US20090178797A1 - Groundwater monitoring technologies applied to carbon dioxide sequestration - Google Patents
Groundwater monitoring technologies applied to carbon dioxide sequestration Download PDFInfo
- Publication number
- US20090178797A1 US20090178797A1 US12/351,834 US35183409A US2009178797A1 US 20090178797 A1 US20090178797 A1 US 20090178797A1 US 35183409 A US35183409 A US 35183409A US 2009178797 A1 US2009178797 A1 US 2009178797A1
- Authority
- US
- United States
- Prior art keywords
- pressure
- fluid
- canister
- canisters
- pressure canister
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 55
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 title description 26
- 229910002092 carbon dioxide Inorganic materials 0.000 title description 13
- 239000001569 carbon dioxide Substances 0.000 title description 13
- 239000003673 groundwater Substances 0.000 title description 12
- 238000005516 engineering process Methods 0.000 title description 4
- 230000009919 sequestration Effects 0.000 title description 3
- 239000012530 fluid Substances 0.000 claims abstract description 106
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 26
- 238000011065 in-situ storage Methods 0.000 claims abstract description 23
- 238000003032 molecular docking Methods 0.000 claims description 25
- 238000005755 formation reaction Methods 0.000 description 20
- 238000000034 method Methods 0.000 description 14
- 229910000831 Steel Inorganic materials 0.000 description 10
- 239000007789 gas Substances 0.000 description 10
- 239000010959 steel Substances 0.000 description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 9
- 239000000463 material Substances 0.000 description 8
- 238000005070 sampling Methods 0.000 description 8
- 239000004677 Nylon Substances 0.000 description 6
- 230000008901 benefit Effects 0.000 description 6
- 229920001778 nylon Polymers 0.000 description 6
- 230000008569 process Effects 0.000 description 5
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 4
- 238000002955 isolation Methods 0.000 description 4
- 230000007774 longterm Effects 0.000 description 4
- 239000003245 coal Substances 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000010926 purge Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 239000010935 stainless steel Substances 0.000 description 3
- 229910001220 stainless steel Inorganic materials 0.000 description 3
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 2
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 239000003086 colorant Substances 0.000 description 2
- 238000013502 data validation Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 229910001873 dinitrogen Inorganic materials 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 239000001257 hydrogen Substances 0.000 description 2
- 229910052739 hydrogen Inorganic materials 0.000 description 2
- 239000003915 liquefied petroleum gas Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000002680 soil gas Substances 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 241000282537 Mandrillus sphinx Species 0.000 description 1
- CBENFWSGALASAD-UHFFFAOYSA-N Ozone Chemical compound [O-][O+]=O CBENFWSGALASAD-UHFFFAOYSA-N 0.000 description 1
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 1
- UQZIWOQVLUASCR-UHFFFAOYSA-N alumane;titanium Chemical compound [AlH3].[Ti] UQZIWOQVLUASCR-UHFFFAOYSA-N 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 239000007795 chemical reaction product Substances 0.000 description 1
- 238000004040 coloring Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 235000012489 doughnuts Nutrition 0.000 description 1
- 239000011152 fibreglass Substances 0.000 description 1
- 239000013505 freshwater Substances 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 239000002927 high level radioactive waste Substances 0.000 description 1
- 238000010952 in-situ formation Methods 0.000 description 1
- 238000012625 in-situ measurement Methods 0.000 description 1
- 238000011545 laboratory measurement Methods 0.000 description 1
- 239000002925 low-level radioactive waste Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 150000002739 metals Chemical class 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 238000010943 off-gassing Methods 0.000 description 1
- 230000033116 oxidation-reduction process Effects 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000011780 sodium chloride Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 239000012209 synthetic fiber Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
- E21B41/0057—Disposal of a fluid by injection into a subterranean formation
- E21B41/0064—Carbon dioxide sequestration
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/124—Units with longitudinally-spaced plugs for isolating the intermediate space
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02C—CAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
- Y02C20/00—Capture or disposal of greenhouse gases
- Y02C20/40—Capture or disposal of greenhouse gases of CO2
Definitions
- One method of dealing with the carbon dioxide reaction product from coal refinement is to sequester the carbon dioxide in fractured rock formations to form subterranean carbon dioxide reservoirs. These reservoirs can be thousands of feet below ground surface (bgs).
- the carbon dioxide levels should be accurately monitored from subsurface wells in order to detect at an early stage whether leakage or seepage problems may be occurring.
- down-hole containerization and measurement of groundwater samples in corrosive and saline environments has become increasingly important.
- other fluids such as liquefied petroleum gas (LPG) and high and low level radioactive waste repositories are critical to monitor.
- LPG liquefied petroleum gas
- radioactive waste repositories are critical to monitor.
- monitoring any or all of these fluids at their actual in-situ temperature and pressure in order to attain greater accuracy can be particularly challenging.
- the present invention is directed toward a fluid monitoring system for a subsurface well in a subterranean formation.
- the fluid monitoring system includes a first zone isolator; a second zone isolator, a fluid inlet, a first pressure canister and a first gas-in line.
- the first and second zone isolators are positioned in the subsurface well.
- the fluid inlet receives fluid from the subterranean formation.
- the first pressure canister is positioned between the first zone isolator and the second zone isolator.
- the first pressure canister receives the fluid at an in-situ pressure.
- the first gas-in line selectively delivers a gas to the first pressure canister to pressurize the first pressure canister so that the first pressure canister is adapted to be removed from the subsurface well at a substantially similar pressure as the in-situ pressure.
- the first pressure canister receives the fluid at an in-situ temperature.
- the first pressure canister is adapted to be removed from the subsurface well at a substantially similar temperature as the in-situ temperature.
- the fluid monitoring system includes a docking receptacle, a docking apparatus, a fluid inlet, a pressure canister and a gas-in line.
- the docking receptacle is positioned in the subsurface well.
- the docking apparatus selectively docks with the docking receptacle in the subsurface well.
- the fluid inlet receives fluid from the subterranean formation.
- the pressure canister is positioned so that the docking apparatus is between the docking receptacle and the pressure canister.
- the pressure canister receives the fluid at an in-situ pressure.
- the gas-in line selectively delivers a gas to the pressure canister to pressurize the pressure canister so that the pressure canister is adapted to be removed from the subsurface well at a substantially similar pressure as the in-situ pressure.
- features from the previous two embodiments are combined with one or more sensors that permit in-situ measurement of formation fluids at close to or actual formation temperatures and pressures.
- FIG. 1A is a simplified cross-sectional side view illustration of one embodiment of a fluid monitoring system having features of the present invention, including one or more pressure canisters;
- FIG. 1B is a detailed cross-sectional view of a portion of the fluid monitoring system illustrated in FIG. 1A ;
- FIG. 2 is a series of simplified cross-sectional view illustrations showing how pressure canisters operate in the system.
- FIG. 3A is a simplified cross-sectional view of one embodiment of the fluid monitoring system that omits a first set of canisters;
- FIG. 3B is a simplified cross-sectional view of one embodiment of the fluid monitoring system that omits the first set of canisters, and only includes one or more canisters in a second set of canisters, illustrated in a nested configuration;
- FIG. 4 is a simplified cross-sectional view of another embodiment of a nested fluid monitoring system
- FIG. 5 is a simplified cross-sectional view of another embodiment of the fluid monitoring system
- FIG. 6 is a simplified cross-sectional view of yet another embodiment of the fluid monitoring system.
- FIG. 7 is a top view and a plurality of perspective views of one or more embodiments of a centralizer used in the fluid monitoring system.
- the fluid monitoring and collection system 10 (hereinafter sometimes referred to as a “fluid monitoring system”) shown and described herein is particularly suited for monitoring and sampling sequestered subterranean fluid.
- a fluid monitoring system carbon dioxide is specifically referenced herein as one fluid that can be monitored and/or sampled by the fluid monitoring system 10 , it is recognized that other suitable fluids can equally be monitored and/or sampled.
