US20050234600A1 - Enterprise energy automation - Google Patents
Enterprise energy automation Download PDFInfo
- Publication number
- US20050234600A1 US20050234600A1 US11/107,222 US10722205A US2005234600A1 US 20050234600 A1 US20050234600 A1 US 20050234600A1 US 10722205 A US10722205 A US 10722205A US 2005234600 A1 US2005234600 A1 US 2005234600A1
- Authority
- US
- United States
- Prior art keywords
- building
- buildings
- energy
- delivery system
- energy supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 claims abstract description 88
- 238000012384 transportation and delivery Methods 0.000 claims abstract description 58
- 230000004044 response Effects 0.000 claims description 34
- 238000009987 spinning Methods 0.000 claims description 32
- 238000009826 distribution Methods 0.000 claims description 30
- 238000007726 management method Methods 0.000 claims description 28
- 230000033228 biological regulation Effects 0.000 claims description 19
- 230000005540 biological transmission Effects 0.000 claims description 16
- 238000012544 monitoring process Methods 0.000 claims description 15
- 238000005265 energy consumption Methods 0.000 claims description 14
- 238000007493 shaping process Methods 0.000 claims description 13
- 230000009471 action Effects 0.000 claims description 11
- 230000000670 limiting effect Effects 0.000 claims description 4
- 239000002131 composite material Substances 0.000 claims description 2
- 238000013486 operation strategy Methods 0.000 claims 15
- 239000000047 product Substances 0.000 description 59
- 230000008901 benefit Effects 0.000 description 31
- 238000011161 development Methods 0.000 description 24
- 239000007789 gas Substances 0.000 description 21
- 230000009467 reduction Effects 0.000 description 19
- 230000007774 longterm Effects 0.000 description 14
- 238000005457 optimization Methods 0.000 description 12
- 238000004891 communication Methods 0.000 description 11
- 238000013461 design Methods 0.000 description 10
- 230000008569 process Effects 0.000 description 9
- 230000002829 reductive effect Effects 0.000 description 9
- 230000001105 regulatory effect Effects 0.000 description 9
- 238000004458 analytical method Methods 0.000 description 8
- 230000002354 daily effect Effects 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 8
- 230000006870 function Effects 0.000 description 8
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 8
- 230000004913 activation Effects 0.000 description 7
- 230000001276 controlling effect Effects 0.000 description 7
- 238000001816 cooling Methods 0.000 description 6
- 230000005611 electricity Effects 0.000 description 6
- 239000012717 electrostatic precipitator Substances 0.000 description 6
- 230000006872 improvement Effects 0.000 description 6
- 238000012360 testing method Methods 0.000 description 6
- 238000012546 transfer Methods 0.000 description 6
- 230000000903 blocking effect Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 230000001965 increasing effect Effects 0.000 description 5
- 230000002776 aggregation Effects 0.000 description 4
- 238000004220 aggregation Methods 0.000 description 4
- 239000003245 coal Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000007613 environmental effect Effects 0.000 description 4
- 238000010438 heat treatment Methods 0.000 description 4
- 239000007788 liquid Substances 0.000 description 4
- 239000003345 natural gas Substances 0.000 description 4
- 230000001932 seasonal effect Effects 0.000 description 4
- 238000004088 simulation Methods 0.000 description 4
- 241000196324 Embryophyta Species 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 238000005485 electric heating Methods 0.000 description 3
- 230000003203 everyday effect Effects 0.000 description 3
- 239000000446 fuel Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000013439 planning Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 238000012795 verification Methods 0.000 description 3
- 230000003442 weekly effect Effects 0.000 description 3
- 239000006227 byproduct Substances 0.000 description 2
- 230000002596 correlated effect Effects 0.000 description 2
- 230000002074 deregulated effect Effects 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000013507 mapping Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- LWSOZPNJUFEDJU-UHFFFAOYSA-N 2-[4-(1,3-benzoxazol-2-yl)-2-methoxyphenyl]acetonitrile Chemical compound C1=C(CC#N)C(OC)=CC(C=2OC3=CC=CC=C3N=2)=C1 LWSOZPNJUFEDJU-UHFFFAOYSA-N 0.000 description 1
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 1
- 241001263323 Maclura tinctoria Species 0.000 description 1
- 208000031481 Pathologic Constriction Diseases 0.000 description 1
- 238000012356 Product development Methods 0.000 description 1
- 230000003044 adaptive effect Effects 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 230000004931 aggregating effect Effects 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000003190 augmentative effect Effects 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 230000001010 compromised effect Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000011217 control strategy Methods 0.000 description 1
- 230000000875 corresponding effect Effects 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000003467 diminishing effect Effects 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical compound C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 description 1
- 239000001257 hydrogen Substances 0.000 description 1
- 229910052739 hydrogen Inorganic materials 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 230000004043 responsiveness Effects 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000035899 viability Effects 0.000 description 1
- 230000002747 voluntary effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Definitions
- a method for enterprise energy automation is provided.
- a method for delivering ancillary services to an energy supply and delivery system by a group of buildings is provided.
- a method for integrating an energy automation system is provided.
- Other preferred embodiments are also provided.
- FIG. 1 is a schematic of an energy automation process of a preferred embodiment.
- FIG. 2 is a diagram of an energy automation system of a preferred embodiment.
- FIG. 3 is a block diagram of an energy automation system of a preferred embodiment.
- FIG. 4 is a graph of building electrical load.
- FIG. 5 is a graph of savings for a 1 MW commercial customer.
- FIG. 6 is a graph of hourly energy price distribution in New York City Summer 2002 weekdays.
- FIG. 7 is a graph of weekday load profile for New York City Summer 2001.
- FIG. 8 is a graph of degree days versus month for Chicago Midway.
- FIG. 9 is a graph of intra-day energy price volatility distribution for New York City Summer 2002 weekdays.
- FIG. 10 is a table of energy automation versus tariff-based operations.
- FIG. 11 is a graph of load profile versus hour for a NYC commercial building.
- FIG. 12 is a graph of load profile versus hour.
- FIG. 13 is another graph of load profile versus hour.
- FIG. 14 is a table showing metropolitan city cooling degree day correlation.
- FIG. 15 is a graph of load profile versus hour for a NYC Comm building customer.
- FIG. 16 is a graph showing governor response and contingency reserves successfully restored then generation/load balance after the loss of 2600 MW of generation.
- FIG. 17 is a graph showing contingency reserves provide a coordinated response to a sudden loss of supply.
- FIG. 18 is a graph showing duration of spinning reserve activation.
- FIG. 19 is a graph of PJM 100% spinning reserve activation.
- FIG. 20 is a graph of 2001 PJM summer spinning reserve activation.
- FIG. 21 is a graph of NYISO day ahead east regulation prices on summer weekdays.
- FIG. 22 is a graph of 2001 PJM spinning reserve activation.
- FIG. 23 is a graph showing that transmission congestion into New York City is significant and volatile.
- FIG. 24 is a graph showing frequency of high prices occurring in PJM.
- FIG. 25 is a graph showing savings for a 1 MW commercial customer.
- Enterprise Energy Automation is the process for leveraging the convergence of new technologies and market metrics to provide major energy economies to commercial buildings.
- Enterprise Energy Automation provides the means by which customers, suppliers, and deliverers include all components of energy cost incurrence on both sides of the meter in their investment and operating decisions. Weekly, daily, hourly, and minute-to-minute, through Energy Automation, economies of 20 to 40% can be continuously and relentlessly wrung out and distributed.
- Enterprise Energy Automation enables the realization of previously untapped economic and reliability benefits—benefits long concealed by the utility-customer tariff relationship. Enterprise Energy Automation is particularly advantageous in major metropolitan areas with persistently high energy supply prices.
- Target customers are commercial buildings—and their energy service providers, building automation contractors, utilities, and regional operators.
- FIG. 1 is a schematic of an energy automation process of a preferred embodiment. As shown in this schematic, an energy automation process interacts with a complex energy supply and delivery system 10 and complex commercial building technology and operations 20 .
- the term “EnergyConnect” used in this figure and in this description refers to the name of the assignee of the present patent application.
- EnergyConnect (or “ECI”) is used in these preferred embodiments to refer to the entity providing the energy automation system/process, it should be understood that other entities can implement the disclosed embodiments, with the appropriate licenses.
- FIG. 2 is a more detailed diagram of the energy automation system.
- the energy supply and delivery system 10 and a commercial building BAS (building automation system) 20 communicates with a control center 30 via a network 40 (here, the Internet).
- the energy automation system integrates an intelligent software solution, a network, a gateway and graphical user interface, and a supply and delivery system interface.
- the intelligent software solution analyzes and executes various cost avoidance and revenue-enhancing strategies, performs data collection and monitoring, and comprises benefit/risk sharing protocols, all to balance energy and comfort decisions.
- the network 40 allows each building to communicate over secure high-speed internet or customer intranet with the national control center 30 .
- the gateway and graphical user interface is located at each building, streamlining and easing the communication, information, and control functions with BAS and building management.
- the supply and delivery system interface is a direct, reliable, and secure communication with utilities, distribution service entities, regional transmission organizations, and other supply entities.
- the control center 30 comprises a platform with intelligent adaptive software that electronically integrates the energy production/delivery systems and customers' energy using equipment. More specifically, the platform acquires and delivers reliable real-time electronic data and control signals. Data transfer will occur in near real-time and with reliability consistent with that presently required for energy system and energy market operations. Most of the necessary energy system and energy market data is readily available, as it is already used for system operation. Some energy system data, e.g. LMP, is becoming available with the advent of independent system operators (ISO). The necessary customer data is available from large buildings with BAS, and is gradually becoming available from smaller buildings as BAS prices drop and hourly metering is deployed by utilities. The platform also decides the optimum operation of a portfolio of customers' equipment.
- ISO independent system operators
- the platform dispatches the portfolio in a manner that (1) maximizes profit from among several competing energy system and energy market opportunities, (2) dependably performs all energy system reliability functions, and (3) maintains building comfort. Decisions are required in several time-frames. For example, electric capacity may require annual or monthly commitment. Electric system ancillary services may require day-ahead commitment. Operating to economy energy prices requires daily, hourly, and real-time decisions.
- the platform also performs accounting and billing consistent with protocols and provides feedback, monitoring, and reporting.
- EnergyConnect provides services to assure that customer facilities are doing the basic blocking and tackling of energy management. They include “tuning” HVAC and BAS equipment to meet design performance, installing “enterprise” energy reporting software, upgrading to state-of-the-art BAS, as necessary to execute Energy Automation strategies and including project finance if preferred, and controlling energy use against utility tariffs. These basic services provide several benefits, including creating additional energy savings for many customers, as much as 10%.
- FIG. 3 is a block diagram of an energy automation system of a preferred embodiment.
- This system comprises an electric system markets and operations interface 50 and a building interface 60 .
- the electric system markets and operations interface 50 comprises a weather database 51 , an REP database 52 , an ECI REP/QSE interface 53 , an ECI QSE interface 54 , a market database 55 , and an APX market database 56 .
- the building interface 60 comprises a module that encodes building instructions 62 , a module that provides a graphical view of building operations and expected system/weather conditions 64 , a building database 66 , and a customer building interface 68 .
- the system also includes an REP QSE module 70 , an ISO 80 , a QSE module 90 , a module that determines day ahead building performance capability 100 , a module that determines optimum day ahead building and portfolio operation 110 , and a module that estimates value 130 .
- the building control and portfolio optimization software will determine the portfolio building operation that maximizes value against market, supplier, and utility prices.
- the diagram depicts a “day-ahead” process.
- the “day-ahead” strategy will anticipate and reflect (a) expected conditions for the next day and (b) prior long-term or seasonal commitments to each building's supplier or to the ISO 80 .
- a similar “short-term” process will continually update and communicate an optimum strategy for the next few hours.
- the “short-term” strategy will anticipate and reflect (a) actual conditions as they unfold during the day and (b) prior long-term and short-term commitments to each building's supplier or to the ISO 80 . Both the “day-ahead” and “short-term” processes entail two steps.
- the first step is to determine day ahead building performance capability. This determines load shifting and response capability of each building based on, for example, (a) an ability to execute pre-defined strategies that have been defined and tested in advance consistent with (1) building and HVAC system character and (2) BAS and communications capability, (b) expected weather (temperature, humidity) and occupancy, (c) historical performance under similar weather and occupancy conditions, and (d) as modified by a building engineer, current status input. In this embodiment, there are several pre-defined strategies in the building database 66 .
- day-ahead shifting to market price e.g., shift load from afternoon (high prices) to morning (low prices) to early morning (even lower prices) in order to minimize energy expense with day-ahead notification
- Chicago shaping and imbalance similar to “shifting” but in illiquid Chicago hourly market
- real-time shifting a variation on “shifting,” i.e. also be prepared to shift the same day, within the afternoon, in response to electric system events/prices
- spinning reserve be prepared to drop significant load, 10 ⁇ minutes, randomly, approx. 10 ⁇ during summer, between noon and 6 pm
- demand limiting augment “shifting” strategy with peak demand control
- curtailment extended peak curtailment, approx. 5 hottest days, commitment made from portfolio).
- Step one determines a model for each building that is one input to the optimization model. For example, to facilitate a predefined day ahead load-shifting strategy, the model considers magnitude and timing leeway for load shifting, inefficiency of precooling in advance of need, efficiency of cooling during lower ambient temperature hours, and delivery tariff constraints. The building models are then combined to create a single model of the building portfolio, also for input and analysis by the optimization model.
- the building model defines the current flexibility of a building and of a building portfolio to (a) shift HVAC-related electrical load and (b) curtail lighting and other loads—to accommodate hourly energy prices—on both a day-ahead and real-time basis.
- the model defines the current ability of a building and of a building portfolio to provide ancillary services to an ISO.
- FIG. 4 is a graph of building electrical load.
- kW is a function of outdoor dry bulb T, outdoor dew-point T, solar load, wind speed, internal electrical equipment and lighting load, hour, and season.
- the chillers have a slower response and longer duration, i.e. primary basis for load-shifting and secondary basis for ancillary services.
- the pumps/AHU have fast response and are able to shift load around if integrates to (approx.) zero over small time period, i.e. ancillary services.
- ECI considers several building characteristics in mapping building electrical equipment and loads to electric system markets and operations. These characteristics include speed of response (e.g., kW/minute or kW/second), advance notice required (e.g., seconds, minutes, hours, day), duration of response (e.g., ability to accommodate 10 minute, 15 minute, hourly, or multi-hour thermal-related load-shifts), time interval of response (e.g., ability to shift thermal-related load back 1 hour, 2 hours, etc.), magnitude of response (e.g., add a second dimension to each of the above parameters; how many kW does that speed, notice, etc.
- speed of response e.g., kW/minute or kW/second
- advance notice required e.g., seconds, minutes, hours, day
- duration of response e.g., ability to accommodate 10 minute, 15 minute, hourly, or multi-hour thermal-related load-shifts
- time interval of response e.g., ability to shift thermal-related load back 1 hour, 2 hours, etc.
- inefficiency/efficiency of response e.g., define efficiency loss incurred by change from historical HVAC operation that tracks building thermal load or efficiency gain obtained by operating HVAC equipment in hours with more favorable ambient conditions
- other thermal character e.g., thermal inertia, recovery ability
- Modeling of buildings for various purposes is well developed. Modeling of a building in a manner that reveals the characteristics listed above is not well developed.
- the ECI building model will adapt existing building model technology to this purpose.
- the ECI building model is also characterized by inverse (the input and output variables are known and measured, and the objective is to determine a mathematical description of the system and to estimate the system parameters), dynamic (use transfer functions where the thermal mass of a building is sufficiently significant to delay the heat gains or losses), and system level (a model of the entire building, not an assembly of component models of the HVAC system.
- “Component” modeling may reside in the building automation systems to more efficiently adapt building loads to hourly and subhourly electric market prices and operations control signals). (The descriptions of inverse and dynamic stated above are from ASHRAE Handbook, Chapter 31, “Energy Estimating and modeling Methods”).
- Step two determine optimum day ahead building and portfolio operation by determining optimum operation of the building portfolio and optimum operation of each stand-alone building.
- Inputs to the optimization model include, for example, (a) a model of each building and of the building portfolio and (b) market prices for energy, capacity, and ancillary services (or alternative supplier price/value indicators).
- Optimization criteria include ST revenue maximization, LT revenue maximization (ISO program enrollment in advance of year or season), LT margin maximization (margin takes into consideration whether capital or opportunity costs are incurred), option value (for example, putting thermal energy in the bank in order to be able to take advantage of short-notice price spikes), and minimum threshold (reflect minimum value or margin of error, and diminishing returns).
- the value in portfolio optimization includes the following: map buildings to opportunity (e.g. revenue maximization), reserves (portfolio reliability/diversity enables firm commitment), shared portfolio reserves (probably using most versatile buildings), scale (e.g. to meet ISO MW thresholds; to affect local price and utility investment; to spread fixed costs over wider base; for bargaining power or influence in developing market), internal market (avoids external transaction costs and supports fractional or kW trades), and support common interests of commercial building sector (market rules and development; who keeps what share of benefits; unfragmented market development; avoidance of supplier switching costs).
- Portfolio optimization enables mapping of sophisticated buildings to sophisticated (not necessarily high margin or high revenue) uses in order to maximize portfolio revenue.
- the most versatile buildings may provide spinning reserve services while also providing “portfolio reserves” to backup multiple other portfolio services being sold off of other buildings.
- Building sophistication or versatility may be defined in terms of 1) communications speed and reliability; 2) RT/ST intra-day flexibility; 3) building thermal inertia or recovery ability; 4) thermal storage; and 5) building engineer preferences. Such criteria may be satisfied through staged optimization.
- First optimally shift each building's thermal load independently to accommodate hourly prices, day ahead (DAH), while respecting demand features of energy supplier contract and utility delivery tariff.
- DAH day ahead
- the basic precooling strategy becomes the baseline—around market prices and processed directly by the supplier and customer.
- EnergyConnect determines the optimum change to the scheduled load, as needed to provide portfolio services, and pays the customer for the value of such portfolio service. (Under this scheme, suppliers and their customers will have a disincentive to falsify this new baseline because ECI may well decide not to change the baseline schedule.
- ECI optimization software estimates basic load shifting strategy to accommodate hourly prices
- building BAS determines actual response to hourly energy prices (that is, for those buildings assigned to a simple price-based, load-shifting strategy, ECI provides a price profile to each building BAS system and the precise load shifting strategy is determined by a local algorithm that can more efficiently and accurately adapt to real-time building conditions)
- the ECI building model learns building capability over time, so that estimates get better over time.
- the BES/RRS bid generator 120 is an example of a market application that could be better developed (and brought to market faster) if outsourced or codeveloped by an ECI partner with hands-on commercial experience in the ERCOT market.
- This software performs two functions. First, as an input to the optimization software 110 , it estimates “winning” bid prices. Second, for transmittal to the QSE 90 , it executes a bid strategy. In production mode, estimates of “winning” bid prices are based on an analysis of awards, including recent history and under similar seasonal, weather, and ISO operating conditions. In a presently preferred embodiment, ECI will conduct weekly or daily trials by simply adopting the actual winning bids as if they were ECI bids. This objective is to demonstrate and test the ability of buildings to participate in these markets and to qualify the building portfolio to participate subsequently in other markets.
- the database software will support all Energy Automation functions: building control & portfolio optimization; scorecard; accounting; and business/product development.
- the building database 66 has the following content: energy profile (daily, seasonal, current; volatility; kWh, kW, therms, Btu; main and submeter data; and billing data), monitored building and building HVAC data (provided by a BAS system), mechanical and BAS (type, size, vintage, available control and telemetry, design capability, communications protocol), load flexibility (response speed, duration, notice requirement, load shift magnitude, load shift frequency, load shift cost (e.g.
- EnergyConnect will work with all participants (buildings owners, energy service providers, scheduling coordinators, etc.) to define a collection of acceptable load shifting commands, actions, and strategies that are available to Energy Automation building control and optimization software. Eventually, this collection will evolve, expand, and automate as EnergyConnect builds and records experience for a wide range of commercial building character under a wide range of conditions.
- the weather database 51 stores hourly temperature, humidity, wind speed, frontal passage, etc.—both forecast (48/168 hours) and history.
- the weather database 51 also stores HDD, CDD history for each market.
- the following table shows database dimensions/scale. Forecast 2004 2005 2006 2007 MW 30 180 360 1,620 MWh (1000) 105 683 1,577 6,307 # of properties 22 130 260 1200 # of major metro areas 2 6 8 10 # of ISO's or regions 2 5 6 7 Building spec averages # of buildings per property 2 Sq ft per property 325,000 Annual MWh per property 6,000 Annual kWh/sq ft 19 MW per property 1.4 Portfolio participation (%) Demand response program 100 100 80 80 Distribution system capital 5 10 conservation Price-response load shifting 10 20 30 40 (DAH or BES) Spinning reserve (RRS) 10 20 50
- the market database 55 stores prior portfolio and building commitments (current and historical bids and awards for BES and RRS, plus longer term commitments), market price and volatility (LMP and energy supplier price signals (electric and gas)), transmission congestion prices (DA, HA, RT (hourly), and RT (6 minute) prices; electric system conditions), yesterday's conditions (yesterday predicts today, at least as a start), ancillary services data (DA and RT prices, opportunity cost, control signals), and utility tariffs (delivery and supply tariffs, especially as a key driver of demand limiting strategies and as they constrain the flexibility of buildings to shift load from high to low-priced hours).
- prior portfolio and building commitments current and historical bids and awards for BES and RRS, plus longer term commitments
- LMP and energy supplier price signals electric and gas
- transmission congestion prices DA, HA, RT (hourly), and RT (6 minute) prices; electric system conditions
- yesterday's conditions yesterday predicts today, at least as a start
- ancillary services data
- the REP Database 52 stores the price or value signals provided by a building's supplier in lieu of, or to augment, market prices, baseline building load schedules, as determined by the supplier for its building customers (these schedules will be modified to reflect Energy Automation strategies), and adjusted building load schedules, as determined by ECI and transmitted to REP.
- the Energy Automation administration database stores Energy Automation commands sent and verification of receipt, Energy Automation receipts and disbursements and the parameters behind them, and customer/supplier admin information.
- the scorecard software serves three functions (1) operational measurement & verification of performance (as a basis for distribution of revenues and against expected performance, to improve building database accuracy), (2) off-line analysis and development of alternative building control strategies (to test and continually improve the optimization software vs. independent, non-portfolio building operation), and (3) internal and external reporting.
- ECI will need off-line access to some subset of the building, weather, and market databases.
- the customer building interface 68 encompasses several component.
- the customer building interface 68 comprises the hardware/software/communications interface between the ECI system and each building's BAS.
- the customer building interface 68 also comprises a graphical user interface that (a) indicates current status of assigned Energy Automation strategies and commands to a property's BAS, (b) displays current electric system operations and market conditions, weather, building, or other information (as necessary to inform building engineers as to how their buildings are creating value under today's conditions), and (c) displays and allows updating of ECI's building database content regarding their properties.
- the customer building interface 68 also automates retrieval and capture of BAS data in the Building Database and encodes building instructions—software that translates ECI building instructions (from the optimization model) into commands recognizable by each building's BAS. Inputs include, for example, standard commands (from building database), optimum portfolio operation (from optimization model), and optimum building operation (from optimization model).
- the customer building interface 68 also receives and interprets deployment signal—ECI will pass some ISO operating signals directly through to a building's BAS. For example, an ISO signal to deploy spinning reserve will require a real-time building response. In anticipation of such a deployment signal, ECI will have already transmitted instructions regarding the required building response.
- this interface is fully integrated with an existing BAS. This will enable evaluation of screen shots and other features. For other buildings, a less intrusive GUI, e.g. web access to an ECI screen, can be provided.
- ECI systems will not directly control BAS.
- One objective of such an implementation is to determine, with the building engineers, whether and to what extent ECI systems need to directly control BAS in a full production system. This means that, for this implementation, building engineers will have to take actions to implement assigned Energy Automation strategies.
