US20020179301A1 - Method and apparatus for placing and interrogating downhole sensors - Google Patents
Method and apparatus for placing and interrogating downhole sensors Download PDFInfo
- Publication number
- US20020179301A1 US20020179301A1 US10/178,188 US17818802A US2002179301A1 US 20020179301 A1 US20020179301 A1 US 20020179301A1 US 17818802 A US17818802 A US 17818802A US 2002179301 A1 US2002179301 A1 US 2002179301A1
- Authority
- US
- United States
- Prior art keywords
- recited
- formation
- wellbore
- placing
- sensor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/01—Devices for supporting measuring instruments on drill bits, pipes, rods or wirelines; Protecting measuring instruments in boreholes against heat, shock, pressure or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
- E21B47/138—Devices entrained in the flow of well-bore fluid for transmitting data, control or actuation signals
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
- E21B7/061—Deflecting the direction of boreholes the tool shaft advancing relative to a guide, e.g. a curved tube or a whipstock
Definitions
- the present invention relates to a method and apparatus for placing sensors downhole in a well to monitor relevant formation characteristics.
- the sensors can be flowed into the formation in the cement, or other suitable material, used to case the well.
- the sensors can be physically bored into the formation with a device described herein.
- the present invention provides a method and system that may be used to passively monitor cement integrity and reservoir/formation parameters near the wellbore at all depths and orientations outside a wellbore. These measurements may be taken without compromising the casing, cement or any other treatment outside or inside the casing. In addition, sensors may be deployed in many more locations because of the non-intrusive nature of reading the sensors once they are in place.
- sensors are “pumped” into place by placing them into a suspension in the cement slurry at the time a well casing is being cemented.
- the sensors are either battery operated, or of a type where external excitation, (EMF, acoustic, RF etc.) may be applied to power and operate the sensor, which will send a signal conveying the desired information.
- EMF external excitation
- the sensor may then be energized and interrogated using a separate piece of wellbore deployed equipment whenever it is desired to monitor cement or formation conditions.
- This wellbore deployed equipment could be, for example, a wireline tool. Having sensors placed in this way allows many different types of measurements to be taken from the downhole environment.
- Sensors placed close to the wellbore can be used to monitor the well integrity by disclosing information about cement condition, casing wear/condition etc.
- Sensors placed closer to the cement/wellbore interface provide reservoir or rock property measurements, which may be used in reservoir analysis.
- the sensors are placed into the formation at or outside the wellbore and may be interrogated whenever it is desired to monitor well or formation conditions.
- One method of placing the sensors into the formation is to use technology similar to side bore coring tools which remove samples in a direction that is perpendicular to the wellbore.
- Another method involves placing the sensors into the gravel slurry used for gravel packing and frackpacking operations thus allowing the sensors to migrate into the formation with the fracpack.
- non-intrusive downhole measurements may be taken from numerous locations in the downhole environment.
- the integrity of the cement job can be closely monitored for initial quality, and degradation with time.
- many transducers may be placed into the well with relatively low deployment cost.
- very accurate measurements can be taken because of transducer placement outside the wellbore.
- very long service life of transducers is achieved because power is supplied by a wellbore device capable of supplying transducer excitation power.
- fluid movement and pressure behind the casing may be measured by comparing the many available downhole measurements.
- FIG. 1 shows a flow chart for placing sensors within the cemented casing of a wellbore.
- FIG. 2 depicts a wellbore with sensors located within the cemented casing.
- FIG. 3 shows a flow chart for placing sensors into the formation.
- FIG. 4 depicts a wellbore and formation with sensors located in the formation.
- FIG. 5 shows a flow chart for placing a sensor into a formation by drilling laterally away from a wellbore.
- FIGS. 6 A- 6 C depict a tool for drilling away from a wellbore and placing a sensor into a formation.
- FIG. 1 shows a flowchart of a preferred embodiment of a method for placing sensors into a wellbore casing.
- FIG. 2 illustrates a cross-sectional view of a wellbore and casing with sensors placed therein.
- a wellbore 240 is drilled into the earth using conventional methods and tools well known to those skilled in the art (step 110 ). Sensors 210 are placed into a cement slurry (step 120 ). A casing is placed into wellbore 240 and the cement slurry containing sensors 210 is pumped into wellbore 240 to provide a cemented casing 240 (step 130 ). A wellbore device (not shown in FIG. 2) is then placed into wellbore 240 (step 140 ). Sensors 210 are then interrogated with the well bore device (step 150 ).
- the wellbore device could be for example a wireline tool or a drill pipe conveyed system.
- Sensors 210 will typically be transducers which are either battery operated, or of a type where external excitation (EMF, acoustic, RF, etc.) may be applied to power and operate the transducer, which will send a signal conveying the desired information.
- Sensors 210 may be interrogated whenever desired to monitor cement or formation conditions.
- Sensors 210 may be of many different types such that many different types of conditions may be monitored. Such monitored conditions include pressure, temperature, resistivity, rock properties, and formation properties. Other monitored conditions include, but are not limited to, paramagnetic properties, magnetic fields, magnetic flux leak, pulse eddy current, and polar spin. Looking at different readings taken at different locations will allow directional properties such as permeability to be examined.
- Sensors 210 placed close to the wellbore can be used to monitor the well integrity by disclosing information about cement condition, casing wear/condition etc. Sensors 210 placed closer to the cement/wellbore interface provide reservoir or rock property measurements which may be used in reservoir analysis.
- Non-intrusive downhole measurements may be taken from numerous locations in the downhole environment.
- the integrity, such as micro-annulus, of the cement job can be closely monitored for initial quality and degradation with time.
- Many sensors may be placed into the well with relatively low deployment cost.
- Very accurate measurements can be taken because of sensor placement outside of the wellbore.
- Very long service life of the sensors because the power is supplied by a wellbore device capable of supplying transducer excitation power. Fluid movement and pressure behind the casing may be measured by comparing the many available downhole measurements.
- FIG. 3 depicts a flow chart for a presently preferred method of placing sensors into a formation.
- FIG. 4 shows a cross-sectional view of a well bore and formation with sensors located within the formation.
- a wellbore 440 is drilled using conventional techniques and devices well known to one skilled in the art (step 310 ). Formation samples are removed from the formations 420 , 425 , and 430 using for example, a side bore coring tool, in a direction perpendicular to wellbore 440 (step 320 ). The maximum distance bored out with standard coring tools is typically around 4 feet from the wellbore 440 .
- a side bore coring tool may be found in U.S. Pat. No. 5,209,309 issued to Wilson which is hereby incorporated by reference.
- Sensors 410 are then placed into the formations 420 , 425 , and 430 (step 330 ). A sensor interrogating device is then placed into the wellbore (step 340 ). Sensors 410 are then interrogated whenever it is desired to gather some information that sensors 410 can gather (step 350 ).
- the formations 420 , 425 , and 430 are fractured and packed with gravel (“fracpacking”).
- Sensors 410 are placed in the gravel slurry prior to packing the fracture.
- sensors 410 are placed outside the wellbore and into the formation.
- perforations 460 can be made in the wellbore 440 casing and the sensors 410 allowed to migrate outside the wellbore 440 with the gravel slurry.
- the gravel slurry and fracpacking will be described in more detail below.
- sensors 410 will typically be transducers which are either battery operated, or of a type where external excitation (EMF, acoustic, RF, etc.) may be applied to power and operate the transducer, which will send a signal conveying the desired information.
- the sensors 410 may be powered using fuel cell or power cell.
- the fuel cell or power cell may be part of the sensors 410 or built as an addition. Formation movement, noise or fluid flow (i.e. effluent flow) could be used to charge or recharge the cell power source.
- Sensors 410 may be interrogated whenever desired to monitor cement or formation conditions. Sensors 410 may be of many different types such that many different types of conditions may be monitored.
- Such monitored conditions include pressure, temperature, resistivity, rock properties, and formation properties.
- Other monitored conditions include, but are not limited to, paramagnetic properties, magnetic fields, magnetic flux leak, pulse eddy current, and polar spin.
- Sensors 410 placed close to the wellbore 440 can be used to monitor the well integrity by disclosing information about cement condition, casing wear/condition etc. Sensors 410 placed further into a formation or other surrounding substrate will provide very accurate reservoir or rock property measurements.
- sensors 210 and 410 may be calibrated before placement and may be recalibrated after placement in the formation or well casing. For example, a radio or acoustic signal may be sent to each or sensors 210 or 410 , after placement, initiating a calibration response in each of sensors 210 or 410 .
- Non-intrusive downhole measurements may be taken from numerous locations in the downhole environment. Very accurate measurements can be taken because of optimal transducer placement outside the wellbore Very long service life of transducers because power is supplied by a wellbore device capable of supplying transducer excitation.
- Direction formation properties may be measured by comparing the many available downhole measurements.
- the particulate material utilized in accordance with the present invention to carry sensors 410 into formations 420 , 425 , and 430 is preferably graded sand which is sized based on a knowledge of the size of the formation fines and sand in an unconsolidated subterranean zone to prevent the formation fines and sand from passing through the gravel pack.
- the graded sand generally has a particle size in the range of from about 10 to about 70 mesh, U.S. Sieve Series. Preferred sand particle size distribution ranges are one or more of 10-20 mesh, 20-40 mesh, 40-60 mesh or 50-70 mesh, depending on the particle size and distribution of the formation fines and sand to be screened out by the graded sand.
- the particulate material carrier liquid utilized which can also be used to fracture the unconsolidated subterranean zone if desired, can be any of the various viscous carrier liquids or fracturing fluids utilized heretofore including gelled water, oil base liquids, foams or emulsions.
- the foams utilized have generally been comprised of water based liquids containing one or more foaming agents famed with a gas such as nitrogen.
- the emulsions have been formed with two or more immiscible liquids.
- a particularly useful emulsion is comprised of a water-based liquid and a liquified normally gaseous fluid such as carbon dioxide. Upon pressure release, the liquified gaseous fluid vaporizes and rapidly flows out of the formation.
- the most common carrier liquid/fracturing fluid utilized heretofore which is also preferred for use in accordance with this invention is comprised of an aqueous liquid such as fresh water or salt water combined with a gelling agent for increasing the viscosity of the liquid.
- aqueous liquid such as fresh water or salt water
- gelling agent for increasing the viscosity of the liquid.
- the increased viscosity reduces fluid loss and allows the carrier liquid to transport significant concentrations of particulate material into the subterranean zone to be completed.
- a variety of gelling agents have been utilized including hydratable polymers which contain one or more functional groups such as hydroxyl, cis-hydoxyl, carboxyl, sulfate, sulfonate, amino or amide.
- Particularly useful polymers are polysaccharides and derivatives thereof which contain one or more of the monosaccharides units galactose, mannose, glucoside, glucose, xylose, arabinose, fructose, glucuronic acid or pyranosyl sulfate.
- Various natural hydratable polymers contain the foregoing functional groups and units including guar gum and derivatives thereof, cellulose and derivatives thereof, and the like. Hydratable synthetic polymers and co-polymers which contain the above mentioned functional groups can also be utilized including polyacrylate, polymeythlacrylate, polycrylamide, and the like.
- Particularly preferred hydratable polymers which yield high viscosities upon hydration at relatively low concentrations, are guar gum and guar derivatives such as hydroxypropylguar and carboxymethylguar and cellulose derivatives such as hydroxyethylcellulose, carboxymethylcellulose and the like.
- the viscosities of aqueous polymer solutions of the types described above can be increased by combining cross-linking agents with the polymer solutions.
- cross-linking agents which can be utilized are multivalent metal salts or compounds which are capable of releasing such metal ions in an aqueous solution.
- the above described gelled or gelled and cross-linked carrier liquids/fracturing fluids can also include gel breakers such as those of the enzyme type, the oxidizing type or the acid buffer type which are well known to those skilled in the art.
- the gel breakers cause the viscous carrier liquids/fracturing fluids to revert to thin fluids that can be produced back to the surface after they have been utilized.
- the hydraulic fracturing process generally involves pumping a viscous liquid containing suspended particulate material into the formation or zone at a rate and pressure whereby fractures are created therein.
- the continued pumping of the fracturing fluid extends the fractures in the zone and carries the particulate material into the fractures.
- the particulate material is deposited in the fractures and the fractures are prevented from closing by the presence of the particulate material therein.
- the subterranean zone to be completed can be fractured prior to or during the injection of the particulate material into the zone, i.e., the pumping of the carrier liquid containing the particulate material through the slotted liner into the zone.
- the particulate material can be pumped into the fractures as well as into the perforations and into the annuli between the sand screen and shroud and between the shroud and the well bore.
- sensors are placed into a formation by drilling laterally away from a borehole.
- FIG. 5 shows a flow chart of this method.
- drilling laterally away from a borehole means in a direction greater than zero degrees away from the general longitudinal (as opposed to radial) direction of the borehole at that particular location and, thus, can include drilling up or down away from the borehole when the longitudinal direction of the borehole is horizontal with respect to the earth's surface.
- drilling laterally away from a borehole mean normal or perpendicular to the surface of the wellbore.
- a borehole 602 is drilled using conventional methods well known to one skilled in the art (step 510 ).
- a sensor placement device 600 is then placed into the borehole 602 (step 515 ).
- Sensor placement device 600 consists of tubing 650 , a fluid diverter 634 , a control line 692 , outer tubing 636 , pistons 630 and 631 , a sensor 622 , a nozzle 632 , a deflector 610 , and a wire 624 .
- Tubing 650 is lowered into the borehole 602 from the earth's surface 693 .
- Tubing 650 may be coiled tubing of a type well known to one skilled in the art.
- fluid diverters 634 Attached to tubing 650 are fluid diverters 634 .
- An opening 652 allows fluid to flow from tubing 650 through fluid diverters 634 and into control line 692 which is attached to fluid diverters 634 by Swagelok fittings.
- At the end of control tube 692 are two pistons 630 and 631 .
- Pistons 630 and 631 provide an offset area for pressure to work against so the outer tube 636 (also called a cylinder) will stroke downward upon application of pressure. This is the placement means for sensor 622 .
- Pistons 630 and 631 are rigidly attached to fluid or flow diverters 634 .
- pistons 630 and 631 may be a smaller size of control line than outer tubing 636 .
- Outer tubing 636 is pushed onto pistons 630 and 631 and remains in a retracted position until pressure is applied. Upon application of pressure, nozzle 632 provides a jetting action for the fluid, which effectively cuts through the formation. As nozzle 632 erodes the formation material, the outer tubing 636 is allowed to move downwards.
- Sensor 622 is attached to the inside of outer tubing 636 by a threaded carrier sub that has an open ID to allow fluid to bypass to nozzle 632 .
- Outer tube 636 has a nozzle 632 at one end.
- Sensor 622 is attached to outer tubing 636 , either by integration into the housing wall or surface mounting, and is connected to wire 624 that connects sensor 622 to a surface electronics 690 .
- Surface electronics 690 may include a recorder to record the data received from sensor 622 for later processing possibly at a remote site and may also include processing equipment to process the data received from sensor 622 as it is received.
- surface electronics 690 may be attached to display devices such as a cathode ray tube (CRT) or similar computer monitor device and/or to a printer.
- CTR cathode ray tube
- the fluid pressure inside tubing 650 is increased (step 520 ).
- the pressure may be increase by, for example, a pump on the surface is connected to the coiled tubing 650 , which provides the high pressure source required to operate the drilling operation or by a subsurface powered pump.
- the increased fluid pressure causes fluid to flow through opening 652 into fluid diverter 634 which diverts fluid into control line 692 causing sensor pods 680 to extend (step 525 ).
- Water may be used as the working fluid unless this will adversely affect the formation sandface. In such event, a conventional mud may be used.
- the fluid may also be a treated liquid comparable with the reservoir to minimize formation damage and may possibly be enhanced with friction reducing polymers and abrasives to enhance jet drilling efficiency.
- the fluid flows from control line 692 into outer tubing 636 .
- the fluid exits outer tubing 636 through nozzle 632 .
- the fluid exiting through nozzle 632 cuts through the surrounding rock, thus drilling the sensor pod 680 into place as housing 636 continues to extend exerting pressure on sensor pod 680 (step 530 ).
- Deflector 610 causes sensor pod 680 to be deflected outward into the formation 604 .
- the surface 612 of deflector 610 can have an angular 611 displacement away from the surface of tubing 650 of just greater than zero degrees to almost 90 degrees depending on the direction an operator wishes to place sensor pod 680 .
- the greater the angular 611 displacement the more sensor pod 680 will be deflected away from tubing 650 such that an angular 611 displacement of almost 90 degrees will result in the sensor pod being deflected in a direction almost perpendicular to the surface of tubing 650 .
- Deflector 610 may be constructed from any suitably hard material that will resist erosion.
- alloy stainless steel is an appropriate and suitable material from which to construct deflector 610 .
- deflector 610 is welded to the base pipe and deflector 610 has a port drilled through it to allow fluid passage.
- control line 692 may be retracted out leaving sensor pod 680 in the formation (step 535 ). By leaving control line 692 in place rather than removing it after sensor placement, wire 624 may be better protected. Sensor 622 remains connected to surface electronics 690 via wire 624 .
- Wire 624 can be an electric wire capable of carrying electronic signals or it can be a fiber optic cable.
- sensor 622 may be recalibrated after placement of sensor 622 downhole in the formation. Such calibration may be accomplished, for example, by means of transmissions via wire 624 or may be through radio and/or acoustic signals.
- the present invention has been described primarily with reference to interrogating the sensors with a wireline tool, other methods of interrogating the sensor may be utilized as well without departing from the scope and spirit of the present invention.
- the sensors could be interrogated by something built into the completion or by a reflected signal that could power up and interrogate the sensor or sensors.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
- Earth Drilling (AREA)
Abstract
A method and system to passively monitor cement integrity and reservoir/formation parameters near the wellbore at all depths and orientations outside a wellbore. Different types (pressure, temperature, resistivity, rock property, formation property etc.) of sensors are “pumped” into place by placing them into a suspension in the cement slurry at the time a well casing is being cemented, by placing them in gravel pack used in frackpacking, or by a deflected drilling tool. The sensors are either battery operated, or of a type where external excitation, (EMF, acoustic, RF etc.) may be applied to power and operate the sensor, which will send a signal conveying the desired information. The sensor is then be energized and interrogated using a separate piece of wellbore deployed equipment whenever it is desired to monitor cement or formation conditions. This wellbore deployed equipment could be, for example, a wireline tool.
Description
- 1. Technical Field
- The present invention relates to a method and apparatus for placing sensors downhole in a well to monitor relevant formation characteristics. Specifically, the sensors can be flowed into the formation in the cement, or other suitable material, used to case the well. Alternatively, the sensors can be physically bored into the formation with a device described herein.
- 2. Description of the Related Art
- Understanding an oil-bearing formation requires accurate knowledge of many conditions, such as critical rock and formation parameters at various points in the zones or formations that the oil bearing formation encompasses. Fluid pressure in the formation, its temperature, the rock stress, formation orientation and flow rates are a few examples of measurements taken within the formation which are useful in reservoir analysis. Having these formation/rock measurements available external to the immediate wellbore in wells within a producing field would facilitate the determination of such formation parameters such as vertical and horizontal permeability, flow regimes outside the wellbores within the formations, relative permeability, water breakthrough condensate banking, and gas breakthrough. Determinations could also be made concerning formation depletion, injection program effectiveness, and the results of fracturing operations, including rock stresses and changes in formation orientation, during well operations.
- In addition to understanding oil bearing formations, the condition of the material used to set casing in a well is of critical interest in monitoring the integrity of a well completion. While cement is commonly used to set casing, other materials such as resins and polymers could be used. So while the term cement is used in this description, it is meant to encompass other suitable materials that might be used now or in the future to set casing. Pressure, temperature and stress, are a few examples of measurements taken within the cement that might be useful in determining the condition of the cement in a well. Various types of transducers placed near the cement/wellbore interface could be used to monitor the condition of the rock or formations outside the wellbore. Having these formation/rock measurements available external to the immediate wellbore in wells within a producing field would facilitate the determination of such formation parameters such as vertical and horizontal permeability, flow regimes outside the wellbores within the formations, relative permeability, potential fines migration, water breakthrough, and gas breakthrough. Determinations could also be made concerning formation depletion, fines migration, injection program effectiveness, and the results of fracturing operations, including rock stresses and changes in formation orientation, during well operations.
- Historically, reservoir analysis has been limited to the use of formation measurements taken within the wellbores. Measurements taken within the wellbore are heavily influenced by wellbore effects, and cannot be used to determine some reservoir parameters. Well conditions such as the integrity of the cement job over time, pressure behind the casing, or fluid movement behind the casing cannot be monitored using the wellbore measurements.
- Therefore, it is desirable to have a method and system that may be used to passively monitor reservoir/formation parameters at all depths and orientations outside a wellbore as well as having a method and system to passively monitor cement integrity. It is further desirable to have a method and system to take these measurements without compromising the casing, cement or any other treatment outside or inside the casing.
- The present invention provides a method and system that may be used to passively monitor cement integrity and reservoir/formation parameters near the wellbore at all depths and orientations outside a wellbore. These measurements may be taken without compromising the casing, cement or any other treatment outside or inside the casing. In addition, sensors may be deployed in many more locations because of the non-intrusive nature of reading the sensors once they are in place.
- In one embodiment, different types (pressure, temperature, resistivity, rock property, formation property etc.) of sensors are “pumped” into place by placing them into a suspension in the cement slurry at the time a well casing is being cemented. The sensors are either battery operated, or of a type where external excitation, (EMF, acoustic, RF etc.) may be applied to power and operate the sensor, which will send a signal conveying the desired information. The sensor may then be energized and interrogated using a separate piece of wellbore deployed equipment whenever it is desired to monitor cement or formation conditions. This wellbore deployed equipment could be, for example, a wireline tool. Having sensors placed in this way allows many different types of measurements to be taken from the downhole environment. Looking at readings taken at different locations will allow directional properties such as permeability to be examined. Sensors placed close to the wellbore can be used to monitor the well integrity by disclosing information about cement condition, casing wear/condition etc. Sensors placed closer to the cement/wellbore interface provide reservoir or rock property measurements, which may be used in reservoir analysis.
- In another embodiment, the sensors are placed into the formation at or outside the wellbore and may be interrogated whenever it is desired to monitor well or formation conditions. One method of placing the sensors into the formation is to use technology similar to side bore coring tools which remove samples in a direction that is perpendicular to the wellbore. Another method involves placing the sensors into the gravel slurry used for gravel packing and frackpacking operations thus allowing the sensors to migrate into the formation with the fracpack.
- There are many advantages of the proposed system. First, non-intrusive downhole measurements may be taken from numerous locations in the downhole environment. Next, the integrity of the cement job can be closely monitored for initial quality, and degradation with time. Further, many transducers may be placed into the well with relatively low deployment cost. Also, very accurate measurements can be taken because of transducer placement outside the wellbore. Also, very long service life of transducers is achieved because power is supplied by a wellbore device capable of supplying transducer excitation power. Finally, fluid movement and pressure behind the casing may be measured by comparing the many available downhole measurements.
- The novel features believed characteristic of the invention are set forth in the appended claims. The invention itself, however, as well as a preferred mode of use, further objectives and advantages thereof, will best be understood by reference to the following detailed description of an illustrative embodiment when read in conjunction with the accompanying drawings, wherein:
- FIG. 1 shows a flow chart for placing sensors within the cemented casing of a wellbore.
- FIG. 2 depicts a wellbore with sensors located within the cemented casing.
- FIG. 3 shows a flow chart for placing sensors into the formation.
- FIG. 4 depicts a wellbore and formation with sensors located in the formation.
- FIG. 5 shows a flow chart for placing a sensor into a formation by drilling laterally away from a wellbore.
- FIGS.6A-6C depict a tool for drilling away from a wellbore and placing a sensor into a formation.
- A presently preferred embodiment of the present invention for placing sensors into a wellbore casing will now be described with reference to FIGS. 1 and 2. FIG. 1 shows a flowchart of a preferred embodiment of a method for placing sensors into a wellbore casing. FIG. 2 illustrates a cross-sectional view of a wellbore and casing with sensors placed therein.
- A
wellbore 240 is drilled into the earth using conventional methods and tools well known to those skilled in the art (step 110). Sensors 210 are placed into a cement slurry (step 120). A casing is placed intowellbore 240 and the cement slurry containing sensors 210 is pumped intowellbore 240 to provide a cemented casing 240 (step 130). A wellbore device (not shown in FIG. 2) is then placed into wellbore 240 (step 140). Sensors 210 are then interrogated with the well bore device (step 150). The wellbore device could be for example a wireline tool or a drill pipe conveyed system. Sensors 210 will typically be transducers which are either battery operated, or of a type where external excitation (EMF, acoustic, RF, etc.) may be applied to power and operate the transducer, which will send a signal conveying the desired information. Sensors 210 may be interrogated whenever desired to monitor cement or formation conditions. Sensors 210 may be of many different types such that many different types of conditions may be monitored. Such monitored conditions include pressure, temperature, resistivity, rock properties, and formation properties. Other monitored conditions include, but are not limited to, paramagnetic properties, magnetic fields, magnetic flux leak, pulse eddy current, and polar spin. Looking at different readings taken at different locations will allow directional properties such as permeability to be examined. Sensors 210 placed close to the wellbore can be used to monitor the well integrity by disclosing information about cement condition, casing wear/condition etc. Sensors 210 placed closer to the cement/wellbore interface provide reservoir or rock property measurements which may be used in reservoir analysis. - There are many advantages to placing sensors within the cemented well casing. Non-intrusive downhole measurements may be taken from numerous locations in the downhole environment. The integrity, such as micro-annulus, of the cement job can be closely monitored for initial quality and degradation with time. Many sensors may be placed into the well with relatively low deployment cost. Very accurate measurements can be taken because of sensor placement outside of the wellbore. Very long service life of the sensors because the power is supplied by a wellbore device capable of supplying transducer excitation power. Fluid movement and pressure behind the casing may be measured by comparing the many available downhole measurements.
- Turning now to FIGS. 3 and 4, a method of placing sensors into a formation will be described. FIG. 3 depicts a flow chart for a presently preferred method of placing sensors into a formation. FIG. 4 shows a cross-sectional view of a well bore and formation with sensors located within the formation.
- A
wellbore 440 is drilled using conventional techniques and devices well known to one skilled in the art (step 310). Formation samples are removed from theformations wellbore 440. One example of a side bore coring tool may be found in U.S. Pat. No. 5,209,309 issued to Wilson which is hereby incorporated by reference.Sensors 410 are then placed into theformations Sensors 410 are then interrogated whenever it is desired to gather some information thatsensors 410 can gather (step 350). - In one variation of this method, rather than removing formation samples with a side bore coring tool, the
formations Sensors 410 are placed in the gravel slurry prior to packing the fracture. Thus,sensors 410 are placed outside the wellbore and into the formation. Alternatively,perforations 460 can be made in thewellbore 440 casing and thesensors 410 allowed to migrate outside thewellbore 440 with the gravel slurry. The gravel slurry and fracpacking will be described in more detail below. - As with sensors210,
sensors 410 will typically be transducers which are either battery operated, or of a type where external excitation (EMF, acoustic, RF, etc.) may be applied to power and operate the transducer, which will send a signal conveying the desired information. Alternatively, thesensors 410 may be powered using fuel cell or power cell. The fuel cell or power cell may be part of thesensors 410 or built as an addition. Formation movement, noise or fluid flow (i.e. effluent flow) could be used to charge or recharge the cell power source.Sensors 410 may be interrogated whenever desired to monitor cement or formation conditions.Sensors 410 may be of many different types such that many different types of conditions may be monitored. Such monitored conditions include pressure, temperature, resistivity, rock properties, and formation properties. Other monitored conditions include, but are not limited to, paramagnetic properties, magnetic fields, magnetic flux leak, pulse eddy current, and polar spin.Sensors 410 placed close to thewellbore 440 can be used to monitor the well integrity by disclosing information about cement condition, casing wear/condition etc.Sensors 410 placed further into a formation or other surrounding substrate will provide very accurate reservoir or rock property measurements. - It should be noted that
sensors 210 and 410 may be calibrated before placement and may be recalibrated after placement in the formation or well casing. For example, a radio or acoustic signal may be sent to each orsensors 210 or 410, after placement, initiating a calibration response in each ofsensors 210 or 410. - There are many advantages to placing sensors outside the wellbore. Non-intrusive downhole measurements may be taken from numerous locations in the downhole environment. Very accurate measurements can be taken because of optimal transducer placement outside the wellbore Very long service life of transducers because power is supplied by a wellbore device capable of supplying transducer excitation. Direction formation properties may be measured by comparing the many available downhole measurements.
- The particulate material utilized in accordance with the present invention to carry
sensors 410 intoformations - The particulate material carrier liquid utilized, which can also be used to fracture the unconsolidated subterranean zone if desired, can be any of the various viscous carrier liquids or fracturing fluids utilized heretofore including gelled water, oil base liquids, foams or emulsions. The foams utilized have generally been comprised of water based liquids containing one or more foaming agents famed with a gas such as nitrogen. The emulsions have been formed with two or more immiscible liquids. A particularly useful emulsion is comprised of a water-based liquid and a liquified normally gaseous fluid such as carbon dioxide. Upon pressure release, the liquified gaseous fluid vaporizes and rapidly flows out of the formation.
- The most common carrier liquid/fracturing fluid utilized heretofore which is also preferred for use in accordance with this invention is comprised of an aqueous liquid such as fresh water or salt water combined with a gelling agent for increasing the viscosity of the liquid. The increased viscosity reduces fluid loss and allows the carrier liquid to transport significant concentrations of particulate material into the subterranean zone to be completed.
- A variety of gelling agents have been utilized including hydratable polymers which contain one or more functional groups such as hydroxyl, cis-hydoxyl, carboxyl, sulfate, sulfonate, amino or amide. Particularly useful polymers are polysaccharides and derivatives thereof which contain one or more of the monosaccharides units galactose, mannose, glucoside, glucose, xylose, arabinose, fructose, glucuronic acid or pyranosyl sulfate. Various natural hydratable polymers contain the foregoing functional groups and units including guar gum and derivatives thereof, cellulose and derivatives thereof, and the like. Hydratable synthetic polymers and co-polymers which contain the above mentioned functional groups can also be utilized including polyacrylate, polymeythlacrylate, polycrylamide, and the like.
- Particularly preferred hydratable polymers, which yield high viscosities upon hydration at relatively low concentrations, are guar gum and guar derivatives such as hydroxypropylguar and carboxymethylguar and cellulose derivatives such as hydroxyethylcellulose, carboxymethylcellulose and the like.
- The viscosities of aqueous polymer solutions of the types described above can be increased by combining cross-linking agents with the polymer solutions. Examples of cross-linking agents which can be utilized are multivalent metal salts or compounds which are capable of releasing such metal ions in an aqueous solution.
- The above described gelled or gelled and cross-linked carrier liquids/fracturing fluids can also include gel breakers such as those of the enzyme type, the oxidizing type or the acid buffer type which are well known to those skilled in the art. The gel breakers cause the viscous carrier liquids/fracturing fluids to revert to thin fluids that can be produced back to the surface after they have been utilized.
- The creation of one or more fractures in the unconsolidated subterranean zone to be completed in order to stimulate the production of hydrocarbons therefrom is well known to those skilled in the art. The hydraulic fracturing process generally involves pumping a viscous liquid containing suspended particulate material into the formation or zone at a rate and pressure whereby fractures are created therein. The continued pumping of the fracturing fluid extends the fractures in the zone and carries the particulate material into the fractures. Upon the reduction of the flow of the fracturing fluid and the reduction of pressure exerted on the zone, the particulate material is deposited in the fractures and the fractures are prevented from closing by the presence of the particulate material therein.
- As mentioned, the subterranean zone to be completed can be fractured prior to or during the injection of the particulate material into the zone, i.e., the pumping of the carrier liquid containing the particulate material through the slotted liner into the zone. Upon the creation of one or more fractures, the particulate material can be pumped into the fractures as well as into the perforations and into the annuli between the sand screen and shroud and between the shroud and the well bore.
- In another presently preferred embodiment, sensors are placed into a formation by drilling laterally away from a borehole. FIG. 5 shows a flow chart of this method. FIGS.6A-6C depict an instrument suitable for performing this method. As used herein, drilling laterally away from a borehole means in a direction greater than zero degrees away from the general longitudinal (as opposed to radial) direction of the borehole at that particular location and, thus, can include drilling up or down away from the borehole when the longitudinal direction of the borehole is horizontal with respect to the earth's surface. Furthermore, there is no requirement that drilling laterally away from a borehole mean normal or perpendicular to the surface of the wellbore.
- A borehole602 is drilled using conventional methods well known to one skilled in the art (step 510). A
sensor placement device 600 is then placed into the borehole 602 (step 515).Sensor placement device 600 consists oftubing 650, afluid diverter 634, acontrol line 692,outer tubing 636,pistons sensor 622, anozzle 632, adeflector 610, and awire 624.Tubing 650 is lowered into the borehole 602 from the earth'ssurface 693.Tubing 650 may be coiled tubing of a type well known to one skilled in the art. - Attached to
tubing 650 arefluid diverters 634. Anopening 652 allows fluid to flow fromtubing 650 throughfluid diverters 634 and intocontrol line 692 which is attached tofluid diverters 634 by Swagelok fittings. At the end ofcontrol tube 692 are twopistons Pistons sensor 622.Pistons flow diverters 634. In one embodiment,pistons outer tubing 636. Although described herein with reference to two pistons, multiple pistons may be used as well and may be deployed in a variety of directions, such as, for example, up, down, or at an angle, without departing from the scope and spirit of the present invention. -
Overlying control line 692 isouter tubing 636.Outer tubing 636 is pushed ontopistons nozzle 632 provides a jetting action for the fluid, which effectively cuts through the formation. Asnozzle 632 erodes the formation material, theouter tubing 636 is allowed to move downwards.Sensor 622 is attached to the inside ofouter tubing 636 by a threaded carrier sub that has an open ID to allow fluid to bypass tonozzle 632.Outer tube 636 has anozzle 632 at one end.Sensor 622 is attached toouter tubing 636, either by integration into the housing wall or surface mounting, and is connected to wire 624 that connectssensor 622 to asurface electronics 690.Surface electronics 690 may include a recorder to record the data received fromsensor 622 for later processing possibly at a remote site and may also include processing equipment to process the data received fromsensor 622 as it is received. Furthermore,surface electronics 690 may be attached to display devices such as a cathode ray tube (CRT) or similar computer monitor device and/or to a printer. - After
sensor placement device 600 has been placed down hole (step 515), the fluid pressure insidetubing 650 is increased (step 520). The pressure may be increase by, for example, a pump on the surface is connected to the coiledtubing 650, which provides the high pressure source required to operate the drilling operation or by a subsurface powered pump. The increased fluid pressure causes fluid to flow throughopening 652 intofluid diverter 634 which diverts fluid intocontrol line 692 causingsensor pods 680 to extend (step 525). Water may be used as the working fluid unless this will adversely affect the formation sandface. In such event, a conventional mud may be used. The fluid may also be a treated liquid comparable with the reservoir to minimize formation damage and may possibly be enhanced with friction reducing polymers and abrasives to enhance jet drilling efficiency. The fluid flows fromcontrol line 692 intoouter tubing 636. The fluid exitsouter tubing 636 throughnozzle 632. The fluid exiting throughnozzle 632 cuts through the surrounding rock, thus drilling thesensor pod 680 into place ashousing 636 continues to extend exerting pressure on sensor pod 680 (step 530).Deflector 610 causessensor pod 680 to be deflected outward into the formation 604. - The
surface 612 ofdeflector 610 can have an angular 611 displacement away from the surface oftubing 650 of just greater than zero degrees to almost 90 degrees depending on the direction an operator wishes to placesensor pod 680. The greater the angular 611 displacement, themore sensor pod 680 will be deflected away fromtubing 650 such that an angular 611 displacement of almost 90 degrees will result in the sensor pod being deflected in a direction almost perpendicular to the surface oftubing 650.Deflector 610 may be constructed from any suitably hard material that will resist erosion. For example, alloy stainless steel is an appropriate and suitable material from which to constructdeflector 610. Typically,deflector 610 is welded to the base pipe anddeflector 610 has a port drilled through it to allow fluid passage. - Once
sensor pod 680 has been drilled into the formation 604,control line 692 may be retracted out leavingsensor pod 680 in the formation (step 535). By leavingcontrol line 692 in place rather than removing it after sensor placement,wire 624 may be better protected.Sensor 622 remains connected to surfaceelectronics 690 viawire 624.Wire 624 can be an electric wire capable of carrying electronic signals or it can be a fiber optic cable. - It should be noted that
sensor 622 may be recalibrated after placement ofsensor 622 downhole in the formation. Such calibration may be accomplished, for example, by means of transmissions viawire 624 or may be through radio and/or acoustic signals. - To aid in understanding the present invention, refer to the following analogy. Consider a garden hose with a nozzle attached to the end. With the end of the nozzle pushed into the ground, increase the water pressure in the garden hose. The water exiting the nozzle provides an effective drilling tool that allows the hose to be pushed into the ground. This is the principle behind the present invention. The outer tubing will stroke downwards as the formation material is removed. The wire attached to the sensor must have enough length to accommodate the stoke length of the cylinder. The wire may feed through the deflector and continue up the outside of the coiled tubing. This may be useful if the coiled tubing is removed after sensor placement. Otherwise as discussed above, the wire will remain inside the coiled tubing where it is better protected.
- Although the present invention has been described primarily with reference to interrogating the sensors with a wireline tool, other methods of interrogating the sensor may be utilized as well without departing from the scope and spirit of the present invention. For example, the sensors could be interrogated by something built into the completion or by a reflected signal that could power up and interrogate the sensor or sensors.
- The description of the present invention has been presented for purposes of illustration and description, but is not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention, the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.
Claims (20)
1. A method of placing sensors in a borehole, the steps comprising:
drilling a borehole with a drill apparatus;
forming a well casing therein; and
placing at least one remote sensor into cement slurry as the well casing is being cemented.
2. The method as recited in claim 1 , wherein the at least one remote sensor comprises a transducer.
3. The method as recited in claim 1 , wherein the at least one remote sensor comprises a pressure measurement device.
4. The method as recited in claim 1 , wherein the at least one remote sensor comprises temperature measurement device.
5. The method as recited in claim 1 , wherein the at least one remote sensor comprises a resistivity measurement device.
6. The method as recited in claim 1 , wherein the at least one remote sensor measures rock properties.
7. The method as recited in claim 1 , wherein the at least one remote sensor measures formation properties.
8. The method as recited in claim 1 , wherein the at least one remote sensor measures paramagnetic properties.
9. The method as recited in claim 1 , wherein the at least one remote sensor measures magnetic fields.
10. The method as recited in claim 1 , wherein the at least one remote sensor measures pulse eddy current.
11. The method as recited in claim 1 , wherein the at least one remote sensor measures polar spin.
12. The method as recited in claim 1 , wherein the at least one remote sensor measures magnetic flux leak.
13. The method as recited in claim 1 , wherein the at least one remote sensor measures well integrity.
14. The method as recited in claim l, wherein the at least one remote sensor measures casing wear.
15. A method of placing sensors in a geologic formation, the steps comprising:
drilling a wellbore with a drill apparatus;
placing a at least one sensor outside said borehole; and
placing a wellbore device into said wellbore to interrogate said at least one sensor.
16. The method as recited in claim 15 , wherein said at least one sensor is powered by external excitation.
17. A method of placing sensors in a geologic formation, the steps comprising:
drilling a wellbore with a drill apparatus;
removing formation material in a direction away from said wellbore to produce a sensor placement area; and
placing a sensor into said sensor placement area.
18. The method as recited in claim 17 , wherein said removing formation material step comprises using a side bore coring tool.
19. The method as recited in claim 17 , wherein said removing formation material step comprises fracturing and packing the formation with a slurry and wherein said placing step comprises placing said sensor in said slurry prior to packing the formation with said slurry.
20. An apparatus for placing a sensor in a geologic formation, comprising:
a first tube,
a second tube attached to said first tube wherein the end of said second tube opposite from end attached to said first tube comprises a nozzle for expressing fluid and wherein said second tube comprises clasping means for attaching a sensor thereto; and
deflectors attached to the outside surface of said first tube for deflecting said second tube away from said first tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/178,188 US20020179301A1 (en) | 2000-07-17 | 2002-06-24 | Method and apparatus for placing and interrogating downhole sensors |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US09/617,212 US6408943B1 (en) | 2000-07-17 | 2000-07-17 | Method and apparatus for placing and interrogating downhole sensors |
US10/178,188 US20020179301A1 (en) | 2000-07-17 | 2002-06-24 | Method and apparatus for placing and interrogating downhole sensors |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/617,212 Division US6408943B1 (en) | 2000-07-17 | 2000-07-17 | Method and apparatus for placing and interrogating downhole sensors |
Publications (1)
Publication Number | Publication Date |
---|---|
US20020179301A1 true US20020179301A1 (en) | 2002-12-05 |
Family
ID=24472722
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/617,212 Expired - Lifetime US6408943B1 (en) | 2000-07-17 | 2000-07-17 | Method and apparatus for placing and interrogating downhole sensors |
US10/178,188 Abandoned US20020179301A1 (en) | 2000-07-17 | 2002-06-24 | Method and apparatus for placing and interrogating downhole sensors |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/617,212 Expired - Lifetime US6408943B1 (en) | 2000-07-17 | 2000-07-17 | Method and apparatus for placing and interrogating downhole sensors |
Country Status (6)
Country | Link |
---|---|
US (2) | US6408943B1 (en) |
EP (1) | EP1305499A1 (en) |
AU (1) | AU2002222950A1 (en) |
CA (1) | CA2416111A1 (en) |
NO (1) | NO20030200L (en) |
WO (1) | WO2002006628A1 (en) |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070234789A1 (en) * | 2006-04-05 | 2007-10-11 | Gerard Glasbergen | Fluid distribution determination and optimization with real time temperature measurement |
US20070289740A1 (en) * | 1998-12-21 | 2007-12-20 | Baker Hughes Incorporated | Apparatus and Method for Managing Supply of Additive at Wellsites |
US20080262737A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Production from Wells |
US20080262735A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Water Breakthrough Detection and Intervention in a Production Well |
US20080262736A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Monitoring Physical Condition of Production Well Equipment and Controlling Well Production |
US20080257544A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Crossflow Detection and Intervention in Production Wellbores |
US20100044027A1 (en) * | 2008-08-20 | 2010-02-25 | Baker Hughes Incorporated | Arrangement and method for sending and/or sealing cement at a liner hanger |
US8215164B1 (en) * | 2012-01-02 | 2012-07-10 | HydroConfidence Inc. | Systems and methods for monitoring groundwater, rock, and casing for production flow and leakage of hydrocarbon fluids |
EP2489828A1 (en) * | 2007-04-02 | 2012-08-22 | Halliburton Energy Services, Inc. | Use of micro-electro-mechanical systems (mems) in well treatments |
US20120234533A1 (en) * | 2011-03-15 | 2012-09-20 | Baker Hughes Incorporated | Precision marking of subsurface locations |
WO2011157996A3 (en) * | 2010-06-16 | 2013-01-03 | Haliburton Energy Services, Inc. | Controlling well operations based on monitored parameters of cement health |
US8931553B2 (en) | 2013-01-04 | 2015-01-13 | Carbo Ceramics Inc. | Electrically conductive proppant and methods for detecting, locating and characterizing the electrically conductive proppant |
WO2015051222A1 (en) * | 2013-10-03 | 2015-04-09 | Schlumberger Canada Limited | System and methodology for monitoring in a borehole |
US20150330214A1 (en) * | 2014-05-15 | 2015-11-19 | Baker Hughes Incorporated | Wellbore Systems with Hydrocarbon Leak Detection Apparatus and Methods |
US20160187531A1 (en) * | 2013-10-16 | 2016-06-30 | Halliburton Energy Services Inc. | Intensity-independent optical computing device |
US9388686B2 (en) | 2010-01-13 | 2016-07-12 | Halliburton Energy Services, Inc. | Maximizing hydrocarbon production while controlling phase behavior or precipitation of reservoir impairing liquids or solids |
US9434875B1 (en) | 2014-12-16 | 2016-09-06 | Carbo Ceramics Inc. | Electrically-conductive proppant and methods for making and using same |
US9551210B2 (en) | 2014-08-15 | 2017-01-24 | Carbo Ceramics Inc. | Systems and methods for removal of electromagnetic dispersion and attenuation for imaging of proppant in an induced fracture |
US9599554B2 (en) * | 2014-03-07 | 2017-03-21 | Halliburton Energy Services, Inc. | Wavelength-dependent light intensity modulation in multivariate optical computing devices using polarizers |
WO2017146675A1 (en) * | 2016-02-22 | 2017-08-31 | Halliburton Energy Services, Inc. | Remote actuation of downhole sensors |
WO2017171723A1 (en) * | 2016-03-29 | 2017-10-05 | Halliburton Energy Services, Inc. | Downhole cement strain gauge |
WO2018111222A1 (en) * | 2016-12-12 | 2018-06-21 | Halliburton Energy Services, Inc. | Chemical sensing using magnetic complexes |
US10221685B2 (en) | 2014-01-15 | 2019-03-05 | Baker Hughes Incorporated | Methods and systems for monitoring well integrity and increasing the lifetime of a well in a subterranean formation |
US11008505B2 (en) | 2013-01-04 | 2021-05-18 | Carbo Ceramics Inc. | Electrically conductive proppant |
US11015438B2 (en) * | 2015-09-18 | 2021-05-25 | Halliburton Energy Services, Inc. | Zonal representation for flow visualization |
EP3714134A4 (en) * | 2018-10-15 | 2021-08-04 | Ozzie's Enterprises LLC | DRILL HOLE MAPPING TOOL AND METHOD FOR MAPPING DRILL HOLES |
Families Citing this family (180)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7036610B1 (en) | 1994-10-14 | 2006-05-02 | Weatherford / Lamb, Inc. | Apparatus and method for completing oil and gas wells |
US7100710B2 (en) | 1994-10-14 | 2006-09-05 | Weatherford/Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
US7013997B2 (en) | 1994-10-14 | 2006-03-21 | Weatherford/Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
US6857486B2 (en) | 2001-08-19 | 2005-02-22 | Smart Drilling And Completion, Inc. | High power umbilicals for subterranean electric drilling machines and remotely operated vehicles |
US7228901B2 (en) | 1994-10-14 | 2007-06-12 | Weatherford/Lamb, Inc. | Method and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
US7108084B2 (en) | 1994-10-14 | 2006-09-19 | Weatherford/Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
US7040420B2 (en) | 1994-10-14 | 2006-05-09 | Weatherford/Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
US6868906B1 (en) | 1994-10-14 | 2005-03-22 | Weatherford/Lamb, Inc. | Closed-loop conveyance systems for well servicing |
US7147068B2 (en) | 1994-10-14 | 2006-12-12 | Weatherford / Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
US6766854B2 (en) | 1997-06-02 | 2004-07-27 | Schlumberger Technology Corporation | Well-bore sensor apparatus and method |
US6742596B2 (en) | 2001-05-17 | 2004-06-01 | Weatherford/Lamb, Inc. | Apparatus and methods for tubular makeup interlock |
US7509722B2 (en) | 1997-09-02 | 2009-03-31 | Weatherford/Lamb, Inc. | Positioning and spinning device |
US6536520B1 (en) | 2000-04-17 | 2003-03-25 | Weatherford/Lamb, Inc. | Top drive casing system |
GB9815809D0 (en) | 1998-07-22 | 1998-09-16 | Appleton Robert P | Casing running tool |
GB2340857A (en) | 1998-08-24 | 2000-03-01 | Weatherford Lamb | An apparatus for facilitating the connection of tubulars and alignment with a top drive |
GB2340859A (en) | 1998-08-24 | 2000-03-01 | Weatherford Lamb | Method and apparatus for facilitating the connection of tubulars using a top drive |
GB2340858A (en) | 1998-08-24 | 2000-03-01 | Weatherford Lamb | Methods and apparatus for facilitating the connection of tubulars using a top drive |
US7188687B2 (en) | 1998-12-22 | 2007-03-13 | Weatherford/Lamb, Inc. | Downhole filter |
EP2273064A1 (en) | 1998-12-22 | 2011-01-12 | Weatherford/Lamb, Inc. | Procedures and equipment for profiling and jointing of pipes |
GB2347441B (en) | 1998-12-24 | 2003-03-05 | Weatherford Lamb | Apparatus and method for facilitating the connection of tubulars using a top drive |
GB2345074A (en) | 1998-12-24 | 2000-06-28 | Weatherford Lamb | Floating joint to facilitate the connection of tubulars using a top drive |
US6429784B1 (en) * | 1999-02-19 | 2002-08-06 | Dresser Industries, Inc. | Casing mounted sensors, actuators and generators |
US6857487B2 (en) | 2002-12-30 | 2005-02-22 | Weatherford/Lamb, Inc. | Drilling with concentric strings of casing |
US6896075B2 (en) | 2002-10-11 | 2005-05-24 | Weatherford/Lamb, Inc. | Apparatus and methods for drilling with casing |
US7311148B2 (en) | 1999-02-25 | 2007-12-25 | Weatherford/Lamb, Inc. | Methods and apparatus for wellbore construction and completion |
US6854533B2 (en) * | 2002-12-20 | 2005-02-15 | Weatherford/Lamb, Inc. | Apparatus and method for drilling with casing |
US9586699B1 (en) | 1999-08-16 | 2017-03-07 | Smart Drilling And Completion, Inc. | Methods and apparatus for monitoring and fixing holes in composite aircraft |
EP1242711B1 (en) | 1999-12-22 | 2006-08-16 | Weatherford/Lamb, Inc. | Drilling bit for drilling while running casing |
US6989764B2 (en) * | 2000-03-28 | 2006-01-24 | Schlumberger Technology Corporation | Apparatus and method for downhole well equipment and process management, identification, and actuation |
US7385523B2 (en) * | 2000-03-28 | 2008-06-10 | Schlumberger Technology Corporation | Apparatus and method for downhole well equipment and process management, identification, and operation |
US7334650B2 (en) | 2000-04-13 | 2008-02-26 | Weatherford/Lamb, Inc. | Apparatus and methods for drilling a wellbore using casing |
US7325610B2 (en) | 2000-04-17 | 2008-02-05 | Weatherford/Lamb, Inc. | Methods and apparatus for handling and drilling with tubulars or casing |
GB0010378D0 (en) | 2000-04-28 | 2000-06-14 | Bbl Downhole Tools Ltd | Expandable apparatus for drift and reaming a borehole |
GB2365463B (en) | 2000-08-01 | 2005-02-16 | Renovus Ltd | Drilling method |
US9625361B1 (en) | 2001-08-19 | 2017-04-18 | Smart Drilling And Completion, Inc. | Methods and apparatus to prevent failures of fiber-reinforced composite materials under compressive stresses caused by fluids and gases invading microfractures in the materials |
US8515677B1 (en) | 2002-08-15 | 2013-08-20 | Smart Drilling And Completion, Inc. | Methods and apparatus to prevent failures of fiber-reinforced composite materials under compressive stresses caused by fluids and gases invading microfractures in the materials |
US7216711B2 (en) | 2002-01-08 | 2007-05-15 | Halliburton Eenrgy Services, Inc. | Methods of coating resin and blending resin-coated proppant |
US7267171B2 (en) | 2002-01-08 | 2007-09-11 | Halliburton Energy Services, Inc. | Methods and compositions for stabilizing the surface of a subterranean formation |
US7343973B2 (en) | 2002-01-08 | 2008-03-18 | Halliburton Energy Services, Inc. | Methods of stabilizing surfaces of subterranean formations |
GB0206227D0 (en) | 2002-03-16 | 2002-05-01 | Weatherford Lamb | Bore-lining and drilling |
US7696901B2 (en) * | 2002-03-22 | 2010-04-13 | Schlumberger Technology Corporation | Methods and apparatus for photonic power conversion downhole |
US7894297B2 (en) * | 2002-03-22 | 2011-02-22 | Schlumberger Technology Corporation | Methods and apparatus for borehole sensing including downhole tension sensing |
US6691780B2 (en) | 2002-04-18 | 2004-02-17 | Halliburton Energy Services, Inc. | Tracking of particulate flowback in subterranean wells |
US20030205376A1 (en) * | 2002-04-19 | 2003-11-06 | Schlumberger Technology Corporation | Means and Method for Assessing the Geometry of a Subterranean Fracture During or After a Hydraulic Fracturing Treatment |
US6994176B2 (en) | 2002-07-29 | 2006-02-07 | Weatherford/Lamb, Inc. | Adjustable rotating guides for spider or elevator |
US6915848B2 (en) | 2002-07-30 | 2005-07-12 | Schlumberger Technology Corporation | Universal downhole tool control apparatus and methods |
US6776240B2 (en) | 2002-07-30 | 2004-08-17 | Schlumberger Technology Corporation | Downhole valve |
US6899186B2 (en) | 2002-12-13 | 2005-05-31 | Weatherford/Lamb, Inc. | Apparatus and method of drilling with casing |
US7730965B2 (en) | 2002-12-13 | 2010-06-08 | Weatherford/Lamb, Inc. | Retractable joint and cementing shoe for use in completing a wellbore |
US6978832B2 (en) * | 2002-09-09 | 2005-12-27 | Halliburton Energy Services, Inc. | Downhole sensing with fiber in the formation |
US7219730B2 (en) | 2002-09-27 | 2007-05-22 | Weatherford/Lamb, Inc. | Smart cementing systems |
US7303022B2 (en) | 2002-10-11 | 2007-12-04 | Weatherford/Lamb, Inc. | Wired casing |
US7938201B2 (en) | 2002-12-13 | 2011-05-10 | Weatherford/Lamb, Inc. | Deep water drilling with casing |
US6953096B2 (en) | 2002-12-31 | 2005-10-11 | Weatherford/Lamb, Inc. | Expandable bit with secondary release device |
US7128154B2 (en) | 2003-01-30 | 2006-10-31 | Weatherford/Lamb, Inc. | Single-direction cementing plug |
USRE42877E1 (en) | 2003-02-07 | 2011-11-01 | Weatherford/Lamb, Inc. | Methods and apparatus for wellbore construction and completion |
WO2004076804A1 (en) | 2003-02-27 | 2004-09-10 | Weatherford/Lamb Inc. | Drill shoe |
CA2517883C (en) | 2003-03-05 | 2010-01-12 | Weatherford/Lamb, Inc. | Full bore lined wellbores |
GB2428059B (en) | 2003-03-05 | 2007-10-10 | Weatherford Lamb | Method and apparatus for drilling with casing |
CA2517978C (en) | 2003-03-05 | 2009-07-14 | Weatherford/Lamb, Inc. | Drilling with casing latch |
CA2677247C (en) | 2003-03-05 | 2012-09-25 | Weatherford/Lamb, Inc. | Casing running and drilling system |
US20040211561A1 (en) | 2003-03-06 | 2004-10-28 | Nguyen Philip D. | Methods and compositions for consolidating proppant in fractures |
US20040182147A1 (en) * | 2003-03-19 | 2004-09-23 | Rambow Frederick H. K. | System and method for measuring compaction and other formation properties through cased wellbores |
US7158049B2 (en) * | 2003-03-24 | 2007-01-02 | Schlumberger Technology Corporation | Wireless communication circuit |
GB2414759B (en) | 2003-04-04 | 2007-11-07 | Weatherford Lamb | Method and apparatus for handling wellbore tubulars |
US7114570B2 (en) | 2003-04-07 | 2006-10-03 | Halliburton Energy Services, Inc. | Methods and compositions for stabilizing unconsolidated subterranean formations |
US6978836B2 (en) | 2003-05-23 | 2005-12-27 | Halliburton Energy Services, Inc. | Methods for controlling water and particulate production |
US20040252748A1 (en) * | 2003-06-13 | 2004-12-16 | Gleitman Daniel D. | Fiber optic sensing systems and methods |
US7252152B2 (en) * | 2003-06-18 | 2007-08-07 | Weatherford/Lamb, Inc. | Methods and apparatus for actuating a downhole tool |
US7114560B2 (en) | 2003-06-23 | 2006-10-03 | Halliburton Energy Services, Inc. | Methods for enhancing treatment fluid placement in a subterranean formation |
US7413010B2 (en) | 2003-06-23 | 2008-08-19 | Halliburton Energy Services, Inc. | Remediation of subterranean formations using vibrational waves and consolidating agents |
US7013976B2 (en) | 2003-06-25 | 2006-03-21 | Halliburton Energy Services, Inc. | Compositions and methods for consolidating unconsolidated subterranean formations |
US7021379B2 (en) | 2003-07-07 | 2006-04-04 | Halliburton Energy Services, Inc. | Methods and compositions for enhancing consolidation strength of proppant in subterranean fractures |
US7066258B2 (en) | 2003-07-08 | 2006-06-27 | Halliburton Energy Services, Inc. | Reduced-density proppants and methods of using reduced-density proppants to enhance their transport in well bores and fractures |
US7650944B1 (en) | 2003-07-11 | 2010-01-26 | Weatherford/Lamb, Inc. | Vessel for well intervention |
US6955218B2 (en) | 2003-08-15 | 2005-10-18 | Weatherford/Lamb, Inc. | Placing fiber optic sensor line |
US7237609B2 (en) | 2003-08-26 | 2007-07-03 | Halliburton Energy Services, Inc. | Methods for producing fluids from acidized and consolidated portions of subterranean formations |
US7017665B2 (en) | 2003-08-26 | 2006-03-28 | Halliburton Energy Services, Inc. | Strengthening near well bore subterranean formations |
US7059406B2 (en) | 2003-08-26 | 2006-06-13 | Halliburton Energy Services, Inc. | Production-enhancing completion methods |
US7156194B2 (en) | 2003-08-26 | 2007-01-02 | Halliburton Energy Services, Inc. | Methods of drilling and consolidating subterranean formation particulate |
US7032667B2 (en) | 2003-09-10 | 2006-04-25 | Halliburtonn Energy Services, Inc. | Methods for enhancing the consolidation strength of resin coated particulates |
US7264067B2 (en) | 2003-10-03 | 2007-09-04 | Weatherford/Lamb, Inc. | Method of drilling and completing multiple wellbores inside a single caisson |
US7345011B2 (en) | 2003-10-14 | 2008-03-18 | Halliburton Energy Services, Inc. | Methods for mitigating the production of water from subterranean formations |
US7063150B2 (en) | 2003-11-25 | 2006-06-20 | Halliburton Energy Services, Inc. | Methods for preparing slurries of coated particulates |
US7131493B2 (en) | 2004-01-16 | 2006-11-07 | Halliburton Energy Services, Inc. | Methods of using sealants in multilateral junctions |
US20050173116A1 (en) | 2004-02-10 | 2005-08-11 | Nguyen Philip D. | Resin compositions and methods of using resin compositions to control proppant flow-back |
US7211547B2 (en) | 2004-03-03 | 2007-05-01 | Halliburton Energy Services, Inc. | Resin compositions and methods of using such resin compositions in subterranean applications |
US7063151B2 (en) | 2004-03-05 | 2006-06-20 | Halliburton Energy Services, Inc. | Methods of preparing and using coated particulates |
US7284617B2 (en) | 2004-05-20 | 2007-10-23 | Weatherford/Lamb, Inc. | Casing running head |
US7541318B2 (en) | 2004-05-26 | 2009-06-02 | Halliburton Energy Services, Inc. | On-the-fly preparation of proppant and its use in subterranean operations |
US7299875B2 (en) | 2004-06-08 | 2007-11-27 | Halliburton Energy Services, Inc. | Methods for controlling particulate migration |
US7073581B2 (en) | 2004-06-15 | 2006-07-11 | Halliburton Energy Services, Inc. | Electroconductive proppant compositions and related methods |
US7140434B2 (en) * | 2004-07-08 | 2006-11-28 | Schlumberger Technology Corporation | Sensor system |
CA2514136C (en) | 2004-07-30 | 2011-09-13 | Weatherford/Lamb, Inc. | Apparatus and methods of setting and retrieving casing with drilling latch and bottom hole assembly |
US7255169B2 (en) | 2004-09-09 | 2007-08-14 | Halliburton Energy Services, Inc. | Methods of creating high porosity propped fractures |
US7281580B2 (en) | 2004-09-09 | 2007-10-16 | Halliburton Energy Services, Inc. | High porosity fractures and methods of creating high porosity fractures |
US7757768B2 (en) | 2004-10-08 | 2010-07-20 | Halliburton Energy Services, Inc. | Method and composition for enhancing coverage and displacement of treatment fluids into subterranean formations |
US7281581B2 (en) | 2004-12-01 | 2007-10-16 | Halliburton Energy Services, Inc. | Methods of hydraulic fracturing and of propping fractures in subterranean formations |
US7273099B2 (en) | 2004-12-03 | 2007-09-25 | Halliburton Energy Services, Inc. | Methods of stimulating a subterranean formation comprising multiple production intervals |
US7398825B2 (en) | 2004-12-03 | 2008-07-15 | Halliburton Energy Services, Inc. | Methods of controlling sand and water production in subterranean zones |
US7883740B2 (en) | 2004-12-12 | 2011-02-08 | Halliburton Energy Services, Inc. | Low-quality particulates and methods of making and using improved low-quality particulates |
US7334635B2 (en) | 2005-01-14 | 2008-02-26 | Halliburton Energy Services, Inc. | Methods for fracturing subterranean wells |
US7334636B2 (en) | 2005-02-08 | 2008-02-26 | Halliburton Energy Services, Inc. | Methods of creating high-porosity propped fractures using reticulated foam |
US7318473B2 (en) | 2005-03-07 | 2008-01-15 | Halliburton Energy Services, Inc. | Methods relating to maintaining the structural integrity of deviated well bores |
US7448451B2 (en) | 2005-03-29 | 2008-11-11 | Halliburton Energy Services, Inc. | Methods for controlling migration of particulates in a subterranean formation |
US7673686B2 (en) | 2005-03-29 | 2010-03-09 | Halliburton Energy Services, Inc. | Method of stabilizing unconsolidated formation for sand control |
US7278480B2 (en) * | 2005-03-31 | 2007-10-09 | Schlumberger Technology Corporation | Apparatus and method for sensing downhole parameters |
US7318474B2 (en) | 2005-07-11 | 2008-01-15 | Halliburton Energy Services, Inc. | Methods and compositions for controlling formation fines and reducing proppant flow-back |
US7819192B2 (en) | 2006-02-10 | 2010-10-26 | Halliburton Energy Services, Inc. | Consolidating agent emulsions and associated methods |
US8613320B2 (en) | 2006-02-10 | 2013-12-24 | Halliburton Energy Services, Inc. | Compositions and applications of resins in treating subterranean formations |
US7926591B2 (en) | 2006-02-10 | 2011-04-19 | Halliburton Energy Services, Inc. | Aqueous-based emulsified consolidating agents suitable for use in drill-in applications |
US7665517B2 (en) | 2006-02-15 | 2010-02-23 | Halliburton Energy Services, Inc. | Methods of cleaning sand control screens and gravel packs |
US7407010B2 (en) | 2006-03-16 | 2008-08-05 | Halliburton Energy Services, Inc. | Methods of coating particulates |
US7398680B2 (en) * | 2006-04-05 | 2008-07-15 | Halliburton Energy Services, Inc. | Tracking fluid displacement along a wellbore using real time temperature measurements |
US7599469B2 (en) * | 2006-04-28 | 2009-10-06 | Cameron International Corporation | Non-intrusive pressure gage |
GB2451784B (en) | 2006-05-12 | 2011-06-01 | Weatherford Lamb | Stage cementing methods used in casing while drilling |
US8276689B2 (en) | 2006-05-22 | 2012-10-02 | Weatherford/Lamb, Inc. | Methods and apparatus for drilling with casing |
US7500521B2 (en) | 2006-07-06 | 2009-03-10 | Halliburton Energy Services, Inc. | Methods of enhancing uniform placement of a resin in a subterranean formation |
US7450053B2 (en) * | 2006-09-13 | 2008-11-11 | Hexion Specialty Chemicals, Inc. | Logging device with down-hole transceiver for operation in extreme temperatures |
US7598898B1 (en) | 2006-09-13 | 2009-10-06 | Hexion Specialty Chemicals, Inc. | Method for using logging device with down-hole transceiver for operation in extreme temperatures |
US7602668B2 (en) * | 2006-11-03 | 2009-10-13 | Schlumberger Technology Corporation | Downhole sensor networks using wireless communication |
US7934557B2 (en) | 2007-02-15 | 2011-05-03 | Halliburton Energy Services, Inc. | Methods of completing wells for controlling water and particulate production |
US8291975B2 (en) | 2007-04-02 | 2012-10-23 | Halliburton Energy Services Inc. | Use of micro-electro-mechanical systems (MEMS) in well treatments |
US9194207B2 (en) | 2007-04-02 | 2015-11-24 | Halliburton Energy Services, Inc. | Surface wellbore operating equipment utilizing MEMS sensors |
US8302686B2 (en) | 2007-04-02 | 2012-11-06 | Halliburton Energy Services Inc. | Use of micro-electro-mechanical systems (MEMS) in well treatments |
US8297352B2 (en) | 2007-04-02 | 2012-10-30 | Halliburton Energy Services, Inc. | Use of micro-electro-mechanical systems (MEMS) in well treatments |
US9822631B2 (en) | 2007-04-02 | 2017-11-21 | Halliburton Energy Services, Inc. | Monitoring downhole parameters using MEMS |
US10358914B2 (en) | 2007-04-02 | 2019-07-23 | Halliburton Energy Services, Inc. | Methods and systems for detecting RFID tags in a borehole environment |
US9200500B2 (en) | 2007-04-02 | 2015-12-01 | Halliburton Energy Services, Inc. | Use of sensors coated with elastomer for subterranean operations |
US8162050B2 (en) | 2007-04-02 | 2012-04-24 | Halliburton Energy Services Inc. | Use of micro-electro-mechanical systems (MEMS) in well treatments |
US8342242B2 (en) | 2007-04-02 | 2013-01-01 | Halliburton Energy Services, Inc. | Use of micro-electro-mechanical systems MEMS in well treatments |
US9732584B2 (en) | 2007-04-02 | 2017-08-15 | Halliburton Energy Services, Inc. | Use of micro-electro-mechanical systems (MEMS) in well treatments |
US8297353B2 (en) | 2007-04-02 | 2012-10-30 | Halliburton Energy Services, Inc. | Use of micro-electro-mechanical systems (MEMS) in well treatments |
US9394785B2 (en) | 2007-04-02 | 2016-07-19 | Halliburton Energy Services, Inc. | Methods and apparatus for evaluating downhole conditions through RFID sensing |
US8316936B2 (en) | 2007-04-02 | 2012-11-27 | Halliburton Energy Services Inc. | Use of micro-electro-mechanical systems (MEMS) in well treatments |
US9879519B2 (en) | 2007-04-02 | 2018-01-30 | Halliburton Energy Services, Inc. | Methods and apparatus for evaluating downhole conditions through fluid sensing |
US9494032B2 (en) | 2007-04-02 | 2016-11-15 | Halliburton Energy Services, Inc. | Methods and apparatus for evaluating downhole conditions with RFID MEMS sensors |
US7762329B1 (en) | 2009-01-27 | 2010-07-27 | Halliburton Energy Services, Inc. | Methods for servicing well bores with hardenable resin compositions |
US8434354B2 (en) * | 2009-03-06 | 2013-05-07 | Bp Corporation North America Inc. | Apparatus and method for a wireless sensor to monitor barrier system integrity |
US20110090496A1 (en) * | 2009-10-21 | 2011-04-21 | Halliburton Energy Services, Inc. | Downhole monitoring with distributed optical density, temperature and/or strain sensing |
US20110088462A1 (en) * | 2009-10-21 | 2011-04-21 | Halliburton Energy Services, Inc. | Downhole monitoring with distributed acoustic/vibration, strain and/or density sensing |
CN101892830B (en) * | 2010-04-27 | 2013-04-24 | 北京科技大学 | Deep ground stress measurement while drilling (MWD) system |
CN101892831B (en) * | 2010-06-13 | 2012-10-31 | 西南石油大学 | A method of measuring the displacement efficiency of cement slurry by using a temperature sensing device |
US8930143B2 (en) | 2010-07-14 | 2015-01-06 | Halliburton Energy Services, Inc. | Resolution enhancement for subterranean well distributed optical measurements |
US8584519B2 (en) | 2010-07-19 | 2013-11-19 | Halliburton Energy Services, Inc. | Communication through an enclosure of a line |
CN101936159B (en) * | 2010-08-30 | 2013-05-29 | 中国石油集团钻井工程技术研究院 | Method for recognizing lithological characters while drilling |
US8511383B2 (en) | 2010-10-20 | 2013-08-20 | Halliburton Energy Services, Inc. | Bottom hole assembly |
US8636063B2 (en) | 2011-02-16 | 2014-01-28 | Halliburton Energy Services, Inc. | Cement slurry monitoring |
US9075155B2 (en) | 2011-04-08 | 2015-07-07 | Halliburton Energy Services, Inc. | Optical fiber based downhole seismic sensor systems and methods |
GB201108098D0 (en) | 2011-05-16 | 2011-06-29 | Intelligent Well Controls Ltd | Determining whether a wellbore cementation operation has been performed correctly |
EP2530239A1 (en) * | 2011-05-31 | 2012-12-05 | Siemens Aktiengesellschaft | Injection system for an oil conveying system |
US9127531B2 (en) | 2011-09-07 | 2015-09-08 | Halliburton Energy Services, Inc. | Optical casing collar locator systems and methods |
US9127532B2 (en) | 2011-09-07 | 2015-09-08 | Halliburton Energy Services, Inc. | Optical casing collar locator systems and methods |
US9297767B2 (en) | 2011-10-05 | 2016-03-29 | Halliburton Energy Services, Inc. | Downhole species selective optical fiber sensor systems and methods |
US10060250B2 (en) | 2012-03-13 | 2018-08-28 | Halliburton Energy Services, Inc. | Downhole systems and methods for water source determination |
WO2013142484A2 (en) | 2012-03-19 | 2013-09-26 | Battelle Memorial Institute | Apparatus and method for remotely determining the structural intergrity of a well or similar structure |
WO2013169255A1 (en) * | 2012-05-10 | 2013-11-14 | Bp Corporation North America Inc. | Methods and systems for long-term monitoring of a well system during abandonment |
US20130299165A1 (en) * | 2012-05-10 | 2013-11-14 | Bp Corporation North America Inc. | Methods and systems for long-term monitoring of a well system during abandonment |
US8893785B2 (en) | 2012-06-12 | 2014-11-25 | Halliburton Energy Services, Inc. | Location of downhole lines |
US9823373B2 (en) | 2012-11-08 | 2017-11-21 | Halliburton Energy Services, Inc. | Acoustic telemetry with distributed acoustic sensing system |
US9068445B2 (en) | 2012-12-17 | 2015-06-30 | Baker Hughes Incorporated | Sensing indicator having RFID tag, downhole tool, and method thereof |
US9239406B2 (en) | 2012-12-18 | 2016-01-19 | Halliburton Energy Services, Inc. | Downhole treatment monitoring systems and methods using ion selective fiber sensors |
CA2815589C (en) * | 2013-04-30 | 2016-01-05 | Baker Hughes Incorporated | Method of real time monitoring of well operations using self-sensing treatment fluids |
WO2015134705A2 (en) | 2014-03-05 | 2015-09-11 | William Marsh Rice University | Systems and methods for fracture mapping via frequency-changing integrated chips |
FR3021992B1 (en) * | 2014-06-04 | 2019-08-16 | Gdf Suez | METHOD AND SYSTEM FOR OPERATING AND MONITORING A FLUID EXTRACTION OR STORAGE WELL |
WO2016019247A1 (en) * | 2014-08-01 | 2016-02-04 | William Marsh Rice University | Systems and methods for monitoring cement quality in a cased well environment with integrated chips |
US10927661B2 (en) * | 2015-12-16 | 2021-02-23 | Halliburton Energy Services, Inc. | Using electro acoustic technology to determine annulus pressure |
WO2017108789A1 (en) * | 2015-12-22 | 2017-06-29 | Shell Internationale Research Maatschappij B.V. | Smart well plug and method for inspecting the integrity of a barrier in an underground wellbore |
US11048893B2 (en) | 2016-05-25 | 2021-06-29 | William Marsh Rice University | Methods and systems related to remote measuring and sensing |
US10113410B2 (en) | 2016-09-30 | 2018-10-30 | Onesubsea Ip Uk Limited | Systems and methods for wirelessly monitoring well integrity |
US20200032643A1 (en) * | 2016-12-07 | 2020-01-30 | Halliburton Energy Services, Inc. | Downhole telemetry system |
EP3379025A1 (en) | 2017-03-21 | 2018-09-26 | Welltec A/S | Downhole completion system |
EP3379022A1 (en) * | 2017-03-21 | 2018-09-26 | Welltec A/S | Downhole sensor system |
EP3379024A1 (en) * | 2017-03-21 | 2018-09-26 | Welltec A/S | Downhole drilling system |
CN109838229B (en) * | 2017-11-27 | 2022-10-28 | 中石化石油工程技术服务有限公司 | Electromagnetic wave resistivity data processing method |
US11649717B2 (en) | 2018-09-17 | 2023-05-16 | Saudi Arabian Oil Company | Systems and methods for sensing downhole cement sheath parameters |
US10644146B1 (en) | 2018-11-13 | 2020-05-05 | Nxp Usa, Inc. | Vertical bi-directional switches and method for making same |
US11293276B2 (en) * | 2019-07-19 | 2022-04-05 | Exxonmobil Upstream Research Company | Monitoring a fracture in a hydrocarbon well |
US20210238980A1 (en) * | 2020-01-31 | 2021-08-05 | Halliburton Energy Services, Inc. | Fiber deployed via a top plug |
US11624258B2 (en) | 2021-08-11 | 2023-04-11 | Saudi Arabian Oil Company | Fail-safe stage tool and down hole sensor |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3489219A (en) * | 1966-03-10 | 1970-01-13 | Halliburton Co | Method of locating tops of fluids in an annulus |
US4120166A (en) * | 1977-03-25 | 1978-10-17 | Exxon Production Research Company | Cement monitoring method |
US4750561A (en) | 1985-12-23 | 1988-06-14 | Ben Wade Oaks Dickinson | Gravel packing system for a production radial tube |
FR2600172B1 (en) * | 1986-01-17 | 1988-08-26 | Inst Francais Du Petrole | DEVICE FOR INSTALLING SEISMIC SENSORS IN A PETROLEUM PRODUCTION WELL |
US4787465A (en) | 1986-04-18 | 1988-11-29 | Ben Wade Oakes Dickinson Iii Et Al. | Hydraulic drilling apparatus and method |
BE905265A (en) | 1986-08-13 | 1986-12-01 | Smet Nik | METHOD AND APPARATUS FOR MAKING A HOLE IN THE GROUND. |
US5189415A (en) | 1990-11-09 | 1993-02-23 | Japan National Oil Corporation | Receiving apparatus |
US5209309A (en) | 1991-08-16 | 1993-05-11 | Wilson Bobby T | Triangular core cutting tool |
US5524709A (en) * | 1995-05-04 | 1996-06-11 | Atlantic Richfield Company | Method for acoustically coupling sensors in a wellbore |
US5720354A (en) | 1996-01-11 | 1998-02-24 | Vermeer Manufacturing Company | Trenchless underground boring system with boring tool location |
US6070662A (en) | 1998-08-18 | 2000-06-06 | Schlumberger Technology Corporation | Formation pressure measurement with remote sensors in cased boreholes |
-
2000
- 2000-07-17 US US09/617,212 patent/US6408943B1/en not_active Expired - Lifetime
-
2001
- 2001-07-17 EP EP01984256A patent/EP1305499A1/en not_active Withdrawn
- 2001-07-17 WO PCT/US2001/022483 patent/WO2002006628A1/en not_active Application Discontinuation
- 2001-07-17 CA CA002416111A patent/CA2416111A1/en not_active Abandoned
- 2001-07-17 AU AU2002222950A patent/AU2002222950A1/en not_active Abandoned
-
2002
- 2002-06-24 US US10/178,188 patent/US20020179301A1/en not_active Abandoned
-
2003
- 2003-01-15 NO NO20030200A patent/NO20030200L/en not_active Application Discontinuation
Cited By (53)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070289740A1 (en) * | 1998-12-21 | 2007-12-20 | Baker Hughes Incorporated | Apparatus and Method for Managing Supply of Additive at Wellsites |
US8682589B2 (en) | 1998-12-21 | 2014-03-25 | Baker Hughes Incorporated | Apparatus and method for managing supply of additive at wellsites |
US20070234789A1 (en) * | 2006-04-05 | 2007-10-11 | Gerard Glasbergen | Fluid distribution determination and optimization with real time temperature measurement |
EP2489828A1 (en) * | 2007-04-02 | 2012-08-22 | Halliburton Energy Services, Inc. | Use of micro-electro-mechanical systems (mems) in well treatments |
AU2008242750B2 (en) * | 2007-04-19 | 2013-06-13 | Baker Hughes Incorporated | System and method for water breakthrough detection and intervention in a production well |
US20080262735A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Water Breakthrough Detection and Intervention in a Production Well |
US7711486B2 (en) | 2007-04-19 | 2010-05-04 | Baker Hughes Incorporated | System and method for monitoring physical condition of production well equipment and controlling well production |
US7805248B2 (en) * | 2007-04-19 | 2010-09-28 | Baker Hughes Incorporated | System and method for water breakthrough detection and intervention in a production well |
US20080262737A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Production from Wells |
US20080262736A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Monitoring Physical Condition of Production Well Equipment and Controlling Well Production |
US20080257544A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Crossflow Detection and Intervention in Production Wellbores |
US20100044027A1 (en) * | 2008-08-20 | 2010-02-25 | Baker Hughes Incorporated | Arrangement and method for sending and/or sealing cement at a liner hanger |
US8327933B2 (en) | 2008-08-20 | 2012-12-11 | Baker Hughes Incorporated | Arrangement and method for sending and/or sealing cement at a liner hanger |
US9388686B2 (en) | 2010-01-13 | 2016-07-12 | Halliburton Energy Services, Inc. | Maximizing hydrocarbon production while controlling phase behavior or precipitation of reservoir impairing liquids or solids |
US8505625B2 (en) | 2010-06-16 | 2013-08-13 | Halliburton Energy Services, Inc. | Controlling well operations based on monitored parameters of cement health |
WO2011157996A3 (en) * | 2010-06-16 | 2013-01-03 | Haliburton Energy Services, Inc. | Controlling well operations based on monitored parameters of cement health |
US20120234533A1 (en) * | 2011-03-15 | 2012-09-20 | Baker Hughes Incorporated | Precision marking of subsurface locations |
US8646520B2 (en) * | 2011-03-15 | 2014-02-11 | Baker Hughes Incorporated | Precision marking of subsurface locations |
US8215164B1 (en) * | 2012-01-02 | 2012-07-10 | HydroConfidence Inc. | Systems and methods for monitoring groundwater, rock, and casing for production flow and leakage of hydrocarbon fluids |
US10538695B2 (en) | 2013-01-04 | 2020-01-21 | Carbo Ceramics Inc. | Electrically conductive proppant and methods for detecting, locating and characterizing the electrically conductive proppant |
US11993749B2 (en) | 2013-01-04 | 2024-05-28 | National Technology & Engineering Solutions Of Sandia, Llc | Electrically conductive proppant and methods for detecting, locating and characterizing the electrically conductive proppant |
US11162022B2 (en) | 2013-01-04 | 2021-11-02 | Carbo Ceramics Inc. | Electrically conductive proppant and methods for detecting, locating and characterizing the electrically conductive proppant |
US11008505B2 (en) | 2013-01-04 | 2021-05-18 | Carbo Ceramics Inc. | Electrically conductive proppant |
US8931553B2 (en) | 2013-01-04 | 2015-01-13 | Carbo Ceramics Inc. | Electrically conductive proppant and methods for detecting, locating and characterizing the electrically conductive proppant |
WO2015051222A1 (en) * | 2013-10-03 | 2015-04-09 | Schlumberger Canada Limited | System and methodology for monitoring in a borehole |
US10519761B2 (en) * | 2013-10-03 | 2019-12-31 | Schlumberger Technology Corporation | System and methodology for monitoring in a borehole |
US20160187531A1 (en) * | 2013-10-16 | 2016-06-30 | Halliburton Energy Services Inc. | Intensity-independent optical computing device |
US9709696B2 (en) * | 2013-10-16 | 2017-07-18 | Halliburton Energy Services, Inc. | Intensity-independent optical computing device |
US10221685B2 (en) | 2014-01-15 | 2019-03-05 | Baker Hughes Incorporated | Methods and systems for monitoring well integrity and increasing the lifetime of a well in a subterranean formation |
US9599554B2 (en) * | 2014-03-07 | 2017-03-21 | Halliburton Energy Services, Inc. | Wavelength-dependent light intensity modulation in multivariate optical computing devices using polarizers |
AU2014385273B2 (en) * | 2014-03-07 | 2017-06-15 | Halliburton Energy Services, Inc. | Wavelength-dependent light intensity modulation in multivariate optical computing devices using polarizers |
GB2540523A (en) * | 2014-05-15 | 2017-01-18 | Baker Hughes Inc | Wellbore systems with hydrocarbon leak detection apparatus and methods |
GB2540523B (en) * | 2014-05-15 | 2019-01-09 | Baker Hughes Inc | Wellbore systems with hydrocarbon leak detection apparatus and methods |
US20150330214A1 (en) * | 2014-05-15 | 2015-11-19 | Baker Hughes Incorporated | Wellbore Systems with Hydrocarbon Leak Detection Apparatus and Methods |
WO2015175169A1 (en) * | 2014-05-15 | 2015-11-19 | Baker Hughes Incorporated | Wellbore systems with hydrocarbon leak detection apparatus and methods |
US9797218B2 (en) * | 2014-05-15 | 2017-10-24 | Baker Hughes Incorporated | Wellbore systems with hydrocarbon leak detection apparatus and methods |
US9551210B2 (en) | 2014-08-15 | 2017-01-24 | Carbo Ceramics Inc. | Systems and methods for removal of electromagnetic dispersion and attenuation for imaging of proppant in an induced fracture |
US10514478B2 (en) | 2014-08-15 | 2019-12-24 | Carbo Ceramics, Inc | Systems and methods for removal of electromagnetic dispersion and attenuation for imaging of proppant in an induced fracture |
US10167422B2 (en) | 2014-12-16 | 2019-01-01 | Carbo Ceramics Inc. | Electrically-conductive proppant and methods for detecting, locating and characterizing the electrically-conductive proppant |
US9434875B1 (en) | 2014-12-16 | 2016-09-06 | Carbo Ceramics Inc. | Electrically-conductive proppant and methods for making and using same |
US11015438B2 (en) * | 2015-09-18 | 2021-05-25 | Halliburton Energy Services, Inc. | Zonal representation for flow visualization |
WO2017146675A1 (en) * | 2016-02-22 | 2017-08-31 | Halliburton Energy Services, Inc. | Remote actuation of downhole sensors |
GB2561762A (en) * | 2016-02-22 | 2018-10-24 | Halliburton Energy Services Inc | Remote actuation of downhole sensors |
US10408048B2 (en) | 2016-02-22 | 2019-09-10 | Halliburton Energy Services, Inc. | Remote actuation of downhole sensors |
GB2561762B (en) * | 2016-02-22 | 2022-01-12 | Halliburton Energy Services Inc | Remote actuation of downhole sensors |
US10655448B2 (en) | 2016-03-29 | 2020-05-19 | Halliburton Energy Services, Inc. | Downhole cement strain gauge |
WO2017171723A1 (en) * | 2016-03-29 | 2017-10-05 | Halliburton Energy Services, Inc. | Downhole cement strain gauge |
GB2561763B (en) * | 2016-03-29 | 2021-08-11 | Halliburton Energy Services Inc | Downhole cement strain gauge |
GB2561763A (en) * | 2016-03-29 | 2018-10-24 | Halliburton Energy Services Inc | Downhole cement strain gauge |
US10996367B2 (en) | 2016-12-12 | 2021-05-04 | Halliburton Energy Services, Inc. | Chemical sensing using magnetic complexes |
WO2018111222A1 (en) * | 2016-12-12 | 2018-06-21 | Halliburton Energy Services, Inc. | Chemical sensing using magnetic complexes |
EP3714134A4 (en) * | 2018-10-15 | 2021-08-04 | Ozzie's Enterprises LLC | DRILL HOLE MAPPING TOOL AND METHOD FOR MAPPING DRILL HOLES |
AU2018445403B2 (en) * | 2018-10-15 | 2021-12-02 | Ozzie's Enterprises LLC | Borehole mapping tool and methods of mapping boreholes |
Also Published As
Publication number | Publication date |
---|---|
AU2002222950A1 (en) | 2002-01-30 |
CA2416111A1 (en) | 2002-01-24 |
NO20030200L (en) | 2003-03-05 |
US6408943B1 (en) | 2002-06-25 |
NO20030200D0 (en) | 2003-01-15 |
WO2002006628A1 (en) | 2002-01-24 |
EP1305499A1 (en) | 2003-05-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6408943B1 (en) | Method and apparatus for placing and interrogating downhole sensors | |
US8714244B2 (en) | Stimulation through fracturing while drilling | |
US7082993B2 (en) | Means and method for assessing the geometry of a subterranean fracture during or after a hydraulic fracturing treatment | |
RU2587197C2 (en) | Method for well treatment of (versions) | |
CN101737033B (en) | Instrumented formation tester for injecting and monitoring of fluids | |
US20070284106A1 (en) | Method and apparatus for well drilling and completion | |
US7237612B2 (en) | Methods of initiating a fracture tip screenout | |
US8245781B2 (en) | Formation fluid sampling | |
US8397817B2 (en) | Methods for downhole sampling of tight formations | |
CA3089466C (en) | Determining in-situ rock stress | |
WO2009126572A2 (en) | A method and apparatus for sampling and/or testing downhole formations | |
US10781669B2 (en) | Simulated wellbore control for dynamic underbalance testing | |
US5443119A (en) | Method for controlling sand production from a hydrocarbon producing reservoir | |
NO20190260A1 (en) | Logging of fluid properties for use in subterranean drilling and completions | |
CA2209306A1 (en) | Method for determining closure of a hydraulically induced in-situ fracture | |
Almaguer et al. | Orienting perforations in the right direction | |
Malhotra et al. | Horizontal-Well Fracturing by Use of Coiled Tubing in the Belridge Diatomite: A Case History | |
Meehan | Rock mechanics issues in petroleum engineering | |
WO2020033202A1 (en) | Systems and methods for evaluating reservoir supercharged conditions | |
Upchurch | Near-wellbore halo effect resulting from Tip-Screenout Fracturing: Direct Measurement and Implication for sand control | |
Upchurch | Near-wellbore halo effect resulting from tip screenout fracturing: its direct measurement and implication for sand control | |
Carpenter | Integrated Technique Provides Effective Water Diagnostics in Tight Sand | |
Mylander | Oil Field Techniques for Water Well Drilling | |
UNCONSOLIDATED et al. | PROPPANT CONTAINMENT APPARATUS | |
Middlebrook et al. | Reservoir evaluation and completion results from a horizontal well in the Mancos B, Douglas Creek Arch, northwest Colorado |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |