+

US20020017068A1 - Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods - Google Patents

Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods Download PDF

Info

Publication number
US20020017068A1
US20020017068A1 US09/908,368 US90836801A US2002017068A1 US 20020017068 A1 US20020017068 A1 US 20020017068A1 US 90836801 A US90836801 A US 90836801A US 2002017068 A1 US2002017068 A1 US 2002017068A1
Authority
US
United States
Prior art keywords
frame
ground
prefabricated
superstructure
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/908,368
Other versions
US6408581B2 (en
Inventor
Mose Monachino
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from IT96AG000002A external-priority patent/ITAG960002A1/en
Priority claimed from ITAG960003 external-priority patent/ITAG960003A1/en
Application filed by Individual filed Critical Individual
Priority to US09/908,368 priority Critical patent/US6408581B2/en
Publication of US20020017068A1 publication Critical patent/US20020017068A1/en
Application granted granted Critical
Publication of US6408581B2 publication Critical patent/US6408581B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/02Flat foundations without substantial excavation

Definitions

  • the present invention relates firstly to a foundation element for supporting a superstructure element on substantially level ground.
  • This method consists of assembling a form on flat, levelled ground, placing the necessary reinforcing bars in the form, including bars which project upwardly for connection to a superstructure element such as a pillar, casting sufficient concrete in the form so as to fill it, awaiting the setting and hardening of the concrete and finally revealing the foundation element by removing the components of the form.
  • a first object of the present invention is to provide a foundation element which is much easier and quicker to put into use than prior art foundations and requires only rough levelling and flattening of the ground, all of which considerably reduces the costs of transport and execution.
  • a foundation element characterised in that it includes a rigid, prefabricated, monolithic frame, including at least two opposite, confining side walls and cross-members interconnecting the two side walls so as to form a casting through-cavity between these walls which, in its condition of use, is downwardly and upwardly open, and in that the frame has adjustable support devices associated with each of the side walls for maintaining these walls at a height above the ground that is adjustable, the monolithic frame being intended to be placed on the ground with the interposition of the adjustable support devices and being intended to receive a settable fluid binder material into its through-cavity, the binder material being able to spill out onto the ground between this and the side walls and to fill the cavity so as to encapsulate the cross-members and iron bars or other connector members for connection to the superstructure element and, after hardening, to constitute a monolithic mass which connects the foundation element and the superstructure element permanently to the ground.
  • This solution enables a relatively light, monolithic frame for use as a non-recoverable form to be prefabricated, the frame being transportable at little cost from the factory to the construction site and, given its lightness, being movable equally cheaply on site.
  • the ground at the construction site intended to receive the frame needs to be only roughly flattened and levelled since the final levelling of the frame may be achieved after it has been laid by suitable manipulation of the adjustable support devices with the aid of spirit levels or more advanced systems such as modern satellite positioning systems.
  • the binder material in spreading out over the ground, adapts to its morphology and ensures an extremely good distribution of the load over the support surface;
  • the frame and the binder material constitute a monolithic foundation element.
  • those surfaces of the foundation element thus formed which are open to view are constituted by parts of the frame, which is prefabricated, these surfaces may have a finished appearance from the start.
  • the rigid monolithic frame is itself mechanically strong, it is able to support a superstructure element for an indefinite period of time before its cavity is filled with the binder material.
  • a foundation element according to the invention enables a method to be carried out, according to the invention itself, for the construction of a prefabricated structure which is characterised by the following operations:
  • connection of the frame and the superstructure element at least by means of a connecting reinforcement fixed, on the one hand, to the superstructure element and, on the other hand, inserted in the frame;
  • the invention also relates to a prefabricated structure made by this method.
  • the invention lends itself ideally to the construction of a prefabricated artificial tunnel.
  • tunnel sections include a prefabricated bed which interconnects the piers as well as the two piers and the arch.
  • the method of the invention is characterised in that in order to constitute each of the consecutive sections, there is used, in addition to the prefabricated elements in the form of piers and an arch, a pair of foundation elements each of which is of the type claimed, and in that the tunnel section is made by the following operations:
  • connection of each frame and its pier at least by means of a connecting reinforcement fixed, on the one hand, to the pier and, on the other hand, inserted in the frame;
  • This method does not require the use of a prefabricated bed since the two foundation elements do not require prior interconnection to stabilise the structure since they are firmly anchored to the ground.
  • the tunnel may subsequently be completed by a bed cast by conventional methods, even af ter the tunnel has been covered with the layer of earth.
  • the invention also relates to an artificial tunnel made by a method according to the invention and, in particular, to an artificial tunnel characterised in that the piers and the arch are articulated together by joints which each comprise a longitudinal channel of arcuate section and a longitudinal rib of corresponding arcuate section, formed along the adjoining edges of the pier and of the arch, and in that the permanent connecting elements of each articulation are in the form of tie rods which substantially intersect the longitudinal axis of articulation of the joint.
  • An artificial tunnel which includes couplings having the said configuration and permanent connecting elements is known from EP-A-0 244 890.
  • the permanent connecting elements are constituted by tie rods which extend tangentially on the exterior of the structure and which permanently lock the joints so as to prevent mutual pivoting in the finished structure.
  • tie rods which substantially intersect the longitudinal axis of articulation of the joint however enables an artificial tunnel to be made in which the elements are always articulated together so that they can always pivot relative to each other about the longitudinal axis just as their rotoidal coupling is always ensured, even under the action of external horizontal and sussultatory forces.
  • the tunnel is thus suitable for use in seismic regions or on unstable ground.
  • the term “artificial tunnel” is used conventionally to indicate a tunnel proper, for example a road or rail tunnel, or a structure with a relatively small section such as a drainage culvert or other underground duct or water conduit or the like.
  • FIG. 1 is a perspective view of a prefabricated frame intended to constitute a foundation element according to a first embodiment of the invention
  • FIG. 2 is an elevational view in which the frame of FIG. 1 is shown sectioned in the transverse plane indicated II-II in FIG. 1 and in which part of a superstructure element being positioned on the frame is shown,
  • FIG. 3 is a partial section showing, on an enlarged scale, the part indicated by the arrow III in FIG. 2 and equipment for operating an adjustable support device incorporated in the frame,
  • FIG. 4 is a representation similar to that of FIG. 2 in which the superstructure element has been positioned on the frame and a binder material is being cast in the cavity of the frame itself,
  • FIG. 5 is a perspective view similar to FIG. 1, showing a monolithic frame according to another embodiment of the invention.
  • FIG. 6 is a perspective view showing the frame of FIG. 5 and part of a superstructure element, partly cut-away, while being lowered on to the frame,
  • FIG. 7 is a plan view showing several similar frames laid in alignment in use
  • FIG. 8 is an elevational view in which the frame of FIGS. 5 and 6 is shown sectioned in the same manner as in FIG. 2, and which illustrates a superstructure element, partly in section, in its position resting on the frame,
  • FIG. 9 is a perspective view showing a section of a prefabricated tunnel during assembly
  • FIG. 10 is a perspective view showing several sections of the prefabricated tunnel after assembly.
  • FIG. 11 is an enlarged transverse section taken on the plane indicated XI-XI in FIG. 10.
  • a rigid, prefabricated, monolithic frame is generally indicated 10 .
  • the frame 10 is preferably of vibrated reinforced concrete or other suitable reinforced conglomerate.
  • the frame 10 includes, integrally, two opposite, containing side walls 12 and a pair of cross-members 14 interconnecting the two walls 12 .
  • the two walls 12 are also interconnected by cross-members in the form of reinforcing iron rods 16 , the ends of which are anchored in the walls 12 during their manufacture.
  • the two cross-members 14 are spaced inwardly from the ends of the side walls 12 so as to give the frame 10 a double-H shape in plan, with the side walls 12 corresponding to the legs and each cross-member 14 corresponding to one of two parallel cross-arms.
  • the upper and lower edges of the two cross-members 14 have sets of aligned, semi-circular notches 18 which, as will be clarified below, serve to house iron rods for connecting several frames 10 laid in alignment.
  • the tubular inserts 20 form parts of adjustable support devices generally indicated 22 .
  • the adjustable support devices 22 are provided in the ratio of two devices 22 for each of the opposite side walls 12 . Each device 22 is located close to one of the ends of the respective side wall.
  • the tubular insert 20 constitutes the nut of a jackscrew.
  • the screw of the jack is constituted by a threaded shaft 24 which has a foot 26 rotatably coupled to its lower end.
  • the upper end of the threaded shaft 24 serves as an operating head and has a transverse notch 28 or other suitable formation engageable by a correspondingly-shaped end of an operating tool 30 in the form of a T-shaped wrench, the shank of which is inserted in the tubular insert 20 from above.
  • FIGS. 2 to 4 the profile of the ground on which the frame 10 has been placed in use is indicated G.
  • the ground G has been flattened and levelled rather roughly, and may even have a slope, before the laying of the frame 10 .
  • the frame 10 even after levelling, remains at a certain height from the ground G so as to define a space S beneath the side walls 12 and the cross-members 14 .
  • the frame 10 is ready to receive a prefabricated superstructure element indicated generally at 32 in FIGS. 2 and 4.
  • the superstructure element 32 may be any prefabricated element, such as a pier or pillar, a wall portion or the like.
  • the superstructure element has iron rods 34 projecting from its underside which constitute a connecting reinforcement which, when the element 32 is lowered in the direction of the arrow A of FIG. 2, are inserted in the through-cavity defined between the cross-members 14 and the transverse rods 16 in the frame 10 .
  • the superstructure element 32 may remain temporarily supported by the frame 10 .
  • the through-cavity defined by the frame 10 is filled with a cement conglomerate or other fluid binder 36 which spreads out of the space S and under the containing walls 12 and the cross-members 14 (FIG. 2 and 3 ), as indicated at 38 .
  • the binder material 36 once hardened, anchors the foundation element thus formed firmly to the ground G and connects the frame 10 and the superstructure element 32 together in a monolithic block.
  • FIGS. 5 and 6 illustrate a frame having characteristics similar to those of the frame 10 of FIG. 1 and 2 .
  • This frame is generally indicated 10 a.
  • the frame 10 a has means for fixing it temporarily to a superstructure element part of which is illustrated in FIG. 6 where it is generally indicated 32 a.
  • the temporary fixing means with which the frame 10 a is provided consist of threaded columns 40 incorporated in the cross-members 14 and which, in use, project upwardly to enable the superstructure element 32 a to be fixed by bolting.
  • Each cross-member 14 may have one or more threaded columns 40 which project from its upper face into the spaces between the notches 18 .
  • FIG. 5 all the possible positions of the threaded columns 40 are illustrated in broken outline except for one position for each cross-member 14 which is illustrated in continuous outline to specify a selected position corresponding to that of the superstructure element 32 a of FIG. 6, as well, as will be described below, as superstructure elements in the form of piers for prefabricated artificial tunnel sections.
  • the frame 10 a of FIGS. 5 and 6 differs from the frame 10 of FIGS. 1 and 2 in that at least some of the iron reinforcing rods 16 project from the periphery of the frame 10 a to enable the foundation element to be connected to contiguous structures. More particularly, in the embodiment of FIGS. 5 and 6, the reinforcing rods 16 have appendages 16 a which project outwardly from one of the side walls 12 .
  • the superstructure element 32 a which may be a pillar, pier, a portion of a wall or the like, has a complex of rods 34 a projecting from underneath to constitute a connecting reinforcement.
  • two holes 42 extend from the lower faces of the elements 32 a and open into recesses 44 formed in one side of the element 32 a.
  • the holes 42 are so arranged that, when the superstructure element 32 a is coupled with the frame la, the connecting rods 34 a are inserted in the through-cavity defined by the frame 10 a between the cross-members 14 and the transverse rods 16 and, at the same time, the threaded columns 40 are fitted into the holes 42 and their threaded ends project into the recesses 44 .
  • the frame 10 a and the superstructure element 32 a may be made rigid with each other by means of nuts 46 screwed onto the columns 40 .
  • the temporary connection formed by means of the threaded columns 40 or equivalent mechanical connection means not only allows the superstructure element 32 a to be fixed temporarily to a frame 10 a when this has already been placed in its position of use and possibly already levelled, but also forms a rigid unitary unit, comprising the frame 10 a and the element 32 a , which can be made in a place other than that in which it is to be put to use, for example in a zone separate from the construction site.
  • This unit may then be placed in its position of use, all together, by means of a suitable machine such as a crane.
  • FIG. 7 illustrates the advantageous possibility of providing several frames in alignment, without discontinuities between their side walls 12 .
  • a method of construction such as that described lends itself ideally to the production of a prefabricated artificial tunnel.
  • FIG. 9 shows the elements which make up a section of a prefabricated artificial tunnel in a disconnected condition.
  • the tunnel section is completed by a prefabricated upper element in the form of an arch, generally indicated 50 .
  • each artificial tunnel section the ground is first excavated in the usual manner to form a cutting (not shown) the bottom of which is flattened and levelled roughly.
  • each frame 10 a is laid with adjustable support devices interposed between the frame and the ground, for example, devices such as that illustrated in FIG. 3.
  • the two opposing frames 10 a are then levelled in the manner described above by means of the adjustable support devices.
  • the piers 32 a are then placed on the frames 10 a which have already been laid and possibly levelled previously, or may be fixed temporarily to each frame 10 a in a zone separate from the construction site and are then placed in the position of use together with their frames 10 a.
  • an arch element 50 is placed on the top of the two opposite piers, as illustrated in FIG. 10.
  • FIG. 11 A preferred configuration of one of these articulated joints is illustrated in FIG. 11.
  • each pier 32 a is formed with an arcuate-section longitudinal channel; a longitudinal rib 54 of corresponding arcuate section is formed on the corresponding longitudinal edge of the arch element 50 .
  • the pier 32 a may have an arcuate rib and the arch 50 may have a corresponding arcuate channel.
  • the pier 32 a and the arch 50 are formed with respective recesses 56 , 58 which open into their extradotal surfaces in the zones adjacent the joint.
  • Respective holes 60 , 62 extend from these recesses 56 , 58 , through the pier 32 a and the arch 50 respectively to open into the bottom of the channel 52 and the top of the rib 54 respectively.
  • a tie rod in the form of a threaded bar 64 is fitted into the pair of aligned holes 60 , 62 , and finally clamping nuts 66 are screwed onto its two ends and tightened.
  • the aligned holes 60 , 62 extend tangentially within the adjoining portions of the pier 32 a and the arch 50 and, with this arrangement, the tie rod 64 substantially intersects the longitudinal axis of articulation of the joint.
  • the recesses 56 , 58 are filled with a sealing material 68 , for example a cement mortar.
  • the structure of the artificial tunnel When the structure of the artificial tunnel has been completed, it is covered in the usual manner with a covering of earth, preferably after it has been water-proofed.
  • the appendages 16 a of the iron reinforcements project inwardly of the tunnel from the individual frames 10 a.
  • the projecting appendages 16 a of the rods serve to fix a plate, for example a road bed, to the frames 10 a , it being possible to cast the bed in the conventional manner before or after the tunnel is covered with earth.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A foundation element comprises a rigid monolithic prefabricated frame (10) which includes at least two opposite containing side walls (12) and cross-members (14) interconnecting the two side walls (12) so as to form a casting through-cavity between these two walls (12). The frame (10) is intended to be located on the ground (G) with the interposition of adjustable support devices (22) and is intended to receive a hardenable fluid binder material (36) poured into its through-cavity and adapted to spread onto the ground (G) between this and the side walls (12) and to fill the cavity, encapsulating the cross-members (14) and the iron rods (34) or other connecting members for connecting a superstructure element (32). The invention also relates to prefabricated structures including prefabricated tunnels, with foundation elements formed by means of the said prefabricated frames (10).

Description

  • The present invention relates firstly to a foundation element for supporting a superstructure element on substantially level ground. [0001]
  • In the construction of buildings both by traditional methods of casting reinforced concrete and with the use of prefabricated elements, the foundation elements are, for the most part, also cast by a traditional method. [0002]
  • This method consists of assembling a form on flat, levelled ground, placing the necessary reinforcing bars in the form, including bars which project upwardly for connection to a superstructure element such as a pillar, casting sufficient concrete in the form so as to fill it, awaiting the setting and hardening of the concrete and finally revealing the foundation element by removing the components of the form. [0003]
  • This traditional method is slow and requires a large workforce and is therefore expensive. [0004]
  • Use has also been made of prefabricated foundation elements in the form of monolithic blocks which are also placed on flat, levelled ground. This solution is known, for example, from U.S. Pat. No. 1,474,808. These prefabricated monolithic elements have the disadvantage of being very expensive to transport and move because of their considerable weight and considerable bulk. [0005]
  • Both these known methods require the ground on which the foundation elements are cast or placed to be not only perfectly flat but also perfectly horizontal, which is very expensive. [0006]
  • A first object of the present invention is to provide a foundation element which is much easier and quicker to put into use than prior art foundations and requires only rough levelling and flattening of the ground, all of which considerably reduces the costs of transport and execution. [0007]
  • According to the present invention this object is achieved by means of a foundation element characterised in that it includes a rigid, prefabricated, monolithic frame, including at least two opposite, confining side walls and cross-members interconnecting the two side walls so as to form a casting through-cavity between these walls which, in its condition of use, is downwardly and upwardly open, and in that the frame has adjustable support devices associated with each of the side walls for maintaining these walls at a height above the ground that is adjustable, the monolithic frame being intended to be placed on the ground with the interposition of the adjustable support devices and being intended to receive a settable fluid binder material into its through-cavity, the binder material being able to spill out onto the ground between this and the side walls and to fill the cavity so as to encapsulate the cross-members and iron bars or other connector members for connection to the superstructure element and, after hardening, to constitute a monolithic mass which connects the foundation element and the superstructure element permanently to the ground. [0008]
  • This solution enables a relatively light, monolithic frame for use as a non-recoverable form to be prefabricated, the frame being transportable at little cost from the factory to the construction site and, given its lightness, being movable equally cheaply on site. The ground at the construction site intended to receive the frame needs to be only roughly flattened and levelled since the final levelling of the frame may be achieved after it has been laid by suitable manipulation of the adjustable support devices with the aid of spirit levels or more advanced systems such as modern satellite positioning systems. [0009]
  • In view of the adjustable support devices, a space is left between the levelled framework and the ground through which the fluid concrete or other binder material may spread out of the frame, thereby widening the base for the latter. [0010]
  • The binder material, in spreading out over the ground, adapts to its morphology and ensures an extremely good distribution of the load over the support surface; [0011]
  • After hardening, the frame and the binder material constitute a monolithic foundation element. [0012]
  • Moreover since those surfaces of the foundation element thus formed which are open to view are constituted by parts of the frame, which is prefabricated, these surfaces may have a finished appearance from the start. [0013]
  • As the rigid monolithic frame is itself mechanically strong, it is able to support a superstructure element for an indefinite period of time before its cavity is filled with the binder material. [0014]
  • A foundation element according to the invention enables a method to be carried out, according to the invention itself, for the construction of a prefabricated structure which is characterised by the following operations: [0015]
  • the placing of the rigid monolithic frame of the foundation element on the ground with the interposition of the adjustable support device between the frame and the ground; [0016]
  • the levelling of the frame by adjustment of its support devices; [0017]
  • the connection of the frame and the superstructure element at least by means of a connecting reinforcement fixed, on the one hand, to the superstructure element and, on the other hand, inserted in the frame; [0018]
  • the casting of a hardenable fluid binder material in the cavity in the frame so that this fluid material, after having spread over the ground beneath the frame, fills the cavity of the frame and encapsulates therein cross-members of the latter and the connecting reinforcement; [0019]
  • the hardening of the binder material to obtain a monolithic unit comprising the base element and the superstructure element. [0020]
  • The invention also relates to a prefabricated structure made by this method. [0021]
  • The invention lends itself ideally to the construction of a prefabricated artificial tunnel. [0022]
  • Methods for the construction of prefabricated artificial tunnels on levelled ground constituted by the bottom of a cutting are already known from U.S. Pat. No. 109,886 and EP-A-0 244 890, these tunnels subsequently being covered with earth and being of the type in which the tunnel. is formed from consecutive inverted U-sections, each of which includes prefabricated lateral superstructure elements in the form of piers and a prefabricated upper element in the form of an arch resting on the tops of the piers. [0023]
  • In methods known from these documents, the, tunnel sections include a prefabricated bed which interconnects the piers as well as the two piers and the arch. [0024]
  • The method of the invention is characterised in that in order to constitute each of the consecutive sections, there is used, in addition to the prefabricated elements in the form of piers and an arch, a pair of foundation elements each of which is of the type claimed, and in that the tunnel section is made by the following operations: [0025]
  • the laying of two rigid monolithic frames on the ground on opposite sides of the bottom of the cutting, each with the interposition of the said adjustable support devices between the frame and the ground; [0026]
  • the levelling of the two frames by adjustment of their adjustable support devices; [0027]
  • the connection of each frame and its pier at least by means of a connecting reinforcement fixed, on the one hand, to the pier and, on the other hand, inserted in the frame; [0028]
  • the casting of a hardenable fluid binder material in the cavity in the frame so that this fluid material, after spreading over the ground beneath the frame, f ills the cavity in the frame and encapsulates the cross-members of the latter and the connecting reinforcement; [0029]
  • the hardening of the binder material to obtain a monolithic unit comprising the base element and the pier; [0030]
  • the placing of the arch on the two piers. [0031]
  • This method does not require the use of a prefabricated bed since the two foundation elements do not require prior interconnection to stabilise the structure since they are firmly anchored to the ground. [0032]
  • The tunnel may subsequently be completed by a bed cast by conventional methods, even af ter the tunnel has been covered with the layer of earth. [0033]
  • The invention also relates to an artificial tunnel made by a method according to the invention and, in particular, to an artificial tunnel characterised in that the piers and the arch are articulated together by joints which each comprise a longitudinal channel of arcuate section and a longitudinal rib of corresponding arcuate section, formed along the adjoining edges of the pier and of the arch, and in that the permanent connecting elements of each articulation are in the form of tie rods which substantially intersect the longitudinal axis of articulation of the joint. [0034]
  • An artificial tunnel which includes couplings having the said configuration and permanent connecting elements is known from EP-A-0 244 890. [0035]
  • In this document, the permanent connecting elements are constituted by tie rods which extend tangentially on the exterior of the structure and which permanently lock the joints so as to prevent mutual pivoting in the finished structure. [0036]
  • This locking of the articulations renders the artificial tunnel according to the document EP-A-0 244 890 unsuitable for use in seismic regions, on unstable ground and where they are subject to unilateral forces resulting from asymmetric external loads, whether permanent or occasional. [0037]
  • The use of tie rods which substantially intersect the longitudinal axis of articulation of the joint however enables an artificial tunnel to be made in which the elements are always articulated together so that they can always pivot relative to each other about the longitudinal axis just as their rotoidal coupling is always ensured, even under the action of external horizontal and sussultatory forces. The tunnel is thus suitable for use in seismic regions or on unstable ground. [0038]
  • Throughout the present description and in the claims, the term “artificial tunnel” is used conventionally to indicate a tunnel proper, for example a road or rail tunnel, or a structure with a relatively small section such as a drainage culvert or other underground duct or water conduit or the like. [0039]
  • The invention will be more clearly understood from a reading of the detailed description which follows, made with reference to the appended drawings, given purely by way of non-limitative example and in which: [0040]
  • FIG. 1 is a perspective view of a prefabricated frame intended to constitute a foundation element according to a first embodiment of the invention, [0041]
  • FIG. 2 is an elevational view in which the frame of FIG. 1 is shown sectioned in the transverse plane indicated II-II in FIG. 1 and in which part of a superstructure element being positioned on the frame is shown, [0042]
  • FIG. 3 is a partial section showing, on an enlarged scale, the part indicated by the arrow III in FIG. 2 and equipment for operating an adjustable support device incorporated in the frame, [0043]
  • FIG. 4 is a representation similar to that of FIG. 2 in which the superstructure element has been positioned on the frame and a binder material is being cast in the cavity of the frame itself, [0044]
  • FIG. 5 is a perspective view similar to FIG. 1, showing a monolithic frame according to another embodiment of the invention, [0045]
  • FIG. 6 is a perspective view showing the frame of FIG. 5 and part of a superstructure element, partly cut-away, while being lowered on to the frame, [0046]
  • FIG. 7 is a plan view showing several similar frames laid in alignment in use, [0047]
  • FIG. 8 is an elevational view in which the frame of FIGS. 5 and 6 is shown sectioned in the same manner as in FIG. 2, and which illustrates a superstructure element, partly in section, in its position resting on the frame, [0048]
  • FIG. 9 is a perspective view showing a section of a prefabricated tunnel during assembly, [0049]
  • FIG. 10 is a perspective view showing several sections of the prefabricated tunnel after assembly, and [0050]
  • FIG. 11 is an enlarged transverse section taken on the plane indicated XI-XI in FIG. 10.[0051]
  • With reference to FIGS. 1 and 2, a rigid, prefabricated, monolithic frame is generally indicated [0052] 10.
  • The [0053] frame 10 is preferably of vibrated reinforced concrete or other suitable reinforced conglomerate.
  • The [0054] frame 10 includes, integrally, two opposite, containing side walls 12 and a pair of cross-members 14 interconnecting the two walls 12.
  • The two [0055] walls 12 are also interconnected by cross-members in the form of reinforcing iron rods 16, the ends of which are anchored in the walls 12 during their manufacture.
  • Preferably, as shown, the two [0056] cross-members 14 are spaced inwardly from the ends of the side walls 12 so as to give the frame 10 a double-H shape in plan, with the side walls 12 corresponding to the legs and each cross-member 14 corresponding to one of two parallel cross-arms.
  • The advantage of this double-H arrangement will be clarified below. [0057]
  • The upper and lower edges of the two [0058] cross-members 14 have sets of aligned, semi-circular notches 18 which, as will be clarified below, serve to house iron rods for connecting several frames 10 laid in alignment.
  • Internally-threaded tubular inserts [0059] 20 are embedded in the end regions of the side walls 12.
  • The tubular inserts [0060] 20 form parts of adjustable support devices generally indicated 22.
  • A preferred embodiment of these support devices will be described with reference to FIG. 3. [0061]
  • The [0062] adjustable support devices 22 are provided in the ratio of two devices 22 for each of the opposite side walls 12. Each device 22 is located close to one of the ends of the respective side wall.
  • With reference to FIG. 3, the [0063] tubular insert 20 constitutes the nut of a jackscrew.
  • The screw of the jack is constituted by a threaded [0064] shaft 24 which has a foot 26 rotatably coupled to its lower end.
  • The upper end of the threaded [0065] shaft 24 serves as an operating head and has a transverse notch 28 or other suitable formation engageable by a correspondingly-shaped end of an operating tool 30 in the form of a T-shaped wrench, the shank of which is inserted in the tubular insert 20 from above.
  • In FIGS. [0066] 2 to 4, the profile of the ground on which the frame 10 has been placed in use is indicated G.
  • The ground G has been flattened and levelled rather roughly, and may even have a slope, before the laying of the [0067] frame 10.
  • After the [0068] frame 10 has been laid, as shown in FIG. 2, it is levelled by adjustment of its support devices 22 with the aid of the T-shaped wrench as indicated at 30 in FIG. 3 or an equivalent tool.
  • The [0069] frame 10, even after levelling, remains at a certain height from the ground G so as to define a space S beneath the side walls 12 and the cross-members 14.
  • The [0070] frame 10, thus levelled, is ready to receive a prefabricated superstructure element indicated generally at 32 in FIGS. 2 and 4.
  • The [0071] superstructure element 32 may be any prefabricated element, such as a pier or pillar, a wall portion or the like.
  • In each case the superstructure element has [0072] iron rods 34 projecting from its underside which constitute a connecting reinforcement which, when the element 32 is lowered in the direction of the arrow A of FIG. 2, are inserted in the through-cavity defined between the cross-members 14 and the transverse rods 16 in the frame 10.
  • In the final position of the [0073] element 32, illustrated in FIG. 4, its lower face rests on the cross-members 14.
  • In this condition the [0074] superstructure element 32 may remain temporarily supported by the frame 10.
  • Once the [0075] superstructure element 32 has been laid as shown in FIG. 4, the through-cavity defined by the frame 10 is filled with a cement conglomerate or other fluid binder 36 which spreads out of the space S and under the containing walls 12 and the cross-members 14 (FIG. 2 and 3), as indicated at 38.
  • The [0076] binder material 36, once hardened, anchors the foundation element thus formed firmly to the ground G and connects the frame 10 and the superstructure element 32 together in a monolithic block.
  • FIGS. 5 and 6 illustrate a frame having characteristics similar to those of the [0077] frame 10 of FIG. 1 and 2.
  • This frame is generally indicated [0078] 10 a.
  • Parts substantially identical to those of the [0079] frame 10 of FIGS. 1 and 2 are generally indicated by the same reference numerals and their description will not be repeated.
  • The [0080] frame 10 a has means for fixing it temporarily to a superstructure element part of which is illustrated in FIG. 6 where it is generally indicated 32 a.
  • In a preferred embodiment, the temporary fixing means with which the [0081] frame 10 a is provided consist of threaded columns 40 incorporated in the cross-members 14 and which, in use, project upwardly to enable the superstructure element 32 a to be fixed by bolting.
  • Each cross-member [0082] 14 may have one or more threaded columns 40 which project from its upper face into the spaces between the notches 18.
  • In FIG. 5 all the possible positions of the threaded [0083] columns 40 are illustrated in broken outline except for one position for each cross-member 14 which is illustrated in continuous outline to specify a selected position corresponding to that of the superstructure element 32 a of FIG. 6, as well, as will be described below, as superstructure elements in the form of piers for prefabricated artificial tunnel sections.
  • The [0084] frame 10 a of FIGS. 5 and 6 differs from the frame 10 of FIGS. 1 and 2 in that at least some of the iron reinforcing rods 16 project from the periphery of the frame 10 a to enable the foundation element to be connected to contiguous structures. More particularly, in the embodiment of FIGS. 5 and 6, the reinforcing rods 16 have appendages 16 a which project outwardly from one of the side walls 12.
  • As in the case of the [0085] superstructure element 32 of FIGS. 2 and 4, the superstructure element 32 a, which may be a pillar, pier, a portion of a wall or the like, has a complex of rods 34 a projecting from underneath to constitute a connecting reinforcement.
  • Moreover, as illustrated in FIGS. 6 and 8, two [0086] holes 42 extend from the lower faces of the elements 32 a and open into recesses 44 formed in one side of the element 32 a.
  • The [0087] holes 42 are so arranged that, when the superstructure element 32 a is coupled with the frame la, the connecting rods 34 a are inserted in the through-cavity defined by the frame 10 a between the cross-members 14 and the transverse rods 16 and, at the same time, the threaded columns 40 are fitted into the holes 42 and their threaded ends project into the recesses 44.
  • With the [0088] superstructure element 32 a fitted onto the corresponding edges of the cross-members 14, the frame 10 a and the superstructure element 32 a may be made rigid with each other by means of nuts 46 screwed onto the columns 40.
  • The temporary connection formed by means of the threaded [0089] columns 40 or equivalent mechanical connection means not only allows the superstructure element 32 a to be fixed temporarily to a frame 10 a when this has already been placed in its position of use and possibly already levelled, but also forms a rigid unitary unit, comprising the frame 10 a and the element 32 a, which can be made in a place other than that in which it is to be put to use, for example in a zone separate from the construction site.
  • This unit may then be placed in its position of use, all together, by means of a suitable machine such as a crane. [0090]
  • FIG. 7 illustrates the advantageous possibility of providing several frames in alignment, without discontinuities between their [0091] side walls 12.
  • This possibility also exists in the case of the [0092] frame 10 of FIGS. 1 and 2.
  • To ensure firm connection between the aligned frames [0093] 10 a when these are placed in their positions of use, both before and after levelling, they are linked by two webs, an upper and lower one, of longitudinal, iron connecting rods 48 which are housed in the notches 18.
  • Although this is not shown in FIG. 7, one may suppose that a [0094] superstructure element 32 a has already been fixed temporarily to each frame 10 a, or a common superstructure element 32 a has been fixed to several frames 10 a.
  • After one or [0095] more frames 10 a have been laid and levelled and one or more superstructure elements 32 a have been fixed in the configuration shown in FIG. 8, the cement conglomerate or other binder material is then cast in the manner described with reference to FIG. 4.
  • As may be seen from FIG. 7, by virtue of the double-H shape of the [0096] frames 10 a, further through-cavities are defined between the adjoining frames 10 a for receiving a fluid binder such as a cement conglomerate.
  • A method of construction such as that described lends itself ideally to the production of a prefabricated artificial tunnel. [0097]
  • FIG. 9 shows the elements which make up a section of a prefabricated artificial tunnel in a disconnected condition. [0098]
  • For simplicity, the two piers of the tunnel section, which constitute the superstructure elements considered above, are again indicated [0099] 32 a and their frames are again indicated 10 a.
  • The tunnel section is completed by a prefabricated upper element in the form of an arch, generally indicated [0100] 50.
  • The means for coupling and interconnecting each [0101] pier 32 a with its arch element 50 will be described below.
  • To construct each artificial tunnel section, the ground is first excavated in the usual manner to form a cutting (not shown) the bottom of which is flattened and levelled roughly. [0102]
  • Subsequently, for each gallery section, two [0103] frames 10 a are laid on the ground on opposite sides of the bottom of the cutting in the arrangement illustrated in FIG. 9.
  • It is understood that each [0104] frame 10 a is laid with adjustable support devices interposed between the frame and the ground, for example, devices such as that illustrated in FIG. 3.
  • The two opposing [0105] frames 10 a are then levelled in the manner described above by means of the adjustable support devices.
  • As described with reference to FIG. 8, the [0106] piers 32 a are then placed on the frames 10 a which have already been laid and possibly levelled previously, or may be fixed temporarily to each frame 10 a in a zone separate from the construction site and are then placed in the position of use together with their frames 10 a.
  • These operations may be carried out for each individual tunnel section being constructed or for a group of consecutive sections. [0107]
  • With the [0108] frames 10 a and the piers 32 a laid and positioned correctly, the cement conglomerate or other binder material is then poured in as illustrated at 36 a in FIG. 10.
  • As a final phase for each section, an [0109] arch element 50 is placed on the top of the two opposite piers, as illustrated in FIG. 10.
  • To advantage, the adjoining edges of the [0110] piers 32 a and the arch 50 in each section are articulated together by joints.
  • A preferred configuration of one of these articulated joints is illustrated in FIG. 11. [0111]
  • The upper longitudinal edge of each [0112] pier 32 a is formed with an arcuate-section longitudinal channel; a longitudinal rib 54 of corresponding arcuate section is formed on the corresponding longitudinal edge of the arch element 50.
  • The arrangement of the mutual articulation formations may be reversed, that is to say, the [0113] pier 32 a may have an arcuate rib and the arch 50 may have a corresponding arcuate channel.
  • The [0114] pier 32 a and the arch 50 are formed with respective recesses 56, 58 which open into their extradotal surfaces in the zones adjacent the joint.
  • [0115] Respective holes 60, 62 extend from these recesses 56, 58, through the pier 32 a and the arch 50 respectively to open into the bottom of the channel 52 and the top of the rib 54 respectively.
  • When the mutual articulation formations constituted by the [0116] channels 52 and ribs 54 are coupled as shown in FIG. 11, the holes 60, 62 are aligned.
  • A tie rod in the form of a threaded [0117] bar 64 is fitted into the pair of aligned holes 60, 62, and finally clamping nuts 66 are screwed onto its two ends and tightened.
  • As will be seen, the aligned [0118] holes 60, 62 extend tangentially within the adjoining portions of the pier 32 a and the arch 50 and, with this arrangement, the tie rod 64 substantially intersects the longitudinal axis of articulation of the joint.
  • This ensures the rotoidal coupling of the [0119] piers 32 a and the arches 50, with the advantages explained in the introduction to the present description.
  • Once the [0120] tie rods 64 have been tensioned by means of their nuts 66, the recesses 56, 58 are filled with a sealing material 68, for example a cement mortar.
  • When the structure of the artificial tunnel has been completed, it is covered in the usual manner with a covering of earth, preferably after it has been water-proofed. [0121]
  • As may be seen in FIG. 10, the [0122] appendages 16 a of the iron reinforcements project inwardly of the tunnel from the individual frames 10 a.
  • The projecting [0123] appendages 16 a of the rods serve to fix a plate, for example a road bed, to the frames 10 a, it being possible to cast the bed in the conventional manner before or after the tunnel is covered with earth.

Claims (24)

1. A foundation element for supporting a superstructure element (32; 32 a) on substantially flat ground (G), this foundation element being characterised in that it includes a rigid, prefabricated, monolithic frame (10; 10 a), including at least two opposite, containing side walls (12) and cross-members (14) interconnecting the two side walls (12) so as to form a casting through-cavity between these two walls (12) which, in its condition of use, is downwardly and upwardly open, and in that the frame (10; 10 a) has adjustable support devices (22) associated with each of the side walls (12) for maintaining these walls at a height above the ground (G) that is adjustable, the monolithic frame (10, 10 a) being intended to be placed on the ground (G) with the interposition of the adjustable support devices (22) and being intended to receive a hardenable fluid binder material (36) in its through-cavity, the binder material being able to spill out onto the ground (G) between this and the side walls (12) and to fill the cavity so as to encapsulate the cross-members (14) and iron bars (34; 34 a) or other connector members for connection to the superstructure element (32; 32 a) and, after hardening, to constitute a monolithic mass which connects the foundation element and the superstructure element (32; 32 a) permanently to the ground (G).
2. A foundation element according to claim 1, characterised in that the rigid monolithic frame (10; 10 a) is a prefabricated element of reinforced conglomerate, such as reinforced concrete, which includes the said containing side walls (12) and the cross-members (14) formed integrally with the side walls (12).
3. A foundation element according to claim 2, characterised in that the rigid monolithic frame (10; 10 a), seen in plan, is in the shape of a double H with the side walls (12) corresponding to the legs and the two cross-members (14) corresponding to the two parallel transverse arms.
4. A foundation element according to claim 2 or claim 3, characterised in that it includes transverse iron bars (16) spaced from and parallel to each other and the cross-members (14), the ends of which bars (16) are anchored in the material of the side walls (12).
5. A foundation element according to any one of claims 2 to 4, characterised in that at least some of the iron bars (16) project from the periphery of the frame (10 a) to constitute appendages (16 a) for connecting the foundation element to contiguous structures.
6. A foundation element according to any one of claims 1 to 5, characterised in that the adjustable support devices (22) are provided in a ratio of two devices for each of the opposite side walls (12), each of the devices (22) being located close to one of the ends of the respective side wall (12).
7. A foundation element according to claim 6, characterised in that each adjustable support device (22) includes a foot (26).
8. A foundation element according to claim 7, characterised in that each foot (26) forms part of a jackscrew (22) which includes, on the one hand, a threaded shaft (24) extending substantially perpendicular to the ground (G) in its condition of use and carrying the foot (26) at its lower end and an operating head (26) at its upper end and, on the other hand, a cooperating female threaded member (20) fixed to the side wall (12).
9. A foundation element according to claim 8, characterised in that each adjustable support device includes a female member in the form of an internally-threaded tubular insert (20) which is incorporated in the respective side wall (12).
10. A foundation element according to any one of the preceding claims, characterised in that the frame (10) includes means (40) for the temporary fixing of a superstructure element (22 a) having corresponding fixing means.
11. A foundation element according to any one of claims 1 to 10, characterised in that it includes threaded columns (40) incorporated in the cross-members (14) and projecting upwardly therefrom in the condition of use, for the fixing of the superstructure element (32 a) by bolting.
12. A method for the construction of a prefabricated structure including at least one foundation element and a superstructure element (32; 32 a), of which the foundation element is laid on substantially levelled ground (G) and the superstructure element (32; 32 a) is supported by the foundation element (10; 10 a)
characterised in that a foundation element according to any one of the preceding claims is used and in that the structure is made by the following operations:
the placing of the rigid monolithic frame (10; 10 a) of the foundation element on the ground (G) with the interposition of the adjustable support devices (22) between the frame (10; 10 a) and the ground (G);
the levelling of the frame (10; 10 a) by adjustment of its support devices (22);
the connection of the frame (10; 10 a) and the superstructure element (32; 32 a) at least by means of a connecting reinforcement (34; 34 a) fixed, on the one hand, to the superstructure element (32; 32 a) and, on the other hand, inserted in the frame (10; 10 a);
the casting of a hardenable fluid binder material in the cavity of the frame so that this fluid material, after having spread over the ground beneath the frame (10; 10 a), fills the cavity of the frame and encapsulates the cross-members (14) of the latter and the connecting reinforcements (34; 34 a);
the hardening of the binder material (36) to obtain a monolithic unit comprising the base element and the superstructure element (32; 32 a).
13. A method of construction according to claim 12, characterised in that a superstructure element (32 a) and a frame (10 a) are used which have mutual mechanical connecting means (40, 42, 46) and, before the casting of the hardenable binder material, the frame (10) is connected temporarily to the foundation element (32) by these connecting means.
14. A method of construction according to claim 13, characterised in that the frame (10 a) and the superstructure element (32 a) are interconnected temporarily before the laying of the frame (10 a), the combination of the frame (10 a) and the superstructure element (32 a) which are temporarily interconnected then being laid together on the ground and the binder material is cast after the levelling of the frame (10 a).
15. A monolithic unit comprising a base element (10; 10 a) and a superstructure element (32; 32 a) made by a method according to any one of claims 11 to 14.
16. A structure including at least one monolithic unit according to claim 15.
17. A method for the construction of a prefabricated artificial tunnel on substantially level ground constituted by the bottom of a cutting, the tunnel subsequently being covered by a layer of earth, of the type in which the tunnel is formed by consecutive inverted-U sections, each of which comprises two prefabricated lateral superstructure elements in the form of piers (32 a) and an upper prefabricated element in the form of an arch (50) resting on the tops of the piers (32 a),
characterised in that, in order to form each of the consecutive sections there is used, in addition to the said prefabricated elements in the form of piers (32 a) and arches (50), a pair of foundation elements each of which is according to any one of claims 1 to 17 and in that the tunnel is built by the following operations:
the laying of two rigid monolithic frames (40 a) on the ground (G) on opposite sides of the bottom of the cutting, each with. the interposition of the said adjustable support devices (22) between the frame and the ground;
the levelling of the two frames (10 a) by adjustment of their adjustable support devices (22);
the connection of each frame (10 a) and its pier (32 a) at least by means of a connecting reinforcement (34 a) fixed, on the one hand, to the pier (32 a) and, on the other hand, inserted in the frame (10 a);
the casting of a hardenable fluid binder material (36 a) in the cavity in the frame so that this fluid material, after spreading over the ground beneath the frame (10 a), fills the cavity in the frame and encapsulates the cross-members (14) of the latter and the connecting reinforcement (34 a);
the hardening of the binder material (36 a) to obtain a monolithic unit comprising the base element and the pier (32 a);
the placing of the arch (50) on the two piers (32 a).
18. A method of construction according to claim 17, characterised in that piers (32 a) and frames (10 a) having mutual mechanical connecting means (40, 42, 46) are used and, before the casting of the hardenable binder material, each frame (10 a) is connected temporarily to its pier (32 a) by means of these connecting means.
19. A method of construction according to claim 18, characterised in that each frame (10 a) and its pier (32 a) are interconnected temporarily before the laying of the frame (10 a) on the ground, the unit constituted by the frame (10 a) and the superstructure element (32 a) interconnected temporarily is then laid on the ground and the binder material is cast after the frame (10 a) has been levelled.
20. A method of construction according to any one of claim 17 to 19, characterised in that piers (32 a) and arches (50) are used which have formations (52, 54) for mutually articulating them about a respective longitudinal axis parallel to the axis of the tunnel and each of the piers (32 a) is secured to its arch by permanent connecting elements (64) so designed as to allow the piers (32 a) to pivot relative to the arch (50) at all times.
21. An artificial tunnel made by a method of construction according to any one of claims 17 to 20.
22. An artificial tunnel made by the method of construction according to claim 20 and characterised in that the piers (32 a) and the arch (50) are articulated together by means of joints which each comprise, on the one hand, a longitudinal channel (52) of arcuate section and, on the other hand, a longitudinal rib (54) of corresponding arcuate section, these being formed on the adjoining edges of the pier (32 a) and of the arch (50), and in that the permanent connecting elements of each articulation are in the form of tie rods (64) which substantially intersect the longitudinal axis of articulation of the joint.
23. An artificial tunnel according to claim 22, characterised in that each of the tie rods is in the form of a threaded bar (64) with clamping nuts (66) or the like, the adjoining parts of each pier (32 a) and arch (50) having aligned holes (60, 62) for the passage of the threaded bars (64), these holes (60, 62) extending tangentially within the adjoining parts, and these adjoining parts having recesses (56, 58) into which the holes (60, 62) open and in which the nuts (66) are located.
24. An artificial tunnel according to claim 23, characterised in that the recesses (56, 58) are formed in the extradotal surfaces of the piers (32 a) and of the arch (50).
US09/908,368 1996-07-17 2001-07-18 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods Expired - Fee Related US6408581B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US09/908,368 US6408581B2 (en) 1996-07-17 2001-07-18 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods

Applications Claiming Priority (8)

Application Number Priority Date Filing Date Title
ITAG96A000002 1996-07-17
IT96AG000002A ITAG960002A1 (en) 1996-07-17 1996-07-17 ECOLOGICAL SELF-STABILIZING PREFABRICATED ARTIFICIAL GALLERY
ITAG96A0002 1996-07-17
ITAG96A0003 1996-09-30
ITAG960003 ITAG960003A1 (en) 1996-09-30 1996-09-30 PREFABRICATED FOUNDATION CALLED "CASSERARMATURA"
ITAG96A000003 1996-09-30
US09/230,147 US6367214B1 (en) 1996-07-17 1997-07-16 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods
US09/908,368 US6408581B2 (en) 1996-07-17 2001-07-18 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
US09/230,147 Continuation US6367214B1 (en) 1996-07-17 1997-07-16 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods
US09/230,147 Division US6367214B1 (en) 1996-07-17 1997-07-16 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods

Publications (2)

Publication Number Publication Date
US20020017068A1 true US20020017068A1 (en) 2002-02-14
US6408581B2 US6408581B2 (en) 2002-06-25

Family

ID=26330217

Family Applications (2)

Application Number Title Priority Date Filing Date
US09/230,147 Expired - Fee Related US6367214B1 (en) 1996-07-17 1997-07-16 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods
US09/908,368 Expired - Fee Related US6408581B2 (en) 1996-07-17 2001-07-18 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US09/230,147 Expired - Fee Related US6367214B1 (en) 1996-07-17 1997-07-16 Foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods

Country Status (8)

Country Link
US (2) US6367214B1 (en)
EP (1) EP0912804B1 (en)
JP (1) JP2000517387A (en)
AT (1) ATE207995T1 (en)
AU (1) AU717556B2 (en)
CA (1) CA2261127A1 (en)
DE (1) DE69707884T2 (en)
WO (1) WO1998003736A1 (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG109988A1 (en) * 2002-09-06 2005-04-28 Eng Shyan Toh Pre-cast panel and a method of constructing a wall structure using pre-cast panels
WO2005078198A1 (en) * 2004-02-12 2005-08-25 Mara-Institut D.O.O. Method of constructing strip foundations with longitudinal socket
US20070175105A1 (en) * 2005-12-23 2007-08-02 Remy Desbiens Ready to assemble shelter
WO2009156818A1 (en) * 2008-06-27 2009-12-30 Geotech Lizenz Ag Prefabricated foundation element for building walls
US20140059957A1 (en) * 2012-08-30 2014-03-06 N. Daniel W. Stark Tower foundation system
US20140290153A1 (en) * 2011-11-02 2014-10-02 EverSheller ApS Construction-unit for immediate or permanent shelter
US8863455B2 (en) * 2012-10-11 2014-10-21 Lafarge Canada Inc. Unitized precast grillage foundation and method for manufacturing the same
CN104428473A (en) * 2012-05-14 2015-03-18 Nev-X系统有限公司 Modular building system
WO2015143354A1 (en) * 2014-03-20 2015-09-24 Michaluk Mitch Arched structure and modular building blocks
CN110344442A (en) * 2019-07-31 2019-10-18 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of prefabricated assembled railway open cut tunnel and its construction method
US10688685B2 (en) * 2015-12-04 2020-06-23 Gabriele MONACHINO Formwork for providing a concrete foundation plinth with exposed horizontal reinforcing bars, plinth provided with such formwork, and structure comprising such plinth
CN114718123A (en) * 2022-04-28 2022-07-08 中国一冶集团有限公司 Prefabricated pipe jacking gallery and cast-in-place pipe gallery butt joint construction method
US11428363B2 (en) 2018-08-14 2022-08-30 Lamprell Energy Lt. Grillage apparatus and method of using and making same
CN115075076A (en) * 2022-07-20 2022-09-20 中交第二公路勘察设计研究院有限公司 High-fill less-soil composite roadbed structure and construction method

Families Citing this family (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19815784A1 (en) * 1998-04-08 1999-10-14 Heinz Stenrueter Agricultural building construction for e.g. cattle sheds
JP3269808B2 (en) * 1998-08-24 2002-04-02 竹村工業株式会社 Method for placing ready-mixed concrete and formwork apparatus used in the method
FR2794784B1 (en) * 1999-06-08 2001-09-07 Joel Queirel NEW BLOCK FORMING LOST FORMWORK ELEMENT FOR REINFORCED CONCRETE WALL
GB0029498D0 (en) * 2000-12-02 2001-01-17 Oceans Engineering Ltd A method of making a foundation
US20020108318A1 (en) * 2001-02-15 2002-08-15 Mikhaylenko Vadim V. Apparatus and method for applying setting material
US6640505B1 (en) * 2001-10-25 2003-11-04 Bebotech Corporation Hybrid arched overfilled structure
US8511043B2 (en) 2002-07-24 2013-08-20 Fyfe Co., Llc System and method of reinforcing shaped columns
US7207149B2 (en) * 2002-07-24 2007-04-24 Fyfe Edward R Anchor and method for reinforcing a structure
DE10341647B4 (en) * 2003-09-10 2006-03-02 Klaus Wabbels Flat foundation for a building made of lightweight construction material and method for the production and dismantling of the flat foundations
US7454871B2 (en) * 2004-03-30 2008-11-25 Joseph Sproules Adjustable pier
BRPI0515356B1 (en) * 2004-09-01 2017-10-10 Hatch Ltd. "ELECTRIC OVEN AND METHOD FOR OPERATING AN ELECTRIC OVEN"
US20070261341A1 (en) * 2005-03-08 2007-11-15 Contech Bridge Solutions, Inc. Open bottom fiber reinforced precast concrete arch unit
US20060201091A1 (en) * 2005-03-08 2006-09-14 Con/Span Bridge Systems Ltd. Open bottom fiber reinforced precast concrete arch unit
ES2326010B2 (en) * 2006-08-16 2011-02-18 Inneo21, S.L. STRUCTURE AND PROCEDURE FOR ASSEMBLING CONCRETE TOWERS FOR WIND TURBINES.
US8479471B2 (en) * 2007-04-02 2013-07-09 Barnet L. Liberman Modular building structures
WO2010067382A1 (en) * 2008-12-12 2010-06-17 Halldor Geir Thorgeirsson Prefabricated housing basement structures and construction method thereof
US8904737B2 (en) 2008-12-18 2014-12-09 Composite Panel Systems, Llc Building panel assemblies and methods of use in wall structures
US9493938B2 (en) 2008-12-18 2016-11-15 Composite Panel Systems, Llc Building panel assemblies and methods of use in wall structures
US8336722B2 (en) * 2009-06-18 2012-12-25 Cardwell Steven A Pallet rack and method for use of same
US8919058B2 (en) 2009-06-22 2014-12-30 Barnet L. Liberman Modular building system for constructing multi-story buildings
US8425153B1 (en) * 2009-11-04 2013-04-23 E & D Company, LLC Arched culvert and method of manufacture
US8425152B1 (en) * 2009-11-04 2013-04-23 E & D Company, LLC Arched culvert and method of manufacture
DE202010001337U1 (en) * 2010-01-26 2011-06-09 GOLDBECK GmbH, 33649 Leveling system for a prefabricated foundation and column arrangement for buildings
US20120085049A1 (en) * 2010-10-08 2012-04-12 Schiffmann Glenn P Footer structures and methods, and panel and wall structures using such footer structures
NO335669B1 (en) * 2011-06-21 2015-01-19 Stabinor As Process for the preparation of a tunnel run, and structural element of concrete for use in the manufacture of tunnel sections for such a tunnel run.
PL2729627T3 (en) * 2011-07-08 2016-08-31 Contech Eng Solutions Llc Foundation system for bridges and other structures
US8925282B2 (en) 2011-07-08 2015-01-06 Contech Engineered Solutions LLC Foundation system for bridges and other structures
US9970166B2 (en) 2012-02-06 2018-05-15 Contech Engineered Solutions LLC Concrete bridge system and related methods
EP2812491B1 (en) 2012-02-06 2016-05-25 Contech Engineered Solutions LLC Concrete bridge system
USD697634S1 (en) 2012-02-20 2014-01-14 Contech Engineered Solutions LLC Upper portion of a concrete bridge unit
USD694910S1 (en) 2012-04-03 2013-12-03 Contech Engineered Solutions LLC Upper portion of a concrete bridge unit
PL2931976T3 (en) * 2012-12-13 2024-07-22 Contech Engineered Solutions LLC Foundation system for bridges and other structures
US9695558B2 (en) 2012-12-13 2017-07-04 Contech Engineered Solutions LLC Foundation system for bridges and other structures
US10053833B2 (en) * 2014-01-24 2018-08-21 Eco Concrete Solutions, Inc. Pre-cast decorative retaining wall system
US9447557B2 (en) 2014-02-21 2016-09-20 Composite Panel Systems, Llc Footer, footer elements, and buildings, and methods of forming same
GB201407868D0 (en) * 2014-05-02 2014-06-18 Soletanche Freyssinet Sas Method of enlarging the space beneath a masonry arch bridge, and a masonry arch bridge
WO2016020932A2 (en) * 2014-08-04 2016-02-11 Srinidhi Anantharaman Deployable pre-fabricated reinforcement cage system
US10267011B2 (en) * 2015-01-23 2019-04-23 Eco Concrete Solutions, Inc. Pre-cast decorative retaining wall system
JP6543077B2 (en) * 2015-04-27 2019-07-10 株式会社竹中工務店 Construction method of structure
US10125506B2 (en) 2015-12-08 2018-11-13 Northern States Metals Company Concrete form system for ballast foundations
US20230030089A1 (en) * 2016-10-26 2023-02-02 Innovative Design Solutions Llc Modular Precast Concrete Water Storage Device and System
US11174614B2 (en) 2017-08-14 2021-11-16 Contech Engineered Solutions LLC Metal foundation system for culverts, buried bridges and other structures
CN113006140A (en) * 2021-04-25 2021-06-22 中化学交通建设集团市政工程有限公司 Underground utility tunnel waterproof construction
US12054896B2 (en) * 2021-08-20 2024-08-06 Structure Sight LLC System for an arch bridge and methods of producing the same
US11814807B1 (en) * 2022-10-13 2023-11-14 Great Plains Tower Products Llc Ballast tray assembly for a tower structure

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US109886A (en) 1870-12-06 Bitehieddec
US1074268A (en) 1912-03-29 1913-09-30 Charles D Kelly Concrete arch.
US1474808A (en) * 1920-02-24 1923-11-20 Zucco Pierre Method of tunnel construction
US2616149A (en) 1941-01-09 1952-11-04 Bowen Colthurst & Partners Ltd Method of molding in situ concrete arched structures
US3195852A (en) * 1963-07-17 1965-07-20 Lundell Mfg Company Concrete form structure
US3286972A (en) * 1964-06-19 1966-11-22 James H Jackson Device for suspending forms from structural beams
US3397494A (en) * 1966-04-04 1968-08-20 Reynolds Metals Co Building apparatus and method of making same
JPS5147961B2 (en) * 1973-02-09 1976-12-17
GB1524252A (en) * 1975-05-13 1978-09-06 Ccl Systems Ltd Joining concrete members in buildings
FR2330818A1 (en) * 1975-11-05 1977-06-03 Squecco Jules Reinforced concrete building foundation section - in shape of inverted U, with hook on top and ridge on which wall is built
US4094110A (en) 1976-03-24 1978-06-13 Radva Plastics Corporation Building system and method
ATE43425T1 (en) 1981-11-17 1989-06-15 Marcel Matiere PROCESSES FOR THE MANUFACTURE OF HOLLOW ELEMENTS SUCH AS PIPES, SILOS OR BUNKER.
US4817353A (en) * 1987-10-28 1989-04-04 Woods John T Selfcontained integral footing form and foundation wall
DE3891234T1 (en) 1988-01-27 1990-01-11 Ts O Metodiceskaja Ekspedicija Vault construction
US4972646A (en) * 1988-03-14 1990-11-27 Foam Form Systems, Inc. Concrete forming system
US5505033A (en) * 1988-12-06 1996-04-09 501 Hitachi Metals Ltd. Column base structure and connection arrangement
US4972641A (en) * 1989-09-27 1990-11-27 Modern Industries, Inc. Leave-in-place cantilever concrete foundation form
FR2668183A1 (en) * 1990-10-19 1992-04-24 Bourachot Philippe PROCESS FOR THE FAST CONSTRUCTION OF ARCHED ARTWORK.
DE9206140U1 (en) 1992-05-07 1993-09-09 Peca-Verbundtechnik Gmbh, 84130 Dingolfing formwork
US5524405A (en) * 1994-02-28 1996-06-11 Byrd; Randall Wall structure
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
US5533835A (en) * 1995-02-06 1996-07-09 Angelette; A. M. Railroad crossing signal foundation and method of producing and erecting the same

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG109988A1 (en) * 2002-09-06 2005-04-28 Eng Shyan Toh Pre-cast panel and a method of constructing a wall structure using pre-cast panels
WO2005078198A1 (en) * 2004-02-12 2005-08-25 Mara-Institut D.O.O. Method of constructing strip foundations with longitudinal socket
EA009928B1 (en) * 2004-02-12 2008-04-28 Мара-Институт Д.О.О. Method of constructing strip foundations with longitudinal groove, a foundation element and holding/leveling device provided therefor
US20070175105A1 (en) * 2005-12-23 2007-08-02 Remy Desbiens Ready to assemble shelter
WO2009156818A1 (en) * 2008-06-27 2009-12-30 Geotech Lizenz Ag Prefabricated foundation element for building walls
US9371641B2 (en) * 2011-11-02 2016-06-21 Evershelter Aps Construction-unit for immediate or permanent shelter
US20140290153A1 (en) * 2011-11-02 2014-10-02 EverSheller ApS Construction-unit for immediate or permanent shelter
US9428901B2 (en) * 2012-05-14 2016-08-30 Nev-X Systems Limited Modular building system
CN104428473A (en) * 2012-05-14 2015-03-18 Nev-X系统有限公司 Modular building system
US20150101263A1 (en) * 2012-05-14 2015-04-16 Nev-X Systems Limited Building foundation
US20140059957A1 (en) * 2012-08-30 2014-03-06 N. Daniel W. Stark Tower foundation system
US9194095B2 (en) 2012-10-11 2015-11-24 Lafarge Canada Inc. Unitized precast grillage foundation and method for manufacturing the same
US8863455B2 (en) * 2012-10-11 2014-10-21 Lafarge Canada Inc. Unitized precast grillage foundation and method for manufacturing the same
WO2015143354A1 (en) * 2014-03-20 2015-09-24 Michaluk Mitch Arched structure and modular building blocks
US10688685B2 (en) * 2015-12-04 2020-06-23 Gabriele MONACHINO Formwork for providing a concrete foundation plinth with exposed horizontal reinforcing bars, plinth provided with such formwork, and structure comprising such plinth
US11428363B2 (en) 2018-08-14 2022-08-30 Lamprell Energy Lt. Grillage apparatus and method of using and making same
CN110344442A (en) * 2019-07-31 2019-10-18 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of prefabricated assembled railway open cut tunnel and its construction method
CN114718123A (en) * 2022-04-28 2022-07-08 中国一冶集团有限公司 Prefabricated pipe jacking gallery and cast-in-place pipe gallery butt joint construction method
CN115075076A (en) * 2022-07-20 2022-09-20 中交第二公路勘察设计研究院有限公司 High-fill less-soil composite roadbed structure and construction method

Also Published As

Publication number Publication date
AU717556B2 (en) 2000-03-30
US6367214B1 (en) 2002-04-09
EP0912804A1 (en) 1999-05-06
DE69707884T2 (en) 2002-09-19
US6408581B2 (en) 2002-06-25
CA2261127A1 (en) 1998-01-29
AU4010697A (en) 1998-02-10
EP0912804B1 (en) 2001-10-31
DE69707884D1 (en) 2001-12-06
JP2000517387A (en) 2000-12-26
WO1998003736A1 (en) 1998-01-29
ATE207995T1 (en) 2001-11-15

Similar Documents

Publication Publication Date Title
EP0912804B1 (en) A foundation element, methods for the construction of prefabricated structures including these elements, particularly prefabricated tunnels, and prefabricated structures made by these methods
US5367845A (en) System for building a structure
US2948995A (en) Connections between reinforced, precast concrete structures and method of making same
US4051570A (en) Road bridge construction with precast concrete modules
US4290246A (en) Multi-purpose precast concrete panels, and methods of constructing concrete structures employing the same
US7114305B2 (en) Hybrid arched overfilled structure
US5255996A (en) Method of constructing a roadway
US7076925B2 (en) Integrated footings
US6988337B1 (en) Means and method for constructing a fully precast top arch overfilled system
US6899489B2 (en) Pre-fabricated warped pavement slab, forming and pavement systems, and methods for installing and making same
US4903450A (en) Concrete footer block and foundation system formed therefrom
KR100443809B1 (en) Fabricated arch tunnel and construction method thereof
EP0079887B1 (en) Multi-purpose precast concrete panels, and methods of constructing concrete structures employing the same
JP3084654B2 (en) Construction foundation, foundation structure using the same, and construction method thereof
JP4154492B2 (en) Pile head connection structure of ready-made piles
JPH10306457A (en) Foundation block
GB2243637A (en) Method of constructing a roadway
US4594825A (en) Cantilevered support member and foundation unit
JPS59165737A (en) Strip foundation and its construction
CN115341597B (en) Implementation method for four-side additional construction of slope-shaped independent foundation
KR101341105B1 (en) Arch-shaped precast structure and construction method of the same
SU883297A1 (en) Frame-type agricultural building
JPH06167003A (en) Road curb stone forming method
JPS59220501A (en) Expanded walking road block and production thereof
KR200212405Y1 (en) Precast concrete segment for arch type culvert

Legal Events

Date Code Title Description
REMI Maintenance fee reminder mailed
FPAY Fee payment

Year of fee payment: 4

SULP Surcharge for late payment
FPAY Fee payment

Year of fee payment: 8

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20140625

点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载