US20080264649A1 - Modular well servicing combination unit - Google Patents
Modular well servicing combination unit Download PDFInfo
- Publication number
- US20080264649A1 US20080264649A1 US11/796,168 US79616807A US2008264649A1 US 20080264649 A1 US20080264649 A1 US 20080264649A1 US 79616807 A US79616807 A US 79616807A US 2008264649 A1 US2008264649 A1 US 2008264649A1
- Authority
- US
- United States
- Prior art keywords
- module
- combination unit
- unit according
- nitrogen
- well servicing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000009428 plumbing Methods 0.000 claims abstract description 15
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 claims description 249
- 229910052757 nitrogen Inorganic materials 0.000 claims description 124
- 238000007689 inspection Methods 0.000 claims description 17
- 238000002156 mixing Methods 0.000 claims description 16
- 239000002253 acid Substances 0.000 claims description 13
- 238000012423 maintenance Methods 0.000 claims description 9
- 239000004568 cement Substances 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 4
- 239000004576 sand Substances 0.000 claims description 4
- 239000003180 well treatment fluid Substances 0.000 claims description 2
- 229910001873 dinitrogen Inorganic materials 0.000 claims 1
- 239000012530 fluid Substances 0.000 description 52
- 239000007788 liquid Substances 0.000 description 35
- 238000009826 distribution Methods 0.000 description 19
- LYCAIKOWRPUZTN-UHFFFAOYSA-N Ethylene glycol Chemical compound OCCO LYCAIKOWRPUZTN-UHFFFAOYSA-N 0.000 description 18
- 238000003860 storage Methods 0.000 description 16
- 239000000126 substance Substances 0.000 description 15
- 238000005086 pumping Methods 0.000 description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 11
- 239000003921 oil Substances 0.000 description 10
- WGCNASOHLSPBMP-UHFFFAOYSA-N hydroxyacetaldehyde Natural products OCC=O WGCNASOHLSPBMP-UHFFFAOYSA-N 0.000 description 9
- 238000009834 vaporization Methods 0.000 description 9
- 230000008016 vaporization Effects 0.000 description 9
- 230000008901 benefit Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 7
- 239000007789 gas Substances 0.000 description 7
- 239000012528 membrane Substances 0.000 description 7
- 239000000203 mixture Substances 0.000 description 7
- 238000013459 approach Methods 0.000 description 6
- 238000002347 injection Methods 0.000 description 6
- 239000007924 injection Substances 0.000 description 6
- 210000002445 nipple Anatomy 0.000 description 6
- 238000006243 chemical reaction Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 5
- 238000012546 transfer Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 229910001220 stainless steel Inorganic materials 0.000 description 4
- 239000010935 stainless steel Substances 0.000 description 4
- 239000006200 vaporizer Substances 0.000 description 4
- 150000007513 acids Chemical class 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 239000000835 fiber Substances 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- CYTYCFOTNPOANT-UHFFFAOYSA-N Perchloroethylene Chemical compound ClC(Cl)=C(Cl)Cl CYTYCFOTNPOANT-UHFFFAOYSA-N 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 2
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 230000003190 augmentative effect Effects 0.000 description 2
- 239000002826 coolant Substances 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 238000002955 isolation Methods 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 238000010926 purge Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000003381 stabilizer Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 208000032544 Cicatrix Diseases 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 235000009967 Erodium cicutarium Nutrition 0.000 description 1
- 244000261422 Lysimachia clethroides Species 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000007872 degassing Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 239000002283 diesel fuel Substances 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 239000003112 inhibitor Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 150000002829 nitrogen Chemical class 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000005336 safety glass Substances 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 231100000241 scar Toxicity 0.000 description 1
- 230000037387 scars Effects 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 239000007858 starting material Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000005496 tempering Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/22—Handling reeled pipe or rod units, e.g. flexible drilling pipes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/166—Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
- E21B43/168—Injecting a gaseous medium
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/2607—Surface equipment specially adapted for fracturing operations
Definitions
- This invention relates, generally, to the treatment of oil and gas wells using fluids to increase the production capability of the wells, and more specifically, to providing for treatment of oil and gas wells with a means and apparatus that combines multiple modules—which may include: coiled tubing, nitrogen generation, fluid pumping, blending tanks, wireline inspection, and other modules—into a single unit.
- the prior art equivalent typically brings as many as five transportation units (tractor-trailers, barges, or boats) to the well to be treated, one having a coil tubing unit; one having either a liquid nitrogen tank or a large footprint nitrogen generation unit; one having the nitrogen pumping unit; one high pressure pumping unit for acids and other chemicals; and a separate wireline unit.
- the prior art may have a very large boat or barge with multiple units, each with its own power source. Separate, dedicated power sources for each unit drastically increases the mass and volume that must be transported.
- Current power packs are horsepower limited, which limits the equipment that each can drive.
- each of the five units above has its own engine. Even with a hydraulic power manifold to drive multiple units from a single engine, the horsepower limits how many can be integrated. The requirement for multiple (or much larger) transportation units increases the transportation costs, time, and personnel required to bring the units to the well and run these services.
- U.S. Provisional Patent application 60/699,759 teaches a single, relatively small, self-powered unit with all of the equipment and accessories for running a nitrogen generation system and pressure pumping chemicals to treat wells.
- U.S. Pat. No. 6,230,805 (Vercaemer) teaches a method of hydraulic fracturing in which at least two separate fracturing fluid components are pumped downhole—one of said components being pumped downhole within coiled tubing—but does not teach how to accomplish this with a single compact unit in which all equipment is powered by an onsite engine and that also provides for the coil tubing operation and wireline inspection.
- U.S. Pat. No. 6,702,011 also by the present inventors, teaches a combined nitrogen treatment system and coiled tubing system in one tractor/trailer apparatus.
- a single tractor-trailer unit is provided, in which the tractor itself drives a plurality of hydraulic motors that control the pumps and motors associated with a nitrogen system that is used for injecting nitrogen into a well.
- a crane unit and a coiled tubing injection unit are also provided.
- no disclosure is made for the provision of wireline inspection, well servicing fluid tanks, mixers, and pumps.
- the preferred type of nitrogen system is tanks of liquid nitrogen, although an alternative mode is disclosed in which the liquid nitrogen system is replaced with one or more nitrogen generators that gather nitrogen from the earth's atmosphere.
- the nitrogen could be mixed with well servicing fluids provided by the same unit.
- PCT Application US2004/034521 teaches a three in-one nitrogen treatment system, fluid system, and coiled tubing system in one unit.
- a single tractor-trailer or marine unit is provided, but unlike the engineless present invention, an onboard engine drives a plurality of hydraulic motors that control the pumps and motors associated with a nitrogen system and a fluid system that is used for injecting nitrogen and fluid into a well.
- a coil tubing system is also provided. The only means disclosed for pumping fluid to the well is through the coil tubing system and no disclosure is made for the injection of well servicing fluids directly into the well, and no fluid blending tank is disclosed. Also, no means for wireline inspection is provided.
- the off-shore prior art that has the same functionality as the present invention is larger, more expensive, and requires either multiple barges or ships—necessitating additional time and expense for set up and take down of ship to ship plumbing- or a larger, more expensive barge or ship that has a deeper draft and can therefore depart from and reach fewer locations.
- the primary object of this present invention is to provide a small engineless unit that can be placed on a single small barge or ship or a single tractor-trailer or marsh buggy and use an onsite power supply to provide wireline inspection, coil tubing operations, and nitrogen generation and pump a combination of high pressure nitrogen and acids or other chemicals into wells.
- the configuration of the present invention on a marsh buggy could be nearly identical to the configuration on a boat or barge.
- Combination of multiple units such as a wireline, coil tubing unit, nitrogen generator with fluid pumping and mixing on a single transportation unit and all powered by an external power source through a single onboard custom hydraulic manifold is not known in the prior art to the best of the inventor's knowledge.
- the primary object of the present invention is to provide a modular well servicing unit that can be placed on a single tractor-trailer, amphibious vehicle, or a small barge or ship.
- a single well servicing combination unit comprising: a hydraulic manifold removably connectable to the power-take-off of a power source to drive a plurality of hydraulic pumps and motors that control a plurality of well servicing modules that are removably mounted on said combination unit, said well servicing modules being interconnectable by plumbing.
- FIG. 1 is a top view diagram of the lay out of a 105 class jack-up boat with a custom hydraulic manifold, wireline inspection module, coil tubing module, crane, mixing tank module, storage tank module, fluid pump with power pack, operator console module, and nitrogen generation module, in accordance with an embodiment of the present invention.
- FIG. 2 is an elevated, block diagram side view of the deck of the boat from FIG. 1 , that shows a nitrogen generation module that is connected to the discharge line at a tee, and storage, mixing, and pumping modules for well servicing fluid connected to said discharge line at said tee, in accordance with an embodiment of the present invention.
- FIG. 3 illustrates, in block diagram, the various systems that are used in accordance with the present invention to treat a well with nitrogen and well servicing fluid, in accordance with an embodiment of the present invention.
- FIG. 4 is a pictorial view of three nitrogen generator modules, in accordance with an embodiment of the present invention.
- FIG. 5 is a pictorial view of a module using membrane technology to pull gaseous nitrogen out of the atmosphere, in accordance with an embodiment of the present invention.
- FIG. 6 shows the external interfaces of the entire WISETM unit including customer-furnished modules, in accordance with an embodiment of the present invention.
- FIG. 7 shows the external interfaces of a subset of the entire WISETM unit, in accordance with an embodiment of the present invention.
- FIG. 8 shows injector head performance, in accordance with an embodiment of the present invention.
- FIG. 9 shows injector head performance, in accordance with an embodiment of the present invention.
- FIG. 10 is a block diagram of a WISETM Unit including a coil tubing deployment module, injector head module, and well control stack module, in accordance with an embodiment of the present invention.
- FIG. 11 is a block diagram of a WISETM CTN2 Unit including a coil tubing deployment module, injector head module, and well control stack BOP Module, in accordance with an embodiment of the present invention.
- the preferred embodiment of the present invention is the “WISETM Unit”, comprising a plurality of modules and components.
- the “WISETM Unit” is the entire package of equipment delivered.
- a “Module” can be any of the removably connectable major parts of the “WISETM Unit.” Examples:
- a Component is a sub part of a Module. This specification defines components only to the extent necessary for manufacturing or operational flexibility.
- the WISETM CT SGN2 unit's architecture (also called the “WISETM Architecture”) allows the insertion of different servicing modules (i.e., coiled tubing, self-generating nitrogen, and servicing fluid pumps) when ordering future WISETM Units without redesign of other Modules (i.e., operator control module, transportation modules, and power packs).
- servicing modules i.e., coiled tubing, self-generating nitrogen, and servicing fluid pumps
- the WISETM Unit's architecture and design documentation allow substitution of major Modules and Components supplied by one manufacturer with Modules and Components meeting the same specifications supplied by another manufacturer to take advantage of shorter lead times.
- a system integrator approach is enabled by completely modularity. Every piece of well intervention equipment becomes a Module to be “integrated” into a working unit. This gives WISE flexibility of design without sacrificing producibility of design (manufacturability—standards) and has direct impact on depot maintenance program and reduces the number of different spare parts in inventory (Standardization).
- FIG. 1 a top view of jack-up boat 10 having either a gasoline engine or a diesel engine is illustrated.
- nitrogen generator module 31 also shown in FIG. 4
- boat deck 30 Mounted on the boat deck 30 are nitrogen generator module 31 (also shown in FIG. 4 ) that extracts nitrogen from the atmosphere to eliminate the need for (and the associated cost of) transporting and filling nitrogen tanks.
- Mounted to boat deck 30 are chemical storage tank modules 42 that supply chemicals to blending tank modules 50 where the chemicals are mixed.
- the mixed chemicals flow to the well servicing fluid pump module 48 .
- the mixed chemicals may flow through the coil tubing 82 , 50 to the well head.
- Wireline inspection module 52 is mounted to deck 30 .
- control cabin module 34 Also mounted on the deck 30 is control cabin module 34 in which the electrical and hydraulic modules 36 are controlled by a human operator. Components are described in greater detail in the description of FIG. 2 below.
- FIG. 2 a diagram of a jack-up boat 10 is illustrated.
- a custom hydraulic manifold 70 that distributes power from an external power source 200 to all engineless modules on deck 30 —nitrogen air feed module 32 , injector module 44 , crane module 46 , well servicing pump module 48 , blending tank module 50 , and Wireline module 52 .
- Mounted on deck 30 is a feed air system 32 that is connected to nitrogen membranes 33 . Together, the feed air system 32 and nitrogen membranes 33 function as a nitrogen generator module 31 (also shown in FIG. 4 ) that extracts nitrogen from the atmosphere to eliminate the need for (and the associated cost of) transporting and filling nitrogen tanks.
- nitrogen generator module 31 utilizes a membrane 33 (also shown in detail in FIG. 5 ) that allows nitrogen-rich air from the earth's atmosphere to be continuously fed into the bundle housing.
- the air reaches the center of the bundle of membrane fibers which, at that point, consists mostly of gaseous nitrogen.
- the nitrogen collects in the mandrel at the center of the bundle.
- the oxygen and other fast gases pass through the wall of the membrane fibers as the fast gases go through to be collected at the end. Oxygen, water vapor, and the other fast gases are continuously collected and are moved from the bundle, thus leaving the nitrogen available to be used for injection into the well being treated. This occurs at near ambient pressure and temperature.
- the nitrogen generator modules 31 of the preferred embodiment accomplish this nitrogen generation with a smaller footprint than any prior art the inventor knows.
- the nitrogen then flows to the nitrogen booster compressor 38 that then compresses the dry nitrogen to the desired pressure.
- the nitrogen will then be pumped to the tee 39 where it mixes with a fluid or a fluid mix, such as an acid, and then the resulting mixture enters the discharge line 41 .
- the nitrogen in the discharge line may be either liquid or gas.
- Mounted to boat deck 30 are chemical storage tank modules 42 that supply chemicals to blending tanks 50 where the chemicals are mixed.
- the mixed chemicals flow first to the centrifugal pump 47 and then to the well servicing fluid pump module 48 .
- the mixed chemicals flow to the tee 39 where the mixed chemicals mix with nitrogen and the resulting mixture flows into the discharge line 41 . From the discharge line 41 the resulting mixture can flow directly to the well head or through the coil tubing 55 to the well head.
- An injector module 44 also described in more detail hereinafter, is situated on the boat deck.
- a hydraulically driven crane module 46 is also situated on the boat deck for situating the coiled tubing injector module 44 immediately above the well being treated.
- a hose reel module 45 and a coiled tubing reel module 55 are situated on the deck 30 .
- a goose neck module 53 is also situated on the deck 30 adjacent the coiled tubing injector module 44 for feeding the coiled tubing from the reel into the injector.
- a stripper 54 is located on the lower end of the coiled tubing injector system 44 for enabling the coiled tubing 55 to be placed into the well being treated.
- a blow out preventer module 56 is also located on the boat deck to be used in shutting in the well to be treated, if needed.
- Wireline inspection module 52 is mounted to deck 30 . Also mounted on the deck 30 is a control cabin 34 in which the electrical 36 (not shown) and hydraulic modules 70 are controlled by a human operator. Referring now to FIG. 3 , there is illustrated in block diagram some of the components that are illustrated in FIGS. 1 and 2 .
- the nitrogen air feed module 32 has its output connected into the input of a hydraulic pump 90 .
- the custom hydraulic manifold 70 which may be connected to either a gasoline powered or diesel powered external power source or marine mobile power pack 200 , has a return line 74 .
- a hydraulic pump 90 is connected into a hydraulic motor 92 that is used to drive the return line 74 .
- a hydraulic pump 96 is connected into a hydraulic motor 98 that is used to drive the chains of the injector module 44 that can either move the coiled tubing into the well being treated or pull the coiled tubing out of the well being treated, as desired, depending on the direction of the chain rotation.
- Another hydraulic pump 100 drives a motor 102 to drive the crane 46 illustrated in FIG. 2 .
- Another hydraulic pump 110 drives a motor 112 to power the well servicing pump 48 , which is illustrated in FIG. 2 .
- Another hydraulic pump 116 drives a motor 118 to power the blending tank modules 50 , which are illustrated in FIG. 2 .
- Another hydraulic pump 122 drives a motor 124 to power the wireline inspection module 52 , which is illustrated in FIG. 2 .
- a custom hydraulic manifold distributes power to each of the five modules.
- Said power source with a power-take-off 200 routed through custom hydraulic manifold 70 drives each of the hydraulic pumps 90 , 96 , 100 , 116 and 122 as shown by the line 106 .
- the hydraulic pumps 90 , 96 , 100 , 116 and 122 are preferably driven by one or more belts that can be used with clutch pulleys as desired.
- the compressor module 108 is also driven by the custom hydraulic manifold 70 via the drive line 106 to bring the nitrogen down to its desired temperature.
- the preferred embodiment of the present invention can operate with a separate land or marine external power source. As long as the preferred embodiment of the present invention can avail itself of an adequate power source it can do all of the following well servicing, including but not limited to:
- One advantage of the present invention is that it makes it possible to do with one unit and an single power source what previously required five separate powered units—a wireline inspection unit, a coiled tubing unit, a liquid nitrogen tank transport means, a powered unit with a high pressure pumping system for other chemicals and acids, and a unit with a nitrogen pumping means. Because this embodiment allows one unit to do what once required several powered units connected together with the requisite hoses and plumbing, the time and expense of plumbing rig-up is avoided. Disconnecting and stowing all of the plumbing after completion is also avoided, saving additional time and labor.
- the preferred embodiment of the present invention can do the same job with one unit in one day.
- the present invention saves the trouble and expense of transporting five separate power sources to the site, each of which takes up over sixty square feet of deck space, allowing this combined unit to be smaller and cheaper than any prior art equivalent.
- the smallest existing vessel with a coil tubing unit is a 175 class boat, yet an embodiment of the present invention with an integrated coil tubing module along with four other integrated modules can be placed on a single 105 class boat.
- the deck load of the prior art equivalent would be about 150,000 pounds, yet an embodiment of the present invention has a deck load of only about 50,000 pounds, allowing operations in shallower water.
- the danger of transporting liquid nitrogen, which is an explosion hazard, is also avoided. Hazards associated with running plumbing and hoses from boat to boat are also avoided, and fewer personnel are required.
- the preferred embodiment of the present invention has a smaller footprint and lighter weight than any functional equivalent.
- the preferred embodiment of the present invention is even more advantageous in remote locations where liquid nitrogen is rare and expensive, or extremely difficult to transport to the well head.
- the invention is well suited for off shore use. Because of its small footprint, this invention allows replacement of large, expensive vessels with much smaller and cheaper barges or ships that have shallower drafts.
- the invention can also be mounted on and use the engine of a truck power pack and is equally suited for on shore use.
- An embodiment of the present invention may be trailered on land, to replace as many as five separate units and realize similar time and cost savings.
- CT SGN2 Onshore-offshore convertible WISETM Combination Coiled Tubing (CT) and Nitrogen (N2) Unit with a Self-Generating Nitrogen (SGN2) Module.
- This WISETM Unit is called the “WISETM CT SGN2 ONSHORE-OFFSHORE CONVERTIBLE UNIT” abbreviated as “CT SGN2”.
- a Truck Power Pack will tow a crane trailer module loaded with modules such as: an Operator Control Module, Coiled Tubing Deployment Module, Injector Head Module, Well Control Stack BOP Module, and SGN2 Nitrogen Module to and from well servicing sites. At well servicing sites, the Truck Power Pack will power the servicing equipment.
- modules such as: an Operator Control Module, Coiled Tubing Deployment Module, Injector Head Module, Well Control Stack BOP Module, and SGN2 Nitrogen Module to and from well servicing sites.
- the Truck Power Pack will power the servicing equipment.
- An advantage of the present invention is that customer-furnished equipment (CFE) can be provided to be integrated into the WISETM Unit, allowing a high degree of customization and cost savings. Changes to the unit configuration can be made much later in the manufacturing/assembly process, or even after the unit is in use in the field.
- CFE customer-furnished equipment
- This WISETM Unit can be deployed for both on-shore and off-shore jobs:
- the WISETM CTN2 Unit can be augmented by an independently-powered fluid pump (customer-furnished) to deliver servicing fluid or nitrified servicing fluid into the well.
- the WISETM CTN2 Unit provides fluid pumping from its Marine Mobile Power Pack to deliver servicing fluid or nitrified servicing fluid into the well.
- the WISETM Unit can be reconfigured for different well-servicing functions at the maintenance depot level.
- the cryogenic liquid nitrogen module can be replaced by or augmented by a fluid servicing pump without modifying the operator control module.
- the following interface standards are universal throughout all of the WISETM units. These standards govern connections between the Operator Control Module and other modules within the WISETM Unit.
- the WISETM Unit will preferably provide nitrogen at a discharge pressure ranging from 0-7500 psig and at an operator-controllable flow rate ranging from 0-850 scfm, while maintaining the discharge temperature at 10° F. above ambient.
- the WISETM Unit will preferably transfer servicing fluid from an independently-powered, customer-furnished source to the well via 2-inch pipe with 1502 Hammer unions compatible with well-servicing fluids.
- the WISETM Unit will preferably pressurize and transfer servicing fluid from a customer-furnished source to the well via the CT at an operator-controllable flow rate ranging from 0-50 gpm and a pressure ranging from 0-5000 psig.
- the Truck Power Pack will tow the WISETM Unit trailer (comprising for example: a crane trailer loaded with an Operator Control Module, Coiled Tubing Deployment Module, and Nitrogen Module) to and from well servicing sites.
- WISETM Unit trailer comprising for example: a crane trailer loaded with an Operator Control Module, Coiled Tubing Deployment Module, and Nitrogen Module
- the Unit travels over a wide range of roads, paved and unpaved, between well-servicing jobs.
- the Unit should configure for transportation to minimize need for special permits in onshore and offshore configurations.
- the Unit can operate beyond its transportation envelope with an operator-extended crane and other extensions such as coolers or open ventilation doors.
- the Unit may be Shipped Overseas.
- Well servicing modules can be installed onto the Onshore Transport Trailer Module with cranes or forklifts.
- the WISETM Unit can provide self-contained onshore transportation for the onshore configuration.
- An embodiment of the onshore configuration comprises all modules except the offshore marine mobile power pack, transportation skid kit, and hose basket with offshore hose bundle.
- the WISETM Unit should preferably have a total height less than 13 feet, 6 inches.
- the WISETM Unit should preferably have a total width of less than 8 feet, 6 inches.
- the WISETM Unit should preferably have a total length of less than 64 feet.
- the preferred embodiment of a marine mobile power pack should preferably be transportable onshore on trucks.
- no single skid in the offshore transportation configuration weigh more than 18,500 pounds, except for the coil tubing drum loaded with coil tubing in its transportation skid.
- the WISETM Unit should preferably weigh less than 85,000 pounds including one full cryogenic nitrogen storage vessel and 10,000 feet of 11 ⁇ 4′′ coil tubing.
- the WISETM Unit should preferably be designed so that the following modules and components can be removed from its onshore transportation trailer for separate transport to an offshore site:
- Availability is defined as the WISETM Unit being ready for transit between well-servicing sites and for performing well-servicing activities. Increasing availability of units minimizes maintenance down time and increases utilization rate. By keeping modules at the depot in inventory, a “broken” module is simply replaced by a certified working. This keeps a unit in service more days per month but with no additional fixed costs (such as crew, etc.). Taking this maintenance approach improves unit availability (utilization).
- the WISETM Unit should preferably provide well services for 12 hours without refueling.
- the WISETM Unit should preferably require no preventive maintenance beyond that described in Appendix C, Customer Maintenance Program.
- the WISETM Unit should preferably incorporate the following provisions (hardware “scars”) for the post-deployment addition of a well servicing fluid pump integrated into the onshore configuration:
- the complete WISETM Unit has the following modules integrated:
- Interface P-1 and P-2 should preferably be identical for hydraulics and electrical.
- Interface P-2 should preferably be identical to the interface between the WISETM III power pack and the remainder of the WISETM III Unit.
- the Operator Control Module represents the core of the WISETM technology principal of central control and operation of multiple well-serving functions from a single power source and control point. Mated with the appropriate power sources and ancillary equipment packages, this module monitors and controls: Coiled Tubing Deployment, Cryogenic Nitrogen, and Fluid Pumping Operations (if installed).
- the Operator Control Module should preferably provide:
- the Operator Control Module should preferably be a skid-mounted module with a crash frame; forklift guide tubes and a four point sling lift attachment points. Lifting slings are CFE.
- the Operator Control Module should preferably e 96′′ long ⁇ 96′′ wide with height to allow 13′6′′ height clearance when loaded on a 48′′ tall truck trailer.
- the Operator Control Module should preferably weigh 15,500 lbs or less.
- the Operator Control Module should preferably operate in the offshore well servicing environment.
- the Operator Control Module should preferably operate in the onshore well servicing environment.
- the control cabin shall:
- BOP control valves should preferably be labeled from left to right “Blinds”, “Cutters”, “Slips”, “Pipe”, “Aux Pipe” and “Blind Shears”. BOP's to have an emergency back-up circuit from an air or hand operated in cabin pump.
- N2 Boost Pump LN2 discharge pressure gauge (150 psi) with debooster or remote sender to protect operators from cryogenic N2 exposure in case of gauge or gauge plumbing failure.
- N2 tank discharge (vaporizer inlet) pressure gauge (10,000 psi) with debooster or remote sender to protect operators from cryogenic N2 exposure in case of gauge or gauge plumbing failure.
- Cryogenic Nitrogen Triplex Injection Pump Speed control valve (warm end).
- N2 Triplex pump hydraulic pressure gauge 27
- the hydraulic controls should preferably be rated for operation at 3000 psi working pressure.
- the hydraulic distribution component of the operator control module should preferably include:
- the hoses should preferably be labeled at each end with bands imprinted with customer-specified text and by numbered stainless steel washers.
- the electrical distribution component of the operator control module should preferably distribute 120 VAC from the electric generator to the listed components at no more than listed current:
- the electrical distribution component of the operator control module should preferably distribute 120 VAC from an offshore platform supply to the listed components at no more than listed current:
- the electrical distribution component should preferably transform 120 VAC to 12 VDC and distribute 12 VDC to:
- the Water-Glycol Distribution component should preferably distribute a water and glycol mix from the power pack to the cryogenic liquid nitrogen modules via the hydraulics heat exchanger.
- the operator control module shall:
- An over-the-road truck tractor provides onshore transportation and onshore power to the hydraulic systems for all Coiled Tubing and Nitrogen Modules.
- the truck power pack should preferably tow the trailer containing the crane and well-servicing modules to onshore well servicing sites and maintenance locations.
- the truck power pack should preferably provide hydraulic power to concurrently operate the coil tubing and nitrogen modules at their maximum capabilities described in section 2.2 (functional and performance requirements).
- the truck power pack should preferably operate in the onshore well servicing environment.
- the truck power pack consists of a Freightliner 515-hp Detroit Diesel series 60, 14.0 L tractor with 10-speed transmission plus “wet kit” consisting of: an auxiliary transmission, a pair of PTO's, a hydraulic reservoir, a glycol reservoir, fluid coolers, hydraulic pumps, and various hoses, fittings, and control valves. Its features include:
- the OnShore Transport Trailer with Crane should preferably operate in the onshore well servicing environment.
- a 48 ft long single drop-deck triple-axle trailer provides the transportation and work platform for all the well servicing equipment and a hydraulic pedestal crane.
- Injector head and well control stack equipment mount should preferably be within the crane's operating envelope. As shown in FIGS. 8 and 9 , the injector may be operated continuously at the intersection of any speed and pull combination as long as the intersection remains on or to the left and below of the 100 hp continuous output curve.
- Injector head mount should preferably position the HydraRig 635 injector head so that the COIL TUBING can remain stabbed during transport between well servicing sites.
- Mounting brackets and setups should preferably secure one 1800-gallon cryogenic liquid nitrogen tank (tank itself is described in nitrogen module specification).
- a hydraulically-operated pedestal crane (such as: National Crane Model 638, 18 ton Pedestal Crane) should preferably be installed on the crane trailer.
- Crane capacities may vary with boom length and attachments.
- Explosion-proof system that helps prevent cable damage by sensing position of winch cable and attachments with respect to sheave case.
- the crane must fold up and fit in the space provided on the crane trailer during transport.
- a reel pivot cylinder that will pivot to either side of the unit will be installed on the unit.
- the WISETM Unit should preferably deploy coiled tubing using the following combinations of coil tubing deployment modules and injector heads:
- the WISETM Unit can:
- the WISETM Unit can:
- This embodiment of the WISETM Unit supplies hydraulic fluid to an injector at an operator-controllable rate ranging from 0-85 gpm (inclusive) and at an operator-controllable pressure ranging from 0-3000 psig (inclusive).
- the Cryogenic Liquid Nitrogen Module should preferably output up to 1,500 scfm gaseous nitrogen at 10,000 psig. However, note that overall integrated unit nitrogen capacities are below this peak due to horsepower limitations.
- the Cryogenic Liquid Nitrogen Module should preferably meet these output requirements in the onshore well servicing environment.
- the cryogenic liquid nitrogen module has two major components:
- the Cryogenic Liquid Nitrogen Storage Vessel module should preferably comprise a double layer vacuum insulated pressure vessel.
- This tank should preferably be provided with fill, suction vent, and pressure building manifolds and valves.
- the vessel capacity should preferably be approximately 1800 liquid gallons. This vessel will be removably attached to the upper deck on the land transport trailer:
- the Cryogenic Liquid Nitrogen Pump and Vaporization Component should preferably draw cryogenic liquid nitrogen from the Cryogenic Liquid Nitrogen Storage vessel and force it through the vaporizer to produce gaseous nitrogen.
- the Cryogenic Liquid Nitrogen Pump and Vaporization Component should preferably meet its output requirements in the offshore well servicing environment.
- This component should preferably be packaged separate from other systems and the cryogenic liquid nitrogen storage vessel.
- the Cryogenic Liquid Nitrogen Pump and Vaporization Component should interface with customer-furnished offshore cryogenic liquid nitrogen storage vessels without modification.
- the Marine Mobile Power Pack provides hydraulic power to concurrently operate the coil tubing and nitrogen modules at their maximum capabilities.
- the Marine Mobile Power Pack should meet its power output requirement in the offshore well servicing environment.
- the preferred embodiment of the Marine Mobile Power Pack should preferably be skid-mounted and comprise a crash frame, forklift guide tubes and a 4-point lift attachment for lifting slings, and one fall protection harness tie off point incorporated into its crash frame.
- the Marine Mobile Power Pack should preferably be no larger than 126′′long ⁇ 96′′ wide ⁇ 102′′ high including the structural skid to allow 13′6′′ height clearance when loaded on a 48′′ tall truck trailer.
- the Marine Mobile Power Pack should preferably weigh no more than 18,500 lbs maximum wet.
- An Electric Generator provides electric power for distribution by the operator control module in onshore applications.
- the Electric Generator should preferably meet these requirements in the onshore well servicing environment.
- a Coil Tubing Reel Carry Skid is used for transport of a Coil Tubing Reel Drum when the drum is removed from unit.
- the Coil Tubing Reel Carry Skid should preferably hold the Coil Tubing Reel Drum in axle-horizontal position during:
- Coil Tubing Reel Carry Skid should comprise forklift and crane sling provisions for moving between ground, truck, and boat in loaded and unloaded configurations, and one fall protection harness tie off point incorporated into its crash frame.
- a Coil Tubing Component Carry Skid is used for transport of injector head, well control stack, and CT-specific tools when removed from a WISETM Unit onshore transportation trailer.
- the Coil Tubing Component Carry Skid should preferably hold the injector head, well control stack, and CT-specific tools during:
- the Coil Tubing Component Carry Skid should preferably have provisions for moving between ground, truck, and boat in loaded and unloaded configurations.
- a hose reel skid when the WISETM Unit is converted to offshore use, a hose reel skid will provide the hydraulic fluid distribution between the modules.
- the onshore hydraulic fluid distribution will remain on the crane trailer.
- the Hose Reel Skid should preferably carry all the WISETM Unit's interconnecting hoses needed for offshore use.
- the Hose Reel Skid should preferably protect the WISETM Unit's interconnecting hoses from damage during transport from onshore to offshore.
- the Hose Reel Skid should preferably have provisions for moving between ground, truck, and boat in loaded and unloaded configurations.
- the Hose Reel Skid should preferably comprise:
- the hoses should preferably be labeled at each end with bands imprinted with text and by numbered stainless steel washers.
- the Hose Reel Skid should preferably include 3 hose reels:
- the Hose Reel Skid should preferably include a hose rack for the marine mobile power pack-to-operator control module hoses.
- Availability The days on which the WISETM Unit is ready for transit between well-servicing sites and for well-servicing activities Scar—A hardware provision for a module or component coming later: must be consistent with the interface requirement Hook—A software provision for programming coming later, such as the ability to expand functionality etc.
- Depot Maintenance maintenance done at a shop Field Maintenance—maintenance done at a job site (other than inside the shop)
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
A single well servicing combination unit comprising: a hydraulic manifold removably connectable to the power-take-off of a power source to drive a plurality of hydraulic pumps and motors that control a plurality of well servicing modules that are removably mounted on said combination unit, said well servicing modules being interconnectable by plumbing.
Description
- This application is a CONTINUATION IN PART of PCT Patent Application PCT/U.S.07/06891 entitled “WELL SERVICING COMBINATION UNIT”, filed 20 Mar. 2007 at the USPTO, which is herein incorporated by reference. This application claims the benefit of US Provisional Patent Application entitled “WELL SERVICING MODULAR COMBINATION UNIT”, filed 19 Apr. 2007 at the USPTO, which is herein incorporated by reference.
- This invention relates, generally, to the treatment of oil and gas wells using fluids to increase the production capability of the wells, and more specifically, to providing for treatment of oil and gas wells with a means and apparatus that combines multiple modules—which may include: coiled tubing, nitrogen generation, fluid pumping, blending tanks, wireline inspection, and other modules—into a single unit.
- It is known in the art to use self-powered units to provide wireline inspection and workover operations using gaseous nitrogen to remove sand and/or water or other impediments to production of oil and gas wells. The prior art has not recognized that a single, relatively small, engineless unit requiring minimal set-up/take-down time can be provided with all of the equipment and accessories for tapping into an onsite power source to run a combined and integrated system that may include one or more of the following: coiled tubing unit, nitrogen generator, fluid pumps, blending tanks, and wireline inspection unit, or other units.
- The prior art equivalent typically brings as many as five transportation units (tractor-trailers, barges, or boats) to the well to be treated, one having a coil tubing unit; one having either a liquid nitrogen tank or a large footprint nitrogen generation unit; one having the nitrogen pumping unit; one high pressure pumping unit for acids and other chemicals; and a separate wireline unit. Alternatively, the prior art may have a very large boat or barge with multiple units, each with its own power source. Separate, dedicated power sources for each unit drastically increases the mass and volume that must be transported. Current power packs are horsepower limited, which limits the equipment that each can drive. Conventionally, each of the five units above has its own engine. Even with a hydraulic power manifold to drive multiple units from a single engine, the horsepower limits how many can be integrated. The requirement for multiple (or much larger) transportation units increases the transportation costs, time, and personnel required to bring the units to the well and run these services.
