US20090326718A1 - Calibration Device, Method And System For A Container Crane - Google Patents
Calibration Device, Method And System For A Container Crane Download PDFInfo
- Publication number
- US20090326718A1 US20090326718A1 US12/487,276 US48727609A US2009326718A1 US 20090326718 A1 US20090326718 A1 US 20090326718A1 US 48727609 A US48727609 A US 48727609A US 2009326718 A1 US2009326718 A1 US 2009326718A1
- Authority
- US
- United States
- Prior art keywords
- markers
- calibration
- sensor
- crane
- container
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/002—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles
- B65G63/004—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles for containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/18—Control systems or devices
- B66C13/46—Position indicators for suspended loads or for crane elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
- B66C19/002—Container cranes
Definitions
- the invention relates to a device for automatic calibration of a container crane and a method for carrying out such an automatic calibration.
- the method may involve automatic and/or manual procedures.
- Container cranes are used to handle freight containers and especially to transfer containers between transport modes at container terminals, freight harbours and the like.
- Standard shipping containers are used to transport a great and growing volume of freight around the world.
- Transshipment is a critical function in freight handling. Transshipment may occur at each point of transfer and there is usually a tremendous number of containers that must be unloaded, transferred to a temporary stack, and later loaded on to another ship, back onto the same ship or loaded instead onto another form of transport. Loading and unloading containers to and from a ship takes a great deal of time.
- the development of automated cranes has improved loading and unloading and made the productivity more predictable, and also eliminated many situations in which port workers have been exposed to danger and injury.
- the control systems that regulate the picking up and landing of containers must be calibrated. This may comprise calibrating sub systems of the crane control systems. For example on gantry cranes or ship-to-shore cranes (STS) that run on rails, a somewhat random error that may occur is caused by changes in one or more wheel positions on a gantry rail, which may cause a skew error. Other errors may arise from subsidence in or damage to the area the containers stand upon, so that the position of a landing slot for a container may change. In addition, when optical sensor equipment or position encoder sensors are repaired or moved a re-calibration is necessary.
- LPS Load Position Sensor
- TPS Target Position Sensor
- co-calibration A LPS subsystem finds the position of the load (container or empty spreader) during lifting, handling, and a TPS subsystem finds the position of a target landing place on a ground slot or on a vehicle, as well as mapping positions of other containers, container stacks etc in the vicinity of a target.
- an estimated 1-4 hours may be spent on stacking tests and parameter fine-tuning.
- the error in measurement may come from any of many sources such as: inclination in gantry rail; curves in gantry rail causing skew in crane position; wheel position on gantry rail causing offsets in trolley direction; wheel position on gantry rail causing skew in crane position; gantry positioning error (synchronization offset); twisted trolley girder profile causing error in measurement angle; skew of trolley platform on trolley rail; LPS system calibration error; TPS system calibration error.
- TPS system calibration error tend to be constant through a given block of containers.
- Other errors such as gantry rail inclination and direction depend on gantry position and may thus differ from bay to bay within a given block. Error in gantry inclination also twists the trolley girder, which makes the error different from one row of containers to another in the same block.
- the aim of the present invention is to provide an improved device, method and system for automatic calibration of the lifting and handling systems of a container crane.
- a calibration device for automatic calibration of a container crane wherein said container crane is controlled by a system comprising at least a first sensor and a second sensor, the device further comprising a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another.
- a calibration device for automatic calibration of a container crane comprising at least a first sensor and a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the calibration rig is arranged in a fixed position in a container yard, freight yard or harbour.
- a calibration device for automatic calibration of a container crane comprising at least a first sensor and/or a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the calibration rig is arranged with at least two 2 first markers comprising a surface with a first visual appearance.
- a calibration device for automatic calibration of a container crane comprising at least a first sensor and/or a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the at least two first markers with the first visual appearance are active markers.
- a calibration device for automatic calibration of a container crane comprising at least a first sensor and/or a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the calibration rig is arranged with at least two second markers comprising a surface with a second visual appearance.
- a calibration device for automatic calibration of a container crane comprising at least a first sensor and/or a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the at least two second markers with the second visual appearance are passive markers.
- a calibration device for automatic calibration of a container crane comprising a calibration rig arranged in a fixed position a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein at least two first or active markers comprise an illumination source from any of the group of: IR laser, IR lamp, visible spectra lamp.
- a calibration device for automatic calibration of a container crane comprising a calibration rig arranged in a fixed position a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein at least two second or passive markers comprise a substantially planar part bounded by at least one straight edge each arranged at the arranged at a known and fixed position.
- a calibration device for automatic calibration of a container crane comprising a calibration rig arranged in a fixed position a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the least two first or active markers are each arranged attached to a passive marker.
- a calibration device for automatic calibration of a container crane comprising a calibration rig arranged in a fixed position a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein at least two first or active markers are arranged in the same known and substantially horizontal plane and separated by a known distance and a third first or active marker is arranged substantially vertically above the first two active markers and separated by a known vertical distance.
- a calibration device for automatic calibration of a container crane wherein said container crane is controlled by a system comprising at least a first sensor and/or a second sensor, the device further comprising a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another and wherein at least first sensor is part of a load position system of the container crane and said second sensor is part of a target position system of the container crane.
- a method for automatic calibration of a container crane wherein said container crane is controlled by a system comprising at least a first sensor and/or a second sensor, and wherein by the actions of moving the crane to a position adjacent a fixed and known calibration device or rig, making an image of a plurality of markers using said at least one first sensor, and by calculating one or more position parameters for at least one control model for controlling the crane relative to a position of a load or a target landing/lifting position.
- the primary advantage of the automatic calibration device is that calibration may be carried out automatically with minimum manual intervention. For a basic calibration only a crane operators actions are necessary, and no ground personnel.
- the automatic process is faster than the known manual methods and saves a lot of valuable time. The time spent calibrating manually has previously involved manpower costs as well as loss of production, estimated to take 4-8 hours per crane.
- Another advantage is that the new automatic calibration gives a consistent accuracy throughout a given block of containers and is the same for all cranes in the block. It depends on the accuracy of the reference markers and is independent of human skill and experience.
- the new method requires no special skill or experience for performing the normal calibration. Extra manual work that may be needed during commissioning or equipment change is limited to being able to measure trim, list and skew and entering these results into the system, for the LPS.
- a graphic user interface which is used to carry out parts of the methods of the invention and which displays the measurements, parameters and validations of the calibrations so determined.
- Another object of the present invention is to provide an improved computer program product and a computer readable medium having a program recorded thereon, for automatically calibrating a container crane, said container crane controlled by a control system comprising at least a first sensor (LPS) and/or a second sensor (TPS) to determine a position relative to a freight container handled by a crane.
- a control system comprising at least a first sensor (LPS) and/or a second sensor (TPS) to determine a position relative to a freight container handled by a crane.
- FIG. 1 shows in a simplified schematic diagram a calibration rig for a container crane according to an embodiment of a first aspect of the invention
- FIGS. 2 and 9 show simplified diagrams of a layout for container stacks and a container crane in a freight terminal or harbour;
- FIG. 3 shows a simplified diagram of a standard container illustrating axes and directions of movement
- FIGS. 4 and 5 show flowcharts for a method of carrying out an automatic calibration of the container crane according to an embodiment of second aspect of the invention
- FIG. 6 shows schematically an interface for displayed for an operator to select an action of the automatic calibration process according to an embodiment of the invention
- FIGS. 7-8 shows schematically one or more interfaces for displaying method steps and other information relevant to an embodiment of the invention.
- FIG. 1 shows a simplified diagram of a calibration rig 1 according to an embodiment of a first aspect of the present invention.
- the rig is shown as seen from a view F in front, and has markers mounted at three positions 2 , 3 , 4 , which are accurately measured beforehand and the position of each marker is known.
- Each of the markers in the exemplary embodiment shown comprise a first marker with a first visual appearance, such as an active marker 5 a - c which is preferably a light source, and a second marker comprising a second visual appearance which is preferably a passive marker 6 a - c.
- Two marker positions 2 , 3 are arranged substantially horizontally at a known and fixed distance D apart.
