+

CN100334570C - Production capability forecasting and ordering system and method between enterprise systems - Google Patents

Production capability forecasting and ordering system and method between enterprise systems Download PDF

Info

Publication number
CN100334570C
CN100334570C CNB021343608A CN02134360A CN100334570C CN 100334570 C CN100334570 C CN 100334570C CN B021343608 A CNB021343608 A CN B021343608A CN 02134360 A CN02134360 A CN 02134360A CN 100334570 C CN100334570 C CN 100334570C
Authority
CN
China
Prior art keywords
data
order
enterprise
carrier
systems
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB021343608A
Other languages
Chinese (zh)
Other versions
CN1467665A (en
Inventor
赖志忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Original Assignee
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongfujin Precision Industry Shenzhen Co Ltd, Hon Hai Precision Industry Co Ltd filed Critical Hongfujin Precision Industry Shenzhen Co Ltd
Priority to CNB021343608A priority Critical patent/CN100334570C/en
Publication of CN1467665A publication Critical patent/CN1467665A/en
Application granted granted Critical
Publication of CN100334570C publication Critical patent/CN100334570C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The present invention relates to a production prediction and order placing system and a method among enterprise systems. The system comprises an order form server, a database and a plurality of terminal machines; the system is connected with an enterprise external system which comprises a customer system, a vendor system and a load bearing merchant system by an external network, and is connected with an enterprise resource planning (ERP) system by a local area network; the order form server is an exchange server of electronic files and takes charge of sending, receiving, exchanging and integrating an electronic format of an order form; the data of customers, the vendor and the load bearing marchant is stored in the database; a working personnel of an enterprise utilizes the terminal machines for accessing the database of order forms and can obtain the information at the inner part of the enterprise and the information relevant to production prediction and order placing of the customers, the vendor and the load bearing merchant of the enterprise, and thus, the purpose of supervising each link of the production prediction and the order placing among the enterprises is attained.

Description

Capability forecasting between business system and ordering system and method
[technical field]
The present invention relates to capability forecasting and ordering system and method between a kind of business system, refer to a kind of especially by connecting the system and method that ERP (Enterprise Resource Planning), client, provider system and bearer system finish capability forecasting between enterprise and place an order.
[background technology]
In 3C (Computer, Consumer, Communication) industry, product can be considered a product supply chain by making beginning to selling in consumer's process, wherein mainly form the role and comprise brand merchant, spare part supplier, manufacturer, bearer and retailer, be responsible for product manufacturing order, spare part supply, product assembly, spare part/product turnout carrying and production marketing down respectively.This supply chain flow process starts from the product manufacturing order, production marketing finally, and each role's the sales volume will improve in the smooth and easy then supply chain of flow process.Above-mentioned brand merchant under the product manufacturing order for starting the basic of supply chain, the program that therefore places an order smoothly is especially important, and the role of related products manufacturing order comprises brand merchant, spare part supplier, manufacturer and bearer in supply chain.How these roles are coordinated to finish the program of placing an order swimmingly, be a big problem of 3C industry always.
A solution is that the program of placing an order is divided into prediction order program and product manufacturing order program down down.Under predict that the order program can allow brand business prediction order earlier down, estimate its order with test spare part supplier and manufacturer and finish ability, and, can avoid thus too much/not enough product manufacturing the foundation of this test result as product manufacturing order under the reality.Yet traditional program of placing an order can't be predicted order down to the bearer, thereby can't grasp and control its spare part in advance and transport approach/carrier, increase the unknowable variable except actual spare part/product being transported flow process, also can't determine the carrier that is fit in advance.In fact the inventory turnover time has also comprised the turnaround time of mobile stock, and just the bearer is carried spare part/product time, and also there is its necessity the turnaround time of therefore estimating its mobile stock.
Above-mentioned following prediction order program and infosystem that down the prediction order described in the product manufacturing order program and order can be by each roles such as brand merchant, spare part supplier, manufacturers with network connect carry out the e-file exchange (Electronic Document Interchanginig, EDI).Yet because of perhaps above-mentioned each computer system uses different electronic document formats, except the translation function of above-mentioned e-file exchange, more need to provide a system and method to integrate electronic document formats different between each computer system, to finish its single process down fast.
In No. the 5th, 991,732, the United States Patent (USP) of on November 23rd, 1999 bulletin, also disclosed a cover and coordinated in the supply chain each role to keep supply chain method smoothly with computer system.Its method is used as down the basis of prediction order based on the sales forecast (sales forecast) that is produced by customer demand.Its method is used as predicting the benchmark of order with the information of sales end, but does not contain the scope of product manufacturing order down.
[summary of the invention]
Capability forecasting between business system of the present invention and ordering system adopt the Terminal server architecture mode, include an order server, a database and a plurality of terminating machine.This order server by utilizing external network and LAN connect external system and comprise client, provider system, bearer system and ERP (Enterprise Resource Planning).Capability forecasting data and ordering sheet data that this database storing obtains from above-mentioned client, provider system, bearer system and ERP (Enterprise Resource Planning).This terminating machine is connected to the order server, in order to the mistake of supervision and eliminating capability forecasting and ordering system.Capability forecasting between this business system and ordering system are by the included data receiver module of order server, the data sending module, data formats conversion functional module and data conformity module are finished and will be received from client, the different electronic document formats of provider system and bearer system are integrated and conversion, comprise form with EDI, an e-file of XML form is integrated and converted to a plurality of different e-files of HTML (Hypertext Markup Language) form and E-mail form etc., and issue ERP (Enterprise Resource Planning), the XML formatted documents that also maybe will be received from ERP (Enterprise Resource Planning) converts to and comprises the EDI form, the e-file of html format or E-mail form etc. is issued client, a plurality of provider system and a plurality of bearer system.With different e-file data conformity conversions, reach the purpose of finishing capability forecasting between business system and placing an order by in time.
The reception that capability forecasting between business system of the present invention and ordering method possess by this system, integration and change a plurality of data with different formatted files of each system and send data with different formatted file function and link up in order to each business system.Enterprise can receive the client by the e-file exchange and predict order and predict enterprises production capacity, supplier's production capacity, especially can predict bearer's available carrier and with the loading time, the suitableeest carrier, carrier quantity, carrying route and carrying temporal information are provided, and the result is replied this client as placing an order and predicting the foundation that when receives goods.This system also can receive this customer order, real-time informing enterprises system, provider system and bearer system.
This system can reach the purpose of finishing capability forecasting between business system and placing an order, and makes supply chain in time smooth and easy, keeps the reasonable stock amount.And the client is grasped in advance by being fabricated onto the time process control that logistics is transported, in order to preferable production routine kinds of goods production and each link of shipment loading time of enterprises system arrangement, shorten the inventory turnover time to satisfy customer order.
[description of drawings]
Fig. 1 is the capability forecasting between business system of the present invention and the hardware structure figure of ordering system.
Fig. 2 is the capability forecasting related data exchange synoptic diagram of capability forecasting between business system of the present invention and ordering system.
Fig. 3 is the related data exchange synoptic diagram that places an order of capability forecasting between business system of the present invention and ordering system.
Fig. 4 is the capability forecasting between business system of the present invention and the order server capability module diagram of ordering system.
Fig. 5 is the capability forecasting between business system of the present invention and the prediction order method flow diagram of ordering method.
Fig. 6 is the capability forecasting between business system of the present invention and the ordering method process flow diagram of ordering method.
Fig. 7 is the system job schematic flow sheet of capability forecasting and ordering method between business system of the present invention.
[embodiment]
Consult shown in Figure 1ly, be the hardware structure figure of capability forecasting between business system of the present invention and ordering system.Capability forecasting and ordering system 10 are made up of an order server 101, database 102 and a plurality of terminating machine 103 between enterprise.This system 10 is connected by external network 11 (external network 11 can be Internet or Extranet etc. in the present embodiment) and a client 12, a plurality of provider system 13 and a plurality of bearer system 14, and be connected with an ERP (Enterprise Resource Planning) 16 by internal network 15 (network 15 can be enterprises lan in the present invention), to obtain capability forecasting and order related data.This order server 101 is with the capability forecasting data (not shown) that obtained and order data (not shown) integration processing in regular turn, it is stored in the order database 102 flow process that enterprise staff can come the supervision and control capability forecasting and place an order by terminating machine 103.The user of above-mentioned client 12 can be client's enterprise staff of enterprise, and the user of provider system 13 can be supplier's enterprise staff of enterprise, and the user of bearer system 14 can be the industry employee of cargo carrying commercial business of enterprise.
Consult shown in Figure 2ly, be the capability forecasting related data exchange synoptic diagram of capability forecasting between business system of the present invention and ordering system.This capability forecasting related data comprises that the spare part planning of the prediction order 201 that is obtained from client 12, provider system 13 singly replys 205, the carrying planning of bearer system 14 singly replys 207, the production capacity of ERP (Enterprise Resource Planning) 16 is estimated report 203, report 210 and prediction order report 212 are estimated in carrying, and its content comprises carrier prediction, carrier quantitative forecast, carrying route prediction and carries time prediction.This capability forecasting related data also comprises the integration converting data via order server 101 (see figure 1)s, comprises capacity planning list 202, spare part planning list 204, spare part production capacity answer 209, carrying production capacity answer 211, spare part planning list 204 altogether, carries planning list 206 and prediction order reply 208.The above-mentioned data formats that is received by client 12, provider system 13 and bearer system 14 comprises EDI, HTML and E-mail form, comprises that with the data formats that is received by ERP (Enterprise Resource Planning) 16 EDI, XML form are not quite similar.This order server 101 is integrated this capability forecasting related data in regular turn and is stored in order database 102 (see figure 1)s.
Consult shown in Figure 3ly, be the related data exchange synoptic diagram that places an order of capability forecasting between business system of the present invention and ordering system.This related data that places an order comprises the order 301 that is obtained from client 12, the spare part sales order 306 of provider system 13, the carrying sales order 308 of bearer system 14, and its content comprises the external order 303 of carrier kind, carrier quantity, carrying route and carrying time, ERP (Enterprise Resource Planning) 16.This related data that places an order comprises that also the integration converting data via order server 101 (see figure 1)s comprises enterprise's order 302, spare part order 305, external order answer 309, carrying order 307 and sales order 304.The above-mentioned data formats that is received by client 12, provider system 13 and bearer system 14 comprises EDI, HTML, E-mail form, comprises that with the data formats that is received by ERP (Enterprise Resource Planning) 16 EDI, XML form are not quite similar.This order server 101 is integrated this related data that places an order in regular turn and is stored in database 102.
Consult shown in Figure 4ly, be capability forecasting between business system of the present invention and the order server capability module diagram in the ordering system.This order server 101 comprises data receiver module 401 responsible receptions from client 12, provider system 13, the data of bearer system 14 and ERP (Enterprise Resource Planning) 16, data sending module 402 is responsible for sending data and is given client 12, provider system 13, bearer system 14 and ERP (Enterprise Resource Planning) 16, data formats modular converter 403 is responsible for converting data formats for example with EDI, HTML, format conversion such as E-mail become the XML form or the XML format conversion are become EDI, HTML, forms such as E-mail, data conformity module 404 is responsible for integrating EDI, HTML, the data content of different-formats such as E-mail, identical entry in the data (as spare part quantity etc.) is done to integrate (as adding up etc.), and data storing module 405 is responsible for storing from client 12, provider system 13, the related data of bearer system 14 and ERP (Enterprise Resource Planning) 16 comprises prediction order 201 (see figure 2)s, spare part planning is single replys 205, carrying planning is single replys 207, production capacity is estimated report 203, report 210 is estimated in carrying, prediction order report 212, order 301 (see figure 3)s, spare part sales order 306, carrying sales order 308, external order 303.Wherein, the content of the single answer 207 of carrying planning comprises carrier prediction, carrier quantitative forecast, carrying route prediction and carrying time prediction.The content of carrying sales order 308 comprises actual carrier kind, carrier quantity, carrying route and the data of carrying time.
Consult shown in Figure 5ly, be the prediction order method flow diagram of capability forecasting between enterprise of the present invention and ordering method.This method is implemented by capability forecasting between business system and ordering system, and its flow process is as follows:
(a) receive the prediction order 201 (step 501) that client 12 sends by an external network 11, and be stored in database 102.
(b) changing this prediction order 201 becomes capacity planning list 202 (step 502), and is stored in database 102.
(c) send this capacity planning list 202 by internal network 15 and give ERP (Enterprise Resource Planning) 16 (step 503).
(d) receive production capacity by this internal network 15 and estimate report 203 (steps 504), and be stored in database 102.
(e) change this production capacity and estimate report 203, and be stored in database 102 with generation supplier's list and single 204 (steps 505) of spare part planning.
(f) send corresponding spare part planning single 204 to provider system 13 (step 506) by this external network 16 according to this supplier's list.
(g) send the single answer of plural spare part planning 205 (steps 507) by this external network 11 by provider system 13, and be stored in database 102.
(h) integrate and change the single answer 205 of these a plurality of spare parts planning and reply 209 (steps 508), and be stored in database 102 for the spare part production capacity.
(i) send this spare part production capacity answer 209 by internal network 15 and give ERP (Enterprise Resource Planning) 16 (step 509).
(j) send carrying by internal network 15 by ERP (Enterprise Resource Planning) 16 and estimate report 210 (steps 510), and be stored in database 102.
(k) change this carrying and estimate report 210 generation bearer's lists and single 206 (steps 511) of carrying planning, and be stored in database 102.
(l) send this carrying planning single 206 to corresponding bearer system 14 (step 512) by external network 11 according to this bearer's list.
(m) send the single answer of plural number carrying planning 207 (steps 513) by external network 11 by bearer system 14, and be stored in database 102.
(n) integrate and change the single answer 207 of these a plurality of carryings planning and reply 211 (steps 514), and be stored in database 102 for carrying production capacity.
(o) send this carrying production capacity by internal network 15 and reply 211 to ERP (Enterprise Resource Planning) 16 (step 515).
(p) send a prediction order report 212 (steps 516) by this internal network 15 by ERP (Enterprise Resource Planning) 16, and be stored in database 102.
(q) conversion estimation order report 212 is prediction order reply 208 (step 517), and is stored in database 102.
(r) send prediction order reply 208 to client 12 (step 518) by external network 11.
Consult shown in Figure 6ly, be the ordering method process flow diagram of capability forecasting between business system of the present invention and ordering method.This method is implemented by capability forecasting between business system and ordering system (see figure 1), and its flow process is as follows:
(a) be received from the order 301 (step 601) that an external network 11 clients 12 send, and be stored in database 102.
(b) change this order 301 with generation enterprise order 302 (steps 602), and be stored in database 102.
(c) send this enterprise's order 302 by internal network 15 and give this ERP (Enterprise Resource Planning) 16 (step 603).
(d) send external order 303 (step 604) by this internal network 15 by ERP (Enterprise Resource Planning) 16, and be stored in database 102.These external order 303 contents comprise sales order, supplier's list and corresponding spare part order, bearer's list and corresponding carrying order.
(e) conversion external order 303 produces sales order 304, supplier's list and a plurality of spare part order 305, bearer's list and a plurality of carrying orders 307 (step 605), and is stored in database 102.Conversion in this program for example XML form changes into EDI, HTML or E-mail form.
(f) send this sales order 304 to client 12 (step 606) by external network 11.
(g) send spare part order 305 to corresponding provider system 13 (step 607) by this external network 11 according to supplier's list.
(h) send carrying order 307 to corresponding bearer system 14 (step 608) by this external network 11.
(i) send spare part sales order 306 (step 609) by this external network 11 by provider system 13, and be stored in database 102.
(j) send carrying sales order 308 (step 610) by this external network 11 by bearer system 14, and be stored in database 102.
(k) integrate and change a plurality of spare part sales orders 306 and a plurality of carrying sales order 308 and reply 309 (steps 611), and be stored in database 102 for external order.
(1) sends external order by internal network 15 and reply 309 to ERP (Enterprise Resource Planning) 16 (step 612).
Consult shown in Figure 7ly, be the system job schematic flow sheet of capability forecasting and ordering method between enterprise of the present invention.This method is implemented by capability forecasting between business system and ordering system (see figure 1), and its flow process is as follows:
(a) starting data receiver module 401 receives file and confirms source (step 700), this document comprises the file from the EDI form of client 12, provider system 13 and bearer system 14, html format or E-Mail form, and from the XML formatted file of Enterprise Resources Planning (ERP) system 16.
(b) start data storing module 405 and store this reception file to database 102 (step 701).
(c) judging and whether to be received file from client 12 (step 702), is then to go to step 703 if be judged as, and is judged as otherwise goes to step 708.
(d) judge this document correct format whether (step 703), if be judged as otherwise go to step 704, being judged as is then to go to step 705.
(e) show error messages and error messages is replied to client 12 by terminating machine 103 by external network 11, and termination process (step 704).
(f) start data formats modular converter 403 and convert this document to file layout (step 705) that ERP (Enterprise Resource Planning) 16 is used.
(g) start data storing module 405 and store this convert file to database 102 (step 706).
(h) this is converted file to ERP (Enterprise Resource Planning) 16 (step 707) to start 402 transmissions of data sending module.
(i) judge that whether this is received file from ERP (Enterprise Resource Planning) 16 (step 708),, be judged as otherwise go to step 715 if to be judged as be then to go to step 709.
(j) judge that this is received file file layout whether correct (step 709), if be judged as otherwise go to step 710, being judged as is then to go to step 711.
(k) show error messages and error messages is replied to ERP (Enterprise Resource Planning) 16 by terminating machine 103 by internal network 15, and termination process (step 710).
(1) read this and be received file, and judge that it sends object (step 711), this transmission object comprises client 12, a plurality of provider system 13 and a plurality of bearer system 14.
(m) convert respective file form (step 712) to according to sending object startup data formats modular converter 403, for example convert the file of EDI form, html format or E-Mail form to according to different bearer systems.
(n) start data storing module 405 and store these convert files to database 102 (step 713).
(o) start data sending module 402 and send files after transform (step 714) according to sending object.
(p) whether judge this reception file from provider system 13 or bearer system 14 (step 715),, be judged as otherwise go to step 722 if to be judged as be then to go to step 716.
(q) judge this reception file file layout whether correct (step 716), if be judged as otherwise go to step 717, being judged as is then to go to step 718.
(r) show error messages and error messages is replied to this provider system 13 or this bearer system 14 by terminating machine 103 by internal network 15, and termination process (step 717).
(s) start data conformity module 404 and collect the identical source file (step 718) that comes, identical to come source file be file that receives by provider system 13 or the file that receives by bearer system 14.
(t) make totalling according to the like terms of collection file content and be integrated into single file (step 719), these like terms are spare part number or carrying tool number for example.
(u) file conversion that these like terms is added the General Logistics Department is ERP (Enterprise Resource Planning) 16 employed file layouts (step 720).
(v) start data storing module 405 and store these convert files to database 102 (step 721).
(w) this is converted file to ERP (Enterprise Resource Planning) 16 (step 722) to start 402 transmissions of data sending module.
(x) unusual condition has appearred, by terminating machine 103 display system error messages (step 723).

Claims (8)

1.一种企业系统间的产能预测及下单系统,客户可通过该系统完成对企业产能预测及下单,其包括有一服务器、一数据库及多个终端机,该服务器通过网络与一客户系统、一企业资源规划系统、多个供应商系统及多个承载商系统连接,其特征在于:1. A capacity forecasting and ordering system among enterprise systems, through which customers can complete forecasting and ordering of enterprise capacity. It includes a server, a database and multiple terminals. The server communicates with a client system through the network . An enterprise resource planning system, multiple supplier systems and multiple carrier systems are connected, characterized in that: 该服务器包括有一资料接收模块、一资料发送模块、一资料储存模块及一资料格式转换模块,其中:The server includes a data receiving module, a data sending module, a data storage module and a data format conversion module, wherein: 资料接收模块,能通过网络接收来自包括客户系统、供应商系统、承载商系统以及企业资源规划系统的资料;The data receiving module can receive data from the customer system, supplier system, carrier system and enterprise resource planning system through the network; 资料发送模块,能通过网络发出资料给客户系统、供应商系统、承载商系统以及企业资源规划系统;The data sending module can send data to the customer system, supplier system, carrier system and enterprise resource planning system through the network; 资料储存模块,能储存包括接收自客户系统的资料、多个供应商系统的资料、承载商系统的资料以及企业资源规划系统的资料;A data storage module capable of storing data including data received from customer systems, data from multiple supplier systems, data from carrier systems, and data from enterprise resource planning systems; 资料格式转换模块,可转换包括接收自客户系统的资料、整合自多个供应商系统的被接收资料、整合自承载商系统的被接收资料以及接收自企业资源规划系统的资料;The data format conversion module can convert the data received from the customer system, the received data integrated from multiple supplier systems, the received data integrated from the carrier system, and the data received from the enterprise resource planning system; 数据库内存储有接收自客户系统、供应商系统、承载商系统以及企业资源规划系统的资料,尤其指接收自承载商系统的内容包括载具预测、载具数量预测、承载路线预测以及承载时间预测,以及实际载具、载具数量、承载路线以及承载时间的资料;以及The data received from the customer system, supplier system, carrier system and enterprise resource planning system are stored in the database, especially the content received from the carrier system includes vehicle forecast, vehicle quantity forecast, load route forecast and load time forecast , as well as information on actual vehicles, number of vehicles, carrying routes and carrying times; and 终端机连接至该服务器以监管产能预测及下单的流程并查询数据库内所储存的资料。The terminal is connected to the server to monitor the process of capacity forecasting and order placement and query the data stored in the database. 2.如权利要求1所述的企业系统间的产能预测及下单系统,其特征在于,其中所述的客户系统为企业资源规划系统。2. The capacity forecasting and ordering system among enterprise systems according to claim 1, wherein said client system is an enterprise resource planning system. 3.如权利要求1所述的企业系统间的产能预测及下单系统,其特征在于,其中所述的供应商系统为企业的零组件供应商的企业资源规划系统。3. The capacity forecasting and ordering system among enterprise systems according to claim 1, wherein said supplier system is an enterprise resource planning system of an enterprise's component suppliers. 4.如权利要求1所述的企业系统间的产能预测及下单系统,其特征在于,其中所述的承载商系统为承载货物及零组件的承载商的企业资源规划系统。4. The production capacity forecasting and ordering system among enterprise systems according to claim 1, wherein said carrier system is an enterprise resource planning system of a carrier that carries goods and components. 5.如权利要求1所述的企业系统间的产能预测及下单系统,其特征在于,其中所述的资料为EDI文件。5. The production capacity forecasting and ordering system between enterprise systems as claimed in claim 1, wherein said data are EDI files. 6.如权利要求1所述的企业系统间的产能预测及下单系统,其特征在于,其中所述的监管为系统错误讯息出现时的障碍排除。6. The production capacity forecasting and ordering system between enterprise systems as claimed in claim 1, wherein said monitoring is to eliminate obstacles when system error messages appear. 7.一种企业系统间的产能预测及下单方法,客户可通过该方法完成对企业产能预测及下单,其包括如下的步骤:7. A production capacity forecasting and ordering method between enterprise systems, through which customers can complete the production capacity forecasting and ordering of the enterprise, which includes the following steps: (a)提供一服务器,通过网络与一客户系统、一企业资源规划系统、多个供应商系统及多个承载商系统相连接;(a) Provide a server, which is connected to a customer system, an enterprise resource planning system, multiple supplier systems and multiple carrier systems through the network; (b)提供一数据库,内存储包括接收自客户系统、供应商系统、承载商系统以及企业资源规划系统的资料,尤其指接收自承载商系统的内容包括载具预测、载具数量预测、承载路线预测以及承载时间预测,以及实际载具、载具数量的资料;以及(b) Provide a database that stores data received from customer systems, supplier systems, carrier systems, and enterprise resource planning systems, in particular, the content received from carrier systems includes carrier forecasts, carrier quantity forecasts, carrier Route predictions and load time predictions, as well as information on actual vehicles and number of vehicles; and (c)提供多个终端机,并通过该多个终端机监管产能预测以及下单流程,包括:(c) Provide multiple terminals, and supervise the production capacity forecast and order process through the multiple terminals, including: (c1)服务器接收由客户系统发出的预测订单资料并将其转换成产能规划资料;(c1) The server receives the forecast order data sent by the client system and converts it into capacity planning data; (c2)服务器发出该产能规划资料给企业资源规划系统;(c2) The server sends the capacity planning data to the enterprise resource planning system; (c3)服务器接收由该企业资源规划系统发出的产能预估资料,该产能预估资料包括供应商产能预估资料及承载商产能预估资料;(c3) The server receives the production capacity estimation data issued by the enterprise resource planning system, and the production capacity estimation data includes supplier capacity estimation data and carrier capacity estimation data; (c4)服务器发送该供应商产能预估资料给供应商系统;(c4) The server sends the supplier's capacity estimation data to the supplier system; (c5)服务器发送该承载商产能预估资料给承载商系统;(c5) The server sends the carrier capacity estimation data to the carrier system; (c6)服务器接收产能回复资料,该产能回复资料包括供应商产能回复资料及承载商产能回复资料;(c6) The server receives the capacity reply data, the capacity reply data includes the supplier capacity reply data and the carrier capacity reply data; (c7)服务器发出该产能预估回复资料给企业资源规划系统;(c7) The server sends the production capacity estimate reply data to the enterprise resource planning system; (c8)服务器接收由企业资源规划系统发出的预测订单回复资料;(c8) The server receives the forecast order reply data sent by the enterprise resource planning system; (c9)服务器发送该预测订单回复资料给该客户系统;(c9) The server sends the predicted order reply data to the client system; (c10)服务器接收由客户系统发出的订单资料,并将其转换为企业订单资料;(c10) The server receives the order information sent by the client system and converts it into enterprise order information; (c11)服务器发出该企业订单资料给企业资源规划系统;(c11) The server sends the order information of the enterprise to the enterprise resource planning system; (c12)服务器接收由该企业资源规划系统发出的外部订单资料,该外部订单资料包括销售订单资料、零组件订单资料及承载订单资料;(c12) The server receives external order data issued by the enterprise resource planning system, and the external order data includes sales order data, component order data and bearer order data; (c13)服务器发送该销售订单资料、零组件订单资料及承载订单资料给客户系统、供应商系统及承载商系统;(c13) The server sends the sales order data, component order data and carrier order data to the customer system, supplier system and carrier system; (c14)服务器接收由供应商系统及承载商系统发出的外部订单回复资料,该外部订单回复资料包括零组件销售订单资料及承载销售订单资料;(c14) The server receives the external order reply data sent by the supplier system and the carrier system, and the external order reply data includes component sales order data and carrier sales order data; (c15)服务器发出该外部订单回复资料给企业资源规划系统。(c15) The server sends the external order reply data to the enterprise resource planning system. 8.如权利要求7所述的企业系统间的产能预测及下单的方法,其特征在于,其中(c)所述的监管为系统错误讯息出现时的障碍排除。8. The method of production capacity forecasting and ordering among enterprise systems according to claim 7, wherein the supervision described in (c) is to eliminate obstacles when system error messages appear.
CNB021343608A 2002-07-12 2002-07-12 Production capability forecasting and ordering system and method between enterprise systems Expired - Fee Related CN100334570C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021343608A CN100334570C (en) 2002-07-12 2002-07-12 Production capability forecasting and ordering system and method between enterprise systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021343608A CN100334570C (en) 2002-07-12 2002-07-12 Production capability forecasting and ordering system and method between enterprise systems

Publications (2)

Publication Number Publication Date
CN1467665A CN1467665A (en) 2004-01-14
CN100334570C true CN100334570C (en) 2007-08-29

Family

ID=34145759

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021343608A Expired - Fee Related CN100334570C (en) 2002-07-12 2002-07-12 Production capability forecasting and ordering system and method between enterprise systems

Country Status (1)

Country Link
CN (1) CN100334570C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574024B (en) * 2015-01-20 2018-05-01 宜昌永鑫精工科技有限公司 A kind of long-range zero inventory supply-chain management systems of ERP
CN110826949A (en) * 2018-08-08 2020-02-21 北京京东振世信息技术有限公司 Production capacity control realization method and device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1279793A (en) * 1997-09-17 2001-01-10 先进处理系统有限公司 Order processing apparatus and method
JP2002024578A (en) * 2000-06-30 2002-01-25 Toshiba Corp Method of providing usual goods delivery service, system thereof, recording medium recording program used for these, and computer
JP2002032643A (en) * 2000-07-17 2002-01-31 Toppan Printing Co Ltd Order management system, order management method, server, customer terminal, supplier terminal
US20020019812A1 (en) * 2000-06-16 2002-02-14 Board Karen Eleanor System and service for receiving, customizing, and re-broadcasting high-speed financial data to users operating wireless network-capable devices
US20020019761A1 (en) * 2000-01-12 2002-02-14 Derek Lidow Supply chain architecture
US20020038255A1 (en) * 2000-06-12 2002-03-28 Infospace, Inc. Universal shopping cart and order injection system
JP2002092372A (en) * 2000-09-13 2002-03-29 Intelligent Wave:Kk Order processing method and order processing system
CA2360221A1 (en) * 2000-10-27 2002-04-27 Joshua Geist Method and system for facilitating electronic commercial transactions

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1279793A (en) * 1997-09-17 2001-01-10 先进处理系统有限公司 Order processing apparatus and method
US20020019761A1 (en) * 2000-01-12 2002-02-14 Derek Lidow Supply chain architecture
US20020038255A1 (en) * 2000-06-12 2002-03-28 Infospace, Inc. Universal shopping cart and order injection system
US20020019812A1 (en) * 2000-06-16 2002-02-14 Board Karen Eleanor System and service for receiving, customizing, and re-broadcasting high-speed financial data to users operating wireless network-capable devices
JP2002024578A (en) * 2000-06-30 2002-01-25 Toshiba Corp Method of providing usual goods delivery service, system thereof, recording medium recording program used for these, and computer
JP2002032643A (en) * 2000-07-17 2002-01-31 Toppan Printing Co Ltd Order management system, order management method, server, customer terminal, supplier terminal
JP2002092372A (en) * 2000-09-13 2002-03-29 Intelligent Wave:Kk Order processing method and order processing system
CA2360221A1 (en) * 2000-10-27 2002-04-27 Joshua Geist Method and system for facilitating electronic commercial transactions

Also Published As

Publication number Publication date
CN1467665A (en) 2004-01-14

Similar Documents

Publication Publication Date Title
TWI752888B (en) Computer-implemented systems and methods for receiving inbound products
Ji et al. An integrated model for the production-inventory-distribution problem in the Physical Internet
TWI757079B (en) Computer-implemented system and computer-implemented method for parsing message
TWI885243B (en) Computer-implemented system and method for managing highly available distributed hybrid database
KR102575655B1 (en) Systems and methods for dynamic aggregation of data and minimization of data loss
TWI831051B (en) System and method for stowing products
KR102380144B1 (en) Systems and methods for interfacing networks using a unified communication scheme
TWI760982B (en) Computer-implemented systems and methods for generating demand forecasting data by performing wavelet transform for generating accurate purchase orders
JP4312846B2 (en) Transaction progress management method
AU2003212308B2 (en) Supply chain fulfillment coordination
CN100334570C (en) Production capability forecasting and ordering system and method between enterprise systems
US20060020498A1 (en) Asset visibility management system with rule engine
US20060020529A1 (en) Asset visibility management system with binding or unbinding assets
KR101410252B1 (en) Object movement chasing method in the EPCglobal network
AU2020104458A4 (en) Systems and methods for interfacing networks using a unified communication scheme
Choy et al. Improving logistics visibility in a supply chain: an integrated approach with radio frequency identification technology
US20060020528A1 (en) Asset visibility management system
KR20030009595A (en) Supply Chain Management System
JP2001160101A (en) Processing method, system and terminal device for inventory management
US20060020499A1 (en) Asset visibility management system with event correlator
CN120258255B (en) Supply chain monitoring and optimizing method and system
KR100955230B1 (en) Freight information delivery service system and method using web service
US20060020527A1 (en) Scalable asset visibility management system
Yee et al. Technology integration needs for manufacturing, logistics, and supply chain management
Emde et al. The bulk of it: Simultaneous pickup and delivery of furniture

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070829

Termination date: 20140712

EXPY Termination of patent right or utility model
点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载