- U.S. Provisional Patent application 60/699,759 teaches a single, relatively small, self-powered unit with all of the equipment and accessories for running a nitrogen generation system and pressure pumping chemicals to treat wells.
- U.S. Pat. No. 6,230,805 (Vercaemer) teaches a method of hydraulic fracturing in which at least two separate fracturing fluid components are pumped downhole—one of said components being pumped downhole within coiled tubing—but does not teach how to accomplish this with a single compact unit in which all equipment is powered by an onsite engine and that also provides for the coil tubing operation and wireline inspection.
- U.S. Pat. No. 6,273,188 (McCafferty) teaches a trailer mounted coiled tubing rig.
- U.S. Pat. No. 6,702,011, also by the present inventors, teaches a combined nitrogen treatment system and coiled tubing system in one tractor/trailer apparatus. A single tractor-trailer unit is provided, in which the tractor itself drives a plurality of hydraulic motors that control the pumps and motors associated with a nitrogen system that is used for injecting nitrogen into a well. A crane unit and a coiled tubing injection unit are also provided. Unlike the present invention, no disclosure is made for the provision of wireline inspection, well servicing fluid tanks, mixers, and pumps. Unlike the present invention, the preferred type of nitrogen system is tanks of liquid nitrogen, although an alternative mode is disclosed in which the liquid nitrogen system is replaced with one or more nitrogen generators that gather nitrogen from the earth's atmosphere. However, it was not disclosed, as in the present invention, that the nitrogen could be mixed with well servicing fluids provided by the same unit.
- PCT Application US2004/034521 teaches a three in-one nitrogen treatment system, fluid system, and coiled tubing system in one unit. A single tractor-trailer or marine unit is provided, but unlike the engineless present invention, an onboard engine drives a plurality of hydraulic motors that control the pumps and motors associated with a nitrogen system and a fluid system that is used for injecting nitrogen and fluid into a well. Like the present invention, a coil tubing system is also provided. The only means disclosed for pumping fluid to the well is through the coil tubing system and no disclosure is made for the injection of well servicing fluids directly into the well, and no fluid blending tank is disclosed. Also, no means for wireline inspection is provided.
- The off-shore prior art that has the same functionality as the present invention is larger, more expensive, and requires either multiple barges or ships—necessitating additional time and expense for set up and take down of ship to ship plumbing- or a larger, more expensive barge or ship that has a deeper draft and can therefore depart from and reach fewer locations.
- The primary object of this present invention is to provide a small engineless unit that can be placed on a single small barge or ship or a single tractor-trailer or marsh buggy and use an onsite power supply to provide wireline inspection, coil tubing operations, and nitrogen generation and pump a combination of high pressure nitrogen and acids or other chemicals into wells. The configuration of the present invention on a marsh buggy could be nearly identical to the configuration on a boat or barge. Combination of multiple units such as a wireline, coil tubing unit, nitrogen generator with fluid pumping and mixing on a single transportation unit and all powered by an external power source through a single onboard custom hydraulic manifold is not known in the prior art to the best of the inventor's knowledge.
- The primary object of the present invention is to provide a modular well servicing unit that can be placed on a single tractor-trailer, amphibious vehicle, or a small barge or ship.
- The approaches described in this section are approaches that could be pursued, but not necessarily approaches that have been previously conceived or pursued. Therefore, unless otherwise indicated, it should not be assumed that any of the approaches described in this section qualify as prior art merely by virtue of their inclusion in this section.
- A single well servicing combination unit comprising: a hydraulic manifold removably connectable to the power-take-off of a power source to drive a plurality of hydraulic pumps and motors that control a plurality of well servicing modules that are removably mounted on said combination unit, said well servicing modules being interconnectable by plumbing.
- These and other features, aspects, and advantages of the present invention will become better understood when the following detailed description is read with reference to the accompanying drawings in which like characters represent like parts throughout the drawings, wherein:
-
FIG. 1 is a top view diagram of the lay out of a 105 class jack-up boat with a custom hydraulic manifold, wireline inspection module, coil tubing module, crane, mixing tank module, storage tank module, fluid pump with power pack, operator console module, and nitrogen generation module, in accordance with an embodiment of the present invention. -
FIG. 2 is an elevated, block diagram side view of the deck of the boat fromFIG. 1 , that shows a nitrogen generation module that is connected to the discharge line at a tee, and storage, mixing, and pumping modules for well servicing fluid connected to said discharge line at said tee, in accordance with an embodiment of the present invention. -
FIG. 3 illustrates, in block diagram, the various systems that are used in accordance with the present invention to treat a well with nitrogen and well servicing fluid, in accordance with an embodiment of the present invention. -
FIG. 4 is a pictorial view of three nitrogen generator modules, in accordance with an embodiment of the present invention. -
FIG. 5 is a pictorial view of a module using membrane technology to pull gaseous nitrogen out of the atmosphere, in accordance with an embodiment of the present invention. -
FIG. 6 shows the external interfaces of the entire WISE™ unit including customer-furnished modules, in accordance with an embodiment of the present invention. -
FIG. 7 shows the external interfaces of a subset of the entire WISE™ unit, in accordance with an embodiment of the present invention. -
FIG. 8 shows injector head performance, in accordance with an embodiment of the present invention. -
FIG. 9 shows injector head performance, in accordance with an embodiment of the present invention. -
FIG. 10 is a block diagram of a WISE™ Unit including a coil tubing deployment module, injector head module, and well control stack module, in accordance with an embodiment of the present invention. -
FIG. 11 is a block diagram of a WISE™ CTN2 Unit including a coil tubing deployment module, injector head module, and well control stack BOP Module, in accordance with an embodiment of the present invention. - The preferred embodiment of the present invention is the “WISE™ Unit”, comprising a plurality of modules and components.
- The “WISE™ Unit” is the entire package of equipment delivered.
-
- Example configurations:
- a WISE
™ 2 Unit, or - an OFFSHORE WISE™ Unit
- a WISE
- Example configurations:
- A “Module” can be any of the removably connectable major parts of the “WISE™ Unit.” Examples:
-
- the CT Module,
- the Nitrogen Module,
- the Operator Control Module
- the power pack module
- A Component is a sub part of a Module. This specification defines components only to the extent necessary for manufacturing or operational flexibility.
-
- EXAMPLES
- Pumps
- Cranes
- Valves
- Gauges
- EXAMPLES
- The WISE™ CT SGN2 unit's architecture (also called the “WISE™ Architecture”) allows the insertion of different servicing modules (i.e., coiled tubing, self-generating nitrogen, and servicing fluid pumps) when ordering future WISE™ Units without redesign of other Modules (i.e., operator control module, transportation modules, and power packs).
- The WISE™ Unit's architecture and design documentation allow substitution of major Modules and Components supplied by one manufacturer with Modules and Components meeting the same specifications supplied by another manufacturer to take advantage of shorter lead times. A system integrator approach is enabled by completely modularity. Every piece of well intervention equipment becomes a Module to be “integrated” into a working unit. This gives WISE flexibility of design without sacrificing producibility of design (manufacturability—standards) and has direct impact on depot maintenance program and reduces the number of different spare parts in inventory (Standardization).
- This specification uses the terms “vendor” and “manufacturer” interchangeably.
- Referring now to
FIG. 1 , a top view of jack-upboat 10 having either a gasoline engine or a diesel engine is illustrated. Mounted on theboat deck 30 is nitrogen generator module 31 (also shown inFIG. 4 ) that extracts nitrogen from the atmosphere to eliminate the need for (and the associated cost of) transporting and filling nitrogen tanks. Mounted toboat deck 30 are chemicalstorage tank modules 42 that supply chemicals to blendingtank modules 50 where the chemicals are mixed. The mixed chemicals flow to the well servicingfluid pump module 48. The mixed chemicals may flow through thecoil tubing Wireline inspection module 52 is mounted todeck 30. Also mounted on thedeck 30 iscontrol cabin module 34 in which the electrical andhydraulic modules 36 are controlled by a human operator. Components are described in greater detail in the description ofFIG. 2 below. - Referring now to
FIG. 2 , a diagram of a jack-upboat 10 is illustrated. Mounted on theboat deck 30 is a customhydraulic manifold 70 that distributes power from anexternal power source 200 to all engineless modules ondeck 30—nitrogenair feed module 32,injector module 44,crane module 46, well servicingpump module 48,blending tank module 50, andWireline module 52. Mounted ondeck 30 is afeed air system 32 that is connected tonitrogen membranes 33. Together, thefeed air system 32 andnitrogen membranes 33 function as a nitrogen generator module 31 (also shown inFIG. 4 ) that extracts nitrogen from the atmosphere to eliminate the need for (and the associated cost of) transporting and filling nitrogen tanks. In the preferred embodiment,nitrogen generator module 31 utilizes a membrane 33 (also shown in detail inFIG. 5 ) that allows nitrogen-rich air from the earth's atmosphere to be continuously fed into the bundle housing. The air reaches the center of the bundle of membrane fibers which, at that point, consists mostly of gaseous nitrogen. The nitrogen collects in the mandrel at the center of the bundle. As the air passes through the bundle of membrane fibers, the oxygen and other fast gases pass through the wall of the membrane fibers as the fast gases go through to be collected at the end. Oxygen, water vapor, and the other fast gases are continuously collected and are moved from the bundle, thus leaving the nitrogen available to be used for injection into the well being treated. This occurs at near ambient pressure and temperature. It is an advantage of this embodiment that large volumes of nitrogen can be provided at the well site to be pumped into the well, without the need to transport that entire volume in either liquid or gaseous form to the well site. Thenitrogen generator modules 31 of the preferred embodiment accomplish this nitrogen generation with a smaller footprint than any prior art the inventor knows. The nitrogen then flows to thenitrogen booster compressor 38 that then compresses the dry nitrogen to the desired pressure. The nitrogen will then be pumped to thetee 39 where it mixes with a fluid or a fluid mix, such as an acid, and then the resulting mixture enters thedischarge line 41. The nitrogen in the discharge line may be either liquid or gas. Mounted toboat deck 30 are chemicalstorage tank modules 42 that supply chemicals to blendingtanks 50 where the chemicals are mixed. The mixed chemicals flow first to thecentrifugal pump 47 and then to the well servicingfluid pump module 48. The mixed chemicals flow to thetee 39 where the mixed chemicals mix with nitrogen and the resulting mixture flows into thedischarge line 41. From thedischarge line 41 the resulting mixture can flow directly to the well head or through the coil tubing 55 to the well head. Aninjector module 44, also described in more detail hereinafter, is situated on the boat deck. A hydraulically drivencrane module 46 is also situated on the boat deck for situating the coiledtubing injector module 44 immediately above the well being treated. Ahose reel module 45 and a coiled tubing reel module 55 are situated on thedeck 30. Agoose neck module 53 is also situated on thedeck 30 adjacent the coiledtubing injector module 44 for feeding the coiled tubing from the reel into the injector. Astripper 54 is located on the lower end of the coiledtubing injector system 44 for enabling the coiled tubing 55 to be placed into the well being treated. A blow outpreventer module 56 is also located on the boat deck to be used in shutting in the well to be treated, if needed.Wireline inspection module 52 is mounted todeck 30. Also mounted on thedeck 30 is acontrol cabin 34 in which the electrical 36 (not shown) andhydraulic modules 70 are controlled by a human operator. Referring now toFIG. 3 , there is illustrated in block diagram some of the components that are illustrated inFIGS. 1 and 2 . - The nitrogen
air feed module 32 has its output connected into the input of ahydraulic pump 90. The customhydraulic manifold 70, which may be connected to either a gasoline powered or diesel powered external power source or marinemobile power pack 200, has areturn line 74. Ahydraulic pump 90 is connected into ahydraulic motor 92 that is used to drive thereturn line 74. - A hydraulic pump 96 is connected into a
hydraulic motor 98 that is used to drive the chains of theinjector module 44 that can either move the coiled tubing into the well being treated or pull the coiled tubing out of the well being treated, as desired, depending on the direction of the chain rotation. - Another
hydraulic pump 100 drives amotor 102 to drive thecrane 46 illustrated inFIG. 2 . - Another
hydraulic pump 110 drives amotor 112 to power thewell servicing pump 48, which is illustrated inFIG. 2 . - Another
hydraulic pump 116 drives amotor 118 to power theblending tank modules 50, which are illustrated inFIG. 2 . - Another
hydraulic pump 122 drives amotor 124 to power thewireline inspection module 52, which is illustrated inFIG. 2 . - It should be appreciated that from the power-take-off of a
power source 200, a custom hydraulic manifold distributes power to each of the five modules. Said power source with a power-take-off 200 routed through customhydraulic manifold 70 drives each of thehydraulic pumps hydraulic manifold 70, thehydraulic pumps compressor module 108 is also driven by the customhydraulic manifold 70 via the drive line 106 to bring the nitrogen down to its desired temperature. By using a power-take-off on the vessel (rig, platform, work boat, tug boat, or jack up barge) that is already on site, thatpower source 200, with over 1000 horsepower available, can drive more machines than a less powerful onboard source could. - The preferred embodiment of the present invention can operate with a separate land or marine external power source. As long as the preferred embodiment of the present invention can avail itself of an adequate power source it can do all of the following well servicing, including but not limited to:
-
- Completions
- Workovers
- Underbalanced drilling Well servicing
- Enhanced oil recovery
- Industrial plant degassing and purging
- Mining
- Purging pipelines with nitrogen
- Deepwater marine applications
- LNG & LPG tanks and facilities
- Nitrogen lifting, the flooding wells that won't flow with nitrogen
- Nitrified Acid
- Nitrogen Displacement
Pipeline testing
Tubing testing
- Fix sanding up—Paraffins—Foam wash
Jet with nitrogen
Nitrify acid
Nitrogen inhibitor - One advantage of the present invention is that it makes it possible to do with one unit and an single power source what previously required five separate powered units—a wireline inspection unit, a coiled tubing unit, a liquid nitrogen tank transport means, a powered unit with a high pressure pumping system for other chemicals and acids, and a unit with a nitrogen pumping means. Because this embodiment allows one unit to do what once required several powered units connected together with the requisite hoses and plumbing, the time and expense of plumbing rig-up is avoided. Disconnecting and stowing all of the plumbing after completion is also avoided, saving additional time and labor. Where the prior art would have taken several units and several days (for set-up, inspection, well treatment, and disassembly), the preferred embodiment of the present invention can do the same job with one unit in one day. The present invention saves the trouble and expense of transporting five separate power sources to the site, each of which takes up over sixty square feet of deck space, allowing this combined unit to be smaller and cheaper than any prior art equivalent. The smallest existing vessel with a coil tubing unit is a 175 class boat, yet an embodiment of the present invention with an integrated coil tubing module along with four other integrated modules can be placed on a single 105 class boat. The deck load of the prior art equivalent would be about 150,000 pounds, yet an embodiment of the present invention has a deck load of only about 50,000 pounds, allowing operations in shallower water. The danger of transporting liquid nitrogen, which is an explosion hazard, is also avoided. Hazards associated with running plumbing and hoses from boat to boat are also avoided, and fewer personnel are required. As far as the inventor knows, the preferred embodiment of the present invention has a smaller footprint and lighter weight than any functional equivalent.
- The preferred embodiment of the present invention is even more advantageous in remote locations where liquid nitrogen is rare and expensive, or extremely difficult to transport to the well head.
- The invention is well suited for off shore use. Because of its small footprint, this invention allows replacement of large, expensive vessels with much smaller and cheaper barges or ships that have shallower drafts.
- It should be noted that while the embodiment described so far is powered by a prime mover such as a marine mobile power pack, the invention can also be mounted on and use the engine of a truck power pack and is equally suited for on shore use. An embodiment of the present invention may be trailered on land, to replace as many as five separate units and realize similar time and cost savings.
- Another embodiment of the present invention comprises an onshore-offshore convertible WISE™ Combination Coiled Tubing (CT) and Nitrogen (N2) Unit with a Self-Generating Nitrogen (SGN2) Module. This WISE™ Unit is called the “WISE™ CT SGN2 ONSHORE-OFFSHORE CONVERTIBLE UNIT” abbreviated as “CT SGN2”.
- In the onshore configuration, a Truck Power Pack will tow a crane trailer module loaded with modules such as: an Operator Control Module, Coiled Tubing Deployment Module, Injector Head Module, Well Control Stack BOP Module, and SGN2 Nitrogen Module to and from well servicing sites. At well servicing sites, the Truck Power Pack will power the servicing equipment.
- An advantage of the present invention is that customer-furnished equipment (CFE) can be provided to be integrated into the WISE™ Unit, allowing a high degree of customization and cost savings. Changes to the unit configuration can be made much later in the manufacturing/assembly process, or even after the unit is in use in the field.
- Reconfiguration between On-Shore and Off-Shore Jobs
- This WISE™ Unit can be deployed for both on-shore and off-shore jobs:
-
- The onshore subset of this WISE™ Unit is a truck power pack that tows all servicing modules mounted on a crane trailer to the job site and then powers the servicing equipment on the job site.
- The offshore subset of this WISE™ Unit is the operator control module and servicing modules removed from the onshore crane trailer plus marine mobile power pack. These modules are transported on a customer-furnished truck to port and on a customer-furnished boat to an offshore oil platform. On the offshore oil platform, the marine mobile power pack supplies all power required for the WISE™ Unit.
- By itself, the marine mobile power pack can be used as a backup or substitute for the WISE™ III marine power pack.
- In the onshore configuration, the WISE™ CTN2 Unit can be augmented by an independently-powered fluid pump (customer-furnished) to deliver servicing fluid or nitrified servicing fluid into the well.
- In the offshore configuration, the WISE™ CTN2 Unit provides fluid pumping from its Marine Mobile Power Pack to deliver servicing fluid or nitrified servicing fluid into the well.
- The WISE™ Unit can be reconfigured for different well-servicing functions at the maintenance depot level. The cryogenic liquid nitrogen module can be replaced by or augmented by a fluid servicing pump without modifying the operator control module.
- In the preferred embodiment, to facilitate modularity the following interface standards are universal throughout all of the WISE™ units. These standards govern connections between the Operator Control Module and other modules within the WISE™ Unit.
-
Equipment Interface Table Air Pneumatics ¾″ and Smaller “Parker” 30 Series QD couplers & Industrial Interchange Nipples 1″ Industry Standard “crow's foot” couplers Hydraulic Fluid 1″ and Smaller “Parker 6600 Series” QD Couplers and Nipples 1¼″ and Larger “Snap-Tite” 75 Series Wing Type QD Couplers and Nipples Water Glycol All “Snap-Tite” VH Series QD Vaporization Loops Couplers and Nipples Water Glycol All “Snap-Tite” VH Series QD Vaporization Loops Couplers and Nipples Liquid Nitrogen All 150N Acme Thread Couplers and Nipples Gaseous Nitrogen All Figure 1502 Hammer Unions Well Treatment Fluids All Figure 1502 Hammer Unions 120/220 VAC Electrical All NEMA Twist Lock Power Connectors DC Instrumentation All Meltric SS PN 12 Series Connectors 12 VDC Power All 4-Pin SAE Truck/Trailer couplings - The WISE™ Unit will preferably provide nitrogen at a discharge pressure ranging from 0-7500 psig and at an operator-controllable flow rate ranging from 0-850 scfm, while maintaining the discharge temperature at 10° F. above ambient.
- In the onshore configuration, the WISE™ Unit will preferably transfer servicing fluid from an independently-powered, customer-furnished source to the well via 2-inch pipe with 1502 Hammer unions compatible with well-servicing fluids.
-
TABLE CTN2-4 Well-Servicing Fluid Supply Circuit Flow acid 1500 gal cement 10 bbl sand slurry 1500 lbs - In the offshore configuration, the WISE™ Unit will preferably pressurize and transfer servicing fluid from a customer-furnished source to the well via the CT at an operator-controllable flow rate ranging from 0-50 gpm and a pressure ranging from 0-5000 psig.
- In between well interventions, the Truck Power Pack will tow the WISE™ Unit trailer (comprising for example: a crane trailer loaded with an Operator Control Module, Coiled Tubing Deployment Module, and Nitrogen Module) to and from well servicing sites.
- The Unit travels over a wide range of roads, paved and unpaved, between well-servicing jobs. The Unit should configure for transportation to minimize need for special permits in onshore and offshore configurations.
- At well servicing sites, the Unit can operate beyond its transportation envelope with an operator-extended crane and other extensions such as coolers or open ventilation doors.
- The Unit may be Shipped Overseas.
- Well servicing modules can be installed onto the Onshore Transport Trailer Module with cranes or forklifts.
- The WISE™ Unit can provide self-contained onshore transportation for the onshore configuration. An embodiment of the onshore configuration comprises all modules except the offshore marine mobile power pack, transportation skid kit, and hose basket with offshore hose bundle.
- In the preferred embodiment of an onshore transportation configuration, the WISE™ Unit should preferably have a total height less than 13 feet, 6 inches.
- In the preferred embodiment of an onshore transportation configuration, the WISE™ Unit should preferably have a total width of less than 8 feet, 6 inches.
- In the preferred embodiment of an onshore transportation configuration, the WISE™ Unit should preferably have a total length of less than 64 feet.
- The preferred embodiment of a marine mobile power pack should preferably be transportable onshore on trucks.
- In the preferred embodiment, it is preferable that no single skid in the offshore transportation configuration weigh more than 18,500 pounds, except for the coil tubing drum loaded with coil tubing in its transportation skid.
- In the offshore configuration, the WISE™ Unit should preferably weigh less than 85,000 pounds including one full cryogenic nitrogen storage vessel and 10,000 feet of 1¼″ coil tubing.
- The WISE™ Unit should preferably be designed so that the following modules and components can be removed from its onshore transportation trailer for separate transport to an offshore site:
-
- operator control module
- coil tubing deployment module
- cryogenic liquid nitrogen module except cryogenic liquid nitrogen storage vessel
- The goal for this onshore to offshore conversion is completion in 8 hours using a three-person operations crew and the following equipment:
-
- customer-furnished forklift
- customer-furnished crane
- Transportation Skid Kit included with the WISE™ Unit
- Hose Reel Skid included with the WISE™ Unit
- The goal for this onshore to offshore conversion is completion in 24 hours using a three-person operations crew and the following equipment:
-
- customer-furnished forklift
- customer-furnished crane
- Transportation Skid Kit included with the WISE™ Unit
- Hose Reel Skid included with the WISE™ Unit
- Overall WISE™ Unit availability is a function of the WISE™ Unit reliability and maintenance and logistics systems. “Availability” is defined as the WISE™ Unit being ready for transit between well-servicing sites and for performing well-servicing activities. Increasing availability of units minimizes maintenance down time and increases utilization rate. By keeping modules at the depot in inventory, a “broken” module is simply replaced by a certified working. This keeps a unit in service more days per month but with no additional fixed costs (such as crew, etc.). Taking this maintenance approach improves unit availability (utilization).
- The WISE™ Unit should preferably provide well services for 12 hours without refueling.
- The WISE™ Unit should preferably require no preventive maintenance beyond that described in Appendix C, Customer Maintenance Program.
- The WISE™ Unit should preferably incorporate the following provisions (hardware “scars”) for the post-deployment addition of a well servicing fluid pump integrated into the onshore configuration:
-
- operator control module fluid pump control
- The complete WISE™ Unit has the following modules integrated:
-
- One (1) Operator Control Module
- One (1) Truck Power Pack
- One (1) Trailer with Crane for Onshore Operations
- One (1) Coiled Tubing Deployment Module (Reel assembly) with major components:
- One (1) Coiled Tubing Reel Skid (cfe)
- One (1) Coiled Tubing Reel Drum (cfe)
- Tubing (cfe)
- One (1) Injector Head Module (cfe)
- One (1) Well Control Stack (Blow Out Preventor (BOP) Module (cfe)
- One (1) Cryogenic Liquid Nitrogen Pumping Module
- One (1) Marine Mobile Power Pack
- One (1) Crew Cab Truck (cfe)
- One (1) Tools (cfe)
- One (1) Electrical Generator
- One (1) Transportation Skid Kit
- One (1) Hose Reel Skid
- Interface P-1 and P-2 should preferably be identical for hydraulics and electrical.
- Interface P-2 should preferably be identical to the interface between the WISE™ III power pack and the remainder of the WISE™ III Unit.
- The following sections contain the requirements for the modules and their major components.
- The Operator Control Module (WISE™ Power Management Module) represents the core of the WISE™ technology principal of central control and operation of multiple well-serving functions from a single power source and control point. Mated with the appropriate power sources and ancillary equipment packages, this module monitors and controls: Coiled Tubing Deployment, Cryogenic Nitrogen, and Fluid Pumping Operations (if installed).
- The Operator Control Module should preferably provide:
- 1. Operator Control and Monitoring interface for entire WISE™ Unit except crane
2. Electrical power transformation (120 VAC to 12 VDC) and distribution to all systems needing electrical power
3. Hydraulic power distribution control to all well-servicing modules and crane
4. Heat transfer water and glycol distribution to N2 (if installed).
5. Well servicing fluid distribution and control in offshore configuration.
6. Well servicing fluid control if integrated in onshore configuration (see 2.11, Growth Requirements). - Note that external customer-furnished fluid pumping is not controlled by the operator control module,
- The Operator Control Module should preferably be a skid-mounted module with a crash frame; forklift guide tubes and a four point sling lift attachment points. Lifting slings are CFE.
- In the transportation configuration, the Operator Control Module should preferably e 96″ long×96″ wide with height to allow 13′6″ height clearance when loaded on a 48″ tall truck trailer. The Operator Control Module should preferably weigh 15,500 lbs or less.
- The Operator Control Module should preferably operate in the offshore well servicing environment.
- The Operator Control Module should preferably operate in the onshore well servicing environment.
- The control cabin shall:
-
- Telescope upward to an operator-controllable height (up to 5′ maximum extension) from the volume of the transportation skid. (to provide operator with visibility of well-servicing operations)
- Be 84″ wide×84″ long (interior)
- Have two (2) side access doors for operator entry with stainless steel door hardware, fixed windows in doors, and rain gutter above doors.
- Have operator access by ladder on one side and steps on the other
- Have front window protected with hinged metal guard that can be fully removed by operator.
- Have fixed side wall windows.
- Have Sliding rear windows.
- Have tempered safety glass in all windows.
- Have all windows tinted.
- Light its interior with one (1) 110 volt interior fluorescent lamp
- Contain an unmounted, portable office-style chair with armrest for operator comfort.
- Contain a 48″ wide bench seat along rear of cabin with removable to access storage below bench seat.
- Contain one (1) chart recorder of a two (2) pen type Well Head Pressure and Circulating Pressure.
- Be cooled by one (1) through the wall Air Conditioner of 12,000 btuh cooling capacity.
- Interface with electrical distribution via one (1) electrical junction box for 110/220 volt power connection for Lighting and Air Conditioner.
- Contain a Control Console of an open “L” shape having a lower section sloped and an upper near vertical section running along the front of the cabin so that operators in both sitting and standing positions can read all instruments and move all controls through their full ranges.
- The preferred embodiment of the control console module provides the following controls and indicators for the operator:
- 1) 6-Bank BOP control valve with a single function handles. BOP control valves should preferably be labeled from left to right “Blinds”, “Cutters”, “Slips”, “Pipe”, “Aux Pipe” and “Blind Shears”. BOP's to have an emergency back-up circuit from an air or hand operated in cabin pump.
- 3) 5-Bank valve panel with integral locking Walvoil type SD6 valves in corner of console for remote plug valve operations. Valves to be labeled “BOP Kill”, “Aux Kill”, “Return”, “
Spare 1” and “Spare 2”
4) Air Regulator Valve and Air Supply Gauge for Stripper Pack-off Air over Hydraulic Pump.
5) Stripper Circuit Air Drive pump with emergency manual operator.
6) Snap-Tite Stripper control valve and Stripper circuit hydraulic pressure gauge.
7) Injector Weight Indicator mounted in center of Panel Upper section. Indicator should preferably read 60,000 lb pipe heavy and 15,000 lb pipe light.
8) Single Pressure Regulator Valve and isolation valves with circuit pressure gauges for three (3) injector traction circuits.
9) Emergency Accumulator systems for:
a) injector traction circuits with full pressure activation valve
b) injector head skate system chain tension circuits with TBD valve
10) Single Pressure Regulator Valve and isolation valve with circuit pressure gauge for a single injector chain tension circuit.
11) Gresen (Munson-Tyson Type) Control Valve for Injection speed and direction, with Cartridge valve for fine control of injector speed. (Auto-driller arrangement)
12) Selector Valves for Injector speed range and injector brake circuit with status indicator gauges.
13) Pressure Control Valve for Setting Injector Power Circuit pressure with gauge.
14) Needle Valve for injector chain oiler control.
15) Three (3) single bank directional control valves for Tubing Reel Pay-Out and Take-Up; Levelwind Raise and Lower; and Levelwind Override.
16) Pressure Control Valve for Reel tension Control with tension pressure gauge.
17) Control Valve for reel brake circuit with pressure gauge.
18) Two (2) 6″ face 4:1 ratio 15,000 psig reading pressure gauges, One (1) for circulating pressure to the left of weight indicator and one (1) for well head pressure to the right of the weight indicator.
19) Air operated controls for power pack engine throttle, shutdown and emergency kill.
20) Power Pack Engine remote instrumentation Package to include, Tachometer, Coolant Temperature.
21) Cryogenic Nitrogen Centrifugal Boost Pump Speed control Valve.
22) N2 Boost Pump hydraulic pressure gauge.
23) N2 Boost Pump LN2 discharge pressure gauge (150 psi) with debooster or remote sender to protect operators from cryogenic N2 exposure in case of gauge or gauge plumbing failure.
24) N2 tank discharge (vaporizer inlet) pressure gauge (10,000 psi) with debooster or remote sender to protect operators from cryogenic N2 exposure in case of gauge or gauge plumbing failure.
25) Cryogenic Nitrogen Triplex Injection Pump Speed control valve (warm end).
26) N2 Triplex pump hydraulic pressure gauge.
27) N2 Triplex pump LN2 discharge pressure gauge. - 30) Remote Air Operated Low Pressure LN2 Prime to Atmosphere control valve.
31) Remote Air Operated Low Pressure LN2 bypass to tank control valve.
32) Remote Air Operated High Pressure LN2 bypass to tank control valve. - 33) Remote Air Operated High Pressure GN2 tempering control valve.
- The hydraulic controls should preferably be rated for operation at 3000 psi working pressure.
- The hydraulic distribution component of the operator control module should preferably include:
- Permanently installed hoses from the control cabin bulkhead for connection to the following:
-
- Injector main drive hoses—power pack to rear of trailer plus extensions to the hose reel.
- Reel pivot hose
- BOP control hoses installed with extensions to the hose rack
- Injector control hoses installed with extensions to the hose rack
- Reel control jumper hoses
- Two (2) 15 gallon accumulators for BOP circuits mounted inside trailer frame rails.
- The hoses should preferably be labeled at each end with bands imprinted with customer-specified text and by numbered stainless steel washers.
- The electrical distribution component of the operator control module should preferably distribute 120 VAC from the electric generator to the listed components at no more than listed current:
-
- the control cabin air conditioning component (10.0 amps)
- the control cabin lighting (2.0 amps)
- The electrical distribution component of the operator control module should preferably distribute 120 VAC from an offshore platform supply to the listed components at no more than listed current:
-
- the control cabin air conditioning component (10.0 amps)
- the control cabin lighting (2.0 amps)
- The electrical distribution component should preferably transform 120 VAC to 12 VDC and distribute 12 VDC to:
-
- monitoring instrumentation
- The Water-Glycol Distribution component should preferably distribute a water and glycol mix from the power pack to the cryogenic liquid nitrogen modules via the hydraulics heat exchanger.
- In the off-shore configuration, the operator control module shall:
-
- Control the well-servicing fluid pump in the marine mobile power pack
- Distribute well-servicing fluid from the power pack to the CT
- An over-the-road truck tractor provides onshore transportation and onshore power to the hydraulic systems for all Coiled Tubing and Nitrogen Modules.
- The truck power pack should preferably tow the trailer containing the crane and well-servicing modules to onshore well servicing sites and maintenance locations.
- At the well-servicing site, the truck power pack should preferably provide hydraulic power to concurrently operate the coil tubing and nitrogen modules at their maximum capabilities described in section 2.2 (functional and performance requirements).
- The truck power pack should preferably operate in the onshore well servicing environment.
- The truck power pack consists of a Freightliner 515-hp Detroit Diesel series 60, 14.0 L tractor with 10-speed transmission plus “wet kit” consisting of: an auxiliary transmission, a pair of PTO's, a hydraulic reservoir, a glycol reservoir, fluid coolers, hydraulic pumps, and various hoses, fittings, and control valves. Its features include:
-
- 515 peak Horsepower Tractor Engine
- Full power capacity driveshaft driven auxiliary transmission with forward and rear facing hydraulic pump mounts.
- Two (2) truck transmission mounted PTO's.
- Two (2) axial piston pressure compensated hydraulic pumps, one for Nitrogen Modules, and one to drive the Coiled Tubing Injector Head.
- One (1) single vane hydraulic pump to serve dual purposes, powering either the pedestal crane, or an auxiliary heat load circuit.
- One (1) double-vane hydraulic pump, with one (1) circuit dedicated to the coiled tubing reel hydraulics distribution, and one (1) circuit dedicated to BOP and safety control modules hydraulic distribution.
- One (1) double-gear glycol and water pump for circulation of water glycol mixture for LN2 vaporization.
- Multiple baffled hydraulic reservoir with integral return filters, strainers and connection points for truck power pack to trailer.
- Two (2) hydraulic fan powered fluid coolers.
- One (1) glycol reservoir and expansion chamber.
OnShore Transport Trailer with Crane
- Major components of this module are the Transport Trailer and Crane.
- The OnShore Transport Trailer with Crane should preferably operate in the onshore well servicing environment.
- Preferably, a 48 ft long single drop-deck triple-axle trailer provides the transportation and work platform for all the well servicing equipment and a hydraulic pedestal crane.
- Trailer specifications are:
-
- Three air ride axles with third (rearmost) axle set up with a dump valve to shorten effective trailer turn radius.
- 48 ft long single drop deck trailer with 11 ft long upper deck, 37 ft lower section.
- Upper deck should preferably be plate, lower section should preferably be bare frame rails.
- 8′ width
- 12″ minimum ground clearance
- Standard king pin setting
- Landing legs 160,000 lb.
- Three (3) each 25,000 lbs. Axles (minimum)
- Brakes 16½×7 air type
- Michelin tires or equivalent 11R24.5
- Parking brake air chambers mounted above axles
- 3½″ SAE King pin with ⅜ rub plate
- Lights, stop/turn armored clearance
- Mud flaps
- Rear bumper
- Running lights for highway use
- Three air ride axles with third (rearmost) axle set up with a dump valve to shorten effective trailer turn radius.
- Complete equipment mounts installed on the trailer should preferably allow quick pin-on and rig-up of equipment:
-
- Well control stack
- Injector head
- All skidded equipment
- Tool boxes
- Injector head and well control stack equipment mount should preferably be within the crane's operating envelope. As shown in
FIGS. 8 and 9 , the injector may be operated continuously at the intersection of any speed and pull combination as long as the intersection remains on or to the left and below of the 100 hp continuous output curve. - Injector head mount should preferably position the HydraRig 635 injector head so that the COIL TUBING can remain stabbed during transport between well servicing sites.
- Mounting brackets and setups should preferably secure one 1800-gallon cryogenic liquid nitrogen tank (tank itself is described in nitrogen module specification).
- A hydraulically-operated pedestal crane (such as: National Crane Model 638, 18 ton Pedestal Crane) should preferably be installed on the crane trailer.
-
-
36,000 lbs. maximum 23,000 lbs. @ 8 ft. boom Radius 16,550 lbs. @ 12 ft. boom Radius 10,500 lbs. @ 20 ft. boom Radius 5,050 lbs. @ 35 ft. boom Radius Note: Crane capacities may vary with boom length and attachments. - Box construction pedestal with turret mounted on shear type ball bearing and bulkhead fittings for crane operation.
- 270□ non-continuous by means of planetary gear, hydraulic drive unit, and swing stops.
- Three (3) section hydraulic telescoping boom, 16 ft. retracted to 38 ft. extended (maximum horizontal reach).
- High performance planetary winch rated at 10,000 lbs. bare drum single line pull
- “RVC” (or equivalent) remote valve control group
- Explosion-proof system that helps prevent cable damage by sensing position of winch cable and attachments with respect to sheave case.
- Rear hydraulic stabilizers, “A” type.
- The crane must fold up and fit in the space provided on the crane trailer during transport.
- A reel pivot cylinder that will pivot to either side of the unit will be installed on the unit.
- The WISE™ Unit should preferably deploy coiled tubing using the following combinations of coil tubing deployment modules and injector heads:
-
Configuration Coil Tubing Deployment Module Injector Head 122″- A Modified HPT 122″ CT Reel Assembly HydraRig 635 122″-B Modified HPT 122″ CTReel Assembly LSI 102″-A LSI 102″ CT Reel AssemblyHydraRig 635 102″- B LSI 102″ CT Reel Assembly LSI - In the 122″ A and B configurations the WISE™ Unit can:
-
- spool 1¾″ diameter CT @ 2500 psig operating pressure.
- provide coiled tubing storage capacity for 1¼″-1¾″ Coiled Tubing (CT).
- provide CT capacity by volume of:
- 21,500 feet of 1¼″ tubing
- 15,500 feet of 1½″ tubing and
- 11,500 feet of 1¾″ tubing.
- In the 102″ A and B configuration embodiments the WISE™ Unit can:
-
- spool 1½″ diameter×0.125″ wall thickness CT @ 2500 psig operating pressure.
- provide coiled tubing storage capacity for 1″-1½″ Coiled Tubing (CT).
- provide CT capacity by volume of:
- 16,000 feet of 1¼″ tubing and
- 111,000 feet of 1½″ tubing.
- provide coil tubing capacity by weight for carrying and deploying a total of 20,000 pounds of continuous coiled tubing.
- Note that this embodiment of the WISE™ Unit's CT length is limited by weight carrying capacity, not volume. Depending upon the wall thickness string length capacities will vary.
- This embodiment of the WISE™ Unit supplies hydraulic fluid to an injector at an operator-controllable rate ranging from 0-85 gpm (inclusive) and at an operator-controllable pressure ranging from 0-3000 psig (inclusive).
- The Cryogenic Liquid Nitrogen Module should preferably output up to 1,500 scfm gaseous nitrogen at 10,000 psig. However, note that overall integrated unit nitrogen capacities are below this peak due to horsepower limitations.
- The Cryogenic Liquid Nitrogen Module should preferably meet these output requirements in the onshore well servicing environment.
- The cryogenic liquid nitrogen module has two major components:
-
- the cryogenic liquid nitrogen storage vessel
- the nitrogen pump and vaporization component
- In the preferred embodiment the Cryogenic Liquid Nitrogen Storage Vessel module should preferably comprise a double layer vacuum insulated pressure vessel. This tank should preferably be provided with fill, suction vent, and pressure building manifolds and valves. The vessel capacity should preferably be approximately 1800 liquid gallons. This vessel will be removably attached to the upper deck on the land transport trailer:
-
- Inner vessel design pressure of 45 psi
- 2½″ Fill and Drain piping
- 1½″ Vent, Recirculation, Rear Fill, and Top Fill piping
- 1″ pressure-build pipes
- The Cryogenic Liquid Nitrogen Pump and Vaporization Component should preferably draw cryogenic liquid nitrogen from the Cryogenic Liquid Nitrogen Storage vessel and force it through the vaporizer to produce gaseous nitrogen.
- The Cryogenic Liquid Nitrogen Pump and Vaporization Component should preferably meet its output requirements in the offshore well servicing environment.
- The preferred embodiment of the Cryogenic Liquid Nitrogen Pump and Vaporization Component comprises:
-
- 2″×1″×4½″ cryogenic centrifugal boost pump with mated high speed hydraulic motor to draw cryogenic liquid nitrogen from the storage vessel and pump it at low pressure (less than 100 psig) to a triplex injection pump.
-
Triplex ICMP 100 type Cryogenic Nitrogen Positive displacement Pump, with mated bent axis hydraulic motor, to develop pressure necessary to overcome the resistance to the fluid through the vaporizer. - Pressure oil lubrication system for triplex pump crankcase.
- Liquid circulation type Liquid Nitrogen Vaporizer.
- This component should preferably be packaged separate from other systems and the cryogenic liquid nitrogen storage vessel.
- The Cryogenic Liquid Nitrogen Pump and Vaporization Component should interface with customer-furnished offshore cryogenic liquid nitrogen storage vessels without modification.
- The Marine Mobile Power Pack provides hydraulic power to concurrently operate the coil tubing and nitrogen modules at their maximum capabilities.
- The Marine Mobile Power Pack should meet its power output requirement in the offshore well servicing environment.
- The preferred embodiment of the Marine Mobile Power Pack should preferably be skid-mounted and comprise a crash frame, forklift guide tubes and a 4-point lift attachment for lifting slings, and one fall protection harness tie off point incorporated into its crash frame.
- The Marine Mobile Power Pack should preferably be no larger than 126″long×96″ wide×102″ high including the structural skid to allow 13′6″ height clearance when loaded on a 48″ tall truck trailer.
- The Marine Mobile Power Pack should preferably weigh no more than 18,500 lbs maximum wet.
- The preferred embodiment of the Marine Mobile Power Pack will preferably have the following features:
-
- Caterpillar 3406C Diesel Engine with a double pump drive attached directly to the flywheel housing.
- Caterpillar matched heavy duty solder dripped radiator.
- Engine has onboard systems for shutdown in over-temperature and low oil pressure situations. Engine also has overspeed auto-shutdown protection and spark arrester exhaust.
- Engine has mechanical lever for remote throttle position to control engine speed at power pack.
- Air Operated fuel shutdown system, and air operated emergency shutdown (air shut-off). Emergency Kill system is failsafe (air signal to run, absent signal shutdown) type.
- Engine mounted Tachometer, oil pressure gauge, coolant temperature gauge and reservoir mounted air pressure gauge.
- 12 cfm air compressor system with 15 gallon reservoir
- Air Starter System
- Axial Piston high pressure open-loop pump for CT injector drive.
- Axial Piston high pressure open-loop pump for Nitrogen System drive.
- Double Vane pump for tubing reel and BOP functions.
- Single Gear pump for water/glycol circulation.
- Pump for well-servicing fluid with manifold designed to pump small volumes of acid (1500 gal), cement (10 bbl), and sand slurry (1500 lbs)
- Single fan powered air to oil heat exchanger mounted above fluid pump for hydraulic fluid cooling.
- Hydraulic Oil Reservoir capacity 250 gallons. Reservoir supplied with protected sight glass, returning fluid filters, and sampling port.
- Hydraulic Pump relief valves are piloted to a series of dump valves at a system start panel.
- Crash Frame provides an integrated access ladder to skid top
- An Electric Generator provides electric power for distribution by the operator control module in onshore applications.
- The preferred embodiment of the electric generator will:
-
- Use Diesel Fuel
- Meet a 6500 Watt Surge capacity
- Produce 5500 Watts continuous
- Start using a self-contained Electric Start system
- Output 120 VAC at 51 amps
- Output 120 VAC at TBD amps Duplicate Specification
- Run at least 12 hours on one tank of fuel
- fit within 36″ length×24″ width×24″ height space on the onshore crane trailer
- weigh no more than 400 lbs
- The Electric Generator should preferably meet these requirements in the onshore well servicing environment.
- A Coil Tubing Reel Carry Skid is used for transport of a Coil Tubing Reel Drum when the drum is removed from unit.
- The Coil Tubing Reel Carry Skid should preferably hold the Coil Tubing Reel Drum in axle-horizontal position during:
-
- onshore transport
- offshore boat transport
- The preferred embodiment of the Coil Tubing Reel Carry Skid should comprise forklift and crane sling provisions for moving between ground, truck, and boat in loaded and unloaded configurations, and one fall protection harness tie off point incorporated into its crash frame.
- A Coil Tubing Component Carry Skid is used for transport of injector head, well control stack, and CT-specific tools when removed from a WISE™ Unit onshore transportation trailer.
- The Coil Tubing Component Carry Skid should preferably hold the injector head, well control stack, and CT-specific tools during:
-
- onshore transport from onshore-to-offshore conversion location to dock
- offshore boat transport
- The Coil Tubing Component Carry Skid should preferably have provisions for moving between ground, truck, and boat in loaded and unloaded configurations.
- In the preferred embodiment, when the WISE™ Unit is converted to offshore use, a hose reel skid will provide the hydraulic fluid distribution between the modules. The onshore hydraulic fluid distribution will remain on the crane trailer.
- The Hose Reel Skid should preferably carry all the WISE™ Unit's interconnecting hoses needed for offshore use.
- The Hose Reel Skid should preferably protect the WISE™ Unit's interconnecting hoses from damage during transport from onshore to offshore.
- The Hose Reel Skid should preferably have provisions for moving between ground, truck, and boat in loaded and unloaded configurations.
- The Hose Reel Skid should preferably comprise:
-
- All hoses necessary to connect the Operator Control Module to the injector head and well control stack in 150-foot lengths.
- All hoses necessary to connect the Marine Mobile Power Pack to the Operator Control Module in 35-foot lengths.
- All hoses necessary to connect the Operator Control Module to the CT Reel in 35-foot lengths.
- The hoses should preferably be labeled at each end with bands imprinted with text and by numbered stainless steel washers.
- The Hose Reel Skid should preferably include 3 hose reels:
-
- One reel for OCM to injector head power hoses
- One reel for injector head control hoses
- One reel for BOP control hoses
- The Hose Reel Skid should preferably include a hose rack for the marine mobile power pack-to-operator control module hoses.
- An advantage of the present invention is that modularity enables change scenarios that can be quickly and cost effectively implemented:
-
- 1) Customer desires a change to WISE™ Unit-level requirements (addition, deletion, or change of capability) due to changing business environment
- 2) Vendor discovers that requirements cannot be met on schedule (i.e., component supplier lead times too great) and proposes alternatives that meet schedule.
- btuh British Thermal Units-Hour
CT Coiled tubing
gpm gallons per minute - PN Part number
psig Pounds per square inch gauge
scfm Standard cubic feet per minute
SS Stainless steel - VAC Volts AC
- Availability—The days on which the WISE™ Unit is ready for transit between well-servicing sites and for well-servicing activities
Scar—A hardware provision for a module or component coming later: must be consistent with the interface requirement
Hook—A software provision for programming coming later, such as the ability to expand functionality etc.
Depot Maintenance—maintenance done at a shop
Field Maintenance—maintenance done at a job site (other than inside the shop)
Line-replaceable subsystem—
Glycol—antifreeze used with water in heat transfer loops - Although the present invention has been described by reference to its preferred embodiment as is disclosed in the specification and drawings above, many more embodiments of the present invention are possible without departing from the invention. Thus, the scope of the invention should be limited only by the appended claims.
Claims (47)
1. A single well servicing combination unit comprising:
a hydraulic manifold removably connectable to the power-take-off of a power source to drive a plurality of hydraulic pumps and motors that control a plurality of well servicing modules that are removably mounted on said combination unit, said well servicing modules being interconnectable by plumbing.
2. The combination unit according to claim 1 , wherein said power source comprises a power pack module.
3. The combination unit according to claim 2 , wherein said power pack module is removably connected to said well servicing combination unit.
4. The combination unit according to claim 2 , wherein said power pack module comprises a truck power pack.
5. The combination unit according to claim 2 , wherein said power pack module comprises a marine mobile power pack.
6. The combination unit according to claim 2 , wherein each module comprises a skid.
7. The combination unit according to claim 1 , wherein said well servicing modules comprise:
i. an operator control module;
ii. a combination module;
iii. a nitrogen module;
said modules being interconnectable by plumbing.
8. The combination unit according to claim 7 , wherein said combination module comprises a coil tubing module and an acid module.
9. The combination unit according to claim 8 , wherein said coil tubing module comprises a coiled tubing reel and a coil tubing string.
10. The combination unit according to claim 9 , wherein said coiled tubing reel ranges in diameter from about 102 inches to over 122 inches and said coil tubing string ranges in diameter from about 1.25 inches to about 2 inches.
11. The combination unit according to claim 7 , wherein said combination module comprises a coil tubing module and a cement module.
12. The combination unit according to claim 11 , wherein said coil tubing module comprises a coiled tubing reel and a coil tubing string.
13. The combination unit according to claim 12 , wherein said coiled tubing reel ranges in diameter from about 102 inches to over 122 inches and said coil tubing string ranges in diameter from about 1.25 inches to about 2 inches.
14. The combination unit according to claim 7 , wherein said combination module comprises a cement module and an acid module.
15. The combination unit according to claim 7 , wherein said nitrogen module comprises a tank of cryogenic nitrogen.
16. The combination unit according to claim 7 , wherein said nitrogen module comprises a nitrogen generator that gathers nitrogen from the earth's atmosphere and wherein said combination unit further comprises a compressor connectable by plumbing to said nitrogen generator.
17. The combination unit according to claim 7 , wherein said nitrogen module comprises a tank of compressed nitrogen gas.
18. The combination unit according to claim 7 , wherein said combination module comprises a sand fracturing tool.
19. The combination unit according to claim 1 , wherein said well servicing modules comprise: an electric wireline apparatus comprising a tubing encapsulated wire conveyance medium suitable for electric wireline operations.
20. The combination unit according to claim 2 , wherein said well servicing modules comprise: a combination module and an electric wireline apparatus comprising a tubing encapsulated wire conveyance medium suitable for electric wireline operations.
21. The combination unit according to claim 1 , wherein said well servicing modules comprise: a wireline inspection unit and a coiled tubing unit.
22. The combination unit according to claim 4 , wherein said combination unit comprises a crane trailer and said Truck Power Pack comprises a truck capable of towing said crane trailer.
23. The combination unit according to claim 4 , wherein said well servicing modules are removably mounted on said crane trailer and comprise an Operator Control Module, a Coiled Tubing Deployment Module, an Injector Head Module, Well Control Stack Blow Out Preventer Module, and a Nitrogen Module.
24. The combination unit according to claim 23 , wherein said Nitrogen Module comprises a Self Generating Nitrogen Module.
25. The combination unit according to claim 1 , wherein each of said modules and components is designed to function in conjunction with a plurality of combinations of said well servicing modules.
26. The combination unit according to claim 1 , wherein said modules may be custom arranged to allow the combination unit to fit in available space for a particular well servicing job.
27. The combination unit according to claim 1 , further comprising a transportation module.
28. The combination unit according to claim 27 , wherein said transportation module comprises a marine vessel.
29. The combination unit according to claim 28 , further comprising a marine mobile power pack.
30. The combination unit according to claim 27 , wherein said transportation module comprises an amphibious vessel.
31. The combination unit according to claim 30 , further comprising a marine mobile power pack.
32. The combination unit according to claim 27 , wherein said transportation module comprises a trailer.
33. The combination unit according to claim 30 , further comprising a truck power pack.
34. The combination unit according to claim 27 , wherein said transportation module comprises a skid.
35. The combination unit according to claim 1 , wherein said well servicing units comprise: a high pressure pump and a blending tank; said high pressure pump and blending tank being interconnectable by plumbing.
36. The combination unit according to claim 35 , further comprising a crane, said blending tank, high pressure pump and crane being interconnectable by plumbing.
37. The combination unit according to claim 1 , wherein said well servicing modules comprise:
i. a wireline inspection module;
ii. a coiled tubing module;
iii. a nitrogen module;
iv. a unit pump module; and
v. a blending tank module.
38. The combination unit according to claim 37 further comprising an acid pump module and an acid tank module that is connectable by plumbing to said blending tank module and said coil tubing module, wherein said hydraulic manifold is removably connectable to said power-take-off of said power source to also drive hydraulic pumps and motors that control said acid pump module.
The combination unit according to claim 1 , wherein said well servicing modules comprise: a coil tubing module and at least one other well servicing module.
39. The combination unit according to claim 1 , wherein said well servicing modules comprise: a wireline inspection module; and at least one other well servicing module.
40. The combination unit according to claim 37 , further comprising a combination nitrogen and high pressure pump module that is connectable by plumbing to said blending tank module and said coil tubing module, wherein said hydraulic manifold is removably connectable to the power-take-off of said power source to also drive hydraulic pumps and motors that control said combination nitrogen and high pressure pump module.
41. The combination unit according to claim 1 , wherein said well servicing modules comprise: coiled tubing reel module for introducing well treatment fluid into a well; and an injector module that can advance said coiled tubing into a wellbore.
42. The combination unit according to claim 1 , wherein said well servicing modules comprise a coiled tubing injector module and a crane module for picking up and lowering the coiled tubing injector of said coil tubing injector module.
43. The combination unit according to claim 1 , further comprising an operator's console module whereby said motors and pumps may be controlled by an operator.
44. The combination unit according to claim 1 , wherein at least one of said modules is skid mounted.
45. The combination unit according to claim 1 , wherein at least one of said modules is skid mounted.
46. A method of well servicing unit maintenance comprising keeping functional modules in inventory and replacing broken or unsatisfactory modules of a modular well servicing combination unit as desired.
47. A method of producing a well servicing unit comprising assembling standardized well servicing modules having standardized interfaces and connectors.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/796,168 US20080264649A1 (en) | 2007-04-29 | 2007-04-29 | Modular well servicing combination unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/796,168 US20080264649A1 (en) | 2007-04-29 | 2007-04-29 | Modular well servicing combination unit |
Publications (1)
Publication Number | Publication Date |
---|---|
US20080264649A1 true US20080264649A1 (en) | 2008-10-30 |
Family
ID=39885628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/796,168 Abandoned US20080264649A1 (en) | 2007-04-29 | 2007-04-29 | Modular well servicing combination unit |
Country Status (1)
Country | Link |
---|---|
US (1) | US20080264649A1 (en) |
Cited By (100)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090050311A1 (en) * | 2006-03-20 | 2009-02-26 | Crawford James B | Well servicing combination unit |
US20100263860A1 (en) * | 2009-04-21 | 2010-10-21 | Rod Shampine | System and Method to Provide Well Service Unit With Integrated Gas Delivery |
WO2013022430A1 (en) * | 2011-08-09 | 2013-02-14 | Halliburton Energy Services, Inc. | Systems and methods for a modular drum with a common power pack unit |
US20140374114A1 (en) * | 2013-06-24 | 2014-12-25 | Helix Energy Solutions Group, Inc. | Subsea Intervention System |
CN104265244A (en) * | 2014-09-14 | 2015-01-07 | 哈尔滨理工大学 | Underground submersible multistage lifting type pumping system and configuration method thereof |
US8978695B2 (en) | 2009-04-20 | 2015-03-17 | S.P.M. Flow Control, Inc. | Flowline flapper valve |
US8998168B2 (en) | 2009-06-03 | 2015-04-07 | S.P.M. Flow Control, Inc. | Plug valve indicator |
USD734434S1 (en) | 2013-03-15 | 2015-07-14 | S.P.M. Flow Control, Inc. | Seal assembly |
US9103448B2 (en) | 2012-08-16 | 2015-08-11 | S.P.M. Flow Control, Inc. | Plug valve having preloaded seal segments |
US9103193B2 (en) | 2011-04-07 | 2015-08-11 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations |
US20150242411A1 (en) * | 2014-02-27 | 2015-08-27 | Halliburton Energy Services, Inc. | Data File Processing for a Well Job Data Archive |
WO2015131284A1 (en) * | 2014-03-06 | 2015-09-11 | Trican Well Service Ltd. | Method and system for purging coil tubing using onsite gas |
US9140110B2 (en) | 2012-10-05 | 2015-09-22 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas |
US9273543B2 (en) | 2012-08-17 | 2016-03-01 | S.P.M. Flow Control, Inc. | Automated relief valve control system and method |
US9322243B2 (en) | 2012-08-17 | 2016-04-26 | S.P.M. Flow Control, Inc. | Automated relief valve control system and method |
US9568138B2 (en) | 2013-07-01 | 2017-02-14 | S.P.M. Flow Control, Inc. | Manifold assembly |
US9611728B2 (en) | 2012-11-16 | 2017-04-04 | U.S. Well Services Llc | Cold weather package for oil field hydraulics |
US9650879B2 (en) | 2012-11-16 | 2017-05-16 | Us Well Services Llc | Torsional coupling for electric hydraulic fracturing fluid pumps |
US9650871B2 (en) | 2012-11-16 | 2017-05-16 | Us Well Services Llc | Safety indicator lights for hydraulic fracturing pumps |
US9745840B2 (en) | 2012-11-16 | 2017-08-29 | Us Well Services Llc | Electric powered pump down |
US9840901B2 (en) | 2012-11-16 | 2017-12-12 | U.S. Well Services, LLC | Remote monitoring for hydraulic fracturing equipment |
US9893500B2 (en) | 2012-11-16 | 2018-02-13 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
US20180066485A1 (en) * | 2015-03-24 | 2018-03-08 | Fmc Kongsberg Subsea As | Modular system and method for controlling subsea operations |
US9964245B2 (en) | 2007-07-03 | 2018-05-08 | S.P.M. Flow Control, Inc. | Swivel joint with uniform ball bearing requirements |
US9970278B2 (en) | 2012-11-16 | 2018-05-15 | U.S. Well Services, LLC | System for centralized monitoring and control of electric powered hydraulic fracturing fleet |
US9995218B2 (en) | 2012-11-16 | 2018-06-12 | U.S. Well Services, LLC | Turbine chilling for oil field power generation |
US10020711B2 (en) | 2012-11-16 | 2018-07-10 | U.S. Well Services, LLC | System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources |
US10036238B2 (en) | 2012-11-16 | 2018-07-31 | U.S. Well Services, LLC | Cable management of electric powered hydraulic fracturing pump unit |
US10119381B2 (en) | 2012-11-16 | 2018-11-06 | U.S. Well Services, LLC | System for reducing vibrations in a pressure pumping fleet |
US10232332B2 (en) | 2012-11-16 | 2019-03-19 | U.S. Well Services, Inc. | Independent control of auger and hopper assembly in electric blender system |
US10254732B2 (en) | 2012-11-16 | 2019-04-09 | U.S. Well Services, Inc. | Monitoring and control of proppant storage from a datavan |
US10280724B2 (en) | 2017-07-07 | 2019-05-07 | U.S. Well Services, Inc. | Hydraulic fracturing equipment with non-hydraulic power |
US10337308B2 (en) | 2012-11-16 | 2019-07-02 | U.S. Well Services, Inc. | System for pumping hydraulic fracturing fluid using electric pumps |
US10407990B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Slide out pump stand for hydraulic fracturing equipment |
US10408031B2 (en) | 2017-10-13 | 2019-09-10 | U.S. Well Services, LLC | Automated fracturing system and method |
US10526882B2 (en) | 2012-11-16 | 2020-01-07 | U.S. Well Services, LLC | Modular remote power generation and transmission for hydraulic fracturing system |
US10557576B2 (en) | 2015-06-15 | 2020-02-11 | S.P.M. Flow Control, Inc. | Full-root-radius-threaded wing nut having increased wall thickness |
US10598258B2 (en) | 2017-12-05 | 2020-03-24 | U.S. Well Services, LLC | Multi-plunger pumps and associated drive systems |
US10648270B2 (en) | 2018-09-14 | 2020-05-12 | U.S. Well Services, LLC | Riser assist for wellsites |
US10648311B2 (en) | 2017-12-05 | 2020-05-12 | U.S. Well Services, LLC | High horsepower pumping configuration for an electric hydraulic fracturing system |
US10655435B2 (en) | 2017-10-25 | 2020-05-19 | U.S. Well Services, LLC | Smart fracturing system and method |
US10677365B2 (en) | 2015-09-04 | 2020-06-09 | S.P.M. Flow Control, Inc. | Pressure relief valve assembly and methods |
US10815764B1 (en) | 2019-09-13 | 2020-10-27 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US10895202B1 (en) | 2019-09-13 | 2021-01-19 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US10954770B1 (en) | 2020-06-09 | 2021-03-23 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US10961908B1 (en) | 2020-06-05 | 2021-03-30 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US10968837B1 (en) | 2020-05-14 | 2021-04-06 | Bj Energy Solutions, Llc | Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge |
US10989180B2 (en) | 2019-09-13 | 2021-04-27 | Bj Energy Solutions, Llc | Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods |
US11002189B2 (en) | 2019-09-13 | 2021-05-11 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11009162B1 (en) | 2019-12-27 | 2021-05-18 | U.S. Well Services, LLC | System and method for integrated flow supply line |
US11015536B2 (en) | 2019-09-13 | 2021-05-25 | Bj Energy Solutions, Llc | Methods and systems for supplying fuel to gas turbine engines |
US11015594B2 (en) | 2019-09-13 | 2021-05-25 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
US11022526B1 (en) | 2020-06-09 | 2021-06-01 | Bj Energy Solutions, Llc | Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit |
US11028677B1 (en) | 2020-06-22 | 2021-06-08 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
US11035207B2 (en) | 2018-04-16 | 2021-06-15 | U.S. Well Services, LLC | Hybrid hydraulic fracturing fleet |
US11067481B2 (en) | 2017-10-05 | 2021-07-20 | U.S. Well Services, LLC | Instrumented fracturing slurry flow system and method |
US11066915B1 (en) | 2020-06-09 | 2021-07-20 | Bj Energy Solutions, Llc | Methods for detection and mitigation of well screen out |
US11098651B1 (en) | 2019-09-13 | 2021-08-24 | Bj Energy Solutions, Llc | Turbine engine exhaust duct system and methods for noise dampening and attenuation |
US11109508B1 (en) | 2020-06-05 | 2021-08-31 | Bj Energy Solutions, Llc | Enclosure assembly for enhanced cooling of direct drive unit and related methods |
US11114857B2 (en) | 2018-02-05 | 2021-09-07 | U.S. Well Services, LLC | Microgrid electrical load management |
US11111768B1 (en) | 2020-06-09 | 2021-09-07 | Bj Energy Solutions, Llc | Drive equipment and methods for mobile fracturing transportation platforms |
US11125066B1 (en) | 2020-06-22 | 2021-09-21 | Bj Energy Solutions, Llc | Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing |
US11149533B1 (en) | 2020-06-24 | 2021-10-19 | Bj Energy Solutions, Llc | Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation |
US11181107B2 (en) | 2016-12-02 | 2021-11-23 | U.S. Well Services, LLC | Constant voltage power distribution system for use with an electric hydraulic fracturing system |
US11193360B1 (en) | 2020-07-17 | 2021-12-07 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11211801B2 (en) | 2018-06-15 | 2021-12-28 | U.S. Well Services, LLC | Integrated mobile power unit for hydraulic fracturing |
US11208878B2 (en) | 2018-10-09 | 2021-12-28 | U.S. Well Services, LLC | Modular switchgear system and power distribution for electric oilfield equipment |
US11208880B2 (en) | 2020-05-28 | 2021-12-28 | Bj Energy Solutions, Llc | Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods |
US11208953B1 (en) | 2020-06-05 | 2021-12-28 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11220895B1 (en) | 2020-06-24 | 2022-01-11 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
US11236739B2 (en) | 2019-09-13 | 2022-02-01 | Bj Energy Solutions, Llc | Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods |
US11255173B2 (en) | 2011-04-07 | 2022-02-22 | Typhon Technology Solutions, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas |
US11268346B2 (en) | 2019-09-13 | 2022-03-08 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems |
CN114427359A (en) * | 2022-02-09 | 2022-05-03 | 辽宁石油化工大学 | Novel tool carrying device for well repair |
US11408794B2 (en) | 2019-09-13 | 2022-08-09 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
US11415125B2 (en) | 2020-06-23 | 2022-08-16 | Bj Energy Solutions, Llc | Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
US11428165B2 (en) | 2020-05-15 | 2022-08-30 | Bj Energy Solutions, Llc | Onboard heater of auxiliary systems using exhaust gases and associated methods |
US11449018B2 (en) | 2012-11-16 | 2022-09-20 | U.S. Well Services, LLC | System and method for parallel power and blackout protection for electric powered hydraulic fracturing |
US11473413B2 (en) | 2020-06-23 | 2022-10-18 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
US11476781B2 (en) | 2012-11-16 | 2022-10-18 | U.S. Well Services, LLC | Wireline power supply during electric powered fracturing operations |
US11486788B2 (en) | 2020-05-28 | 2022-11-01 | Schlumberger Technology Corporation | Test system for a pressure control equipment system |
US11542786B2 (en) | 2019-08-01 | 2023-01-03 | U.S. Well Services, LLC | High capacity power storage system for electric hydraulic fracturing |
US11560845B2 (en) | 2019-05-15 | 2023-01-24 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11578577B2 (en) | 2019-03-20 | 2023-02-14 | U.S. Well Services, LLC | Oversized switchgear trailer for electric hydraulic fracturing |
US11624326B2 (en) | 2017-05-21 | 2023-04-11 | Bj Energy Solutions, Llc | Methods and systems for supplying fuel to gas turbine engines |
US11635074B2 (en) | 2020-05-12 | 2023-04-25 | Bj Energy Solutions, Llc | Cover for fluid systems and related methods |
US11639654B2 (en) | 2021-05-24 | 2023-05-02 | Bj Energy Solutions, Llc | Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods |
US11708752B2 (en) | 2011-04-07 | 2023-07-25 | Typhon Technology Solutions (U.S.), Llc | Multiple generator mobile electric powered fracturing system |
US11728709B2 (en) | 2019-05-13 | 2023-08-15 | U.S. Well Services, LLC | Encoderless vector control for VFD in hydraulic fracturing applications |
US11867118B2 (en) | 2019-09-13 | 2024-01-09 | Bj Energy Solutions, Llc | Methods and systems for supplying fuel to gas turbine engines |
CN117646614A (en) * | 2024-01-29 | 2024-03-05 | 中国石油集团川庆钻探工程有限公司 | Freezing temporary plugging valve replacing device and method |
US11933153B2 (en) | 2020-06-22 | 2024-03-19 | Bj Energy Solutions, Llc | Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control |
US11939853B2 (en) | 2020-06-22 | 2024-03-26 | Bj Energy Solutions, Llc | Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units |
US11955782B1 (en) | 2022-11-01 | 2024-04-09 | Typhon Technology Solutions (U.S.), Llc | System and method for fracturing of underground formations using electric grid power |
US11959371B2 (en) | 2012-11-16 | 2024-04-16 | Us Well Services, Llc | Suction and discharge lines for a dual hydraulic fracturing unit |
US12065968B2 (en) | 2019-09-13 | 2024-08-20 | BJ Energy Solutions, Inc. | Systems and methods for hydraulic fracturing |
US12078110B2 (en) | 2015-11-20 | 2024-09-03 | Us Well Services, Llc | System for gas compression on electric hydraulic fracturing fleets |
US12152448B2 (en) * | 2021-11-30 | 2024-11-26 | Sichuan Honghua Petroleum Equipment Co., Ltd | Coiled tubing operating system and coiled tubing operating method |
US12221872B2 (en) | 2014-10-14 | 2025-02-11 | U.S. Well Services, LLC | System and method for parallel power and blackout protection for electric powered hydraulic fracturing |
US12276577B2 (en) | 2023-06-23 | 2025-04-15 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3129774A (en) * | 1960-09-09 | 1964-04-21 | California Research Corp | Method and apparatus for drilling and working in offshore wells |
US5965031A (en) * | 1995-12-28 | 1999-10-12 | Union Oil Company Of California | pH modification of geothermal brine with sulfur-containing acid |
US6003598A (en) * | 1998-01-02 | 1999-12-21 | Cancoil Technology Corporation | Mobile multi-function rig |
US6068056A (en) * | 1999-10-13 | 2000-05-30 | Schlumberger Technology Corporation | Well treatment fluids comprising mixed aldehydes |
US6234260B1 (en) * | 1997-03-19 | 2001-05-22 | Coast Machinery, Inc. | Mobile drilling apparatus |
US20040244993A1 (en) * | 2002-04-22 | 2004-12-09 | Crawford James B. | Three in one combined power unit for nitrogen system, fluid system, and coiled tubing system |
US20080110635A1 (en) * | 2006-11-14 | 2008-05-15 | Schlumberger Technology Corporation | Assembling Functional Modules to Form a Well Tool |
-
2007
- 2007-04-29 US US11/796,168 patent/US20080264649A1/en not_active Abandoned
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3129774A (en) * | 1960-09-09 | 1964-04-21 | California Research Corp | Method and apparatus for drilling and working in offshore wells |
US5965031A (en) * | 1995-12-28 | 1999-10-12 | Union Oil Company Of California | pH modification of geothermal brine with sulfur-containing acid |
US6234260B1 (en) * | 1997-03-19 | 2001-05-22 | Coast Machinery, Inc. | Mobile drilling apparatus |
US6003598A (en) * | 1998-01-02 | 1999-12-21 | Cancoil Technology Corporation | Mobile multi-function rig |
US6068056A (en) * | 1999-10-13 | 2000-05-30 | Schlumberger Technology Corporation | Well treatment fluids comprising mixed aldehydes |
US20040244993A1 (en) * | 2002-04-22 | 2004-12-09 | Crawford James B. | Three in one combined power unit for nitrogen system, fluid system, and coiled tubing system |
US20080110635A1 (en) * | 2006-11-14 | 2008-05-15 | Schlumberger Technology Corporation | Assembling Functional Modules to Form a Well Tool |
Cited By (272)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090050311A1 (en) * | 2006-03-20 | 2009-02-26 | Crawford James B | Well servicing combination unit |
US9964245B2 (en) | 2007-07-03 | 2018-05-08 | S.P.M. Flow Control, Inc. | Swivel joint with uniform ball bearing requirements |
US8978695B2 (en) | 2009-04-20 | 2015-03-17 | S.P.M. Flow Control, Inc. | Flowline flapper valve |
US20100263860A1 (en) * | 2009-04-21 | 2010-10-21 | Rod Shampine | System and Method to Provide Well Service Unit With Integrated Gas Delivery |
US8590612B2 (en) * | 2009-04-21 | 2013-11-26 | Schlumberger Technology Corporation | System and method to provide well service unit with integrated gas delivery |
US8998168B2 (en) | 2009-06-03 | 2015-04-07 | S.P.M. Flow Control, Inc. | Plug valve indicator |
US11851998B2 (en) | 2011-04-07 | 2023-12-26 | Typhon Technology Solutions (U.S.), Llc | Dual pump VFD controlled motor electric fracturing system |
US10774630B2 (en) | 2011-04-07 | 2020-09-15 | Typhon Technology Solutions, Llc | Control system for electric fracturing operations |
US11255173B2 (en) | 2011-04-07 | 2022-02-22 | Typhon Technology Solutions, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas |
US10502042B2 (en) | 2011-04-07 | 2019-12-10 | Typhon Technology Solutions, Llc | Electric blender system, apparatus and method for use in fracturing underground formations using liquid petroleum gas |
US10648312B2 (en) | 2011-04-07 | 2020-05-12 | Typhon Technology Solutions, Llc | Dual pump trailer mounted electric fracturing system |
US9103193B2 (en) | 2011-04-07 | 2015-08-11 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations |
US11391133B2 (en) | 2011-04-07 | 2022-07-19 | Typhon Technology Solutions (U.S.), Llc | Dual pump VFD controlled motor electric fracturing system |
US9121257B2 (en) | 2011-04-07 | 2015-09-01 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations |
US11391136B2 (en) | 2011-04-07 | 2022-07-19 | Typhon Technology Solutions (U.S.), Llc | Dual pump VFD controlled motor electric fracturing system |
US10689961B2 (en) | 2011-04-07 | 2020-06-23 | Typhon Technology Solutions, Llc | Multiple generator mobile electric powered fracturing system |
US10718195B2 (en) | 2011-04-07 | 2020-07-21 | Typhon Technology Solutions, Llc | Dual pump VFD controlled motor electric fracturing system |
US10227855B2 (en) | 2011-04-07 | 2019-03-12 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations |
US10221668B2 (en) | 2011-04-07 | 2019-03-05 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations |
US9366114B2 (en) | 2011-04-07 | 2016-06-14 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations |
US11613979B2 (en) | 2011-04-07 | 2023-03-28 | Typhon Technology Solutions, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas |
US10718194B2 (en) | 2011-04-07 | 2020-07-21 | Typhon Technology Solutions, Llc | Control system for electric fracturing operations |
US10724353B2 (en) | 2011-04-07 | 2020-07-28 | Typhon Technology Solutions, Llc | Dual pump VFD controlled system for electric fracturing operations |
US11708752B2 (en) | 2011-04-07 | 2023-07-25 | Typhon Technology Solutions (U.S.), Llc | Multiple generator mobile electric powered fracturing system |
US20190271218A1 (en) * | 2011-04-07 | 2019-09-05 | Evolution Well Services, Llc | Vfd controlled motor mobile electrically powered system for use in fracturing underground formations for electric fracturing operations |
US11187069B2 (en) | 2011-04-07 | 2021-11-30 | Typhon Technology Solutions, Llc | Multiple generator mobile electric powered fracturing system |
US11913315B2 (en) | 2011-04-07 | 2024-02-27 | Typhon Technology Solutions (U.S.), Llc | Fracturing blender system and method using liquid petroleum gas |
US11939852B2 (en) | 2011-04-07 | 2024-03-26 | Typhon Technology Solutions (U.S.), Llc | Dual pump VFD controlled motor electric fracturing system |
US11002125B2 (en) | 2011-04-07 | 2021-05-11 | Typhon Technology Solutions, Llc | Control system for electric fracturing operations |
US10982521B2 (en) | 2011-04-07 | 2021-04-20 | Typhon Technology Solutions, Llc | Dual pump VFD controlled motor electric fracturing system |
US12258847B2 (en) | 2011-04-07 | 2025-03-25 | Typhon Technology Solutions (U.S.), Llc | Fracturing blender system and method |
US10895138B2 (en) | 2011-04-07 | 2021-01-19 | Typhon Technology Solutions, Llc | Multiple generator mobile electric powered fracturing system |
US10876386B2 (en) | 2011-04-07 | 2020-12-29 | Typhon Technology Solutions, Llc | Dual pump trailer mounted electric fracturing system |
US10837270B2 (en) * | 2011-04-07 | 2020-11-17 | Typhon Technology Solutions, Llc | VFD controlled motor mobile electrically powered system for use in fracturing underground formations for electric fracturing operations |
US10851634B2 (en) | 2011-04-07 | 2020-12-01 | Typhon Technology Solutions, Llc | Dual pump mobile electrically powered system for use in fracturing underground formations |
US20140048286A1 (en) * | 2011-08-09 | 2014-02-20 | Fabian Fidel Rojas | Systems and methods for a modular drum with a common power pack unit |
WO2013022430A1 (en) * | 2011-08-09 | 2013-02-14 | Halliburton Energy Services, Inc. | Systems and methods for a modular drum with a common power pack unit |
US9638337B2 (en) | 2012-08-16 | 2017-05-02 | S.P.M. Flow Control, Inc. | Plug valve having preloaded seal segments |
US9103448B2 (en) | 2012-08-16 | 2015-08-11 | S.P.M. Flow Control, Inc. | Plug valve having preloaded seal segments |
US9322243B2 (en) | 2012-08-17 | 2016-04-26 | S.P.M. Flow Control, Inc. | Automated relief valve control system and method |
US9857807B2 (en) | 2012-08-17 | 2018-01-02 | S.P.M. Flow Control, Inc. | Automated relief valve control system and method |
US9273543B2 (en) | 2012-08-17 | 2016-03-01 | S.P.M. Flow Control, Inc. | Automated relief valve control system and method |
US9475021B2 (en) | 2012-10-05 | 2016-10-25 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas |
US9475020B2 (en) | 2012-10-05 | 2016-10-25 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas |
US11118438B2 (en) | 2012-10-05 | 2021-09-14 | Typhon Technology Solutions, Llc | Turbine driven electric fracturing system and method |
US9140110B2 (en) | 2012-10-05 | 2015-09-22 | Evolution Well Services, Llc | Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas |
US10107085B2 (en) | 2012-10-05 | 2018-10-23 | Evolution Well Services | Electric blender system, apparatus and method for use in fracturing underground formations using liquid petroleum gas |
US10107084B2 (en) | 2012-10-05 | 2018-10-23 | Evolution Well Services | System and method for dedicated electric source for use in fracturing underground formations using liquid petroleum gas |
US9840901B2 (en) | 2012-11-16 | 2017-12-12 | U.S. Well Services, LLC | Remote monitoring for hydraulic fracturing equipment |
US10934824B2 (en) | 2012-11-16 | 2021-03-02 | U.S. Well Services, LLC | System for reducing vibrations in a pressure pumping fleet |
US10407990B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Slide out pump stand for hydraulic fracturing equipment |
US9650871B2 (en) | 2012-11-16 | 2017-05-16 | Us Well Services Llc | Safety indicator lights for hydraulic fracturing pumps |
US10337308B2 (en) | 2012-11-16 | 2019-07-02 | U.S. Well Services, Inc. | System for pumping hydraulic fracturing fluid using electric pumps |
US10526882B2 (en) | 2012-11-16 | 2020-01-07 | U.S. Well Services, LLC | Modular remote power generation and transmission for hydraulic fracturing system |
US11959371B2 (en) | 2012-11-16 | 2024-04-16 | Us Well Services, Llc | Suction and discharge lines for a dual hydraulic fracturing unit |
US11181879B2 (en) | 2012-11-16 | 2021-11-23 | U.S. Well Services, LLC | Monitoring and control of proppant storage from a datavan |
US9650879B2 (en) | 2012-11-16 | 2017-05-16 | Us Well Services Llc | Torsional coupling for electric hydraulic fracturing fluid pumps |
US11449018B2 (en) | 2012-11-16 | 2022-09-20 | U.S. Well Services, LLC | System and method for parallel power and blackout protection for electric powered hydraulic fracturing |
US11136870B2 (en) | 2012-11-16 | 2021-10-05 | U.S. Well Services, LLC | System for pumping hydraulic fracturing fluid using electric pumps |
US11476781B2 (en) | 2012-11-16 | 2022-10-18 | U.S. Well Services, LLC | Wireline power supply during electric powered fracturing operations |
US9611728B2 (en) | 2012-11-16 | 2017-04-04 | U.S. Well Services Llc | Cold weather package for oil field hydraulics |
US10408030B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Electric powered pump down |
US11091992B2 (en) | 2012-11-16 | 2021-08-17 | U.S. Well Services, LLC | System for centralized monitoring and control of electric powered hydraulic fracturing fleet |
US10686301B2 (en) | 2012-11-16 | 2020-06-16 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
US10254732B2 (en) | 2012-11-16 | 2019-04-09 | U.S. Well Services, Inc. | Monitoring and control of proppant storage from a datavan |
US10232332B2 (en) | 2012-11-16 | 2019-03-19 | U.S. Well Services, Inc. | Independent control of auger and hopper assembly in electric blender system |
US10119381B2 (en) | 2012-11-16 | 2018-11-06 | U.S. Well Services, LLC | System for reducing vibrations in a pressure pumping fleet |
US10107086B2 (en) | 2012-11-16 | 2018-10-23 | U.S. Well Services, LLC | Remote monitoring for hydraulic fracturing equipment |
US10731561B2 (en) | 2012-11-16 | 2020-08-04 | U.S. Well Services, LLC | Turbine chilling for oil field power generation |
US11850563B2 (en) | 2012-11-16 | 2023-12-26 | U.S. Well Services, LLC | Independent control of auger and hopper assembly in electric blender system |
US10036238B2 (en) | 2012-11-16 | 2018-07-31 | U.S. Well Services, LLC | Cable management of electric powered hydraulic fracturing pump unit |
US10020711B2 (en) | 2012-11-16 | 2018-07-10 | U.S. Well Services, LLC | System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources |
US9995218B2 (en) | 2012-11-16 | 2018-06-12 | U.S. Well Services, LLC | Turbine chilling for oil field power generation |
US9970278B2 (en) | 2012-11-16 | 2018-05-15 | U.S. Well Services, LLC | System for centralized monitoring and control of electric powered hydraulic fracturing fleet |
US11674352B2 (en) | 2012-11-16 | 2023-06-13 | U.S. Well Services, LLC | Slide out pump stand for hydraulic fracturing equipment |
US12228023B2 (en) | 2012-11-16 | 2025-02-18 | U.S. Well Services, LLC | Cable management of electric powered hydraulic fracturing pump unit |
US9893500B2 (en) | 2012-11-16 | 2018-02-13 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
US11066912B2 (en) | 2012-11-16 | 2021-07-20 | U.S. Well Services, LLC | Torsional coupling for electric hydraulic fracturing fluid pumps |
US10927802B2 (en) | 2012-11-16 | 2021-02-23 | U.S. Well Services, LLC | System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources |
US9745840B2 (en) | 2012-11-16 | 2017-08-29 | Us Well Services Llc | Electric powered pump down |
US10947829B2 (en) | 2012-11-16 | 2021-03-16 | U.S. Well Services, LLC | Cable management of electric powered hydraulic fracturing pump unit |
US12209490B2 (en) | 2012-11-16 | 2025-01-28 | U.S. Well Services, LLC | System for pumping hydraulic fracturing fluid using electric pumps |
US11713661B2 (en) | 2012-11-16 | 2023-08-01 | U.S. Well Services, LLC | Electric powered pump down |
USD734434S1 (en) | 2013-03-15 | 2015-07-14 | S.P.M. Flow Control, Inc. | Seal assembly |
US9273536B2 (en) * | 2013-06-24 | 2016-03-01 | Helix Energy Solutions Group, Inc. | Subsea intervention system |
US20140374114A1 (en) * | 2013-06-24 | 2014-12-25 | Helix Energy Solutions Group, Inc. | Subsea Intervention System |
US9568138B2 (en) | 2013-07-01 | 2017-02-14 | S.P.M. Flow Control, Inc. | Manifold assembly |
US10738928B2 (en) | 2013-07-01 | 2020-08-11 | S.P.M. Flow Control, Inc. | Manifold assembly |
USD873860S1 (en) | 2013-07-01 | 2020-01-28 | S.P.M. Flow Control, Inc. | Mounting bracket for manifold assembly |
US9417970B2 (en) * | 2014-02-27 | 2016-08-16 | Halliburton Energy Services, Inc. | Data file processing for a well job data archive |
US20150242411A1 (en) * | 2014-02-27 | 2015-08-27 | Halliburton Energy Services, Inc. | Data File Processing for a Well Job Data Archive |
WO2015131284A1 (en) * | 2014-03-06 | 2015-09-11 | Trican Well Service Ltd. | Method and system for purging coil tubing using onsite gas |
CN104265244A (en) * | 2014-09-14 | 2015-01-07 | 哈尔滨理工大学 | Underground submersible multistage lifting type pumping system and configuration method thereof |
US12221872B2 (en) | 2014-10-14 | 2025-02-11 | U.S. Well Services, LLC | System and method for parallel power and blackout protection for electric powered hydraulic fracturing |
US10570682B2 (en) * | 2015-03-24 | 2020-02-25 | Fmc Kongsberg Subsea As | Modular system and method for controlling subsea operations |
US20180066485A1 (en) * | 2015-03-24 | 2018-03-08 | Fmc Kongsberg Subsea As | Modular system and method for controlling subsea operations |
US10557576B2 (en) | 2015-06-15 | 2020-02-11 | S.P.M. Flow Control, Inc. | Full-root-radius-threaded wing nut having increased wall thickness |
US11519530B2 (en) | 2015-06-15 | 2022-12-06 | Spm Oil & Gas Inc. | Full-root-radius-threaded wing nut having increased wall thickness |
US10677365B2 (en) | 2015-09-04 | 2020-06-09 | S.P.M. Flow Control, Inc. | Pressure relief valve assembly and methods |
US12085017B2 (en) | 2015-11-20 | 2024-09-10 | Us Well Services, Llc | System for gas compression on electric hydraulic fracturing fleets |
US12078110B2 (en) | 2015-11-20 | 2024-09-03 | Us Well Services, Llc | System for gas compression on electric hydraulic fracturing fleets |
US12092095B2 (en) | 2016-12-02 | 2024-09-17 | Us Well Services, Llc | Constant voltage power distribution system for use with an electric hydraulic fracturing system |
US11181107B2 (en) | 2016-12-02 | 2021-11-23 | U.S. Well Services, LLC | Constant voltage power distribution system for use with an electric hydraulic fracturing system |
US11624326B2 (en) | 2017-05-21 | 2023-04-11 | Bj Energy Solutions, Llc | Methods and systems for supplying fuel to gas turbine engines |
US10280724B2 (en) | 2017-07-07 | 2019-05-07 | U.S. Well Services, Inc. | Hydraulic fracturing equipment with non-hydraulic power |
US11067481B2 (en) | 2017-10-05 | 2021-07-20 | U.S. Well Services, LLC | Instrumented fracturing slurry flow system and method |
US11203924B2 (en) | 2017-10-13 | 2021-12-21 | U.S. Well Services, LLC | Automated fracturing system and method |
US10408031B2 (en) | 2017-10-13 | 2019-09-10 | U.S. Well Services, LLC | Automated fracturing system and method |
US10655435B2 (en) | 2017-10-25 | 2020-05-19 | U.S. Well Services, LLC | Smart fracturing system and method |
US10598258B2 (en) | 2017-12-05 | 2020-03-24 | U.S. Well Services, LLC | Multi-plunger pumps and associated drive systems |
US10648311B2 (en) | 2017-12-05 | 2020-05-12 | U.S. Well Services, LLC | High horsepower pumping configuration for an electric hydraulic fracturing system |
US11959533B2 (en) | 2017-12-05 | 2024-04-16 | U.S. Well Services Holdings, Llc | Multi-plunger pumps and associated drive systems |
US11114857B2 (en) | 2018-02-05 | 2021-09-07 | U.S. Well Services, LLC | Microgrid electrical load management |
US11035207B2 (en) | 2018-04-16 | 2021-06-15 | U.S. Well Services, LLC | Hybrid hydraulic fracturing fleet |
US12142928B2 (en) | 2018-06-15 | 2024-11-12 | U.S. Well Services, LLC | Integrated mobile power unit for hydraulic fracturing |
US11211801B2 (en) | 2018-06-15 | 2021-12-28 | U.S. Well Services, LLC | Integrated mobile power unit for hydraulic fracturing |
US10648270B2 (en) | 2018-09-14 | 2020-05-12 | U.S. Well Services, LLC | Riser assist for wellsites |
US11208878B2 (en) | 2018-10-09 | 2021-12-28 | U.S. Well Services, LLC | Modular switchgear system and power distribution for electric oilfield equipment |
US11578577B2 (en) | 2019-03-20 | 2023-02-14 | U.S. Well Services, LLC | Oversized switchgear trailer for electric hydraulic fracturing |
US11728709B2 (en) | 2019-05-13 | 2023-08-15 | U.S. Well Services, LLC | Encoderless vector control for VFD in hydraulic fracturing applications |
US11560845B2 (en) | 2019-05-15 | 2023-01-24 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11542786B2 (en) | 2019-08-01 | 2023-01-03 | U.S. Well Services, LLC | High capacity power storage system for electric hydraulic fracturing |
US11280266B2 (en) | 2019-09-13 | 2022-03-22 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11859482B2 (en) | 2019-09-13 | 2024-01-02 | Bj Energy Solutions, Llc | Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods |
US10815764B1 (en) | 2019-09-13 | 2020-10-27 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US10895202B1 (en) | 2019-09-13 | 2021-01-19 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US10907459B1 (en) | 2019-09-13 | 2021-02-02 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US10961912B1 (en) | 2019-09-13 | 2021-03-30 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US12092100B2 (en) | 2019-09-13 | 2024-09-17 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
US11236739B2 (en) | 2019-09-13 | 2022-02-01 | Bj Energy Solutions, Llc | Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods |
US10982596B1 (en) | 2019-09-13 | 2021-04-20 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US12065968B2 (en) | 2019-09-13 | 2024-08-20 | BJ Energy Solutions, Inc. | Systems and methods for hydraulic fracturing |
US12049808B2 (en) | 2019-09-13 | 2024-07-30 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US11971028B2 (en) | 2019-09-13 | 2024-04-30 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
US10989180B2 (en) | 2019-09-13 | 2021-04-27 | Bj Energy Solutions, Llc | Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods |
US11268346B2 (en) | 2019-09-13 | 2022-03-08 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems |
US11002189B2 (en) | 2019-09-13 | 2021-05-11 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11015536B2 (en) | 2019-09-13 | 2021-05-25 | Bj Energy Solutions, Llc | Methods and systems for supplying fuel to gas turbine engines |
US11280331B2 (en) | 2019-09-13 | 2022-03-22 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
US11287350B2 (en) | 2019-09-13 | 2022-03-29 | Bj Energy Solutions, Llc | Fuel, communications, and power connection methods |
US11867118B2 (en) | 2019-09-13 | 2024-01-09 | Bj Energy Solutions, Llc | Methods and systems for supplying fuel to gas turbine engines |
US11015594B2 (en) | 2019-09-13 | 2021-05-25 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
US11852001B2 (en) | 2019-09-13 | 2023-12-26 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US11767791B2 (en) | 2019-09-13 | 2023-09-26 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11761846B2 (en) | 2019-09-13 | 2023-09-19 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
US11319878B2 (en) | 2019-09-13 | 2022-05-03 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US11725583B2 (en) | 2019-09-13 | 2023-08-15 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11346280B1 (en) | 2019-09-13 | 2022-05-31 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US11719234B2 (en) | 2019-09-13 | 2023-08-08 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
US11060455B1 (en) | 2019-09-13 | 2021-07-13 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11655763B1 (en) | 2019-09-13 | 2023-05-23 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US11156159B1 (en) | 2019-09-13 | 2021-10-26 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11149726B1 (en) | 2019-09-13 | 2021-10-19 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
US11649766B1 (en) | 2019-09-13 | 2023-05-16 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11401865B1 (en) | 2019-09-13 | 2022-08-02 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US11629584B2 (en) | 2019-09-13 | 2023-04-18 | Bj Energy Solutions, Llc | Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods |
US11408794B2 (en) | 2019-09-13 | 2022-08-09 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
US11415056B1 (en) | 2019-09-13 | 2022-08-16 | Bj Energy Solutions, Llc | Turbine engine exhaust duct system and methods for noise dampening and attenuation |
US11619122B2 (en) | 2019-09-13 | 2023-04-04 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US11092152B2 (en) | 2019-09-13 | 2021-08-17 | Bj Energy Solutions, Llc | Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump |
US11613980B2 (en) | 2019-09-13 | 2023-03-28 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US11608725B2 (en) | 2019-09-13 | 2023-03-21 | Bj Energy Solutions, Llc | Methods and systems for operating a fleet of pumps |
US11604113B2 (en) | 2019-09-13 | 2023-03-14 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
US11460368B2 (en) | 2019-09-13 | 2022-10-04 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
US11459954B2 (en) | 2019-09-13 | 2022-10-04 | Bj Energy Solutions, Llc | Turbine engine exhaust duct system and methods for noise dampening and attenuation |
US11598263B2 (en) | 2019-09-13 | 2023-03-07 | Bj Energy Solutions, Llc | Mobile gas turbine inlet air conditioning system and associated methods |
US11098651B1 (en) | 2019-09-13 | 2021-08-24 | Bj Energy Solutions, Llc | Turbine engine exhaust duct system and methods for noise dampening and attenuation |
US11473503B1 (en) | 2019-09-13 | 2022-10-18 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US11473997B2 (en) | 2019-09-13 | 2022-10-18 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
US11578660B1 (en) | 2019-09-13 | 2023-02-14 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US11560848B2 (en) | 2019-09-13 | 2023-01-24 | Bj Energy Solutions, Llc | Methods for noise dampening and attenuation of turbine engine |
US11555756B2 (en) | 2019-09-13 | 2023-01-17 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
US11512642B1 (en) | 2019-09-13 | 2022-11-29 | Bj Energy Solutions, Llc | Direct drive unit removal system and associated methods |
US11530602B2 (en) | 2019-09-13 | 2022-12-20 | Bj Energy Solutions, Llc | Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods |
US12152711B2 (en) | 2019-12-27 | 2024-11-26 | U.S. Well Services, LLC | System and method for integrated flow supply line |
US11009162B1 (en) | 2019-12-27 | 2021-05-18 | U.S. Well Services, LLC | System and method for integrated flow supply line |
US11708829B2 (en) | 2020-05-12 | 2023-07-25 | Bj Energy Solutions, Llc | Cover for fluid systems and related methods |
US11635074B2 (en) | 2020-05-12 | 2023-04-25 | Bj Energy Solutions, Llc | Cover for fluid systems and related methods |
US11898504B2 (en) | 2020-05-14 | 2024-02-13 | Bj Energy Solutions, Llc | Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge |
US10968837B1 (en) | 2020-05-14 | 2021-04-06 | Bj Energy Solutions, Llc | Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge |
US11434820B2 (en) | 2020-05-15 | 2022-09-06 | Bj Energy Solutions, Llc | Onboard heater of auxiliary systems using exhaust gases and associated methods |
US11698028B2 (en) | 2020-05-15 | 2023-07-11 | Bj Energy Solutions, Llc | Onboard heater of auxiliary systems using exhaust gases and associated methods |
US11542868B2 (en) | 2020-05-15 | 2023-01-03 | Bj Energy Solutions, Llc | Onboard heater of auxiliary systems using exhaust gases and associated methods |
US11624321B2 (en) | 2020-05-15 | 2023-04-11 | Bj Energy Solutions, Llc | Onboard heater of auxiliary systems using exhaust gases and associated methods |
US11428165B2 (en) | 2020-05-15 | 2022-08-30 | Bj Energy Solutions, Llc | Onboard heater of auxiliary systems using exhaust gases and associated methods |
US11959419B2 (en) | 2020-05-15 | 2024-04-16 | Bj Energy Solutions, Llc | Onboard heater of auxiliary systems using exhaust gases and associated methods |
US11486788B2 (en) | 2020-05-28 | 2022-11-01 | Schlumberger Technology Corporation | Test system for a pressure control equipment system |
US11365616B1 (en) | 2020-05-28 | 2022-06-21 | Bj Energy Solutions, Llc | Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods |
US12018999B2 (en) | 2020-05-28 | 2024-06-25 | Schlumberger Technology Corporation | Test system for a pressure control equipment system |
US11814940B2 (en) | 2020-05-28 | 2023-11-14 | Bj Energy Solutions Llc | Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods |
US11208880B2 (en) | 2020-05-28 | 2021-12-28 | Bj Energy Solutions, Llc | Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods |
US11313213B2 (en) | 2020-05-28 | 2022-04-26 | Bj Energy Solutions, Llc | Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods |
US11603745B2 (en) | 2020-05-28 | 2023-03-14 | Bj Energy Solutions, Llc | Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods |
US11891952B2 (en) | 2020-06-05 | 2024-02-06 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11300050B2 (en) | 2020-06-05 | 2022-04-12 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11746698B2 (en) | 2020-06-05 | 2023-09-05 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11723171B2 (en) | 2020-06-05 | 2023-08-08 | Bj Energy Solutions, Llc | Enclosure assembly for enhanced cooling of direct drive unit and related methods |
US11598264B2 (en) | 2020-06-05 | 2023-03-07 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11129295B1 (en) | 2020-06-05 | 2021-09-21 | Bj Energy Solutions, Llc | Enclosure assembly for enhanced cooling of direct drive unit and related methods |
US11109508B1 (en) | 2020-06-05 | 2021-08-31 | Bj Energy Solutions, Llc | Enclosure assembly for enhanced cooling of direct drive unit and related methods |
US10961908B1 (en) | 2020-06-05 | 2021-03-30 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11627683B2 (en) | 2020-06-05 | 2023-04-11 | Bj Energy Solutions, Llc | Enclosure assembly for enhanced cooling of direct drive unit and related methods |
US11208953B1 (en) | 2020-06-05 | 2021-12-28 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11378008B2 (en) | 2020-06-05 | 2022-07-05 | Bj Energy Solutions, Llc | Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit |
US11022526B1 (en) | 2020-06-09 | 2021-06-01 | Bj Energy Solutions, Llc | Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit |
US11066915B1 (en) | 2020-06-09 | 2021-07-20 | Bj Energy Solutions, Llc | Methods for detection and mitigation of well screen out |
US11867046B2 (en) | 2020-06-09 | 2024-01-09 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US11643915B2 (en) | 2020-06-09 | 2023-05-09 | Bj Energy Solutions, Llc | Drive equipment and methods for mobile fracturing transportation platforms |
US10954770B1 (en) | 2020-06-09 | 2021-03-23 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US11111768B1 (en) | 2020-06-09 | 2021-09-07 | Bj Energy Solutions, Llc | Drive equipment and methods for mobile fracturing transportation platforms |
US11629583B2 (en) | 2020-06-09 | 2023-04-18 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US11208881B1 (en) | 2020-06-09 | 2021-12-28 | Bj Energy Solutions, Llc | Methods and systems for detection and mitigation of well screen out |
US11015423B1 (en) | 2020-06-09 | 2021-05-25 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US11339638B1 (en) | 2020-06-09 | 2022-05-24 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US11566506B2 (en) | 2020-06-09 | 2023-01-31 | Bj Energy Solutions, Llc | Methods for detection and mitigation of well screen out |
US11174716B1 (en) | 2020-06-09 | 2021-11-16 | Bj Energy Solutions, Llc | Drive equipment and methods for mobile fracturing transportation platforms |
US11085281B1 (en) | 2020-06-09 | 2021-08-10 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US11261717B2 (en) | 2020-06-09 | 2022-03-01 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US11319791B2 (en) | 2020-06-09 | 2022-05-03 | Bj Energy Solutions, Llc | Methods and systems for detection and mitigation of well screen out |
US11939854B2 (en) | 2020-06-09 | 2024-03-26 | Bj Energy Solutions, Llc | Methods for detection and mitigation of well screen out |
US11512570B2 (en) | 2020-06-09 | 2022-11-29 | Bj Energy Solutions, Llc | Systems and methods for exchanging fracturing components of a hydraulic fracturing unit |
US11952878B2 (en) | 2020-06-22 | 2024-04-09 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
US11939853B2 (en) | 2020-06-22 | 2024-03-26 | Bj Energy Solutions, Llc | Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units |
US11639655B2 (en) | 2020-06-22 | 2023-05-02 | Bj Energy Solutions, Llc | Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing |
US11208879B1 (en) | 2020-06-22 | 2021-12-28 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
US11732565B2 (en) | 2020-06-22 | 2023-08-22 | Bj Energy Solutions, Llc | Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing |
US11572774B2 (en) | 2020-06-22 | 2023-02-07 | Bj Energy Solutions, Llc | Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing |
US11933153B2 (en) | 2020-06-22 | 2024-03-19 | Bj Energy Solutions, Llc | Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control |
US11028677B1 (en) | 2020-06-22 | 2021-06-08 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
US11408263B2 (en) | 2020-06-22 | 2022-08-09 | Bj Energy Solutions, Llc | Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing |
US11898429B2 (en) | 2020-06-22 | 2024-02-13 | Bj Energy Solutions, Llc | Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing |
US11598188B2 (en) | 2020-06-22 | 2023-03-07 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
US11236598B1 (en) | 2020-06-22 | 2022-02-01 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
US11125066B1 (en) | 2020-06-22 | 2021-09-21 | Bj Energy Solutions, Llc | Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing |
US11428218B2 (en) | 2020-06-23 | 2022-08-30 | Bj Energy Solutions, Llc | Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
US11939974B2 (en) | 2020-06-23 | 2024-03-26 | Bj Energy Solutions, Llc | Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
US12065917B2 (en) | 2020-06-23 | 2024-08-20 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
US11466680B2 (en) | 2020-06-23 | 2022-10-11 | Bj Energy Solutions, Llc | Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
US11566505B2 (en) | 2020-06-23 | 2023-01-31 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
US11473413B2 (en) | 2020-06-23 | 2022-10-18 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
US11415125B2 (en) | 2020-06-23 | 2022-08-16 | Bj Energy Solutions, Llc | Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
US11719085B1 (en) | 2020-06-23 | 2023-08-08 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
US11649820B2 (en) | 2020-06-23 | 2023-05-16 | Bj Energy Solutions, Llc | Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
US11661832B2 (en) | 2020-06-23 | 2023-05-30 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
US11746638B2 (en) | 2020-06-24 | 2023-09-05 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
US11692422B2 (en) | 2020-06-24 | 2023-07-04 | Bj Energy Solutions, Llc | System to monitor cavitation or pulsation events during a hydraulic fracturing operation |
US11220895B1 (en) | 2020-06-24 | 2022-01-11 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
US11542802B2 (en) | 2020-06-24 | 2023-01-03 | Bj Energy Solutions, Llc | Hydraulic fracturing control assembly to detect pump cavitation or pulsation |
US11391137B2 (en) | 2020-06-24 | 2022-07-19 | Bj Energy Solutions, Llc | Systems and methods to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation |
US11512571B2 (en) | 2020-06-24 | 2022-11-29 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
US11506040B2 (en) | 2020-06-24 | 2022-11-22 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
US11274537B2 (en) | 2020-06-24 | 2022-03-15 | Bj Energy Solutions, Llc | Method to detect and intervene relative to cavitation and pulsation events during a hydraulic fracturing operation |
US11149533B1 (en) | 2020-06-24 | 2021-10-19 | Bj Energy Solutions, Llc | Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation |
US11668175B2 (en) | 2020-06-24 | 2023-06-06 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
US11299971B2 (en) | 2020-06-24 | 2022-04-12 | Bj Energy Solutions, Llc | System of controlling a hydraulic fracturing pump or blender using cavitation or pulsation detection |
US11255174B2 (en) | 2020-06-24 | 2022-02-22 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
US11608727B2 (en) | 2020-07-17 | 2023-03-21 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11920450B2 (en) | 2020-07-17 | 2024-03-05 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11193360B1 (en) | 2020-07-17 | 2021-12-07 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11255175B1 (en) | 2020-07-17 | 2022-02-22 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11365615B2 (en) | 2020-07-17 | 2022-06-21 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11193361B1 (en) | 2020-07-17 | 2021-12-07 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11603744B2 (en) | 2020-07-17 | 2023-03-14 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11994014B2 (en) | 2020-07-17 | 2024-05-28 | Bj Energy Solutions, Llc | Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations |
US11867045B2 (en) | 2021-05-24 | 2024-01-09 | Bj Energy Solutions, Llc | Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods |
US11732563B2 (en) | 2021-05-24 | 2023-08-22 | Bj Energy Solutions, Llc | Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods |
US11639654B2 (en) | 2021-05-24 | 2023-05-02 | Bj Energy Solutions, Llc | Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods |
US12152448B2 (en) * | 2021-11-30 | 2024-11-26 | Sichuan Honghua Petroleum Equipment Co., Ltd | Coiled tubing operating system and coiled tubing operating method |
CN114427359A (en) * | 2022-02-09 | 2022-05-03 | 辽宁石油化工大学 | Novel tool carrying device for well repair |
US11955782B1 (en) | 2022-11-01 | 2024-04-09 | Typhon Technology Solutions (U.S.), Llc | System and method for fracturing of underground formations using electric grid power |
US12276577B2 (en) | 2023-06-23 | 2025-04-15 | Bj Energy Solutions, Llc | Fuel, communications, and power connection systems and related methods |
CN117646614A (en) * | 2024-01-29 | 2024-03-05 | 中国石油集团川庆钻探工程有限公司 | Freezing temporary plugging valve replacing device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20080264649A1 (en) | Modular well servicing combination unit | |
WO2009023042A1 (en) | Well servicing modular combination unit | |
US11506026B2 (en) | Power system and method | |
US11339637B2 (en) | Packaging and deployment of a frac pump on a frac pad | |
US10830029B2 (en) | Equipment, system and method for delivery of high pressure fluid | |
US10837270B2 (en) | VFD controlled motor mobile electrically powered system for use in fracturing underground formations for electric fracturing operations | |
US7207389B2 (en) | Hybrid coiled tubing/fluid pumping unit | |
US7921914B2 (en) | Combined three-in-one fracturing system | |
US7051818B2 (en) | Three in one combined power unit for nitrogen system, fluid system, and coiled tubing system | |
US11255173B2 (en) | Mobile, modular, electrically powered system for use in fracturing underground formations using liquid petroleum gas | |
US20090050311A1 (en) | Well servicing combination unit | |
US20090151927A1 (en) | Combined nitrogen generation system and well servicing fluid system in one power unit apparatus | |
US12241352B2 (en) | Power system and method | |
US10850970B2 (en) | Method and apparatus for direct gravity-fed fuel delivery | |
CN202156464U (en) | Continuous oil pipe semitrailer | |
US11519369B1 (en) | Fuel supply system | |
CA3061972A1 (en) | Equipment, system and method for delivery of high pressure fluid | |
US11952893B2 (en) | Compact peripheral unit for onshore production rigs | |
WO2018195124A1 (en) | Power system and method | |
CA2457307C (en) | Hybrid coiled tubing/fluid pumping unit | |
Cooper et al. | Jet Frac Porta-Skid-A New Concept in Oil Field Service Pump Equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: WS (BLOCKER), INC., CALIFORNIA Free format text: BILL OF SALE/ASSIGNMENT;ASSIGNOR:WISE WELL INTERVENTION SERVICES, INC.;REEL/FRAME:023586/0279 Effective date: 20070831 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |