightly to permit the larger diameter tool joints to pass through. If the well has been closed with the use of ram blowout preventers, the tool joints will not pass by the closed ram element. Hence, while keeping the well closed with either another ram blowout preventer or the annular blowout preventer, the ram must be opened manually, then the pipe lowered until the tool joint is just below the ram, and then closing the ram again. This procedure is repeated whenever a tool joint must pass by a ram blowout preventer. In snubbing operations, the pressure in the wellbore acting on the cross-sectional area of the tubular can exert sufficient force to overcome the weight of the drillstring, so the string must be pushed or “snubbed” back into the wellbore. In ordinary stripping operations, the pipe falls into the wellbore under its own weight, and no additional downward force or pushing is required.
- Through-tubing well completion operations pertain to any reservoir or wellbore treatment performed through the tubing string. Through-tubing treatments are generally associated with live-well operations, thereby causing minimal interruption to production and eliminating the need to kill the well.
- Well workover and intervention operations pertain to a range of products, services and techniques designed to be run through, or conducted within, the production tubing of an oil or gas well. The term implies an ability to operate within a restricted diameter tubular and is often associated with live-well intervention since the tubing is in place.
- Typically, the well site is required to be rigged-up prior to production beginning. The rigging-up process includes setting up the substructure of the rig, setting up rig floor, setting up the mast or derrick, installing handrails, guardrails, stairs, walkways, and ladders, installing the power systems, rigging up the circulating system, installing the auxiliary equipment, and inspecting the rig. After the procedure is complete that required the rig, the rigging-down procedure is begun. The rigging down procedure is, typically, the opposite procedure from the rigging-up procedure.
- In setting up the substructure of the rig, the equipment is unloaded and positioned at or near the exact location that it will occupy during operations. The substructure is assembled, pinned together, leveled, and made ready for other rig components on the floor. Equipping the cellar begins but can be done throughout the rigging up process. Equipping the cellar includes welding on a drilling nipple to the conductor pipe and attaching a flow line. The cellar is a pit in the ground to provide additional height between the rig floor and the well head to accommodate the installation of blowout preventers, ratholes, mouseholes, and so forth. The cellar also collects drainage water and other fluids for disposal.
- Once the substructure is set in place, the process of setting up the rig floor begins. Setting up the rig floor begins by installing stairways and guardrails to allow access to the rig floor. Then, the drawworks is set in place and secured to the substructure. On mechanical rigs, the engines are set in place and the compound and associated equipment connected to the drawworks. On electric rigs, the electric cables or lines are strung to the drawworks.
- The bottom of the mast is raised to the rig floor and pinned in place. The crown section is then raised into place on the derrick stand. The “A-legs” are raised and pinned into place. The monkey board is pinned in place on the mast and all lines and cables are laid out to prevent tangling when the mast is raised. The mast is now ready to be raised. The engines are started, and the drilling line is spooled onto the drawworks drum. Once the mast has been raised and pinned, the remaining floor equipment can be set into place. If the rig has safety guylines, they must be attached to the anchors and properly tensioned prior to continuing the rigging up process. A derrick emergency escape device is installed on the mast. Handrails, guardrails, stairways, walkways, and ladders are installed where they are needed for safety and access.
- The power system is usually installed simultaneously with setting up the rig floor, because power is needed to operate the equipment. Today there are generally two types of rigs being used on land. A mechanical rig is powered by engines and compound. An electric rig is powered by engines and generators. This type supplies power to electric motors, which drive the machinery. All power cords, belts, and chains are connected to the machinery from their associated power source. Also, the fuel lines and tanks are hooked up, and the engines are started.
- Then, the circulating system is rigged up. Rigging up the circulating system requires that the mud tanks and mud pumps are set into the predetermined location. The mud lines are then connected and electric cords are strung.
- Thereafter, all remaining drilling and auxiliary equipment must be set into place and installed where needed. The catwalk and pipe racks are positioned and the pipe and drill collars are set on the racks.
- After production casing is run and cemented, the rig is taken down and moved to another site. The rigging down process is similar to, but the opposite of, the rigging up process.
- Wells eventually need maintenance or service on the surface or down-hole equipment. Working on an existing well to restore or increase oil and gas production is an important part of the petroleum industry. A well that is not producing to its full potential may require service or workover.
- Workover activities include one or more of a variety of remedial operations on a producing well to try to increase production. For example, sand cleanout operations are performed to remove buildup of sand in the wellbore. Repair is required for the liners and casing. The liners and casing are essentially the same and repair procedures are the same for both. Casing can be damaged by corrosion, abrasion, pressure, or other forces that create holes or splits. A packer is run down the well to locate the hole in the casing. Fluid is pumped into the casing above the packer. A loss of pressure indicates a hole in the casing. Examples of just some of the principal methods for repairing casing is squeeze cementing, patching a liner, replacing casing, adding a liner, and opening collapsed casing.
- Sidetracking is the workover term for drilling a directional hole to bypass an obstruction in the well that cannot be removed or causes damage to the well, such as a collapsed casing that cannot be repaired. Sidetracking is also done to deepen a well or to relocate the bottom of the well in a more productive zone, which is horizontally removed from the original well. To sidetrack, a hole called a window is made in the casing above the obstruction. The well is then plugged with cement below the window. Special drill tools, such as a whipstock, bent housing, or bent sub are used to drill off at an angle from the main well. This new hole is completed in the same manner as any well after a liner is set.
- Plug-back places a cement plug at one or more locations in a well to shut off flow from below the plug. Plug-back is also used before abandoning a well or before sidetracking is done.
- Generally, a pulling unit or production rig is a well-servicing outfit used in pulling rods and tubing from the well. The production rig is a portable servicing or workover unit, usually mounted on wheels and self-propelled. A well servicing unit consists of a hoist and engine mounted on a wheeled chassis with a self-erecting mast. A workover rig is basically the same, with the addition of a substructure with rotary, pump, pits, and auxiliaries to permit handling and working a drill string.
- Among the reasons for pulling tubing includes replacing a packer, locating a tubing leak, or plugged tubing. To service, repair, or replace the rods or pump, the sucker rod string must be pulled out of the hole. Pulling rods refers to the process of removing rods from the well. Running rods refers to the process of replacing rods in the well.
- To begin the process of pulling or running rods, the wellhead must be removed from the casing flange. The wellhead or casing head is a heavy, flanged steel fitting connected to the first string of casing. The casing head provides a housing for slips and packing assemblies, allows suspension of intermediate and production strings of casing, and supplies the means for the annulus to be sealed off. It may also be called a spool.
- The above background discussion provides examples where the rigless well intervention apparatus and method of the present invention can be used. The above discussion is not intended to be limiting, but rather, is meant to be exemplar. Thus, one skilled in the art will appreciate that the rigless well intervention apparatus and method can be adapted for use in many and varied applications, including applications not discussed above, but appreciated by those skilled in the art as being applicable applications of the present invention.
- The accompanying drawings which are incorporated in and constitute a part of the specification, illustrate a preferred embodiment of the invention and together with the general description of the invention given above and the detailed description of the preferred embodiments given below, serve to explain the principles of the invention.
-
FIG. 1 is an elevation view of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention. -
FIG. 2 is an elevation view of the preferred embodiment of the rigless well intervention apparatus encompassed by the present invention at a 90 degree angle from the view inFIG. 1 . -
FIG. 3 is an plan view of the preferred embodiment of the rigless well intervention apparatus encompassed by the present invention as illustrated inFIGS. 1 and 2 . -
FIG. 4 is an plan view of the upper level of the preferred embodiment of the rigless well intervention apparatus encompassed by the present invention as illustrated inFIGS. 1 , 2 and 3. -
FIG. 5 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing a landing joint about to engage a hanger. -
FIG. 6 is an illustration of the preferred embodiment of the rigless well intervention apparatus inFIG. 5 showing the hanger being removed. -
FIG. 7 is an illustration of the preferred embodiment of the rigless well intervention apparatus inFIGS. 5 and 6 showing the hanger being removed and the cylinders and gauges. -
FIG. 8 is an illustration of the preferred embodiment of the rigless well intervention apparatus inFIGS. 5 , 6 and 7 showing the hanger removed. -
FIG. 9 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing a spider on the second level with the spider in ant open position. -
FIG. 10 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing the spider on the second level as shown inFIG. 9 with the spider in an engaged position. -
FIG. 11 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing the rigless well intervention apparatus being lifted and placed on a well. -
FIG. 12 is flow chart of a preferred embodiment of the rigless well intervention method encompassed by the present invention. -
FIG. 13 is flow chart of another preferred embodiment of the rigless well intervention method encompassed by the present invention. -
FIG. 14 is flow chart of another preferred embodiment of the rigless well intervention method encompassed by the present invention. - The above general description and the following detailed description are merely illustrative of the generic invention, and additional modes, advantages, and particulars of this invention will be readily suggested to those skilled in the art without departing from the spirit and scope of the invention.
- The rigless intervention apparatus of the present invention is a substructure frame created to handle pipe and perform many and varied well workover and intervention operations. Such operations can pertain to a range of products, services and techniques associated with running or pulling pipe, or alternately, associated with the servicing or repair of the production tubing or other aspects of an oil or gas well. The rigless intervention apparatus of the present invention is especially adapted for running or pulling pipe on salt leaching, geothermal, or suspended wells.
- The substructure frame of the rigless intervention apparatus and method of the present invention includes hydraulic jacks and strain gauges for accurately controlling the positioning and movement of the pipe or other well components.
- The rigless intervention apparatus of the present invention provides a moveable framework adapted for movement mechanically, hydraulically, using any type of fluid pressure, or any other way to move the parts of the frame to enable lifting or moving tubulars, pipe, and other components. In one embodiment, the framework of the rigless intervention apparatus of the present invention has three levels: a upper level, a mid level and a base level. The top level has a gallows-type device for lifting. The mid level has a spider elevator. And, the base level is configured to any height required to accommodate the ground covered. The rigless intervention apparatus of the present invention has a lifting capacity of several hundred tons. Strain gauges are incorporated into the rigless intervention apparatus of the present invention to determine and to monitor the exact weight to be lifted or being lifted. The strain gauges are preferably in operative association with or located in the lifting mechanism. However, it is appreciated by one skilled in the art that the strain gauges can be adapted for use with respect to any part of the rigless intervention apparatus of the present invention. Thus, the rigless intervention apparatus of the present invention can determine, for example, the weight of the pipe of the old string hanging on the hook, or, what the weight is before initiating the pull to make sure that the weigh of the string will not exceed the pulling weight. The rigless intervention method and apparatus of the present invention replaces the conventional rig and incorporates the ability to monitor the lifting process.
- Activities for which the rigless intervention apparatus of the present invention is adapted particularly includes, without limitation, running completions, running and pulling casing for measuring the cavern cavities, pulling damaged pipe, jacking of the hanger prior to pulling, drilling salt with a mud motor, repair cavity leakage by pumping synthetic resin, drilling a synthetic plug, testing with an inflatable plug system, change over of the P-Seals on the well head without pulling the casing, pull testing on the packer down hole, setting completion in tension, cavern acceptance testing, changing seals on the wellhead. Examples of the varied and different activities for which the rigless intervention apparatus of the present invention is adapted are jacking the hanger free, running pipe and running a control line.
- The rigless intervention apparatus of the present invention can be built, transported and lifted into place on the well head.
- The advantages of the rigless intervention apparatus of the present invention are varied and numerous. By way of example, and without limitation, the rigless intervention apparatus and method of the present invention is designed for leached activities, it is safe to operate, has low transportation cost, has low rig movement cost, has low cost during the rig-up and rig-down process, the capacity can be above a conventional workover rig, it has minimum equipment requirements, no highly qualified personnel are required, it has minimum certification requirements, and all operations are PC monitored. Additional features and advantages of the invention will be set forth in part in this description, and in part will become apparent from the description, or may be learned by practice of the invention. The features and advantages of the invention may be realized by means of the combinations and steps particularly pointed out in the appended claims.
- Reference will now be made in detail to the present preferred embodiments of the invention as described in the accompanying drawings.
-
FIG. 1 is an elevation view of a preferred embodiment of the riglesswell intervention apparatus 100 encompassed by the present invention. The riglesswell intervention apparatus 100 comprises abase level 110, anintermediate level 120 and anupper level 130. Theupper level 130 has agallows structure 132 for lifting components. Also, theupper level 130 has aladder 134 for accessing theupper level 130. -
FIG. 2 is an elevation view of the preferred embodiment of the riglesswell intervention apparatus 200 encompassed by the present invention. The riglesswell intervention apparatus 200 inFIG. 2 is shown at a 90 degree angle from the view inFIG. 1 . The riglesswell intervention apparatus 200 comprises abase level 210, anintermediate level 220 and anupper level 230. -
FIG. 3 is an elevation view of an embodiment of thecylinder strain gauge well intervention apparatus 300 encompassed by the present invention. The riglesswell intervention apparatus 300 is shown with abase level 310 and anintermediate level 320. Intermediate between thebase level 310 and theintermediate level 320 are a rotatingmember exterior cylinder cylinder mechanism strain gauge shaft rotating member -
FIG. 4 is an plan view of anupper level 402 of the preferred embodiment of the riglesswell intervention apparatus 400 encompassed by the present invention. -
FIG. 5 is an illustration of a preferred embodiment of the riglesswell intervention apparatus 500 encompassed by the present invention showing a landing joint 12 about to engage ahanger 14. The landing joint 12 and thehanger 14 are disposed between thebase level 510 and theintermediate level 520. -
FIG. 6 is an illustration of the preferred embodiment of the riglesswell intervention apparatus 600 inFIG. 5 showing thehanger 12 being removed from thewell head 16.FIG. 6 also illustrates thebase level 610, theintermediate level 620 and theupper level 630. Between thebase level 610 and theintermediate level 620, the rotatingmember 611, the exterior cylinder 312, and the shaft 314 are shown. -
FIG. 7 is an illustration of the preferred embodiment of the riglesswell intervention apparatus 700 inFIGS. 5 and 6 showing thehanger 12 being removed from thewell head 16 via the landing joint 14. Theintermediate level 720 is supported by the combination of theexterior cylinder 712, therod 714 and the rotatingmember 713. Also illustrated is theconnection 718C in thecylinder 712 for the strain gauge. Therod 714 is shown extended from thecylinder 712. -
FIG. 8 is an illustration of the preferred embodiment of the riglesswell intervention apparatus 800 inFIGS. 5 , 6 and 7 showing thehanger 12 removed. Between thebase level 810 and theintermediate level 820, the rotatingmember 811, theexterior cylinder 812, and theshaft 814 are shown. Therod 814 is shown withdrawn into thecylinder 812. -
FIG. 9 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing thespider 932 on thesecond level 920 and below theupper level 930. Thespider 932 is in a disengaged, open position. -
FIG. 10 is an illustration of a preferred embodiment of the rigless well intervention apparatus encompassed by the present invention showing thespider 1032 on thesecond level 1020 and below theupper level 1030. Thespider 1032 is in an engaged, closed position. -
FIG. 11 is an illustration of a preferred embodiment of the riglesswell intervention apparatus 1100 encompassed by the present invention showing the riglesswell intervention apparatus 1100 being lifted and placed on a well by acrane 18. -
FIG. 12 is flow chart of a preferred embodiment of the riglesswell intervention method 1200 encompassed by the present invention. The method is for performing various well completion, recompletion, servicing, workover and intervention operations that pertain to a range of products, services and techniques applied to a well having a wellbore, and particularly, associated with a pipe string. The method comprises the steps of maintaining a structure in association with the wellbore such that the structure has a maximumstring pulling capacity 1202, measuring the weight of the pipe string in thewellbore 1204, determining whether the weight of the pipe string in the wellbore exceeds the maximum string pulling capacity of thestructure 1206, if the weight of the pipe string in the wellbore exceeds the maximum string pulling capacity of the structure then, terminating the pull of the pipe string in thewellbore 1208, and, if the weight of the pipe string in the wellbore does not exceed the maximum string pulling capacity of the structure then, commencing the pull of the pipe string in thewellbore 1210. -
FIG. 13 is flow chart of another preferred embodiment of the riglesswell intervention method 1300 encompassed by the present invention for performing various well completion, recompletion, servicing, workover and intervention operations that pertains to a range of products, services and techniques applied to a well having a wellbore and a component associated with the well. The method comprising the steps of maintaining a structure in association with the wellbore such that the structure has amaximum lifting capacity 1302, measuring the weight of the component associated with the well 1304, determining whether the weight of the component associated with the well exceeds the maximum lifting capacity of thestructure 1306, if the weight of the component associated with the well exceeds the maximum lifting capacity of the structure then, terminating the lift of the component associated with the well 1308, and if the weight of the component associated with the well does not exceed the maximum lifting capacity of the structure then, commencing the lift of the component associated with thewell 1310. -
FIG. 14 is flow chart of another preferred embodiment of the riglesswell intervention method 1400 encompassed by the present invention for performing various well completion, recompletion, servicing, workover and intervention operations that pertains to a range of products, services and techniques applied to a well having a wellbore and a component associated with the well. The method comprising the steps of maintaining a structure in association with the wellbore such that the structure has amaximum lifting capacity 1402, measuring the weight of the component associated with the well 1404, determining whether the weight of the component associated with the well exceeds the maximum lifting capacity of thestructure 1406, if the weight of the component associated with the well exceeds the maximum lifting capacity of the structure then, terminating the lift of the component associated with the well 1408, if the weight of the component associated with the well does not exceed the maximum lifting capacity of the structure then, commencing the lift of the component associated with the well 1410, monitoring the weight of the component during thelift 1412, if the weight of the component exceeds the maximum lifting capacity of the structure during the lifting process then, terminating the lift of the component and secure thecomponent 1414, and if the weight of the component does not exceed the maximum lifting capacity of the structure during the lifting process then, continuing the lift of the component tocompletion 1416. - Additional advantages and modification will readily occur to those skilled in the art. The invention in its broader aspects is therefore not limited to the specific details, representative apparatus, and the illustrative examples shown and described herein. Accordingly, departures may be made from the details without departing from the spirit or scope of the disclosed general inventive concept.
Claims (20)
1. A rigless well intervention apparatus comprising:
a substructure frame having at least a first level and a second level;
at least one first lifting device in operative association with the first level, the second level, or combinations thereof, wherein said at least one first lifting device is operative to control a distance between the first level and the second level for moving a well component associated with the first level or the second level;
a second lifting device disposed on the substructure frame for moving the well component, an additional well component, or combinations thereof;
a first strain gauge in operative association with said at least one first lifting device, wherein the first strain gauge monitors a weight of the well component associated with said at least one first lifting device; and
a second strain gauge in operative association with the second lifting device, wherein the second strain gauge monitors a weight of the well component, the additional well component, or combinations thereof, associated with the second lifting device.
2. The rigless well intervention apparatus of claim 1 , wherein said at least one first lifting device comprises a cylinder mechanism disposed between the first level and the second level, and wherein the cylinder mechanism is operable to raise and lower the second level relative to the first level.
3. The rigless well intervention apparatus of claim 2 , wherein the second lifting device comprises an additional cylinder mechanism disposed between the first level and the second level, and wherein the additional cylinder mechanism is operable to raise and lower the second level relative to the first level
4. The rigless well intervention apparatus of claim 2 , further comprising a gripping apparatus disposed on the second level for gripping the well component, wherein the cylinder mechanism is operable to move the well component concurrent with raising and lowering the second level relative to the first level.
5. The rigless well intervention apparatus of claim 1 , wherein the second lifting device comprises a gallows type lifting device for moving the well component disposed on an upper level of the substructure frame.
6. A rigless well intervention apparatus comprising:
a frame having a plurality of levels;
a gripping apparatus disposed on a selected level of the plurality of levels for gripping a well component;
at least one cylinder mechanism in operative association with the selected level, wherein said at least one cylinder mechanism is operable to raise and lower the selected level relative to at least one other level, thereby moving the well component; and
a strain gauge in operative association with said at least one cylinder mechanism, wherein the strain gauge monitors a weight of the well component associated with said at least one cylinder mechanism.
7. The rigless well intervention apparatus of claim 6 , wherein the plurality of levels comprises a top level above the selected level and a base level below the selected level.
8. The rigless well intervention apparatus of claim 7 , further comprising a gallows type lifting device disposed on the top level for moving the well component.
9. The rigless well intervention apparatus of claim 6 , further comprising:
at least one additional cylinder mechanism in operative association with the selected level, wherein said at least one additional cylinder mechanism is operable to raise and lower the selected level relative to said at least one other level, thereby moving the well component; and
an additional strain gauge in operative association with said at least one additional cylinder mechanism, wherein the additional strain gauge monitors a weight of the well component associated with said at least one additional cylinder mechanism.
10. A rigless well intervention apparatus comprising:
a base level;
an intermediate level above the base level, wherein the intermediate level comprises a spider elevator for gripping a well component;
a top level above the intermediate level, wherein the top level comprises a gallows type lifting device for moving the well component;
at least one cylinder mechanism in operative association with the intermediate level, wherein said at least one cylinder mechanism is operable to raise and lower the intermediate level relative to the top level, the base level, or combinations thereof, thereby moving the well component; and
a strain gauge in operative association with said at least one cylinder mechanism, wherein the strain gauge monitors a weight of the well component associated with said at least one additional cylinder mechanism.
11. The rigless well intervention apparatus of claim 10 , further comprising:
at least one additional cylinder mechanism in operative association with the intermediate level, wherein said at least one additional cylinder mechanism is operable to raise and lower the intermediate level relative to said at least one other level, thereby moving the well component; and
an additional strain gauge in operative association with said at least one additional cylinder mechanism, wherein the additional strain gauge monitors a weight of the well component associated with said at least one additional cylinder mechanism.
12. The rigless well intervention apparatus of claim 10 , further comprising an additional strain gauge in operative association with the spider elevator, the gallows type lifting device, or combinations thereof, wherein the additional strain gauge monitors a weight of the well component associated with the spider elevator, the gallows type lifting device, or combinations thereof.
13. A rigless method for performing well operations comprising:
providing a substructure frame comprising a plurality of levels;
providing a well component in association with a selected level of the plurality of levels;
moving the selected level relative to at least one other level, thereby moving the well component;
monitoring a weight of the well component while moving the selected level; and
modifying a rate of movement of the selected level responsive to the weight of the well component.
14. The method of claim 13 , wherein providing the well component in association with the selected level comprises gripping the well component using a gripping apparatus disposed on the selected level.
15. The method of claim 13 , wherein moving the selected level relative to at least one other level comprises actuating at least one cylinder mechanism disposed in operative association with the selected level to raise or lower the selected level.
16. The method of claim 15 , wherein monitoring the weight of the well component comprises using a strain gauge in operative association with said at least one cylinder mechanism to measure weight associated with said at least one cylinder mechanism.
17. A rigless method for performing well operations comprising:
providing a structure having a first level comprising a gripping apparatus disposed thereon, at least one cylinder mechanism in operative association with the first level, and a strain gauge in operative association with said at least one cylinder mechanism;
gripping a well component with the gripping apparatus;
actuating said at least one cylinder mechanism to move the first level relative to an additional level of the structure, thereby moving the well component;
monitoring a weight of the well component associated with said at least one cylinder mechanism using the strain gauge; and
modifying a rate of movement of the first level responsive to the weight of the well component.
18. The method of claim 17 , wherein the structure further comprises a second level above the first level having a gallows type lifting device disposed thereon, the method further comprising moving the well component using the gallows type lifting device, moving an additional well component using the gallows type lifting device, or combinations thereof.
19. The method of claim 18 , further comprising monitoring a weight of the well component, the additional well component, or combinations thereof, associated with the gallows type lifting device using an additional strain gauge and modifying a rate of lifting of the gallows type lifting device responsive to the weight.
20. The method of claim 19 , further comprising determining a total weight using the strain gauge and the additional strain gauge and modifying the rate of movement of the first level, the rate of lifting of the gallows type lifting device, or combinations thereof, responsive to the total weight.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/804,420 US20100307766A1 (en) | 2006-06-19 | 2010-07-21 | Rigless well intervention apparatus and method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/471,370 US20070289738A1 (en) | 2006-06-19 | 2006-06-19 | Rigless well intervention apparatus and method |
US12/804,420 US20100307766A1 (en) | 2006-06-19 | 2010-07-21 | Rigless well intervention apparatus and method |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/471,370 Continuation US20070289738A1 (en) | 2006-06-19 | 2006-06-19 | Rigless well intervention apparatus and method |
Publications (1)
Publication Number | Publication Date |
---|---|
US20100307766A1 true US20100307766A1 (en) | 2010-12-09 |
Family
ID=38834111
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/471,370 Abandoned US20070289738A1 (en) | 2006-06-19 | 2006-06-19 | Rigless well intervention apparatus and method |
US12/804,420 Abandoned US20100307766A1 (en) | 2006-06-19 | 2010-07-21 | Rigless well intervention apparatus and method |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/471,370 Abandoned US20070289738A1 (en) | 2006-06-19 | 2006-06-19 | Rigless well intervention apparatus and method |
Country Status (4)
Country | Link |
---|---|
US (2) | US20070289738A1 (en) |
EP (1) | EP2035657A4 (en) |
CA (1) | CA2655944A1 (en) |
WO (1) | WO2007149507A2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9416652B2 (en) | 2013-08-08 | 2016-08-16 | Vetco Gray Inc. | Sensing magnetized portions of a wellhead system to monitor fatigue loading |
CN107387004A (en) * | 2017-07-27 | 2017-11-24 | 中国石油化工股份有限公司 | A kind of safe release device of oil-water well hanger |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7921918B2 (en) * | 2008-06-26 | 2011-04-12 | Bryant Jr Charles Larue | Support apparatus for a well bore tool |
CA2652068C (en) * | 2009-01-30 | 2011-07-05 | Brian Tucken | Push / pull unit and support structure for snubbing unit or the like on a rig floor |
US20130319674A1 (en) * | 2012-06-01 | 2013-12-05 | Smith International, Inc. | Rigless casing cutting/pulling stand |
US9725970B1 (en) | 2013-09-18 | 2017-08-08 | CRW Contracting, Inc. | Compact pipe handling trailer |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4479547A (en) * | 1981-06-01 | 1984-10-30 | Varco International, Inc. | Well pipe jack |
US5160055A (en) * | 1991-10-02 | 1992-11-03 | Jlg Industries, Inc. | Load moment indicator system |
US20040065874A1 (en) * | 2002-10-03 | 2004-04-08 | Newman Frederic M. | Engine speed limiter for a hoist |
US7063159B2 (en) * | 2003-03-25 | 2006-06-20 | Schlumberger Technology Corp. | Multi-purpose coiled tubing handling system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3713129A (en) * | 1970-03-30 | 1973-01-23 | R Buchholz | Crane overloading protective system |
-
2006
- 2006-06-19 US US11/471,370 patent/US20070289738A1/en not_active Abandoned
-
2007
- 2007-06-19 WO PCT/US2007/014421 patent/WO2007149507A2/en active Application Filing
- 2007-06-19 EP EP07809739A patent/EP2035657A4/en not_active Withdrawn
- 2007-06-19 CA CA002655944A patent/CA2655944A1/en not_active Abandoned
-
2010
- 2010-07-21 US US12/804,420 patent/US20100307766A1/en not_active Abandoned
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4479547A (en) * | 1981-06-01 | 1984-10-30 | Varco International, Inc. | Well pipe jack |
US5160055A (en) * | 1991-10-02 | 1992-11-03 | Jlg Industries, Inc. | Load moment indicator system |
US20040065874A1 (en) * | 2002-10-03 | 2004-04-08 | Newman Frederic M. | Engine speed limiter for a hoist |
US7063159B2 (en) * | 2003-03-25 | 2006-06-20 | Schlumberger Technology Corp. | Multi-purpose coiled tubing handling system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9416652B2 (en) | 2013-08-08 | 2016-08-16 | Vetco Gray Inc. | Sensing magnetized portions of a wellhead system to monitor fatigue loading |
CN107387004A (en) * | 2017-07-27 | 2017-11-24 | 中国石油化工股份有限公司 | A kind of safe release device of oil-water well hanger |
Also Published As
Publication number | Publication date |
---|---|
CA2655944A1 (en) | 2007-12-27 |
WO2007149507A2 (en) | 2007-12-27 |
EP2035657A2 (en) | 2009-03-18 |
US20070289738A1 (en) | 2007-12-20 |
EP2035657A4 (en) | 2011-11-16 |
WO2007149507A3 (en) | 2008-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6712147B2 (en) | Spool for pressure containment used in rigless well completion, re-completion, servicing or workover | |
CA2419650C (en) | System for performing wellbore operations | |
CA2863292C (en) | A method and an apparatus for retrieving a tubing from a well | |
US7527100B2 (en) | Method and apparatus for cutting and removal of pipe from wells | |
US4208158A (en) | Auxiliary offshore rig and methods for using same | |
US8186457B2 (en) | Offshore casing drilling method | |
WO2011135541A2 (en) | Modular multi-workstring system for subsea intervention and abandonment operations | |
US20100307766A1 (en) | Rigless well intervention apparatus and method | |
US10760347B2 (en) | System and method for offline suspension or cementing of tubulars | |
US9045944B2 (en) | Pull-down method and equipment for installing well casing | |
Skinner | Hydraulic rig technology and operations | |
WO2017201154A1 (en) | Mat for wellhead cellar | |
US20180163472A1 (en) | Drilling traction system and method | |
US11105182B2 (en) | Compact rotating jacking apparatus, for cementing casing in a bore providing rotating and reciprocal stroke motion to casing from surface, and other well tasks | |
US20070227742A1 (en) | Casing transition nipple and method of casing a well to facilitate well completion, re-completion and workover | |
CA3036184C (en) | Compact rotating jacking apparatus | |
Hovland | Alternatives to conventional rig for P&A on fixed installations | |
NO346881B1 (en) | A system and a method for heave compensated make-up and break-out of drill pipe connections in connection with drilling | |
Denney | Dual Activities Without the Second Derrick | |
Reudelhuber et al. | The Diamond Coring System Phase II (4500 M Depth Capability) | |
Briggs et al. | 5. DIAMOND CORING SYSTEM PHASE IIB1 | |
Rike et al. | Recent Innovations in Offshore Completion and Workover Systems | |
Fayaz et al. | Reaming With Casing and Rotating While Cementing | |
CA2541748A1 (en) | A casing transition nipple and method of casing a well to facilitate well completion, re-completion and workover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: FRANK'S INTERNATIONAL, INC., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KAMPMAN, ROLF N.;SCHMIDT, HANS A.;REEL/FRAME:024765/0089 Effective date: 20090707 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |