US20060086607A1 - Aluminum production installation employing fused-salt electrolysis - Google Patents

Aluminum production installation employing fused-salt electrolysis Download PDF

Info

Publication number
US20060086607A1
US20060086607A1 US10/517,211 US51721105A US2006086607A1 US 20060086607 A1 US20060086607 A1 US 20060086607A1 US 51721105 A US51721105 A US 51721105A US 2006086607 A1 US2006086607 A1 US 2006086607A1
Authority
US
United States
Prior art keywords
installation according
electrolysis installation
runway
cells
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/517,211
Inventor
Christian Duval
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rio Tinto France SAS
Original Assignee
Aluminium Pechiney SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aluminium Pechiney SA filed Critical Aluminium Pechiney SA
Assigned to ALUMINUM PECHINEY reassignment ALUMINUM PECHINEY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: DUVAL, CHRISTIAN
Publication of US20060086607A1 publication Critical patent/US20060086607A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25CPROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
    • C25C3/00Electrolytic production, recovery or refining of metals by electrolysis of melts
    • C25C3/06Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/06Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes

Definitions

  • the invention relates to aluminium production plants based on igneous electrolysis using the Hall-Héroult process. It particularly relates to handling equipment used in the said plants.
  • Aluminium metal is produced industrially by igneous electrolysis, namely by electrolysis of alumina in solution in a molten cryolithic bath called an electrolytic bath, using the well known Hall-Héroult process.
  • the electrolytic bath is contained in pots comprising a steel shell lined on the inside with refractory and/or insulating materials, and a cathodic assembly located at the bottom of the pot.
  • Anodes made of carbonaceous materials are partially immersed in the electrolytic bath. Each pot and its anodes form what is frequently called an electrolytic cell.
  • the plants contain a large number of electrolytic cells arranged in line, in buildings called electrolysis halls or potrooms, and are electrically connected in series using connecting conductors so as to optimise the ground occupancy of the plants.
  • the cells are usually arranged so as to form two or more parallel lines that are electrically connected together by end conductors. Thus, the electrolytic current passes in cascade from one cell to the next.
  • the purpose of the invention is an electrolysis installation designed for the production of aluminium by igneous electrolysis, comprising a potroom, a plurality of electrolytic cells arranged in line inside the potroom, a passageway (also called a “service aisle”) parallel to the said line of cells and located inside the potroom, and at least one first mobile lifting and handling unit called a “travelling crane”, that is supported on a first runway parallel to the main axis of the line and that can be moved above the said line of cells on the said first runway.
  • the installation according to the invention is characterised in that it also comprises at least one second mobile lifting and handling unit called the “lateral portal crane” or “lateral gantry”, and a second runway parallel to the main axis of the line and independent of the first runway, and in that this second unit is supported by the said second runway and can be moved underneath the first unit, along the said line of electrolytic cells on the said second runway, such that the two lifting and handling units can be moved independently, and in that the said second unit is capable of lifting and handling liquid metal ladles and/or liquid bath ladles.
  • the lateral portal crane or “lateral gantry”
  • the applicant had the idea of separating the handling and lifting devices (or “tools”) as a function of the displacement requirements for each operation done on the cells. More precisely, the applicant had the idea of separating operations that require movements of the said tools over a large proportion of the surface of the electrolytic potroom, such as anode changes, from operations limited to much more specific zones of the potroom, such as tapping liquid metals that only involves movements along a relatively narrow strip along one of the ends of the cells.
  • the applicant also had the idea of equipping the potroom with at least one second lifting and handling unit independent of the first unit and moving underneath the first unit, and making it specialised in operations that only require mobility along the ends of the cells. The two units can pass one above the other so that one can move independently of the other.
  • Another purpose of the invention is to use an electrolysis installation according to the invention for production of aluminium.
  • Another purpose of the invention is a production plant comprising at least one electrolysis installation according to the invention.
  • FIG. 1 illustrates an electrolysis installation for aluminium production according to prior art.
  • FIG. 2 illustrates an electrolysis installation for the production of aluminium according to the invention.
  • FIG. 3 illustrates a variant of the electrolysis installation for the production of aluminium according to the invention.
  • FIG. 4 illustrates an embodiment of a lateral lifting and handling unit in an electrolysis installation for production of aluminium according to the invention.
  • FIG. 5 illustrates typical displacement limits of the lateral lifting and handling unit according to the invention.
  • FIG. 6 illustrates a lateral lifting and handling unit of an electrolysis installation for the production of aluminium according to the invention in a liquid metal tapping position.
  • the electrolysis plants intended for the production of aluminium comprise a liquid aluminium production zone that comprises one or several electrolytic potrooms ( 1 ). These potrooms contain electrolytic cells ( 2 ) that are arranged in substantially linear rows or lines, each line typically containing more than a hundred cells. Each potroom typically contains one or two lines of electrolytic cells.
  • Passageways are also provided in the units for circulation, particularly for the transport of equipment, anodes and liquid aluminium.
  • the electrolytic potrooms ( 1 ) are served by external peripheral roads and access means ( 4 , 5 ) to enable motorised vehicles to enter and to leave ( 16 ).
  • Each potroom usually comprises at least one internal passageway ( 15 ) called the “service aisle” parallel to the line of cells.
  • This aisle is used for the circulation of motorised vehicles ( 16 ) and operators ( 17 ) and for temporary storage of equipment (such as anodes) or apparatus.
  • the service aisle ( 15 ) is usually elevated above the ground ( 3 ), so that access ramps ( 5 ) are necessary between the aisle and the peripheral roads.
  • an electrolytic potroom ( 1 ) typically comprises a usually metallic structure ( 6 ), building cladding ( 7 ), and at least one lifting and handling unit (or “travelling crane”) ( 8 ) to perform operations on the pots.
  • the travelling crane ( 8 ) comprises a cross beam or member ( 9 ) and at least one (and typically two) trolleys ( 10 , 11 ) that can be moved along the cross beam. Each trolley ( 10 , 11 ) is typically provided with lifting means ( 12 ) and/or tools ( 13 ) (such as a shovel).
  • the travelling crane ( 8 ) is supported on and travels along a runway ( 14 ) that typically includes two running means ( 14 a , 14 b ) such as rails parallel to each other and to the main axis A of the potroom (and the line of cells).
  • the running means ( 14 a , 14 b ) usually guide displacement of the travelling crane ( 8 ).
  • the runway ( 14 ) is typically entirely elevated above the level of the service aisle ( 15 ).
  • the corresponding running means ( 14 a , 14 b ) are typically fixed to the structure ( 6 ) of the potroom.
  • the travelling crane ( 8 ) can normally be moved from one end of the potroom to the other along the main axis A of the potroom.
  • Combined displacements of the cross beam ( 9 ) along the potroom and the trolleys ( 10 , 11 ) along the cross beam generally provide access to all electrolytic cells ( 2 ) and the service aisle ( 15 ).
  • the travelling crane ( 8 ) is typically capable of performing operations such as an anode change, filling feed hoppers with crushed bath and AlF 3 from electrolytic cells, and lifting and handling pot elements.
  • the electrolysis installation intended for aluminium production by igneous electrolysis comprises a potroom ( 1 ), a plurality of electrolytic cells ( 2 ) arranged inside the potroom ( 1 ) so as to form at least one line with a main axis A, a so called service aisle ( 15 ) parallel to the said line of cells and located inside the potroom ( 1 ), and at least one first mobile lifting and handling unit ( 8 ) called a “travelling crane”, supported on a first runway ( 14 ) parallel to the main axis A of the line, and that can be moved above the said line of cells on the said first runway, and is characterised in that it also comprises at least one second mobile lifting and handling unit ( 20 ) called the “lateral portal crane” and a second runway ( 21 ) parallel to the main axis A of the line and independent of the first runway ( 14 ), in that the said second unit ( 20 ) is supported on the said second runway ( 21 ) and can be moved along the said second runway ( 21 ) underneath the first unit (
  • the liquid metal ladles are used for tapping liquid metal from an electrolytic cell.
  • the liquid bath ladles are used to tap liquid electrolyte bath from an electrolytic cell.
  • the lifting capacity of the lateral portal crane ( 20 ) is typically at least 10 tonnes, for lifting and handling full ladles.
  • the lateral portal crane ( 20 ) which is intended mainly for lifting and handling liquid metal ladles or liquid bath ladles, may possibly be capable of positioning the said ladles for tapping liquids from an electrolytic cell.
  • it may also be designed to lift and handle other elements and equipment placed in the service aisle ( 15 ).
  • the lateral portal crane ( 20 ) may be displaced (or “translated”) from one end of the potroom ( 1 ) to the other.
  • the total height H of the lateral portal crane is typically less than the height Hm of the lowest part of the travelling crane ( 8 ), so that the travelling crane ( 8 ) and the lateral portal crane ( 20 ) can “pass” each other.
  • the lateral portal crane ( 20 ) comprises rolling means ( 22 a , 22 b ) capable of travelling on the said second runway ( 21 ).
  • the lateral portal crane ( 20 ) typically includes at least one transverse beam ( 23 , 23 a , 23 b ) that is preferably substantially horizontal and perpendicular to the main axis A.
  • the lateral portal crane ( 20 ) is equipped with a trolley ( 25 ) capable of being moved along a direction preferably substantially perpendicular to the main axis A of the line of cells.
  • the trolley ( 25 ) typically moves along at least one transverse beam ( 23 , 23 a , 23 b ).
  • the working range of the lateral portal crane ( 20 ) is limited essentially to the area of the service aisle ( 15 ) and the service end ( 18 ) of the electrolytic cells ( 2 ).
  • the travelling crane ( 8 ) can be used for lifting and handling operations that require access into the area above the electrolytic cells.
  • the movement range L of the trolley ( 25 ) is limited to a value equal to or less than the width Lo of the service aisle ( 15 ).
  • the term “movement range” means the maximum extension of possible movements of the main axis B of the trolley in a direction transverse to the main axis A of the line of electrolytic cells.
  • the said movement range is preferably such that the main vertical axis B of the trolley ( 25 ) is entirely above the service aisle, regardless of the position of the said trolley.
  • the movement range L of the trolley ( 25 ) preferably extends not further than the outside edge ( 15 a ) of the service aisle on one side, and not further than the inside edge ( 15 b ) thereof on the other side.
  • the trolley ( 25 ) is equipped with lifting means ( 26 ) and gripping means ( 27 ).
  • the gripping means ( 27 ) typically comprises one or several means ( 28 ) of fixing the object (such as an element or equipment) to be lifted and handled.
  • the gripping means ( 27 ) can be installed on a pivoting support ( 29 ) to enable rotation of the element or equipment that it supports about an axis B.
  • the attachment means ( 28 ) may be inserted in the corresponding attachment means ( 41 ) on the said ladle ( 40 ).
  • the attachment means ( 28 ) and ( 41 ) advantageously enable rotation of the ladle about an axis C typically parallel to the service aisle.
  • the trolley may be equipped with a siphon ( 43 ) that is intended to be fixed on the ladle ( 40 ), and more precisely on the cover ( 44 ) of the ladle ( 40 ). This variant simplifies handling and transport of ladles ( 40 ).
  • the liquid metal tapping operation (frequently called the “pour operation”) can be done using a process that typically comprises:
  • Elements of cells and equipment such as anodes or liquid metal ladles that will be lifted and transported by the travelling crane ( 8 ) or the lateral portal crane ( 20 ) may be transported on pallets ( 42 ) and stored in the service aisle ( 15 ).
  • the electrolytic cells ( 2 ) are fully or partly surrounded by working floors ( 50 ).
  • operators can access these working floors by fixed or movable staircases.
  • the service aisle ( 15 ) is located on a first level, which is preferably located at the level of the ground ( 3 ) outside the potroom ( 1 ), and the working floors ( 50 ) are located at at least one second elevated level at a determined height Hb above the first level.
  • the height Hb is typically between 0.5 m and 4 m. This configuration simplifies the civil works of the building and makes it more economic.
  • the working floors ( 50 ) may possibly comprise a service balcony ( 51 ) on the side of the service aisle ( 15 ), and the said balcony may possibly be common to all cells ( 2 ).
  • the service balcony ( 51 ) preferably comprises a handrail ( 52 ) for safety reasons.
  • the movement range L of the trolley ( 25 ) may be such that the main axis B of the trolley ( 25 ) may also overhang or cantilever over the said balcony.
  • the value of the movement range L may be larger than the width Lo of the service aisle ( 15 ), but will preferably remain less than the distance Do between the outside edge ( 15 a ) of the service aisle and the inside edge ( 51 a ) of the balcony, such that it overhangs only the service aisle ( 15 ) and the service balcony ( 51 ), regardless of the position of the said trolley.
  • the movement range L of the trolley ( 25 ) preferably extends not further than the outside edge ( 15 a ) of the service aisle on one side, and not further than the inside edge ( 51 a ) of the service balcony on the other side.
  • the working floors ( 50 ) preferably include floors ( 53 ) between the cells.
  • the working floors ( 50 ) comprise a service balcony ( 51 )
  • the latter is preferably at the same level as the said floors ( 53 ) between the cells.
  • the second runway ( 21 ) comprises a first running means ( 21 a ) elevated above the level of the service aisle ( 15 ) and a second running means ( 21 b ) at a lower level than the first running means ( 21 a ).
  • the second running means ( 21 b ) is preferably close to or on the service aisle ( 15 ).
  • the second running means ( 21 b ) may be located directly on the service aisle ( 15 ) as illustrated in FIG. 2 , or it may be located on a platform ( 19 ) with a determined height Ha above the said aisle, as illustrated in FIG. 3 .
  • the height Ha is typically between 0.2 and 2.5 m.
  • the second running means ( 21 b ) is advantageously also directly on the service aisle ( 15 ), thus covering a determined circulation strip which considerably simplifies the installation.
  • the rolling means ( 22 a , 22 b ) typically comprise rolling means “on the ground” such as wheels or wheel sets ( 22 b ) supported on the second running means ( 21 b ) (either on the said platform or on the service aisle ( 15 )).
  • the lateral portal crane is called the “semi portal crane” or “semi gantry” because only one part of the runway is elevated.
  • the rolling means ( 22 a ) supported on the elevated running means ( 21 a ) is typically placed at one end of the transverse beam(s) ( 23 , 23 a , 23 b ).
  • the rolling means on the ground ( 22 b ) may be fixed to the transverse beam(s) ( 23 , 23 a , 23 b ) by uprights ( 24 ).
  • the running means ( 21 a ) elevated above the level of the service aisle ( 15 ) is located at a determined height which is typically more than 3 m in order to leave sufficient space for the passage of vehicles ( 16 ) and the storage of pot elements or equipment in the service aisle ( 15 ).
  • the elevated running means ( 21 a ) is advantageously fixed to the structure ( 6 ) of the potroom ( 1 ), which stabilises the lateral position of the lateral portal crane ( 20 ) and thus enables automatic operation of the lateral portal crane without the need for guide systems that could be sensitive to magnetic fields.
  • the second running means ( 21 b ) is advantageously at a distance of less than 0.5 m from the inside edge ( 15 b ) of the service aisle (in other words the edge of the aisle located at the side of the line of the cells), or possibly adjacent to the said edge ( 15 b ), to avoid taking up space in the service aisle ( 15 ).
  • the second running means ( 21 b ) may be on the service balcony ( 51 ), or it may be located on a platform fixed to the service balcony.
  • the potroom ( 1 ) may comprise two or several lines of parallel cells. In this case, it may be advantageous to provide one travelling crane for each line of cells or each group of lines of cells, and at least one lateral portal crane for each line of cells.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Electrolytic Production Of Metals (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to an electrolysis installation, intended for the production of aluminium based on igneous electrolysis, comprising a potroom, a plurality of electrolytic cells arranged inside the potroom, a service aisle parallel to the line of cells and located inside the potroom, and at least one first mobile lifting and handling unit, supported on a first runway parallel to the main axis A of the line, and that can be moved above the line of cells on the first runway, and wherein the installation also comprises at least one second mobile lifting and handling unit, and a second runway parallel to the main axis A of the line and independent of the first runway, and in that the second unit is supported on the second runway and can be moved along the second runway and can be moved underneath the first unit and along the line of electrolytic cells, on the second runway, such that the two lifting and handling units can be moved independently, and in that the said second unit is capable of lifting and handling liquid metal ladles and/or liquid bath ladles.

Description

    DOMAIN OF THE INVENTION
  • The invention relates to aluminium production plants based on igneous electrolysis using the Hall-Héroult process. It particularly relates to handling equipment used in the said plants.
  • STATE OF THE ART
  • Aluminium metal is produced industrially by igneous electrolysis, namely by electrolysis of alumina in solution in a molten cryolithic bath called an electrolytic bath, using the well known Hall-Héroult process. The electrolytic bath is contained in pots comprising a steel shell lined on the inside with refractory and/or insulating materials, and a cathodic assembly located at the bottom of the pot. Anodes made of carbonaceous materials are partially immersed in the electrolytic bath. Each pot and its anodes form what is frequently called an electrolytic cell. The electrolysis current that circulates in the electrolytic bath and the layer of liquid aluminium through anodes and cathode elements, causes alumina reduction reactions to take place and also keeps the electrolytic bath at a temperature of the order of 950° C. by the Joule effect.
  • The plants contain a large number of electrolytic cells arranged in line, in buildings called electrolysis halls or potrooms, and are electrically connected in series using connecting conductors so as to optimise the ground occupancy of the plants. The cells are usually arranged so as to form two or more parallel lines that are electrically connected together by end conductors. Thus, the electrolytic current passes in cascade from one cell to the next.
  • Work has to be done on electrolytic cells during operation of an electrolysis plant, particularly including the replacement of spent anodes by new anodes, tapping liquid metal from cells and tapping or adding electrolyte. The most modern plants are equipped with a lifting and handling unit (frequently referred to as a “overhead crane” or “travelling crane”) that may be moved longitudinally above and along the electrolytic cells, and is provided with several devices (frequently called “tools”) such as shovels and hoists for handling and for working.
  • Although travelling cranes have many advantages when doing work on electrolytic cells, the applicant has noted that their multi-functional nature means that various facilities on them are underused, which unnecessarily increases operating costs.
  • Therefore, the applicant searched for means of reducing investment and operating costs of known installations.
  • DESCRIPTION OF THE INVENTION
  • The purpose of the invention is an electrolysis installation designed for the production of aluminium by igneous electrolysis, comprising a potroom, a plurality of electrolytic cells arranged in line inside the potroom, a passageway (also called a “service aisle”) parallel to the said line of cells and located inside the potroom, and at least one first mobile lifting and handling unit called a “travelling crane”, that is supported on a first runway parallel to the main axis of the line and that can be moved above the said line of cells on the said first runway.
  • The installation according to the invention is characterised in that it also comprises at least one second mobile lifting and handling unit called the “lateral portal crane” or “lateral gantry”, and a second runway parallel to the main axis of the line and independent of the first runway, and in that this second unit is supported by the said second runway and can be moved underneath the first unit, along the said line of electrolytic cells on the said second runway, such that the two lifting and handling units can be moved independently, and in that the said second unit is capable of lifting and handling liquid metal ladles and/or liquid bath ladles.
  • In his search for a solution to the stated problem, the applicant had the idea of separating the handling and lifting devices (or “tools”) as a function of the displacement requirements for each operation done on the cells. More precisely, the applicant had the idea of separating operations that require movements of the said tools over a large proportion of the surface of the electrolytic potroom, such as anode changes, from operations limited to much more specific zones of the potroom, such as tapping liquid metals that only involves movements along a relatively narrow strip along one of the ends of the cells. The applicant also had the idea of equipping the potroom with at least one second lifting and handling unit independent of the first unit and moving underneath the first unit, and making it specialised in operations that only require mobility along the ends of the cells. The two units can pass one above the other so that one can move independently of the other.
  • Another purpose of the invention is to use an electrolysis installation according to the invention for production of aluminium.
  • Another purpose of the invention is a production plant comprising at least one electrolysis installation according to the invention.
  • The invention will be better understood with the help of the figures and the detailed description given below.
  • FIG. 1 illustrates an electrolysis installation for aluminium production according to prior art.
  • FIG. 2 illustrates an electrolysis installation for the production of aluminium according to the invention.
  • FIG. 3 illustrates a variant of the electrolysis installation for the production of aluminium according to the invention.
  • FIG. 4 illustrates an embodiment of a lateral lifting and handling unit in an electrolysis installation for production of aluminium according to the invention.
  • FIG. 5 illustrates typical displacement limits of the lateral lifting and handling unit according to the invention.
  • FIG. 6 illustrates a lateral lifting and handling unit of an electrolysis installation for the production of aluminium according to the invention in a liquid metal tapping position.
  • The electrolysis plants intended for the production of aluminium comprise a liquid aluminium production zone that comprises one or several electrolytic potrooms (1). These potrooms contain electrolytic cells (2) that are arranged in substantially linear rows or lines, each line typically containing more than a hundred cells. Each potroom typically contains one or two lines of electrolytic cells.
  • Passageways are also provided in the units for circulation, particularly for the transport of equipment, anodes and liquid aluminium. In particular, the electrolytic potrooms (1) are served by external peripheral roads and access means (4, 5) to enable motorised vehicles to enter and to leave (16).
  • Each potroom usually comprises at least one internal passageway (15) called the “service aisle” parallel to the line of cells. This aisle is used for the circulation of motorised vehicles (16) and operators (17) and for temporary storage of equipment (such as anodes) or apparatus. The service aisle (15) is usually elevated above the ground (3), so that access ramps (5) are necessary between the aisle and the peripheral roads.
  • As shown in FIG. 1, an electrolytic potroom (1) typically comprises a usually metallic structure (6), building cladding (7), and at least one lifting and handling unit (or “travelling crane”) (8) to perform operations on the pots.
  • The travelling crane (8) comprises a cross beam or member (9) and at least one (and typically two) trolleys (10, 11) that can be moved along the cross beam. Each trolley (10, 11) is typically provided with lifting means (12) and/or tools (13) (such as a shovel). The travelling crane (8) is supported on and travels along a runway (14) that typically includes two running means (14 a, 14 b) such as rails parallel to each other and to the main axis A of the potroom (and the line of cells). The running means (14 a, 14 b) usually guide displacement of the travelling crane (8). The runway (14) is typically entirely elevated above the level of the service aisle (15). The corresponding running means (14 a, 14 b) are typically fixed to the structure (6) of the potroom. The travelling crane (8) can normally be moved from one end of the potroom to the other along the main axis A of the potroom. Combined displacements of the cross beam (9) along the potroom and the trolleys (10, 11) along the cross beam generally provide access to all electrolytic cells (2) and the service aisle (15).
  • The travelling crane (8) is typically capable of performing operations such as an anode change, filling feed hoppers with crushed bath and AlF3 from electrolytic cells, and lifting and handling pot elements.
  • According to the invention, the electrolysis installation intended for aluminium production by igneous electrolysis, comprises a potroom (1), a plurality of electrolytic cells (2) arranged inside the potroom (1) so as to form at least one line with a main axis A, a so called
    Figure US20060086607A1-20060427-P00900
    service
    Figure US20060086607A1-20060427-P00901
    aisle (15) parallel to the said line of cells and located inside the potroom (1), and at least one first mobile lifting and handling unit (8) called a “travelling crane”, supported on a first runway (14) parallel to the main axis A of the line, and that can be moved above the said line of cells on the said first runway, and is characterised in that it also comprises at least one second mobile lifting and handling unit (20) called the “lateral portal crane” and a second runway (21) parallel to the main axis A of the line and independent of the first runway (14), in that the said second unit (20) is supported on the said second runway (21) and can be moved along the said second runway (21) underneath the first unit (8) and along the said line of electrolytic cells (2), such that the two lifting and handling units can be moved independently, and in that the said second unit (20) can be used to lift and handle liquid metal ladles (also called “tapping ladles”) and/or liquid bath ladles (also called “bath ladles”).
  • The liquid metal ladles are used for tapping liquid metal from an electrolytic cell. Similarly, the liquid bath ladles are used to tap liquid electrolyte bath from an electrolytic cell. The lifting capacity of the lateral portal crane (20) is typically at least 10 tonnes, for lifting and handling full ladles.
  • Advantageously, the lateral portal crane (20), which is intended mainly for lifting and handling liquid metal ladles or liquid bath ladles, may possibly be capable of positioning the said ladles for tapping liquids from an electrolytic cell. Optionally, it may also be designed to lift and handle other elements and equipment placed in the service aisle (15).
  • Typically, the lateral portal crane (20) may be displaced (or “translated”) from one end of the potroom (1) to the other. The total height H of the lateral portal crane is typically less than the height Hm of the lowest part of the travelling crane (8), so that the travelling crane (8) and the lateral portal crane (20) can “pass” each other.
  • The lateral portal crane (20) comprises rolling means (22 a, 22 b) capable of travelling on the said second runway (21). The lateral portal crane (20) typically includes at least one transverse beam (23, 23 a, 23 b) that is preferably substantially horizontal and perpendicular to the main axis A.
  • The lateral portal crane (20) is equipped with a trolley (25) capable of being moved along a direction preferably substantially perpendicular to the main axis A of the line of cells. The trolley (25) typically moves along at least one transverse beam (23, 23 a, 23 b).
  • The working range of the lateral portal crane (20) is limited essentially to the area of the service aisle (15) and the service end (18) of the electrolytic cells (2). The travelling crane (8) can be used for lifting and handling operations that require access into the area above the electrolytic cells. Preferably, the movement range L of the trolley (25) is limited to a value equal to or less than the width Lo of the service aisle (15). The term “movement range” means the maximum extension of possible movements of the main axis B of the trolley in a direction transverse to the main axis A of the line of electrolytic cells. The said movement range is preferably such that the main vertical axis B of the trolley (25) is entirely above the service aisle, regardless of the position of the said trolley. In other words, the movement range L of the trolley (25) preferably extends not further than the outside edge (15 a) of the service aisle on one side, and not further than the inside edge (15 b) thereof on the other side.
  • Typically, the trolley (25) is equipped with lifting means (26) and gripping means (27). The gripping means (27) typically comprises one or several means (28) of fixing the object (such as an element or equipment) to be lifted and handled. The gripping means (27) can be installed on a pivoting support (29) to enable rotation of the element or equipment that it supports about an axis B.
  • In the case of a liquid metal ladle or liquid bath ladle (40), the attachment means (28) may be inserted in the corresponding attachment means (41) on the said ladle (40). In this case, the attachment means (28) and (41) advantageously enable rotation of the ladle about an axis C typically parallel to the service aisle.
  • The trolley may be equipped with a siphon (43) that is intended to be fixed on the ladle (40), and more precisely on the cover (44) of the ladle (40). This variant simplifies handling and transport of ladles (40).
  • The liquid metal tapping operation (frequently called the “pour operation”) can be done using a process that typically comprises:
  • deposition of a tapping ladle (40) facing a determined electrolytic cell (2);
  • positioning of the lateral portal crane (20) facing the said cell;
  • lowering the gripping means (27) (with the siphon 43) in a waiting position (a));