- the third position 4 is arranged substantially perpendicularly above the mid point of 2 - 3 at a substantially vertical distance V.
- a vertical check means 8 such as a simple plumb line, or a sensor that may be read remotely, may be mounted to provide a ready check that the rig is correctly aligned in the vertical direction.
- the markers are also shown in the lower part of the diagram in a view U as seen looking down from above the rig.
- the first or active markers 5 a - c are indicated with a cross hatching and are arranged attached to the second or passive markers 6 a - c shown as plain rectangular shapes defined by one or more straight edges in this embodiment.
- a first or active marker 5 a - c is arranged together with a second or passive marker 6 a - c.
- the first or active markers may be a light source of some type, such as an IR (Infra Red) diode which is detected during a calibration process by an optical receiver or sensor such as a camera, CCD camera or video camera of the LPS (Load Position System).
- the passive markers 6 a - c comprising a surface with the second visual appearance are detected by a laser scanner of the TPS (Target Position System) which surface and/or one or more edges of the passive markers.
- the passive marker may, for example, have a substantially rectangular or circular etc. planar shape.
- the two sensors of the two control system subsystems can register and be calibrated by both systems to the same position in space in the container yard.
- FIG. 9 shows a ship 10 and a STS crane 9 ′.
- the crane is shown to have a gantry 17 under which runs a trolley 11 forward and back in the X direction. This direction is also known as the gantry direction.
- the trolley supports a spreader 12 which holds a container 13 .
- the crane lifts the container 13 , for example, out of the ship 10 and along a path such as path P to be set down on a container, or a landing place such as a ground slot, or onto a truck or other vehicle (not shown).
- the crane 9 ′ runs on rails under each set 15 , 16 of legs in a direction in or out of the plane of the paper, indicated as a Y direction. This direction is also known as the trolley direction.
- FIG. 9 shows a ship 10 and a STS crane 9 ′.
- the crane is shown to have a gantry 17 under which runs a trolley 11 forward and back in the X direction. This direction is also known as the gantry direction.
- FIG. 2 also shows a layout of containers, cranes and container stacks in a freight terminal or harbour in a view from above the freight yard.
- FIG. 2 shows a block of containers 20 and a container crane 9 ′.
- the gantry 17 of the crane is shown supporting a container 13 (see also the container, spreader and trolley in FIG. 9 ).
- the crane runs on two rails 15 r, 16 r in the Y or gantry direction.
- the rectangular block 20 of stacked containers and ground slots 25 is a known but arbitrarily selected group of container stacks around one crane and preferably between two cranes. In this description the group 20 is called a “block” of container stacks and ground slots.
- Containers may be full size such as 40 foot containers or other sizes such as 20 foot containers 14 arranged in ground slots.
- the block is also divided into single lines of containers or ground slots in the X direction called bays 21 ; and into single lines of containers along a direction perpendicular to that which are called rows 22 .
- FIG. 3 shows three principal orthogonal axes X, Y, V with respect to a container 13 , and shows three imaginary centre lines for the container with respect to the orthogonal axes.
- the figure also shows diagrammatically a skew error S as a rotation about a vertical axis V, a list error L with which a container tends to list around its long axis and rotate about the axis Y, and a trim error T with which one of the ends of the container along the long axis hangs lower than the other end, shown as a rotation about the imaginary centre line axis X.
- the calibration processes for TPS and LPS are both absolute (i.e. relative to the yard X-Y-V coordinate system) and thus there is no need for co-calibration between the LPS and the TPS.
- the result is a high and consistent accuracy throughout the container block 20 . Since all cranes in a block are absolute calibrated using the same references their co-stacking capability is improved because any measurement error in the position of the reference targets will have the same effect on all cranes.
- the system is able to self-diagnose the status (i.e. quality) of its calibration parameter set, using the known positions of the reference targets.
- An adaptation algorithm is available for automatically adjusting parameters used by the positioning systems in order to handle the possible effect of changes in the environment, such as shifting of the rails etc. This is described in more detail below.
- the automatic calibration is enabled in part by a model-based LPS system. During production the model is able to determine very accurately the position of the spreader markers. These positions are then used to determine the position of the spreader and bottom of the load (the container 13 ) as well as the trim, list and skew.
- the calibration procedure for the crane operator consists of pressing a “start calibration” button after which the crane moves into position at the reference marker rig, the spreader markers are switched off if necessary and the rig markers 5 a - c switched on (see also Calibrate LPS button of FIG. 6 ).
- the LPS camera on the trolley detects the rig markers, measurements are made by the camera, model parameters are calculated and the crane returns to the block after restoring power to the spreader markers and switching of the calibration rig markers.
- the resulting accuracy of the calibrated model depends on the accuracy of the first or active marker 5 a - c positions.
- An offset error in their position will lead to an offset error in the camera model and an error in the top marker 5 b position will lead to a corresponding inclination error that is linear in height.
- all cranes using the same rig will get the same offsets.
- the precision of the LPS system is determined by the model errors (which are likely to be very small) and the correctness of the inclination tables (described in more detail below) in addition to the always present, uncontrollable, random errors (such as wheel position on the rail etc.).
- FIG. 4 shows a flowchart for a method of carrying out the automatic calibration on, for example, the LPS system, using the calibration rig 1 .
- the figure shows the blocks:
- the LPS calibration calculates the position of the spreader 12 and the actual position of the trolley 11 house (in both gantry and trolley directions).
- the TPS system is used to detect the position of a Target Landing Position (or lifting position) for a container 13 , as well as to measure or map positions for other container stacks etc near to the position of interest.
- TPS calibration uses the position of the trolley 11 house together with the known positions 2 , 3 , 4 (shown in FIG. 1 ) of the calibration rig.
- the TPS measures the position of the rig markers in a similar way as described above and in relation to FIG. 4 ; and adjusts its calibration parameters until the TPS measured position of the rig corresponds to the actual position of calibration rig and trolley house position.
- both cranes carry out calibrations using the same automatic calibration rig, which will ensure that both cranes will later measure the containers equally in the block.
- the TPS system uses the passive markers 6 a - c because it has a different sensor, preferably a laser scanner.
- the TPS calibration is made in sequence with and following the LPS calibration.
- the control system When pressing the “start calibration” button the control system will first make an LPS calibration (see FIG. 6 ). After an acknowledgement of a successful LPS calibration the control system then carries out the TPS calibration. The result is presented in the user interface (see partial displays in FIGS. 7-8 ). Some additional work is required on commissioning or if equipment is changed (i.e. leveling and skew determination of the TPS).
- FIG. 5 shows a flowchart for a method of carrying out the automatic calibration on, for example, the TPS system, using the calibration rig 1 .
- the figure shows in addition to the blocks 400 - 407 of the method of FIG. 4 the following blocks:
- GUI graphical user interface
- FIG. 6 shows schematically a simplified diagram for a GUI 60 which displays an interface comprising selection means for starting a calibration or automatic calibration of LPS, Calibrate LPS 62 , to calibrate a container load, Calibrate Load 66 , and to calibrate the TPS system, Calibrate TPS 64 .
- FIG. 7 shows a GUI interface 70 displaying in a schematic way information displayed during the LPS calibration process.
- LPS Sequence Info 76 which may comprise status indicators such as camera calibration started, crane in calibration position, spreader markers power on 73 (marked positive), rig markers found 71 , and Faults.
- the process info shows that the spreader markers are still on.
- LPS Result 77 displays information such as camera calibrated (indicated as completed), last camera calibration successful 76 , last camera calibration failed 74 .
- FIG. 8 shows a similar interface 80 displaying an LPS Model Validation 82 result.
- status indications for: camera check started, crane in calibration position (indicated as completed) spreader markers on 83 , rig markers found 81 (indicated as completed).
- the spreader markers are off 407 , and that the rig markers are on 406 and detected.
- the figure also shows results from a calibration including comparable figures for measurements from the trolley (TPS system) 87 and measurements from the gantry 86 .
- a Load Position System is preferably used to determine, from the trolley position and the spreader position, the instantaneous position of a container in space.
- LPS Load Position System
- data from a LPS may also be supplemented by data from external sensors.
- the measurement system of LPS and TPS may also comprise adaption methods and algorithms in order to minimize errors.
- a first way to minimize error is for a crane to always pick up a container at the same position as where another crane made the set-down; and in addition within the control system:
- TPS calibration error Some errors such as (i) TPS calibration error are constant through the block.
- Other errors such as gantry rail inclination and direction (a) depend on gantry position along the rail and are thus different from bay to bay. Error in gantry inclination also twists the trolley girder, which makes the error different from one lane to another.
- the adaptation is made individually for each ground slot but also common for actual bay, actual row and for the whole block, that is, there are four adaptions (for ground slot 25 , bay 21 , row 22 and block 20 FIG. 2 ).
- weight factors are individual for slot, bay, row and block and also individual for the adaptation between cranes, between TPS and LPS and between TPS and ground measurements.
- the adaption between LPS/TPS and between the cranes can not detect when inclination in gantry rail cause the stacks not to be erected vertically.
- the adaptation will make both cranes to stack in the same position but if one crane has a bad unknown inclination, both cranes will make a stack with half that error in inclination. Therefore there is still a need for measuring the inclination of the gantry rail.
- the inclination will be preset to zero in the position of the calibration rig. The inclination of all other positions will be determined relative to the inclination of this position, and the values stored in an inclination table.
- the processing or supervision of the calibration methods may be carried out automatically by one or more or computerised processes without any need for supervision by or actions from an operator. At any time an operator or other authorised person may access the system to display, view, inspect or analyse live data on-line or off line as required.
- the first markers have a first visual appearance but are not active markers in the sense of being illumination sources.
- the first markers may for example be highly reflective for the ambient natural light or for wavelengths associated with illumination by lamps on the spreader (or trolley) and/or wavelengths that are significant for the camera sensors.
- the second markers are passive markers that have different visual characteristics from the first markers.
- the surface may be non-reflective to particular wavelengths or highly reflective to selected, but in any case the visual and/or optical characteristics are different to those of the first markers.
- the first markers have a first visual appearance according to a first colour and the second markers have a second visual appearance according to a second colour.
- Methods of the invention may be supervised, controlled or carried out by one or more computer programs.
- One or more microprocessors comprise a central processing unit CPU connected to or comprised in one or more of the above described crane control units, which processors, PLCs or computers perform the steps of the methods according to one or more aspects of the invention, as described for example for operating or controlling a system of two industrial handlers and two presses, as described with reference to FIG. 4 .
- the computer programs for carrying out methods according to the invention may also be run on one or more general purpose industrial microprocessors or PLCs or computers instead of one or more specially adapted computers or processors.
- the computer program comprises computer program code elements or software code portions that make the computer or processor perform the methods using equations, algorithms, data, stored values, calculations, synchronisations and the like for the methods previously described, and for example in relation to the flowcharts of FIGS. 4 , 5 , and/or to the graphic user interfaces of FIGS. 6 , 7 , 8 .
- a part of the program may be stored in a processor as above, but also in a ROM, RAM, PROM, EPROM or EEPROM chip or similar memory means.
- the or some of the programs in part or in whole may also be stored locally (or centrally) on, or in, other suitable computer readable medium such as a magnetic disk, CD-ROM or DVD disk, hard disk, magneto-optical memory storage means, in volatile memory, in flash memory, as firmware, or stored on a data server.
- suitable computer readable medium such as a magnetic disk, CD-ROM or DVD disk, hard disk, magneto-optical memory storage means, in volatile memory, in flash memory, as firmware, or stored on a data server.
- Other known and suitable media including removable memory media such as Sony memory stickTM, a USB memory stick and other removable flash memories, hard drives etc. may also be used.
- the program may also in part be supplied or updated from a data network, including a public network such as the Internet.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automation & Control Theory (AREA)
- Control And Safety Of Cranes (AREA)
- Crystals, And After-Treatments Of Crystals (AREA)
- Glass Compositions (AREA)
- Ceramic Products (AREA)
Abstract
Description
- The present application is a continuation of pending International patent application PCT/EP2007/064469 filed on Dec. 21, 2007 which designates the United States and claims priority from Swedish patent application 0602790-8 filed on Dec. 21, 2006 the content of which is incorporated herein by reference.
- The invention relates to a device for automatic calibration of a container crane and a method for carrying out such an automatic calibration. The method may involve automatic and/or manual procedures.
- Container cranes are used to handle freight containers and especially to transfer containers between transport modes at container terminals, freight harbours and the like. Standard shipping containers are used to transport a great and growing volume of freight around the world. Transshipment is a critical function in freight handling. Transshipment may occur at each point of transfer and there is usually a tremendous number of containers that must be unloaded, transferred to a temporary stack, and later loaded on to another ship, back onto the same ship or loaded instead onto another form of transport. Loading and unloading containers to and from a ship takes a great deal of time. The development of automated cranes has improved loading and unloading and made the productivity more predictable, and also eliminated many situations in which port workers have been exposed to danger and injury.
- For accurate handling of containers the control systems that regulate the picking up and landing of containers must be calibrated. This may comprise calibrating sub systems of the crane control systems. For example on gantry cranes or ship-to-shore cranes (STS) that run on rails, a somewhat random error that may occur is caused by changes in one or more wheel positions on a gantry rail, which may cause a skew error. Other errors may arise from subsidence in or damage to the area the containers stand upon, so that the position of a landing slot for a container may change. In addition, when optical sensor equipment or position encoder sensors are repaired or moved a re-calibration is necessary.
- It is estimated that with today's manual procedures it may take about 4-8 hours per crane to perform a LPS (Load Position Sensor), TPS (Target Position Sensor) and co-calibration. A LPS subsystem finds the position of the load (container or empty spreader) during lifting, handling, and a TPS subsystem finds the position of a target landing place on a ground slot or on a vehicle, as well as mapping positions of other containers, container stacks etc in the vicinity of a target. In addition, depending on how much time is available, an estimated 1-4 hours may be spent on stacking tests and parameter fine-tuning. These are average estimates for a block of containers, which is a given stacking area of eg between two adjacent cranes, when the block has been emptied and taken out of production. If calibration is to be performed on a crane in a block that is in production it often takes more time than that because the procedure is interrupted and has to start over several times. In addition it is often not allowed, on safety grounds, for a maintenance person to work alone in a block of containers.
- The error in measurement may come from any of many sources such as: inclination in gantry rail; curves in gantry rail causing skew in crane position; wheel position on gantry rail causing offsets in trolley direction; wheel position on gantry rail causing skew in crane position; gantry positioning error (synchronization offset); twisted trolley girder profile causing error in measurement angle; skew of trolley platform on trolley rail; LPS system calibration error; TPS system calibration error.
- Some errors such as TPS system calibration error tend to be constant through a given block of containers. Other errors such as gantry rail inclination and direction depend on gantry position and may thus differ from bay to bay within a given block. Error in gantry inclination also twists the trolley girder, which makes the error different from one row of containers to another in the same block.
- The aim of the present invention is to provide an improved device, method and system for automatic calibration of the lifting and handling systems of a container crane.
- This and other aims are obtained by a method, and a system characterised by the attached independent claims. Advantageous embodiments are described in sub-claims to the above independent claims.
- In a first aspect of the invention a calibration device for automatic calibration of a container crane is described, wherein said container crane is controlled by a system comprising at least a first sensor and a second sensor, the device further comprising a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another.
- In an embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising at least a first sensor and a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the calibration rig is arranged in a fixed position in a container yard, freight yard or harbour.
- In an embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising at least a first sensor and/or a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the calibration rig is arranged with at least two 2 first markers comprising a surface with a first visual appearance.
- In another embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising at least a first sensor and/or a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the at least two first markers with the first visual appearance are active markers.
- In another embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising at least a first sensor and/or a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the calibration rig is arranged with at least two second markers comprising a surface with a second visual appearance.
- In another embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising at least a first sensor and/or a second sensor, and a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the at least two second markers with the second visual appearance are passive markers.
- In an embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising a calibration rig arranged in a fixed position a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein at least two first or active markers comprise an illumination source from any of the group of: IR laser, IR lamp, visible spectra lamp.
- In an embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising a calibration rig arranged in a fixed position a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein at least two second or passive markers comprise a substantially planar part bounded by at least one straight edge each arranged at the arranged at a known and fixed position.
- In an embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising a calibration rig arranged in a fixed position a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein the least two first or active markers are each arranged attached to a passive marker.
- In another embodiment of the invention a calibration device for automatic calibration of a container crane is described, said device comprising a calibration rig arranged in a fixed position a plurality of markers each arranged at a known and fixed position and distance relative to one another wherein at least two first or active markers are arranged in the same known and substantially horizontal plane and separated by a known distance and a third first or active marker is arranged substantially vertically above the first two active markers and separated by a known vertical distance.
- In an embodiment of the invention a calibration device for automatic calibration of a container crane is described, wherein said container crane is controlled by a system comprising at least a first sensor and/or a second sensor, the device further comprising a calibration rig arranged in a fixed position and comprising a plurality of markers each arranged at a known and fixed position and distance relative to one another and wherein at least first sensor is part of a load position system of the container crane and said second sensor is part of a target position system of the container crane.
- In another aspect of the invention a method for automatic calibration of a container crane is described, wherein said container crane is controlled by a system comprising at least a first sensor and/or a second sensor, and wherein by the actions of moving the crane to a position adjacent a fixed and known calibration device or rig, making an image of a plurality of markers using said at least one first sensor, and by calculating one or more position parameters for at least one control model for controlling the crane relative to a position of a load or a target landing/lifting position.
- The primary advantage of the automatic calibration device is that calibration may be carried out automatically with minimum manual intervention. For a basic calibration only a crane operators actions are necessary, and no ground personnel. The automatic process is faster than the known manual methods and saves a lot of valuable time. The time spent calibrating manually has previously involved manpower costs as well as loss of production, estimated to take 4-8 hours per crane.
- Previous manual methods also required, depending somewhat on how much time is available, an estimated 1-4 hours to be spent on stacking tests and parameter fine-tuning. The new calibration system takes around five to fifteen minutes depending on which processes are used to turn power to the LPS spreader markers on and off. In addition, the time-saving potential of the automatic calibration may be at least doubled when looking at the manpower costs for calibration because maintenance personnel are usually not allowed to work alone in a block of containers.
- Another advantage is that the new automatic calibration gives a consistent accuracy throughout a given block of containers and is the same for all cranes in the block. It depends on the accuracy of the reference markers and is independent of human skill and experience. The new method requires no special skill or experience for performing the normal calibration. Extra manual work that may be needed during commissioning or equipment change is limited to being able to measure trim, list and skew and entering these results into the system, for the LPS.
- In another embodiment of the invention a graphic user interface is disclosed which is used to carry out parts of the methods of the invention and which displays the measurements, parameters and validations of the calibrations so determined.
- Another object of the present invention is to provide an improved computer program product and a computer readable medium having a program recorded thereon, for automatically calibrating a container crane, said container crane controlled by a control system comprising at least a first sensor (LPS) and/or a second sensor (TPS) to determine a position relative to a freight container handled by a crane.
- A more complete understanding of the method and system of the present invention may be had by reference to the following detailed description when taken in conjunction with the accompanying drawings wherein:
-
FIG. 1 shows in a simplified schematic diagram a calibration rig for a container crane according to an embodiment of a first aspect of the invention; -
FIGS. 2 and 9 show simplified diagrams of a layout for container stacks and a container crane in a freight terminal or harbour; -
FIG. 3 shows a simplified diagram of a standard container illustrating axes and directions of movement; -
FIGS. 4 and 5 show flowcharts for a method of carrying out an automatic calibration of the container crane according to an embodiment of second aspect of the invention; -
FIG. 6 shows schematically an interface for displayed for an operator to select an action of the automatic calibration process according to an embodiment of the invention; -
FIGS. 7-8 shows schematically one or more interfaces for displaying method steps and other information relevant to an embodiment of the invention. -
FIG. 1 shows a simplified diagram of acalibration rig 1 according to an embodiment of a first aspect of the present invention. The rig is shown as seen from a view F in front, and has markers mounted at threepositions marker positions - At each
marker position -
FIG. 9 shows aship 10 and aSTS crane 9′. The crane is shown to have agantry 17 under which runs atrolley 11 forward and back in the X direction. This direction is also known as the gantry direction. The trolley supports aspreader 12 which holds acontainer 13. The crane lifts thecontainer 13, for example, out of theship 10 and along a path such as path P to be set down on a container, or a landing place such as a ground slot, or onto a truck or other vehicle (not shown). Thecrane 9′ runs on rails under each set 15, 16 of legs in a direction in or out of the plane of the paper, indicated as a Y direction. This direction is also known as the trolley direction.FIG. 2 also shows a layout of containers, cranes and container stacks in a freight terminal or harbour in a view from above the freight yard.FIG. 2 shows a block ofcontainers 20 and acontainer crane 9′. Thegantry 17 of the crane is shown supporting a container 13 (see also the container, spreader and trolley inFIG. 9 ). The crane runs on tworails rectangular block 20 of stacked containers andground slots 25 is a known but arbitrarily selected group of container stacks around one crane and preferably between two cranes. In this description thegroup 20 is called a “block” of container stacks and ground slots. Containers may be full size such as 40 foot containers or other sizes such as 20foot containers 14 arranged in ground slots. The block is also divided into single lines of containers or ground slots in the X direction calledbays 21; and into single lines of containers along a direction perpendicular to that which are calledrows 22. -
FIG. 3 shows three principal orthogonal axes X, Y, V with respect to acontainer 13, and shows three imaginary centre lines for the container with respect to the orthogonal axes. The figure also shows diagrammatically a skew error S as a rotation about a vertical axis V, a list error L with which a container tends to list around its long axis and rotate about the axis Y, and a trim error T with which one of the ends of the container along the long axis hangs lower than the other end, shown as a rotation about the imaginary centre line axis X. - The calibration processes for TPS and LPS are both absolute (i.e. relative to the yard X-Y-V coordinate system) and thus there is no need for co-calibration between the LPS and the TPS. The result is a high and consistent accuracy throughout the
container block 20. Since all cranes in a block are absolute calibrated using the same references their co-stacking capability is improved because any measurement error in the position of the reference targets will have the same effect on all cranes. - With the automatic calibration system there is no need of extensive, time-consuming stacking tests with tweaking or fine tuning of offsets and other adjustment parameters in order to get a satisfactory result.
- The system is able to self-diagnose the status (i.e. quality) of its calibration parameter set, using the known positions of the reference targets. An adaptation algorithm is available for automatically adjusting parameters used by the positioning systems in order to handle the possible effect of changes in the environment, such as shifting of the rails etc. This is described in more detail below.
- Automatic calibration of the LPS system is carried out using three LPS reference markers 5 a-c at accurately
determined positions FIG. 1 for marker positions on the rig). A preferred setup of these markers is to use twolower markers spreader 12, if necessary. Preferably this power on/off should be controllable automatically, from the crane or remotely. - The automatic calibration is enabled in part by a model-based LPS system. During production the model is able to determine very accurately the position of the spreader markers. These positions are then used to determine the position of the spreader and bottom of the load (the container 13) as well as the trim, list and skew.
- The calibration procedure for the crane operator consists of pressing a “start calibration” button after which the crane moves into position at the reference marker rig, the spreader markers are switched off if necessary and the rig markers 5 a-c switched on (see also Calibrate LPS button of
FIG. 6 ). The LPS camera on the trolley then detects the rig markers, measurements are made by the camera, model parameters are calculated and the crane returns to the block after restoring power to the spreader markers and switching of the calibration rig markers. - On commissioning, or if any equipment (e.g. marker boxes, IR diode, spreader etc.) is changed, there is a need to establish or re-establish the relation between the spreader and its markers. This is done by lowering the spreader and measuring its trim, list and skew (see diagram of T,L,S in
FIG. 3 ). These values are entered into the system where they are compared to the corresponding output from the LPS to create calibration variables compensating for any differences. - It is possible to let the crane return to the reference rig and have the LPS self-diagnose its calibration status. This is done by evaluating the positions of the reference markers which should equal the known, measured, positions of the reference markers.
- The resulting accuracy of the calibrated model depends on the accuracy of the first or active marker 5 a-c positions. An offset error in their position will lead to an offset error in the camera model and an error in the top marker 5 b position will lead to a corresponding inclination error that is linear in height. However, all cranes using the same rig will get the same offsets. During operation the precision of the LPS system is determined by the model errors (which are likely to be very small) and the correctness of the inclination tables (described in more detail below) in addition to the always present, uncontrollable, random errors (such as wheel position on the rail etc.).
-
FIG. 4 shows a flowchart for a method of carrying out the automatic calibration on, for example, the LPS system, using thecalibration rig 1. The figure shows the blocks: -
- 400 start calibration, the operator press a start button (eg Calibrate
LPS 62FIG. 6 ) - 402 move crane to calibration rig position,—the crane is moved to be adjacent to the calibration rig, preferably automatically,
- 406 switch on markers on the rig, the active markers 5 a-c are switched on,
- 407 the markers on the crane spreader are switched off, if that is necessary, so that the sensor system detects the calibration rig and is not affected by the spreader marker light sources,
- 408 make image of rig markers relative to the trolley with LPS camera, so that the positions of the active rig markers 5 a-c are found and measured,
- 410 calculate relative position of rig markers to trolley, the measured positions of the rig markers extracted from the marker image data are compared to stored values for the marker positions,
- 412 calculate/update parameters for model, after comparison the model values may be updated from the measured values if the measured values are, upon checking, found to be valid,
- 413 Present results on a
graphic interface example items FIG. 8 ,
- 400 start calibration, the operator press a start button (eg Calibrate
- which is then followed by the actions of moving crane away from calibration rig, and switching off the rig markers, and switching on the spreader markers (if the spreader markers had been switched off in 407).
- The LPS calibration calculates the position of the
spreader 12 and the actual position of thetrolley 11 house (in both gantry and trolley directions). As noted previously, the TPS system is used to detect the position of a Target Landing Position (or lifting position) for acontainer 13, as well as to measure or map positions for other container stacks etc near to the position of interest. TPS calibration uses the position of thetrolley 11 house together with the knownpositions FIG. 1 ) of the calibration rig. The TPS measures the position of the rig markers in a similar way as described above and in relation toFIG. 4 ; and adjusts its calibration parameters until the TPS measured position of the rig corresponds to the actual position of calibration rig and trolley house position. When more than one crane are arranged together both cranes carry out calibrations using the same automatic calibration rig, which will ensure that both cranes will later measure the containers equally in the block. However the TPS system uses the passive markers 6 a-c because it has a different sensor, preferably a laser scanner. - The TPS calibration is made in sequence with and following the LPS calibration. When pressing the “start calibration” button the control system will first make an LPS calibration (see
FIG. 6 ). After an acknowledgement of a successful LPS calibration the control system then carries out the TPS calibration. The result is presented in the user interface (see partial displays inFIGS. 7-8 ). Some additional work is required on commissioning or if equipment is changed (i.e. leveling and skew determination of the TPS). -
FIG. 5 shows a flowchart for a method of carrying out the automatic calibration on, for example, the TPS system, using thecalibration rig 1. The figure shows in addition to the blocks 400-407 of the method ofFIG. 4 the following blocks: -
- 508 make image of rig markers relative to trolley house with TPS sensor; so that markers 6 a-c are detected by trolley sensor or laser scanner,
- 510 calculate relative position of rig markers to trolley house; similar to 410 image data is processed to extract a position for markers 6 a-c,
- 512 calculate/update parameters for model; the measured positions are validated and compared to stored values, and parameters updated where necessary,
- 513 Present results on a graphic interface, similar to the examples in
FIG. 8 .
- A graphical user interface (GUI) may be used to display one or more of the information or values obtained using the system and methods described above.
FIG. 6 shows schematically a simplified diagram for aGUI 60 which displays an interface comprising selection means for starting a calibration or automatic calibration of LPS, CalibrateLPS 62, to calibrate a container load, CalibrateLoad 66, and to calibrate the TPS system, CalibrateTPS 64.FIG. 7 shows aGUI interface 70 displaying in a schematic way information displayed during the LPS calibration process. The figure shows information about stages in the process,LPS Sequence Info 76, which may comprise status indicators such as camera calibration started, crane in calibration position, spreader markers power on 73 (marked positive), rig markers found 71, and Faults. In the figure the process info shows that the spreader markers are still on.LPS Result 77 displays information such as camera calibrated (indicated as completed), last camera calibration successful 76, last camera calibration failed 74. -
FIG. 8 shows asimilar interface 80 displaying anLPS Model Validation 82 result. Among the information determined during the calibration and displayed on this type of interface are status indications for: camera check started, crane in calibration position (indicated as completed) spreader markers on 83, rig markers found 81 (indicated as completed). Thus an operator would understand that the crane has moved over to therig 402FIG. 4 , the spreader markers are off 407, and that the rig markers are on 406 and detected. The figure also shows results from a calibration including comparable figures for measurements from the trolley (TPS system) 87 and measurements from thegantry 86. - As described above, a Load Position System (LPS) is preferably used to determine, from the trolley position and the spreader position, the instantaneous position of a container in space. However it is also possible to determine the position of the container under the spreader by means of external sensors. In addition, data from a LPS may also be supplemented by data from external sensors.
- The measurement system of LPS and TPS may also comprise adaption methods and algorithms in order to minimize errors. A first way to minimize error is for a crane to always pick up a container at the same position as where another crane made the set-down; and in addition within the control system:
-
- LPS system should report the same position as where TPS measured the container at a pickup of a container, and
- TPS system should measure the ground markers to be in nominal position. Ground markers are markers fixed on the ground which indicate the position of one or more ground slots.
- Errors in measurement while handling containers may come from many possible sources:
-
- a) Inclination in gantry rail
- b) Curves in gantry rail causing skew in crane position
- c) Wheel position on gantry rail causing offsets in trolley direction
- d) Wheel position on gantry rail causing skew in crane position
- e) Gantry positioning error (synchronization offset)
- f) Twisted trolley girder profile causing error in measurement angle
- g) Skew of trolley platform on trolley rail
- h) LPS calibration error
- i) TPS calibration error
- Some errors such as (i) TPS calibration error are constant through the block. Other errors such as gantry rail inclination and direction (a) depend on gantry position along the rail and are thus different from bay to bay. Error in gantry inclination also twists the trolley girder, which makes the error different from one lane to another. To take care of the different types of errors the adaptation is made individually for each ground slot but also common for actual bay, actual row and for the whole block, that is, there are four adaptions (for
ground slot 25,bay 21,row 22 and block 20FIG. 2 ). - There are errors that are stochastic such as wheel position on gantry rail. To reduce the impact of those errors on the adaptation only a small part of the measurement difference (about 5%) is used for adjustment of the system. How much is defined using weight factors, the weight factors are individual for slot, bay, row and block and also individual for the adaptation between cranes, between TPS and LPS and between TPS and ground measurements.
- The adaption between LPS/TPS and between the cranes can not detect when inclination in gantry rail cause the stacks not to be erected vertically. The adaptation will make both cranes to stack in the same position but if one crane has a bad unknown inclination, both cranes will make a stack with half that error in inclination. Therefore there is still a need for measuring the inclination of the gantry rail. The inclination will be preset to zero in the position of the calibration rig. The inclination of all other positions will be determined relative to the inclination of this position, and the values stored in an inclination table.
- The processing or supervision of the calibration methods may be carried out automatically by one or more or computerised processes without any need for supervision by or actions from an operator. At any time an operator or other authorised person may access the system to display, view, inspect or analyse live data on-line or off line as required.
- In another embodiment the first markers have a first visual appearance but are not active markers in the sense of being illumination sources. The first markers may for example be highly reflective for the ambient natural light or for wavelengths associated with illumination by lamps on the spreader (or trolley) and/or wavelengths that are significant for the camera sensors. The second markers are passive markers that have different visual characteristics from the first markers. The surface may be non-reflective to particular wavelengths or highly reflective to selected, but in any case the visual and/or optical characteristics are different to those of the first markers. In its simplest form the first markers have a first visual appearance according to a first colour and the second markers have a second visual appearance according to a second colour. By means of the first and second visual appearance it is clear to the system which set of markers are being detected, registered and/or photographed.
- Methods of the invention may be supervised, controlled or carried out by one or more computer programs. One or more microprocessors (or processors or computers) comprise a central processing unit CPU connected to or comprised in one or more of the above described crane control units, which processors, PLCs or computers perform the steps of the methods according to one or more aspects of the invention, as described for example for operating or controlling a system of two industrial handlers and two presses, as described with reference to
FIG. 4 . It is to be understood that the computer programs for carrying out methods according to the invention may also be run on one or more general purpose industrial microprocessors or PLCs or computers instead of one or more specially adapted computers or processors. - The computer program comprises computer program code elements or software code portions that make the computer or processor perform the methods using equations, algorithms, data, stored values, calculations, synchronisations and the like for the methods previously described, and for example in relation to the flowcharts of
FIGS. 4 , 5, and/or to the graphic user interfaces ofFIGS. 6 , 7, 8. A part of the program may be stored in a processor as above, but also in a ROM, RAM, PROM, EPROM or EEPROM chip or similar memory means. The or some of the programs in part or in whole may also be stored locally (or centrally) on, or in, other suitable computer readable medium such as a magnetic disk, CD-ROM or DVD disk, hard disk, magneto-optical memory storage means, in volatile memory, in flash memory, as firmware, or stored on a data server. Other known and suitable media, including removable memory media such as Sony memory stick™, a USB memory stick and other removable flash memories, hard drives etc. may also be used. The program may also in part be supplied or updated from a data network, including a public network such as the Internet. - It should be noted that while the above describes exemplifying embodiments of the invention, there are several variations and modifications which may be made to the disclosed solution without departing from the scope of the present invention as defined in the appended claims.
Claims (18)
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE0602790 | 2006-12-21 | ||
SE0602790-8 | 2006-12-21 | ||
SE0602790A SE530490C2 (en) | 2006-12-21 | 2006-12-21 | Calibration device, method and system for a container crane |
PCT/EP2007/064469 WO2008074882A1 (en) | 2006-12-21 | 2007-12-21 | Calibration device, method and system for a container crane |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2007/064469 Continuation WO2008074882A1 (en) | 2006-12-21 | 2007-12-21 | Calibration device, method and system for a container crane |
Publications (2)
Publication Number | Publication Date |
---|---|
US20090326718A1 true US20090326718A1 (en) | 2009-12-31 |
US8267264B2 US8267264B2 (en) | 2012-09-18 |
Family
ID=39183070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/487,276 Active 2029-09-12 US8267264B2 (en) | 2006-12-21 | 2009-06-18 | Calibration device, method and system for a container crane |
Country Status (10)
Country | Link |
---|---|
US (1) | US8267264B2 (en) |
EP (1) | EP2102089B1 (en) |
KR (1) | KR101465814B1 (en) |
CN (1) | CN101573286B (en) |
AT (1) | ATE465119T1 (en) |
CA (1) | CA2672056C (en) |
DE (1) | DE602007006056D1 (en) |
ES (1) | ES2344374T3 (en) |
SE (1) | SE530490C2 (en) |
WO (1) | WO2008074882A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102367158A (en) * | 2011-09-15 | 2012-03-07 | 济南富友慧明监控设备有限公司 | Method for determining tower crane roll-over critical state base on rigidity of tower body |
CN102367159A (en) * | 2011-09-15 | 2012-03-07 | 济南富友慧明监控设备有限公司 | Method for determining missed drawing of tower crane |
US20120283868A1 (en) * | 2011-05-04 | 2012-11-08 | Rutt John D | Generation of plans for loading and unloading a container |
US9108571B2 (en) | 2011-12-12 | 2015-08-18 | Google Inc. | Method, system, and computer program product for image capture positioning using a pattern of invisible light |
US20160031682A1 (en) * | 2014-07-31 | 2016-02-04 | Par Systems, Inc. | Crane motion control |
CN113044736A (en) * | 2021-06-01 | 2021-06-29 | 新乡职业技术学院 | Crane with sling stability control |
US11079060B2 (en) | 2017-02-24 | 2021-08-03 | Pilkington Group Limited | Universal target stand for ADAS calibration |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2157041B1 (en) * | 2008-08-20 | 2013-06-12 | Siemens Aktiengesellschaft | Method and system for calculating a position of an object in a container crane facility and control program for a measuring device |
DE102009060513B4 (en) * | 2009-12-23 | 2013-11-14 | Siemens Aktiengesellschaft | Method of aligning a towing vehicle, control program and route guidance system |
TWI415785B (en) * | 2011-01-12 | 2013-11-21 | Inotera Memories Inc | Overhead hoist transport system and operating method thereof |
US9096294B1 (en) * | 2011-06-20 | 2015-08-04 | The United States Of America As Represented By The Secretary Of The Navy | Trolley-payload inter-ship transfer system |
EP2562125B1 (en) * | 2011-08-26 | 2014-01-22 | Liebherr-Werk Nenzing GmbH | Crane control apparatus |
US9415976B2 (en) * | 2012-05-10 | 2016-08-16 | Trimble Navigation Limited | Crane collision avoidance |
DE102013202413A1 (en) | 2013-02-14 | 2014-08-14 | Siemens Aktiengesellschaft | Method for calibrating a mobile crane part of a crane |
EP2910512B1 (en) * | 2014-02-21 | 2016-05-25 | Siemens Aktiengesellschaft | Method for calibrating laser scanners to a container transportation crane |
EP3056464A1 (en) * | 2015-02-11 | 2016-08-17 | Siemens Aktiengesellschaft | Automated crane control taking into account load and location dependent measurement errors |
US9924103B2 (en) * | 2015-04-09 | 2018-03-20 | The Boeing Company | Automated local positioning system calibration using optically readable markers |
CN105480864B (en) * | 2016-01-20 | 2017-05-10 | 上海振华重工电气有限公司 | Automatic detecting and calibrating system and method for container crane |
US10544012B2 (en) | 2016-01-29 | 2020-01-28 | Manitowoc Crane Companies, Llc | Visual outrigger monitoring system |
US10829347B2 (en) | 2016-11-22 | 2020-11-10 | Manitowoc Crane Companies, Llc | Optical detection system for lift crane |
US10323936B2 (en) * | 2016-12-30 | 2019-06-18 | Bosch Automotive Service Solutions Inc. | Calibration system for sensors and cameras on vehicles |
TWI612006B (en) * | 2017-01-13 | 2018-01-21 | 中國鋼鐵股份有限公司 | Slab automatic storage system and operation method thereof |
DE102017112661A1 (en) * | 2017-06-08 | 2018-12-13 | Konecranes Global Corporation | Automatically guided portal lifting device for containers and method for operating such a portal lifting device |
CN107445067B (en) * | 2017-08-01 | 2020-01-10 | 集美大学 | Automatic loading and unloading system for container tyre crane |
CN107449499B (en) * | 2017-09-30 | 2020-07-28 | 南京中高知识产权股份有限公司 | Container unbalance loading value detection system and working method thereof |
US10759635B2 (en) | 2018-06-05 | 2020-09-01 | Abraham Ben Seutter | SIDAS—spreader impact damage avoidance system |
EP3699136A1 (en) * | 2019-02-25 | 2020-08-26 | ABB Schweiz AG | Container crane comprising reference marker |
DE102019206831A1 (en) * | 2019-05-10 | 2020-11-12 | Thyssenkrupp Ag | Device and method for at least partially automated computer-aided positioning of at least one goods / material flow unit |
CN110143524A (en) * | 2019-05-22 | 2019-08-20 | 武汉前兴科技股份有限公司 | Automatic container system of putting based on visual detection |
WO2022006629A1 (en) | 2020-07-07 | 2022-01-13 | Amlab Pty Ltd | Mapping of a crane spreader and a crane spreader target |
CN112441500A (en) * | 2020-11-27 | 2021-03-05 | 江西省丰和泰重工科技有限公司 | Hoisting quick positioning mechanism of tower crane |
US12195306B2 (en) | 2021-04-12 | 2025-01-14 | Structural Services, Inc. | Systems and methods for identifying and locating building material objects |
KR20240007160A (en) | 2021-04-12 | 2024-01-16 | 스트럭처럴 서비시스, 인크. | Systems and methods for supporting crane operators |
CN114180458B (en) * | 2021-11-04 | 2024-07-16 | 珠海三一港口机械有限公司 | Container hoisting equipment, hoisting control method, computer equipment and storage medium |
CN115849195B (en) * | 2022-11-16 | 2023-12-19 | 上海西井科技股份有限公司 | Self-adaptive alignment calibration method, system, equipment and storage medium for transportation equipment |
CN118464094B (en) * | 2024-07-09 | 2024-09-10 | 交通运输部天津水运工程科学研究所 | In-situ calibration method and system for structural sensors for port infrastructure performance monitoring |
Citations (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4281342A (en) * | 1978-03-29 | 1981-07-28 | Hitachi, Ltd. | Mark detecting system using image pickup device |
US4784420A (en) * | 1986-03-12 | 1988-11-15 | Hitachi, Ltd. | Orientation control apparatus for suspender |
US5491549A (en) * | 1992-11-03 | 1996-02-13 | Siemens Aktiengesellschaft | Apparatus for acquiring pendulum oscillations of crane loads using measurement techniques |
US5878896A (en) * | 1993-08-13 | 1999-03-09 | Caillard | Method for controlling the swinging of a hanging load and device for the implementation of the method |
US6124932A (en) * | 1996-04-10 | 2000-09-26 | Tax; Hans | Method for target-path correction of a load carrier and target-detection device and directional beam-emitting unit for performance of said method |
US6145680A (en) * | 1997-09-24 | 2000-11-14 | Kci Konecranes International Plc | Apparatus for reducing overload and dampening collision energy |
US6182843B1 (en) * | 1994-05-11 | 2001-02-06 | Tax Ingenieurgesellschaft Mbh | Method for the target path correction of a load carrier and load transport apparatus |
US6229473B1 (en) * | 1996-08-05 | 2001-05-08 | Siemens Aktiengesellschaft | Arrangements for the one-dimensional or multi-dimensional determination of the position of a load suspension point in hoists |
US6234332B1 (en) * | 1994-03-28 | 2001-05-22 | Mitsubishi Jukogyo Kabushiki Kaisha | Swaying hoisted load-piece damping control apparatus |
US6256553B1 (en) * | 1995-11-14 | 2001-07-03 | Sime Oy | Method and device to pick up, transport and put down a load |
US6351720B1 (en) * | 1997-10-24 | 2002-02-26 | Mitsubishi Heavy Industries, Ltd. | Trolley camera position detecting apparatus |
US20020024598A1 (en) * | 2000-07-25 | 2002-02-28 | Satoshi Kunimitsu | Detecting system for container's location |
US20020191813A1 (en) * | 2000-10-27 | 2002-12-19 | Kouji Uchida | Container position measuring method and device for cargo crane and container landing/stacking method |
US6505998B1 (en) * | 1997-08-20 | 2003-01-14 | Global Innovations, Inc. | Ground treatment |
US20040026349A1 (en) * | 2002-05-08 | 2004-02-12 | The Stanley Works | Methods and apparatus for manipulation of heavy payloads with intelligent assist devices |
US20050016005A1 (en) * | 1999-12-14 | 2005-01-27 | Voecks Larry A. | Apparatus and method for measuring and controlling pendulum motion |
US20050192702A1 (en) * | 2002-03-15 | 2005-09-01 | Jannis Moutsokapas | Optical device for the automatic loading and unloading of containers onto vehicles |
US20050232626A1 (en) * | 2002-09-30 | 2005-10-20 | Siemens Aktiengesellschaft | Method and device for determining a swinging motion of a load suspended from a lifting gear |
US20050281644A1 (en) * | 2002-11-07 | 2005-12-22 | Siemens Aktiengesellschaft | Container crane, and method of determining and correcting a misalignment between a load-carrying frame and a transport vehicle |
US7040496B2 (en) * | 2001-03-23 | 2006-05-09 | Kci Konecranes Plc | Arrangement for placing crane mechanisms |
US7123132B2 (en) * | 2001-10-26 | 2006-10-17 | Abb Ab | Chassis alignment system |
US7137771B2 (en) * | 2002-09-30 | 2006-11-21 | Siemens Aktiengesellschaft | Method and device for recognition of a load on a lifting gear |
US7950539B2 (en) * | 2005-06-28 | 2011-05-31 | Abb Ab | Load control device for a crane |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE502609C2 (en) | 1990-03-28 | 1995-11-20 | Asea Brown Boveri | Moving of goods with container cranes |
US5089972A (en) * | 1990-12-13 | 1992-02-18 | Nachman Precision Systems, Inc. | Moored ship motion determination system |
JP3329844B2 (en) * | 1991-10-09 | 2002-09-30 | 社団法人港湾荷役機械化協会 | Container handling equipment |
SE513174C2 (en) | 1998-10-22 | 2000-07-24 | Abb Ab | Process for handling containers and apparatus for carrying out the process |
FR2791963B1 (en) | 1999-04-09 | 2001-06-29 | Nfm Tech | METHOD FOR LOADING A CONTAINER ONTO A PLATFORM WITH A MEANS OF TRANSPORT AND INSTALLATION FOR STORING AND HANDLING CONTAINERS |
ES2247001T3 (en) * | 2000-08-11 | 2006-03-01 | Gottwald Port Technology Gmbh | LOADING DEVICE FOR ISO CONTAINERS. |
KR100372099B1 (en) * | 2000-09-05 | 2003-02-11 | 주식회사 포스콘 | Crane automated control system |
KR200220758Y1 (en) * | 2000-11-18 | 2001-04-16 | 포항종합제철주식회사 | Automatic alignment correction appratus for distance measurement of crane |
JP4856394B2 (en) * | 2005-05-09 | 2012-01-18 | Ihi運搬機械株式会社 | Object position measuring apparatus for container crane and automatic cargo handling apparatus using the object position measuring apparatus |
ES2401439T3 (en) * | 2006-08-29 | 2013-04-19 | Abb Ab | Load control device for a crane |
KR100944684B1 (en) * | 2007-09-19 | 2010-02-26 | 이인옥 | How to choose beacons for location-aware systems |
-
2006
- 2006-12-21 SE SE0602790A patent/SE530490C2/en not_active IP Right Cessation
-
2007
- 2007-12-21 EP EP07858080A patent/EP2102089B1/en active Active
- 2007-12-21 CN CN2007800474133A patent/CN101573286B/en active Active
- 2007-12-21 CA CA2672056A patent/CA2672056C/en not_active Expired - Fee Related
- 2007-12-21 KR KR1020097012875A patent/KR101465814B1/en active Active
- 2007-12-21 AT AT07858080T patent/ATE465119T1/en not_active IP Right Cessation
- 2007-12-21 ES ES07858080T patent/ES2344374T3/en active Active
- 2007-12-21 WO PCT/EP2007/064469 patent/WO2008074882A1/en active Application Filing
- 2007-12-21 DE DE602007006056T patent/DE602007006056D1/en active Active
-
2009
- 2009-06-18 US US12/487,276 patent/US8267264B2/en active Active
Patent Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4281342A (en) * | 1978-03-29 | 1981-07-28 | Hitachi, Ltd. | Mark detecting system using image pickup device |
US4784420A (en) * | 1986-03-12 | 1988-11-15 | Hitachi, Ltd. | Orientation control apparatus for suspender |
US5491549A (en) * | 1992-11-03 | 1996-02-13 | Siemens Aktiengesellschaft | Apparatus for acquiring pendulum oscillations of crane loads using measurement techniques |
US5878896A (en) * | 1993-08-13 | 1999-03-09 | Caillard | Method for controlling the swinging of a hanging load and device for the implementation of the method |
US6234332B1 (en) * | 1994-03-28 | 2001-05-22 | Mitsubishi Jukogyo Kabushiki Kaisha | Swaying hoisted load-piece damping control apparatus |
US6182843B1 (en) * | 1994-05-11 | 2001-02-06 | Tax Ingenieurgesellschaft Mbh | Method for the target path correction of a load carrier and load transport apparatus |
US6256553B1 (en) * | 1995-11-14 | 2001-07-03 | Sime Oy | Method and device to pick up, transport and put down a load |
US6124932A (en) * | 1996-04-10 | 2000-09-26 | Tax; Hans | Method for target-path correction of a load carrier and target-detection device and directional beam-emitting unit for performance of said method |
US6229473B1 (en) * | 1996-08-05 | 2001-05-08 | Siemens Aktiengesellschaft | Arrangements for the one-dimensional or multi-dimensional determination of the position of a load suspension point in hoists |
US6505998B1 (en) * | 1997-08-20 | 2003-01-14 | Global Innovations, Inc. | Ground treatment |
US6145680A (en) * | 1997-09-24 | 2000-11-14 | Kci Konecranes International Plc | Apparatus for reducing overload and dampening collision energy |
US6351720B1 (en) * | 1997-10-24 | 2002-02-26 | Mitsubishi Heavy Industries, Ltd. | Trolley camera position detecting apparatus |
US20050016005A1 (en) * | 1999-12-14 | 2005-01-27 | Voecks Larry A. | Apparatus and method for measuring and controlling pendulum motion |
US20020024598A1 (en) * | 2000-07-25 | 2002-02-28 | Satoshi Kunimitsu | Detecting system for container's location |
US20020191813A1 (en) * | 2000-10-27 | 2002-12-19 | Kouji Uchida | Container position measuring method and device for cargo crane and container landing/stacking method |
US7040496B2 (en) * | 2001-03-23 | 2006-05-09 | Kci Konecranes Plc | Arrangement for placing crane mechanisms |
US7123132B2 (en) * | 2001-10-26 | 2006-10-17 | Abb Ab | Chassis alignment system |
US20050192702A1 (en) * | 2002-03-15 | 2005-09-01 | Jannis Moutsokapas | Optical device for the automatic loading and unloading of containers onto vehicles |
US20040026349A1 (en) * | 2002-05-08 | 2004-02-12 | The Stanley Works | Methods and apparatus for manipulation of heavy payloads with intelligent assist devices |
US20050232626A1 (en) * | 2002-09-30 | 2005-10-20 | Siemens Aktiengesellschaft | Method and device for determining a swinging motion of a load suspended from a lifting gear |
US7137771B2 (en) * | 2002-09-30 | 2006-11-21 | Siemens Aktiengesellschaft | Method and device for recognition of a load on a lifting gear |
US7331477B2 (en) * | 2002-09-30 | 2008-02-19 | Siemens Aktiengesellschaft | Method and device for determining a swinging motion of a load suspended from a lifting gear |
US20050281644A1 (en) * | 2002-11-07 | 2005-12-22 | Siemens Aktiengesellschaft | Container crane, and method of determining and correcting a misalignment between a load-carrying frame and a transport vehicle |
US7950539B2 (en) * | 2005-06-28 | 2011-05-31 | Abb Ab | Load control device for a crane |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120283868A1 (en) * | 2011-05-04 | 2012-11-08 | Rutt John D | Generation of plans for loading and unloading a container |
US9171277B2 (en) * | 2011-05-04 | 2015-10-27 | Victaulic Company | Generation of plans for loading and unloading a container |
CN102367158A (en) * | 2011-09-15 | 2012-03-07 | 济南富友慧明监控设备有限公司 | Method for determining tower crane roll-over critical state base on rigidity of tower body |
CN102367159A (en) * | 2011-09-15 | 2012-03-07 | 济南富友慧明监控设备有限公司 | Method for determining missed drawing of tower crane |
US9108571B2 (en) | 2011-12-12 | 2015-08-18 | Google Inc. | Method, system, and computer program product for image capture positioning using a pattern of invisible light |
US20160031682A1 (en) * | 2014-07-31 | 2016-02-04 | Par Systems, Inc. | Crane motion control |
US9776838B2 (en) * | 2014-07-31 | 2017-10-03 | Par Systems, Inc. | Crane motion control |
US11079060B2 (en) | 2017-02-24 | 2021-08-03 | Pilkington Group Limited | Universal target stand for ADAS calibration |
US20210356069A1 (en) * | 2017-02-24 | 2021-11-18 | Pilkington Group Limited | Universal target stand for adas static calibration, method of using the same, target plate for the same and use of a mat for the same |
US12060966B2 (en) * | 2017-02-24 | 2024-08-13 | Pilkington Group Limited | Universal target stand for ADAS static calibration, method of using the same, target plate for the same and use of a mat for the same |
CN113044736A (en) * | 2021-06-01 | 2021-06-29 | 新乡职业技术学院 | Crane with sling stability control |
Also Published As
Publication number | Publication date |
---|---|
KR101465814B1 (en) | 2014-11-26 |
CA2672056A1 (en) | 2008-06-26 |
KR20090106482A (en) | 2009-10-09 |
SE530490C2 (en) | 2008-06-24 |
EP2102089B1 (en) | 2010-04-21 |
ATE465119T1 (en) | 2010-05-15 |
CA2672056C (en) | 2013-03-26 |
SE0602790L (en) | 2008-06-22 |
CN101573286A (en) | 2009-11-04 |
ES2344374T3 (en) | 2010-08-25 |
US8267264B2 (en) | 2012-09-18 |
WO2008074882A1 (en) | 2008-06-26 |
CN101573286B (en) | 2013-04-17 |
EP2102089A1 (en) | 2009-09-23 |
DE602007006056D1 (en) | 2010-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8267264B2 (en) | Calibration device, method and system for a container crane | |
CN104860203B (en) | The method that laser scanner on container transshipment crane is calibrated | |
CN105480864B (en) | Automatic detecting and calibrating system and method for container crane | |
US10562188B1 (en) | Automated package registration systems, devices, and methods | |
JP4300118B2 (en) | Optical device for automatic loading and unloading of containers on vehicles | |
EP1123243B1 (en) | Method for handling containers and a means to carry out a method for selecting a desired position on a stacking target | |
US20070289931A1 (en) | Load control device for a crane | |
JP4712388B2 (en) | Container crane | |
EP1894881A2 (en) | Load control device for a crane | |
CN111618842A (en) | Vision calibration system for robotic carton unloading | |
CN109835815B (en) | Automatic calibration method and system for container crane | |
CN111606205A (en) | Container crane comprising a reference mark | |
CN205472298U (en) | Automatic calibration system that detects of container crane | |
KR20120060901A (en) | Chassis alignment system | |
JP7504147B2 (en) | Initial setup method for unmanned forklift, adjustment pallet, and adjustment system for unmanned forklift | |
CN216583872U (en) | Lifting appliance positioning control system and engineering machinery | |
TW202334012A (en) | A vehicle-portable grid assessment device | |
US20220044192A1 (en) | Managing automated guidance and validation of stacking items to handling units | |
CN114555511B (en) | Hoist position control | |
CN114590507A (en) | Positioning system and positioning method | |
US20240428184A1 (en) | Computer vision based inventory system at industrial plants | |
CN117446520B (en) | Container stacking method, device, electronic equipment and storage medium | |
WO2024263191A1 (en) | Computer vision based inventory system at industrial plants | |
JP4186230B2 (en) | Teaching unit for overhead traveling vehicle system and method for acquiring delivery data | |
WO2022244209A1 (en) | Patrol route determination system, patrol route determination method, and non-transitory computer-readable medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: ABB AB, SWEDEN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BRYFORS, UNO;HENRIKSSON, BJORN;LINDEBERG, ERIK;AND OTHERS;REEL/FRAME:023284/0888;SIGNING DATES FROM 20090604 TO 20090911 Owner name: ABB AB, SWEDEN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BRYFORS, UNO;HENRIKSSON, BJORN;LINDEBERG, ERIK;AND OTHERS;SIGNING DATES FROM 20090604 TO 20090911;REEL/FRAME:023284/0888 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
AS | Assignment |
Owner name: ABB SCHWEIZ AG, SWITZERLAND Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ABB AB;REEL/FRAME:045713/0398 Effective date: 20171024 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 12 |