TWI606171B - Curtain wall system and method of installing the system - Google Patents

Curtain wall system and method of installing the system Download PDF

Info

Publication number
TWI606171B
TWI606171B TW100124681A TW100124681A TWI606171B TW I606171 B TWI606171 B TW I606171B TW 100124681 A TW100124681 A TW 100124681A TW 100124681 A TW100124681 A TW 100124681A TW I606171 B TWI606171 B TW I606171B
Authority
TW
Taiwan
Prior art keywords
frame
unit
straight
curtain wall
construction
Prior art date
Application number
TW100124681A
Other languages
Chinese (zh)
Other versions
TW201303125A (en
Inventor
丁明朗
Original Assignee
丁明朗
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 丁明朗 filed Critical 丁明朗
Priority to TW100124681A priority Critical patent/TWI606171B/en
Publication of TW201303125A publication Critical patent/TW201303125A/en
Application granted granted Critical
Publication of TWI606171B publication Critical patent/TWI606171B/en

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Description

幕牆系統及其蓋建方法Curtain wall system and its construction method

本發明是有關一種幕牆系統,尤其是一種幕牆系統的改進及其蓋建方法。The invention relates to a curtain wall system, in particular to an improvement of a curtain wall system and a method for constructing the same.

在丁氏美國專利US 7,134,247所提及的幕牆的蓋建方法是由下向上的程序,包括以下的步驟:The method of constructing a curtain wall as mentioned in U.S. Patent No. 7,134,247 is a bottom-up procedure comprising the following steps:

(1) 將一個幕牆單位放進而扣入相鄰的兩根通常是垂直的直料,然後下滑與在下面已蓋好的幕牆單元相扣;(1) A curtain wall unit is placed and then snapped into two adjacent, normally vertical straight materials, and then slid down to the covered curtain wall unit below;

(2) 用兩支螺絲將單元上橫料鎖定在兩直料上;以及(2) Lock the horizontal block on the unit with two screws;

(3) 在上橫料處放上水密條及檔水條。(3) Put a watertight strip and a water strip at the upper level.

以上改良的幕牆系統有一個好處,就是沒有兩直料間的橫料,如此簡化了蓋建的方法,也減低了成本。One of the advantages of the improved curtain wall system is that there is no horizontal material between the two straight materials, which simplifies the method of building and reduces the cost.

在城市中新蓋或翻修工程,由於擁擠的市區,工程交通困難,因此通常最希望第一樓的幕牆最後才蓋上,這就是最好能由上向下蓋的構造方式;在翻修工程中,這種由上向下蓋的方法還可避免雨水或雜物由翻修中的樓層掉到翻修好的下樓。Newly built or renovated in the city, due to the crowded urban area, the engineering traffic is difficult, so it is usually most desirable to cover the curtain wall of the first floor, which is the best way to construct from the top to the bottom; in the renovation project In this method, the upper and lower cover can also prevent rain or debris from falling from the floor in the renovation to the renovated lower floor.

本發明的幕牆系統可以由下向上或由上向下或上下混和的施工方法,為了要達到以上各種施工法的目的,本發明的幕牆系統包括複數的面材單元和支撐面材單元的垂直直料,每個面材單元包括一片面材和一個獨立的框架,面材單元可包括以下一種或多種的單元:由上向下的施工單元、由下向上的施工單元和上下相界的施工單元,每個單元框架由一個上橫料、一個下橫料及至少一個側框料組合而成,側框料是用來連接上、下橫料並與直料可側向滑行的結構相扣。每個由上向下的施工單元係包括有一個下突的公性接頭可直接固定到直料上;每個由下向上的施工單元則有一個上突的公性街頭可直接固定到直料上;每個上、下相界的施工單元則有一個上突的公性接頭及一個下突的公性接頭,這上突的或下突的接頭可隨意或全部鎖定在直料上。這種上突的接頭是設計與上單元的母性下橫料以側向可滑行的方式公母相接;這種下突的接頭則是設計與下單元的母性上橫料以側向可滑行的方式公母相接;另有一個較好的直料設計是將直料頭部及管狀部分開而施工過程中用螺絲固定成一個複合直料,這種複合直料可將吸收工廠或工地的公差性能提高不少,也就是將施工的簡易度提高。The curtain wall system of the present invention can be constructed from bottom to top or from top to bottom or up and down. For the purpose of achieving the above various construction methods, the curtain wall system of the present invention includes a plurality of face material units and vertical support of the face material unit. Each of the facestock units comprises a sheet of face material and a separate frame, and the facestock unit may comprise one or more of the following units: a construction unit from top to bottom, a construction unit from bottom to top, and a construction unit on the upper and lower boundary. Each unit frame is composed of an upper horizontal material, a lower horizontal material and at least one side frame material, and the side frame material is used for connecting the upper and lower horizontal materials and is interlocked with the structure in which the straight material can be laterally glided. Each of the upper and lower construction units includes a downwardly protruding male connector that can be directly attached to the straight material; each of the lower-facing construction units has an upper protruding male street that can be directly fixed to the straight material. Upper; each upper and lower phase boundary construction unit has an upper male joint and a lower male joint, and the upper or lower joint can be locked at random or all. The protruding joint is designed to be connected to the male and female transverse members of the upper unit in a laterally slidable manner; the downwardly protruding joint is designed to be laterally slidable with the maternal upper material of the lower unit. The way the male and female are connected; another good straight material design is to open the head and the tubular part and fix it into a composite straight material during the construction process. This composite material can be used to absorb the factory or the construction site. The tolerance performance is improved a lot, that is, the ease of construction is improved.

本發明說明了多種不同的幕牆施工方法,包括左右向、由上向下、由下向上及上下混和的施工方法,其中一個改良的方法是將第一個下突單元在建築物的上部,接下來是至少用一個螺絲在下突的公性接頭固定在直料上,最後又放上第二個由上向下的施工單元與固定好的上單元相扣而將第二單元一樣固定到直料上。The invention describes a plurality of different curtain wall construction methods, including left-right, top-down, bottom-up and up-and-down construction methods, one of which is to improve the first sub-projection unit in the upper part of the building. Down, at least one screw is used to fix the straight joint on the straight material, and finally the second upper and lower construction unit is fastened to the fixed upper unit to fix the second unit to the straight material. on.

底下藉由具體實施例配合所附的圖式詳加說明,當更容易瞭解本發明之目的、技術內容、特點及其所達成之功效。The purpose, technical contents, features and effects achieved by the present invention will be more readily understood by the detailed description of the embodiments and the accompanying drawings.

為了容易說明本發明之較佳實施例及使用本發明最好的模式,一些名詞下定義如下:In order to facilitate the description of the preferred embodiment of the invention and the best mode of the invention, some nouns are defined as follows:

複合直料:一個支撐幕牆的直料,由至少一支管狀料及至少一支直料頭組合而成。Composite straight material: a straight material supporting the curtain wall, which is composed of at least one tubular material and at least one straight material head.

單元(panel):在建築物多數單元中的其中任何一個單元,包括一塊面材及環繞且封閉面材邊緣的框架,框架由複數片段的框料在工廠組合並封閉面材邊緣。Panel: Any of the units in a majority of a building's unit, including a facestock and a frame that surrounds and closes the edge of the facestock. The frame is assembled at the factory by a plurality of segments of the frame and closes the edge of the facestock.

公性框料(male panel member):一段框料有外突的公性腳,在施工時用以與相鄰的單元的母性框料相扣連接。Male panel member: A piece of frame material has a protruding male leg that is used to connect with the mating frame material of an adjacent unit during construction.

母性框料(female panel member):一段框料有內凹的母性槽,在施工時用以與相鄰的單元的公性框料相扣連接。Female panel member: A piece of frame material has a concave mother groove, which is used to connect with the adjacent frame of the common frame material during construction.

水密條(water seal member):一元件在施工時安裝於單元的框料上,以提供水密性能。Water seal member: A component is mounted on the frame material of the unit during construction to provide watertight performance.

檔水條(rain screen member):一元件在施工時安裝於單元的框料上,以提供系統的檔水功能。Rain screen member: A component is mounted on the frame material of the unit during construction to provide the system's water function.

第1圖所示為本發明之較佳實施例,第1圖中沿剖面線3-3的剖視圖如第2(a)圖所示,幕牆系統10包括多數的單元(單元11、11a或/及11b)支持在至少一支一般垂直的直料14,直料14是固定在樓板邊緣或其他建物(圖中未示),圖中所示的幕牆只有直料14而無橫料,幕牆的水平接縫12和垂直接縫13在相鄰的單元間造成(單元11、11a、11b)。第2(a)圖所示為一個改良的直料各由一個管狀料61及一個直料頭62組合而成;直料頭62最好使用至少一個緊固件,如螺絲63固定到管狀料61上,換句話說,管狀料61與直料頭62是由間隔的螺絲63固定在一起而構成一個改良的複合直料14,但其他單一的直料或其他方式組合的直料均可適用。1 is a cross-sectional view along section line 3-3 of FIG. 1 as shown in FIG. 2(a), and the curtain wall system 10 includes a plurality of units (units 11, 11a or / And 11b) support at least one generally vertical straight material 14, the straight material 14 is fixed on the edge of the slab or other building (not shown), the curtain wall shown in the figure is only straight material 14 without horizontal material, the curtain wall The horizontal seam 12 and the vertical seam 13 are created between adjacent units (units 11, 11a, 11b). Figure 2(a) shows a modified straight material each consisting of a tubular material 61 and a straight head 62; the straight head 62 is preferably secured to the tubular material 61 using at least one fastener, such as a screw 63. In other words, the tubular material 61 and the straight head 62 are fixed together by spaced screws 63 to form an improved composite straight material 14, but other single straight materials or other combinations of straight materials can be applied.

單元11,11a,11b較佳者係包括隔熱玻璃15或其他面材,如第2(a)圖所示,幕牆10也可包括其他面材,如鋁板、石板、複合板、三明治板等等。在第1圖所示,改良的單元11、11a、11b包括顯框式的框架18、18a、18b,而每個框架可與面材15分開。這種顯框式的框架18、18a、18b通常用鋁擠型的框料沿面材15的四周組合而成。但其他建材也可做為框料,且框料與面材邊緣的相對位置也可變化,比如說框料隱藏在不透明的面材後面,由外就看不到框料(隱框式),任何一個單元也可做成顯框式和隱框式混合的框架。雖然第1圖所示的單元11、11a、11b都是平面的單元,但其他單元的造型均可適用。不管單元的造型如何,單元都是支持在至少一個直料上且與相鄰的單元和直料扣接在一起,以構成一部份的幕牆10;只要單元間有相容的公母相接的設計,許多不同的單元均可適用。Preferably, the units 11, 11a, 11b comprise insulating glass 15 or other face material, as shown in Figure 2(a), the curtain wall 10 may also include other face materials such as aluminum plates, slate, composite panels, sandwich panels, etc. Wait. As shown in Fig. 1, the modified unit 11, 11a, 11b includes framed frames 18, 18a, 18b, and each frame can be separated from the face material 15. Such frame-like frames 18, 18a, 18b are typically assembled from the periphery of the facestock 15 with a frame material of aluminum extrusion. However, other building materials can also be used as frame materials, and the relative position of the frame material and the edge of the surface material can also be changed. For example, the frame material is hidden behind the opaque surface material, and the frame material cannot be seen from the outside (hidden frame type). Any unit can also be made into a frame-in-frame and a hidden frame. Although the units 11, 11a, and 11b shown in Fig. 1 are all flat units, the shapes of other units are applicable. Regardless of the shape of the unit, the unit is supported on at least one straight material and is fastened to the adjacent unit and the straight material to form a part of the curtain wall 10; as long as there is a compatible male and female connection between the units The design is suitable for many different units.

一般水平的和垂直的幕牆接縫12、13都是在相鄰的二個單元間形成,一個水平接縫12由上下相鄰的二個單元11和11a或11a和11b間形成。接縫12通常介於二支相鄰的直料14之間;一個垂直接縫13是在二個左右相鄰的邊料間形成且這相鄰的邊料是同時座落在同一支直料上。然而,其他多種的幕牆接縫均可適用,諸如非直線的接縫,對角或其他方向的直線接縫,或者依造型需求設計出來的立體接縫。The generally horizontal and vertical curtain wall seams 12, 13 are formed between two adjacent units, and a horizontal seam 12 is formed between two adjacent units 11 and 11a or 11a and 11b. The seam 12 is usually between two adjacent straight materials 14; one vertical seam 13 is formed between two adjacent left and right edges and the adjacent edges are simultaneously placed in the same straight material. on. However, a variety of other façade seams are available, such as non-linear seams, straight seams in diagonal or other directions, or three-dimensional seams designed to meet the needs of the styling.

改良的幕牆系統10包括複數個上下相界的施工單元11a,複數個由下向上的施工單元11,其部份位在單元11a的上端相接如第3圖所示,以及複數個由上向下的施工單元11b在單元11a的下端相接,如第4圖所示,每個上下相界的施工單元11a有一個上突的公性框料或公性接頭17如第3圖所示,一個下突的公性框料或公性接頭21如第4圖所示,及至少一支邊料19(見第2(a)圖)與上、下接頭17、21相連而構成上下相界單元的框架18a。根據本發明之實施例所示,單元框架均為長方形,與相界單元相鄰的由下向上的施工單元11及由上向下的施工單元11b各有一個母性接頭16(見第3圖)或22(見第4圖)分別與上突接頭17或下突接頭21相扣連接。因此,所有高於相界單元11a的幕牆接縫均與第3圖所示相似而所有低於相界單元11a的幕牆接縫均與第4圖所示相似。也就是說以相界單元為基準點,往上是由下向上施工,而往下是由上向下施工。The improved curtain wall system 10 includes a plurality of upper and lower phase boundary construction units 11a, a plurality of lower-up construction units 11 partially connected at the upper end of the unit 11a as shown in FIG. 3, and a plurality of upward-facing directions. The lower construction unit 11b is connected at the lower end of the unit 11a. As shown in Fig. 4, each of the upper and lower phase boundary construction units 11a has an upwardly protruding male frame material or a male joint 17 as shown in Fig. 3. A downwardly protruding male frame material or male joint 21 is shown in Fig. 4, and at least one edge material 19 (see Fig. 2(a)) is connected to the upper and lower joints 17, 21 to form an upper and lower phase boundary unit. Frame 18a. According to an embodiment of the present invention, the unit frames are all rectangular, and the bottom-up construction unit 11 and the upper-down construction unit 11b adjacent to the phase-bound unit each have a female joint 16 (see Fig. 3). Or 22 (see Fig. 4) is connected to the upper joint 17 or the lower joint 21, respectively. Therefore, all the curtain wall joints higher than the phase boundary unit 11a are similar to those shown in Fig. 3, and all the curtain wall joints lower than the phase boundary unit 11a are similar to those shown in Fig. 4. That is to say, the phase boundary unit is used as the reference point, and the upward direction is applied from the bottom to the top, and the downward direction is from the top to the bottom.

第3圖表示本發明一般幕牆接縫12的設計的局部剖視圖,第3圖的剖面是取自第1圖中的剖面線2-2。由下向上的施工單元11包括可由外拆換或由內拆換的玻璃面材15,可由外拆換的設計較適用於樑帶玻璃,而可由內拆換的設計較適用於視區玻璃。如圖所示,上下相界的施工單元11a是可由內拆換玻璃的設計較適用於幕牆系統10的視區。在上相鄰的單元11的上端有個上突的公性接頭(圖中未示),而有個內凹的母性接頭16在單元11的下端。第3圖所示幕牆接縫是由上單元11下端的母性接頭16的凹槽51與相界單元11a上端的公性接頭17的公腳52相扣連接而成;此公性接頭17也就是相界單元11a的上橫料的一部分,此相界單元11a的接頭17是用兩支螺絲34或其他緊固件固定到相鄰的兩支直料14。一個水密條26及一個擋水條27就可安裝上相界單元11a的公性接頭17。Figure 3 is a partial cross-sectional view showing the design of the general curtain wall joint 12 of the present invention, and the cross section of Figure 3 is taken from the section line 2-2 in Figure 1. The bottom-up construction unit 11 includes a glass face material 15 that can be externally removed or internally removed, and the outer-replaceable design is more suitable for the beam-striped glass, and the inner-replaceable design is more suitable for the viewing zone glass. As shown, the construction unit 11a of the upper and lower phase boundaries is a viewable area in which the glass can be removed from the interior of the curtain wall system 10. At the upper end of the upper adjacent unit 11, there is an upwardly protruding male joint (not shown), and a concave female joint 16 is at the lower end of the unit 11. The curtain wall joint shown in Fig. 3 is formed by the groove 51 of the female joint 16 at the lower end of the upper unit 11 and the male foot 52 of the male joint 17 at the upper end of the phase boundary unit 11a; the male joint 17 is A portion of the upper cross-section of the phase-bounding unit 11a, the joint 17 of the phase-bounding unit 11a is secured to the adjacent two straight stocks 14 by two screws 34 or other fasteners. A watertight strip 26 and a water retaining strip 27 can be used to mount the male joint 17 of the phase boundary unit 11a.

第4圖表示本發明一般幕牆座落於單元11a和11b的接縫12的設計。圖中的剖面是取自第1圖中的剖面線2a-2a。上下相界的施工單元11a是適用於視區可由內換裝玻璃的單元。下鄰的單元11b是可由內換裝玻璃的單元適用於樑帶區或視區而不易由內換裝時的情況,這下單元11b有一個下端的公性接頭(圖中未示)及一個上端的母性接頭22,也就是單元的上框料。上下相界的施工單元11a有一個上端的公性接頭17(見第3圖)及一個下端的公性接頭21,也就是單元的下框料;幕牆接縫12是由相界單元11a下端公性接頭21的公性腳與相鄰的下單元11b的上端的母性接頭22的母性槽相扣連接而成。相界單元11a的下端公性接頭21可直接用螺絲34或其他固定方式固定到直料14上,用以支持單元的荷重,其他直接固定到直料的方式可包括焊接、夾接、或部份的公性接頭21夾接在直料14上。單元框料與直料相接的方式避免了支架所需橫料的需求,如圖所示,水密條26是與上端的母性接頭22合體的;擋水條27則安裝於相鄰單元11b上端的母性接頭22上。Figure 4 shows the design of the seam 12 of the general curtain wall of the present invention seated on the units 11a and 11b. The cross section in the figure is taken from the section line 2a-2a in Fig. 1. The construction unit 11a of the upper and lower phase boundaries is a unit suitable for the glass to be replaced by the inside of the viewing zone. The lower adjacent unit 11b is a case where the unit for replacing the glass can be applied to the beam zone or the viewing zone without being easily replaced by the inside. The lower unit 11b has a lower end male connector (not shown) and a The female connector 22 at the upper end, that is, the upper frame of the unit. The upper and lower phase boundary construction unit 11a has an upper end male joint 17 (see Fig. 3) and a lower end male joint 21, that is, a lower frame material of the unit; the curtain wall joint 12 is formed by the lower end of the phase boundary unit 11a. The male leg of the sexual joint 21 is connected to the mother groove of the female joint 22 at the upper end of the adjacent lower unit 11b. The lower end male connector 21 of the phase boundary unit 11a can be directly fixed to the straight material 14 by screws 34 or other fixing means for supporting the load of the unit. Other ways of directly fixing to the straight material may include welding, clamping, or part. The portion of the male connector 21 is clamped to the straight material 14. The manner in which the unit frame material is connected to the straight material avoids the need for the horizontal material required for the bracket. As shown, the watertight strip 26 is combined with the female joint 22 at the upper end; the water retaining strip 27 is mounted on the upper end of the adjacent unit 11b. On the female connector 22.

根據本發明一實施例之結構,相界單元11a有一個上突的公性接頭17及一個下突的公性接頭21,而上鄰或下鄰的單元11或11b各有一個母性接頭22與上突的公性接頭17及下突的公性接頭21相連接,其他的單元11可簡易的用由下向上的施工法固定而其他的單元11b可簡易的用由上向下的施工法固定。也就是說由相界單元11a或定位於牆頂的相界單元(圖中未示),以下的所有單元11b均可用由上向下的施工法固定。According to an embodiment of the present invention, the phase boundary unit 11a has an upwardly protruding male connector 17 and a downwardly protruding male connector 21, and the upper or lower adjacent unit 11 or 11b has a female connector 22 and The protruding male connector 17 and the protruding male connector 21 are connected, and the other units 11 can be easily fixed by the bottom-up construction method, and the other units 11b can be easily fixed by the upper-down construction method. . That is to say, by the phase boundary unit 11a or the phase boundary unit (not shown) positioned at the top of the wall, all of the following units 11b can be fixed by the upper and lower construction methods.

本發明的另一實施例是相界單元有一個上凹的母性接頭及一個下凹的母性接頭(類似接頭16、22),而相鄰的單元11及/或11b在第1圖上剛好在上下相反的位置,也就是說下鄰的單元11有個上突的公性接頭17,而上鄰的單元11b則有下突的公性接頭21;如此的設計,所有下鄰的單元11可簡易的用由下向上的施工法固定,而所有上鄰的單元11b則可簡易的用由上向下的施工法固定。Another embodiment of the invention is that the phase boundary unit has a concave female connector and a female female connector (similar to the connectors 16, 22), and the adjacent units 11 and/or 11b are just in Fig. 1. The upper and lower opposite positions, that is, the lower adjacent unit 11 has an upwardly protruding male joint 17, and the upper adjacent unit 11b has a downwardly protruding male joint 21; such a design, all lower adjacent units 11 can The simple construction is fixed by the bottom-up construction method, and all the adjacent units 11b can be easily fixed by the upper and lower construction methods.

本發明的再一實施例(圖中未示),就是只用一支相界橫料來取代相界單元的功能,也就是一支料同時有上突及下突的公性接頭與相界單元11a的上下端相似;或者是一支料同時有上凹及下凹的母性接頭,這種相界料也可直接用扣件固定在屋頂或樓板上的結構體。還有一個可能的第三個變化的設計是用只有一方向的公性或母性的接頭在相界料上,比如在牆頂用一支只有下突的公性接頭的相界料,以做為由上往下的施工單元的起始點。According to still another embodiment of the present invention (not shown), only one phase boundary material is used to replace the function of the phase boundary unit, that is, the common joint and the phase boundary of the upper and lower protrusions of one material simultaneously The upper and lower ends of the unit 11a are similar; or a piece of material has a concave and concave female joint at the same time, and the phase boundary material can also be directly fixed to the structure on the roof or the floor by a fastener. There is also a possible third change in the design of a joint with only one direction of the male or female joints, such as a phase boundary material with a male joint that only protrudes at the top of the wall. The starting point for the construction unit from top to bottom.

本發明也揭露一種的幕牆系統的施工方法,此方法可隨意用由下向上或由上向下施工。依第3圖所示,由相界單元11a以上的所有單元用由下向上的施工方法,包括以下四個主要步驟:The invention also discloses a construction method of a curtain wall system, which can be used freely from bottom to top or from top to bottom. According to the third figure, the construction method from the bottom to the top by all the units above the phase boundary unit 11a includes the following four main steps:

(1) 將一個相界單元11a定位在牆面10較低的部位且扣接在相鄰的兩支直料14上;(1) positioning a phase boundary unit 11a at a lower portion of the wall 10 and snapping onto the adjacent two straight materials 14;

(2) 用單元固定螺絲34穿進相界單元11a的上端公性接頭17而固定到相鄰的兩支直料14;(2) The unit fixing screw 34 is inserted into the upper end of the phase boundary unit 11a and is fixed to the adjacent two straight materials 14;

(3) 在相界單元11a上端的公性接頭17上,安裝上擋水條料26及水密條27;以及(3) mounting a water barrier strip 26 and a watertight strip 27 on the male joint 17 at the upper end of the phase boundary unit 11a;

(4) 相界單元11a以上的單元11有一個與17相似的上端公性接頭及一個下端能與17相容的母性接頭16。施工時,將單元扣入相鄰二直料14之間,而後下滑造成相界單元的公性接頭與單元11的母性接頭16相扣連接。(4) The unit 11 above the phase boundary unit 11a has an upper male joint similar to 17 and a female joint 16 whose lower end is compatible with 17. During construction, the unit is snapped between the adjacent two straight materials 14, and then the lower joint causes the male joint of the phase boundary unit to be connected with the female joint 16 of the unit 11.

用相似的步驟,在相界單元11a以下的幕牆系統10可簡易的用由上向下的施工方法安裝,依第4圖所示,這種施工法包括以下四個主要步驟:With similar steps, the curtain wall system 10 below the phase boundary unit 11a can be easily installed using a top-down construction method. As shown in Fig. 4, the construction method includes the following four main steps:

(1) 將一個相界單元11a定位在牆面10較高的部位且扣接在兩支相鄰的直料14上;(1) positioning a phase boundary unit 11a at a higher portion of the wall 10 and snapping onto two adjacent straight materials 14;

(2) 用單元固定螺絲34穿進相界單元11a的下端公性接頭21而固定到相鄰的兩支直料14;(2) The unit fixing screw 34 is inserted into the lower end male joint 21 of the phase boundary unit 11a and fixed to the adjacent two straight materials 14;

(3) 相界單元11a以下的單元11b有一個上端的母性接頭16及一個與21相似的下端公性接頭;施工時,先將單元11b扣入兩相鄰直料14間而上滑造成相界單元11a的下端公性接頭21與單元11b的上端母性接頭16相扣連接;以及(3) The unit 11b below the phase boundary unit 11a has an upper end female joint 16 and a lower end male joint similar to 21; during construction, the unit 11b is first buckled into two adjacent straight materials 14 and slipped up to cause phase The lower end male connector 21 of the boundary unit 11a is connected to the upper female connector 16 of the unit 11b;

(4) 將單元11b的下端公性接頭21固定在相鄰兩直料14上。(4) The lower end male joint 21 of the unit 11b is fixed to the adjacent two straight materials 14.

另外,除了以上二種施工方法外,本發明的幕牆系統10也可以不用相界單元11a,例如,整個幕牆可使用單元11b全部由下向上安裝或是用牆頂的相界料起始而使用單元11全部由上向下安裝。由下向上及由上向下混合的施工方法可隨意在幕牆上分區施作,由上向下的施工方法還有一個好處就是單元用螺絲在下端公性接頭固定在相鄰兩直料上後,不必再安裝分體的擋水條及水密條。In addition, in addition to the above two construction methods, the curtain wall system 10 of the present invention can also be used without the phase boundary unit 11a. For example, the entire curtain wall usable unit 11b can be used from the bottom up or the wall top phase boundary material. Units 11 are all mounted from top to bottom. The construction method from bottom to top and from top to bottom can be applied on the curtain wall at will. The upper and lower construction method also has the advantage that the unit is fixed on the adjacent two straight materials with the screw at the lower end. It is no longer necessary to install separate water retaining strips and watertight strips.

第2(a)圖表示本發明依據第1圖的剖面線3-3的剖視圖的牆隙13的另一設計,此設計的直料14是個複合直料,由管狀料61及直料頭62用相間的螺絲63固定組合而成。此直料頭62是設計與相鄰兩直料間的單元能配合相扣。Fig. 2(a) shows another design of the wall gap 13 of the cross-sectional view of the present invention according to the section line 3-3 of Fig. 1. The straight material 14 of this design is a composite straight material, which is composed of a tubular material 61 and a straight material head 62. It is fixed by a combination of screws 63. The straight head 62 is designed to be interlocked with the unit between the two adjacent straight materials.

圖中所示相鄰的兩單元全是相界單元11a,第2(b)圖表示由左向右用複合直料較適合的施工步驟,如下列各步驟:The adjacent two units shown in the figure are all the phase boundary unit 11a, and the second (b) diagram shows the construction steps suitable for the composite material from left to right, such as the following steps:

1. 將直料頭62扣入右邊已裝好的相界單元11a;1. The straight material head 62 is buckled into the sealed phase boundary unit 11a on the right side;

2. 至少用一個螺絲63將直料頭62固定在管狀料61上而構成一個複合直料14;2. At least one screw 63 is used to fix the straight head 62 on the tubular material 61 to form a composite straight material 14;

3. 將左邊未安裝的相界單元11a側向滑進與直料頭62相扣的位置;以及3. Slide the unbound phase boundary unit 11a laterally into a position that is interlocked with the straight head 62;

4. 將左邊的相界單元11a依第3圖或第4圖定位並用螺絲34固定。4. Position the left phase boundary unit 11a according to Fig. 3 or Fig. 4 and fix it with screws 34.

以上側向的施工步驟亦適用於固定相鄰的單元11或11b。雖然第2(b)圖所示為由左向右的施工方法,用相似的方式,可很容易換成由右向左的施工方法。The above lateral construction steps also apply to the fixation of adjacent units 11 or 11b. Although Figure 2(b) shows the construction method from left to right, in a similar manner, it can be easily changed to a right-to-left construction method.

另外,加註的是單元的安裝並不需要側鄰單元先安裝好,因此正如美國專利US 7,134,247一樣,可隨意漏空補空。比如有受損的單元的話,可先漏空而斷續安裝側鄰的單元,不會防礙施工進度。In addition, the installation of the unit does not require the side adjacent unit to be installed first, so as in the US patent US 7,134,247, it can be emptied at will. For example, if there is a damaged unit, it may be leaked first and intermittently install the adjacent unit, which will not hinder the construction progress.

本發明的施工彈性很高,很適合新蓋或翻修工程,因為各種側向施工方法,如由左向右或由右向左,及縱向施工方法,如由下向上或由上向下加上任何混合方式均可隨工程需求而事先安排。這種側向施工方法的彈性可解決許多施工管理的許多問題,比如說某種特殊單元太慢運到工地等等而不影響施工進度,因此用本發明的幕牆系統,承包商可省時又省錢。The construction of the invention is very flexible and is very suitable for new cover or renovation works, because various lateral construction methods, such as from left to right or from right to left, and longitudinal construction methods, such as from bottom to top or from top to bottom Any mixing method can be arranged in advance according to the needs of the project. The flexibility of this lateral construction method can solve many problems of many construction management, such as a certain unit is too slow to transport to the construction site, etc. without affecting the construction progress, so with the curtain wall system of the invention, the contractor can save time and time. save money.

以上對本發明的系統說明及施工方法的說明僅係為說明本發明之技術思想及特點,其目的在使熟習此項技藝之人士能夠瞭解本發明之內容並據以實施,當不能以之限定本發明之專利範圍,即大凡依本發明所揭示之精神所作之均等變化或修飾,仍應涵蓋在本發明之專利範圍內。The above description of the system and the construction method of the present invention are merely for explaining the technical idea and the features of the present invention, and the purpose of the present invention is to enable those skilled in the art to understand the contents of the present invention and implement it according to the present invention. </ RTI> <RTIgt; </ RTI> <RTIgt; </ RTI> <RTIgt; </ RTI> <RTIgt; </ RTI> <RTIgt; </ RTI> <RTIgt;

10...幕牆10. . . Curtain wall

11、11a、11b...單元11, 11a, 11b. . . unit

12...水平接縫12. . . Horizontal seam

13...垂直接縫13. . . Vertical seam

14...直料14. . . Direct material

15...隔熱玻璃(面材)15. . . Insulating glass (face material)

16...母性接頭16. . . Maternity connector

17...公性接頭17. . . Male connector

18、18a、18b...框架18, 18a, 18b. . . frame

19...邊料19. . . Edge material

21...公性接頭twenty one. . . Male connector

22...母性接頭twenty two. . . Maternity connector

26...水密條26. . . Watertight strip

27...擋水條27. . . Water stop

34...螺絲34. . . Screw

51...凹槽51. . . Groove

52...公腳52. . . Male foot

61...管狀料61. . . Tubular material

62...直料頭62. . . Straight head

63...螺絲63. . . Screw

第1圖為本發明的幕牆系統的一實施例的立體圖。Figure 1 is a perspective view of an embodiment of a curtain wall system of the present invention.

第2(a)圖為本發明的一個局部剖視圖。Figure 2(a) is a partial cross-sectional view of the present invention.

第2(b)圖為本發明的一個展開剖視圖。Figure 2(b) is a developed cross-sectional view of the present invention.

第3圖為本發明一實施例的單元接縫的局部剖視圖。Figure 3 is a partial cross-sectional view of a unit seam in accordance with an embodiment of the present invention.

第4圖為本發明的另一實施例的單元接縫的局部剖視圖。Figure 4 is a partial cross-sectional view showing a unit seam of another embodiment of the present invention.

10...幕牆10. . . Curtain wall

11、11a、11b...單元11, 11a, 11b. . . unit

12...水平接縫12. . . Horizontal seam

13...垂直接縫13. . . Vertical seam

14...直料14. . . Direct material

Claims (20)

一種幕牆系統,包括:一幕牆支撐直料;以及複數單元,其係利用該幕牆支撐直料支撐,該單元包括:複數具有一施工框架結構之施工單元,每一該施工單元包括:一上突公性框料;一下突公性框料;及至少一邊料,連接該上突公性框料及該下突公性框料,以組成每一該施工單元的框架;以及複數具有一不同於該施工框架結構之框架結構的上相鄰單元或/及下相鄰單元,每一該相鄰單元包括一母性框料,其係與該上突公性框料或該下突公性框料接合。 A curtain wall system comprising: a curtain wall supporting a straight material; and a plurality of units for supporting the straight material support by the curtain wall, the unit comprising: a plurality of construction units having a construction frame structure, each of the construction units comprising: an upper protrusion a common frame material; a protruding frame material; and at least one side material, connecting the upper protruding frame material and the lower protruding frame material to form a frame of each of the construction units; and the plural has a different An upper adjacent unit or/and a lower adjacent unit of the frame structure of the construction frame structure, each of the adjacent units including a mating frame material that is engaged with the upper protruding frame material or the lower protruding frame material . 如請求項1所述之幕牆系統,其中該幕牆支撐直料更包括:至少一直料頭;以及至少一管狀料,連接該直料頭,其中該直料頭係與位於其橫向相對二側之該相鄰單元之一直料頭接合。 The curtain wall system of claim 1, wherein the curtain wall supporting the straight material further comprises: at least a material head; and at least one tubular material connected to the straight material head, wherein the straight material head is located on opposite sides of the horizontal direction The adjacent unit is always joined by the material. 如請求項2所述之幕牆系統,其中該直料頭係利用至少一緊固件連接至該管狀料。 The curtain wall system of claim 2, wherein the straight head is attached to the tubular material with at least one fastener. 如請求項2所述之幕牆系統,其中該下突公性框料係在缺少一般橫料之情況下,利用荷重緊固件裝設於該直料頭上。 The curtain wall system of claim 2, wherein the lower protruding frame material is mounted on the straight material head by using load fasteners in the absence of a general cross material. 如請求項4所述之幕牆系統,更包括一擋水條及一水密條裝設於該公性框料上。 The curtain wall system of claim 4, further comprising a water barrier and a watertight strip mounted on the male frame material. 一種幕牆系統的蓋建方法,包括下列步驟:將至少一具有一施工框架結構之施工單元放置於一幕牆支撐直料上,其中該施工單元包括一上突公性框料及一下突公性框料分別位於該施工單元的上側及下側;利用緊固件將該下突公性框料鎖固於該幕牆支撐直料上,以形成一鞏固施工單元;以及 將至少一具有一不同於該施工框架結構之框架結構的下相鄰單元沿著垂直方向與該鞏固施工單元接合,其中該下相鄰單元包括一上端母性框料,用來接合該鞏固施工單元的下突公性框料。 A method for constructing a curtain wall system, comprising the steps of: placing at least one construction unit having a construction frame structure on a curtain wall supporting straight material, wherein the construction unit comprises an upper protruding frame material and a protruding convex frame material Separately located on the upper side and the lower side of the construction unit; the lower protruding male frame material is locked on the curtain wall supporting straight material by using a fastener to form a consolidation construction unit; Forming at least one lower adjacent unit having a frame structure different from the construction frame structure in a vertical direction with the consolidation construction unit, wherein the lower adjacent unit includes an upper end mother frame material for engaging the consolidation construction unit The undercut frame material. 如請求項6所述之幕牆系統的蓋建方法,其中在該下突公性框料鎖固於該幕牆支撐直料上之步驟後,更包括:安裝一水密條及/或一擋水條於該上端母性框料上。 The method for constructing a curtain wall system according to claim 6, wherein after the step of locking the male frame material on the curtain wall supporting the straight material, the method further comprises: installing a watertight strip and/or a water retaining strip On the upper end of the mother frame material. 如請求項7所述之幕牆系統的蓋建方法,其中該上端母性框料為單元的上框料時,該下突公性框料為單元的下框料。 The method for constructing a curtain wall system according to claim 7, wherein when the upper end of the mother frame material is the upper frame material of the unit, the lower protruding frame material is the lower frame material of the unit. 如請求項6所述之幕牆系統的蓋建方法,其中該鞏固施工單元固定於該幕牆支撐直料上係利用至少一緊固件鎖固在該上突公性框料或該下突公性框料,且其中該幕牆支撐直料包括至少一直料頭,以及至少一管狀料利用至少一緊固件連接該直料頭。 The method for constructing a curtain wall system according to claim 6, wherein the consolidation construction unit is fixed on the curtain wall supporting the straight material, and the at least one fastener is locked on the upper protruding frame material or the lower protruding frame. And wherein the curtain wall supports the straight material including at least the material head, and the at least one tubular material is connected to the straight material head by using at least one fastener. 一種幕牆系統的二面材單元蓋建方法,該幕牆系統係利用位於一建築物的複數個樓板上的二垂直分開直料的至少其中之一來支撐,一第一面材單元包括一第一面材,及一第一框架包括一第一下框料、一第一上框料及一個或多個的第一側框料連接連接該第一上框料及該第一下框料;以及一第二面材單元包括一第二面材,及一第二框架包括一第二上框料、一第二下框料及一個或多個的第二側框料連接該第二上框料及該第二下框料;其中,該第一及第二側框料係滑入接合至少一該直料,且該第二上框料係滑入接合該第一下框料,以及在該第一框架固定於至少一該直料上之後,在該第一及第二側框料滑入接合該直料時,該第二框架係固接於至少一該二直料上;該蓋建方法包括:設置該第一側框料,以滑入接合至少一該二直料;將該第一框架固定於至少一該二直料上;設置該第二框架於該第一框架下方,以滑入接合至少一該二直料;以及 將該第二框架固定於至少一該二直料上;其中至少一該第一框架或該第二框架具有一施工框架結構,而另一該第一框架或該第二框架具有一不同於該施工框架結構之框架結構。 A method for constructing a two-face material unit of a curtain wall system, wherein the curtain wall system is supported by at least one of two vertically separated straight materials located on a plurality of floors of a building, the first surface material unit including a first The first frame includes a first lower frame material, a first upper frame material and one or more first side frame materials connected to the first upper frame material and the first lower frame material; and a first frame The second face material unit comprises a second face material, and the second frame comprises a second upper frame material, a second lower frame material and one or more second side frame materials connecting the second upper frame material and the second a lower frame material; wherein the first and second side frame materials are slidably engaged with at least one of the straight materials, and the second upper frame material is slidably engaged with the first lower frame material, and fixed in the first frame After the at least one of the straight materials is applied, the second frame is fixed to the at least one of the two straight materials when the first and second side frame materials are slid into the straight material; the cover construction method comprises: setting The first side frame material is configured to slide into the at least one of the two straight materials; fixing the first frame to the at least one A linear material; the second frame disposed beneath said first frame, slide to engage at least one of the two linear material; and Fixing the second frame to at least one of the two straight materials; wherein at least one of the first frame or the second frame has a construction frame structure, and the other of the first frame or the second frame has a different The frame structure of the construction frame structure. 如請求項10所述之蓋建方法,其中該第一下框料係為第一公性框料,該第二上框料係為第二母性框料,且該第二母性框料設置來封閉接合該第一公性框料。 The method of claim 10, wherein the first lower frame material is a first common frame material, the second upper frame material is a second mother frame material, and the second mother frame material is set. The first male frame material is closedly joined. 如請求項11所述之蓋建方法,其中該第一面材單元係在缺少一般橫料之情況下直接利用該直料支撐。 The method of claim 11 as claimed in claim 11, wherein the first facestock unit directly utilizes the straight material support in the absence of a general crosspiece. 如請求項12所述之蓋建方法,其中在該第二框架固定來定位在相鄰於該第一框架,而沒有安裝擋水條及/或水密條於其間。 The method of claim 12, wherein the second frame is fixed to be positioned adjacent to the first frame without a water barrier and/or a watertight strip therebetween. 一種幕牆系統,其係包括獨立的面材單元,且支撐在一建築物的一個或多個上樓板的至少一垂直分開直料上,該幕牆系統包括:一第一面材及一第一框架係形成一第一面材單元,該第一框架包括一第一下框料、一第一上框料,以及一個或多個第一側框料連接該第一上、下框料;一第二面材及一第二框架係形成一第二面材單元,該第二框架包括一第二上框料、一第二下框料,以及一個或多個第二側框料連接該第二上、下框料;以及其中該第一及第二側框料係滑入接合至少一該直料,且該第二上框料係滑入接合該第一下框料,以及在該第一框架直接固定於該直料上之後,在該第一及第二側框料滑入接合該直料之後,以及在該第一下框料滑入接合該第二上框料時,該第二框架係可直接固接於該直料上;其中至少一該第一框架或該第二框架具有一施工框架結構,而另一該第一框架或該第二框架具有一不同於該施工框架結構之框架結構。 A curtain wall system comprising a separate facestock unit and supported on at least one vertically separated straight material of one or more upper floors of a building, the curtain wall system comprising: a first facestock and a first frame Forming a first face material unit, the first frame comprises a first lower frame material, a first upper frame material, and one or more first side frame materials are connected to the first upper and lower frame materials; The second facestock and a second frame form a second facestock unit, the second frame comprises a second upper frame material, a second lower frame material, and one or more second side frame materials are connected to the second frame material Upper and lower frame materials; and wherein the first and second side frame materials are slidably engaged with at least one of the straight materials, and the second upper frame material is slidably engaged with the first lower frame material, and at the first After the frame is directly fixed to the straight material, after the first and second side frame materials are slid into the straight material, and when the first lower frame material is slid into the second upper frame material, the second The frame system can be directly fixed to the straight material; at least one of the first frame or the second frame has a construction frame Configuration, and the other of the first frame or the second frame having a frame structure different from the frame structure of the construction. 一種幕牆系統之第一面材單元,包括:一第一面材;一第一周圍框架,分離地接觸該第一面材,且包括第一周圍框料,即第一上橫料、一第二下橫料及至少一側框料; 至少一幕牆支撐直料,其中該側框料係可密封接合一第一側鄰直料;一上鄰的第二周圍框架,其中該第一上橫料係可密封接合該上鄰的第二周圍框架的一下橫料;一下鄰的第三周圍框架,其中該第一下橫料係可密封接合該下鄰的第三周圍框架的一相鄰上橫料;其中至少一該第一框架或該第二框架具有一施工框架結構,而另一該第一框架或該第二框架具有一不同於該施工框架結構之框架結構;其中,至少一該周圍框料包括下突的一第一公性接頭;以及在固定該第三周圍框架之前,將該第一公性接頭固定至該第一側鄰直料上的手段。 A first face material unit of a curtain wall system, comprising: a first face material; a first surrounding frame that separately contacts the first face material, and includes a first surrounding frame material, that is, a first upper horizontal material, a first Two horizontal materials and at least one side frame material; At least one curtain wall supports the straight material, wherein the side frame material is sealably engaged with a first side adjacent straight material; an adjacent second surrounding frame, wherein the first upper horizontal line system sealingly engages the second adjacent upper portion a lower cross-web of the surrounding frame; a third adjacent frame adjacent to the first, wherein the first lower cross-feeding system is sealingly engageable with an adjacent upper cross-web of the lower adjacent third surrounding frame; wherein at least one of the first frames or The second frame has a construction frame structure, and the other first frame or the second frame has a frame structure different from the construction frame structure; wherein at least one of the surrounding frame materials includes a first protrusion a joint; and means for securing the first male joint to the first side of the straight material prior to securing the third surrounding frame. 如請求項15所述之幕牆系統之第一面材單元,包含複數個該幕牆支撐直料,其係在缺少一般橫料之情況下直接垂直設置。 The first face material unit of the curtain wall system of claim 15, comprising a plurality of the curtain wall supporting straight materials, which are directly disposed vertically in the absence of a general transverse material. 如請求項15所述之幕牆系統之第一面材單元,其中該面材包括至少一玻璃板。 The first facestock unit of the curtain wall system of claim 15, wherein the facestock comprises at least one glass panel. 如請求項15所述之幕牆系統之第一面材單元,其中該第一側鄰直料更包括一直料頭,以及一管狀料係連接該直料頭。 The first facestock unit of the curtain wall system of claim 15, wherein the first side adjacent straight material further comprises a continuous material head, and a tubular material system is coupled to the straight material head. 如請求項15所述之幕牆系統之第一面材單元,其中該第一周圍框架更包括一上突的第二公性接頭,與該第一公性接頭反向垂直並可固定於該第一側鄰直料。 The first face material unit of the curtain wall system of claim 15, wherein the first surrounding frame further comprises an upwardly protruding second male connector, which is perpendicular to the first male connector and can be fixed to the first One side is adjacent to the material. 如請求項19所述之幕牆系統之第一面材單元,其中該上鄰的第二周圍框架包括第二周圍框料,其係具有一下突的公性接頭且在缺少一般橫料之情況下直接固定於該第一側鄰直料上。 The first facestock unit of the curtain wall system of claim 19, wherein the second adjacent perimeter frame comprises a second surrounding frame material having a protruding male connector and in the absence of a general crosspiece Directly fixed on the first side adjacent straight material.
TW100124681A 2011-07-12 2011-07-12 Curtain wall system and method of installing the system TWI606171B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW100124681A TWI606171B (en) 2011-07-12 2011-07-12 Curtain wall system and method of installing the system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW100124681A TWI606171B (en) 2011-07-12 2011-07-12 Curtain wall system and method of installing the system

Publications (2)

Publication Number Publication Date
TW201303125A TW201303125A (en) 2013-01-16
TWI606171B true TWI606171B (en) 2017-11-21

Family

ID=48137964

Family Applications (1)

Application Number Title Priority Date Filing Date
TW100124681A TWI606171B (en) 2011-07-12 2011-07-12 Curtain wall system and method of installing the system

Country Status (1)

Country Link
TW (1) TWI606171B (en)

Also Published As

Publication number Publication date
TW201303125A (en) 2013-01-16

Similar Documents

Publication Publication Date Title
US8191325B2 (en) Curtain wall system and method of installing the system
KR101450628B1 (en) Windows and doors curtain wall insulation system
US7389617B2 (en) Building curtain wall sealing system
RU2580557C2 (en) Wall insulation system with rectangular blocks
KR102660761B1 (en) Panel Assembly Structure of Building Wall
TWI606171B (en) Curtain wall system and method of installing the system
JP2006022509A (en) Curtain wall and its mounting method
JP3809995B2 (en) Water stop structure in unit type curtain wall
JP3912577B2 (en) Joint seal structure of vertical frame and horizontal frame in curtain wall
CN102877577A (en) Curtain wall system and curtain wall building method, as well as face bar unit and building method applied by same
JP2000104355A (en) Exterior wall panel sealing structure and exterior wall panel sealing method
JP3078174B2 (en) Curtain wall unit
JP2009084811A (en) Waterproof structure of vertically-laid extruded cement board
WO2020053637A1 (en) Wall structure, window frame attachment, window frame construction method
KR20200128881A (en) open joint panel assembly without gasket
JP7391636B2 (en) Exterior wall panels with gaskets and gaskets
KR102117407B1 (en) Panel system for overlapimg outer wall of building and contruction method thereof
KR102776326B1 (en) An exterior panel system that is earthquake-resistant using a frame holder and pollution-proof using the panel&#39;s drainage grooves
JP2002256668A (en) Eave component such as eave decorative panel
AU2010242547A1 (en) Facade system
KR101529242B1 (en) Outside panel assembly for construction
JP6875112B2 (en) Joiner for outer wall material and joint structure of outer wall material using this joiner
JPH11210123A (en) Double wall structure
JP6755004B2 (en) Solar power generation equipment and roof with solar power generation equipment
CN115467455A (en) Sectional installation nodes of super high-rise curtain wall unit plates

Legal Events

Date Code Title Description
MM4A Annulment or lapse of patent due to non-payment of fees
点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载