- the interface design in this implementation can facilitate the building engineer's execution of such strategies. An exception to this is, to test the ability of buildings to participate in ERCOT ancillary services markets, those buildings will receive ISO deployment signals. For all buildings in this implementation, the system will automatically obtain and store key building information via the BAS.
- Chiller trend (amp, load) 5-15 minute (shorter interval required only during periods that buildings are participating in ISO programs requiring real-time response)
- AHU trend (amp, load, 5-15 minute (as above)
- SAT Pump trend
- amp, load 5-15 minute (as above) Occupancy schedule Daily Major equipment status Event driven Confirmation that ECI Event driven communications have been received, that ISO deployment signals have been acted on.
- the electric system markets and operations interface 50 comprises the REP/QSE interface 53 , the market database 55 (which derives ISO market and operations data, both current and historical, from the APX market database 56 ), the REP Database 52 , and the weather database 51 .
- ECI has two alternatives: a standard ECI-specified interface or several REP-specified interfaces.
- the interface will transfer expected day-ahead building/portfolio load schedule to ECI and then transfer ECI-modified schedule back to REP, transfer REP price signals, if any, to ECI, and provide acknowledgments.
- this interface will be a simple, custom-designed interface designed to accommodate participation of a specific office.
- the QSE Interface 54 will be used for ancillary service market participation. This interface 54 will send ancillary service bids to a QSE to be forwarded to the ISO 80 , receive ancillary service awards, and receive ISO deployment signals.
- ECI will test the ability of a commercial building portfolio to reliably provide ancillary services to ERCOT. This means that ECI need not send/receive actual BES and RRS bids/awards. For example, ECI may adopt others' actual winning bids, and then deploy as if ECI bids/awards. Such operation will far simplify this QSE interface 54 , putting the emphasis on deployment of the building portfolio. Because of the relatively small magnitude of kW deployed from a 15-20 building portfolio, the resulting effect on kWh schedules will probably be too small to show up in ERCOT/QSE/REP settlement accounting.
- the market database 55 contains historical ISO market and operations data, from the APX Market Database 56 , current BES and RRS bid and award information (in one implementation, to be adopted from others' actual winning bids), and a record of ancillary service bids, awards, and deployments and their associated parameters.
- this data would contain day-ahead and RT hourly energy prices (e.g., last 30 days, current season, same season from a year earlier), and BES and RRS market price history (same periods as above).
- the latter data is needed to develop bids in the BES/RRS Bid Generator 120 .
- the Bid Generator 120 will simply adopt others' actual winning bids, so this historical data will not be needed.
- the REP database 52 contains historical and current building/portfolio baseline load schedules, as provided by the REP, and historical and current building/portfolio adjusted load schedules, as sent to the REP.
- the weather database 51 contains historical weather data (available from National Climatology Center), such as hourly temperature and humidity (to match the same periods for which hourly interval meter data is available and stored in the building database 66 ) and daily HDD and CDD data (same periods as above), as well as a 48 hour forecast of temperature and humidity, by hour (available by internet feed from NWS).
- an integrated design of ECI and APX systems is performed to minimize development expense until better specification is available and to better explore mutual, long-term development benefits including shared resources (programming, NOC, etc.), development of APX scheduling software, to accommodate customer participation in ISO markets development, setting the standard for QSE and building interface, facilitating QSE value-added services, etc., national roll-out of Energy Automation using APX systems (for example, anticipate and accommodate PJM programs similar to ERCOT by end of year), and a role for Fulcrum. Additional issues can be addressed in the implementation. For example, if an REP is its own QSE, will confidential ECI bid/award data be available to the affiliated REP or a potential ECI competitor?
- a QSE is not an REP but otherwise performs commercial services in the market, will confidential ECI bid/award data be compromised? For example, if the QSE affiliate is bidding into the same market as ECI, will it view ECI bids and routinely undercut ECI by 1%? Another issue that can be addressed is to decide whether modified schedules provided directly to a scheduling entity or instead provided to the supplier for submission to its scheduling entity? In Texas, this may be a mute point since many REP's are their own QSE.
- EnergyConnect's building control and portfolio optimization software strives to maximize portfolio benefits (revenue increases, expense reductions, risk management) while maintaining building comfort. Protocols, in turn, provide the basis for allocating benefits and risks within a building portfolio (according to participation in EnergyConnect products and services) and among market participants (ISO, utility, BAS, ESP, power marketer, and EnergyConnect). Protocols serve several purposes. First, they must produce prices that incent customer, ESP, and utility participation. EnergyConnect programs will develop significant dollar margins, so both attractive pricing and attractive EnergyConnect profit margins are achievable. Second, protocols will influence whether and how competitors enter and share the expense of market development. Third, protocols will seek recognition and capture of the indirect benefits of EnergyConnect programs.
- Protocols tasks include: specifying protocols (and in form that can be translated into accounting) and defining associated information requirements, especially as they affect hardware/software/communications development (for example, commercial building energy bill monitoring and savings analysis, commercial building performance measurement and verification, and revenue disbursement and netting of payments).
- the communications, signal management, and building/BAS Interface 68 is software/hardware that handles data transfer among EnergyConnect, building owners and their BAS systems, scheduling coordinators, energy service providers and collects data from ISOs, the National Weather Service, and utilities.
- the EnergyConnect platform enables powerful products and services.
- the following “initial” products are targeted to benefit commercial buildings by reducing energy expense and by reducing the burden on energy suppliers and energy delivery systems. All of these products and more can be provided today under already established rules in Texas. Many of these products can be provided today in the New England, New York, Mid-Atlantic, and Midwest markets. As these markets continue to develop, so will EnergyConnect products and services.
- EnergyConnect products include capturing energy margins, reduce system or local coincident peak load, reduce shaping and imbalance energy expense, reduce risk management expense, reduce ancillary services expense, arbitrage gas/electric prices, and basic blocking and tackling. Reduced energy expenses shows up immediately in property market values.
- the value to the building owner of improved operating profit is typically ten to one, e.g., adding $10,000 to net operating profit increases the value of a property by $100,000.
- the value of this incentive to building owners depends on widely varying tenant arrangements.
- Weather-driven load and market price variability differs from city to city. For example, Chicago and Dallas experience widely varying summer weather (see FIG. 8 with respect to Chicago); San Diego and San Francisco do not.
- FIG. 9 shows that volatile energy costs and prices occur intra-day, that is, from hour-to-hour within an on-peak window. This means that commercial buildings need only shift cooling loads hour-to-hour in order to create significant economies.
- the table in FIG. 10 and graph in FIG. 11 summarize a simulation performed on a 1 MW commercial office building over three summer months.
- the building has a state-of-the-art BAS system and is rigorously controlled to minimize the electric tariff bill each month.
- Tariff-based operation produced a summer bill of $154,000.
- the BAS system instead rigorously controlled the building to minimize the economic cost of supply and delivery.
- Relative to the tariff-based operation economic operation reduced the cost of supply and delivery by 20-40% over a wide range of assumptions.
- cost was reduced $50,000—roughly 1 ⁇ 3 rd of the tariff bill.
- This same simulation increased the tariff bill by over $15,000.
- the increase is largely attributable to increased demand and demand charges on non-peak days and hours, i.e. days and hours that did not tax either the generation or delivery systems.
- the table in FIG. 10 shows the cost reductions that produced the $50,000 savings.
- the graph in FIG. 11 provides an example of summer weekday electric prices and a building pre-cooling strategy carried
- EnergyConnect will target very large cities that have (1) locational marginal prices (LMP) and deregulated retail markets for electricity or (2) existing time-of-use or real-time-pricing utility tariffs. EnergyConnect will then migrate this product to other large cities. Compensation for providing this service may come from a share of customers' energy savings, as reflected monthly in their utility or energy service provider (ESP) bill.
- ESP energy service provider
- EC needs to gain recognition of real and reactive loss profiles by hour, day-type, and season. I 2 r means that distribution losses are much greater weekday afternoons in the summer when prices are highest. Reactive power losses also typically peak in those same hours.
- This product can be described as curtailing demand in coincident peak load periods; in its most basic form, control and shift demand to mitigate utility tariff charges.
- curtail or shift peak demand into off-peak windows based on signals from ISO's and utilities.
- Examples of practical early applications include the CA Demand Reserve Partnership Program and ISO demand response programs such as the NYISO's ICAP Special Case Resources (SCR), Emergency Demand Response Program (EDRP) or Day-Ahead Demand Response Program (DADRP).
- Emerging programs like the CA Demand Reserve Partnership Program, include many features conducive to commercial load participation. These features include, for example, aggregation of building loads (contrasts with historical utility programs requiring commitment from individual building accounts.
- the diversity of an aggregated portfolio enables commitment that an individual building cannot make.), variable and changeable month by month commitment level (allows commitment to vary seasonally to reflect changing building energy uses and use levels), and ad hoc participation (for lesser compensation, building loads can offer curtailment on an ad hoc voluntary basis without the burden of an every day obligation).
- NYISO's SCR pays retail electricity customers to provide their load reduction capability for a specified contract period.
- Program participants receive payments in advance for an agreement to curtail usage during times when the electric grid could be in jeopardy. Based upon system condition forecasts, participants are notified to curtail this claimed “capacity”, either through the use of on-site generation and/or reducing electricity consumption to a firm power level.
- EDRP allows participants to be paid for reducing their energy consumption upon notice from the NYISO that an operating reserves deficiency or major emergency exists.
- the program is open to interruptible loads or local “behind-the-fence” generation greater than or equal to 100 kW per zone.
- CSPs Curtailment Service Providers
- LBMP real-time zonal locational-based marginal price
- DADRP allows loads, through their load serving entity, to bid load reduction into the day-ahead energy market.
- Load reduction bids are evaluated along with generation supplier bids as part of the NYISO's Security Constrained Unit Commitment (SCUC) program. If scheduled through SCUC, loads are paid day-ahead LBMP for the scheduled demand reduction, and are also paid an incentive (at the day-ahead LBMP) for any additional load reduction provided in real time.
- SCUC Security Constrained Unit Commitment
- EnergyConnect can sell capacity, e.g. as part of the NYISO ICAP Special Case Resource Program. Participation in utility and ISO programs depends on commercial load aggregation. These programs are designed for customers able to shed significant MW for the duration of the super peak period, e.g. 1-5 MW for 3-6 consecutive hours, typically weekday afternoons in the summer. Such performance is typically not possible out of a single commercial building, but could be extracted from a 25 MW portfolio of buildings acting in coordination.
- Compensation for reducing peak load may come from i) share of customers' utility tariff demand savings or ESP demand charge savings, ii) utility interruptible program payments, iii) ISO demand-response program payments, and iv) capacity sales within ISO-sponsored markets.
- utility interruptible programs provide only a small share of benefits to participating customers.
- EnergyConnect will immediately provide a building portfolio with the ability 1) to reduce the utility or energy service provider (ESP) expense and risk of buying shaped products from the market and 2) to self-manage volume risk and imbalance price risk.
- This product complements (does not preclude) other EC products and services.
- EC would initially commit its portfolio to a shape that more closely approximates standard market products.
- the energy supplier would then contract on a forward basis, relying more so on these less expensive standard products.
- FIG. 12 shows that it is expensive to shape energy supply to customer loads.
- FIG. 13 shows that it is even more expensive to adjust “shape” purchases weekly, daily, and hourly to fit dynamic customer loads. Default imbalance energy is especially pricey and risky. Compensation for providing this service may come from a share of customers' energy and risk management savings. ESPs will facilitate this product and so will also share in the savings.
- ESP customer portfolios have less diversity (more volatility) and are odder-shaped.
- ESPs typically have to buy shaped products at the margin from generation-controlling utilities. This means there will likely be strong initial interest in this product from ESPs, especially those without their own regional generation portfolios and without large regional customer portfolios. Even a modest EnergyConnect building portfolio can provide smaller ESP's with the benefit of diversity. A larger portfolio may have the flexibility to sell shaping/imbalance products to the energy market.
- EnergyConnect In most applications EnergyConnect is paid directly by the supplier, but in some cases with large building owners and managers the contract between supplier and building may reflect the service, and the building customer will pay EnergyConnect. Regarding reducing long-term risk management expense, expectation of damped energy prices and associated volatility will reduce long-term risk management expense. This product differs from short-term risk not only in time frame, but the cost to supply is an even smaller fraction of current price.
- Risk management is a significant byproduct of Energy Automation products and services. In high price/high load months or seasons, more frequent and more valuable opportunities exist for price-responsive load shifting, peak demand reduction, and shaping and imbalance energy savings. This means that the associated Energy Automation revenue (or savings) is positively correlated with a customer's monthly or seasonal energy expense, and so provides a natural hedge. This natural hedge is also intrinsic to other Energy Automation products and services. Eventually, the more liquid energy markets created by Energy Automation will damp expected prices and price volatility and thereby reduce the associated risk premiums incurred by suppliers (and passed on to customers).
- FIG. 14 is a table showing metropolitan city cooling degree day correlation.
- This product can be described as follows. As a byproduct, customers and suppliers will derive significant financial risk management benefits from Energy Automation products and services. To the extent not needed by any one customer, these benefits are transferable to other building customers within the portfolio.
- EnergyConnect provides services to assure that customer facilities are doing the basic blocking and tackling of energy management. They include “tuning” HVAC and BAS equipment to meet design performance, installing “enterprise” energy reporting software, upgrading to state-of-the-art BAS, as necessary to execute Energy Automation strategies and including project finance if preferred, and controlling energy use against utility tariffs.
- Compensation for this service may come from a share of the energy cost savings (from enhanced energy management system performance) as reflected in the customers' monthly utility or energy service provider (ESP) bills. This will be a monthly fee or percentage of savings. In addition, a fee will be charged to the customers for engineering, project management and program interface if the BAS is upgraded. Fee based relationships will be developed between EnergyConnect and the various suppliers of these upgrade services (BAS manufacturers and installing contractors).
- ESP energy service provider
- EnergyConnect can deliver joint products and services extracted from the building portfolio.
- Such products and services include reducing locational marginal price, reducing capacity reserve margin requirements and expense, selling ancillary services to the market, reducing capital investment for distribution system growth, reducing distribution system operating expense, selling shaping and imbalance services, and controlling distributed generation.
- the reducing locational marginal price (LMP) product can be described as shifting energy use to lower-priced hours in local, transmission constrained market, typically a large metropolitan city, e.g. New York, Chicago, San Francisco. Additional opportunity during less frequent, system-wide price spikes. See FIG. 15 , which is a graph of load profile versus hour for a NYC Comm building customer. Compensation for providing this service may come from negotiated share of estimated savings, e.g. a fee from BOMA members that recognizes value created by operation of the Energy Automation System.
- the product description for reducing capacity reserve margin requirements and expense is that building groups can internally provide many of the services and manage many of the risks that capacity reserve margins are intended to cover. Examples include weather-related load volatility, load forecast error, and spinning/regulating reserves.
- Operating reserves include capacity to provide regulation, spinning, and non-synchronous operating reserves.
- spinning reserve equal to 3% of load are required on a peak day (i.e. 1,000 MW for largest contingency divided by a 33,000 MW peak load). This means that at least 3% of a 15% installed capacity reserve margin is dictated by the need to provide spinning reserves from generating resources during peak load conditions.
- a commercial load portfolio would provide spinning reserve MW's on summer weekdays equal to 3% of its load and have its reserve margin requirement dropped to 12%.
- the second possibility is that the same portfolio would provide spinning reserve MW's disproportionate to its size, e.g.>3%. In this case, the portfolio's reserve margin requirement could drop even further, MW for MW. This is an example, and technical adjustments both up and down can be made.
- Responsive Reserve requires that an Under Frequency Relay (UFR) be installed that opens the load feeder breaker on automatic detection of an under frequency condition. These loads are also required to be manually interrupted within a 10 minute notice. The load, breaker status, and relay status must have real-time telemetry to ERCOT (through the QSE) installed. Loads qualified for the Responsive Reserve market are also automatically qualified for the Non-Spin market, Replacement and Balancing Energy Market.
- Non-Spin Reserve requires that interruptible loads be manually interrupted (e.g., opening a circuit breaker) within 30 minutes notice.
- the load must also have real-time telemetry installed.
- Regulation Up and Down Service requires that interruptible loads through automatic controls respond to signals provided by ERCOT to increase and decrease load while meeting rigorous performance monitoring criteria. The load must also have real-time telemetry installed. Loads qualified for Regulation Up and Down service are also qualified to provide Non-Spinning Reserve, Balancing Energy Services, and Replacement Reserves. (ERCOT systems do not yet accommodate loads of this type).
- Balancing Energy Up requires that loads be able to respond through manual or automatic operations to interrupt load within 10 minutes. The load must also have real-time telemetry installed. Loads qualifying for Balancing Energy Service are also qualified to provide Replacement service. If an interruptible load has been awarded an ancillary service capacity payment, that load may not be bid into the balancing energy market.
- Replacement Reserve Service loads that were planning to be on-line but not providing any other Ancillary Service.
- providing ancillary services to market provides spinning reserves and load and frequency regulation. Such services can be reliably provided out of a large, diverse building portfolio. Such a portfolio will provide 1) size, e.g. NYISO requires that regulating resources provide at least 5 MW; 2) regulation-capable or variable speed motor loads; and 3) performance reliability. Nimble variable speed motors are much better suited to these services than are cumbersome power plants.
- FIG. 16 is a graph showing governor response and contingency reserves successfully restored then generation/load balance after the loss of 2600 MW of generation
- FIG. 17 is a graph showing contingency reserves provide a coordinated response to a sudden loss of supply.
- the source for these graphs is “Technical Issues Related To Retail-Load Provision Of Ancillary Services, Background Issues Discussion,” Brendan Kirby and Eric Hirst, Feb. 10, 2003.
- Regulation reserves are called on continuously, e.g. in NYISO to respond to AGC signals transmitted every 6 seconds.
- a regulating resource is deemed to have performed if it responds within a bandwidth established by the min/max AGC signals sent out over the subsequent 30 seconds. Operation outside this bandwidth results in decreased payments for service.
- spinning reserves are called infrequently due to random generator outages and other significant ACE excursions. When called on for a generator outage, they fill the breech, e.g. until more permanent operating reserves can be brought on-line, e.g. in 10-30 minutes.
- FIG. 18 is a graph showing duration of spinning reserve activation
- FIG. 19 is a graph of PJM 100% spinning reserve activation
- FIG. 20 is a graph of 2001 PJM summer spinning reserve activation.
- the circle size is equal to the duration of spinning reserve call.
- the solid circles are weekdays, and the patterned circles are weekend.
- ACE means spinning reserve called on to restore ACE
- unit means spinning reserve called for generating unit failure.
- EnergyConnect revenues come from service revenues, based on spinning reserve market prices and opportunity cost payments currently provided to generators, capacity revenues (i.e. installed capacity is no longer needed in the peak hours of the year to provide spinning reserves that are customer supplied, thus reducing the required installed capacity reserve margins), and energy market price reduction (i.e. the marginal unit setting market prices will now be a lower priced generating unit).
- the “reducing capital investment for distribution system growth” product can be described as eliminating or deferring capital improvements to distribution system by controlling coincident peak load growth, by reducing load uncertainty, and by responding to distribution system contingencies.
- Con Ed has distribution assets of $8.5 billion and spends over $400 million (5%) each year for growth/reliability and replacement.
- the peak growth rate, 1994-2002 has been 2%, although it appears to have flattened in recent years.
- the energy growth rate, 1994-2002 has been a negative 2%. Revenue has also declined slightly over the same period.
- Commercial revenue comprises 60% of Con Ed revenue and has declined approximately 3% per year.
- Consolidated Edison Company of New York, Inc.—(Con Edison) is investing $522 million this year in upgrades to its electric delivery system for the summer.
- These upgrades and improvements reflect Con Edison's commitment to continuing to provide the most reliable electric delivery service in the country,” said Lou Rana, senior vice president of electric operations for Con Edison.
- Industry analysts have rated Con Edison as the leading electric utility for reliability, and the company is ranked 10 times more reliable than the national average. With energy supplies continuing to be tight, however, company officials encouraged customers to use energy wisely. The company said the more than a half-billion dollars in improvements this year would help maintain reliable service delivery to the company's 3.1 million business and residential customers in its service area of New York City and Westchester County.
- the upgrades and improvements include $328 million on the distribution system, including $65 million for upgrades to cables and transformers, $20 million on transmission upgrades, $174 million on substation installation and circuit breakers, 158 miles of underground and aerial feeder cables replaced, 345 thermally sensitive cable joints replaced, 211 new transformers installed, and 20 electrical (4 kV) unit substations enhanced and upgraded.
- Consolidated Edison Company of New York, Inc. announced today that it has issued a Request For Proposals (RFP) seeking qualified respondents to administer a program aimed at reducing electricity use during peak periods by 125 megawatts over five years beginning May 1, 2004.
- RFP Request For Proposals
- a reduction in peak energy use of 125 megawatts would represent saving the energy required to power 125,000 homes.
- the company is seeking to achieve these energy-use reductions in selected neighborhoods throughout its service area. Over the past several years, we have seen power use throughout our service area growing. Supply, however, has remained relatively unchanged. At the same time, energy use in certain neighborhoods has increased at a faster pace than in others. That growth has necessitated electric delivery improvements in those communities sooner than planned,’ said Stephen F. Wood, vice president of engineering services for Con Edison.”
- Con Ed is recognizing the value of peak load reduction to reduce 1) generating capacity expense, 2) transmission capital expenditures, and 3) distribution capital expenditures.
- the initial program is looking for “permanent” reductions” and so favors technologies such as on-site generation or storage over BAS.
- the “reducing distribution system operating expense” product can be described as follows. Gas and electric distribution systems in large cities are complex to build and complex to operate. For example, the underground transmission systems into city centers provide significant capacitance—a benefit during the day, a cause of high voltage at night. Night-time commercial building motor loads would greatly benefit electric system operators, even more so if it could be “dispatched” by distribution system operators. As another example, distribution system operators—both gas and electric—could take advantage of the ability to switch commercial heating load between electric and gas supply in order to i) control short-term electric or gas distribution loading; ii) clip system load spikes or slow ramping requirements; or iii) provide gas storage.
- the “selling shaping and imbalance services” product can be described as selling imbalance and shaping services to other building customers and to other energy service providers out of a large commercial building portfolio. This service follows from a building portfolio's ability to modify its own load shape (as discussed earlier under initial products and services). EnergyConnect will immediately provide a building portfolio with the ability 1) to reduce the utility or energy service provider (ESP) expense and risk of buying shaped products from the market and 2) to self-manage volume risk and imbalance price risk. As the portfolio develops, some buildings will be able to overcompensate—that is, shift energy use sufficiently to also provide shaping and imbalance to other buildings with less flexibility. In terms of market development issues, efficient development calls for adding these “other buildings” to the EnergyConnect portfolio in order to forecast need and value with greater certainty and to reduce transaction costs.
- ESP utility or energy service provider
- the “controlling distributed generation” product can be described as follows. It is a natural extension for EnergyConnect systems to integrate commercial building and others' on-site generation with electric system markets and operations. Such on-site generation is more valuable as part of an EnergyConnect building portfolio than if considered as a stand-alone resource.
- on-site generation (1) provides additional benefit to the commercial building portfolio (For example, with on-site generation acting in reserve, a building portfolio can commit more of its capability to ISO markets. That is, the building portfolio will hold fewer buildings in reserve to cover possible, but improbable significant day-ahead or real-time non-performance.
- On-site generation can also serve to cap a building portfolio's exposure to the market in the event of non-performance) and (2) derives additional benefit from the commercial building portfolio (For example, on-site generators, augmented by the commercial building portfolio, can function like more sophisticated generators. This creates opportunities to participate more often and in more lucrative markets).
- EnergyConnect programs will mitigate or even eliminate energy price spikes. Such spikes are a significant part of on-site generation profit expectations. Instead, EnergyConnect will provide alternative revenue sources for this generation.
- Other long-term option values include a platform for economic energy storage (flow batteries, flywheels, compressed air, and pumped hydro; services (e.g., building envelope evaluation; control equipment mark-up and installation; maintenance of control equipment; central operation of others' building control systems; HVAC equipment maintenance contracts); intra-portfolio markets for service reliability; increase viability, liquidity, and competitiveness of local wholesale market—low cost virtual generation, low cost services, and increased number of “suppliers” in market mitigates market power; better use, efficiency, and environmental performance from baseload generation—reduced use of coal plants for regulation, ramping, and spinning reserve allows much better tuning and performance of environmental control systems; running at optimal turbine and boiler efficiency points reduces average cost; relegate dirty and inefficient local generation to back-up status; transmission—sufficient peak management will delay need for transmission enhancements and reduce bottlenecks; and tenant satisfaction value and, associated improved lease terms and improved occupancy
- FIG. 23 is a graph showing that transmission congestion into New York City is significant and volatile.
- FIG. 25 Another example is in high-priced locations in PJM, the frequency of high prices has grown steadily, despite the construction of new generation.
- the chart in FIG. 24 captures five years of summer period history. There is no indication of price mitigation in these locations.
- clipping prices and reducing volatility through Energy Automation appreciably reduces energy bills.
- the top line reflects actual wholesale energy expense to serve a 1 MW customer at each of the ⁇ 3,000 PJM LMP points (sorted in descending order). Each succeeding line reflects the effect of clipping prices at $300, $150, $100, and $50.
- EnergyConnect extracts and sells many of these products as a composite of contributions of the entire building portfolio in each market. Some of these products are selling ancillary services to the market, selling peaking capacity equivalent to the market, reducing distribution system capital and operating expenses, arbitraging gas/electric prices, providing electric/gas distribution system control, selling imbalance services, selling load-shedding services, selling frequency control services, and controlling distributed generation.
- EnergyConnect will have the ability to address emerging market issues such as providing intra-portfolio markets for service reliability, improving efficiency and environmental performance of baseload generation, relegating old, inefficient local generation to back-up status, reducing need for expensive transmission upgrades into congested metropolitan areas, improving tenant satisfaction and building rentability, integrating distributed resources with electric/gas system planning and operations, and providing platform for fuel cell entry into large metropolitan areas.
- Scale benefits EnergyConnect in four ways.
- Building diversity comes in many forms: user sensitivities, specific location, scope and time of energy use, motor load, vintage construction, design and efficiency of heating and cooling systems, control sophistication, owner and manager business philosophies, etc. This means that buildings are not equally suited to participate in any one program or market on any given day. Also, a building's suitability for a particular service can differ by season or evolve over time.
- FERC and state regulatory bodies encourage demand response through a variety of market and institutional measures. Accelerated application of LMP will create price signals for the value of energy and services at different locations and times. Biddable demand reductions, interruptible load, real-time pricing, and other load management programs will be instrumental in achieving resource adequacy. Customer participation in ancillary service markets will free generation resources for other purposes. Customer participation will mitigate generation market power for which there is otherwise no easy solution.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Development Economics (AREA)
- Finance (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Primary Health Care (AREA)
- Tourism & Hospitality (AREA)
- General Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The preferred embodiments described herein relate to enterprise energy automation. In one preferred embodiment, a method for enterprise energy automation is provided. In another preferred embodiment, a method for delivering ancillary services to an energy supply and delivery system by a group of buildings is provided. In yet another preferred embodiment, a method for integrating an energy automation system is provided. Other preferred embodiments are also provided.
Description
- This application claims the benefit of U.S. Provisional Application No. 60/562,691, filed Apr. 16, 2004, which is hereby incorporated by reference.
- It would be desirable to provide a process for leveraging the convergence of new technologies and market metrics to provide major energy economies to commercial buildings.
- The present invention is defined by the following claims, and nothing in this section should be taken as a limitation on those claims.
- By way of introduction, the preferred embodiments described below relate to enterprise energy automation. In one preferred embodiment, a method for enterprise energy automation is provided. In another preferred embodiment, a method for delivering ancillary services to an energy supply and delivery system by a group of buildings is provided. In yet another preferred embodiment, a method for integrating an energy automation system is provided. Other preferred embodiments are also provided.
- The preferred embodiments will now be described with reference to the attached drawings.
-
FIG. 1 is a schematic of an energy automation process of a preferred embodiment. -
FIG. 2 is a diagram of an energy automation system of a preferred embodiment. -
FIG. 3 is a block diagram of an energy automation system of a preferred embodiment. -
FIG. 4 is a graph of building electrical load. -
FIG. 5 is a graph of savings for a 1 MW commercial customer. -
FIG. 6 is a graph of hourly energy price distribution in New York CitySummer 2002 weekdays. -
FIG. 7 is a graph of weekday load profile for New York City Summer 2001. -
FIG. 8 is a graph of degree days versus month for Chicago Midway. -
FIG. 9 is a graph of intra-day energy price volatility distribution for New York CitySummer 2002 weekdays. -
FIG. 10 is a table of energy automation versus tariff-based operations. -
FIG. 11 is a graph of load profile versus hour for a NYC commercial building. -
FIG. 12 is a graph of load profile versus hour. -
FIG. 13 is another graph of load profile versus hour. -
FIG. 14 is a table showing metropolitan city cooling degree day correlation. -
FIG. 15 is a graph of load profile versus hour for a NYC Comm building customer. -
FIG. 16 is a graph showing governor response and contingency reserves successfully restored then generation/load balance after the loss of 2600 MW of generation. -
FIG. 17 is a graph showing contingency reserves provide a coordinated response to a sudden loss of supply. -
FIG. 18 is a graph showing duration of spinning reserve activation. -
FIG. 19 is a graph ofPJM 100% spinning reserve activation. -
FIG. 20 is a graph of 2001 PJM summer spinning reserve activation. -
FIG. 21 is a graph of NYISO day ahead east regulation prices on summer weekdays. -
FIG. 22 is a graph of 2001 PJM spinning reserve activation. -
FIG. 23 is a graph showing that transmission congestion into New York City is significant and volatile. -
FIG. 24 is a graph showing frequency of high prices occurring in PJM. -
FIG. 25 is a graph showing savings for a 1 MW commercial customer. - Introduction
- By way of introduction, the preferred embodiments described below are directed to Enterprise Energy Automation, which is the process for leveraging the convergence of new technologies and market metrics to provide major energy economies to commercial buildings. Enterprise Energy Automation provides the means by which customers, suppliers, and deliverers include all components of energy cost incurrence on both sides of the meter in their investment and operating decisions. Weekly, daily, hourly, and minute-to-minute, through Energy Automation, economies of 20 to 40% can be continuously and relentlessly wrung out and distributed. Enterprise Energy Automation enables the realization of previously untapped economic and reliability benefits—benefits long concealed by the utility-customer tariff relationship. Enterprise Energy Automation is particularly advantageous in major metropolitan areas with persistently high energy supply prices. Target customers are commercial buildings—and their energy service providers, building automation contractors, utilities, and regional operators.
- This detailed description will first describe the components and operation of a presently preferred system for implementing Enterprise Energy Automation. The detailed description will then describe the products, services, and long-term option values that can be provided through Enterprise Energy Automation
- Enterprise Energy Automation System
- Turning now to the drawings,
FIG. 1 is a schematic of an energy automation process of a preferred embodiment. As shown in this schematic, an energy automation process interacts with a complex energy supply anddelivery system 10 and complex commercial building technology andoperations 20. The term “EnergyConnect” used in this figure and in this description refers to the name of the assignee of the present patent application. Although “EnergyConnect” (or “ECI”) is used in these preferred embodiments to refer to the entity providing the energy automation system/process, it should be understood that other entities can implement the disclosed embodiments, with the appropriate licenses. - Referring again to the drawings,
FIG. 2 is a more detailed diagram of the energy automation system. As shown inFIG. 2 , the energy supply anddelivery system 10 and a commercial building BAS (building automation system) 20 communicates with acontrol center 30 via a network 40 (here, the Internet). The energy automation system integrates an intelligent software solution, a network, a gateway and graphical user interface, and a supply and delivery system interface. The intelligent software solution analyzes and executes various cost avoidance and revenue-enhancing strategies, performs data collection and monitoring, and comprises benefit/risk sharing protocols, all to balance energy and comfort decisions. Thenetwork 40 allows each building to communicate over secure high-speed internet or customer intranet with thenational control center 30. The gateway and graphical user interface is located at each building, streamlining and easing the communication, information, and control functions with BAS and building management. The supply and delivery system interface is a direct, reliable, and secure communication with utilities, distribution service entities, regional transmission organizations, and other supply entities. - The
control center 30 comprises a platform with intelligent adaptive software that electronically integrates the energy production/delivery systems and customers' energy using equipment. More specifically, the platform acquires and delivers reliable real-time electronic data and control signals. Data transfer will occur in near real-time and with reliability consistent with that presently required for energy system and energy market operations. Most of the necessary energy system and energy market data is readily available, as it is already used for system operation. Some energy system data, e.g. LMP, is becoming available with the advent of independent system operators (ISO). The necessary customer data is available from large buildings with BAS, and is gradually becoming available from smaller buildings as BAS prices drop and hourly metering is deployed by utilities. The platform also decides the optimum operation of a portfolio of customers' equipment. The platform dispatches the portfolio in a manner that (1) maximizes profit from among several competing energy system and energy market opportunities, (2) dependably performs all energy system reliability functions, and (3) maintains building comfort. Decisions are required in several time-frames. For example, electric capacity may require annual or monthly commitment. Electric system ancillary services may require day-ahead commitment. Operating to economy energy prices requires daily, hourly, and real-time decisions. The platform also performs accounting and billing consistent with protocols and provides feedback, monitoring, and reporting. - The platform enables powerful “products” that reduce supply and delivery costs and increase commercial building, BAS, and communications systems values by reducing current and expected energy expense and by reducing pressure on suppliers and distribution systems. These products will be discussed in more detail below. Preparatory to providing initial Energy Automation products and services, EnergyConnect provides services to assure that customer facilities are doing the basic blocking and tackling of energy management. They include “tuning” HVAC and BAS equipment to meet design performance, installing “enterprise” energy reporting software, upgrading to state-of-the-art BAS, as necessary to execute Energy Automation strategies and including project finance if preferred, and controlling energy use against utility tariffs. These basic services provide several benefits, including creating additional energy savings for many customers, as much as 10%.
- Turning again to the drawings,
FIG. 3 is a block diagram of an energy automation system of a preferred embodiment. This system comprises an electric system markets and operations interface 50 and abuilding interface 60. The electric system markets and operations interface 50 comprises a weather database 51, an REP database 52, an ECI REP/QSE interface 53, anECI QSE interface 54, a market database 55, and anAPX market database 56. Thebuilding interface 60 comprises a module that encodes building instructions 62, a module that provides a graphical view of building operations and expected system/weather conditions 64, abuilding database 66, and acustomer building interface 68. The system also includes anREP QSE module 70, anISO 80, aQSE module 90, a module that determines day ahead buildingperformance capability 100, a module that determines optimum day ahead building andportfolio operation 110, and a module that estimatesvalue 130. - The building control and portfolio optimization software will determine the portfolio building operation that maximizes value against market, supplier, and utility prices. The diagram depicts a “day-ahead” process. The “day-ahead” strategy will anticipate and reflect (a) expected conditions for the next day and (b) prior long-term or seasonal commitments to each building's supplier or to the
ISO 80. A similar “short-term” process will continually update and communicate an optimum strategy for the next few hours. The “short-term” strategy will anticipate and reflect (a) actual conditions as they unfold during the day and (b) prior long-term and short-term commitments to each building's supplier or to theISO 80. Both the “day-ahead” and “short-term” processes entail two steps. - The first step is to determine day ahead building performance capability. This determines load shifting and response capability of each building based on, for example, (a) an ability to execute pre-defined strategies that have been defined and tested in advance consistent with (1) building and HVAC system character and (2) BAS and communications capability, (b) expected weather (temperature, humidity) and occupancy, (c) historical performance under similar weather and occupancy conditions, and (d) as modified by a building engineer, current status input. In this embodiment, there are several pre-defined strategies in the
building database 66. These include day-ahead shifting to market price (e.g., shift load from afternoon (high prices) to morning (low prices) to early morning (even lower prices) in order to minimize energy expense with day-ahead notification), Chicago shaping and imbalance (similar to “shifting” but in illiquid Chicago hourly market), real-time shifting (a variation on “shifting,” i.e. also be prepared to shift the same day, within the afternoon, in response to electric system events/prices), spinning reserve (be prepared to drop significant load, 10±minutes, randomly, approx. 10×during summer, between noon and 6 pm), demand limiting (augment “shifting” strategy with peak demand control), and curtailment (extended peak curtailment, approx. 5 hottest days, commitment made from portfolio). - Step one determines a model for each building that is one input to the optimization model. For example, to facilitate a predefined day ahead load-shifting strategy, the model considers magnitude and timing leeway for load shifting, inefficiency of precooling in advance of need, efficiency of cooling during lower ambient temperature hours, and delivery tariff constraints. The building models are then combined to create a single model of the building portfolio, also for input and analysis by the optimization model.
- The building model defines the current flexibility of a building and of a building portfolio to (a) shift HVAC-related electrical load and (b) curtail lighting and other loads—to accommodate hourly energy prices—on both a day-ahead and real-time basis. Similarly, the model defines the current ability of a building and of a building portfolio to provide ancillary services to an ISO.
-
FIG. 4 is a graph of building electrical load. In this graph, kW is a function of outdoor dry bulb T, outdoor dew-point T, solar load, wind speed, internal electrical equipment and lighting load, hour, and season. The chillers have a slower response and longer duration, i.e. primary basis for load-shifting and secondary basis for ancillary services. The pumps/AHU have fast response and are able to shift load around if integrates to (approx.) zero over small time period, i.e. ancillary services. - ECI considers several building characteristics in mapping building electrical equipment and loads to electric system markets and operations. These characteristics include speed of response (e.g., kW/minute or kW/second), advance notice required (e.g., seconds, minutes, hours, day), duration of response (e.g., ability to accommodate 10 minute, 15 minute, hourly, or multi-hour thermal-related load-shifts), time interval of response (e.g., ability to shift thermal-related load back 1 hour, 2 hours, etc.), magnitude of response (e.g., add a second dimension to each of the above parameters; how many kW does that speed, notice, etc. apply to), inefficiency/efficiency of response (e.g., define efficiency loss incurred by change from historical HVAC operation that tracks building thermal load or efficiency gain obtained by operating HVAC equipment in hours with more favorable ambient conditions), and other thermal character (e.g., thermal inertia, recovery ability).
- Modeling of buildings for various purposes is well developed. Modeling of a building in a manner that reveals the characteristics listed above is not well developed. The ECI building model will adapt existing building model technology to this purpose. The ECI building model is also characterized by inverse (the input and output variables are known and measured, and the objective is to determine a mathematical description of the system and to estimate the system parameters), dynamic (use transfer functions where the thermal mass of a building is sufficiently significant to delay the heat gains or losses), and system level (a model of the entire building, not an assembly of component models of the HVAC system. “Component” modeling may reside in the building automation systems to more efficiently adapt building loads to hourly and subhourly electric market prices and operations control signals). (The descriptions of inverse and dynamic stated above are from ASHRAE Handbook, Chapter 31, “Energy Estimating and modeling Methods”).
- Step two determine optimum day ahead building and portfolio operation by determining optimum operation of the building portfolio and optimum operation of each stand-alone building. Inputs to the optimization model include, for example, (a) a model of each building and of the building portfolio and (b) market prices for energy, capacity, and ancillary services (or alternative supplier price/value indicators). Optimization criteria include ST revenue maximization, LT revenue maximization (ISO program enrollment in advance of year or season), LT margin maximization (margin takes into consideration whether capital or opportunity costs are incurred), option value (for example, putting thermal energy in the bank in order to be able to take advantage of short-notice price spikes), and minimum threshold (reflect minimum value or margin of error, and diminishing returns).
- The value in portfolio optimization includes the following: map buildings to opportunity (e.g. revenue maximization), reserves (portfolio reliability/diversity enables firm commitment), shared portfolio reserves (probably using most versatile buildings), scale (e.g. to meet ISO MW thresholds; to affect local price and utility investment; to spread fixed costs over wider base; for bargaining power or influence in developing market), internal market (avoids external transaction costs and supports fractional or kW trades), and support common interests of commercial building sector (market rules and development; who keeps what share of benefits; unfragmented market development; avoidance of supplier switching costs).
- Portfolio optimization enables mapping of sophisticated buildings to sophisticated (not necessarily high margin or high revenue) uses in order to maximize portfolio revenue. For example, the most versatile buildings may provide spinning reserve services while also providing “portfolio reserves” to backup multiple other portfolio services being sold off of other buildings. Building sophistication or versatility may be defined in terms of 1) communications speed and reliability; 2) RT/ST intra-day flexibility; 3) building thermal inertia or recovery ability; 4) thermal storage; and 5) building engineer preferences. Such criteria may be satisfied through staged optimization. First, optimally shift each building's thermal load independently to accommodate hourly prices, day ahead (DAH), while respecting demand features of energy supplier contract and utility delivery tariff. Second, modify DAH for LT commitments & associated reserves. Third, modify DAH to anticipate ST products & associated reserves (involving product bids to ISO, anticipating awards or not resulting from such bids, and anticipating a fallback ST load-shifting strategy in the event that a bid is not successful). Fourth, modify DAH for 3-hour ahead events and price changes. This model eventually anticipates and takes advantage of others' independent, non-portfolio building actions.
- Eventually, the basic precooling strategy becomes the baseline—around market prices and processed directly by the supplier and customer. EnergyConnect then determines the optimum change to the scheduled load, as needed to provide portfolio services, and pays the customer for the value of such portfolio service. (Under this scheme, suppliers and their customers will have a disincentive to falsify this new baseline because ECI may well decide not to change the baseline schedule. Regarding distributed analysis/decision-making, (a) ECI optimization software estimates basic load shifting strategy to accommodate hourly prices, (b) building BAS determines actual response to hourly energy prices (that is, for those buildings assigned to a simple price-based, load-shifting strategy, ECI provides a price profile to each building BAS system and the precise load shifting strategy is determined by a local algorithm that can more efficiently and accurately adapt to real-time building conditions), and (c) the ECI building model learns building capability over time, so that estimates get better over time. Also, the BES/
RRS bid generator 120 is an example of a market application that could be better developed (and brought to market faster) if outsourced or codeveloped by an ECI partner with hands-on commercial experience in the ERCOT market. - The following paragraphs will describe other components of the system shown in
FIG. 3 . -
Estimate Value Module 130 - A simple algorithm to indicate to building engineers in real time the value of actions that they are being asked to take with their building systems. For example, this can be a specific dollar value or a “high”, “moderate”, “low” designation.
- BES/
RRS Bid Generator 120 - This software performs two functions. First, as an input to the
optimization software 110, it estimates “winning” bid prices. Second, for transmittal to theQSE 90, it executes a bid strategy. In production mode, estimates of “winning” bid prices are based on an analysis of awards, including recent history and under similar seasonal, weather, and ISO operating conditions. In a presently preferred embodiment, ECI will conduct weekly or daily trials by simply adopting the actual winning bids as if they were ECI bids. This objective is to demonstrate and test the ability of buildings to participate in these markets and to qualify the building portfolio to participate subsequently in other markets. - The database software will support all Energy Automation functions: building control & portfolio optimization; scorecard; accounting; and business/product development.
- Building
Database 66 - The
building database 66 has the following content: energy profile (daily, seasonal, current; volatility; kWh, kW, therms, Btu; main and submeter data; and billing data), monitored building and building HVAC data (provided by a BAS system), mechanical and BAS (type, size, vintage, available control and telemetry, design capability, communications protocol), load flexibility (response speed, duration, notice requirement, load shift magnitude, load shift frequency, load shift cost (e.g. losses from precooling, tenant discomfort, equipment wear/tear)), performance history (accumulate a record of actual response to actual Energy Automation control, to eventually provide a “learned” building capability profile over a wide range of conditions), on-site generation (type, available control, design capability, etc.), current building equipment status (as updated by building engineers or continually by monitoring through BAS system), and a library of commands to commercial buildings. In one embodiment, EnergyConnect will work with all participants (buildings owners, energy service providers, scheduling coordinators, etc.) to define a collection of acceptable load shifting commands, actions, and strategies that are available to Energy Automation building control and optimization software. Eventually, this collection will evolve, expand, and automate as EnergyConnect builds and records experience for a wide range of commercial building character under a wide range of conditions. - Weather Database 51
- The weather database 51 stores hourly temperature, humidity, wind speed, frontal passage, etc.—both forecast (48/168 hours) and history. The weather database 51 also stores HDD, CDD history for each market.
- The following table shows database dimensions/scale.
Forecast 2004 2005 2006 2007 MW 30 180 360 1,620 MWh (1000) 105 683 1,577 6,307 # of properties 22 130 260 1200 # of major metro areas 2 6 8 10 # of ISO's or regions 2 5 6 7 Building spec averages # of buildings per property 2 Sq ft per property 325,000 Annual MWh per property 6,000 Annual kWh/ sq ft 19 MW per property 1.4 Portfolio participation (%) Demand response program 100 100 80 80 Distribution system capital 5 10 conservation Price-response load shifting 10 20 30 40 (DAH or BES) Spinning reserve (RRS) 10 20 50 - Market Database 55
- The market database 55 stores prior portfolio and building commitments (current and historical bids and awards for BES and RRS, plus longer term commitments), market price and volatility (LMP and energy supplier price signals (electric and gas)), transmission congestion prices (DA, HA, RT (hourly), and RT (6 minute) prices; electric system conditions), yesterday's conditions (yesterday predicts today, at least as a start), ancillary services data (DA and RT prices, opportunity cost, control signals), and utility tariffs (delivery and supply tariffs, especially as a key driver of demand limiting strategies and as they constrain the flexibility of buildings to shift load from high to low-priced hours).
- REP Database 52
- The REP Database 52 stores the price or value signals provided by a building's supplier in lieu of, or to augment, market prices, baseline building load schedules, as determined by the supplier for its building customers (these schedules will be modified to reflect Energy Automation strategies), and adjusted building load schedules, as determined by ECI and transmitted to REP.
- Operations Support Software
- The Energy Automation administration database stores Energy Automation commands sent and verification of receipt, Energy Automation receipts and disbursements and the parameters behind them, and customer/supplier admin information. The scorecard software serves three functions (1) operational measurement & verification of performance (as a basis for distribution of revenues and against expected performance, to improve building database accuracy), (2) off-line analysis and development of alternative building control strategies (to test and continually improve the optimization software vs. independent, non-portfolio building operation), and (3) internal and external reporting. In regard to the development database, in order to continue development of the building model and the optimization model, ECI will need off-line access to some subset of the building, weather, and market databases.
-
Customer Building Interface 68 - The
customer building interface 68 encompasses several component. First, thecustomer building interface 68 comprises the hardware/software/communications interface between the ECI system and each building's BAS. Thecustomer building interface 68 also comprises a graphical user interface that (a) indicates current status of assigned Energy Automation strategies and commands to a property's BAS, (b) displays current electric system operations and market conditions, weather, building, or other information (as necessary to inform building engineers as to how their buildings are creating value under today's conditions), and (c) displays and allows updating of ECI's building database content regarding their properties. Thecustomer building interface 68 also automates retrieval and capture of BAS data in the Building Database and encodes building instructions—software that translates ECI building instructions (from the optimization model) into commands recognizable by each building's BAS. Inputs include, for example, standard commands (from building database), optimum portfolio operation (from optimization model), and optimum building operation (from optimization model). Thecustomer building interface 68 also receives and interprets deployment signal—ECI will pass some ISO operating signals directly through to a building's BAS. For example, an ISO signal to deploy spinning reserve will require a real-time building response. In anticipation of such a deployment signal, ECI will have already transmitted instructions regarding the required building response. - In one implementation, for a few buildings, this interface is fully integrated with an existing BAS. This will enable evaluation of screen shots and other features. For other buildings, a less intrusive GUI, e.g. web access to an ECI screen, can be provided. In this implementation, ECI systems will not directly control BAS. One objective of such an implementation is to determine, with the building engineers, whether and to what extent ECI systems need to directly control BAS in a full production system. This means that, for this implementation, building engineers will have to take actions to implement assigned Energy Automation strategies. The interface design in this implementation can facilitate the building engineer's execution of such strategies. An exception to this is, to test the ability of buildings to participate in ERCOT ancillary services markets, those buildings will receive ISO deployment signals. For all buildings in this implementation, the system will automatically obtain and store key building information via the BAS.
- The following table shows the initial definition of building data for retrieval through BAS system. Standard commands can either be universally interpreted by each building's BAS and/or custom to each building's BAS.
Description Retrieval frequency (minutes) IDR kWh 1 min for Houston buildings participating in BES and RRS real- time ISO markets 15 minute for Chicago and Houston load shifting strategies Temperature, return air, 15 minute every 3rd floor, EWNS Humidity, sampled 15 minute or less frequently? Chiller trend (amp, load) 5-15 minute (shorter interval required only during periods that buildings are participating in ISO programs requiring real-time response) AHU trend (amp, load, 5-15 minute (as above) SAT) Pump trend (amp, load) 5-15 minute (as above) Occupancy schedule Daily Major equipment status Event driven Confirmation that ECI Event driven communications have been received, that ISO deployment signals have been acted on. - Electric System Markets and
Operations Interface 50 - The electric system markets and operations interface 50 comprises the REP/
QSE interface 53, the market database 55 (which derives ISO market and operations data, both current and historical, from the APX market database 56), the REP Database 52, and the weather database 51. - In regard to the REP/
QSE Interface 53, ECI has two alternatives: a standard ECI-specified interface or several REP-specified interfaces. The interface will transfer expected day-ahead building/portfolio load schedule to ECI and then transfer ECI-modified schedule back to REP, transfer REP price signals, if any, to ECI, and provide acknowledgments. In one implementation, this interface will be a simple, custom-designed interface designed to accommodate participation of a specific office. - The
QSE Interface 54 will be used for ancillary service market participation. Thisinterface 54 will send ancillary service bids to a QSE to be forwarded to theISO 80, receive ancillary service awards, and receive ISO deployment signals. In one implementation, ECI will test the ability of a commercial building portfolio to reliably provide ancillary services to ERCOT. This means that ECI need not send/receive actual BES and RRS bids/awards. For example, ECI may adopt others' actual winning bids, and then deploy as if ECI bids/awards. Such operation will far simplify thisQSE interface 54, putting the emphasis on deployment of the building portfolio. Because of the relatively small magnitude of kW deployed from a 15-20 building portfolio, the resulting effect on kWh schedules will probably be too small to show up in ERCOT/QSE/REP settlement accounting. - The market database 55 contains historical ISO market and operations data, from the
APX Market Database 56, current BES and RRS bid and award information (in one implementation, to be adopted from others' actual winning bids), and a record of ancillary service bids, awards, and deployments and their associated parameters. With regard to historical ISO market and operations data, this data would contain day-ahead and RT hourly energy prices (e.g., last 30 days, current season, same season from a year earlier), and BES and RRS market price history (same periods as above). The latter data is needed to develop bids in the BES/RRS Bid Generator 120. In one implementation, theBid Generator 120 will simply adopt others' actual winning bids, so this historical data will not be needed. - The REP database 52 contains historical and current building/portfolio baseline load schedules, as provided by the REP, and historical and current building/portfolio adjusted load schedules, as sent to the REP.
- The weather database 51 contains historical weather data (available from National Climatology Center), such as hourly temperature and humidity (to match the same periods for which hourly interval meter data is available and stored in the building database 66) and daily HDD and CDD data (same periods as above), as well as a 48 hour forecast of temperature and humidity, by hour (available by internet feed from NWS).
- In one implementation, an integrated design of ECI and APX systems is performed to minimize development expense until better specification is available and to better explore mutual, long-term development benefits including shared resources (programming, NOC, etc.), development of APX scheduling software, to accommodate customer participation in ISO markets development, setting the standard for QSE and building interface, facilitating QSE value-added services, etc., national roll-out of Energy Automation using APX systems (for example, anticipate and accommodate PJM programs similar to ERCOT by end of year), and a role for Fulcrum. Additional issues can be addressed in the implementation. For example, if an REP is its own QSE, will confidential ECI bid/award data be available to the affiliated REP or a potential ECI competitor? If a QSE is not an REP but otherwise performs commercial services in the market, will confidential ECI bid/award data be compromised? For example, if the QSE affiliate is bidding into the same market as ECI, will it view ECI bids and routinely undercut ECI by 1%? Another issue that can be addressed is to decide whether modified schedules provided directly to a scheduling entity or instead provided to the supplier for submission to its scheduling entity? In Texas, this may be a mute point since many REP's are their own QSE.
- Protocols
- EnergyConnect's building control and portfolio optimization software strives to maximize portfolio benefits (revenue increases, expense reductions, risk management) while maintaining building comfort. Protocols, in turn, provide the basis for allocating benefits and risks within a building portfolio (according to participation in EnergyConnect products and services) and among market participants (ISO, utility, BAS, ESP, power marketer, and EnergyConnect). Protocols serve several purposes. First, they must produce prices that incent customer, ESP, and utility participation. EnergyConnect programs will develop significant dollar margins, so both attractive pricing and attractive EnergyConnect profit margins are achievable. Second, protocols will influence whether and how competitors enter and share the expense of market development. Third, protocols will seek recognition and capture of the indirect benefits of EnergyConnect programs. As EnergyConnect achieves scale in each market, customers, utilities, and ESPs will realize significant indirect benefits. For example, when energy price volatility is mitigated by EnergyConnect programs, risk and risk management expense will diminish for all market participants. Fourth, protocols will codify direction and timing of the flow of funds among parties. This will dictate EnergyConnect's credit risk exposure and working capital requirements. The protocols will also codify the financial risks borne by each party.
- One can confirm designs and test alternative prototype protocols for allocating program benefits and risks. Allocation of benefits and risks takes into consideration: commercial building availability, building performance capability, actual performance (all as recorded by the scorecard software), and incremental contribution to portfolio benefits (as determined by the portfolio optimization software). Protocols tasks include: specifying protocols (and in form that can be translated into accounting) and defining associated information requirements, especially as they affect hardware/software/communications development (for example, commercial building energy bill monitoring and savings analysis, commercial building performance measurement and verification, and revenue disbursement and netting of payments).
- Communications, Signal Management, and Building/
BAS Interface 68 - The communications, signal management, and building/
BAS Interface 68 is software/hardware that handles data transfer among EnergyConnect, building owners and their BAS systems, scheduling coordinators, energy service providers and collects data from ISOs, the National Weather Service, and utilities. - Products and Services
- The EnergyConnect platform enables powerful products and services. The following “initial” products are targeted to benefit commercial buildings by reducing energy expense and by reducing the burden on energy suppliers and energy delivery systems. All of these products and more can be provided today under already established rules in Texas. Many of these products can be provided today in the New England, New York, Mid-Atlantic, and Midwest markets. As these markets continue to develop, so will EnergyConnect products and services. EnergyConnect products include capturing energy margins, reduce system or local coincident peak load, reduce shaping and imbalance energy expense, reduce risk management expense, reduce ancillary services expense, arbitrage gas/electric prices, and basic blocking and tackling. Reduced energy expenses shows up immediately in property market values. The value to the building owner of improved operating profit is typically ten to one, e.g., adding $10,000 to net operating profit increases the value of a property by $100,000. The value of this incentive to building owners depends on widely varying tenant arrangements. These products will now be described in more detail.
- Capturing Energy Margins
- Capturing energy margins continuously and optimally shifts use to shoulder and off-peak periods based on day ahead prices, continuously and optimally shifts use to lower-priced hours dynamically during each day, or, if market prices are not available, continuously and optimally shifts use to minimize costs under utility tariff. In other words, capturing energy margins continuously, optimally, and automatically shifts time-of-use to lower-priced hours. There are two ways to be paid for this product: responding to utility tariff (provides direct savings on the customer power bill) and responding to the ISO provides payment for service. If the utility bill is reduced, then a customer fee or share of savings is paid to EnergyConnect. In the case of payments from the ISO, EnergyConnect receives the entire amount and shares the appropriate portion with the building customer.
- As the PJM analysis in
FIG. 5 indicates, a market program that clips just the highest prices (that is, that shifts individual customer's energy use away from a few high-priced hours) can significantly reduce customers' energy bills. The top line in the figure reflects actual wholesale energy expense to serve a 1 MW customer at each of the ˜3,000 PJM LMP points (sorted in descending order). Each succeeding line reflects the effect of clipping prices at $300, $150, $100, and $50. EnergyConnect's target markets and customers will benefit especially, because higher and more volatile prices are characteristic of large metropolitan areas. Shifting an individual customer's energy use away from high-priced or high value hours is not the onerous task implied by most utility tariffs. In contrast to the static pricing historically used in such tariffs, power supply and delivery economics produce high and volatile energy costs and prices. Nonetheless, a price clipping strategy would involve relatively few hours (seeFIG. 6 ). - Likewise, demand control has disproportionate value on just a few peak days. As
FIG. 7 indicates, customer loads vary across a wide range, and so electric supply and delivery systems are burdened on relatively few peak summer days. - Weather-driven load and market price variability differs from city to city. For example, Chicago and Dallas experience widely varying summer weather (see
FIG. 8 with respect to Chicago); San Diego and San Francisco do not. - As an important corollary, if permitted the freedom to shift hour-to-hour energy use every day, absent the strictures of an every day demand charge, a commercial building can create significant economies for the supply and delivery system. Allowing flexible energy use on other than the few peak days would not tax either the generation or delivery systems.
FIG. 9 shows that volatile energy costs and prices occur intra-day, that is, from hour-to-hour within an on-peak window. This means that commercial buildings need only shift cooling loads hour-to-hour in order to create significant economies. - The table in
FIG. 10 and graph inFIG. 11 summarize a simulation performed on a 1 MW commercial office building over three summer months. The building has a state-of-the-art BAS system and is rigorously controlled to minimize the electric tariff bill each month. Tariff-based operation produced a summer bill of $154,000. Under the simulation, the BAS system instead rigorously controlled the building to minimize the economic cost of supply and delivery. Relative to the tariff-based operation, economic operation reduced the cost of supply and delivery by 20-40% over a wide range of assumptions. In one simulation, cost was reduced $50,000—roughly ⅓rd of the tariff bill. This same simulation increased the tariff bill by over $15,000. The increase is largely attributable to increased demand and demand charges on non-peak days and hours, i.e. days and hours that did not tax either the generation or delivery systems. The table inFIG. 10 shows the cost reductions that produced the $50,000 savings. The graph inFIG. 11 provides an example of summer weekday electric prices and a building pre-cooling strategy carried out in anticipation of such prices. - This product can be described as continuously and optimally shifting building load to lower-priced hours. Initially, EnergyConnect will target very large cities that have (1) locational marginal prices (LMP) and deregulated retail markets for electricity or (2) existing time-of-use or real-time-pricing utility tariffs. EnergyConnect will then migrate this product to other large cities. Compensation for providing this service may come from a share of customers' energy savings, as reflected monthly in their utility or energy service provider (ESP) bill. There are several market development issues. First, there is a need to amend utility tariffs so that demand charges discriminate between coincident and non-coincident peak use. That is, demand charges need not constrain hourly price-response actions except during peak hours. Second, ISO's need to extend operation of real-time demand-response programs into a lower range of prices. EnergyConnect customers will capture their most significant savings through volume in the frequent $50-100/MWh hours, not in the increasingly rare $100-1000/MWh hours. Third, EC needs to gain recognition of real and reactive loss profiles by hour, day-type, and season. I2r means that distribution losses are much greater weekday afternoons in the summer when prices are highest. Reactive power losses also typically peak in those same hours.
- Reducing System or Local Coincident Peak Load
- To reduce system or local coincident peak load, individual building actions in real time reduce system or local loads at times when increasing coincident load would cause additional costs to be incurred by energy supply or delivery entities. Certainty and permanence of reductions are created through portfolios of customers that can more effectively assure reductions on year ahead or day ahead basis and dynamically during each day. Reducing system coincident peak load involves responding as a portfolio to utility and ISO demand reduction programs. This is significantly more valuable to suppliers than programs targeted at individual customer demand reductions. Payment for service varies by program and has maximum value in EnergyConnect target markets. EnergyConnect receives payment for service and distributes a portion of the proceeds to the building customer.
- This product can be described as curtailing demand in coincident peak load periods; in its most basic form, control and shift demand to mitigate utility tariff charges. With some aggregation of commercial building load, curtail or shift peak demand into off-peak windows based on signals from ISO's and utilities. Examples of practical early applications include the CA Demand Reserve Partnership Program and ISO demand response programs such as the NYISO's ICAP Special Case Resources (SCR), Emergency Demand Response Program (EDRP) or Day-Ahead Demand Response Program (DADRP). Emerging programs, like the CA Demand Reserve Partnership Program, include many features conducive to commercial load participation. These features include, for example, aggregation of building loads (contrasts with historical utility programs requiring commitment from individual building accounts. The diversity of an aggregated portfolio enables commitment that an individual building cannot make.), variable and changeable month by month commitment level (allows commitment to vary seasonally to reflect changing building energy uses and use levels), and ad hoc participation (for lesser compensation, building loads can offer curtailment on an ad hoc voluntary basis without the burden of an every day obligation).
- NYISO's SCR pays retail electricity customers to provide their load reduction capability for a specified contract period. Program participants receive payments in advance for an agreement to curtail usage during times when the electric grid could be in jeopardy. Based upon system condition forecasts, participants are notified to curtail this claimed “capacity”, either through the use of on-site generation and/or reducing electricity consumption to a firm power level. EDRP allows participants to be paid for reducing their energy consumption upon notice from the NYISO that an operating reserves deficiency or major emergency exists. The program is open to interruptible loads or local “behind-the-fence” generation greater than or equal to 100 kW per zone. Loads register for the program through Curtailment Service Providers (CSPs); when called upon, CSPs will be paid for verified load reduction at the rate of $500/MWhr or real-time zonal locational-based marginal price (LBMP), whichever is greater. DADRP allows loads, through their load serving entity, to bid load reduction into the day-ahead energy market. Load reduction bids are evaluated along with generation supplier bids as part of the NYISO's Security Constrained Unit Commitment (SCUC) program. If scheduled through SCUC, loads are paid day-ahead LBMP for the scheduled demand reduction, and are also paid an incentive (at the day-ahead LBMP) for any additional load reduction provided in real time.
- With aggregation and some greater sophistication, EnergyConnect can sell capacity, e.g. as part of the NYISO ICAP Special Case Resource Program. Participation in utility and ISO programs depends on commercial load aggregation. These programs are designed for customers able to shed significant MW for the duration of the super peak period, e.g. 1-5 MW for 3-6 consecutive hours, typically weekday afternoons in the summer. Such performance is typically not possible out of a single commercial building, but could be extracted from a 25 MW portfolio of buildings acting in coordination.
- Compensation for reducing peak load may come from i) share of customers' utility tariff demand savings or ESP demand charge savings, ii) utility interruptible program payments, iii) ISO demand-response program payments, and iv) capacity sales within ISO-sponsored markets. One market development issue is that utility interruptible programs provide only a small share of benefits to participating customers.
- Reducing Shaping and Imbalance Energy Expense
- Reducing shaping and imbalance energy expense shapes customer load to approximate more liquid wholesale energy blocks and self-mitigates weather-driven volume volatility. Less reliance on illiquid hourly energy markets will reduce energy suppliers' energy and risk management expense.
- This product can be described as follows. EnergyConnect will immediately provide a building portfolio with the ability 1) to reduce the utility or energy service provider (ESP) expense and risk of buying shaped products from the market and 2) to self-manage volume risk and imbalance price risk. This product complements (does not preclude) other EC products and services. For example, EC would initially commit its portfolio to a shape that more closely approximates standard market products. The energy supplier would then contract on a forward basis, relying more so on these less expensive standard products. Second, in actual operation, EnergyConnect would then shift load in response to hourly prices, creating additional value with no downside risk. See
FIG. 12 and 13 for graphs of load profile versus hour.FIG. 12 shows that it is expensive to shape energy supply to customer loads. Less liquid hourly products are pricey and risky.FIG. 13 shows that it is even more expensive to adjust “shape” purchases weekly, daily, and hourly to fit dynamic customer loads. Default imbalance energy is especially pricey and risky. Compensation for providing this service may come from a share of customers' energy and risk management savings. ESPs will facilitate this product and so will also share in the savings. - Regarding market development issues, utilities with large, incumbent customer portfolios can shape supply and manage imbalance more easily because of the diversity of customers because regional resources are more or less matched to the utility's load shape and because they typically own or control significant regional resources. As a corollary, ESP customer portfolios have less diversity (more volatility) and are odder-shaped. Moreover, ESPs typically have to buy shaped products at the margin from generation-controlling utilities. This means there will likely be strong initial interest in this product from ESPs, especially those without their own regional generation portfolios and without large regional customer portfolios. Even a modest EnergyConnect building portfolio can provide smaller ESP's with the benefit of diversity. A larger portfolio may have the flexibility to sell shaping/imbalance products to the energy market.
- Reducing Risk Management Expense
- Regarding reducing risk management expense, the revenues derived from Energy Automation products and services are positively correlated with customers' volatile energy expenses (both gas and electric), and thus hedge customers' energy expense risk. Moreover, expectation of damped energy prices and associated volatility will reduce long-term risk management expense. Reducing short-term risk management expense shapes customer load around more liquid wholesale energy blocks and self-manage weather-driven volume volatility. Less reliance on illiquid hourly energy markets and less exposure to volatile imbalance energy will reduce short-term risk premiums. This service to suppliers and ISOs competes directly with the price currently paid. The cost to supply this service is a small fraction of current price. In most applications EnergyConnect is paid directly by the supplier, but in some cases with large building owners and managers the contract between supplier and building may reflect the service, and the building customer will pay EnergyConnect. Regarding reducing long-term risk management expense, expectation of damped energy prices and associated volatility will reduce long-term risk management expense. This product differs from short-term risk not only in time frame, but the cost to supply is an even smaller fraction of current price.
- Risk management is a significant byproduct of Energy Automation products and services. In high price/high load months or seasons, more frequent and more valuable opportunities exist for price-responsive load shifting, peak demand reduction, and shaping and imbalance energy savings. This means that the associated Energy Automation revenue (or savings) is positively correlated with a customer's monthly or seasonal energy expense, and so provides a natural hedge. This natural hedge is also intrinsic to other Energy Automation products and services. Eventually, the more liquid energy markets created by Energy Automation will damp expected prices and price volatility and thereby reduce the associated risk premiums incurred by suppliers (and passed on to customers).
- To the extent energy price volatility is driven by natural gas prices, Energy Automation provides an additional tool for building owners and energy service providers to hedge their natural gas exposure. To the extent energy price volatility is weather-driven, Energy Automation provides national building owners and national energy service providers an additional tool for managing energy price risk on a regional portfolio basis. This results from the weather correlation among cities within broad regions of the country.
FIG. 14 is a table showing metropolitan city cooling degree day correlation. - This product can be described as follows. As a byproduct, customers and suppliers will derive significant financial risk management benefits from Energy Automation products and services. To the extent not needed by any one customer, these benefits are transferable to other building customers within the portfolio.
- Reducing Ancillary Services Expense
- Reducing ancillary services expense reduces load regulation burden and spinning-reserve burden on the electric system. These products will initially be sold to ISOs at prices established for delivery of similar services by generators. EnergyConnect will be paid directly by the ISO.
- Reducing load regulation expense product description: This involves reducing or eliminating load regulation burden on the electric system. Control area operators balance generation with ever changing electric loads. For example, NYISO sends dispatch “basepoint” signals to generators every 5 minutes. Such signals cause generation to follow the daily/hourly load profile. NYISO also sends regulation or AGC signals to “regulating” generators every 6 seconds. Such signals cause generation to follow minute/second load volatility. This finer control is needed to meet NERC/NYISO control area performance standards for load/generation balance and for frequency control. To perform this finer control, NYISO typically requires flexible regulating capacity equal to 1% of the customer load. If a customer load is not volatile, then it imposes no regulation burden on the control area. If customer load volatility can be controlled to vary opposite the control area load, then that customer is providing a regulation benefit to the control area. In advance of ISO recognition of customer-provided regulation service, EnergyConnect will at least seek relief from regulation charges. This will provide some savings while demonstrating that customer loads can reliably and profitably participate in control area regulation services markets. Compensation for providing this service may come from sharing in avoided regulation charge.
- One market development issue is gaining ISO recognition of reduced burden on ISO operation. This is a simple, first step toward setting up commercial customers as suppliers of regulation services.
- Arbitraging Gas/Electric Prices
- By arbitraging gas/electric prices, current very high gas prices overcome electric inefficiencies in markets and in hours that coal-based generation is at the margin. This product can be described as follows: switch HVAC systems between electric and gas supply in order to arbitrage gas/electric prices. At night, the gas/electric price spread may overcome the inherent inefficiency of electric supply and merit switching to electric heating. Switching night-time heating load will make sense when coal or nuclear generation is at the margin setting electric market prices. There is a corresponding opportunity to switch electric heating customers to natural gas during on-peak periods when electric prices are high. For example, electric prices typically spike during the early morning load pickup when all the residential set-back thermostats trigger. Compensation for providing this service may come from sharing of arbitrage savings. Regarding market development issues, electric heating at night, when performed on a market scale, would take significant pressure off the price of natural gas, a premium fuel. The reduced coal plant cycling would mitigate added environmental emissions. To implement this service, commercial buildings will typically have to add an electric heat exchanger to their existing heating systems, and ESPs will have to augment their gas scheduling operations to accommodate short-term switching. In the current climate of historically high and volatile gas prices, ESPs will appreciate the financial risk management value of this option.
- Basic Blocking and Tackling
- Basic blocking and tackling involves rigorous application of state-of-the-art building automation systems to create additional energy savings for many customers, as much as 10%, and sets the stage for Enterprise Energy Automation. Preparatory to providing initial Energy Automation products and services, EnergyConnect provides services to assure that customer facilities are doing the basic blocking and tackling of energy management. They include “tuning” HVAC and BAS equipment to meet design performance, installing “enterprise” energy reporting software, upgrading to state-of-the-art BAS, as necessary to execute Energy Automation strategies and including project finance if preferred, and controlling energy use against utility tariffs.
- These basic services provide several benefits. First, they create additional energy savings for many customers, as much as 10%—alone usually sufficient to justify BAS upgrade. Second, they enable an enterprise energy solution for national customers, whose facilities exist in a variety of regulated/deregulated markets. Finally, they provide with insight into customers' energy equipment and use that is invaluable to executing Energy Automation. All of these products and services increase building value—by reducing energy expenses. Value to the building owner is typically ten to one, e.g. adding a sustainable $10,000 to net operating profit increases the value of the building by $100,000.
- Compensation for this service may come from a share of the energy cost savings (from enhanced energy management system performance) as reflected in the customers' monthly utility or energy service provider (ESP) bills. This will be a monthly fee or percentage of savings. In addition, a fee will be charged to the customers for engineering, project management and program interface if the BAS is upgraded. Fee based relationships will be developed between EnergyConnect and the various suppliers of these upgrade services (BAS manufacturers and installing contractors).
- Regarding market development issues, these services are more applicable to high cost energy markets (electricity and gas) and to markets where tariffs support and reward buildings able to control load hourly (time-of-use rates, peak, super-peak, etc.).
- Additional Products and Services
- Additional products and services can be used to provide expansion and greater profit margins. EnergyConnect can deliver joint products and services extracted from the building portfolio. Such products and services include reducing locational marginal price, reducing capacity reserve margin requirements and expense, selling ancillary services to the market, reducing capital investment for distribution system growth, reducing distribution system operating expense, selling shaping and imbalance services, and controlling distributed generation.
- Reducing Locational Marginal Price (LMP)
- The reducing locational marginal price (LMP) product can be described as shifting energy use to lower-priced hours in local, transmission constrained market, typically a large metropolitan city, e.g. New York, Chicago, San Francisco. Additional opportunity during less frequent, system-wide price spikes. See
FIG. 15 , which is a graph of load profile versus hour for a NYC Comm building customer. Compensation for providing this service may come from negotiated share of estimated savings, e.g. a fee from BOMA members that recognizes value created by operation of the Energy Automation System. - There are several market development issues. These include: i) customer volume needed for material effect and ii) eventually, this program will damp prices and price volatility for all customers, so high prices will lose visibility and customers therefore will no longer see a benchmark against which to measure savings.
- Reducing Capacity Reserve Margin Requirements and Expense
- The product description for reducing capacity reserve margin requirements and expense is that building groups can internally provide many of the services and manage many of the risks that capacity reserve margins are intended to cover. Examples include weather-related load volatility, load forecast error, and spinning/regulating reserves.
- Reduced operating reserves provide an intriguing example. Operating reserves include capacity to provide regulation, spinning, and non-synchronous operating reserves. As an example, for discussion, assume spinning reserve equal to 3% of load are required on a peak day (i.e. 1,000 MW for largest contingency divided by a 33,000 MW peak load). This means that at least 3% of a 15% installed capacity reserve margin is dictated by the need to provide spinning reserves from generating resources during peak load conditions. One possibility is that a commercial load portfolio would provide spinning reserve MW's on summer weekdays equal to 3% of its load and have its reserve margin requirement dropped to 12%. The second possibility is that the same portfolio would provide spinning reserve MW's disproportionate to its size, e.g.>3%. In this case, the portfolio's reserve margin requirement could drop even further, MW for MW. This is an example, and technical adjustments both up and down can be made.
- Providing Ancillary Services to Market
- In Texas, commercial buildings are now allowed to participate in ancillary service markets. The specific technical requirements have been articulated and leeway has been given to scheduling entities regarding the nature of contractual arrangements. This provides the opportunity to prove out the ability of commercial building loads to participate profitably in such markets. Other parts of the country will follow.
- In Texas, “Loads acting as resources” can provide ancillary services based on the load's available technology, as follows. (1) Responsive Reserve: requires that an Under Frequency Relay (UFR) be installed that opens the load feeder breaker on automatic detection of an under frequency condition. These loads are also required to be manually interrupted within a 10 minute notice. The load, breaker status, and relay status must have real-time telemetry to ERCOT (through the QSE) installed. Loads qualified for the Responsive Reserve market are also automatically qualified for the Non-Spin market, Replacement and Balancing Energy Market. (2) Non-Spin Reserve: requires that interruptible loads be manually interrupted (e.g., opening a circuit breaker) within 30 minutes notice. The load must also have real-time telemetry installed. (3) Regulation Up and Down Service: requires that interruptible loads through automatic controls respond to signals provided by ERCOT to increase and decrease load while meeting rigorous performance monitoring criteria. The load must also have real-time telemetry installed. Loads qualified for Regulation Up and Down service are also qualified to provide Non-Spinning Reserve, Balancing Energy Services, and Replacement Reserves. (ERCOT systems do not yet accommodate loads of this type). (4) Balancing Energy Up: requires that loads be able to respond through manual or automatic operations to interrupt load within 10 minutes. The load must also have real-time telemetry installed. Loads qualifying for Balancing Energy Service are also qualified to provide Replacement service. If an interruptible load has been awarded an ancillary service capacity payment, that load may not be bid into the balancing energy market. (5) Replacement Reserve Service: loads that were planning to be on-line but not providing any other Ancillary Service.
- In terms of a product description, providing ancillary services to market provides spinning reserves and load and frequency regulation. Such services can be reliably provided out of a large, diverse building portfolio. Such a portfolio will provide 1) size, e.g. NYISO requires that regulating resources provide at least 5 MW; 2) regulation-capable or variable speed motor loads; and 3) performance reliability. Nimble variable speed motors are much better suited to these services than are cumbersome power plants.
-
FIG. 16 is a graph showing governor response and contingency reserves successfully restored then generation/load balance after the loss of 2600 MW of generation, andFIG. 17 is a graph showing contingency reserves provide a coordinated response to a sudden loss of supply. The source for these graphs is “Technical Issues Related To Retail-Load Provision Of Ancillary Services, Background Issues Discussion,” Brendan Kirby and Eric Hirst, Feb. 10, 2003. - Regulation reserves are called on continuously, e.g. in NYISO to respond to AGC signals transmitted every 6 seconds. A regulating resource is deemed to have performed if it responds within a bandwidth established by the min/max AGC signals sent out over the subsequent 30 seconds. Operation outside this bandwidth results in decreased payments for service.
- By contrast, spinning reserves are called infrequently due to random generator outages and other significant ACE excursions. When called on for a generator outage, they fill the breech, e.g. until more permanent operating reserves can be brought on-line, e.g. in 10-30 minutes.
-
FIG. 18 is a graph showing duration of spinning reserve activation,FIG. 19 is a graph ofPJM 100% spinning reserve activation, andFIG. 20 is a graph of 2001 PJM summer spinning reserve activation. InFIG. 20 , the circle size is equal to the duration of spinning reserve call. The solid circles are weekdays, and the patterned circles are weekend. “ACE” means spinning reserve called on to restore ACE, and “unit” means spinning reserve called for generating unit failure. - Relatively few spinning reserve calls occur during the priciest summer hours, e.g. 11 am to 8 pm weekdays. During these periods, generating units are typically fully loaded and incur a high opportunity cost to provide spinning reserve service. Commercial building loads would aim to compete to provide such services in these hours. Instead, most summer spinning reserve calls occur as generation and load are ramping up early in the day or ramping down in the evening. During these periods, many generating units are backed off and readily available to provide spinning reserve service. Prices are at their lowest. Commercial building loads, e.g. air conditioning, would typically not be available to compete in these periods. These same conclusions generally hold year-round, as shown in the graph of
FIGS. 21 and 22 . - EnergyConnect revenues come from service revenues, based on spinning reserve market prices and opportunity cost payments currently provided to generators, capacity revenues (i.e. installed capacity is no longer needed in the peak hours of the year to provide spinning reserves that are customer supplied, thus reducing the required installed capacity reserve margins), and energy market price reduction (i.e. the marginal unit setting market prices will now be a lower priced generating unit).
- Reducing Capital Investment for Distribution System Growth
- The “reducing capital investment for distribution system growth” product can be described as eliminating or deferring capital improvements to distribution system by controlling coincident peak load growth, by reducing load uncertainty, and by responding to distribution system contingencies. A commercial building portfolio—by responding to contingencies or restoring contingency margin—may be able to reduce the number of contingencies that distribution system planners currently consider in order to maintain delivery reliability. This translates into reduced or deferred capital expenditures.
- The following table relates to a Consolidated Edison Case Study and is discussed below.
Distribution Plant Expenditures Energy Year Expenditures Peak MW $/kW-year (1000 MWh) 2002 $422M 10,215 $41 33,972 2001 $438M 10,293 $43 34,190 2000 $385M 9,379 $41 35,410 1999 $422M 10,038 $42 35,114 - Con Ed has distribution assets of $8.5 billion and spends over $400 million (5%) each year for growth/reliability and replacement. The peak growth rate, 1994-2002, has been 2%, although it appears to have flattened in recent years. The energy growth rate, 1994-2002, has been a negative 2%. Revenue has also declined slightly over the same period. Commercial revenue comprises 60% of Con Ed revenue and has declined approximately 3% per year.
- As announced on Jun. 3, 2003, Consolidated Edison Company of New York, Inc.—(Con Edison) is investing $522 million this year in upgrades to its electric delivery system for the summer. These upgrades and improvements reflect Con Edison's commitment to continuing to provide the most reliable electric delivery service in the country,” said Lou Rana, senior vice president of electric operations for Con Edison. Industry analysts have rated Con Edison as the leading electric utility for reliability, and the company is ranked 10 times more reliable than the national average. With energy supplies continuing to be tight, however, company officials encouraged customers to use energy wisely. The company said the more than a half-billion dollars in improvements this year would help maintain reliable service delivery to the company's 3.1 million business and residential customers in its service area of New York City and Westchester County. The upgrades and improvements include $328 million on the distribution system, including $65 million for upgrades to cables and transformers, $20 million on transmission upgrades, $174 million on substation installation and circuit breakers, 158 miles of underground and aerial feeder cables replaced, 345 thermally sensitive cable joints replaced, 211 new transformers installed, and 20 electrical (4 kV) unit substations enhanced and upgraded.
- For discussion of the Con Ed analysis, it is assumed that (1) 80% or $325 million of annual capital expenditures are driven by growth/reliability; and 60% of that $325 million is driven by commercial customer growth, (2) a commercial building EEA portfolio of 1000 MW would allow Con Ed to remove one level of design contingency on related distribution facilities and thereby reduce capital spending, and (3) a commercial building portfolio of 1000 MW could drop its coincident peak load by 20% (achieved in stages over 3 years) and thereby offset 1-2 years growth on the rest of the Con Ed system. 20%×1,000 MW of commercial load=200 MW. 1-2% growth×[10,000 total load−1,000 of commercial load]=90-180 MW. 200/90=2.2 years, 200/180=1.1 years. This translates into $325-650 million, spread over three years or $100-$200,000 per 1 MW customer per year.
- One market development issues is aggregating local loads sufficient to affect the magnitude and timing of specific local substation and distribution system replacement and/or expansion. Con Ed lent credence to this Energy Automation product in July 2003 when it announced it was soliciting bids to reduce peak loads on specifically identified, local distribution busses.
- As reported, “Consolidated Edison Company of New York, Inc. (Con Edison) announced today that it has issued a Request For Proposals (RFP) seeking qualified respondents to administer a program aimed at reducing electricity use during peak periods by 125 megawatts over five years beginning May 1, 2004. A reduction in peak energy use of 125 megawatts would represent saving the energy required to power 125,000 homes. The company is seeking to achieve these energy-use reductions in selected neighborhoods throughout its service area. Over the past several years, we have seen power use throughout our service area growing. Supply, however, has remained relatively unchanged. At the same time, energy use in certain neighborhoods has increased at a faster pace than in others. That growth has necessitated electric delivery improvements in those communities sooner than planned,’ said Stephen F. Wood, vice president of engineering services for Con Edison.”
- In this first-of-a-kind program, Con Ed is recognizing the value of peak load reduction to reduce 1) generating capacity expense, 2) transmission capital expenditures, and 3) distribution capital expenditures. The initial program is looking for “permanent” reductions” and so favors technologies such as on-site generation or storage over BAS.
- Reducing Distribution System Operating Expense
- The “reducing distribution system operating expense” product can be described as follows. Gas and electric distribution systems in large cities are complex to build and complex to operate. For example, the underground transmission systems into city centers provide significant capacitance—a benefit during the day, a cause of high voltage at night. Night-time commercial building motor loads would greatly benefit electric system operators, even more so if it could be “dispatched” by distribution system operators. As another example, distribution system operators—both gas and electric—could take advantage of the ability to switch commercial heating load between electric and gas supply in order to i) control short-term electric or gas distribution loading; ii) clip system load spikes or slow ramping requirements; or iii) provide gas storage.
- Regarding market development issues, these services require commercial building portfolio scale and sophisticated operating coordination with utilities and ISO's (which becomes affordable with scale).
- Selling Shaping and Imbalance Services
- The “selling shaping and imbalance services” product can be described as selling imbalance and shaping services to other building customers and to other energy service providers out of a large commercial building portfolio. This service follows from a building portfolio's ability to modify its own load shape (as discussed earlier under initial products and services). EnergyConnect will immediately provide a building portfolio with the ability 1) to reduce the utility or energy service provider (ESP) expense and risk of buying shaped products from the market and 2) to self-manage volume risk and imbalance price risk. As the portfolio develops, some buildings will be able to overcompensate—that is, shift energy use sufficiently to also provide shaping and imbalance to other buildings with less flexibility. In terms of market development issues, efficient development calls for adding these “other buildings” to the EnergyConnect portfolio in order to forecast need and value with greater certainty and to reduce transaction costs.
- Controlling Distributed Generation
- The “controlling distributed generation” product can be described as follows. It is a natural extension for EnergyConnect systems to integrate commercial building and others' on-site generation with electric system markets and operations. Such on-site generation is more valuable as part of an EnergyConnect building portfolio than if considered as a stand-alone resource. For example, on-site generation (1) provides additional benefit to the commercial building portfolio (For example, with on-site generation acting in reserve, a building portfolio can commit more of its capability to ISO markets. That is, the building portfolio will hold fewer buildings in reserve to cover possible, but improbable significant day-ahead or real-time non-performance. On-site generation can also serve to cap a building portfolio's exposure to the market in the event of non-performance) and (2) derives additional benefit from the commercial building portfolio (For example, on-site generators, augmented by the commercial building portfolio, can function like more sophisticated generators. This creates opportunities to participate more often and in more lucrative markets). Regarding market development issues, over time, EnergyConnect programs will mitigate or even eliminate energy price spikes. Such spikes are a significant part of on-site generation profit expectations. Instead, EnergyConnect will provide alternative revenue sources for this generation.
- Long Term Option Value
- There are several long-term option values that can be provided with Enterprise Energy Automation. These long-term option values include expansion into world markets (see Jones Lang LaSalle map of megacities); provide testing ground for extension of these capabilities to smaller commercial and industrial customers (technology improvements, understanding of cost/benefit, and other meaningful intelligence); technology introduced for these purposes has other uses, none of which could support the cost on its own; provides customers with understanding of supply side competitive issues—further enhancing negotiating position; capturing “free riders” through enhanced capabilities in market structuring, regulatory management, and legislative management; platform for integration of distributed resources with electric/gas system planning and operations; platform for fuel cell entry (natural additions to support additional market power, access to Federal support funds associated with developing hydrogen as a permanent energy source, solution to new Chicago back-up rules—solves space, noise, and pollution problems).
- Other long-term option values include a platform for economic energy storage (flow batteries, flywheels, compressed air, and pumped hydro; services (e.g., building envelope evaluation; control equipment mark-up and installation; maintenance of control equipment; central operation of others' building control systems; HVAC equipment maintenance contracts); intra-portfolio markets for service reliability; increase viability, liquidity, and competitiveness of local wholesale market—low cost virtual generation, low cost services, and increased number of “suppliers” in market mitigates market power; better use, efficiency, and environmental performance from baseload generation—reduced use of coal plants for regulation, ramping, and spinning reserve allows much better tuning and performance of environmental control systems; running at optimal turbine and boiler efficiency points reduces average cost; relegate dirty and inefficient local generation to back-up status; transmission—sufficient peak management will delay need for transmission enhancements and reduce bottlenecks; and tenant satisfaction value and, associated improved lease terms and improved occupancy
- Backdrop for Initial Markets and Services
- Because transmission bottlenecks impede access to regional generation, high and volatile energy prices persist in very large cities. For example, in New York City, transmission congestion imposes a significant premium on top of energy prices available elsewhere in the state.
FIG. 23 is a graph showing that transmission congestion into New York City is significant and volatile. - Another example is in high-priced locations in PJM, the frequency of high prices has grown steadily, despite the construction of new generation. The chart in
FIG. 24 captures five years of summer period history. There is no indication of price mitigation in these locations. Moreover, as the PJM analysis inFIG. 25 indicates, clipping prices and reducing volatility through Energy Automation appreciably reduces energy bills. InFIG. 25 , the top line reflects actual wholesale energy expense to serve a 1 MW customer at each of the ˜3,000 PJM LMP points (sorted in descending order). Each succeeding line reflects the effect of clipping prices at $300, $150, $100, and $50. - Additional Products Provide Greater Profit Margins
- A significant number of additional products have been developed and other are under development. All leverage the base investment. In each market, a different sequence of introduction will be appropriate. EnergyConnect extracts and sells many of these products as a composite of contributions of the entire building portfolio in each market. Some of these products are selling ancillary services to the market, selling peaking capacity equivalent to the market, reducing distribution system capital and operating expenses, arbitraging gas/electric prices, providing electric/gas distribution system control, selling imbalance services, selling load-shedding services, selling frequency control services, and controlling distributed generation.
- There can also be extension within existing metropolitan areas. As a large and flexible building portfolio, EnergyConnect will have the ability to address emerging market issues such as providing intra-portfolio markets for service reliability, improving efficiency and environmental performance of baseload generation, relegating old, inefficient local generation to back-up status, reducing need for expensive transmission upgrades into congested metropolitan areas, improving tenant satisfaction and building rentability, integrating distributed resources with electric/gas system planning and operations, and providing platform for fuel cell entry into large metropolitan areas.
- Scale Provides Far More than Bargaining Power
- Scale benefits EnergyConnect in four ways. First, services are more flexibly carved out of a portfolio—a building portfolio with diverse designs, operating requirements, and capabilities can better match up to one or several of EnergyConnect's profit sources than can a single building. Second, performance reliability meets ISO and utility operating standards—again, an advantage of a portfolio over an individual building, e.g. in meeting strict performance requirements related to ISO ancillary services. Third, learning curve advantages in a rapidly developing market—a large market share means EnergyConnect will learn more quickly than the competition. Fourth, bargaining power, especially to affect the scope and pace of market development—a portfolio provides the ISO or utilities with 1) a critical mass around which they are willing to invest their own resources and 2) greater long-term assurance of availability and stability of customer participation which are critical for long-term resource adequacy decisions.
- Building diversity comes in many forms: user sensitivities, specific location, scope and time of energy use, motor load, vintage construction, design and efficiency of heating and cooling systems, control sophistication, owner and manager business philosophies, etc. This means that buildings are not equally suited to participate in any one program or market on any given day. Also, a building's suitability for a particular service can differ by season or evolve over time.
- EnergyConnect Markets Enhanced by Regulatory Expectations and Actions
- As stated by William L. Massey, FERC Commissioner, on Sep. 26, 2002, “. . . a robust demand response is largely absent from electricity markets, yet it is an important means of moderating prices. Fortunately, getting a level of demand response sufficient to counteract price run ups is not insurmountable. Studies indicate that we need only about 5 to 10% of demand to be effective. I believe that good market operation will require this. Demand responsiveness, when developed, can also be an important factor in determining generation and transmission adequacy and in congestion management.”
- FERC and state regulatory bodies encourage demand response through a variety of market and institutional measures. Accelerated application of LMP will create price signals for the value of energy and services at different locations and times. Biddable demand reductions, interruptible load, real-time pricing, and other load management programs will be instrumental in achieving resource adequacy. Customer participation in ancillary service markets will free generation resources for other purposes. Customer participation will mitigate generation market power for which there is otherwise no easy solution.
- Demand participation in power markets provides greatest value in transmission constrained metropolitan areas—EnergyConnect's target market. Large metropolitan areas have not benefited from the recent generation construction boom. Generation construction is incredibly difficult and costly in metropolitan areas, and transmission bottlenecks impede access to remote generation. Customer participation and other distributed resources are the long-term solution in such metropolitan areas.
- The forgoing detailed description has described only a few of the many possible implementations of the present invention. For this reason, this detailed description is intended by way of illustration, and not by way of limitation. It is only the following claims, including all equivalents, that are intended to define the scope of this invention.
Claims (69)
1. A method for enterprise energy automation, the method comprising:
(a) monitoring data from an energy supply and delivery system;
(b) extracting data from one or more building automation systems in a group of buildings designated for modifying coincident peak load on the energy supply and delivery system if building performance capability permits;
(c) determining a building operation strategy for one or more buildings in the group of buildings based on the data from the energy supply and delivery system and the data from the one or more building automation systems; and
(d) sending a bid to the energy supply and delivery system for an energy supply and delivery system product, wherein the bid is based on an availability of the one or more buildings to modify load in a manner consistent with the building operating strategy for a specific period of time.
2. The method of claim 1 , wherein the data from the energy supply and delivery system and the data from the one or more building automation systems are received via the Internet.
3. The method of claim 1 , wherein the data from the energy supply and delivery system and the data from the one or more building automation systems are received continuously.
4. The method of claim 1 , wherein the data from the one or more building automation systems includes meter data.
5. The method of claim 1 , wherein the data from the one or more building automation systems includes occupancy data.
6. The method of claim 1 further comprising receiving local weather data for the group of buildings, and wherein the building operation strategy is determined in (c) based on the data from the energy supply and delivery system, the data from the one or more building automation systems, and the local weather data.
7. The method of claim 1 , wherein the building operations strategy is determined using a model for each of the one or more buildings, a model of a composite of operations of the group of buildings, a current status of each of the one or more buildings, and data from the energy supply and delivery system.
8. The method of claim 1 , wherein the building operation strategy preserves quality of service in the one or more buildings.
9. The method of claim 1 , wherein the building operation strategy comprises a commitment to day-ahead load shifting to an estimated market price.
10. The method of claim 1 , wherein the building operation strategy comprises forward period load shifting to market price.
11. The method of claim 1 , wherein the building operation strategy comprises real-time load shifting.
12. The method of claim 1 , wherein the building operation strategy comprises actions to support a supply of spinning reserve to the energy supply and delivery system.
13. The method of claim 1 , wherein the building operation strategy comprises actions to support demand limiting products for the energy supply and delivery system.
14. The method of claim 1 , wherein the building operation strategy comprises curtailment.
15. The method of claim 1 , wherein the building operation strategy comprises two or more of the following: (i) a commitment to day-ahead load shifting to an estimated market price, (ii) forward period load shifting to market price, (iii) real-time load shifting, (iv) actions to support a supply of spinning reserve to the energy supply and delivery system, (v) actions to support demand limiting products for the energy supply and delivery system, (vi) and curtailment.
16. The method of claim 1 , wherein the energy supply and delivery system product modifies operation of the one or more buildings to capture energy margins.
17. The method of claim 1 , wherein the energy supply and delivery system product modifies operation of the one or more buildings to reduce system coincident peak load.
18. The method of claim 1 , wherein the energy supply and delivery system product modifies operation of the one or more buildings to reduce local coincident peak load.
19. The method of claim 1 , wherein the energy supply and delivery system product modifies operation of the one or more buildings to reduce shaping and imbalance energy expense.
20. The method of claim 1 , wherein the energy supply and delivery system product modifies operation of the one or more buildings to reduce risk management expense.
21. The method of claim 1 , wherein the energy supply and delivery system product modifies operation of the one or more buildings to reduce ancillary services expense.
22. The method of claim 1 , wherein the energy supply and delivery system product modifies operation of the one or more buildings to arbitrage gas and electric prices.
23. The method of claim 1 , wherein the energy supply and delivery system product performs two or more of the following acts: (i) modifies operation of the one or more buildings to capture energy margins, (ii) modifies operation of the one or more buildings to reduce system coincident peak load, (iii) modifies operation of the one or more buildings to reduce local coincident peak load, (iv) modifies operation of the one or more buildings to reduce shaping and imbalance energy expense, (v) modifies operation of the one or more buildings to reduce risk management expense, (vi) modifies operation of the one or more buildings to reduce ancillary services expense, and (vii) modifies operation of the one or more buildings to arbitrage gas and electric prices.
24. The method of claim 1 further comprising:
(e) computing energy cost each of the one or more buildings saves under the building operation strategy.
25. The method of claim I further comprising:
(e) computing power bill changes for each of the one or more buildings under the building operation strategy and confirming the power bill changes.
26. The method of claim 1 further comprising:
(e) if the energy supply and delivery system does not accept the bid, providing a different building operation strategy to the one or more buildings.
27. The method of claim 1 further comprising:
(e) continuously monitoring data from the energy supply and delivery system and changing the building operation strategy according to the continuously monitored data.
28. The method of claim 1 , wherein the bid is based on an availability of the one or more buildings to reduce load in a manner consistent with the building operating strategy for a specific period of time.
29. The method of claim 1 , wherein the bid is based on an availability of the one or more buildings to increase load in a manner consistent with the building operating strategy for a specific period of time.
30. The method of claim 1 , wherein the data in (a) comprises price of an energy supply and delivery system product.
31. The method of claim 1 , wherein the data in (a) comprises cost of an energy supply and delivery system product.
32. The method of claim 1 , wherein the data in (a) comprises status of one or more of the following: a transmission line, a generating plant, and a distribution system.
33. The method of claim 1 further comprising:
(e) receiving an acceptance of the bid from the energy supply and delivery system; and
(f) executing the building operation strategy.
34. The method of claim 33 further comprising:
(g) providing compensation for the one or more buildings.
35. The method of claim 34 , wherein the compensation comprises a share of utility tariff demand savings.
36. The method of claim 34 , wherein the compensation comprises a share of ESP demand charge savings.
37. The method of claim 34 , wherein the compensation comprises utility interruptible program payments.
38. The method of claim 34 , wherein the compensation comprises ISO demand-response program payments.
39. The method of claim 34 , wherein the compensation comprises capacity sales within ISO-sponsored markets.
40. The method of claim 1 , wherein (a)-(d) are performed by a national control center.
41. A method comprising:
(a) designating a portfolio of buildings to be available for reducing energy cost by time shifting energy usage;
(b) monitoring building automation systems in each building in the portfolio of buildings to determine each building's capacity to modify electrical energy consumption on a time-varying basis; and
(c) automating operation of electrical energy consumption in one or more buildings in the portfolio of buildings to modify electrical energy cost.
42. The method of claim 41 , wherein (c) comprises performing curtailment.
43. The method of claim 41 , wherein (c) comprises shifting peak demand into off-peak windows based on signals from an energy supply and delivery system.
44. The method of claim 41 further comprising:
(d) providing compensation for the one or more buildings in the portfolio of buildings.
45. The method of claim 44 , wherein the compensation comprises a share of utility tariff demand savings.
46. The method of claim 44 , wherein the compensation comprises a share of ESP demand charge savings.
47. The method of claim 44 , wherein the compensation comprises utility interruptible program payments.
48. The method of claim 44 , wherein the compensation comprises ISO demand-response program payments.
49. The method of claim 44 , wherein the compensation comprises capacity sales within ISO-sponsored markets.
50. The method of claim 44 , wherein the compensation comprises a share of utility tariff energy savings.
51. The method of claim 44 , wherein the compensation comprises a share of ESP energy charge savings.
52. The method of claim 41 , wherein (b) comprises monitoring building automation systems in each building in the portfolio of buildings to determine each building's capacity to reduce electrical energy consumption on a time-varying basis.
53. The method of claim 41 , wherein (b) comprises monitoring building automation systems in each building in the portfolio of buildings to determine each building's capacity to increase electrical energy consumption on a time-varying basis.
54. The method of claim 41 , wherein (c) comprises automating operation of electrical energy consumption in one or more buildings in the portfolio of buildings to reduce electrical energy cost.
55. The method of claim 41 , wherein (c) comprises automating operation of electrical energy consumption in one or more buildings in the portfolio of buildings to increase electrical energy cost.
56. A method for delivering ancillary services to an energy supply and delivery system by a group of buildings, the method comprising:
(a) designating a portfolio of buildings to be available for providing services to an energy supply and delivery system by reducing energy consumption at times of high demand;
(b) monitoring building automation systems in each building in the portfolio of buildings to determine each building's capacity to modify electrical energy consumption on a time-varying basis; and
(c) automating operation of electrical energy consumption in one or more buildings in the portfolio of buildings to deliver an ancillary service to the energy supply and delivery system.
57. The method of claim 56 , wherein the ancillary service comprises a response reserve service.
58. The method of claim 56 , wherein the ancillary service comprises a non-spin reserve service.
59. The method of claim 56 , wherein the ancillary service comprises a regulation up and down service.
60. The method of claim 56 , wherein the ancillary service comprises a balancing energy up service.
61. The method of claim 56 , wherein the ancillary service comprises a replacement reserve service.
62. The method of claim 56 , wherein (b) comprises monitoring building automation systems in each building in the portfolio of buildings to determine each building's capacity to reduce electrical energy consumption on a time-varying basis.
63. The method of claim 56 , wherein (b) comprises monitoring building automation systems in each building in the portfolio of buildings to determine each building's capacity to increase electrical energy consumption on a time-varying basis.
64. A method for integrating an energy automation system, the method comprising:
(a) designating a portfolio of buildings to be available for providing services to an energy supply and deliver system, each building in the portfolio having a building automation system; and
(b) monitoring building automation systems in each building in the portfolio of buildings via internet access.
65. The method of claim 64 further comprising:
(c) monitoring an energy supply and deliver system via internet access.
66. The method of claim 65 , wherein the internet access to the building automation systems and the energy supply and delivery system is accessed through software that has one or more of the following features: (a) analyzes cost avoidance and revenue-enhancing strategies, (b) executes cost avoidance and revenue-enhancing strategies, (c) collects data, (d) monitors data, and (e) balances energy and comfort decisions.
67. The method of claim 64 , wherein the energy supply and deliver system is monitored in real-time.
68. The method of claim 64 further comprising:
(c) automating operation of electrical energy consumption in one or more buildings in the portfolio of buildings to reduce electrical energy cost.
69. The method of claim 64 further comprising:
(c) automating operation of electrical energy consumption in one or more buildings in the portfolio of buildings to deliver an ancillary service to the energy supply and delivery system.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/107,222 US20050234600A1 (en) | 2004-04-16 | 2005-04-15 | Enterprise energy automation |
US12/270,308 US8428785B2 (en) | 2004-04-16 | 2008-11-13 | Enterprise energy automation |
US13/842,807 US8880231B2 (en) | 2004-04-16 | 2013-03-15 | Enterprise energy automation |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US56269104P | 2004-04-16 | 2004-04-16 | |
US11/107,222 US20050234600A1 (en) | 2004-04-16 | 2005-04-15 | Enterprise energy automation |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/270,308 Continuation US8428785B2 (en) | 2004-04-16 | 2008-11-13 | Enterprise energy automation |
Publications (1)
Publication Number | Publication Date |
---|---|
US20050234600A1 true US20050234600A1 (en) | 2005-10-20 |
Family
ID=35097335
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/107,222 Abandoned US20050234600A1 (en) | 2004-04-16 | 2005-04-15 | Enterprise energy automation |
US12/270,308 Active 2025-11-07 US8428785B2 (en) | 2004-04-16 | 2008-11-13 | Enterprise energy automation |
US13/842,807 Active US8880231B2 (en) | 2004-04-16 | 2013-03-15 | Enterprise energy automation |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/270,308 Active 2025-11-07 US8428785B2 (en) | 2004-04-16 | 2008-11-13 | Enterprise energy automation |
US13/842,807 Active US8880231B2 (en) | 2004-04-16 | 2013-03-15 | Enterprise energy automation |
Country Status (1)
Country | Link |
---|---|
US (3) | US20050234600A1 (en) |
Cited By (85)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008092082A2 (en) * | 2007-01-26 | 2008-07-31 | Autani Corporation | Upgradeable automation devices, systems, architectures, and methods for energy management and other applications |
US20090031249A1 (en) * | 2007-07-26 | 2009-01-29 | Gennaro Castelli | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US20090228388A1 (en) * | 2008-03-07 | 2009-09-10 | Gridpoint, Inc. | System and method for automated trading of electrical consumption |
US20090326726A1 (en) * | 2008-06-25 | 2009-12-31 | Versify Solutions, Llc | Aggregator, monitor, and manager of distributed demand response |
US20100114385A1 (en) * | 2008-10-31 | 2010-05-06 | Ian Dempster | Systems and methods to control energy consumption efficiency |
US20100134051A1 (en) * | 2009-03-02 | 2010-06-03 | Adura Technologies, Inc. | Systems and methods for remotely controlling an electrical load |
US7735918B2 (en) | 2002-07-25 | 2010-06-15 | Herman Miller | Office components, seating structures, methods of using seating structures, and systems of seating structures |
US20100191388A1 (en) * | 2005-03-14 | 2010-07-29 | Huizenga Charles A | Wireless Network Control for Building Facilities |
US20100198640A1 (en) * | 2003-06-11 | 2010-08-05 | Kabushiki Kaisha Toshiba | Electric-power-generating-facility operation management support system, electric-power-generating-facility operation management support method, and program for executing operation management support method on computer |
US20100274402A1 (en) * | 2009-04-27 | 2010-10-28 | Cisco Technology, Inc. | System for utilizing predictive energy consumption |
US20110022434A1 (en) * | 2010-07-02 | 2011-01-27 | David Sun | Method for evaluating operational and financial performance for dispatchers using after the fact analysis |
US20110022239A1 (en) * | 2007-08-28 | 2011-01-27 | Forbes Jr Joseph W | Method and apparatus for effecting controlled restart of electrical servcie with a utility service area |
US20110029147A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | Multi-interval dispatch method for enabling dispatchers in power grid control centers to manage changes |
US20110029142A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | System tools that provides dispatchers in power grid control centers with a capability to make changes |
US20110029141A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US20110055287A1 (en) * | 2010-07-02 | 2011-03-03 | David Sun | System tools for evaluating operational and financial performance from dispatchers using after the fact analysis |
US20110071690A1 (en) * | 2010-07-02 | 2011-03-24 | David Sun | Methods that provide dispatchers in power grid control centers with a capability to manage changes |
WO2010146174A3 (en) * | 2009-06-18 | 2011-03-31 | Archimede Solutions Sarl | System for accessing, controlling and managing heterogeneous communicating objects |
US7925384B2 (en) | 2008-06-02 | 2011-04-12 | Adura Technologies, Inc. | Location-based provisioning of wireless control systems |
US20110100004A1 (en) * | 2009-10-30 | 2011-05-05 | Wael Faisal Al-Mazeedi | Adaptive control of a concentrated solar power-enabled power plant |
US20110178643A1 (en) * | 2008-09-29 | 2011-07-21 | Malcolm Stuart Metcalfe | System, method, and computer readable medium for regulating demand for electricity |
US8010812B2 (en) | 2007-08-28 | 2011-08-30 | Forbes Jr Joseph W | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US8131403B2 (en) | 2007-08-28 | 2012-03-06 | Consert, Inc. | System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8195539B1 (en) * | 2009-07-06 | 2012-06-05 | Southern Company Services, Inc. | Open access transmission tariff information system |
US20120233060A1 (en) * | 2009-11-06 | 2012-09-13 | Panasonic Corporation | Electric power interchange system |
US8275471B2 (en) | 2009-11-06 | 2012-09-25 | Adura Technologies, Inc. | Sensor interface for wireless control |
US20120296482A1 (en) * | 2009-10-23 | 2012-11-22 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
US20120323637A1 (en) * | 2011-02-24 | 2012-12-20 | Cushing Vincent J | Optimization of attributes in a portfolio of commercial and industrial facilities |
US8364325B2 (en) | 2008-06-02 | 2013-01-29 | Adura Technologies, Inc. | Intelligence in distributed lighting control devices |
WO2012148987A3 (en) * | 2011-04-29 | 2013-03-07 | Cisco Technology, Inc. | Cross-profile coordination of energy consumption policies |
US8396606B2 (en) | 2007-08-28 | 2013-03-12 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US20130090770A1 (en) * | 2011-10-07 | 2013-04-11 | Hanwha Solution & Consulting Co., Ltd. | System and method for automatically controlling energy apparatus using energy modeling technique |
US20130100805A1 (en) * | 2010-06-25 | 2013-04-25 | Siemens Aktiengesellschaft | Prioritized transfer of data telegrams |
US8577711B2 (en) | 2008-01-25 | 2013-11-05 | Herman Miller, Inc. | Occupancy analysis |
US8606686B1 (en) | 2008-03-07 | 2013-12-10 | Versify Solutions, Inc. | System and method for gathering and performing complex analyses on power data from multiple remote sources |
US20130346139A1 (en) * | 2009-10-23 | 2013-12-26 | Alain P. Steven | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US8682635B2 (en) | 2010-05-28 | 2014-03-25 | Rockwell Automation Technologies, Inc. | Optimal self-maintained energy management system and use |
US8700187B2 (en) | 2007-08-28 | 2014-04-15 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US20140114844A1 (en) * | 2012-10-24 | 2014-04-24 | Joseph W. Forbes, Jr. | System, method, and apparatus for settlement for participation in an electric power grid |
US8761948B1 (en) | 2008-04-25 | 2014-06-24 | Versify Solutions, Inc. | System and method for managing and monitoring renewable energy power generation |
US8774976B2 (en) * | 2012-05-31 | 2014-07-08 | Sharp Laboratories Of America, Inc. | Method and system for reducing peak load charge on utility bill using target peak load and countermeasures |
US8805552B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
US8806239B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US20140277808A1 (en) * | 2013-03-15 | 2014-09-18 | Open Access Technology International, Inc. | Use of Demand Response (DR) and Distributed Energy Resources (DER) to mitigate the impact of Variable Energy Resources (VER) in Power System Operation |
US8855279B2 (en) | 2007-08-28 | 2014-10-07 | Consert Inc. | Apparatus and method for controlling communications to and from utility service points |
US8874242B2 (en) | 2011-03-18 | 2014-10-28 | Rockwell Automation Technologies, Inc. | Graphical language for optimization and use |
US8890505B2 (en) | 2007-08-28 | 2014-11-18 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8965719B1 (en) | 2008-03-07 | 2015-02-24 | Versify Solutions, Inc. | Universal performance monitor for power generators |
US20150058064A1 (en) * | 2007-10-02 | 2015-02-26 | Google Inc. | Systems, methods and apparatus for overall load balancing by scheduled and prioritized reductions |
US8972070B2 (en) | 2010-07-02 | 2015-03-03 | Alstom Grid Inc. | Multi-interval dispatch system tools for enabling dispatchers in power grid control centers to manage changes |
US8996183B2 (en) | 2007-08-28 | 2015-03-31 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US20150206083A1 (en) * | 2014-01-22 | 2015-07-23 | Fujitsu Limited | Demand response event assessment |
US9093840B2 (en) | 2010-07-02 | 2015-07-28 | Alstom Technology Ltd. | System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US9098876B2 (en) | 2013-05-06 | 2015-08-04 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US9130402B2 (en) | 2007-08-28 | 2015-09-08 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US9159108B2 (en) | 2009-10-23 | 2015-10-13 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets |
US9159042B2 (en) | 2009-10-23 | 2015-10-13 | Viridity Energy, Inc. | Facilitating revenue generation from data shifting by data centers |
US9171276B2 (en) | 2013-05-06 | 2015-10-27 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets using an engineering-based model |
US9177323B2 (en) | 2007-08-28 | 2015-11-03 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US9192019B2 (en) | 2011-12-07 | 2015-11-17 | Abl Ip Holding Llc | System for and method of commissioning lighting devices |
US9207698B2 (en) | 2012-06-20 | 2015-12-08 | Causam Energy, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US9312698B2 (en) | 2012-12-19 | 2016-04-12 | Robert Bosch Gmbh | System and method for energy distribution |
US9335747B2 (en) | 2009-10-23 | 2016-05-10 | Viridity Energy, Inc. | System and method for energy management |
US9438041B2 (en) | 2012-12-19 | 2016-09-06 | Bosch Energy Storage Solutions Llc | System and method for energy distribution |
US9513648B2 (en) | 2012-07-31 | 2016-12-06 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US9563215B2 (en) | 2012-07-14 | 2017-02-07 | Causam Energy, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US9634488B2 (en) * | 2009-06-26 | 2017-04-25 | Abb Schweiz Ag | Load scheduling optimization in distributed system |
CN107679018A (en) * | 2017-08-16 | 2018-02-09 | 浙江浙能富兴燃料有限公司 | A kind of poor computational methods of coal-burning power plant limit coal unit price |
US10230241B1 (en) * | 2015-09-30 | 2019-03-12 | The United States Of America, As Represented By The Secretary Of The Navy | Self-optimizing hybrid power system |
US10295969B2 (en) | 2007-08-28 | 2019-05-21 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US10310534B2 (en) | 2012-07-31 | 2019-06-04 | Causam Energy, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US10409305B2 (en) | 2017-01-29 | 2019-09-10 | Trane International Inc. | HVAC system configuration and zone management |
US10547178B2 (en) | 2012-06-20 | 2020-01-28 | Causam Energy, Inc. | System and methods for actively managing electric power over an electric power grid |
US20200143491A1 (en) * | 2013-03-13 | 2020-05-07 | Johnson Controls Technology Company | Systems and methods for cascaded model predictive control |
CN111625947A (en) * | 2020-05-20 | 2020-09-04 | 国网能源研究院有限公司 | Distributed energy development scale prediction method, equipment and medium |
US10768653B2 (en) | 2012-06-20 | 2020-09-08 | Causam Holdings, LLC | System and methods for actively managing electric power over an electric power grid and providing revenue grade data usable for settlement |
US10861112B2 (en) | 2012-07-31 | 2020-12-08 | Causam Energy, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform |
US10948937B2 (en) * | 2015-09-21 | 2021-03-16 | Peak Power, Inc. | Systems and methods for creating load peaks and valleys |
US11004160B2 (en) | 2015-09-23 | 2021-05-11 | Causam Enterprises, Inc. | Systems and methods for advanced energy network |
US11068623B2 (en) | 2019-02-04 | 2021-07-20 | Cove Tool, Inc. | Automated building design guidance software that optimizes cost, energy, daylight, glare, and thermal comfort |
US11131972B2 (en) | 2017-01-12 | 2021-09-28 | Trane International Inc. | Performance optimization in a building automation system |
CN114388002A (en) * | 2021-12-07 | 2022-04-22 | 孙斌 | Building economy and finance measuring and calculating system based on Internet of things |
US11367152B2 (en) * | 2016-10-28 | 2022-06-21 | Chicago Mercantile Exchange Inc. | Futures margin modeling system having seasonality detection |
US11875371B1 (en) | 2017-04-24 | 2024-01-16 | Skyline Products, Inc. | Price optimization system |
US11909207B2 (en) | 2021-03-10 | 2024-02-20 | Abb Schweiz Ag | Hierarchical method for prediction of loads with high variance |
Families Citing this family (107)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7623028B2 (en) | 2004-05-27 | 2009-11-24 | Lawrence Kates | System and method for high-sensitivity sensor |
US8033479B2 (en) | 2004-10-06 | 2011-10-11 | Lawrence Kates | Electronically-controlled register vent for zone heating and cooling |
US7784704B2 (en) | 2007-02-09 | 2010-08-31 | Harter Robert J | Self-programmable thermostat |
US7979360B2 (en) * | 2007-05-29 | 2011-07-12 | Accenture Global Services Limited | Error propagation in calculation with conditional alternatives |
US20090012916A1 (en) * | 2007-07-07 | 2009-01-08 | Alexander Montgomery Barnett | Energy optimization system and method |
US11610275B1 (en) * | 2007-09-04 | 2023-03-21 | Bluenet Holdings, Llc | System and methods for customer relationship management for an energy provider |
US7848900B2 (en) * | 2008-09-16 | 2010-12-07 | Ecofactor, Inc. | System and method for calculating the thermal mass of a building |
US8019567B2 (en) | 2007-09-17 | 2011-09-13 | Ecofactor, Inc. | System and method for evaluating changes in the efficiency of an HVAC system |
US8010237B2 (en) | 2008-07-07 | 2011-08-30 | Ecofactor, Inc. | System and method for using ramped setpoint temperature variation with networked thermostats to improve efficiency |
US8180492B2 (en) | 2008-07-14 | 2012-05-15 | Ecofactor, Inc. | System and method for using a networked electronic device as an occupancy sensor for an energy management system |
US20100070089A1 (en) * | 2008-09-15 | 2010-03-18 | Johnson Controls Technology Company | Hvac controller user interfaces |
US20100106575A1 (en) * | 2008-10-28 | 2010-04-29 | Earth Aid Enterprises Llc | Methods and systems for determining the environmental impact of a consumer's actual resource consumption |
US20100169227A1 (en) * | 2008-12-31 | 2010-07-01 | International Business Machines Corporation | ENERGY MANAGEMENT AND QUALITY OF SERVICE (QoS) |
US8754775B2 (en) | 2009-03-20 | 2014-06-17 | Nest Labs, Inc. | Use of optical reflectance proximity detector for nuisance mitigation in smoke alarms |
US8740100B2 (en) | 2009-05-11 | 2014-06-03 | Ecofactor, Inc. | System, method and apparatus for dynamically variable compressor delay in thermostat to reduce energy consumption |
US8596550B2 (en) | 2009-05-12 | 2013-12-03 | Ecofactor, Inc. | System, method and apparatus for identifying manual inputs to and adaptive programming of a thermostat |
CN102598583B (en) * | 2009-10-26 | 2016-08-31 | Lg电子株式会社 | The method controlling network system |
US9412082B2 (en) * | 2009-12-23 | 2016-08-09 | General Electric Company | Method and system for demand response management in a network |
US20120029718A1 (en) * | 2010-05-21 | 2012-02-02 | Davis Edward L | Systems and methods for generating and utilizing electrical signatures for electrical and electronic equipment |
US10584890B2 (en) | 2010-05-26 | 2020-03-10 | Ecofactor, Inc. | System and method for using a mobile electronic device to optimize an energy management system |
US8556188B2 (en) | 2010-05-26 | 2013-10-15 | Ecofactor, Inc. | System and method for using a mobile electronic device to optimize an energy management system |
US20120016524A1 (en) * | 2010-07-16 | 2012-01-19 | General Electric Company | Thermal time constraints for demand response applications |
US8090477B1 (en) | 2010-08-20 | 2012-01-03 | Ecofactor, Inc. | System and method for optimizing use of plug-in air conditioners and portable heaters |
US8510255B2 (en) | 2010-09-14 | 2013-08-13 | Nest Labs, Inc. | Occupancy pattern detection, estimation and prediction |
US9104211B2 (en) | 2010-11-19 | 2015-08-11 | Google Inc. | Temperature controller with model-based time to target calculation and display |
US8727611B2 (en) | 2010-11-19 | 2014-05-20 | Nest Labs, Inc. | System and method for integrating sensors in thermostats |
US8918219B2 (en) | 2010-11-19 | 2014-12-23 | Google Inc. | User friendly interface for control unit |
US8606374B2 (en) | 2010-09-14 | 2013-12-10 | Nest Labs, Inc. | Thermodynamic modeling for enclosures |
US8950686B2 (en) | 2010-11-19 | 2015-02-10 | Google Inc. | Control unit with automatic setback capability |
US9046898B2 (en) | 2011-02-24 | 2015-06-02 | Google Inc. | Power-preserving communications architecture with long-polling persistent cloud channel for wireless network-connected thermostat |
US8850348B2 (en) | 2010-12-31 | 2014-09-30 | Google Inc. | Dynamic device-associated feedback indicative of responsible device usage |
US8195313B1 (en) | 2010-11-19 | 2012-06-05 | Nest Labs, Inc. | Thermostat user interface |
US11334034B2 (en) | 2010-11-19 | 2022-05-17 | Google Llc | Energy efficiency promoting schedule learning algorithms for intelligent thermostat |
US9256230B2 (en) | 2010-11-19 | 2016-02-09 | Google Inc. | HVAC schedule establishment in an intelligent, network-connected thermostat |
US9268344B2 (en) | 2010-11-19 | 2016-02-23 | Google Inc. | Installation of thermostat powered by rechargeable battery |
US9459018B2 (en) | 2010-11-19 | 2016-10-04 | Google Inc. | Systems and methods for energy-efficient control of an energy-consuming system |
US9075419B2 (en) | 2010-11-19 | 2015-07-07 | Google Inc. | Systems and methods for a graphical user interface of a controller for an energy-consuming system having spatially related discrete display elements |
US9714772B2 (en) | 2010-11-19 | 2017-07-25 | Google Inc. | HVAC controller configurations that compensate for heating caused by direct sunlight |
US9448567B2 (en) | 2010-11-19 | 2016-09-20 | Google Inc. | Power management in single circuit HVAC systems and in multiple circuit HVAC systems |
US9429962B2 (en) | 2010-11-19 | 2016-08-30 | Google Inc. | Auto-configuring time-of day for building control unit |
US10346275B2 (en) | 2010-11-19 | 2019-07-09 | Google Llc | Attributing causation for energy usage and setpoint changes with a network-connected thermostat |
US9453655B2 (en) | 2011-10-07 | 2016-09-27 | Google Inc. | Methods and graphical user interfaces for reporting performance information for an HVAC system controlled by a self-programming network-connected thermostat |
US8583531B2 (en) * | 2010-11-24 | 2013-11-12 | Joseph P. Hirl | Decision support system for the management of energy use, contracting and capital investments for facilities |
US9417637B2 (en) | 2010-12-31 | 2016-08-16 | Google Inc. | Background schedule simulations in an intelligent, network-connected thermostat |
US9342082B2 (en) | 2010-12-31 | 2016-05-17 | Google Inc. | Methods for encouraging energy-efficient behaviors based on a network connected thermostat-centric energy efficiency platform |
US8944338B2 (en) | 2011-02-24 | 2015-02-03 | Google Inc. | Thermostat with self-configuring connections to facilitate do-it-yourself installation |
US8511577B2 (en) | 2011-02-24 | 2013-08-20 | Nest Labs, Inc. | Thermostat with power stealing delay interval at transitions between power stealing states |
US9115908B2 (en) | 2011-07-27 | 2015-08-25 | Honeywell International Inc. | Systems and methods for managing a programmable thermostat |
US8893032B2 (en) | 2012-03-29 | 2014-11-18 | Google Inc. | User interfaces for HVAC schedule display and modification on smartphone or other space-limited touchscreen device |
CN103890667B (en) | 2011-10-21 | 2017-02-15 | 谷歌公司 | User-friendly, network connected learning thermostat and related systems and methods |
CN106440187A (en) | 2011-10-21 | 2017-02-22 | 谷歌公司 | Energy efficiency promoting schedule learning algorithms for intelligent thermostat |
US8622314B2 (en) | 2011-10-21 | 2014-01-07 | Nest Labs, Inc. | Smart-home device that self-qualifies for away-state functionality |
US9892472B2 (en) * | 2012-02-27 | 2018-02-13 | Siemens Corporation | Cost optimization for buildings with hybrid ventilation systems |
CN106288191B (en) | 2012-03-29 | 2020-08-25 | 谷歌有限责任公司 | Processing and reporting usage information for a network-connected thermostat-controlled HVAC system |
US9091453B2 (en) | 2012-03-29 | 2015-07-28 | Google Inc. | Enclosure cooling using early compressor turn-off with extended fan operation |
US9362749B2 (en) * | 2012-04-20 | 2016-06-07 | Battelle Memorial Institute | Controller for thermostatically controlled loads |
US10048706B2 (en) | 2012-06-14 | 2018-08-14 | Ecofactor, Inc. | System and method for optimizing use of individual HVAC units in multi-unit chiller-based systems |
US8620841B1 (en) | 2012-08-31 | 2013-12-31 | Nest Labs, Inc. | Dynamic distributed-sensor thermostat network for forecasting external events |
US9547316B2 (en) | 2012-09-07 | 2017-01-17 | Opower, Inc. | Thermostat classification method and system |
US8994540B2 (en) | 2012-09-21 | 2015-03-31 | Google Inc. | Cover plate for a hazard detector having improved air flow and other characteristics |
US8630741B1 (en) | 2012-09-30 | 2014-01-14 | Nest Labs, Inc. | Automated presence detection and presence-related control within an intelligent controller |
US8600561B1 (en) | 2012-09-30 | 2013-12-03 | Nest Labs, Inc. | Radiant heating controls and methods for an environmental control system |
US10067516B2 (en) | 2013-01-22 | 2018-09-04 | Opower, Inc. | Method and system to control thermostat using biofeedback |
US9810442B2 (en) | 2013-03-15 | 2017-11-07 | Google Inc. | Controlling an HVAC system in association with a demand-response event with an intelligent network-connected thermostat |
US9807099B2 (en) | 2013-03-15 | 2017-10-31 | Google Inc. | Utility portals for managing demand-response events |
US9595070B2 (en) | 2013-03-15 | 2017-03-14 | Google Inc. | Systems, apparatus and methods for managing demand-response programs and events |
US10775814B2 (en) | 2013-04-17 | 2020-09-15 | Google Llc | Selective carrying out of scheduled control operations by an intelligent controller |
US9910449B2 (en) | 2013-04-19 | 2018-03-06 | Google Llc | Generating and implementing thermodynamic models of a structure |
US9298197B2 (en) | 2013-04-19 | 2016-03-29 | Google Inc. | Automated adjustment of an HVAC schedule for resource conservation |
US9360229B2 (en) | 2013-04-26 | 2016-06-07 | Google Inc. | Facilitating ambient temperature measurement accuracy in an HVAC controller having internal heat-generating components |
US9696735B2 (en) | 2013-04-26 | 2017-07-04 | Google Inc. | Context adaptive cool-to-dry feature for HVAC controller |
US10719797B2 (en) | 2013-05-10 | 2020-07-21 | Opower, Inc. | Method of tracking and reporting energy performance for businesses |
US10169833B2 (en) | 2013-05-14 | 2019-01-01 | University Of Florida Research Foundation, Incorporated | Using customer premises to provide ancillary services for a power grid |
US10001792B1 (en) | 2013-06-12 | 2018-06-19 | Opower, Inc. | System and method for determining occupancy schedule for controlling a thermostat |
US10230240B2 (en) | 2013-10-22 | 2019-03-12 | University Of Florida Research Foundation, Incorporated | Low-frequency ancillary power grid services |
US10047968B2 (en) | 2013-12-12 | 2018-08-14 | University Of Florida Research Foundation, Incorporated | Comfortable, energy-efficient control of a heating, ventilation, and air conditioning system |
US9727063B1 (en) | 2014-04-01 | 2017-08-08 | Opower, Inc. | Thermostat set point identification |
US9857238B2 (en) | 2014-04-18 | 2018-01-02 | Google Inc. | Thermodynamic model generation and implementation using observed HVAC and/or enclosure characteristics |
US10019739B1 (en) | 2014-04-25 | 2018-07-10 | Opower, Inc. | Energy usage alerts for a climate control device |
US10572889B2 (en) | 2014-08-07 | 2020-02-25 | Opower, Inc. | Advanced notification to enable usage reduction |
US10410130B1 (en) | 2014-08-07 | 2019-09-10 | Opower, Inc. | Inferring residential home characteristics based on energy data |
JP6404650B2 (en) * | 2014-09-11 | 2018-10-10 | 株式会社東芝 | Device operation set value determination device, device operation set value determination method, and device operation set value determination program |
WO2016073601A1 (en) * | 2014-11-04 | 2016-05-12 | LO3 Energy Inc. | Use of computationally generated thermal energy |
US10033184B2 (en) | 2014-11-13 | 2018-07-24 | Opower, Inc. | Demand response device configured to provide comparative consumption information relating to proximate users or consumers |
US10198483B2 (en) | 2015-02-02 | 2019-02-05 | Opower, Inc. | Classification engine for identifying business hours |
US11093950B2 (en) | 2015-02-02 | 2021-08-17 | Opower, Inc. | Customer activity score |
US10074097B2 (en) | 2015-02-03 | 2018-09-11 | Opower, Inc. | Classification engine for classifying businesses based on power consumption |
US10371861B2 (en) | 2015-02-13 | 2019-08-06 | Opower, Inc. | Notification techniques for reducing energy usage |
JP6507734B2 (en) * | 2015-03-11 | 2019-05-08 | 中国電力株式会社 | Power trading volume determination system, power trading volume determining method and program |
US10817789B2 (en) | 2015-06-09 | 2020-10-27 | Opower, Inc. | Determination of optimal energy storage methods at electric customer service points |
US9958360B2 (en) | 2015-08-05 | 2018-05-01 | Opower, Inc. | Energy audit device |
US9702582B2 (en) | 2015-10-12 | 2017-07-11 | Ikorongo Technology, LLC | Connected thermostat for controlling a climate system based on a desired usage profile in comparison to other connected thermostats controlling other climate systems |
US10559044B2 (en) | 2015-11-20 | 2020-02-11 | Opower, Inc. | Identification of peak days |
US10101050B2 (en) | 2015-12-09 | 2018-10-16 | Google Llc | Dispatch engine for optimizing demand-response thermostat events |
US10181165B2 (en) * | 2016-02-12 | 2019-01-15 | Fujitsu Limited | Critical peak pricing demand response participant assessment |
US10755216B2 (en) * | 2016-10-21 | 2020-08-25 | International Business Machines Corporation | Energy supplier strategy based on supplier confidence scoring |
US10613492B2 (en) | 2017-07-26 | 2020-04-07 | General Electric Company | Method and system for providing flexible reserve power for power grid |
US10886739B2 (en) | 2018-05-31 | 2021-01-05 | Trane International Inc. | Systems and methods for grid appliances |
WO2020160369A1 (en) | 2019-01-31 | 2020-08-06 | General Electric Company | Battery charge and discharge power control in a power grid |
EP3726685A1 (en) | 2019-04-16 | 2020-10-21 | Carrier Corporation | Method for responding to electrical power source request |
CN112352106B (en) | 2019-05-10 | 2023-05-02 | 开利公司 | Compressor with vibration sensor |
EP3977214A1 (en) * | 2019-05-31 | 2022-04-06 | Carrier Corporation | Method for supervisory control of building power consumption |
US11726507B2 (en) | 2020-08-28 | 2023-08-15 | Google Llc | Compensation for internal power dissipation in ambient room temperature estimation |
US11761823B2 (en) * | 2020-08-28 | 2023-09-19 | Google Llc | Temperature sensor isolation in smart-home devices |
US11885838B2 (en) | 2020-08-28 | 2024-01-30 | Google Llc | Measuring dissipated electrical power on a power rail |
US12182385B2 (en) | 2021-11-08 | 2024-12-31 | Tyco Fire & Security Gmbh | Building automation system with resource consumption tracking features |
US11808467B2 (en) | 2022-01-19 | 2023-11-07 | Google Llc | Customized instantiation of provider-defined energy saving setpoint adjustments |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4749992A (en) * | 1986-07-03 | 1988-06-07 | Total Energy Management Consultants Corp. (Temco) | Utility monitoring and control system |
US5566084A (en) * | 1993-03-02 | 1996-10-15 | Cmar; Gregory | Process for identifying patterns of electric energy effects of proposed changes, and implementing such changes in the facility to conserve energy |
US6493643B1 (en) * | 1995-02-20 | 2002-12-10 | Wrap, Spa | Method for the energy management in a domestic environment |
US6528957B1 (en) * | 1999-09-08 | 2003-03-04 | Lutron Electronics, Co., Inc. | Power/energy management control system |
US20030050737A1 (en) * | 2001-09-10 | 2003-03-13 | Robert Osann | Energy-smart home system |
US6583521B1 (en) * | 2000-03-21 | 2003-06-24 | Martin Lagod | Energy management system which includes on-site energy supply |
US20030171851A1 (en) * | 2002-03-08 | 2003-09-11 | Peter J. Brickfield | Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems |
US6633823B2 (en) * | 2000-07-13 | 2003-10-14 | Nxegen, Inc. | System and method for monitoring and controlling energy usage |
US6681156B1 (en) * | 2000-09-28 | 2004-01-20 | Siemens Aktiengesellschaft | System and method for planning energy supply and interface to an energy management system for use in planning energy supply |
US20040024685A1 (en) * | 2002-03-11 | 2004-02-05 | Siemens Power Transmission & Distribution, Inc. | Security constrained optimal dispatch for electricity markets |
US6701298B1 (en) * | 1999-08-18 | 2004-03-02 | Envinta/Energetics Group | Computerized management system and method for energy performance evaluation and improvement |
US20040095237A1 (en) * | 1999-01-09 | 2004-05-20 | Chen Kimball C. | Electronic message delivery system utilizable in the monitoring and control of remote equipment and method of same |
US20040111226A1 (en) * | 2002-12-09 | 2004-06-10 | Brewster David B. | Aggregation of distributed generation resources |
US20040133314A1 (en) * | 2002-03-28 | 2004-07-08 | Ehlers Gregory A. | System and method of controlling an HVAC system |
US7343360B1 (en) * | 1998-05-13 | 2008-03-11 | Siemens Power Transmission & Distribution, Inc. | Exchange, scheduling and control system for electrical power |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6519509B1 (en) * | 2000-06-22 | 2003-02-11 | Stonewater Software, Inc. | System and method for monitoring and controlling energy distribution |
-
2005
- 2005-04-15 US US11/107,222 patent/US20050234600A1/en not_active Abandoned
-
2008
- 2008-11-13 US US12/270,308 patent/US8428785B2/en active Active
-
2013
- 2013-03-15 US US13/842,807 patent/US8880231B2/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4749992B1 (en) * | 1986-07-03 | 1996-06-11 | Total Energy Management Consul | Utility monitoring and control system |
US4749992A (en) * | 1986-07-03 | 1988-06-07 | Total Energy Management Consultants Corp. (Temco) | Utility monitoring and control system |
US5566084A (en) * | 1993-03-02 | 1996-10-15 | Cmar; Gregory | Process for identifying patterns of electric energy effects of proposed changes, and implementing such changes in the facility to conserve energy |
US6493643B1 (en) * | 1995-02-20 | 2002-12-10 | Wrap, Spa | Method for the energy management in a domestic environment |
US7343360B1 (en) * | 1998-05-13 | 2008-03-11 | Siemens Power Transmission & Distribution, Inc. | Exchange, scheduling and control system for electrical power |
US20040095237A1 (en) * | 1999-01-09 | 2004-05-20 | Chen Kimball C. | Electronic message delivery system utilizable in the monitoring and control of remote equipment and method of same |
US6701298B1 (en) * | 1999-08-18 | 2004-03-02 | Envinta/Energetics Group | Computerized management system and method for energy performance evaluation and improvement |
US6528957B1 (en) * | 1999-09-08 | 2003-03-04 | Lutron Electronics, Co., Inc. | Power/energy management control system |
US6583521B1 (en) * | 2000-03-21 | 2003-06-24 | Martin Lagod | Energy management system which includes on-site energy supply |
US6633823B2 (en) * | 2000-07-13 | 2003-10-14 | Nxegen, Inc. | System and method for monitoring and controlling energy usage |
US6681156B1 (en) * | 2000-09-28 | 2004-01-20 | Siemens Aktiengesellschaft | System and method for planning energy supply and interface to an energy management system for use in planning energy supply |
US20030050737A1 (en) * | 2001-09-10 | 2003-03-13 | Robert Osann | Energy-smart home system |
US20030171851A1 (en) * | 2002-03-08 | 2003-09-11 | Peter J. Brickfield | Automatic energy management and energy consumption reduction, especially in commercial and multi-building systems |
US20040024685A1 (en) * | 2002-03-11 | 2004-02-05 | Siemens Power Transmission & Distribution, Inc. | Security constrained optimal dispatch for electricity markets |
US20040133314A1 (en) * | 2002-03-28 | 2004-07-08 | Ehlers Gregory A. | System and method of controlling an HVAC system |
US20040111226A1 (en) * | 2002-12-09 | 2004-06-10 | Brewster David B. | Aggregation of distributed generation resources |
Cited By (230)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7896436B2 (en) | 2002-07-25 | 2011-03-01 | Herman Miller, Inc. | Office components, seating structures, methods of using seating structures, and systems of seating structures |
US7735918B2 (en) | 2002-07-25 | 2010-06-15 | Herman Miller | Office components, seating structures, methods of using seating structures, and systems of seating structures |
US20100198640A1 (en) * | 2003-06-11 | 2010-08-05 | Kabushiki Kaisha Toshiba | Electric-power-generating-facility operation management support system, electric-power-generating-facility operation management support method, and program for executing operation management support method on computer |
US8219439B2 (en) * | 2003-06-11 | 2012-07-10 | Kabushiki Kaisha Toshiba | Electric-power-generating-facility operation management support system, electric-power-generating-facility operation management support method, and program for executing operation management support method on computer |
US20100191388A1 (en) * | 2005-03-14 | 2010-07-29 | Huizenga Charles A | Wireless Network Control for Building Facilities |
US7884732B2 (en) | 2005-03-14 | 2011-02-08 | The Regents Of The University Of California | Wireless network control for building facilities |
WO2008092082A2 (en) * | 2007-01-26 | 2008-07-31 | Autani Corporation | Upgradeable automation devices, systems, architectures, and methods for energy management and other applications |
WO2008092082A3 (en) * | 2007-01-26 | 2008-10-30 | Autani Corp | Upgradeable automation devices, systems, architectures, and methods for energy management and other applications |
AU2008207842B2 (en) * | 2007-01-26 | 2013-08-01 | Autani, Llc | Upgradeable automation devices, systems, architectures, and methods for energy management and other applications |
US20090030557A1 (en) * | 2007-07-26 | 2009-01-29 | Gennaro Castelli | Energy management system that provides real time situation awareness of a potential energy management failure |
US10846039B2 (en) | 2007-07-26 | 2020-11-24 | General Electric Technology Gmbh | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US9367936B2 (en) | 2007-07-26 | 2016-06-14 | Alstom Technology Ltd | Methods for assessing reliability of a utility company's power system |
US9710212B2 (en) | 2007-07-26 | 2017-07-18 | Alstom Technology Ltd. | Methods for assessing potentially compromising situations of a utility company |
US9311728B2 (en) | 2007-07-26 | 2016-04-12 | Alstom Technology Ltd. | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US10552109B2 (en) | 2007-07-26 | 2020-02-04 | General Electric Technology Gmbh | Methods for assessing reliability of a utility company's power system |
US20090030758A1 (en) * | 2007-07-26 | 2009-01-29 | Gennaro Castelli | Methods for assessing potentially compromising situations of a utility company |
US9367935B2 (en) | 2007-07-26 | 2016-06-14 | Alstom Technology Ltd. | Energy management system that provides a real time assessment of a potentially compromising situation that can affect a utility company |
US20090030556A1 (en) * | 2007-07-26 | 2009-01-29 | Gennaro Castelli | Methods for assessing reliability of a utility company's power system |
US8321800B2 (en) | 2007-07-26 | 2012-11-27 | Areva T & D, Inc. | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US8321804B2 (en) | 2007-07-26 | 2012-11-27 | Areva T & D, Inc. | Methods for assessing reliability of a utility company's power system |
US20090031241A1 (en) * | 2007-07-26 | 2009-01-29 | Gennaro Castelli | Energy management system that provides a real time assessment of a potentially compromising situation that can affect a utility company |
US8112253B2 (en) * | 2007-07-26 | 2012-02-07 | Areva T&D, Inc. | Energy management system that provides real time situation awareness of a potential energy management failure |
US20090031249A1 (en) * | 2007-07-26 | 2009-01-29 | Gennaro Castelli | Methods for creating dynamic lists from selected areas of a power system of a utility company |
US10985556B2 (en) | 2007-08-28 | 2021-04-20 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US9881259B2 (en) | 2007-08-28 | 2018-01-30 | Landis+Gyr Innovations, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US9177323B2 (en) | 2007-08-28 | 2015-11-03 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US9305454B2 (en) | 2007-08-28 | 2016-04-05 | Consert Inc. | Apparatus and method for controlling communications to and from fixed position communication devices over a fixed bandwidth communication link |
US9130402B2 (en) | 2007-08-28 | 2015-09-08 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US11119521B2 (en) | 2007-08-28 | 2021-09-14 | Causam Enterprises, Inc. | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US9651973B2 (en) | 2007-08-28 | 2017-05-16 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8010812B2 (en) | 2007-08-28 | 2011-08-30 | Forbes Jr Joseph W | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US8032233B2 (en) | 2007-08-28 | 2011-10-04 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by an electric utility |
US11650612B2 (en) | 2007-08-28 | 2023-05-16 | Causam Enterprises, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
US8131403B2 (en) | 2007-08-28 | 2012-03-06 | Consert, Inc. | System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US9069337B2 (en) | 2007-08-28 | 2015-06-30 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US11651295B2 (en) | 2007-08-28 | 2023-05-16 | Causam Enterprises, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8996183B2 (en) | 2007-08-28 | 2015-03-31 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8890505B2 (en) | 2007-08-28 | 2014-11-18 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US11108263B2 (en) | 2007-08-28 | 2021-08-31 | Causam Enterprises, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US11022995B2 (en) | 2007-08-28 | 2021-06-01 | Causam Enterprises, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
US9899836B2 (en) | 2007-08-28 | 2018-02-20 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8307225B2 (en) | 2007-08-28 | 2012-11-06 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US8315717B2 (en) | 2007-08-28 | 2012-11-20 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by an electric utility |
US11025057B2 (en) | 2007-08-28 | 2021-06-01 | Causam Enterprises, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8855279B2 (en) | 2007-08-28 | 2014-10-07 | Consert Inc. | Apparatus and method for controlling communications to and from utility service points |
US10116134B2 (en) | 2007-08-28 | 2018-10-30 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US11733726B2 (en) | 2007-08-28 | 2023-08-22 | Causam Enterprises, Inc. | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US8806239B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US8805552B2 (en) | 2007-08-28 | 2014-08-12 | Causam Energy, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
US20110022239A1 (en) * | 2007-08-28 | 2011-01-27 | Forbes Jr Joseph W | Method and apparatus for effecting controlled restart of electrical servcie with a utility service area |
US8396606B2 (en) | 2007-08-28 | 2013-03-12 | Consert Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US10833504B2 (en) | 2007-08-28 | 2020-11-10 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US10295969B2 (en) | 2007-08-28 | 2019-05-21 | Causam Energy, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
US10303194B2 (en) | 2007-08-28 | 2019-05-28 | Causam Energy, Inc | System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators |
US11735915B2 (en) | 2007-08-28 | 2023-08-22 | Causam Enterprises, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US8527107B2 (en) | 2007-08-28 | 2013-09-03 | Consert Inc. | Method and apparatus for effecting controlled restart of electrical servcie with a utility service area |
US10389115B2 (en) | 2007-08-28 | 2019-08-20 | Causam Energy, Inc. | Systems and methods for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
US8700187B2 (en) | 2007-08-28 | 2014-04-15 | Consert Inc. | Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities |
US10394268B2 (en) | 2007-08-28 | 2019-08-27 | Causam Energy, Inc. | Method and apparatus for actively managing consumption of electric power over an electric power grid |
US10396592B2 (en) | 2007-08-28 | 2019-08-27 | Causam Energy, Inc. | System and method for estimating and providing dispatchable operating reserve energy capacity through use of active load management |
US10048712B2 (en) * | 2007-10-02 | 2018-08-14 | Google Llc | Systems, methods and apparatus for overall load balancing by scheduled and prioritized reductions |
US10698434B2 (en) | 2007-10-02 | 2020-06-30 | Google Llc | Intelligent temperature management based on energy usage profiles and outside weather conditions |
US20150058064A1 (en) * | 2007-10-02 | 2015-02-26 | Google Inc. | Systems, methods and apparatus for overall load balancing by scheduled and prioritized reductions |
US8577711B2 (en) | 2008-01-25 | 2013-11-05 | Herman Miller, Inc. | Occupancy analysis |
US8606686B1 (en) | 2008-03-07 | 2013-12-10 | Versify Solutions, Inc. | System and method for gathering and performing complex analyses on power data from multiple remote sources |
US20090228388A1 (en) * | 2008-03-07 | 2009-09-10 | Gridpoint, Inc. | System and method for automated trading of electrical consumption |
US8965719B1 (en) | 2008-03-07 | 2015-02-24 | Versify Solutions, Inc. | Universal performance monitor for power generators |
US8761948B1 (en) | 2008-04-25 | 2014-06-24 | Versify Solutions, Inc. | System and method for managing and monitoring renewable energy power generation |
US7925384B2 (en) | 2008-06-02 | 2011-04-12 | Adura Technologies, Inc. | Location-based provisioning of wireless control systems |
US9664814B2 (en) | 2008-06-02 | 2017-05-30 | Abl Ip Holding Llc | Wireless sensor |
US8364325B2 (en) | 2008-06-02 | 2013-01-29 | Adura Technologies, Inc. | Intelligence in distributed lighting control devices |
US10139787B2 (en) | 2008-06-02 | 2018-11-27 | Abl Ip Holding Llc | Intelligence in distributed lighting control devices |
US8260468B2 (en) * | 2008-06-25 | 2012-09-04 | Versify Solutions, Inc. | Aggregator, monitor, and manager of distributed demand response |
US20130024036A1 (en) * | 2008-06-25 | 2013-01-24 | Ippolito David | Aggregator, monitor, and manager of distributed demand response |
US20090326726A1 (en) * | 2008-06-25 | 2009-12-31 | Versify Solutions, Llc | Aggregator, monitor, and manager of distributed demand response |
US9805325B2 (en) * | 2008-06-25 | 2017-10-31 | Versify Solutions, Inc. | Aggregator, monitor, and manager of distributed demand response |
US9052732B2 (en) | 2008-06-25 | 2015-06-09 | Versify Solutions, Inc. | Aggregator, monitor, and manager of distributed micro-generators |
US20110178643A1 (en) * | 2008-09-29 | 2011-07-21 | Malcolm Stuart Metcalfe | System, method, and computer readable medium for regulating demand for electricity |
US11409315B2 (en) | 2008-09-30 | 2022-08-09 | Google Llc | Systems, methods and apparatus for encouraging energy conscious behavior based on aggregated third party energy consumption |
US20150226446A1 (en) * | 2008-10-31 | 2015-08-13 | Optimum Energy | Systems and methods to control energy consumption efficiency |
US11473796B2 (en) | 2008-10-31 | 2022-10-18 | Optimum Energy Llc | Systems and methods to control energy consumption efficiency |
US20100114385A1 (en) * | 2008-10-31 | 2010-05-06 | Ian Dempster | Systems and methods to control energy consumption efficiency |
US8219250B2 (en) * | 2008-10-31 | 2012-07-10 | Optimum Energy, Llc | Systems and methods to control energy consumption efficiency |
US20120271462A1 (en) * | 2008-10-31 | 2012-10-25 | Ian Dempster | Systems and methods to control energy consumption efficiency |
US10408481B2 (en) * | 2008-10-31 | 2019-09-10 | Optimum Energy Llc | Systems and methods to control energy consumption efficiency |
CN103941591A (en) * | 2008-10-31 | 2014-07-23 | 优化能源有限公司 | System and method to control energy consumption efficiency |
US20100134051A1 (en) * | 2009-03-02 | 2010-06-03 | Adura Technologies, Inc. | Systems and methods for remotely controlling an electrical load |
US7839017B2 (en) | 2009-03-02 | 2010-11-23 | Adura Technologies, Inc. | Systems and methods for remotely controlling an electrical load |
US20100274402A1 (en) * | 2009-04-27 | 2010-10-28 | Cisco Technology, Inc. | System for utilizing predictive energy consumption |
US8494685B2 (en) * | 2009-04-27 | 2013-07-23 | Cisco Technology, Inc. | System for utilizing predictive energy consumption |
US11676079B2 (en) | 2009-05-08 | 2023-06-13 | Causam Enterprises, Inc. | System and method for generating and providing dispatchable operating reserve energy capacity through use of active load management |
WO2010146174A3 (en) * | 2009-06-18 | 2011-03-31 | Archimede Solutions Sarl | System for accessing, controlling and managing heterogeneous communicating objects |
US9634488B2 (en) * | 2009-06-26 | 2017-04-25 | Abb Schweiz Ag | Load scheduling optimization in distributed system |
US8195539B1 (en) * | 2009-07-06 | 2012-06-05 | Southern Company Services, Inc. | Open access transmission tariff information system |
US9772643B2 (en) * | 2009-10-23 | 2017-09-26 | Viridity Energy Solutions, Inc. | Methods, apparatus and systems for managing energy assets |
US20120296482A1 (en) * | 2009-10-23 | 2012-11-22 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
US8892264B2 (en) * | 2009-10-23 | 2014-11-18 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
US20130346139A1 (en) * | 2009-10-23 | 2013-12-26 | Alain P. Steven | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US9367825B2 (en) * | 2009-10-23 | 2016-06-14 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US9367052B2 (en) | 2009-10-23 | 2016-06-14 | Viridity Energy, Inc. | Managing energy assets associated with transport operations |
US9335747B2 (en) | 2009-10-23 | 2016-05-10 | Viridity Energy, Inc. | System and method for energy management |
US9159042B2 (en) | 2009-10-23 | 2015-10-13 | Viridity Energy, Inc. | Facilitating revenue generation from data shifting by data centers |
US9159108B2 (en) | 2009-10-23 | 2015-10-13 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets |
US20110100004A1 (en) * | 2009-10-30 | 2011-05-05 | Wael Faisal Al-Mazeedi | Adaptive control of a concentrated solar power-enabled power plant |
US20110137477A1 (en) * | 2009-10-30 | 2011-06-09 | Wael Faisal Al-Mazeedi | Adaptive control of a concentrated solar power plant |
US8755915B2 (en) | 2009-11-06 | 2014-06-17 | Abl Ip Holding Llc | Sensor interface for wireless control |
US20120233060A1 (en) * | 2009-11-06 | 2012-09-13 | Panasonic Corporation | Electric power interchange system |
US8854208B2 (en) | 2009-11-06 | 2014-10-07 | Abl Ip Holding Llc | Wireless sensor |
US8275471B2 (en) | 2009-11-06 | 2012-09-25 | Adura Technologies, Inc. | Sensor interface for wireless control |
US8990114B2 (en) * | 2009-11-06 | 2015-03-24 | Panasonic Intellectual Property Management Co., Ltd. | Electric power interchange system |
US8682635B2 (en) | 2010-05-28 | 2014-03-25 | Rockwell Automation Technologies, Inc. | Optimal self-maintained energy management system and use |
US20130100805A1 (en) * | 2010-06-25 | 2013-04-25 | Siemens Aktiengesellschaft | Prioritized transfer of data telegrams |
US10128655B2 (en) | 2010-07-02 | 2018-11-13 | General Electric Technology Gmbh | System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive, synchronized and harmonized load forecast |
US20110029141A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US9727828B2 (en) | 2010-07-02 | 2017-08-08 | Alstom Technology Ltd. | Method for evaluating operational and financial performance for dispatchers using after the fact analysis |
US8972070B2 (en) | 2010-07-02 | 2015-03-03 | Alstom Grid Inc. | Multi-interval dispatch system tools for enabling dispatchers in power grid control centers to manage changes |
US8538593B2 (en) * | 2010-07-02 | 2013-09-17 | Alstom Grid Inc. | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US20110022434A1 (en) * | 2010-07-02 | 2011-01-27 | David Sun | Method for evaluating operational and financial performance for dispatchers using after the fact analysis |
US9824319B2 (en) | 2010-07-02 | 2017-11-21 | General Electric Technology Gmbh | Multi-interval dispatch system tools for enabling dispatchers in power grid control centers to manage changes |
US9851700B2 (en) * | 2010-07-02 | 2017-12-26 | General Electric Technology Gmbh | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive, synchronized and harmonized load forecast |
US20140005849A1 (en) * | 2010-07-02 | 2014-01-02 | Alstom Grid Inc. | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive, synchronized and harmonized load forecast |
US9251479B2 (en) | 2010-07-02 | 2016-02-02 | General Electric Technology Gmbh | Multi-interval dispatch method for enabling dispatchers in power grid control centers to manage changes |
US20110029147A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | Multi-interval dispatch method for enabling dispatchers in power grid control centers to manage changes |
US20110071690A1 (en) * | 2010-07-02 | 2011-03-24 | David Sun | Methods that provide dispatchers in power grid control centers with a capability to manage changes |
US9558250B2 (en) | 2010-07-02 | 2017-01-31 | Alstom Technology Ltd. | System tools for evaluating operational and financial performance from dispatchers using after the fact analysis |
US10460264B2 (en) | 2010-07-02 | 2019-10-29 | General Electric Technology Gmbh | Method for evaluating operational and financial performance for dispatchers using after the fact analysis |
US20110055287A1 (en) * | 2010-07-02 | 2011-03-03 | David Sun | System tools for evaluating operational and financial performance from dispatchers using after the fact analysis |
US10510029B2 (en) | 2010-07-02 | 2019-12-17 | General Electric Technology Gmbh | Multi-interval dispatch system tools for enabling dispatchers in power grid control centers to manage changes |
US9093840B2 (en) | 2010-07-02 | 2015-07-28 | Alstom Technology Ltd. | System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US10488829B2 (en) | 2010-07-02 | 2019-11-26 | General Electric Technology Gmbh | Method for integrating individual load forecasts into a composite load forecast to present a comprehensive, synchronized and harmonized load forecast |
US20110029142A1 (en) * | 2010-07-02 | 2011-02-03 | David Sun | System tools that provides dispatchers in power grid control centers with a capability to make changes |
US20120323637A1 (en) * | 2011-02-24 | 2012-12-20 | Cushing Vincent J | Optimization of attributes in a portfolio of commercial and industrial facilities |
US8874242B2 (en) | 2011-03-18 | 2014-10-28 | Rockwell Automation Technologies, Inc. | Graphical language for optimization and use |
WO2012148987A3 (en) * | 2011-04-29 | 2013-03-07 | Cisco Technology, Inc. | Cross-profile coordination of energy consumption policies |
US8868247B2 (en) | 2011-04-29 | 2014-10-21 | Cisco Technology, Inc. | Cross-profile coordination of energy consumption policies |
US20130090770A1 (en) * | 2011-10-07 | 2013-04-11 | Hanwha Solution & Consulting Co., Ltd. | System and method for automatically controlling energy apparatus using energy modeling technique |
US10111308B2 (en) | 2011-12-07 | 2018-10-23 | Abl Ip Holding Llc | System for and method of commissioning lighting devices within a wireless network |
US9192019B2 (en) | 2011-12-07 | 2015-11-17 | Abl Ip Holding Llc | System for and method of commissioning lighting devices |
US9888548B2 (en) | 2011-12-07 | 2018-02-06 | Abl Ip Holding Llc | System for and method of commissioning lighting devices |
US8774976B2 (en) * | 2012-05-31 | 2014-07-08 | Sharp Laboratories Of America, Inc. | Method and system for reducing peak load charge on utility bill using target peak load and countermeasures |
US11899482B2 (en) | 2012-06-20 | 2024-02-13 | Causam Exchange, Inc. | System and method for actively managing electric power over an electric power grid and providing revenue grade data usable for settlement |
US10768653B2 (en) | 2012-06-20 | 2020-09-08 | Causam Holdings, LLC | System and methods for actively managing electric power over an electric power grid and providing revenue grade data usable for settlement |
US11262779B2 (en) | 2012-06-20 | 2022-03-01 | Causam Enterprises, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US12210367B1 (en) | 2012-06-20 | 2025-01-28 | Causam Enterprises, Inc. | System and methods for actively managing electric power over an electric power grid |
US10831223B2 (en) | 2012-06-20 | 2020-11-10 | Causam Energy, Inc. | System and method for actively managing electric power over an electric power grid and providing revenue grade data usable for settlement |
US11703902B2 (en) | 2012-06-20 | 2023-07-18 | Causam Enterprises, Inc. | System and methods for actively managing electric power over an electric power grid and providing revenue grade data usable for settlement |
US11228184B2 (en) | 2012-06-20 | 2022-01-18 | Causam Enterprises, Inc. | System and methods for actively managing electric power over an electric power grid |
US12124285B2 (en) | 2012-06-20 | 2024-10-22 | Causam Enterprises, Inc. | System and methods for actively managing electric power over an electric power grid |
US11703903B2 (en) | 2012-06-20 | 2023-07-18 | Causam Enterprises, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US10088859B2 (en) | 2012-06-20 | 2018-10-02 | Causam Energy, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US11899483B2 (en) | 2012-06-20 | 2024-02-13 | Causam Exchange, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US9207698B2 (en) | 2012-06-20 | 2015-12-08 | Causam Energy, Inc. | Method and apparatus for actively managing electric power over an electric power grid |
US10547178B2 (en) | 2012-06-20 | 2020-01-28 | Causam Energy, Inc. | System and methods for actively managing electric power over an electric power grid |
US9563215B2 (en) | 2012-07-14 | 2017-02-07 | Causam Energy, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US11782470B2 (en) | 2012-07-14 | 2023-10-10 | Causam Enterprises, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US12061491B2 (en) | 2012-07-14 | 2024-08-13 | Causam Exchange, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US11126213B2 (en) | 2012-07-14 | 2021-09-21 | Causam Enterprises, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US11625058B2 (en) | 2012-07-14 | 2023-04-11 | Causam Enterprises, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US12181904B2 (en) | 2012-07-14 | 2024-12-31 | Causam Enterprises, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US10429871B2 (en) | 2012-07-14 | 2019-10-01 | Causam Energy, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US10768654B2 (en) | 2012-07-14 | 2020-09-08 | Causam Energy, Inc. | Method and apparatus for actively managing electric power supply for an electric power grid |
US11501389B2 (en) | 2012-07-31 | 2022-11-15 | Causam Enterprises, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform |
US11316367B2 (en) | 2012-07-31 | 2022-04-26 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US10651682B2 (en) | 2012-07-31 | 2020-05-12 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US12013711B2 (en) | 2012-07-31 | 2024-06-18 | Causam Enterprises, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US10852760B2 (en) | 2012-07-31 | 2020-12-01 | Causam Enterprises, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US10861112B2 (en) | 2012-07-31 | 2020-12-08 | Causam Energy, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform |
US10938236B2 (en) | 2012-07-31 | 2021-03-02 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US12007802B2 (en) | 2012-07-31 | 2024-06-11 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US10985609B2 (en) | 2012-07-31 | 2021-04-20 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US9513648B2 (en) | 2012-07-31 | 2016-12-06 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US10998764B2 (en) | 2012-07-31 | 2021-05-04 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US10996706B2 (en) | 2012-07-31 | 2021-05-04 | Causam Enterprises, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US11782471B2 (en) | 2012-07-31 | 2023-10-10 | Causam Enterprises, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US10559976B2 (en) | 2012-07-31 | 2020-02-11 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US11774996B2 (en) | 2012-07-31 | 2023-10-03 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US11747849B2 (en) | 2012-07-31 | 2023-09-05 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US11095151B2 (en) | 2012-07-31 | 2021-08-17 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US9806563B2 (en) | 2012-07-31 | 2017-10-31 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US10523050B2 (en) | 2012-07-31 | 2019-12-31 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US11681317B2 (en) | 2012-07-31 | 2023-06-20 | Causam Enterprises, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US10310534B2 (en) | 2012-07-31 | 2019-06-04 | Causam Energy, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US11650613B2 (en) | 2012-07-31 | 2023-05-16 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US10320227B2 (en) | 2012-07-31 | 2019-06-11 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US10429872B2 (en) | 2012-07-31 | 2019-10-01 | Causam Energy, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US11561565B2 (en) | 2012-07-31 | 2023-01-24 | Causam Enterprises, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US11561564B2 (en) | 2012-07-31 | 2023-01-24 | Causam Enterprises, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US10381870B2 (en) | 2012-07-31 | 2019-08-13 | Causam Energy, Inc. | System, method, and apparatus for electric power grid and network management of grid elements |
US11307602B2 (en) | 2012-07-31 | 2022-04-19 | Causam Enterprises, Inc. | System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network |
US10521868B2 (en) | 2012-10-24 | 2019-12-31 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US10497074B2 (en) | 2012-10-24 | 2019-12-03 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US11816744B2 (en) | 2012-10-24 | 2023-11-14 | Causam Exchange, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US8849715B2 (en) * | 2012-10-24 | 2014-09-30 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US11803921B2 (en) | 2012-10-24 | 2023-10-31 | Causam Exchange, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US20140114844A1 (en) * | 2012-10-24 | 2014-04-24 | Joseph W. Forbes, Jr. | System, method, and apparatus for settlement for participation in an electric power grid |
US11288755B2 (en) | 2012-10-24 | 2022-03-29 | Causam Exchange, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US11270392B2 (en) | 2012-10-24 | 2022-03-08 | Causam Exchange, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US11263710B2 (en) | 2012-10-24 | 2022-03-01 | Causam Exchange, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US11823292B2 (en) | 2012-10-24 | 2023-11-21 | Causam Enterprises, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US11195239B2 (en) | 2012-10-24 | 2021-12-07 | Causam Enterprises, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US10497073B2 (en) | 2012-10-24 | 2019-12-03 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US11798103B2 (en) | 2012-10-24 | 2023-10-24 | Causam Exchange, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US10529037B2 (en) | 2012-10-24 | 2020-01-07 | Causam Energy, Inc. | System, method, and apparatus for settlement for participation in an electric power grid |
US9438041B2 (en) | 2012-12-19 | 2016-09-06 | Bosch Energy Storage Solutions Llc | System and method for energy distribution |
US9312698B2 (en) | 2012-12-19 | 2016-04-12 | Robert Bosch Gmbh | System and method for energy distribution |
US20200143491A1 (en) * | 2013-03-13 | 2020-05-07 | Johnson Controls Technology Company | Systems and methods for cascaded model predictive control |
US10635056B2 (en) * | 2013-03-15 | 2020-04-28 | Open Access Technology International, Inc. | Model and control virtual power plant performance |
US20140277808A1 (en) * | 2013-03-15 | 2014-09-18 | Open Access Technology International, Inc. | Use of Demand Response (DR) and Distributed Energy Resources (DER) to mitigate the impact of Variable Energy Resources (VER) in Power System Operation |
US9098876B2 (en) | 2013-05-06 | 2015-08-04 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
US20160180474A1 (en) * | 2013-05-06 | 2016-06-23 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets using an engineering-based energy asset model |
US9171276B2 (en) | 2013-05-06 | 2015-10-27 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets using an engineering-based model |
US10152683B2 (en) * | 2014-01-22 | 2018-12-11 | Fujistu Limited | Demand response event assessment |
US20150206083A1 (en) * | 2014-01-22 | 2015-07-23 | Fujitsu Limited | Demand response event assessment |
US10948937B2 (en) * | 2015-09-21 | 2021-03-16 | Peak Power, Inc. | Systems and methods for creating load peaks and valleys |
US11846960B2 (en) | 2015-09-21 | 2023-12-19 | Peak Power, Inc. | Systems and methods for creating load peaks and valleys |
US11004160B2 (en) | 2015-09-23 | 2021-05-11 | Causam Enterprises, Inc. | Systems and methods for advanced energy network |
US10230241B1 (en) * | 2015-09-30 | 2019-03-12 | The United States Of America, As Represented By The Secretary Of The Navy | Self-optimizing hybrid power system |
US20230298113A1 (en) * | 2016-10-28 | 2023-09-21 | Chicago Mercantile Exchange Inc. | Futures margin modeling system having seasonality detection |
US11704751B2 (en) * | 2016-10-28 | 2023-07-18 | Chicago Mercantile Exchange Inc. | Futures margin modeling system having seasonality detection |
US20220270188A1 (en) * | 2016-10-28 | 2022-08-25 | Chicago Mercantile Exchange Inc. | Futures margin modeling system having seasonality detection |
US12141881B2 (en) * | 2016-10-28 | 2024-11-12 | Chicago Mercantile Exchange Inc. | Futures margin modeling system having seasonality detection |
US11367152B2 (en) * | 2016-10-28 | 2022-06-21 | Chicago Mercantile Exchange Inc. | Futures margin modeling system having seasonality detection |
US11131972B2 (en) | 2017-01-12 | 2021-09-28 | Trane International Inc. | Performance optimization in a building automation system |
US10409305B2 (en) | 2017-01-29 | 2019-09-10 | Trane International Inc. | HVAC system configuration and zone management |
US11875371B1 (en) | 2017-04-24 | 2024-01-16 | Skyline Products, Inc. | Price optimization system |
CN107679018A (en) * | 2017-08-16 | 2018-02-09 | 浙江浙能富兴燃料有限公司 | A kind of poor computational methods of coal-burning power plant limit coal unit price |
US11068623B2 (en) | 2019-02-04 | 2021-07-20 | Cove Tool, Inc. | Automated building design guidance software that optimizes cost, energy, daylight, glare, and thermal comfort |
CN111625947A (en) * | 2020-05-20 | 2020-09-04 | 国网能源研究院有限公司 | Distributed energy development scale prediction method, equipment and medium |
US11909207B2 (en) | 2021-03-10 | 2024-02-20 | Abb Schweiz Ag | Hierarchical method for prediction of loads with high variance |
CN114388002A (en) * | 2021-12-07 | 2022-04-22 | 孙斌 | Building economy and finance measuring and calculating system based on Internet of things |
Also Published As
Publication number | Publication date |
---|---|
US20090254225A1 (en) | 2009-10-08 |
US8880231B2 (en) | 2014-11-04 |
US20130238139A1 (en) | 2013-09-12 |
US8428785B2 (en) | 2013-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8880231B2 (en) | Enterprise energy automation | |
Mansour-lakouraj et al. | Comprehensive analysis of risk-based energy management for dependent micro-grid under normal and emergency operations | |
Qdr | Benefits of demand response in electricity markets and recommendations for achieving them | |
Jin et al. | Impact of demand response on thermal generation investment with high wind penetration | |
US20080177678A1 (en) | Method of communicating between a utility and its customer locations | |
Hirst et al. | Retail-load participation in competitive wholesale electricity markets | |
Hummon et al. | Grid integration of aggregated demand response, part 2: modeling demand response in a production cost model | |
Cappers | Mass market demand response and variable generation integration issues: A scoping study | |
US7430459B1 (en) | System and method to control distributed power generation network | |
Ma et al. | Demand response and energy storage integration study | |
Mill et al. | Planning for a distributed disruption: innovative practices for incorporating distributed solar into utility planning | |
US20030220864A1 (en) | Apparatus for market dispatch for resolving energy imbalance requirements in real-time | |
US20030229576A1 (en) | Method and apparatus for resolving energy imbalance requirements in real-time | |
Black | Integrating demand into the US electric power system: technical, economic, and regulatory frameworks for responsive load | |
Strbac et al. | Electricity market design and renewables integration in developing countries | |
Fisher et al. | The economics of commercial demand response for spinning reserve | |
Aoun et al. | Demand-side management | |
Nguyen | Demand response for domestic and small business consumers: A new challenge | |
Hledik et al. | The economic potential for energy storage in Nevada | |
Ros et al. | Economic framework for compensating distributed energy resources: Theory and practice | |
US20030216994A1 (en) | Historical database system for resolving energy imbalance requirements in real-time | |
Ilic et al. | Electric power systems operation by decision and control. The case revisited | |
Zareipour | Price forecasting and optimal operation of wholesale customers in a competitive electricity market | |
Hirst et al. | Bulk-power basics: reliability and commerce | |
Edmunds et al. | Ancillary service revenue potential for geothermal generators in California |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: ENERGYCONNECT, INC., CALIFORNIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BOUCHER, RODNEY M.;AMEDURI, GENE J.;CUSHING, VINCENT J., JR.;REEL/FRAME:016488/0764;SIGNING DATES FROM 20050406 TO 20050415 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |
|
AS | Assignment |
Owner name: JOHNSON CONTROLS TECHNOLOGY COMPANY, MICHIGAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:ENERGYCONNECT, INC.;REEL/FRAME:038232/0284 Effective date: 20160408 |