- the sensor devices described herein are particularly suited for sensing carbon dioxide, other suitable sensors can be utilized with the fluid monitoring system 10 in order to sense other fluid parameters.
- the fluid monitoring system 10 can be used to sense and/or monitor temperature, conductivity, flow conductivity, the presence of oxygen or other fluids, pH, oxidation-reduction potential, dimensions and/or weight, the presence of metals or other solids, or any other suitable parameters.
- FIG. 1 is a side-view illustration of one embodiment of a fluid monitoring system 10 that is used in a subsurface well.
- the fluid monitoring system 10 includes one or more of a well casing 12 , a first zone isolator 14 (such as a straddle packer, as one example), a second zone isolator 16 (such as a straddle packer, as one example), one or more fluid entry ports 18 , one or more pressure canisters 20 (sometimes referred to simply as “canister”), a lower pump 22 , a docking receptacle 24 , a docking apparatus 26 , a sensor 28 , an upper pump 30 , one or more gas-in lines 32 , one or more sample return lines 34 , a power source 36 , a sensor signal return line 38 and a fluid-tight adapter 40 .
- This fluid monitoring system can be placed within a riser pipe 41 in the borehole.
- One embodiment consists of an evolutionary technology for collecting depth discrete soil gas and groundwater samples at formation temperatures and pressures during borehole advancement in unconsolidated to semi-consolidated earth materials as well as in hard-rock formation materials using advanced drilling and coring apparatus and methods.
- the fluid monitoring system 10 is positioned within the borehole (not shown).
- Advantages can include one or more of the following: the ability to collect a groundwater and soil and/or soil-gas and soil samples at the same time; and/or the ability of the fluid monitoring system 10 to be pile-driven or advanced by coring while still under pneumatic pressure inside the pressure canister 20 .
- the fluid monitoring system 10 can include one or more sensors 28 for measuring formation fluid properties, rock properties as well as chemical constituents can be incorporated into the apparatus for multi-tasking performance.
- Each pressure canister 20 can vary in capacity.
- the canister 20 can have a capacity of between 50 milliliters to 10 liters.
- Multiple canisters 20 in the system 10 can have different volumes or the same volume.
- pressure is released from a pneumatic line that extends from the top of the sampler to the ground surface (not shown)—by opening a release valve located at the ground surface.
- the device can be driven greater than or less than two feet beyond the bottom of the borehole.
- Filling of the pressure canister 20 can be pneumatically monitored from the ground surface through the back pressurization line 32 .
- the fill detection process can also allow a determination of the quantity of water that has entered the pressure canister(s) 20 .
- the canisters 20 can be re-pressurized to simulate formation pressure, and the system 10 can be withdrawn or pulled from the punched hole below the bottom of the borehole, and tripped back to the ground surface for depressurization and sample transfer, for example.
- One or more pressure canisters 20 can be integrated into straddle packer systems as illustrated in the embodiment in FIG. 1A , either as a single unit or as an in-line series of canisters 20 isolated between a set of straddle packers.
- any of the pressure canister configurations can be outfitted with shut-off valves located at the top and bottom of the canisters—such that following removal of canisters from the borehole the top and bottom pressure containment valves can be closed prior to direct connection to analytical systems for analysis of supercritical fluids in a single, or double or three-phase system.
- shut-off valves located at the top and bottom of the canisters—such that following removal of canisters from the borehole the top and bottom pressure containment valves can be closed prior to direct connection to analytical systems for analysis of supercritical fluids in a single, or double or three-phase system.
- pressure inside the canisters 20 can be maintained by use of shut-off valves in combination with compressed at the ground surface.
- FIG. 1B is a more detailed view of a portion of the fluid monitoring system 10 .
- the lower pump 22 is connected to the gas-in line 32 and the sample return line 34 .
- These lines 32 , 34 can extend from the lower pump 22 through a fluid-tight adapter 40 to allow the lines to enter and/or exit the interior of the fluid monitoring system 10 .
- a back pressurization line can extend from an exterior of the fluid monitoring system 10 through the fluid-tight adapter 40 to the pressure canisters 20 .
- a first set 42 of pressure canisters 20 (three canisters 20 are illustrated in the first set 42 in FIG. 1A ) are illustrated in the lower portion of FIG. 1A , and are positioned between the first zone isolator 14 and the second zone isolator 16 .
- a second set 44 of pressure canisters 20 (two canisters are illustrated in the second set 44 in FIG. 1A ) are illustrated above the upper pump 30 .
- the second set 44 of canisters 20 can be removed from to the ground surface prior to and independently from the first set 42 of canisters 20 .
- the docking apparatus 26 can be “undocked” from the docking receptacle 24 , to remove the sensor 28 , the upper pump 30 , and the second set 44 of canisters 20 , along with one or more gas-in line 32 , sample return line 34 , power source 36 and/or signal return lines 38 .
- This allows the second set 44 of samples to be analyzed in a laboratory while the first set 42 of canisters 20 remains within the borehole for in-situ monitoring and corroboration with the laboratory results from the second set 44 of canisters 20 .
- both the first set 42 of canisters 20 and the second set 44 of canisters 20 can be removed from the borehole for analysis.
- FIG. 1A illustrates both the first set 42 of canisters 20 and the second set 44 of canisters 20
- the fluid monitoring system 10 can be operated with one of the two sets 42 , 44 of canisters.
- the second set 44 of canisters 20 can be omitted from the fluid monitoring system 10 , and the system 10 can be utilized with only the first set 42 of canisters.
- the first set 42 of canisters 20 can be omitted, and the fluid monitoring system 10 can be operated with only the second set 44 of canisters 20 .
- a pump can be integrated so that groundwater can be purged through the system before samples are containerized.
- Use of the down-hole sensor array can determine when parameters are stabilized for collection of the water samples.
- the in-situ sensor field measurements can be used to corroborate laboratory measurements for establishing data validation.
- a single or multiple straddle packer zone isolation technology is connected to the bottom end of a steel pipe strand extending up to 10,000 feet below ground surface.
- the straddle packer section is outfitted with one or more pressure canisters 20 between each pair of isolating zone packers that are inflated by water or air.
- a fluid entry port is located at the bottom of each set of pressure canisters.
- the bottom most canister has one or more valves located on the inside of the canister and near its bottom. On the outside of each pressure canister is located a shut off valve that can be closed upon retrieval of the pressure canisters to the ground surface.
- a back pressurization line is connected to the top most canister with pressure inside this line controlled from the ground surface by use of compressed gas and valves.
- a completely separate fluid entry port is located above the top most canister and allows passage of formation fluids from to an open tapered receiver located between the straddle packer assembly and the hollow steel pipe strand.
- a cross-over adapter that permits an air-tight and fluid tight exit of back pressurization tubing, pump tubing and sensor cables that are located between the straddle packers to pass from the inside of the apparatus to the outside of the steel pipe strand that rises to the ground surface.
- Steel centralizers located above the cross-over sub have steel arms that extend from the main body of the centralizer ring and allow tubes and cables to be recessed for protection during transport if the entire SP-ZIST and steel pipe strand into and from the borehole environment.
- all of the canisters When being lowered into the borehole, all of the canisters can be back pressurized from the ground surface such that the internal sealing valve located near the bottom of the lower most canister between in pair of straddle packers can be closed to prevent borehole fluids from entering the canisters during descent to the target sampling location(s).
- the straddle packers can be inflated and sealed against the borehole wall. Back pressure from the ground surface can be released allowing the canisters to be filled in-situ formation fluid from the bottom up.
- a bubbler monitor or any other type of instrument made for such purpose can be used to monitor when the canisters are full. Once the canisters are full, compressed gas can be released from the ground surface to once again back pressure the internal valve located near the bottom of the bottom most canister.
- a small gas displacement pump can also be used to purge water from the canisters and is positioned inside the cross-over sub or at some other position directly within, above or below the straddle packer assembly.
- a second sample collection and sensor system can be deployed on the inside of the steel pipe strand.
- the system is small enough to easily fit on the inside of the steel pipe and is lowered until it reaches the tapered receiver as described above.
- it can be configured such that sensors, pump and miniaturized pressure canisters can all be lowered independently to dock with the tapered receiver for only a single task function.
- any combination of the devices can be coupled together to allow multi task functions after docking with the tapered receiver.
- the canisters can be back pressurized during descent using compressed gas at the ground surface.
- the back pressure charge can be released so that the canisters can fill with formation fluid.
- a fluid entry port located below the top most packer of the straddle packer pair allows formation fluid from the isolated sample target zone to migrate directly to the opening with the tapered receiver.
- a pump can be located within the apparatus to purge formation fluids that are derived from other areas of the borehole that are not part of the isolated sampling target.
- sensors within the apparatus can monitor parameter stabilization during pumping to determine when sample target zone fluids are in contact with the apparatus and inside the miniaturized pressure canisters. Once the sensor measurements are completed and formation fluid samples collected into the miniaturized pressure canisters, the canister can be back pressurized and retrieved to the ground surface with the entire second apparatus described herein. As before, with the larger canisters located between the pairs of straddle packers, valves located above and below each of the miniaturized pressure canisters can be closed, disconnected from the apparatus, and then directly connected to laboratory instruments for analysis. Sensor data can be corroborated against lab analyses of the formation fluid samples for the purpose of data validation.
- the Nested System is quite achievable to a depth of at least approximately 1,500 feet bgs.
- the key advantage of this technology is that it is simple to install and easy to operate.
- development of each well within the nest is readily doable by use of air-lifting methods.
- nitrogen gas or a 150 scfm air compressor
- a weighted drop tube inside the well may be included.
- a properly designed diverter mechanism for discharging the water may be included.
- the fluid monitoring system 10 includes a zone isolation assembly, such as those more fully described in U.S. Patent Publication Nos. 2007/0158062, 2007/0158065, 2007/0158066 and 2007/0199691, which are incorporated herein by reference to the extent permitted.
- any other suitable zone isolation assembly can be incorporated into the fluid monitoring system 10 .
- the upper pump 30 and the docking apparatus 26 docks with the docking receptacle 24 .
- the receptacle 24 can be placed between the riser pipe 41 and the well screen—and is geometrically tapered on the inside.
- the upper pump 30 can have an external o-ring 56 close to its bottom—near the intake.
- FIG. 2 shows one embodiment of how the pressure canisters operate in the system.
- the canister 20 is lowered into the borehole 200 . Borehole fluids cannot enter the canister 20 during the lowering process because the canister 20 is back pressurized with a gas 202 , such as nitrogen, or another suitable fluid.
- a gas 202 such as nitrogen, or another suitable fluid.
- the canister 20 is driven ahead of the borehole bottom with an up-hole or down-hole drive hammer.
- the canister 20 is still under pressure.
- the gas 202 is released from the canister 20 by a ground surface controller, and a well screen 204 is exposed to allow the canister 20 to begin filling with groundwater 206 .
- the canister 20 fills with groundwater 206 .
- the displaced gas 202 enters a water-filled bottle or bucket as bubbles, serving as a fill indicator.
- the canister 20 is repressurized with gas 202 , and then the canister 20 is removed from the drive hole at the bottom of the borehole 200 .
- Back-pressure charge inhibits the borehole fluids from cross-contaminating the groundwater sample 206 and inhibits off-gassing of VOC molecules in the groundwater sample 206 .
- FIG. 3A shows one embodiment of the fluid monitoring system 310 A that omits the first set of canisters, and only includes one or more canisters in the second set of canisters, in a single configuration.
- FIG. 3B shows one embodiment of the fluid monitoring system 310 B that omits the first set of canisters, and only includes one or more canisters in the second set of canisters, in a nested configuration.
- the nested configuration includes a plurality of fluid monitoring subsystems 358 that can be included in a plurality of different boreholes, or in a single uniform diameter borehole or telescoping diameter borehole.
- the nested fluid monitoring system 310 B has one or more advantages.
- the nested systems 310 B can be outfitted with one or more of the features that are shown in the embodiment in FIG. 1 —i.e. integrating 1) one or more pumps, 2) docking Receptacle, 3) pressure transducers, 4) pressure canisters, and/or 5) an automated and/or semi-automated control system at the ground surface.
- FIG. 4 illustrates another embodiment of a nested system 410 .
- the pumps 430 are placed above the pressure canister(s) 420 and sensors 428 (if included) so that pumping from the system 410 continuously pulls fresh water from the screened target zone 462 .
- the pressure canisters 420 and pumps 430 can be back-pressurized from the ground surface—with simulated formation pressure locked into both devices.
- valves located at the tops and bottoms of each pressure vessel are closed—locking in the simulated formation pressure into each canister 420 .
- the pump(s) 430 can be depressurized, and the pressure canister 420 detached from the bottom of the sampling string.
- a nested system 410 can be successfully completed to a depth of at least 2,500 feet bgs, and perhaps to 3,000 feet bgs.
- Use of Schedule 120 PVC would likely be suitable to these depths in conjunction with stainless steel well screen.
- Each well within the nest could be developed using air-lifting methods with a relatively small 150 standard cubic feet per minute (scfm) air compressor (i.e. Ingersol Rand).
- FIG. 5 illustrates another embodiment of the fluid monitoring system 510 .
- the fluid monitoring system 510 includes a plurality of pump/canister assemblies 564 that are positioned in series for use in a single borehole (not shown in FIG. 5 ).
- multiple samples, each from a different level in the formation can be monitored and/or collected.
- Each of these pump/canister assemblies 564 operates in a similar manner to at least some of those previously described.
- HW-SPS Hardwired Straddle Packer System
- tubing and instrumentation components are individually not removable from any part of the system unless most or all of the straddle packer system is removed from the borehole.
- some wells have various integral components that are not removable from the ground surface—such as packers, sampling ports, electromagnetic couplings, etc. So, if any one of these components malfunctions, most or all of the system has to be removed from the well or borehole for repair and/or replacement.
- Such a system can incorporate one or more of the following: 1) one or more pumps, 2) one or more pressure canisters, 3) one or more multi-parameter sensors, and/or 4) a multi-channel control unit for simultaneous purging, sampling, and/or back pressurization.
- the HW-SPS could be designed for a 6 (150 mm) to 8 inch (200 mm) diameter borehole, although other boreholes of different diameters can be used with the HW-SPS. This would allow the stainless steel mandrills of each packer to be made with a large enough inside diameter to pass through one or more of the following:
- a straddle packer of 140 mm would permit a pass through of approximately 125 mm and have ample coverage for inflation pressure, sealing pressures and pressure differentials between packers located at different depths within the same borehole and for the same depth range group.
- a single packer inflation line would be all that is required and would likely have an OD of 4.6 mm ( 3/16-inch)—made from high pressure Nylon or other polyamides—reinforced with fiberglass or synthetic fibers, for example.
- the back-pressurization line for each of the pressure canisters can also be 4.6 mm OD and be made from high pressure Nylon, in one non-exclusive embodiment.
- each of the Idronaut cables can be about 6 mm to 7 mm and can be made from military grade cable materials, for instance. Alternatively, the cables can be larger than 7 mm or smaller than 6 mm.
- HS-SPS When using a long term HS-SPS, one or more of four factors can come into play, such as: 1) the method for deployment and retrieval from the borehole, 2) the method and system used for jacketing tubing and cable, 3) the method and apparatus for supporting the system over the long term following placement into the borehole, and 4) the materials used for resisting and preventing corrosion from long term exposure to brinish or other corrosive fluids.
- a structural support rod can be used to interconnect all of the straddle packer units and to connect the top straddle packer unit to the ground surface.
- the support rod would possibly be slower than the use of a strong, thick steel cable to deploy and retrieve the HW-SPS, the support rod makes for a reliable and robust substrate to attach the jacketed tubing bundles and instrumentation cables.
- the Nylon tubes for each zone can be of different colors so that they are easily identified. Moreover, if not enough colors are available due to coloring limitations from fabricators and retailers, then tubes of the same color for each zone can be differentiated simply by using a lettering or numbering convention, for example.
- the HW-SPS can be supported from both the bottom and the top.
- the bottom of the system can be outfitted with a heavy-duty steel structural support pedestal.
- the top of the support system can receive most of the load and be supported with a substantial stainless steel manifold plate in the shape of a large donut, several inches thick, and can be bolted to a reinforced concrete block or pedestal.
- materials used for jacketing Nylon tubes and instrumentation cables can be made from marine grade polymers used for oceanographic work.
- Metallic components used in instrumentation that would be exposed to the brinish fluids over a period of years can be made from materials such as titanium aluminum alloys, and the like.
- a Hybrid system referred to herein as a Hardwired/Nested Straddle Packer System (HW/N-SPS) is a versatile system for very deep carbon dioxide observation well applications—since this particular design would still facilitate use of pressure canisters for collection of carbon dioxide under super critical fluid conditions.
- FIG. 6 shows the basic layout of one embodiment of such a fluid monitoring system 610 .
- the advantages of a hybrid system can include that a minimal number of sampling components would be placed between each straddle packer unit—thereby: 1) minimizing long term maintenance involving removal of the system from the well bore for repair and/or replacement of pumps and sensors, and/or, 2) permitting the use of removable pumps, sensors and/or pressure canisters for analyzing samples containing super critical carbon dioxide fluids.
- a hybrid system would lend itself to the use of a telescoping borehole that would significantly reduce drilling costs.
- one important feature of the system is the attachment of the riser pipe sections to the central support rod via customized support centralizers 770 —some of which are illustrated in FIG. 7 . All of the structural and materials conditions that are described for the Hardwired Straddle Packer System can also be used for the Hybrid system described herein.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
A fluid monitoring system for a subsurface well in a subterranean formation includes a first zone isolator, a second zone isolator, a fluid inlet, a first pressure canister and a first gas-in line. The first and second zone isolators are positioned in the subsurface well. The fluid inlet receives fluid from the subterranean formation. The first pressure canister is positioned between the first zone isolator and the second zone isolator. The first pressure canister receives the fluid at an in-situ pressure. The first gas-in line selectively delivers a gas to the first pressure canister to pressurize the first pressure canister so that the first pressure canister is adapted to be removed from the subsurface well at a substantially similar pressure as the in-situ pressure. In one embodiment, the first pressure canister receives the fluid at an in-situ temperature. In this embodiment, the first pressure canister is adapted to be removed from the subsurface well at a substantially similar temperature as the in-situ temperature.
Description
- This application claims benefit under 35 U.S.C. §119(e) from U.S. Provisional Patent Application Ser. No. 61/010,831, filed Jan. 11, 2008, the entire contents of which are expressly incorporated herein by reference to the extent permitted.
- Generating energy which is an alternative to oil has become increasingly important. Because oil is a finite resource that is relatively costly and exists only in certain regions of the world, the move to less expensive, renewable energy sources has reached the critical stage. For example, substantial research in the production and use of hydrogen fuel is currently underway. Additionally, the world's abundant coal reserves are being considered as an excellent source of energy, and could be used in the transition from oil to hydrogen or other energy sources. One major concern stemming from coal usage is the production of carbon dioxide, which has been found to likely contribute to ozone depletion and global warming.
- One method of dealing with the carbon dioxide reaction product from coal refinement is to sequester the carbon dioxide in fractured rock formations to form subterranean carbon dioxide reservoirs. These reservoirs can be thousands of feet below ground surface (bgs). The carbon dioxide levels should be accurately monitored from subsurface wells in order to detect at an early stage whether leakage or seepage problems may be occurring. Thus, down-hole containerization and measurement of groundwater samples in corrosive and saline environments has become increasingly important. In addition, other fluids, such as liquefied petroleum gas (LPG) and high and low level radioactive waste repositories are critical to monitor. However, monitoring any or all of these fluids at their actual in-situ temperature and pressure in order to attain greater accuracy can be particularly challenging.
- The present invention is directed toward a fluid monitoring system for a subsurface well in a subterranean formation. In one embodiment, the fluid monitoring system includes a first zone isolator; a second zone isolator, a fluid inlet, a first pressure canister and a first gas-in line. The first and second zone isolators are positioned in the subsurface well. The fluid inlet receives fluid from the subterranean formation. The first pressure canister is positioned between the first zone isolator and the second zone isolator. The first pressure canister receives the fluid at an in-situ pressure. The first gas-in line selectively delivers a gas to the first pressure canister to pressurize the first pressure canister so that the first pressure canister is adapted to be removed from the subsurface well at a substantially similar pressure as the in-situ pressure. In one embodiment, the first pressure canister receives the fluid at an in-situ temperature. In this embodiment, the first pressure canister is adapted to be removed from the subsurface well at a substantially similar temperature as the in-situ temperature.
- In another embodiment, the fluid monitoring system includes a docking receptacle, a docking apparatus, a fluid inlet, a pressure canister and a gas-in line. The docking receptacle is positioned in the subsurface well. The docking apparatus selectively docks with the docking receptacle in the subsurface well. The fluid inlet receives fluid from the subterranean formation. The pressure canister is positioned so that the docking apparatus is between the docking receptacle and the pressure canister. The pressure canister receives the fluid at an in-situ pressure. The gas-in line selectively delivers a gas to the pressure canister to pressurize the pressure canister so that the pressure canister is adapted to be removed from the subsurface well at a substantially similar pressure as the in-situ pressure.
- In a further embodiment, features from the previous two embodiments are combined with one or more sensors that permit in-situ measurement of formation fluids at close to or actual formation temperatures and pressures.
- The novel features of this invention, as well as the invention itself, both as to its structure and its operation, will be best understood from the accompanying drawings, taken in conjunction with the accompanying description, in which similar reference characters refer to similar parts, and in which:
-
FIG. 1A is a simplified cross-sectional side view illustration of one embodiment of a fluid monitoring system having features of the present invention, including one or more pressure canisters; -
FIG. 1B is a detailed cross-sectional view of a portion of the fluid monitoring system illustrated inFIG. 1A ; -
FIG. 2 is a series of simplified cross-sectional view illustrations showing how pressure canisters operate in the system. -
FIG. 3A is a simplified cross-sectional view of one embodiment of the fluid monitoring system that omits a first set of canisters; -
FIG. 3B is a simplified cross-sectional view of one embodiment of the fluid monitoring system that omits the first set of canisters, and only includes one or more canisters in a second set of canisters, illustrated in a nested configuration; -
FIG. 4 is a simplified cross-sectional view of another embodiment of a nested fluid monitoring system; -
FIG. 5 is a simplified cross-sectional view of another embodiment of the fluid monitoring system; -
FIG. 6 is a simplified cross-sectional view of yet another embodiment of the fluid monitoring system; and -
FIG. 7 is a top view and a plurality of perspective views of one or more embodiments of a centralizer used in the fluid monitoring system. - As an overview, the fluid monitoring and collection system 10 (hereinafter sometimes referred to as a “fluid monitoring system”) shown and described herein is particularly suited for monitoring and sampling sequestered subterranean fluid. Although carbon dioxide is specifically referenced herein as one fluid that can be monitored and/or sampled by the
fluid monitoring system 10, it is recognized that other suitable fluids can equally be monitored and/or sampled. Additionally, although the sensor devices described herein are particularly suited for sensing carbon dioxide, other suitable sensors can be utilized with thefluid monitoring system 10 in order to sense other fluid parameters. For example, as non-exclusive examples only, thefluid monitoring system 10 can be used to sense and/or monitor temperature, conductivity, flow conductivity, the presence of oxygen or other fluids, pH, oxidation-reduction potential, dimensions and/or weight, the presence of metals or other solids, or any other suitable parameters. -
FIG. 1 is a side-view illustration of one embodiment of afluid monitoring system 10 that is used in a subsurface well. In this embodiment, thefluid monitoring system 10 includes one or more of awell casing 12, a first zone isolator 14 (such as a straddle packer, as one example), a second zone isolator 16 (such as a straddle packer, as one example), one or morefluid entry ports 18, one or more pressure canisters 20 (sometimes referred to simply as “canister”), alower pump 22, adocking receptacle 24, adocking apparatus 26, asensor 28, anupper pump 30, one or more gas-inlines 32, one or moresample return lines 34, apower source 36, a sensorsignal return line 38 and a fluid-tight adapter 40. This fluid monitoring system can be placed within ariser pipe 41 in the borehole. - One embodiment consists of an evolutionary technology for collecting depth discrete soil gas and groundwater samples at formation temperatures and pressures during borehole advancement in unconsolidated to semi-consolidated earth materials as well as in hard-rock formation materials using advanced drilling and coring apparatus and methods. In the embodiment illustrated in
FIG. 1A , thefluid monitoring system 10 is positioned within the borehole (not shown). Advantages can include one or more of the following: the ability to collect a groundwater and soil and/or soil-gas and soil samples at the same time; and/or the ability of thefluid monitoring system 10 to be pile-driven or advanced by coring while still under pneumatic pressure inside thepressure canister 20. Further, in certain embodiments, back pressurization with nitrogen gas prior to collection of a groundwater sample is maintained so that borehole fluids are prevented from entering thefluid monitoring system 10 during transport to the bottom of the borehole and during the pile driving process into the sediments below the bottom of the borehole. Further, thefluid monitoring system 10 can include one ormore sensors 28 for measuring formation fluid properties, rock properties as well as chemical constituents can be incorporated into the apparatus for multi-tasking performance. - Each
pressure canister 20 can vary in capacity. In one embodiment, thecanister 20 can have a capacity of between 50 milliliters to 10 liters.Multiple canisters 20 in thesystem 10 can have different volumes or the same volume. - In one embodiment, once the
fluid monitoring system 10 is driven approximately two feet beyond a bottom of the borehole, pressure is released from a pneumatic line that extends from the top of the sampler to the ground surface (not shown)—by opening a release valve located at the ground surface. In alternative embodiments, the device can be driven greater than or less than two feet beyond the bottom of the borehole. Filling of thepressure canister 20 can be pneumatically monitored from the ground surface through theback pressurization line 32. The fill detection process can also allow a determination of the quantity of water that has entered the pressure canister(s) 20. After sufficient groundwater sample has been obtained, thecanisters 20 can be re-pressurized to simulate formation pressure, and thesystem 10 can be withdrawn or pulled from the punched hole below the bottom of the borehole, and tripped back to the ground surface for depressurization and sample transfer, for example. - One or
more pressure canisters 20 can be integrated into straddle packer systems as illustrated in the embodiment inFIG. 1A , either as a single unit or as an in-line series ofcanisters 20 isolated between a set of straddle packers. As a matter of flexibility, any of the pressure canister configurations can be outfitted with shut-off valves located at the top and bottom of the canisters—such that following removal of canisters from the borehole the top and bottom pressure containment valves can be closed prior to direct connection to analytical systems for analysis of supercritical fluids in a single, or double or three-phase system. During retrieval of thecanisters 20 to the ground surface, pressure inside thecanisters 20 can be maintained by use of shut-off valves in combination with compressed at the ground surface. -
FIG. 1B is a more detailed view of a portion of thefluid monitoring system 10. For example, inFIG. 1B , thelower pump 22 is connected to the gas-inline 32 and thesample return line 34. Theselines lower pump 22 through a fluid-tight adapter 40 to allow the lines to enter and/or exit the interior of thefluid monitoring system 10. Further, a back pressurization line can extend from an exterior of thefluid monitoring system 10 through the fluid-tight adapter 40 to thepressure canisters 20. - Referring back to
FIG. 1A , two sets of pressure canisters for two separate retrieval operations can be used. Afirst set 42 of pressure canisters 20 (threecanisters 20 are illustrated in thefirst set 42 inFIG. 1A ) are illustrated in the lower portion ofFIG. 1A , and are positioned between thefirst zone isolator 14 and thesecond zone isolator 16. Asecond set 44 of pressure canisters 20 (two canisters are illustrated in thesecond set 44 inFIG. 1A ) are illustrated above theupper pump 30. In one embodiment, thesecond set 44 ofcanisters 20 can be removed from to the ground surface prior to and independently from thefirst set 42 ofcanisters 20. In other words, thedocking apparatus 26 can be “undocked” from thedocking receptacle 24, to remove thesensor 28, theupper pump 30, and thesecond set 44 ofcanisters 20, along with one or more gas-inline 32,sample return line 34,power source 36 and/or signal return lines 38. This allows thesecond set 44 of samples to be analyzed in a laboratory while thefirst set 42 ofcanisters 20 remains within the borehole for in-situ monitoring and corroboration with the laboratory results from thesecond set 44 ofcanisters 20. Alternatively, both thefirst set 42 ofcanisters 20 and thesecond set 44 ofcanisters 20 can be removed from the borehole for analysis. - It should be recognized that although the embodiment in
FIG. 1A illustrates both thefirst set 42 ofcanisters 20 and thesecond set 44 ofcanisters 20, thefluid monitoring system 10 can be operated with one of the twosets second set 44 ofcanisters 20 can be omitted from thefluid monitoring system 10, and thesystem 10 can be utilized with only thefirst set 42 of canisters. Conversely, thefirst set 42 ofcanisters 20 can be omitted, and thefluid monitoring system 10 can be operated with only thesecond set 44 ofcanisters 20. - From the standpoint of deployment into a borehole to depths of 1,000 to 10,000 feet below ground surface (bgs), a robust, heavy duty motorized hose spool can be required—much like that required in deep oceanographic applications. A pump can be integrated so that groundwater can be purged through the system before samples are containerized. Use of the down-hole sensor array can determine when parameters are stabilized for collection of the water samples. Moreover, the in-situ sensor field measurements can be used to corroborate laboratory measurements for establishing data validation.
- With respect to groundwater monitoring carbon dioxide sequestration there are at least four general embodiments that can be utilized depending on depth, functional requirements or necessities and budget, as follows:
-
- Paired Smaller Removable Tube/Pipe Inside Larger Removable Pipe System (to 10,000 feet bgs).
- Nested Systems: typically achievable to 1,500 feet bgs.
- Hardwired Straddle Packer Systems: to 10,000 ft. bgs.
- Hybrid Hardwired/Nested Straddle Packer Systems: Nested Portion to 1,500 ft. bgs. and Hardwired portion to 10,000 ft. bgs.
- A single or multiple straddle packer zone isolation technology (SP-ZIST) is connected to the bottom end of a steel pipe strand extending up to 10,000 feet below ground surface. In one embodiment, the straddle packer section is outfitted with one or
more pressure canisters 20 between each pair of isolating zone packers that are inflated by water or air. A fluid entry port is located at the bottom of each set of pressure canisters. The bottom most canister has one or more valves located on the inside of the canister and near its bottom. On the outside of each pressure canister is located a shut off valve that can be closed upon retrieval of the pressure canisters to the ground surface. A back pressurization line is connected to the top most canister with pressure inside this line controlled from the ground surface by use of compressed gas and valves. A completely separate fluid entry port is located above the top most canister and allows passage of formation fluids from to an open tapered receiver located between the straddle packer assembly and the hollow steel pipe strand. - As fluids enter and ascend through the fluid entry port, their migration is channeled through a cross-over adapter that permits an air-tight and fluid tight exit of back pressurization tubing, pump tubing and sensor cables that are located between the straddle packers to pass from the inside of the apparatus to the outside of the steel pipe strand that rises to the ground surface. Steel centralizers located above the cross-over sub have steel arms that extend from the main body of the centralizer ring and allow tubes and cables to be recessed for protection during transport if the entire SP-ZIST and steel pipe strand into and from the borehole environment. When being lowered into the borehole, all of the canisters can be back pressurized from the ground surface such that the internal sealing valve located near the bottom of the lower most canister between in pair of straddle packers can be closed to prevent borehole fluids from entering the canisters during descent to the target sampling location(s).
- Once the SP-ZIST system is in place, the straddle packers can be inflated and sealed against the borehole wall. Back pressure from the ground surface can be released allowing the canisters to be filled in-situ formation fluid from the bottom up. A bubbler monitor or any other type of instrument made for such purpose can be used to monitor when the canisters are full. Once the canisters are full, compressed gas can be released from the ground surface to once again back pressure the internal valve located near the bottom of the bottom most canister. A small gas displacement pump can also be used to purge water from the canisters and is positioned inside the cross-over sub or at some other position directly within, above or below the straddle packer assembly.
- A second sample collection and sensor system can be deployed on the inside of the steel pipe strand. The system is small enough to easily fit on the inside of the steel pipe and is lowered until it reaches the tapered receiver as described above. In this portion of the apparatus it can be configured such that sensors, pump and miniaturized pressure canisters can all be lowered independently to dock with the tapered receiver for only a single task function. Alternatively, any combination of the devices can be coupled together to allow multi task functions after docking with the tapered receiver. When using miniaturized pressure canisters, the canisters can be back pressurized during descent using compressed gas at the ground surface.
- Once the apparatus has been seated into the tapered receiver, the back pressure charge can be released so that the canisters can fill with formation fluid. A fluid entry port located below the top most packer of the straddle packer pair allows formation fluid from the isolated sample target zone to migrate directly to the opening with the tapered receiver. When the sample and monitoring apparatus docks with the receiver formation fluid then come into direct contact with apparatus. A pump can be located within the apparatus to purge formation fluids that are derived from other areas of the borehole that are not part of the isolated sampling target.
- Additionally, sensors within the apparatus can monitor parameter stabilization during pumping to determine when sample target zone fluids are in contact with the apparatus and inside the miniaturized pressure canisters. Once the sensor measurements are completed and formation fluid samples collected into the miniaturized pressure canisters, the canister can be back pressurized and retrieved to the ground surface with the entire second apparatus described herein. As before, with the larger canisters located between the pairs of straddle packers, valves located above and below each of the miniaturized pressure canisters can be closed, disconnected from the apparatus, and then directly connected to laboratory instruments for analysis. Sensor data can be corroborated against lab analyses of the formation fluid samples for the purpose of data validation.
- The Nested System is quite achievable to a depth of at least approximately 1,500 feet bgs. The key advantage of this technology is that it is simple to install and easy to operate. Moreover, development of each well within the nest is readily doable by use of air-lifting methods. Provided that there is sufficient hydraulic head, use of nitrogen gas (or a 150 scfm air compressor), a weighted drop tube inside the well, a properly designed diverter mechanism for discharging the water, and/or a Baker tank to hold the discharged water may be included.
- In the embodiment illustrated in
FIG. 1A , thefluid monitoring system 10 includes a zone isolation assembly, such as those more fully described in U.S. Patent Publication Nos. 2007/0158062, 2007/0158065, 2007/0158066 and 2007/0199691, which are incorporated herein by reference to the extent permitted. Alternatively, any other suitable zone isolation assembly can be incorporated into thefluid monitoring system 10. Theupper pump 30 and thedocking apparatus 26 docks with thedocking receptacle 24. Thereceptacle 24 can be placed between theriser pipe 41 and the well screen—and is geometrically tapered on the inside. Theupper pump 30 can have an external o-ring 56 close to its bottom—near the intake. When theupper pump 30 reaches the bottom of theriser pipe 41, the external o-ring near theupper pump 30 base combined with the weight of theupper pump 30 and hydraulic head of water inside theriser pipe 41 seats the o-ring 56 inside the tapered wall of thereceptacle 24. In so doing, theupper pump 30 is now hydraulically connected directly to the well screen target zone—and the volume of water inside theriser pipe 41 is negated or eliminated from the sampling process. This type of zone isolation assembly is -
FIG. 2 shows one embodiment of how the pressure canisters operate in the system. Atstep 246, thecanister 20 is lowered into theborehole 200. Borehole fluids cannot enter thecanister 20 during the lowering process because thecanister 20 is back pressurized with agas 202, such as nitrogen, or another suitable fluid. - At
step 248, thecanister 20 is driven ahead of the borehole bottom with an up-hole or down-hole drive hammer. Thecanister 20 is still under pressure. - At
step 250, thegas 202 is released from thecanister 20 by a ground surface controller, and awell screen 204 is exposed to allow thecanister 20 to begin filling withgroundwater 206. - At
step 252, thecanister 20 fills withgroundwater 206. The displacedgas 202 enters a water-filled bottle or bucket as bubbles, serving as a fill indicator. - At
step 254, thecanister 20 is repressurized withgas 202, and then thecanister 20 is removed from the drive hole at the bottom of theborehole 200. Back-pressure charge inhibits the borehole fluids from cross-contaminating thegroundwater sample 206 and inhibits off-gassing of VOC molecules in thegroundwater sample 206. -
FIG. 3A shows one embodiment of thefluid monitoring system 310A that omits the first set of canisters, and only includes one or more canisters in the second set of canisters, in a single configuration. -
FIG. 3B shows one embodiment of thefluid monitoring system 310B that omits the first set of canisters, and only includes one or more canisters in the second set of canisters, in a nested configuration. The nested configuration includes a plurality offluid monitoring subsystems 358 that can be included in a plurality of different boreholes, or in a single uniform diameter borehole or telescoping diameter borehole. - For the purpose of carbon dioxide sequestration monitoring, the nested
fluid monitoring system 310B has one or more advantages. The nestedsystems 310B can be outfitted with one or more of the features that are shown in the embodiment in FIG. 1—i.e. integrating 1) one or more pumps, 2) docking Receptacle, 3) pressure transducers, 4) pressure canisters, and/or 5) an automated and/or semi-automated control system at the ground surface. -
FIG. 4 illustrates another embodiment of a nestedsystem 410. As shown in the embodiment inFIG. 4 , thepumps 430 are placed above the pressure canister(s) 420 and sensors 428 (if included) so that pumping from thesystem 410 continuously pulls fresh water from the screenedtarget zone 462. When it is determined that parameters have stabilized (down-hole or up-hole) thepressure canisters 420 and pumps 430 can be back-pressurized from the ground surface—with simulated formation pressure locked into both devices. Once eachpressure canister 420 is retrieved at ground surface, valves located at the tops and bottoms of each pressure vessel are closed—locking in the simulated formation pressure into eachcanister 420. At this point, the pump(s) 430 can be depressurized, and thepressure canister 420 detached from the bottom of the sampling string. - In certain embodiments, a nested
system 410 can be successfully completed to a depth of at least 2,500 feet bgs, and perhaps to 3,000 feet bgs. Use of Schedule 120 PVC would likely be suitable to these depths in conjunction with stainless steel well screen. Each well within the nest could be developed using air-lifting methods with a relatively small 150 standard cubic feet per minute (scfm) air compressor (i.e. Ingersol Rand). -
FIG. 5 illustrates another embodiment of thefluid monitoring system 510. In this embodiment, thefluid monitoring system 510 includes a plurality of pump/canister assemblies 564 that are positioned in series for use in a single borehole (not shown inFIG. 5 ). In this embodiment, multiple samples, each from a different level in the formation can be monitored and/or collected. Each of these pump/canister assemblies 564 operates in a similar manner to at least some of those previously described. - As used herein, the term “Hardwired Straddle Packer System” (HW-SPS) includes a system where tubing and instrumentation components are individually not removable from any part of the system unless most or all of the straddle packer system is removed from the borehole. As an example, some wells have various integral components that are not removable from the ground surface—such as packers, sampling ports, electromagnetic couplings, etc. So, if any one of these components malfunctions, most or all of the system has to be removed from the well or borehole for repair and/or replacement.
- Such a system can incorporate one or more of the following: 1) one or more pumps, 2) one or more pressure canisters, 3) one or more multi-parameter sensors, and/or 4) a multi-channel control unit for simultaneous purging, sampling, and/or back pressurization. It is contemplated that the HW-SPS could be designed for a 6 (150 mm) to 8 inch (200 mm) diameter borehole, although other boreholes of different diameters can be used with the HW-SPS. This would allow the stainless steel mandrills of each packer to be made with a large enough inside diameter to pass through one or more of the following:
-
- Packer inflation line. One line can be used for all of the packers.
- A Gas-In and Sample Return Line (two lines) for each pump.
- Cable pass-through for each sensor.
- In one non-exclusive embodiment, a straddle packer of 140 mm would permit a pass through of approximately 125 mm and have ample coverage for inflation pressure, sealing pressures and pressure differentials between packers located at different depths within the same borehole and for the same depth range group. A single packer inflation line would be all that is required and would likely have an OD of 4.6 mm ( 3/16-inch)—made from high pressure Nylon or other polyamides—reinforced with fiberglass or synthetic fibers, for example. The back-pressurization line for each of the pressure canisters can also be 4.6 mm OD and be made from high pressure Nylon, in one non-exclusive embodiment. The gas-in and sample return lines for each of the pumps could be 6.35 mm OD (¼-inch)×4.6 mm ID, for example, and can be made from high pressure Nylon or other suitable materials. In certain embodiments, each of the Idronaut cables can be about 6 mm to 7 mm and can be made from military grade cable materials, for instance. Alternatively, the cables can be larger than 7 mm or smaller than 6 mm.
- When using a long term HS-SPS, one or more of four factors can come into play, such as: 1) the method for deployment and retrieval from the borehole, 2) the method and system used for jacketing tubing and cable, 3) the method and apparatus for supporting the system over the long term following placement into the borehole, and 4) the materials used for resisting and preventing corrosion from long term exposure to brinish or other corrosive fluids.
- When lowering such a system into a deep borehole, the total weight of the system will have been calculated in order to size out the specific crane to be used. In one embodiment, a structural support rod can be used to interconnect all of the straddle packer units and to connect the top straddle packer unit to the ground surface. Although the use of the support rod would possibly be slower than the use of a strong, thick steel cable to deploy and retrieve the HW-SPS, the support rod makes for a reliable and robust substrate to attach the jacketed tubing bundles and instrumentation cables.
- Whether a common jacket is used for all of the Nylon tubes or a community of jackets, the Nylon tubes for each zone can be of different colors so that they are easily identified. Moreover, if not enough colors are available due to coloring limitations from fabricators and retailers, then tubes of the same color for each zone can be differentiated simply by using a lettering or numbering convention, for example.
- Upon reaching total depth of emplacement within the borehole, the HW-SPS can be supported from both the bottom and the top. In one embodiment, the bottom of the system can be outfitted with a heavy-duty steel structural support pedestal. In one embodiment, the top of the support system can receive most of the load and be supported with a substantial stainless steel manifold plate in the shape of a large donut, several inches thick, and can be bolted to a reinforced concrete block or pedestal.
- In one embodiment, materials used for jacketing Nylon tubes and instrumentation cables can be made from marine grade polymers used for oceanographic work. Metallic components used in instrumentation that would be exposed to the brinish fluids over a period of years can be made from materials such as titanium aluminum alloys, and the like.
- A Hybrid system, referred to herein as a Hardwired/Nested Straddle Packer System (HW/N-SPS) is a versatile system for very deep carbon dioxide observation well applications—since this particular design would still facilitate use of pressure canisters for collection of carbon dioxide under super critical fluid conditions.
FIG. 6 shows the basic layout of one embodiment of such afluid monitoring system 610. The advantages of a hybrid system can include that a minimal number of sampling components would be placed between each straddle packer unit—thereby: 1) minimizing long term maintenance involving removal of the system from the well bore for repair and/or replacement of pumps and sensors, and/or, 2) permitting the use of removable pumps, sensors and/or pressure canisters for analyzing samples containing super critical carbon dioxide fluids. - The use of a hybrid system would lend itself to the use of a telescoping borehole that would significantly reduce drilling costs. In one embodiment, one important feature of the system is the attachment of the riser pipe sections to the central support rod via customized
support centralizers 770—some of which are illustrated inFIG. 7 . All of the structural and materials conditions that are described for the Hardwired Straddle Packer System can also be used for the Hybrid system described herein. - While the fluid monitoring and
collection systems 10 and methods as shown and disclosed herein are fully capable of obtaining the objects and providing the advantages herein before stated, it is to be understood that they are merely illustrative of the presently preferred embodiments of the invention and that no limitations are intended to the details of the methods, processes, construction or design herein shown and described.
Claims (5)
1. A fluid monitoring system for a subsurface well in a subterranean formation, the fluid monitoring system comprising:
a first zone isolator positioned in the subsurface well;
a second zone isolator positioned in the subsurface well;
a fluid inlet that receives fluid from the subterranean formation;
a first pressure canister positioned between the first zone isolator and the second zone isolator, the pressure canister receiving the fluid at an in-situ pressure; and
a first gas-in line that selectively delivers a gas to the pressure canister to pressurize the pressure canister so that the pressure canister is adapted to be removed from the subsurface well at a substantially similar pressure as the in-situ pressure.
2. The fluid monitoring system of claim 1 wherein the pressure canister receives the fluid at an in-situ temperature, and wherein the pressure canister is adapted to be removed from the subsurface well at a substantially similar temperature as the in-situ temperature.
3. The fluid monitoring system of claim 1 further comprising:
a docking receptacle positioned in the subsurface well,
a docking apparatus that selectively docks with the docking receptacle in the subsurface well;
a second pressure canister that is positioned so that the docking apparatus is between the docking receptacle and the pressure canister, the pressure canister receiving the fluid at an in-situ pressure; and
a second gas-in line that selectively delivers a gas to the pressure canister to pressurize the pressure canister so that the pressure canister is adapted to be removed from the subsurface well at a substantially similar pressure as the in-situ pressure.
4. A fluid monitoring system for a subsurface well in a subterranean formation, the subsurface well having a surface region, the fluid monitoring system comprising:
a docking receptacle positioned in the subsurface well;
a docking apparatus that selectively docks with the docking receptacle in the subsurface well;
a fluid inlet that receives fluid from the subterranean formation;
a pressure canister that is positioned so that the docking apparatus is between the docking receptacle and the pressure canister, the pressure canister receiving the fluid at an in-situ pressure; and
a gas-in line that selectively delivers a gas to the pressure canister to pressurize the pressure canister so that the pressure canister is adapted to be removed from the subsurface well at a substantially similar pressure as the in-situ pressure.
5. The fluid monitoring system of claim 4 wherein the pressure canister receives the fluid at an in-situ temperature, and wherein the pressure canister is adapted to be removed from the subsurface well at a substantially similar temperature as the in-situ temperature.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/351,834 US20090178797A1 (en) | 2008-01-11 | 2009-01-10 | Groundwater monitoring technologies applied to carbon dioxide sequestration |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US1083108P | 2008-01-11 | 2008-01-11 | |
US12/351,834 US20090178797A1 (en) | 2008-01-11 | 2009-01-10 | Groundwater monitoring technologies applied to carbon dioxide sequestration |
Publications (1)
Publication Number | Publication Date |
---|---|
US20090178797A1 true US20090178797A1 (en) | 2009-07-16 |
Family
ID=40849659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/351,834 Abandoned US20090178797A1 (en) | 2008-01-11 | 2009-01-10 | Groundwater monitoring technologies applied to carbon dioxide sequestration |
Country Status (1)
Country | Link |
---|---|
US (1) | US20090178797A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130036811A1 (en) * | 2009-09-01 | 2013-02-14 | Intelisys Limited | In-borehole gas monitor apparatus and method comprising a voc concentration analyser and a voc collector |
US10208585B2 (en) | 2015-08-11 | 2019-02-19 | Intrasen, LLC | Groundwater monitoring system and method |
CN109580207A (en) * | 2018-12-28 | 2019-04-05 | 中国科学院武汉岩土力学研究所 | A kind of downhole packer method for testing performance and device |
CN115341874A (en) * | 2022-07-07 | 2022-11-15 | 北京科技大学 | Method and system for determining location and sequestration mode of coal bed carbon sequestration area |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3248938A (en) * | 1965-10-04 | 1966-05-03 | Petroleum Res Corp | Fluid producing and testing system for petroleum reservoir formations |
US3357504A (en) * | 1965-06-07 | 1967-12-12 | Gerald G Calhoun | Straddle packer wire line tester |
US6357525B1 (en) * | 1999-04-22 | 2002-03-19 | Schlumberger Technology Corporation | Method and apparatus for testing a well |
US6688390B2 (en) * | 1999-03-25 | 2004-02-10 | Schlumberger Technology Corporation | Formation fluid sampling apparatus and method |
US6722432B2 (en) * | 2001-01-29 | 2004-04-20 | Schlumberger Technology Corporation | Slimhole fluid tester |
US20050028974A1 (en) * | 2003-08-04 | 2005-02-10 | Pathfinder Energy Services, Inc. | Apparatus for obtaining high quality formation fluid samples |
US7086463B2 (en) * | 1999-03-31 | 2006-08-08 | Halliburton Energy Services, Inc. | Methods of downhole testing subterranean formations and associated apparatus therefor |
US20070158062A1 (en) * | 2006-01-11 | 2007-07-12 | Besst,Inc. | Zone isolation assembly for isolating and testing fluid samples from a subsurface well |
US20070169933A1 (en) * | 2006-01-11 | 2007-07-26 | Besst, Inc., | Sensor assembly for determining fluid properties in a subsurface well |
US20080066535A1 (en) * | 2006-09-18 | 2008-03-20 | Schlumberger Technology Corporation | Adjustable Testing Tool and Method of Use |
US7556097B2 (en) * | 2006-01-11 | 2009-07-07 | Besst, Inc. | Docking receiver of a zone isolation assembly for a subsurface well |
US7631696B2 (en) * | 2006-01-11 | 2009-12-15 | Besst, Inc. | Zone isolation assembly array for isolating a plurality of fluid zones in a subsurface well |
-
2009
- 2009-01-10 US US12/351,834 patent/US20090178797A1/en not_active Abandoned
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3357504A (en) * | 1965-06-07 | 1967-12-12 | Gerald G Calhoun | Straddle packer wire line tester |
US3248938A (en) * | 1965-10-04 | 1966-05-03 | Petroleum Res Corp | Fluid producing and testing system for petroleum reservoir formations |
US6688390B2 (en) * | 1999-03-25 | 2004-02-10 | Schlumberger Technology Corporation | Formation fluid sampling apparatus and method |
US7086463B2 (en) * | 1999-03-31 | 2006-08-08 | Halliburton Energy Services, Inc. | Methods of downhole testing subterranean formations and associated apparatus therefor |
US6357525B1 (en) * | 1999-04-22 | 2002-03-19 | Schlumberger Technology Corporation | Method and apparatus for testing a well |
US6722432B2 (en) * | 2001-01-29 | 2004-04-20 | Schlumberger Technology Corporation | Slimhole fluid tester |
US20050028974A1 (en) * | 2003-08-04 | 2005-02-10 | Pathfinder Energy Services, Inc. | Apparatus for obtaining high quality formation fluid samples |
US20070158062A1 (en) * | 2006-01-11 | 2007-07-12 | Besst,Inc. | Zone isolation assembly for isolating and testing fluid samples from a subsurface well |
US20070169933A1 (en) * | 2006-01-11 | 2007-07-26 | Besst, Inc., | Sensor assembly for determining fluid properties in a subsurface well |
US7556097B2 (en) * | 2006-01-11 | 2009-07-07 | Besst, Inc. | Docking receiver of a zone isolation assembly for a subsurface well |
US7631696B2 (en) * | 2006-01-11 | 2009-12-15 | Besst, Inc. | Zone isolation assembly array for isolating a plurality of fluid zones in a subsurface well |
US20080066535A1 (en) * | 2006-09-18 | 2008-03-20 | Schlumberger Technology Corporation | Adjustable Testing Tool and Method of Use |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130036811A1 (en) * | 2009-09-01 | 2013-02-14 | Intelisys Limited | In-borehole gas monitor apparatus and method comprising a voc concentration analyser and a voc collector |
US10208585B2 (en) | 2015-08-11 | 2019-02-19 | Intrasen, LLC | Groundwater monitoring system and method |
CN109580207A (en) * | 2018-12-28 | 2019-04-05 | 中国科学院武汉岩土力学研究所 | A kind of downhole packer method for testing performance and device |
CN115341874A (en) * | 2022-07-07 | 2022-11-15 | 北京科技大学 | Method and system for determining location and sequestration mode of coal bed carbon sequestration area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4338141B2 (en) | Method and system for monitoring groundwater using borehole | |
EP1792048B1 (en) | Remote gas monitoring apparatus for seabed drilling | |
RU2556583C2 (en) | Directed sampling of formation fluids | |
EP2749732B1 (en) | Measurement while drilling tool with interconnect assembly | |
CA2440991C (en) | Method and apparatus to provide miniature formation fluid sample | |
NO20220364A1 (en) | Core sampling and analysis using a sealed pressure vessel | |
US6761062B2 (en) | Borehole testing system | |
BRPI1000894A2 (en) | equipment, and method for conducting tests in an underground formation | |
US7845883B1 (en) | Method for remediation of contaminated subsurface area | |
EP3362641A1 (en) | Method for monitoring gas lift wells using minimal concentration tracer materials | |
NO323047B1 (en) | Formation loading method using rudder stamping test device in lined borehole | |
US20140105760A1 (en) | Sensor assembly for determining fluid properties in a subsurface well | |
US20230109552A1 (en) | Stacked dynamic steady-state flow and chemistry profiling for long-screened test wells used in mud rotary pilot holes | |
US20090178797A1 (en) | Groundwater monitoring technologies applied to carbon dioxide sequestration | |
US20030155152A1 (en) | Method of conducting in situ measurements of properties of a reservoir fluid | |
US20070199691A1 (en) | Zone isolation assembly for isolating a fluid zone in a subsurface well | |
AU2010362681B2 (en) | Very high pressure sample capture and transportation vessel | |
AU2005287856B2 (en) | Remote gas monitoring apparatus for seabed drilling | |
NO20101003A1 (en) | Elongated probe for wellbore tool | |
JPH07209280A (en) | Method and apparatus for measuring concentration of dissolved gas | |
WO2001077489A1 (en) | A method of conducting in situ measurements of properties of a reservoir fluid | |
MXPA06005494A (en) | Apparatus and method for obtaining downhole samples |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: BESST, INC., CALIFORNIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HELLER, NOAH R.;REEL/FRAME:022087/0020 Effective date: 20090109 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO PAY ISSUE FEE |