+

CN103136612A - Development method of zero-coding component-based flow business - Google Patents

Development method of zero-coding component-based flow business Download PDF

Info

Publication number
CN103136612A
CN103136612A CN 201110387695 CN201110387695A CN103136612A CN 103136612 A CN103136612 A CN 103136612A CN 201110387695 CN201110387695 CN 201110387695 CN 201110387695 A CN201110387695 A CN 201110387695A CN 103136612 A CN103136612 A CN 103136612A
Authority
CN
China
Prior art keywords
business
configuration
flow
rule
definition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110387695
Other languages
Chinese (zh)
Inventor
于晓雪
高艳芝
徐拥军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DIGITAL CHINA INFORMATION SYSTEM Co Ltd
Original Assignee
DIGITAL CHINA INFORMATION SYSTEM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DIGITAL CHINA INFORMATION SYSTEM Co Ltd filed Critical DIGITAL CHINA INFORMATION SYSTEM Co Ltd
Priority to CN 201110387695 priority Critical patent/CN103136612A/en
Publication of CN103136612A publication Critical patent/CN103136612A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A development method of zero-coding component-based flow business is characterized by including framework construction, component combination, business flow configuration, and business flow platform configuration, finally, before a new item of business flow integration is developed, according to the characters of the new item, the described method is used for carrying out business loading and software development, the development period of the item is bound to be shortened, and the zero-coding target is achieved, the items which are rapid in changes of requirements and not stable can be coped with, and the purposes that business requirements can be continuously broadened, and application and maintenance in future are convenient are achieved.

Description

A kind of development approach of Zero-code componentization traffic flow
Technical field
The present invention relates to single system flow process and flow process and integrate the quick development method of class business Zero-code componentization, refer to especially a kind ofly to adopt that architecture is built, Component composition, operation flow configuration combine the method for carrying out the operation flow fast Development, basically can realize by this method the Zero-code exploitation of operation flow integration project, this method is mainly for flow process class business.
Background technology
Along with IT application in enterprise is constantly promoted, information system management has become the main flow trend of business administration, and this trend can not be reversed.Workflow technology is undoubtedly important means and the effective tool that carries out flow process curing, optimization and application integration in the IT application in enterprise process.
Yet traditional flow process intermediate item development mode is that technological frame and business demand are tied up the exploitation that customizes, and after causing project development to complete, both is solidified togather, and be difficult to accomplish the demand of activating business from now on and using, and inconvenience is safeguarded.
The characteristics of flow process type systematic are, exploitation business process model in early stage is more fixing, but the changes in demand of the business form page is very large.After system's operation, follow the continuous adjustment of business event and department, some operation flow and business form all can change a lot.For the enhanced scalability of flow process type systematic, high maintainable requirement, the construction of flow process type systematic need to be adopted new project development pattern, can continue to reach the demand of activating business, be convenient to the purpose of applicating maintenance from now on.
Adopt the present invention, the general thought of whole flow process type systematic platform construction is: framework is built+Component composition+operation flow configuration, this method makes and changes frequently business demand and also can have preferably and realize, the maintenance cost in later stage reduces greatly, simultaneously on stream, realize Zero-code, the technician is freed from loaded down with trivial details, the work that repeats, concentrate and pay close attention to enterprise core business and innovation, reply changes fast, reduce costs, raise the efficiency.
Summary of the invention
Problem to be solved by this invention is the Improving Project development progress, the reply business demand changes fast, in the situation that the flow process demand is continued to optimize, is changed, provide a kind of fast, business development method cheaply, this method can solve the enhanced scalability of flow process type systematic, high maintainable requirement, adopting this method to go to carry out new project can arrive and continue to activate business, the purpose of being convenient to safeguard.
Method of the present invention comprises following step at least:
Step 1: framework is built: under the integral application framework, build the technical support environment, comprise the rights management environment, use back-up environment, technical foundation environment and standard criterion system etc.
Step 2: Component composition: member is the high cohesion of realizing a certain concrete function, the technology entity of low coupling, it can be a physical instrument, it can be also a concrete software function, under the interface of following unified standard or exchange standard condition, by different Component compositions, complete a concrete technical functionality.Comprise the three basic member in this method: flow process member, list member, business rule member.
Step 3: operation flow configuration: based on the technological accumulation and inheritance that has built, follow reusable thinking, by the general utility tool that provides, utilize the mode of definition and configuration, definition, storage, the calculating of realization to operation flow, business form, business rule, thus realize a concrete traffic flow demand.Comprise business rule configuration, business form configuration, three steps of operation flow configuration.
Step 31: business rule configuration: business rule refers to and the working specification of traffic aided, management article, rules and regulations, industry standard etc.In fact also can be understood as a set condition and operation with this understanding, is one group of accurate condensed statement, is used for describing, retraining and control structure, running and the strategy of enterprise, is the section business logic in application program.Its theoretical foundation is: a set of circumstances is set, when satisfying this set of circumstances, triggers one or more action.Catch policy statement with rule format great dirigibility and good adaptability can be provided.
Mainly utilize the Business Rule Management platform to carry out loading, calculating and the management of business rule herein, the vestige that each rule loads is on the books at the Business Rule Management platform, guarantees reviewing of strictly all rules.
Step 32: business form configuration: business form is configured in business rule and configures complete carrying out afterwards, usually defines business form and expresses actual business.Utilize form design tools to carry out the design effort of forms pages herein; The list management platform is responsible for loading, the data of list and is submitted to and management.The list member provides visual form design tools, adopts the mode that pulls, and guarantees the user is easy, carry out fast forms pages exploitation and design.Can the applied business rule carry out the binding of form data in the design process of list, list can be submitted data to database voluntarily by the list engine, has omitted the SQL statement development of data submission part in original development mode.The list management platform manages the different editions of list; Can follow the tracks of the data of list and submit situation to, the vestige that guarantees form data loading each time is all on the books in the list management platform, when data load link, any variation occuring, can find the genetic connection of data from the list management platform, guarantees the availability of data.
Step 33: operation flow configuration: the operation flow configuration is after business rule, business form configuration are complete, according to practical business requirement definition business process model.Utilize the flow scheme design instrument to carry out the modeling work of flow process herein; The flow process application development platform is responsible for loading, execution, management, the monitoring of procedural model.The flow process member provides the visible process design tool, adopts the mode pull, guarantees that the user is easy, carry out process modeling fast.The flow process member is with information such as the operating personnel of specific operation link in the common configuration service flow process of authority member, posies in the process modeling process; The flow process member with business rule member in conjunction with information such as configuration flow actuating logic, operating right, operating resources; The flow process member represents with the practical business of list member in conjunction with each operation link of configuration flow.
The articulating of the same authority of mode realization flow, rule and list by configuration fully in the performance history of whole flow process.
Step 4: operation flow platform configuration, its specific implementation are with reference to following steps:
Step 41: the prerequisite of configuration: the loading of finishing service rule, business form, operation flow.
Step 42: based on the configuration module that the application back-up environment provides, the management modes such as the ways of presentation of definition operation flow and authority.Use back-up environment process-based application development platform overall technology framework, on the basic components such as authority, daily record, backup recovery, encapsulate the required application component of all kinds of business, comprise query statistic member, olap analysis member, form member, graphically show member etc., service interface and the graphical operation interface of standard is provided.Using registration operation flow module on back-up environment, according to the practical business demand, operation flow is assigned on different business modules, register business module on the application back-up environment.
Step 43: based on the technology member, in semantic layer, take metadata as driving, carry out configuration and the definition of miscellaneous service rule, business model, operation flow, the semantical definition process is completed by the business personnel, the technology that realized is to business conversion and linking, and the business of really accomplishing loads separates with technology platform.Semantical definition comprises that specifically data integration rule definition, data administer rule definition, business model definition, business rule definition, use and represent definition, operation flow definition, represents instrument, workflow management instrument as the support of semantical definition by regulation management instrument, application.
Step 44: the data and the application component that provide based on technological layer, definition and rule configuration through semantic layer, data and business load complete after, namely realized the exploitation of the application functions such as business rule, business form, operation flow, query statistic, form, analysis.
Step 45: by the componentization encapsulation to application function, it is issued as application service, then definition and the configuration by workflow management, application service is integrated in operation flow, make it become an ingredient of operation flow function, at last it is represented the page and undertaken integratedly by front-end presentation tool, namely the interface of vocational work door is integrated.Api interface according to door provides defines, formulates corresponding template flexibly, satisfies types of functionality demand and staff's individual demand, reaches best user's experience effect, and finishing service loads.
Step 46: the empowerment management of application service.System authorizes each user for the rights of using of service application by centralized function, data permission management based on role, post.
Step 5: before the flow process of commencing business is integrated the new projects of class, according to project characteristic, adopt above-described method to go the enforcement business to load and software development, must shorten the construction cycle of project, realize the target of Zero-code; Can tackle changes in demand fast, the project of the characteristics such as unstable reaches and can continue the demand of activating business, is convenient to the purpose of applicating maintenance from now on.
Embodiment
the implementing method of said method following at first on the basis that framework is built with the data management environment, use back-up environment, technical foundation environment and standard criterion system are announced out, allow the constraint of framework be deep in program member's routine work, secondly will produce the interface that meets in a large number unified standard or technology member and the part basic business member of exchange standard condition, wherein there are three important platforms to build, the flow process application development platform, the Business Rule Management platform, the list management platform, carry out the preliminary work that data load under the guidance of these three platforms, based on the technological accumulation and inheritance that has built, follow reusable thinking with every flow process, the definition of business rule enters the flow process application development platform, based on the configuration module of using back-up environment and providing, the management modes such as the ways of presentation of definition business and authority, based on the technology member, in semantic layer, take metadata as driving, carry out the miscellaneous service rule, business model, the configuration of operation flow and definition, the semantical definition process is completed by the business personnel, the technology that realized is to business conversion and linking, the business of really accomplishing loads separates with technology platform, by the componentization encapsulation to application function, it is issued as application service, then definition and the configuration by workflow management, application service is integrated in operation flow, make it become an ingredient of operation flow function, at last it being represented the page is undertaken integrated by front-end presentation tool, the interface that is the vocational work door is integrated.
Technique scheme can shorten the construction cycle of flow process class, flow process integration intermediate item when implementing, solve the traffic flow changes in demand high, business demand is difficult to stable actual conditions, this method proposes a highly expansion, high maintainable scheme, and the maintenance that the enforcement of this method finally can continue the demand of activating business, be convenient to use from now on.
It should be noted last that, above embodiment is only in order to explanation and unrestricted technical scheme described in the invention; Therefore, although this instructions has been described in detail the present invention with reference to the above embodiments,, those of ordinary skill in the art should be appreciated that still and can modify or replace equally the present invention; And all do not break away from technical scheme and the improvement thereof of the spirit and scope of the present invention, and it all should be encompassed in the middle of claim scope of the present invention.

Claims (3)

1. the development approach of a Zero-code componentization traffic flow, it is characterized in that: the method comprises following step at least:
Step 1: framework is built: under the integral application framework, build the technical support environment, comprise the rights management environment, use back-up environment, technical foundation environment and standard criterion system etc.
Step 2: Component composition: member is the high cohesion of realizing a certain concrete function, the technology entity of low coupling, it can be a physical instrument, it can be also a concrete software function, under the interface of following unified standard or exchange standard condition, by different Component compositions, complete a concrete technical functionality.Comprise the three basic member in this method: flow process member, list member, business rule member.
Step 3: operation flow configuration: based on the technological accumulation and inheritance that has built, follow reusable thinking, by the general utility tool that provides, utilize the mode of definition and configuration, definition, storage, the calculating of realization to operation flow, business form, business rule, thus realize a concrete traffic flow demand.Comprise business rule configuration, business form configuration, three steps of operation flow configuration.
Step 4: operation flow platform configuration.
Step 5: before the flow process of commencing business is integrated the new projects of class, according to project characteristic, adopt above-described method to go the enforcement business to load and software development, must shorten the construction cycle of project, realize the target of Zero-code; Can tackle changes in demand fast, the project of the characteristics such as unstable reaches and can continue the demand of activating business, is convenient to the purpose of applicating maintenance from now on.
2. the development approach of a Zero-code componentization traffic flow is characterized in that the step of operation flow configuration is:
Step 31: business rule configuration: business rule refers to and the working specification of traffic aided, management article, rules and regulations, industry standard etc.In fact also can be understood as a set condition and operation with this understanding, is one group of accurate condensed statement, is used for describing, retraining and control structure, running and the strategy of enterprise, is the section business logic in application program.Its theoretical foundation is: a set of circumstances is set, when satisfying this set of circumstances, triggers one or more action.Catch policy statement with rule format great dirigibility and good adaptability can be provided.
Mainly utilize the Business Rule Management platform to carry out loading, calculating and the management of business rule herein, the vestige that each rule loads is on the books at the Business Rule Management platform, guarantees reviewing of strictly all rules.
Step 32: business form configuration: business form is configured in business rule and configures complete carrying out afterwards, usually defines business form and expresses actual business.Utilize form design tools to carry out the design effort of forms pages herein; The list management platform is responsible for loading, the data of list and is submitted to and management.The list member provides visual form design tools, adopts the mode that pulls, and guarantees the user is easy, carry out fast forms pages exploitation and design.Can the applied business rule carry out the binding of form data in the design process of list, list can be submitted data to database voluntarily by the list engine, has omitted the SQL statement development of data submission part in original development mode.The list management platform manages the different editions of list; Can follow the tracks of the data of list and submit situation to, the vestige that guarantees form data loading each time is all on the books in the list management platform, when data load link, any variation occuring, can find the genetic connection of data from the list management platform, guarantees the availability of data.
Step 33: operation flow configuration: the operation flow configuration is after business rule, business form configuration are complete, according to practical business requirement definition business process model.Utilize the flow scheme design instrument to carry out the modeling work of flow process herein; The flow process application development platform is responsible for loading, execution, management, the monitoring of procedural model.The flow process member provides the visible process design tool, adopts the mode pull, guarantees that the user is easy, carry out process modeling fast.The flow process member is with information such as the operating personnel of specific operation link in the common configuration service flow process of authority member, posies in the process modeling process; The flow process member with business rule member in conjunction with information such as configuration flow actuating logic, operating right, operating resources; The flow process member represents with the practical business of list member in conjunction with each operation link of configuration flow.
The articulating of the same authority of mode realization flow, rule and list by configuration fully in the performance history of whole flow process.
3. the development approach of a Zero-code componentization traffic flow is characterized in that the step of operation flow platform configuration is:
Step 41: the prerequisite of configuration: the loading of finishing service rule, business form, operation flow.
Step 42: based on the configuration module that the application back-up environment provides, the management modes such as the ways of presentation of definition operation flow and authority.Use back-up environment process-based application development platform overall technology framework, on the basic components such as authority, daily record, backup recovery, encapsulate the required application component of all kinds of business, comprise query statistic member, olap analysis member, form member, graphically show member etc., service interface and the graphical operation interface of standard is provided.Using registration operation flow module on back-up environment, according to the practical business demand, operation flow is assigned on different business modules, register business module on the application back-up environment.
Step 43: based on the technology member, in semantic layer, take metadata as driving, carry out configuration and the definition of miscellaneous service rule, business model, operation flow, the semantical definition process is completed by the business personnel, the technology that realized is to business conversion and linking, and the business of really accomplishing loads separates with technology platform.Semantical definition comprises that specifically data integration rule definition, data administer rule definition, business model definition, business rule definition, use and represent definition, operation flow definition, represents instrument, workflow management instrument as the support of semantical definition by regulation management instrument, application.
Step 44: the data and the application component that provide based on technological layer, definition and rule configuration through semantic layer, data and business load complete after, namely realized the exploitation of the application functions such as business rule, business form, operation flow, query statistic, form, analysis.
Step 45: by the componentization encapsulation to application function, it is issued as application service, then definition and the configuration by workflow management, application service is integrated in operation flow, make it become an ingredient of operation flow function, at last it is represented the page and undertaken integratedly by front-end presentation tool, namely the interface of vocational work door is integrated.Api interface according to door provides defines, formulates corresponding template flexibly, satisfies types of functionality demand and staff's individual demand, reaches best user's experience effect, and finishing service loads.
Step 46: the empowerment management of application service.System authorizes each user for the rights of using of service application by centralized function, data permission management based on role, post.
CN 201110387695 2011-11-29 2011-11-29 Development method of zero-coding component-based flow business Pending CN103136612A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110387695 CN103136612A (en) 2011-11-29 2011-11-29 Development method of zero-coding component-based flow business

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110387695 CN103136612A (en) 2011-11-29 2011-11-29 Development method of zero-coding component-based flow business

Publications (1)

Publication Number Publication Date
CN103136612A true CN103136612A (en) 2013-06-05

Family

ID=48496421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110387695 Pending CN103136612A (en) 2011-11-29 2011-11-29 Development method of zero-coding component-based flow business

Country Status (1)

Country Link
CN (1) CN103136612A (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103294475A (en) * 2013-06-08 2013-09-11 北京邮电大学 Automatic service generating system and automatic service generating method both of which are based on imaging service scene and field template
CN103793373A (en) * 2014-01-23 2014-05-14 福建工程学院 Tracking relation recovery method based on syntax
CN104156854A (en) * 2014-07-15 2014-11-19 神州数码融信软件有限公司 Method and system for realizing financial products based on product plant design concept
CN104571026A (en) * 2014-12-17 2015-04-29 中冶南方(武汉)信息技术工程有限公司 Platform and method for establishing whole-process metallurgical manufacturing execution system
CN104765608A (en) * 2015-04-02 2015-07-08 广州力富视频科技有限公司 Implementation method and device of audio and video workflow application system
CN106327553A (en) * 2015-06-19 2017-01-11 拓维信息系统股份有限公司 Rapid development system for mobile phone animation
CN107111802A (en) * 2015-01-26 2017-08-29 株式会社日立制作所 Business specification regeneration system, business specification regeneration method
CN107291887A (en) * 2017-06-21 2017-10-24 北京中泰合信管理顾问有限公司 LNMP frameworks realize the process management system of software implementation
CN107291925A (en) * 2017-06-29 2017-10-24 浪潮软件股份有限公司 Examination and approval data precipitation method based on business model
CN108038089A (en) * 2017-12-01 2018-05-15 方欣科技有限公司 A kind of online electronic spreadsheet engine of property tax
CN108279879A (en) * 2018-01-25 2018-07-13 北京卓越智软科技有限公司 Applied software development method towards engine
CN109377106A (en) * 2018-12-06 2019-02-22 浪潮通用软件有限公司 A kind of operation flow implementation method based on pilot pattern
CN109597814A (en) * 2018-12-06 2019-04-09 广州万惠信息技术咨询服务有限公司 Online rapid delivery system of background management information system
CN109889571A (en) * 2019-01-09 2019-06-14 深圳市雁联计算系统有限公司 A kind of development platform system and development approach
CN110673839A (en) * 2019-09-10 2020-01-10 口碑(上海)信息技术有限公司 Distributed tool configuration construction generation method and system
CN110865816A (en) * 2019-11-22 2020-03-06 贵州科学院(贵州省应用技术研究院) Flow engine method for quickly constructing form
CN110989983A (en) * 2019-11-28 2020-04-10 深圳航天智慧城市系统技术研究院有限公司 A Zero-Code Application Software Rapid Construction System
CN111190578A (en) * 2019-12-20 2020-05-22 天阳宏业科技股份有限公司 Customizable flow operation development system
CN111208979A (en) * 2019-12-31 2020-05-29 深圳易伙科技有限责任公司 Assembly type development method and system based on platform framework
CN111611270A (en) * 2020-05-26 2020-09-01 深圳博沃智慧科技有限公司 Form design and operation processing method and system
CN113253982A (en) * 2021-05-11 2021-08-13 广州以大计算机科技有限公司 Data flow customization management system
CN113672222A (en) * 2021-08-04 2021-11-19 中汽创智科技有限公司 Application program interface management device and construction method thereof
CN119295195A (en) * 2024-09-20 2025-01-10 赞同科技股份有限公司 Method for automatically identifying and defining domain services and internal components based on business entities

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103294475A (en) * 2013-06-08 2013-09-11 北京邮电大学 Automatic service generating system and automatic service generating method both of which are based on imaging service scene and field template
CN103294475B (en) * 2013-06-08 2016-01-13 北京邮电大学 The business automatic creation system of graphic based business scenario and domain template and method
CN103793373A (en) * 2014-01-23 2014-05-14 福建工程学院 Tracking relation recovery method based on syntax
CN103793373B (en) * 2014-01-23 2017-02-01 福建工程学院 Tracking relation recovery method based on syntax
CN104156854A (en) * 2014-07-15 2014-11-19 神州数码融信软件有限公司 Method and system for realizing financial products based on product plant design concept
CN104571026A (en) * 2014-12-17 2015-04-29 中冶南方(武汉)信息技术工程有限公司 Platform and method for establishing whole-process metallurgical manufacturing execution system
CN107111802A (en) * 2015-01-26 2017-08-29 株式会社日立制作所 Business specification regeneration system, business specification regeneration method
CN104765608A (en) * 2015-04-02 2015-07-08 广州力富视频科技有限公司 Implementation method and device of audio and video workflow application system
CN106327553A (en) * 2015-06-19 2017-01-11 拓维信息系统股份有限公司 Rapid development system for mobile phone animation
CN107291887A (en) * 2017-06-21 2017-10-24 北京中泰合信管理顾问有限公司 LNMP frameworks realize the process management system of software implementation
CN107291925B (en) * 2017-06-29 2020-05-26 浪潮软件股份有限公司 A business model-based approval data precipitation method
CN107291925A (en) * 2017-06-29 2017-10-24 浪潮软件股份有限公司 Examination and approval data precipitation method based on business model
CN108038089A (en) * 2017-12-01 2018-05-15 方欣科技有限公司 A kind of online electronic spreadsheet engine of property tax
CN108279879A (en) * 2018-01-25 2018-07-13 北京卓越智软科技有限公司 Applied software development method towards engine
CN108279879B (en) * 2018-01-25 2018-12-18 北京卓越智软科技有限公司 Applied software development method towards engine
CN109377106A (en) * 2018-12-06 2019-02-22 浪潮通用软件有限公司 A kind of operation flow implementation method based on pilot pattern
CN109597814A (en) * 2018-12-06 2019-04-09 广州万惠信息技术咨询服务有限公司 Online rapid delivery system of background management information system
CN109889571A (en) * 2019-01-09 2019-06-14 深圳市雁联计算系统有限公司 A kind of development platform system and development approach
CN110673839A (en) * 2019-09-10 2020-01-10 口碑(上海)信息技术有限公司 Distributed tool configuration construction generation method and system
CN110865816A (en) * 2019-11-22 2020-03-06 贵州科学院(贵州省应用技术研究院) Flow engine method for quickly constructing form
CN110989983A (en) * 2019-11-28 2020-04-10 深圳航天智慧城市系统技术研究院有限公司 A Zero-Code Application Software Rapid Construction System
CN111190578A (en) * 2019-12-20 2020-05-22 天阳宏业科技股份有限公司 Customizable flow operation development system
CN111208979A (en) * 2019-12-31 2020-05-29 深圳易伙科技有限责任公司 Assembly type development method and system based on platform framework
CN111208979B (en) * 2019-12-31 2023-05-23 深圳易伙科技有限责任公司 Assembly type development method and system based on platform framework
CN111611270A (en) * 2020-05-26 2020-09-01 深圳博沃智慧科技有限公司 Form design and operation processing method and system
CN113253982A (en) * 2021-05-11 2021-08-13 广州以大计算机科技有限公司 Data flow customization management system
CN113672222A (en) * 2021-08-04 2021-11-19 中汽创智科技有限公司 Application program interface management device and construction method thereof
CN119295195A (en) * 2024-09-20 2025-01-10 赞同科技股份有限公司 Method for automatically identifying and defining domain services and internal components based on business entities

Similar Documents

Publication Publication Date Title
CN103136612A (en) Development method of zero-coding component-based flow business
Zhou et al. Upgrading pathways of intelligent manufacturing in China: Transitioning across technological paradigms
CN102693465A (en) Enterprise resource planning system
CN102222278A (en) Operation process customizing method and device
CN111126884A (en) Engineering progress management system and method based on block chain
CN103020873A (en) Automatic transferring method and system for electric system
CN102243495A (en) Electronic work instruction designed for isa-95 standard
CN117591079A (en) Design construction method of enterprise-level integrated operation management system
CN102567856A (en) Method for realizing time management in work flow system
CN101751618A (en) Method, device and system for realizing rail traffic construction management collaborative application platform
CN103150164B (en) The quick SOWF framework method that a kind of transaction rules drives
CN103049279A (en) Method for loading software business
CN102945515B (en) Coordination plan establishment and manner of execution
CN103810307A (en) CAD (computer aided design)-based complicated mechanical design method
CN104572835A (en) Method and device for building process meta model
Vasyaycheva To the quiestion of the corporate governance improvement
Shang et al. A collaborative framework for exception handling in business process execution
CN103593404B (en) A kind of database integration online management system implementation method
Liao et al. Application of supernetworks in modeling activity-travel behaviour
Irina Industry 4.0 Supporting Sustainable Development
Vanderveen QUARTERLY PROGRESS REPORT-1/07.
Ji et al. Research on Production and Management Optimization of Assembled Prefabricated Component Enterprises Based on TOC Theory
Wang et al. Research on Data Sharing Between Design and Production of PC Components
Gao Research on the Application of Accounting Tools of Integrated Management of Business Finance under the Background of Supply-Side Reform
Stumpf et al. Using CADD applications to support construction activities

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130605

点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载