CN117354354A - Remote control method and system for construction protection platform - Google Patents

Remote control method and system for construction protection platform Download PDF

Info

Publication number
CN117354354A
CN117354354A CN202311647942.4A CN202311647942A CN117354354A CN 117354354 A CN117354354 A CN 117354354A CN 202311647942 A CN202311647942 A CN 202311647942A CN 117354354 A CN117354354 A CN 117354354A
Authority
CN
China
Prior art keywords
protection platform
construction protection
leasing
lease
request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311647942.4A
Other languages
Chinese (zh)
Other versions
CN117354354B (en
Inventor
周勇
钟松杏
张阳川
林宇鹏
王力
吴泽琛
童宇
杨金友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Xiamen Anke Technology Co Ltd
Quanzhou Yuntai Technology Co Ltd
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Xiamen Anke Technology Co Ltd
Quanzhou Yuntai Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Xiamen Anke Technology Co Ltd, Quanzhou Yuntai Technology Co Ltd filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN202311647942.4A priority Critical patent/CN117354354B/en
Publication of CN117354354A publication Critical patent/CN117354354A/en
Application granted granted Critical
Publication of CN117354354B publication Critical patent/CN117354354B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • H04L67/125Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0645Rental transactions; Leasing transactions
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y10/00Economic sectors
    • G16Y10/30Construction
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y40/00IoT characterised by the purpose of the information processing
    • G16Y40/50Safety; Security of things, users, data or systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1095Replication or mirroring of data, e.g. scheduling or transport for data synchronisation between network nodes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computing Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Finance (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Signal Processing (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Emergency Management (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Medical Informatics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of engineering equipment control, in particular to a remote control method and a remote control system for a construction protection platform, wherein a cloud server is in real-time communication with an acquisition controller of the construction protection platform to acquire load information of motors of the construction protection platform; the cloud server sends load information of each motor of the leasing construction protection platform associated with the authority to the user side for display according to the access request of the user side and the authority of the user side, and can control each motor according to a remote control instruction of the user side and generate a control log; the cloud server automatically carries out safety judgment on the load information and synchronously generates a log: when the load information is obtained to exceed the first safety threshold, the execution controller is controlled to send an alarm, and when the load information exceeds the second safety threshold, a control request is sent to the execution controller to safely lock the leasing construction protection platform, lock the height and stop working.

Description

Remote control method and system for construction protection platform
Technical Field
The invention relates to the technical field of engineering equipment control, in particular to a remote control method and a system for a construction protection platform.
Background
The use of construction protection platforms now plays an important role in construction projects. In practice, construction protection platforms in building projects are often obtained for use by leasing.
During use, equipment damage may be caused by equipment quality reasons or by personnel handling. In this case, it is easy to trace responsibility. Especially in the case where on-site personnel cause damage to equipment due to illegal operations, but disallowing acceptance, it is difficult to trace back its responsibility.
How to avoid the damage of equipment caused by illegal operation in advance and how to trace back responsibility after the equipment damage occurs are the technical problems to be solved at present.
Disclosure of Invention
The technical problems to be solved by the invention are as follows: a remote control method and system for a construction protection platform is provided, and control and record are provided for use of the construction protection platform.
In order to solve the technical problems, the invention adopts the following technical scheme:
a remote control method for a construction protection platform comprises the following steps:
s1, a cloud server is communicated with an acquisition controller of a leasing construction protection platform in real time to acquire load information of motors of the leasing construction protection platform;
s2, the cloud server sends load information of each motor of the leasing construction protection platform associated with the authority to the user side for display according to the access request of the user side and the authority of the user side, and can control each motor according to a remote control instruction of the user side and generate a control log;
s3, the cloud server automatically carries out safety judgment on the load information and synchronously generates a log:
when the load information is obtained to exceed a first safety threshold, controlling the execution controller to give an alarm, and when the load information exceeds a second safety threshold, sending a control request to the execution controller, and performing safety locking, height locking and stopping work on the leasing construction protection platform.
In order to solve the technical problems, the invention adopts another technical scheme that:
the remote control system for the construction protection platform comprises a cloud service end, wherein the cloud service end comprises a first processor, a first memory and a first computer program which is stored in the first memory and can run on the first processor, and the following steps are realized when the first processor executes the first computer program:
s1, carrying out real-time communication with an acquisition controller of a leasing construction protection platform to obtain load information of each motor of the leasing construction protection platform;
s2, according to the access request of the user side and the authority of the user side, sending the load information of each motor of the leasing construction protection platform associated with the authority to the user side for display, controlling each motor according to a remote control instruction of the user side, and generating a control log;
s3, automatically judging the safety of the load information, and synchronously generating a log:
when the load information is obtained to exceed a first safety threshold, controlling the execution controller to give an alarm, and when the load information exceeds a second safety threshold, sending a control request to the execution controller, and performing safety locking, height locking and stopping work on the leasing construction protection platform.
The invention has the beneficial effects that: according to the remote control method and system for the construction protection platform, the load information of each motor of the construction protection platform is obtained in real time, so that a user side can monitor the working condition of each construction protection platform in real time through the access server side, can remotely control the operation condition of each construction protection platform, and meanwhile, can conduct classified safety judgment on the load information according to the safety threshold value, further, damage or safety risk of equipment caused by illegal operation is effectively avoided, logs are recorded in real time on the safety condition and the operation action, and responsibility tracing after possible risk occurrence is facilitated.
Drawings
FIG. 1 is a flow chart of a method for remotely controlling a construction protection platform according to an embodiment of the present invention;
fig. 2 is a schematic diagram of a remote control system for a construction protection platform according to an embodiment of the present invention.
Detailed Description
In order to describe the technical contents, the achieved objects and effects of the present invention in detail, the following description will be made with reference to the embodiments in conjunction with the accompanying drawings.
Referring to fig. 1, a remote control method for a construction protection platform includes the steps of:
s1, a cloud server is communicated with an acquisition controller of a leasing construction protection platform in real time to acquire load information of motors of the leasing construction protection platform;
s2, the cloud server sends load information of each motor of the leasing construction protection platform associated with the authority to the user side for display according to the access request of the user side and the authority of the user side, and can control each motor according to a remote control instruction of the user side and generate a control log;
s3, the cloud server automatically carries out safety judgment on the load information and synchronously generates a log:
when the load information is obtained to exceed a first safety threshold, controlling the execution controller to give an alarm, and when the load information exceeds a second safety threshold, sending a control request to the execution controller, and performing safety locking, height locking and stopping work on the leasing construction protection platform.
From the above description, the beneficial effects of the invention are as follows: according to the remote control method and system for the construction protection platform, the load information of each motor of the construction protection platform is obtained in real time, so that a user side can monitor the working condition of each construction protection platform in real time through the access server side, can remotely control the operation condition of each construction protection platform, and meanwhile, can conduct classified safety judgment on the load information according to the safety threshold value, further, damage or safety risk of equipment caused by illegal operation is effectively avoided, logs are recorded in real time on the safety condition and the operation action, and responsibility tracing after possible risk occurrence is facilitated.
Further, the method further comprises the steps of:
s4, the cloud server receives an emergency authorization request of the project security side, wherein the emergency authorization request comprises information of the leasing construction protection platform which is locked safely;
s5, the cloud server sends a mode change request to the execution controller of the leasing construction protection platform appointed by the request according to the emergency authorization request, so that the execution controller starts an emergency mode;
and in the emergency mode, the execution controller releases the safety locking, reenters the work, and the cloud server ignores the load information of the leasing construction protection platform and does not carry out alarming and safety locking again.
According to the description, the situation that the overload of the construction protection platform received by the cloud server is possibly caused by unsafe factors is considered, the security personnel can submit an emergency authorization request under the situation, the cloud server remotely performs authorization starting, the site can be lifted in an emergency mode after the authorization, and at the moment, no alarm and no locking occur.
Further, the first safety threshold is 115% of the rated load of the rental construction protection platform, and the second safety threshold is 130% of the rated load of the rental construction protection platform.
From the above description, the first safety threshold is 115% of the rated load, and the second safety threshold is 130% of the rated load, as a specific embodiment of the present invention.
Further, the method also comprises a remote lease control step:
a1, the cloud server writes lease records into a database according to an administrator request, wherein the lease records comprise information of the lease construction protection platform, lease party information, lease time and lease duration information;
a2, the cloud server monitors each lease record in real time, judges whether the lease expires according to the lease time and the lease duration information, if so, sends an expiration alarm to the lease party according to the lease party information, and accumulates the excess duration;
when the exceeding time length reaches a preset threshold value, a remote machine locking request is sent to an execution controller of the leasing construction protection platform through wireless communication, and the use is limited.
According to the above description, the construction protection platform equipment exceeding the period is locked according to the recorded lease information, so as to limit the construction protection platform equipment, so that the renter cannot continue to use the construction protection platform equipment under the condition that the renter does not pay the rent again to increase the lease time, thereby forcing the renter to pay the rent timely, and avoiding the situation that the rent needs to be discussed or even discussed without fruits.
Further, step A2 further includes the steps of:
and after receiving a remote locking request sent by the cloud server, the execution controller monitors the working state of the leasing construction protection platform in real time, and when the current operation of the leasing construction protection platform is finished, the operation is stopped, and the unlocking request of the cloud server is not received, the leasing construction protection platform is forbidden to be started again to work.
According to the description, after the execution controller receives the remote machine locking request, the machine locking is performed after the construction protection platform finishes the current running and stops running, so that the machine is forbidden to be used again, and the possible risk caused by the fact that a safety person does not have sign of locking and stopping under the condition of blindness in the working process of the construction protection platform is avoided.
Referring to fig. 2, a remote control system for a construction protection platform includes a cloud service end, where the cloud service end includes a first processor, a first memory, and a first computer program stored in the first memory and capable of running on the first processor, and when the first processor executes the first computer program, the following steps are implemented:
s1, carrying out real-time communication with an acquisition controller of a leasing construction protection platform to obtain load information of each motor of the leasing construction protection platform;
s2, according to the access request of the user side and the authority of the user side, sending the load information of each motor of the leasing construction protection platform associated with the authority to the user side for display, controlling each motor according to a remote control instruction of the user side, and generating a control log;
s3, automatically judging the safety of the load information, and synchronously generating a log:
when the load information is obtained to exceed a first safety threshold, controlling the execution controller to give an alarm, and when the load information exceeds a second safety threshold, sending a control request to the execution controller, and performing safety locking, height locking and stopping work on the leasing construction protection platform.
Further, the first processor executing the first computer program further comprises the steps of:
s4, receiving an emergency authorization request of the project security administrator, wherein the emergency authorization request comprises the information of the leasing construction protection platform which is locked safely;
s5, according to the emergency authorization request, a mode change request is sent to the execution controller of the leasing construction protection platform appointed by the request, and the execution controller is enabled to start an emergency mode;
and in the emergency mode, the execution controller releases the safety locking, reenters the work, and the cloud server ignores the load information of the leasing construction protection platform and does not carry out alarming and safety locking again.
According to the description, the situation that the overload of the construction protection platform received by the cloud server is possibly caused by unsafe factors is considered, the security personnel can submit an emergency authorization request under the situation, the cloud server remotely performs authorization starting, the site can be lifted in an emergency mode after the authorization, and at the moment, no alarm and no locking occur.
Further, the first safety threshold is 115% of the rated load of the rental construction protection platform, and the second safety threshold is 130% of the rated load of the rental construction protection platform.
From the above description, the first safety threshold is 115% of the rated load, and the second safety threshold is 130% of the rated load, as a specific embodiment of the present invention.
Further, the first processor, when executing the first computer program, further includes a remote rental management control step:
a1, the cloud server writes lease records into a database according to an administrator request, wherein the lease records comprise information of the lease construction protection platform, lease party information, lease time and lease duration information;
a2, the cloud server monitors each lease record in real time, judges whether the lease expires according to the lease time and the lease duration information, if so, sends an expiration alarm to the lease party according to the lease party information, and accumulates the excess duration;
when the exceeding time length reaches a preset threshold value, a remote machine locking request is sent to an execution controller of the leasing construction protection platform through wireless communication, and the use is limited.
According to the above description, the construction protection platform equipment exceeding the period is locked according to the recorded lease information, so as to limit the construction protection platform equipment, so that the renter cannot continue to use the construction protection platform equipment under the condition that the renter does not pay the rent again to increase the lease time, thereby forcing the renter to pay the rent timely, and avoiding the situation that the rent needs to be discussed or even discussed without fruits.
Further, the method further comprises an execution controller, the execution controller comprises a second processor, a second memory and a second computer program stored in the second memory and capable of running on the second processor, and the step A2 when the second processor executes the second computer program further comprises the steps of:
and after receiving a remote machine locking request sent by the cloud server, monitoring the working state of the leasing construction protection platform in real time, and prohibiting the leasing construction protection platform from starting again to work when the leasing construction protection platform finishes the current operation, stops the operation and does not receive the unlocking request of the cloud server.
According to the description, after the execution controller receives the remote machine locking request, the machine locking is performed after the construction protection platform finishes the current running and stops running, so that the machine is forbidden to be used again, and the possible risk caused by the fact that a safety person does not have sign of locking and stopping under the condition of blindness in the working process of the construction protection platform is avoided.
The remote control method and the system for the construction protection platform are suitable for the situation that construction protection platform manufacturers/renters need to remotely control the construction protection platform under the condition that the construction protection platform is rented in a building project.
Referring to fig. 1 and 2, a first embodiment of the invention is as follows:
a remote control method for a construction protection platform comprises the following steps:
s1, the cloud server is communicated with an acquisition controller of the leasing construction protection platform in real time to acquire load information of each motor of the leasing construction protection platform.
The cloud server monitors the load information of the leasing construction protection platform, and the monitoring comprises two modes.
One of which is implemented by a gravity sensor. And acquiring data of the gravity sensor through the acquisition controller, so as to obtain load information of the construction protection platform.
And secondly, by means of a gravity sensor-free mode. The current signal is collected by the current collector, and the different gravity values of each machine position can lead to different output power of the electric hoist motor, so that the current is different, that is, the change of the current value can reflect the change of the gravity value of each machine position. Therefore, the load information of the leasing construction protection platform is obtained through pre-testing or by combining a relation function obtained through motor parameter deduction according to motor current calculation.
S2, the cloud server sends load information of each motor of the leasing construction protection platform associated with the authority to the user side for display according to the access request of the user side and the authority of the user side, and can control each motor according to a remote control instruction of the user side and generate a control log;
s3, the cloud server automatically carries out safety judgment on the load information and synchronously generates a log:
when the load information is obtained to exceed a first safety threshold, controlling the execution controller to give an alarm, and when the load information exceeds a second safety threshold, sending a control request to the execution controller, and performing safety locking, height locking and stopping work on the leasing construction protection platform.
In this embodiment, the first safety threshold is 115% of the rated load, and the second safety threshold is 130% of the rated load. In other equivalent embodiments, the values of the first safety threshold and the second safety threshold may be adjusted according to actual requirements.
S4, the cloud server receives an emergency authorization request of the project security side, wherein the emergency authorization request comprises information of the leasing construction protection platform which is locked safely;
s5, the cloud server sends a mode change request to the execution controller of the leasing construction protection platform appointed by the request according to the emergency authorization request, so that the execution controller starts an emergency mode;
and in the emergency mode, the execution controller releases the safety locking, reenters the work, and the cloud server ignores the load information of the leasing construction protection platform and does not carry out alarming and safety locking again.
The second embodiment of the invention is as follows:
the difference between the remote control method for the construction protection platform and the first embodiment is that the remote lease control method further comprises the steps of:
a1, the cloud server writes lease records into a database according to an administrator request, wherein the lease records comprise information of the lease construction protection platform, lease party information, lease time and lease duration information;
a2, the cloud server monitors each lease record in real time, judges whether the lease expires according to the lease time and the lease duration information, if so, sends an expiration alarm to the lease party according to the lease party information, and accumulates the excess duration;
when the exceeding time length reaches a preset threshold value, a remote machine locking request is sent to an execution controller of the leasing construction protection platform through wireless communication, and the use is limited.
In this embodiment, when the cloud server determines that a certain lease construction protection platform expires, firstly, according to lease party information (including contact information that can be a mobile phone number or a mailbox) recorded in a database, an alarm file for lease expiration is pushed to the lease party, so as to remind the lease party to renew lease or return equipment. And when the renting party receives the alarm information for a period of time and does not return the renting construction protection platform, sending a remote locking request to an execution controller of the renting construction protection platform so as to limit the use of the renting construction protection platform.
Step A2 further comprises the steps of:
and after receiving a remote locking request sent by the cloud server, the execution controller monitors the working state of the leasing construction protection platform in real time, and when the current operation of the leasing construction protection platform is finished, the operation is stopped, and the unlocking request of the cloud server is not received, the leasing construction protection platform is forbidden to be started again to work.
In this embodiment, after the renter selects to renew the renting, the cloud server initiates modification of the renting record (modifying or re-entering the renting record through the login system) by the administrator, and adjusts the renting duration. At this time, when the cloud server monitors each lease record in real time, if the locked lease construction protection platform is found not to be out of date, an unlocking request is sent to the lease construction protection platform execution controller so as to resume normal use of the lease construction protection platform execution controller.
Referring to fig. 2, a third embodiment of the present invention is as follows:
the remote control system for the construction protection platform comprises a cloud service end and a leasing construction protection platform, wherein the cloud service end comprises a first processor, a first memory and a first computer program which is stored in the first memory and can run on the first processor, the leasing construction protection platform comprises an execution controller, the execution controller comprises a second processor, a second memory and a second computer program which is stored in the second memory and can run on the second processor, and the steps in the remote control method for the construction protection platform in one or two of the above embodiments are jointly realized when the first processor executes the first computer program and when the second processor executes the second computer program.
In summary, according to the remote control method and system for the construction protection platform provided by the invention, the load information of each motor of the construction protection platform is obtained in real time, so that the user side can monitor the working condition of each lease protection platform in real time through the access server side and can remotely control the lease protection platform, meanwhile, the safety judgment of grading the load information is carried out according to the safety threshold, thereby effectively avoiding equipment damage or safety risk caused by illegal operation, and simultaneously, logs are recorded in real time for the safety condition and the operation action, so that the responsibility tracing after possible risk occurrence is facilitated.
In addition, according to the lease information recorded, locking is carried out on construction protection platform equipment in excess to limit construction protection platform equipment, so that a leaser cannot continue to use the construction protection platform equipment under the condition that lease time is increased by not paying lease again, the leaser is forced to pay lease timely, the condition that lease needs to be discussed or even discussed is avoided, meanwhile, during the lease of the construction protection platform, a service end monitors the working state of the construction protection platform, and therefore safety control can be carried out, and dangerous use of the construction protection platform is avoided.
The foregoing description is only illustrative of the present invention and is not intended to limit the scope of the invention, and all equivalent changes made by the specification and drawings of the present invention, or direct or indirect application in the relevant art, are included in the scope of the present invention.

Claims (10)

1. The remote control method for the construction protection platform is characterized by comprising the following steps:
s1, a cloud server is communicated with an acquisition controller of a leasing construction protection platform in real time to acquire load information of motors of the leasing construction protection platform;
s2, the cloud server sends load information of each motor of the leasing construction protection platform associated with the authority to the user side for display according to the access request of the user side and the authority of the user side, and can control each motor according to a remote control instruction of the user side and generate a control log;
s3, the cloud server automatically carries out safety judgment on the load information and synchronously generates a log:
when the load information is obtained to exceed a first safety threshold, controlling an execution controller to send an alarm, and when the load information exceeds a second safety threshold, sending a control request to the execution controller, and performing safety locking, height locking and work stopping on the leasing construction protection platform.
2. The method for remotely controlling a construction protection platform according to claim 1, further comprising the steps of:
s4, the cloud server receives an emergency authorization request of the project security side, wherein the emergency authorization request comprises information of the leasing construction protection platform which is locked safely;
s5, the cloud server sends a mode change request to the execution controller of the leasing construction protection platform appointed by the request according to the emergency authorization request, so that the execution controller starts an emergency mode;
and in the emergency mode, the execution controller releases the safety locking, reenters the work, and the cloud server ignores the load information of the leasing construction protection platform and does not carry out alarming and safety locking again.
3. The method of claim 1, wherein the first safety threshold is 115% of the rated load of the rental construction protection platform and the second safety threshold is 130% of the rated load of the rental construction protection platform.
4. The method for remotely controlling a construction protection platform according to claim 1, further comprising the step of remotely leasing the platform:
a1, the cloud server writes lease records into a database according to an administrator request, wherein the lease records comprise information of the lease construction protection platform, lease party information, lease time and lease duration information;
a2, the cloud server monitors each lease record in real time, judges whether the lease expires according to the lease time and the lease duration information, if so, sends an expiration alarm to the lease party according to the lease party information, and accumulates the excess duration;
when the exceeding time length reaches a preset threshold value, a remote machine locking request is sent to an execution controller of the leasing construction protection platform through wireless communication, and the use is limited.
5. The method for remotely controlling a construction protection platform according to claim 4, wherein the step A2 further comprises the steps of:
and after receiving a remote locking request sent by the cloud server, the execution controller monitors the working state of the leasing construction protection platform in real time, and when the current operation of the leasing construction protection platform is finished, the operation is stopped, and the unlocking request of the cloud server is not received, the leasing construction protection platform is forbidden to be started again to work.
6. The remote control system for the construction protection platform comprises a cloud service end, wherein the cloud service end comprises a first processor, a first memory and a first computer program which is stored in the first memory and can run on the first processor, and the remote control system is characterized in that the first processor realizes the following steps when executing the first computer program:
s1, carrying out real-time communication with an acquisition controller of a leasing construction protection platform to obtain load information of each motor of the leasing construction protection platform;
s2, according to the access request of the user side and the authority of the user side, sending the load information of each motor of the leasing construction protection platform associated with the authority to the user side for display, controlling each motor according to a remote control instruction of the user side, and generating a control log;
s3, automatically judging the safety of the load information, and synchronously generating a log:
when the load information is obtained to exceed a first safety threshold, controlling an execution controller to send an alarm, and when the load information exceeds a second safety threshold, sending a control request to the execution controller, and performing safety locking, height locking and work stopping on the leasing construction protection platform.
7. The remote control system for a construction protection platform according to claim 6, wherein the first processor when executing the first computer program further comprises the steps of:
s4, receiving an emergency authorization request of the project security administrator, wherein the emergency authorization request comprises the information of the leasing construction protection platform which is locked safely;
s5, according to the emergency authorization request, a mode change request is sent to the execution controller of the leasing construction protection platform appointed by the request, and the execution controller is enabled to start an emergency mode;
and in the emergency mode, the execution controller releases the safety locking, reenters the work, and the cloud server ignores the load information of the leasing construction protection platform and does not carry out alarming and safety locking again.
8. The remote control system for a construction protection platform of claim 6, wherein the first safety threshold is 115% of the rated load of the rental construction protection platform and the second safety threshold is 130% of the rated load of the rental construction protection platform.
9. The remote control system for a construction protection platform according to claim 6, wherein the first processor when executing the first computer program further comprises a remote lease control step of:
a1, the cloud server writes lease records into a database according to an administrator request, wherein the lease records comprise information of the lease construction protection platform, lease party information, lease time and lease duration information;
a2, the cloud server monitors each lease record in real time, judges whether the lease expires according to the lease time and the lease duration information, if so, sends an expiration alarm to the lease party according to the lease party information, and accumulates the excess duration;
when the exceeding time length reaches a preset threshold value, a remote machine locking request is sent to an execution controller of the leasing construction protection platform through wireless communication, and the use is limited.
10. The remote control system for a construction protection platform according to claim 9, further comprising an execution controller, the execution controller comprising a second processor, a second memory, and a second computer program stored in the second memory and executable on the second processor, wherein step A2 when the second processor executes the second computer program further comprises the steps of:
and after receiving a remote machine locking request sent by the cloud server, monitoring the working state of the leasing construction protection platform in real time, and prohibiting the leasing construction protection platform from starting again to work when the leasing construction protection platform finishes the current operation, stops the operation and does not receive the unlocking request of the cloud server.
CN202311647942.4A 2023-12-05 2023-12-05 Remote control method and system for construction protection platform Active CN117354354B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311647942.4A CN117354354B (en) 2023-12-05 2023-12-05 Remote control method and system for construction protection platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311647942.4A CN117354354B (en) 2023-12-05 2023-12-05 Remote control method and system for construction protection platform

Publications (2)

Publication Number Publication Date
CN117354354A true CN117354354A (en) 2024-01-05
CN117354354B CN117354354B (en) 2024-03-26

Family

ID=89357917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311647942.4A Active CN117354354B (en) 2023-12-05 2023-12-05 Remote control method and system for construction protection platform

Country Status (1)

Country Link
CN (1) CN117354354B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106991762A (en) * 2017-05-03 2017-07-28 无锡租八戒软件有限公司 Lease electric car safety driving system and its management method
CN107146139A (en) * 2017-05-03 2017-09-08 无锡租八戒软件有限公司 Join formula electromobile lease system and its join management method
CN109472372A (en) * 2018-10-17 2019-03-15 平安国际融资租赁有限公司 Resource data distribution method, device and computer equipment based on leased equipment
CN112465582A (en) * 2020-10-14 2021-03-09 中企云链(北京)金融信息服务有限公司 Rental equipment working condition monitoring and management system
JP2021105967A (en) * 2019-12-27 2021-07-26 株式会社ジュウサポ Renter watch system
CN114331598A (en) * 2021-12-17 2022-04-12 珠海格力电器股份有限公司 A rental management terminal and rental equipment and its locking control method
CN114360222A (en) * 2022-01-18 2022-04-15 平安国际融资租赁有限公司 State early warning method, device, equipment and medium for rental equipment
CN114791706A (en) * 2021-10-29 2022-07-26 天津长荣科技集团股份有限公司 Remote control system of leasing equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106991762A (en) * 2017-05-03 2017-07-28 无锡租八戒软件有限公司 Lease electric car safety driving system and its management method
CN107146139A (en) * 2017-05-03 2017-09-08 无锡租八戒软件有限公司 Join formula electromobile lease system and its join management method
CN109472372A (en) * 2018-10-17 2019-03-15 平安国际融资租赁有限公司 Resource data distribution method, device and computer equipment based on leased equipment
JP2021105967A (en) * 2019-12-27 2021-07-26 株式会社ジュウサポ Renter watch system
CN112465582A (en) * 2020-10-14 2021-03-09 中企云链(北京)金融信息服务有限公司 Rental equipment working condition monitoring and management system
CN114791706A (en) * 2021-10-29 2022-07-26 天津长荣科技集团股份有限公司 Remote control system of leasing equipment
CN114331598A (en) * 2021-12-17 2022-04-12 珠海格力电器股份有限公司 A rental management terminal and rental equipment and its locking control method
CN114360222A (en) * 2022-01-18 2022-04-15 平安国际融资租赁有限公司 State early warning method, device, equipment and medium for rental equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郑丽娟;彭团丰;魏佳栋;: "基于移动网络及云平台的智能化箱变远程监测系统研究", 无线互联科技, no. 12, 25 June 2020 (2020-06-25) *

Also Published As

Publication number Publication date
CN117354354B (en) 2024-03-26

Similar Documents

Publication Publication Date Title
CN103536287B (en) The remote monitoring maintenance system of medical imaging devices and method
CN106385341B (en) Method and system for monitoring thread by client
CN109299855B (en) A power information communication dispatching system and dispatching method thereof
CN111806279A (en) Method for improving charging safety of charging pile, server, charging pile and system
CN102615709B (en) Concrete slump monitoring device and method
CN117354354B (en) Remote control method and system for construction protection platform
US20230322121A1 (en) Battery swap control method and system, medium, apparatus, and battery charging and swap station
CN111680978A (en) Unlocking key authorization method, using method and returning method
CN110963428A (en) An intelligent monitoring system for tower crane jacking operation
CN201638282U (en) A fingerprint access control system for unattended substations
CN112528304B (en) Self-help debugging system
CN111517224B (en) Pin shaft monitoring method and device for tower crane jacking operation
CN210895105U (en) Intelligent monitoring system for fastening of mounting bolts of tower crane
CN113958108A (en) Electric box control method, electric box, server and storage medium
CN111131196A (en) Online safety monitoring method and system for electricity consumption information acquisition terminal
JP2004005149A (en) Portable information terminal device and maintenance management system
CN113958107B (en) Climbing frame control method, electric box, server and storage medium
CN112909365A (en) Battery control method and device
CN113119909A (en) Vehicle safety system based on face recognition system
CN111362087A (en) Elevator maintenance supervision method based on multimedia terminal
CN110633503A (en) BIM-based PDCA (packet data processing architecture) cycle closed type safety management system
CN218336052U (en) Coal-winning machine crossheading communication fingerprint remote start device
CN219871595U (en) Tower machine power cabinet testing arrangement
CN119863058B (en) A management system for power supply box
CN212195707U (en) Novel infrastructure management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 362400 Lianfeng Science and Technology Industrial Park, Guanqiao Town, Anxi County, Quanzhou City, Fujian Province

Patentee after: Quanzhou Yuntai Technology Co.,Ltd.

Country or region after: China

Patentee after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

Patentee after: Xiamen Anke Technology Co.,Ltd.

Address before: 362400 Lianfeng Science and Technology Industrial Park, Guanqiao Town, Anxi County, Quanzhou City, Fujian Province

Patentee before: Quanzhou Yuntai Technology Co.,Ltd.

Country or region before: China

Patentee before: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

Patentee before: XIAMEN ANKE TECHNOLOGY Co.,Ltd.

点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载