  • stowing the ladle on the gripping means (27);
  • fixing the siphon (43) on the ladle (40);
  • lifting the ladle (40) to a first high position;
  • rotating the ladle so as to orient the siphon (43) towards a determined electrolytic cell (2) (tapping position (b));
  • displacement of the trolley (25) towards the said cell, so as to bring the ladle towards the said cell;
  • lowering the ladle to a second high position and possibly rotating the ladle (or “tipping” it) around the C axis, so as to bring the tip of the siphon into the cell;
  • tapping the metal.
  • Elements of cells and equipment such as anodes or liquid metal ladles that will be lifted and transported by the travelling crane (8) or the lateral portal crane (20) may be transported on pallets (42) and stored in the service aisle (15).
  • Advantageously, the electrolytic cells (2) are fully or partly surrounded by working floors (50). Typically, operators can access these working floors by fixed or movable staircases.
  • In one advantageous embodiment of the invention, the service aisle (15) is located on a first level, which is preferably located at the level of the ground (3) outside the potroom (1), and the working floors (50) are located at at least one second elevated level at a determined height Hb above the first level. The height Hb is typically between 0.5 m and 4 m. This configuration simplifies the civil works of the building and makes it more economic.
  • In this variant of the invention, the working floors (50) may possibly comprise a service balcony (51) on the side of the service aisle (15), and the said balcony may possibly be common to all cells (2). The service balcony (51) preferably comprises a handrail (52) for safety reasons.
  • When the working floors (50) comprise a service balcony (51) (with width Bo), the movement range L of the trolley (25) may be such that the main axis B of the trolley (25) may also overhang or cantilever over the said balcony. In this case, the value of the movement range L may be larger than the width Lo of the service aisle (15), but will preferably remain less than the distance Do between the outside edge (15 a) of the service aisle and the inside edge (51 a) of the balcony, such that it overhangs only the service aisle (15) and the service balcony (51), regardless of the position of the said trolley. In other words, the movement range L of the trolley (25) preferably extends not further than the outside edge (15 a) of the service aisle on one side, and not further than the inside edge (51 a) of the service balcony on the other side.
  • The working floors (50) preferably include floors (53) between the cells. When the working floors (50) comprise a service balcony (51), the latter is preferably at the same level as the said floors (53) between the cells.
  • In one preferred embodiment of the invention, the second runway (21) comprises a first running means (21 a) elevated above the level of the service aisle (15) and a second running means (21 b) at a lower level than the first running means (21 a). The second running means (21 b) is preferably close to or on the service aisle (15). In particular, the second running means (21 b) may be located directly on the service aisle (15) as illustrated in FIG. 2, or it may be located on a platform (19) with a determined height Ha above the said aisle, as illustrated in FIG. 3. The height Ha is typically between 0.2 and 2.5 m. The second running means (21 b) is advantageously also directly on the service aisle (15), thus covering a determined circulation strip which considerably simplifies the installation. In these variants, the rolling means (22 a, 22 b) typically comprise rolling means “on the ground” such as wheels or wheel sets (22 b) supported on the second running means (21 b) (either on the said platform or on the service aisle (15)). In these embodiments of the invention, the lateral portal crane is called the “semi portal crane” or “semi gantry” because only one part of the runway is elevated. The rolling means (22 a) supported on the elevated running means (21 a) is typically placed at one end of the transverse beam(s) (23, 23 a, 23 b). The rolling means on the ground (22 b) may be fixed to the transverse beam(s) (23, 23 a, 23 b) by uprights (24).
  • The running means (21 a) elevated above the level of the service aisle (15) is located at a determined height which is typically more than 3 m in order to leave sufficient space for the passage of vehicles (16) and the storage of pot elements or equipment in the service aisle (15). The elevated running means (21 a) is advantageously fixed to the structure (6) of the potroom (1), which stabilises the lateral position of the lateral portal crane (20) and thus enables automatic operation of the lateral portal crane without the need for guide systems that could be sensitive to magnetic fields.
  • The second running means (21 b) is advantageously at a distance of less than 0.5 m from the inside edge (15 b) of the service aisle (in other words the edge of the aisle located at the side of the line of the cells), or possibly adjacent to the said edge (15 b), to avoid taking up space in the service aisle (15).
  • When the working floors (50) comprise a service balcony (51) on the same side of the service aisle (15), the second running means (21 b) may be on the service balcony (51), or it may be located on a platform fixed to the service balcony.
  • The potroom (1) may comprise two or several lines of parallel cells. In this case, it may be advantageous to provide one travelling crane for each line of cells or each group of lines of cells, and at least one lateral portal crane for each line of cells.
  • LIST OF NUMERIC MARKS
    • 1 Electrolytic potroom
    • 2 Electrolytic cell
    • 3 Ground
    • 4 Access means
    • 5 Access ramp
    • 6 Structure
    • 7 Building cladding
    • 8 Travelling crane
    • 9 Cross beam
    • 10 First lifting and handling trolley
    • 11 Second lifting and handling trolley
    • 12 Lifting means
    • 13 Tool
    • 14 Travelling crane runway
    • 14 a, 14 b Travelling crane running means
    • 15 Service aisle
    • 15 a Outside edge of service aisle
    • 15 b Inside edge of service aisle
    • 16 Motor driven vehicle
    • 17 Operator
    • 18 Cell service end
    • 19 Running platform
    • 20 Lateral portal crane
    • 21 Lateral portal crane runway
    • 21 a, 21 b Lateral portal crane running means
    • 22 a, 22 b Rolling means
    • 23, 23 a, 23 b Transverse beam
    • 24 Upright
    • 25 Trolley
    • 26, 26′ Lifting means
    • 27 Gripping means
    • 28 Attachment means
    • 29 Pivot support
    • 30 Parallel beam
    • 40 Liquid metal ladle or liquid bath ladle
    • 41 Attachment means to a ladle
    • 42 Pallet
    • 43 Siphon
    • 44 Cover
    • 50 Working floor
    • 51 Service balcony
    • 51 a Inside edge of service balcony
    • 52 Handrail
    • 53 Working floor between electrolytic cells

Claims (22)

1. An electrolysis installation, intended for the production of aluminium based on igneous electrolysis, comprising:
a potroom,
a plurality of electrolytic cells arranged inside the potroom so as to form at least one line with a main axis A,
a service aisle parallel to said line of cells and located inside the potroom,
at least one first mobile lifting and handling unit, or travelling crane, supported on a first runway parallel to the main axis A of the line, and that can be moved above said line of cells on said first runway,
at least one second mobile lifting and handling unit, or lateral portal crane and
a second runway parallel to the main axis A of the line and independent of the first runway, in that said second unit is supported on said second runway and can be moved along said second runway, underneath the first unit and along said line of electrolytic cells, such that the lifting and handling units can be moved independently, and in that said second unit can be used to lift and handle liquid metal ladles and/or liquid bath ladles.
2. An electrolysis installation according to claim 1, wherein the lateral portal crane is equipped with a trolley capable of being moved along a direction substantially perpendicular to the main axis A of the line of cells.
3. An electrolysis installation according to claim 2, wherein the trolley is equipped with lifting means and gripping means.
4. An electrolysis installation according to claim 3, wherein the gripping means comprises at least one means of fixing an object to be lifted and handled.
5. An electrolysis installation according to claim 3, wherein the gripping means is installed on a pivoting support to enable rotation of an element that said gripping means supports about an axis B.
6. An electrolysis installation according to claim 2, wherein the lateral portal crane comprises at least one transverse beam that is substantially horizontal and perpendicular to the main axis A, and in that the trolley moves on the said beam.
7. An electrolysis installation according to claim 2, wherein the working range of the trolley is such that a main vertical axis B thereof only overhangs the service aisle, regardless of the position of said trolley.
8. An electrolysis installation according to claim 1, wherein the electrolytic cells are fully or partly surrounded by working platforms.
9. An electrolysis installation according to claim 8, wherein the service aisle is located on a first level and the working platforms are located at at least one second elevated level at a determined height Hb above the first level.
10. An electrolysis installation according to claim 9, wherein the height Hb is between 0.5 m and 4 m.
11. An electrolysis installation according to claim 9, wherein the first level is located at ground level outside the potroom.
12. An electrolysis installation according to claim 8, wherein the working platforms comprise a service balcony on a side of said aisle.
13. An electrolysis installation according to claim 12, wherein the service balcony is common to said cells.
14. An electrolysis installation according to claim 12, wherein the working platforms comprise floors between the cells and in that the service balcony is at the same level as said floors between the cells.
15. An electrolysis installation according to claim 12, wherein the working range L of the trolley is such that a main axis B of the trolley also overhangs the service balcony.
16. An electrolysis installation according to claim 1, wherein the second runway comprises a first running means elevated above the level of the service aisle a and a second running means that is located directly on the service aisle.
17. An electrolysis installation according to claim 1, wherein the second runway comprises a first running means elevated above a level of the service aisle and a second running means that is located on a platform with a determined height Ha above said aisle.
18. An electrolysis installation according to claim 17, wherein the height Ha is between 0.2 and 2.5 m.
19. An electrolysis installation according to claim 12, wherein the second runway comprises a first running means that is elevated above a level of the service aisle and a second running means located directly on the service balcony or located on a platform fixed thereto.
20. An electrolysis installation according to claim 16, wherein the elevated running means is fixed to a structure of the potroom.
21. A method for the production of aluminium comprising using an installation according to claim 1.
22. A plant for the production of aluminium, comprising at least one electrolysis installation according to claim 1.
US10/517,211 2002-07-11 2003-07-09 Aluminum production installation employing fused-salt electrolysis Abandoned US20060086607A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FR02/08739 2002-07-11
FR0208739A FR2842216B1 (en) 2002-07-11 2002-07-11 IGNEE ELECTROLYSIS ALUMINUM PRODUCTION FACILITY
PCT/FR2003/002134 WO2004007807A2 (en) 2002-07-11 2003-07-09 Aluminium production installation employing fused-salt electrolysis

Publications (1)

Publication Number Publication Date
US20060086607A1 true US20060086607A1 (en) 2006-04-27

Family

ID=29763745

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/517,211 Abandoned US20060086607A1 (en) 2002-07-11 2003-07-09 Aluminum production installation employing fused-salt electrolysis

Country Status (10)

Country Link
US (1) US20060086607A1 (en)
CN (1) CN1659314A (en)
AR (1) AR040392A1 (en)
AU (1) AU2003263275A1 (en)
CA (1) CA2488362A1 (en)
FR (1) FR2842216B1 (en)
NO (1) NO20050696L (en)
RU (1) RU2005103604A (en)
WO (1) WO2004007807A2 (en)
ZA (1) ZA200409822B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110194916A1 (en) * 2008-10-16 2011-08-11 E.C.L. Pot tending machine for working on electrolysis cells for the production of aluminum by igneous electrolysis
CN104787663A (en) * 2015-05-08 2015-07-22 安徽江淮汽车股份有限公司 Electrophoresis conveying device
WO2015121796A1 (en) * 2014-02-14 2015-08-20 Dubai Aluminium Pjsc Start-up fuse for aluminium reduction electrolysis cell
US10336587B1 (en) * 2017-12-12 2019-07-02 Professor Cargo, Llc Hoist and crane

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3032455B1 (en) * 2015-02-09 2020-10-09 Ecl UNIT FOR THE OPERATION OF AN ALUMINUM PRODUCTION PLANT
CN106348036A (en) * 2016-11-17 2017-01-25 中冶华天工程技术有限公司 Bar transfer method and device
CN110342243A (en) * 2019-06-23 2019-10-18 北京鲲鹏神通科技有限公司 A kind of unmanned intelligent kitchen reclaimer robot

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6409894B1 (en) * 2000-03-24 2002-06-25 Aluminium Pechiney Lay-out of installations in an electrolysis plant for the production of aluminum

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1142086A (en) * 1956-02-01 1957-09-13 Mannesmann Ag Installation to improve the loading rate of operations processing scrap metal, in particular Martin-Siemens steelworks
JPS60213622A (en) * 1984-04-10 1985-10-25 Fujisash Co Aluminum extruded shape material conveyor
IT1263968B (en) * 1993-02-25 1996-09-05 Gianfranco Zannini AUTOMATED EQUIPMENT FOR THE CHANGE OF THE ELECTROLYTIC CELL ANODES FOR THE PRODUCTION OF ALUMINUM
JP2816138B2 (en) * 1996-11-29 1998-10-27 株式会社アルテス Structure of passage for transporting plating object
NO980430L (en) * 1998-01-30 1999-08-02 Norsk Hydro As Process and equipment for handling ball bodies and other material
SI1028083T1 (en) * 1999-02-12 2003-10-31 Reel S.A. Hoisting device for the replacement of the anodes in the electrolytic cells for aluminium production

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6409894B1 (en) * 2000-03-24 2002-06-25 Aluminium Pechiney Lay-out of installations in an electrolysis plant for the production of aluminum

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110194916A1 (en) * 2008-10-16 2011-08-11 E.C.L. Pot tending machine for working on electrolysis cells for the production of aluminum by igneous electrolysis
US8647481B2 (en) * 2008-10-16 2014-02-11 E.C.L. Pot tending machine for working on electrolysis cells for the production of aluminum by igneous electrolysis
WO2015121796A1 (en) * 2014-02-14 2015-08-20 Dubai Aluminium Pjsc Start-up fuse for aluminium reduction electrolysis cell
CN104787663A (en) * 2015-05-08 2015-07-22 安徽江淮汽车股份有限公司 Electrophoresis conveying device
US10336587B1 (en) * 2017-12-12 2019-07-02 Professor Cargo, Llc Hoist and crane

Also Published As

Publication number Publication date
ZA200409822B (en) 2006-07-26
RU2005103604A (en) 2005-09-27
NO20050696L (en) 2005-02-09
WO2004007807A3 (en) 2004-04-08
AR040392A1 (en) 2005-03-30
FR2842216A1 (en) 2004-01-16
WO2004007807A2 (en) 2004-01-22
AU2003263275A1 (en) 2004-02-02
CN1659314A (en) 2005-08-24
FR2842216B1 (en) 2005-02-25
CA2488362A1 (en) 2004-01-22

Similar Documents

Publication Publication Date Title
EP0298198B1 (en) Equipment for the mechanized replacement of the anodes in the electrolytic cells for aluminum production
CA2000544A1 (en) Automated installation for the laying of masonry on a wall
US3783792A (en) Repair facility for overhead crane
US20060086607A1 (en) Aluminum production installation employing fused-salt electrolysis
MXPA02009160A (en) Implantation of installations of an electrolysis plant for producing aluminium.
US20080251392A1 (en) Process For Changing an Anode In an Electrolytic Aluminium Production Cell Including Adjustment of the Position of the Anode and Pot Tending Machine For Implementing It
US7422675B2 (en) Process for changing anodes in an electrolytic aluminum production cell including adjustment of the position of the anode and device for implementing the process
US12065752B2 (en) Intervention tool for the operation of an electrolytic cell
US7780823B2 (en) Compact service module for use in electrolytic aluminum production plants
JPS5918317B2 (en) Method and device for lifting a load by combining a pair of hoists
US20070205104A1 (en) Remote controllable pot tending module for use in aluminum production plants
US8273223B2 (en) Handling device for hoods of a cell for electrolytic aluminium production
US20120047668A1 (en) Device for collecting the solid debris in the bath and the molten metal of an electrolytic pot designed for the production of aluminum, by scraping of the bottom of said pot
AU2015226002B2 (en) System for carrying out operations linked to the use of cells of a facility for producing aluminium by means of electrolysis
US7857954B2 (en) Compact pot tending module for use in plants for the production of aluminum by electrolysis
CN217876598U (en) Cooling device for brown corundum
NO321743B1 (en) Lifting and handling device for cargo in a plant for the production of aluminum by spark electrolysis, as well as plants using such a device
GB2585217A (en) A maintenance device for a superstructure of an electrolytic cell, and maintenance method using said maintenance device
US20060060469A1 (en) Serving machine for electrolysis cells for producing aluminium
CA1177442A (en) Process for changing aluminum reduction cells and production unit for carrying out said process
EP4293141A1 (en) Anode servicing assembly for an aluminium electrolysis plant, and methods for operating the same
AU2020237368A1 (en) Handling device intended to transport an intervention tool for an electrolytic cell
US4121955A (en) Treatment of electrodes
EP2360282B1 (en) Electric arc furnace
US4053059A (en) Portable overhead crane and method of installing it

Legal Events

Date Code Title Description
AS Assignment

Owner name: ALUMINUM PECHINEY, FRANCE

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:DUVAL, CHRISTIAN;REEL/FRAME:016816/0418

Effective date: 20050211

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION