CN106149625B - A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method - Google Patents
A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method Download PDFInfo
- Publication number
- CN106149625B CN106149625B CN201610712442.8A CN201610712442A CN106149625B CN 106149625 B CN106149625 B CN 106149625B CN 201610712442 A CN201610712442 A CN 201610712442A CN 106149625 B CN106149625 B CN 106149625B
- Authority
- CN
- China
- Prior art keywords
- wall
- barricade
- level
- water
- wall body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000746 purification Methods 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 title claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 39
- 239000004575 stone Substances 0.000 claims description 30
- 238000009412 basement excavation Methods 0.000 claims description 9
- 239000004576 sand Substances 0.000 claims description 8
- 229910000366 copper(II) sulfate Inorganic materials 0.000 claims description 7
- JZCCFEFSEZPSOG-UHFFFAOYSA-L copper(II) sulfate pentahydrate Chemical compound O.O.O.O.O.[Cu+2].[O-]S([O-])(=O)=O JZCCFEFSEZPSOG-UHFFFAOYSA-L 0.000 claims description 7
- 238000001914 filtration Methods 0.000 claims description 7
- 239000011083 cement mortar Substances 0.000 claims description 6
- 239000004746 geotextile Substances 0.000 claims description 6
- 239000003673 groundwater Substances 0.000 claims description 5
- 239000002023 wood Substances 0.000 claims description 5
- 239000011449 brick Substances 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims 6
- 239000007787 solid Substances 0.000 claims 2
- 238000012423 maintenance Methods 0.000 abstract description 4
- 230000007613 environmental effect Effects 0.000 abstract description 3
- 241000196324 Embryophyta Species 0.000 description 24
- 239000011150 reinforced concrete Substances 0.000 description 11
- 239000000463 material Substances 0.000 description 8
- 239000002689 soil Substances 0.000 description 7
- 239000004570 mortar (masonry) Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 238000005260 corrosion Methods 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 238000005265 energy consumption Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 241000209495 Acorus Species 0.000 description 1
- 240000000724 Berberis vulgaris Species 0.000 description 1
- 235000016068 Berberis vulgaris Nutrition 0.000 description 1
- 244000025254 Cannabis sativa Species 0.000 description 1
- 244000207543 Euphorbia heterophylla Species 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000008635 plant growth Effects 0.000 description 1
- 239000003755 preservative agent Substances 0.000 description 1
- 230000002335 preservative effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011426 transformation method Methods 0.000 description 1
- 239000010878 waste rock Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/066—Quays
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
本发明公开的一种生态自净型景观护岸改造结构,包括挡墙墙身,挡墙墙身被局部破拆至设计高程,被局部破拆后的挡墙墙身的顶面上沿挡墙岸线延伸方向间隔设置有若干道排水凹槽;在河道堤岸的地面上位于挡墙墙身的迎水侧面的前方设置有至少一级墙前水生平台,每一级墙前水生平台上种植有水生植物;被局部破拆后的挡墙墙身的挡土侧面上设置有一排水过滤结构;被局部破拆后的挡墙墙身后方的地面上铺设有一过滤排水层;在过滤排水层上沿坡面由上至下间隔砌筑有若干级墙后陆生梯台,每一级墙后陆生梯台上种植陆生植物。还公开了施工方法。本发明具有安全耐久、生态景观优美、开拓创新、环保节能、简单经济、维护便利等优点。
An ecological self-purification landscape revetment reconstruction structure disclosed by the present invention includes a retaining wall body, the retaining wall body is partially demolished to the design elevation, and the top surface of the partially demolished retaining wall body is along the retaining wall bank. There are several drainage grooves arranged at intervals in the direction of the line extension; at least one level of aquatic platform in front of the wall is arranged on the ground of the river embankment in front of the water facing side of the retaining wall, and aquatic plants are planted on each level of aquatic platform in front of the wall. Plants; a drainage filter structure is set on the retaining side of the partially demolished retaining wall; a filter drainage layer is laid on the ground behind the partially demolished retaining wall; on the filter drainage layer along the slope There are several terrestrial terraces behind walls built at intervals from top to bottom, and terrestrial plants are planted on the terrestrial terraces behind each wall. A construction method is also disclosed. The invention has the advantages of safety and durability, beautiful ecological landscape, innovation, environmental protection and energy saving, simple and economical, convenient maintenance and the like.
Description
技术领域technical field
本发明涉及河湖堤岸生态景观改造技术领域,尤其涉及一种基于传统的挡墙结构的基础上进行生态化景观改造的生态自净型景观护岸改造结构及其施工方法。The invention relates to the technical field of ecological landscape reconstruction of river and lake embankments, in particular to an ecological self-purification landscape revetment reconstruction structure based on a traditional retaining wall structure for ecological landscape reconstruction and a construction method thereof.
背景技术Background technique
随着城市化进程的推进,传统的挡墙结构已无法满足人们对生态景观的需求。近些年,城市内涝的频繁发生,促使建设“海绵城市”的理念得以推广,其中就包括了建设生态河道及其附属结构。With the advancement of urbanization, the traditional retaining wall structure can no longer meet people's needs for ecological landscape. In recent years, the frequent occurrence of urban waterlogging has promoted the concept of building a "sponge city", which includes the construction of ecological rivers and their subsidiary structures.
为了改善城市积弊和美化环境,越来越多的河道生态化改造工程列入建设计划中。目前常见的改造方式多为将现状护岸拆除,重建新型生态护岸,但存在对周边环境负面影响大、资源浪费、能耗高、造价高等一系列弊病,同时由于土地资源日益紧缺,产生的建筑垃圾也无处安置。In order to improve the urban disadvantages and beautify the environment, more and more river ecological reconstruction projects are included in the construction plan. At present, most of the common transformation methods are to demolish the existing revetment and rebuild new ecological revetment, but there are a series of disadvantages such as large negative impact on the surrounding environment, waste of resources, high energy consumption, and high cost. At the same time, due to the increasing shortage of land resources, the construction waste generated There is nowhere to place it.
重力式浆砌块石护岸是最古老的一种挡墙结构形式,因其料源丰富、形式简单、取材方便、施工简便,一直以来应用十分广泛。参见图1,图中给出的是现状浆砌块石重力式护岸,包括前排钢筋砼预制方桩10、后排钢筋砼预制方桩20、设置在前排钢筋砼预制方桩10和后排钢筋砼预制方桩20的顶端且与前排钢筋砼预制方桩10和后排钢筋砼预制方桩20固接的钢筋砼底板30、设置在钢筋砼底板30上的浆砌块石墙身40以及设置在浆砌块石墙身40的顶面上的压顶50。对于地势落差小、河道水不深、挡土高度小的平原地区,从经济实用层面来考虑,大多会选用重力式浆砌块石护岸结构。Gravity-type mortar block stone revetment is the oldest form of retaining wall structure. It has been widely used because of its rich material source, simple form, convenient material acquisition and convenient construction. Referring to Fig. 1, what provided in the figure is the existing grout block stone gravity revetment, including the front row of reinforced concrete prefabricated square piles 10, the rear row of reinforced concrete prefabricated square piles 20, the front row of reinforced concrete prefabricated square piles 10 and the rear The top of the row of reinforced concrete prefabricated square piles 20 and the reinforced concrete bottom plate 30 fixedly connected with the front row of reinforced concrete prefabricated square piles 10 and the rear row of reinforced concrete prefabricated square piles 20, and the mortar block stone wall body arranged on the reinforced concrete bottom plate 30 40 and the pressure top 50 that is arranged on the top surface of the mortar block stone wall body 40 . For plain areas with small terrain drop, low river water, and small retaining height, from the perspective of economics and practicality, gravity-type mortar block stone bank revetment structures are mostly used.
基于城市发展需求,需要对现状护岸进行生态化改造。大多数设计者通常是采用完全拆卸现状挡墙结构,取而代之以墙体材料为预制砼块体、生态石笼等生态景观效果好的护岸结构形式,在河湖生态化治理方面取得了一定的成效。但由于较多现状护岸尚在使用年限内,结构安全可靠,安全拆除重建既不经济也不环保,实施难度也大,缺点比较明显,亟需在现状护岸结构的基础上研究出利用现状护岸、仅进行局部拆除的生态化改造方案。Based on the needs of urban development, it is necessary to carry out ecological transformation of the current revetment. Most designers usually completely dismantle the existing retaining wall structure and replace it with prefabricated concrete blocks, ecological gabions and other revetment structures with good ecological landscape effects, which have achieved certain results in the ecological management of rivers and lakes. . However, because most of the current revetment is still within the service life, the structure is safe and reliable, safe demolition and reconstruction are neither economical nor environmentally friendly, and the implementation is also difficult, with obvious shortcomings. An ecological transformation plan with only partial demolition.
为此,申请人进行了有益的探索和尝试,找到了解决上述问题的办法,下面将要介绍的技术方案便是在这种背景下产生的。For this reason, the applicant has conducted useful explorations and attempts, and has found a solution to the above-mentioned problems, and the technical solutions to be introduced below are produced under this background.
发明内容Contents of the invention
本发明所要解决的技术问题之一在于:针对现状护岸在进行生态化改造时采用完全拆卸现状挡墙结构而导致既不经济也不环保,且实施难度大等问题,而提供一种既经济环保,也便于施工实施和安全耐久的生态自净型景观护岸改造结构。One of the technical problems to be solved by the present invention is to provide an economical and environmental , It is also convenient for construction and implementation and a safe and durable ecological self-purification landscape revetment reconstruction structure.
本发明所要解决的技术问题之二在于:提供一种上述生态自净型景观护岸改造结构的施工方法。The second technical problem to be solved by the present invention is to provide a construction method for the aforementioned ecological self-purification landscape revetment reconstruction structure.
作为本发明第一方面的一种生态自净型景观护岸改造结构,包括前排桩、后排桩、设置在所述前排桩和后排桩的顶端且与所述前排桩和后排桩固接的挡墙底板以及设置在所述挡墙底板上的挡墙墙身,其特征在于,所述挡墙墙身被局部破拆至设计高程,被局部破拆后的挡墙墙身的顶面上沿挡墙岸线延伸方向间隔设置有若干道排水凹槽,每一道排水凹槽将所述被局部破拆后的挡墙墙身的迎水侧面和挡土侧面贯通;在河道堤岸的地面上位于所述挡墙墙身的迎水侧面的前方设置有至少一级墙前水生平台,每一级墙前水生平台上种植有水生植物;所述被局部破拆后的挡墙墙身的挡土侧面上设置有一排水过滤结构,在所述被局部破拆后的挡墙墙身和排水过滤结构的顶面上铺设有一顶层铺装垫层,所述顶层铺装垫层构成一水平观景平台;所述被局部破拆后的挡墙墙身后方的地面上铺设有一过滤排水层;在所述过滤排水层上沿坡面由上至下间隔砌筑有若干级墙后陆生梯台,每一级墙后陆生梯台上种植陆生植物。As a first aspect of the present invention, an ecological self-cleaning landscape revetment reconstruction structure includes a front row of piles and a rear row of piles, which are arranged on the top of the front row of piles and the rear row of piles and connected with the front row of piles and the rear row of piles. The fixed retaining wall base plate and the retaining wall body arranged on the retaining wall base plate are characterized in that the retaining wall body is partially demolished to the design elevation, and the height of the retaining wall body after being partially demolished is On the top surface, there are several drainage grooves arranged at intervals along the extension direction of the retaining wall shoreline, and each drainage groove penetrates the water-facing side and the soil-retaining side of the partially demolished retaining wall body; At least one level of aquatic platform in front of the wall is arranged on the ground in front of the water-facing side of the wall body of the retaining wall, and aquatic plants are planted on the aquatic platform in front of each level of wall; the partially demolished retaining wall A drainage filter structure is arranged on the retaining side of the body, and a top pavement cushion is laid on the top surface of the partially demolished retaining wall body and the drainage filter structure, and the top pavement cushion forms a Horizontal viewing platform; a filter drainage layer is laid on the ground behind the partially demolished retaining wall; several levels of walls are laid on the filter drainage layer along the slope from top to bottom at intervals. Terraces, terrestrial plants are planted on the terrestrial terraces behind each level of wall.
在本发明的一个优选实施例中,所述挡墙墙身被局部破拆时所涉及的表面采用水泥砂浆对石缝进行抹平处理。In a preferred embodiment of the present invention, cement mortar is used to smooth the stone joints on the surface involved when the wall body of the retaining wall is partially demolished.
在本发明的一个优选实施例中,所述墙前水生平台为两个,分别为第一级墙前水生平台和第二级墙前水生平台,所述第一级墙前水生平台的设计高程低于所述第二级墙前水生平台的设计高程,所述第一级墙前水生平台上种植的水生植物为耐水深度在0.8m~1m的水生植物,所述第二级墙前水生平台上种植的水生植物为耐水深度在0.3m~0.6m的水生植物。In a preferred embodiment of the present invention, there are two aquatic platforms in front of the wall, namely the first-level aquatic platform in front of the wall and the second-level aquatic platform in front of the wall, and the design elevation of the first-level aquatic platform in front of the wall Lower than the design elevation of the aquatic platform in front of the second-level wall, the aquatic plants planted on the aquatic platform in front of the first-level wall are aquatic plants with a water-resistant depth of 0.8m to 1m, and the aquatic platform in front of the second-level wall The aquatic plants planted above are aquatic plants with a water tolerance depth of 0.3m to 0.6m.
在本发明的一个优选实施例中,所述第一级墙前水生平台和第二级墙前水生平台的外缘处采用密排的圆木桩进行挡土,所述圆木桩的桩径为0.1m~0.2m,所述圆木桩的桩长为2m~3m。In a preferred embodiment of the present invention, the outer edges of the aquatic platform in front of the first-level wall and the second-level wall in front of the second-level wall adopt close-packed round wooden piles to retain soil, and the pile diameter of the round wooden piles is 0.1m-0.2m, and the pile length of the round wooden pile is 2m-3m.
在本发明的一个优选实施例中,所述第二级墙前水生平台的外缘处设置的圆木桩采用波浪形布置方式或者顺河连接布置方式或者间隔布置方式进行布置。In a preferred embodiment of the present invention, the round wooden piles arranged at the outer edge of the aquatic platform in front of the second-level wall are arranged in a wave-shaped arrangement or in a river-side connection arrangement or an interval arrangement.
在本发明的一个优选实施例中,所述顶层铺装垫层上沿挡墙岸线延伸方向间隔铺设有若干防腐木。In a preferred embodiment of the present invention, several anti-corrosion woods are laid at intervals along the extension direction of the shoreline of the retaining wall on the top pavement cushion.
在本发明的一个优选实施例中,所述排水过滤结构由依次设置在所述被局部破拆后的挡墙墙身的挡土侧面上的棱形生态石笼和袋装碎石过滤层构成。In a preferred embodiment of the present invention, the drainage filtering structure is composed of a prismatic ecological gabion and a filter layer of bagged gravel sequentially arranged on the retaining side of the partially demolished retaining wall .
在本发明的一个优选实施例中,所述过滤排水层由砂砾石透水层以及设置在所述砂砾石透水层上的土工布构成。In a preferred embodiment of the present invention, the filter drainage layer is composed of a gravel permeable layer and a geotextile arranged on the gravel permeable layer.
在本发明的一个优选实施例中,所述若干级墙后陆生梯台采用所述挡墙墙身被局部破拆的那部分石料铺设在所述过滤排水层上而构成。In a preferred embodiment of the present invention, the terrestrial terraces behind the several levels of walls are formed by laying the partially demolished part of the retaining wall on the filter drainage layer.
在本发明的一个优选实施例中,所述若干级墙后陆生梯台的宽度由上至下逐渐加大。In a preferred embodiment of the present invention, the width of the terrestrial terrace behind the several levels of walls increases gradually from top to bottom.
在本发明的一个优选实施例中,所述若干级墙后陆生梯台上沿挡墙岸线延伸方向间隔设置有若干人行小道,每一人行小道的一端位于堤顶处,其另一端向下延伸至所述水平观景平台处。In a preferred embodiment of the present invention, several walkways are arranged at intervals along the extension direction of the retaining wall shoreline on the land terraces behind the several levels of walls, one end of each walkway is located at the top of the embankment, and the other end of the walkway faces Extend down to the horizontal viewing platform.
在本发明的一个优选实施例中,在堤顶上沿挡墙岸线延伸方向铺设有一条人行步道,所述人行步道由若干均匀间隔设置的青石板构成。In a preferred embodiment of the present invention, a pedestrian walkway is laid on the top of the embankment along the extension direction of the retaining wall shoreline, and the pedestrian walkway is composed of several bluestone slabs arranged at regular intervals.
在本发明的一个优选实施例中,相邻的两块青石板之间种植草皮,在堤顶上位于所述人行步道的两侧堤肩种植灌木或乔木。In a preferred embodiment of the present invention, turf is planted between two adjacent bluestone slabs, and shrubs or trees are planted on the shoulders of both sides of the walkway on the top of the embankment.
作为本发明第二方面的一种上述生态自净型景观护岸改造结构的施工方法,包括以下步骤:As a kind of construction method of above-mentioned ecological self-purification type landscape revetment reconstruction structure of the second aspect of the present invention, comprises the following steps:
步骤1,根据河道自身特点构筑围堰,并将围堰与拟建挡墙岸线之间的河水抽干;Step 1. Construct a cofferdam according to the characteristics of the river channel itself, and drain the river water between the cofferdam and the shoreline of the proposed retaining wall;
步骤2,基坑开挖至设计高程处,在基坑开挖前,将地下水位降低至开挖面0.5m~1m以下;Step 2, the foundation pit is excavated to the design elevation, and before the foundation pit is excavated, the groundwater level is lowered to 0.5m to 1m below the excavation surface;
步骤3,将挡墙墙身局部破拆至设计高程,同时将破拆后的石料做适当处理,再对挡墙墙身被局部破拆时所涉及的表面采用水泥砂浆对石缝进行抹平处理;Step 3: Partially demolish the retaining wall to the design elevation, and at the same time properly dispose of the demolished stone, and then use cement mortar to smooth the stone joints on the surface involved when the retaining wall is partially demolished deal with;
步骤4,在被局部破拆后的挡墙墙身的挡土侧面上铺装排水过滤结构;Step 4, laying a drainage and filtering structure on the retaining side of the partially demolished retaining wall;
步骤5,在被局部破拆后的挡墙墙身后方的地面上铺设过滤排水层;Step 5, laying a filter drainage layer on the ground behind the partially demolished retaining wall;
步骤6,在被局部破拆后的挡墙墙身的后方回填土并铺设至设计高程,并压实整平;Step 6: Backfill the soil behind the partially demolished retaining wall and lay it up to the design elevation, and compact and level it;
步骤7,在被局部破拆后的挡墙墙身和排水过滤结构的顶面上铺设顶层铺装垫层,并在顶层铺装垫层上沿挡墙岸线延伸方向间隔铺设防腐木;Step 7, laying the top pavement cushion on the top surface of the partially demolished retaining wall and the drainage filter structure, and laying anti-corrosion wood at intervals along the extension direction of the retaining wall shoreline on the top pavement cushion;
步骤9,在过滤排水层上砌筑有若干级墙后陆生梯台,并在每一级墙后陆生梯台上种植陆生植物;Step 9, building terrestrial terraces behind several levels of walls on the filter drainage layer, and planting terrestrial plants on the terrestrial terraces behind each level of walls;
步骤10,在堤顶铺设人行步道;Step 10, laying footpaths on the top of the embankment;
步骤11,在河道堤岸的地面上位于被局部破拆后的挡墙墙身的迎水侧面的前方设置至少一级墙前水生平台,并在每一级墙前水生平台的外缘处打设密排的圆木桩,再在每一级墙前水生平台上种植水生植物;Step 11, set at least one level of aquatic platform in front of the wall on the ground of the river embankment in front of the water-facing side of the partially demolished retaining wall, and drill a water platform at the outer edge of each level of wall front aquatic platform Densely arranged round wooden piles, and then plant aquatic plants on the aquatic platform in front of each level of wall;
步骤12,拆除围堰,并对施工场地进行整理。Step 12, remove the cofferdam and tidy up the construction site.
在本发明的一个优选实施例中,在所述步骤4中,所述排水过滤结构由依次设置在所述被局部破拆后的挡墙墙身的挡土侧面上的棱形生态石笼和袋装碎石过滤层构成。In a preferred embodiment of the present invention, in the step 4, the drainage filtering structure is composed of a prismatic ecological gabion and a It is composed of bagged crushed stone filter layer.
在本发明的一个优选实施例中,在所述步骤5中,所述过滤排水层由砂砾石透水层以及设置在所述砂砾石透水层上的土工布构成。In a preferred embodiment of the present invention, in the step 5, the filter drainage layer is composed of a sand and gravel water permeable layer and a geotextile arranged on the sand and gravel water permeable layer.
由于采用了如上的技术方案,本发明的有益效果在于:Owing to adopting above technical scheme, the beneficial effect of the present invention is:
1、安全耐久。改造后的护岸结构墙后土压力减小,墙后地下水位下降,水压力减小,墙前土坡更稳固,且未对墙身施加大的竖向外荷载,整体结构更安全,结构防护到位,维持了原本的耐久性能。1. Safe and durable. The soil pressure behind the modified revetment structure wall decreases, the groundwater level behind the wall decreases, the water pressure decreases, the soil slope in front of the wall is more stable, and no large vertical external load is applied to the wall, the overall structure is safer and the structure is protected In place, maintaining the original durability.
2、生态景观优美。水陆交换通道打开,大面积种植水生和陆生植物,生态性能优越,外部结构景观效果一致,继承浆砌石的自然古朴的同时,加入了防腐木等现代感不错的元素。2. Beautiful ecological landscape. The water and land exchange channel is opened, and aquatic and terrestrial plants are planted in a large area. The ecological performance is superior, and the external structure and landscape effect are consistent.
3、开拓创新。本发明的护岸改造结构基于常规生态景观设计思路,融入“海绵城市”理念,创造性的将海绵体结构进行转化,石笼网等生态防护结构与硬质结构组合使用的另类方式为硬质护岸改造提供了新思路。3. Pioneering and innovative. The bank revetment reconstruction structure of the present invention is based on the idea of conventional ecological landscape design, incorporates the concept of "sponge city", creatively transforms the sponge structure, and the alternative way of combining ecological protection structures such as gabion nets with hard structures is hard bank revetment reconstruction Provided new ideas.
4、环保节能。本发明的护岸改造结构充分利用了拆除挡墙墙身时所产生的废石料,改造后的断面均使用了低能耗的工艺和材料,运行过程中无能耗。4. Environmental protection and energy saving. The revetment reconstruction structure of the present invention makes full use of the waste rock produced when the retaining wall is removed, and the sections after reconstruction all use low-energy-consumption techniques and materials, and there is no energy consumption during operation.
5、简单经济。本发明的护岸改造结构的施工工艺容易实施,施工便捷;选用材料也较易采购,除青石板外,其余用材在景观、生态设计中均不属高价品;预算工程费用单延米为4920元,较为经济。5. Simple and economical. The construction technology of the revetment reconstruction structure of the present invention is easy to implement, and the construction is convenient; the selected materials are also relatively easy to purchase, except for bluestone slabs, the rest of the materials are not high-priced items in landscape and ecological design; the budgeted project cost per linear meter is 4920 yuan , more economical.
6、维护便利。本发明的护岸改造结构耐久性较好,维护成本主要体现在植物养护;结构用材也较为常规,后期替换修复也较为便捷;墙后滤水系统即使失效,对结构安全稳定不会造成大的影响。6. Easy maintenance. The bank revetment reconstruction structure of the present invention has good durability, and the maintenance cost is mainly reflected in plant maintenance; the structural materials are also relatively conventional, and the later replacement and repair are also relatively convenient; even if the water filtration system behind the wall fails, it will not cause a major impact on the safety and stability of the structure .
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1是现状浆砌块石重力式护岸的断面图。Figure 1 is a cross-sectional view of the existing mortar block stone gravity revetment.
图2是本发明的生态自净型景观护岸改造结构的断面图。Fig. 2 is a cross-sectional view of the ecological self-purification landscape revetment reconstruction structure of the present invention.
图3是本发明的生态自净型景观护岸改造结构的迎水侧立面图。Fig. 3 is a water-facing side elevation view of the ecological self-purification landscape revetment reconstruction structure of the present invention.
具体实施方式Detailed ways
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本发明。In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations.
参见图2和图3,图中给出的是一种生态自净型景观护岸改造结构,包括前排桩100、后排桩200、设置在前排桩100和后排桩200的顶端且与前排桩100和后排桩200固接的挡墙底板300以及设置在挡墙底板300上的挡墙墙身400。前排桩100和后排桩200为C30钢筋砼预制方桩。挡墙底板300采用C30钢筋混凝土制成。Referring to Fig. 2 and Fig. 3, what provides in the figure is a kind of ecological self-cleaning type landscape bank revetment reconstruction structure, comprises front row pile 100, rear row pile 200, is arranged on the top of front row pile 100 and rear row pile 200 and is connected with front row pile 100 and rear row pile 200. The retaining wall bottom plate 300 to which the row of piles 100 and the rear row of piles 200 are fixedly connected and the retaining wall body 400 arranged on the retaining wall bottom plate 300 . The front row of piles 100 and the rear row of piles 200 are C30 reinforced concrete prefabricated square piles. The bottom plate 300 of the retaining wall is made of C30 reinforced concrete.
挡墙墙身400被局部破拆至设计高程,设计高程通常是3.0m(约三层石料),高程3.0m~2.4m的挡墙墙身400的挡土侧约0.6m厚石料也需拆除,确保被破拆后的挡墙墙身400的墙顶宽度不小于0.5m,墙背斜率与未破拆的挡墙墙身一致;高程3.0m~2.6m的挡墙墙身400每延米拆除一块石料。破拆挡墙墙身400后,可以保证常水位时水、陆贯通。挡墙墙身400被局部破拆时所涉及的表面需采用1:3水泥砂浆对石缝进行抹平处理,以免影响挡墙墙身400耐久性。挡墙墙身400在破拆时所产生的石料无需外运,经去除砌筑砂浆并清洗后可作为墙后陆生梯台的挡土石,石缝中亦可生长植物,既与挡墙墙身400保持了风格的统一,也使每级植物生长平台的边界轮廓显得自然生动有趣。The wall body 400 of the retaining wall is partially demolished to the design elevation, which is usually 3.0m (about three layers of stone), and the stone materials about 0.6m thick on the retaining side of the wall body 400 with an elevation of 3.0m to 2.4m also need to be removed , to ensure that the width of the top of the wall body 400 of the demolished retaining wall is not less than 0.5m, and the slope of the wall back is consistent with that of the wall body that has not been demolished; the wall body 400 of the wall with an elevation of 3.0m to 2.6m is 400 meters per linear meter Remove a stone. After the wall body of the retaining wall is demolished for 400 degrees, it can ensure that the water and land are connected at a constant water level. When the wall body 400 of the retaining wall is partially demolished, the surface involved shall be smoothed with 1:3 cement mortar to avoid affecting the durability of the wall body 400 of the retaining wall. The stones produced during the demolition of the retaining wall body 400 do not need to be transported outside. After the masonry mortar is removed and cleaned, they can be used as retaining stones for the terrestrial terraces behind the wall. Plants can also grow in the stone crevices, which is compatible with the retaining wall. Body 400 maintains the unity of style, and also makes the boundary outline of each level of plant growth platform appear natural, vivid and interesting.
被局部破拆后的挡墙墙身400的顶面上沿挡墙岸线延伸方向间隔设置有若干道排水凹槽410,每一道排水凹槽410将被局部破拆后的挡墙墙身400的迎水侧面和挡土侧面贯通,排水凹槽410的宽度为0.3m。The top surface of the partially demolished retaining wall body 400 is provided with several drainage grooves 410 at intervals along the extending direction of the retaining wall shoreline, and each drainage groove 410 will be partially demolished. The water-facing side and the soil-retaining side are connected, and the width of the drainage groove 410 is 0.3m.
考虑河道一般具有行洪、排涝功能,本次改造不宜减小河道水面率、过水和蓄水能力,因此,不宜大范围改变墙前土坡坡率等重要参数,因而在河道堤岸的地面上位于挡墙墙身400的迎水侧面的前方设置有至少一级墙前水生平台,并在每一级墙前水生平台上种植水生植物,对河道水面率、过水和蓄水能力横断面几无影响。在本实施例中,墙前水生平台为两个,分别为第一级墙前水生平台510和第二级墙前水生平台520,第一级墙前水生平台510的设计高程低于第二级墙前水生平台520的设计高程,具体地,第一级墙前水生平台510的高程为1.8m,第二级墙前水生平台520的高程为2.4m。第一级墙前水生平台510和第二级墙前水生平台520的平台填土坡度为1:10,可以种植不同耐水深度的水生植物。例如,第一级墙前水生平台510上种植的水生植物通常为耐水深度在0.8m~1m的水生植物,例如荷花、萍蓬草等;第二级墙前水生平台520上种植的水生植物通常为耐水深度在0.3m~0.6m的水生植物,例如再力花、黄菖蒲、慈菇等。Considering that the river generally has the functions of flood discharge and drainage, this reconstruction should not reduce the water surface rate, water flow and water storage capacity of the river. Therefore, it is not suitable to change important parameters such as the slope ratio of the soil in front of the wall on a large scale. Therefore, on the ground of the river embankment At least one level of aquatic platform in front of the wall is arranged in front of the water-facing side of the wall body 400 of the retaining wall, and aquatic plants are planted on the aquatic platform in front of each level of wall. no effect. In this embodiment, there are two aquatic platforms in front of the wall, namely the first-level aquatic platform 510 in front of the wall and the second-level aquatic platform 520 in front of the wall, and the design elevation of the first-level aquatic platform 510 in front of the wall is lower than that of the second level The design elevation of the aquatic platform 520 in front of the wall, specifically, the elevation of the aquatic platform 510 in front of the first stage of the wall is 1.8m, and the elevation of the aquatic platform 520 of the second stage in front of the wall is 2.4m. The filling slope of the first-level aquatic platform 510 in front of the wall and the second-level aquatic platform 520 in front of the wall is 1:10, and aquatic plants of different water-resistant depths can be planted. For example, the aquatic plants planted on the aquatic platform 510 in front of the first-level wall are usually aquatic plants with a water-resistant depth of 0.8m to 1m, such as lotus, milkweed, etc.; the aquatic plants planted on the aquatic platform 520 in front of the second-level wall are usually It is an aquatic plant that can tolerate water at a depth of 0.3m to 0.6m, such as Zailihua, Acorus iris, Arrowhead, etc.
第一级墙前水生平台510和第二级墙前水生平台520的外缘处采用密排的圆木桩511、521进行挡土,根据挡土高度不同,圆木桩511、521的桩径为0.1m~0.2m,圆木桩511、521的桩长为2m~3m。为了使景色错落有致,除在水生植物型式、种植范围等方面做一些景观设计,第二级墙前水生平台520的外缘处设置的圆木桩521采用波浪形布置方式或者顺河连接布置方式或者间隔布置方式进行布置。The outer edges of the aquatic platform 510 in front of the first-level wall and the aquatic platform 520 in front of the second-level wall adopt close-packed round wooden piles 511, 521 to retain the soil. 0.1m to 0.2m, and the pile lengths of the round wooden piles 511 and 521 are 2m to 3m. In order to make the scenery well-proportioned, in addition to doing some landscape design in terms of aquatic plant types and planting ranges, the round wooden piles 521 set at the outer edge of the aquatic platform 520 in front of the second-level wall are arranged in a wave shape or connected along the river. Or arrange at intervals.
被局部破拆后的挡墙墙身400的挡土侧面上设置有一排水过滤结构600,排水过滤结构600由依次设置在被局部破拆后的挡墙墙身400的挡土侧面上的棱形生态石笼610(横断面尺寸600×600mm)和袋装碎石过滤层620(厚300mm)构成。A drainage filter structure 600 is arranged on the retaining side of the partially demolished retaining wall body 400, and the drainage filtering structure 600 consists of prism-shaped Ecological gabion 610 (cross-sectional size 600 * 600mm) and bagged crushed stone filter layer 620 (thick 300mm) constitute.
在被局部破拆后的挡墙墙身400和排水过滤结构600的顶面上铺设有一顶层铺装垫层700,顶层铺装垫层700为C30钢筋砼预制板(尺寸500×100×1600mm),顶层铺装垫层700构成一水平观景平台,水平观景平台的宽度为1.5m。顶层铺装垫层700上沿挡墙岸线延伸方向间隔铺设有若干防腐木710(尺寸45×120×1600mm),相邻的两块防腐木710的铺设间距为2cm。A top pavement cushion 700 is laid on the top surface of the partially demolished retaining wall body 400 and the drainage filter structure 600, and the top pavement cushion 700 is a C30 reinforced concrete prefabricated slab (size 500×100×1600mm) , the top paving cushion layer 700 constitutes a horizontal viewing platform, and the width of the horizontal viewing platform is 1.5m. A number of preservative wood 710 (size 45×120×1600mm) is laid at intervals on the top pavement cushion 700 along the extension direction of the retaining wall shoreline, and the laying distance between two adjacent pieces of anticorrosive wood 710 is 2cm.
被局部破拆后的挡墙墙身400后方的地面上铺设有一与排水过滤结构600连接的过滤排水层800,过滤排水层800由砂砾石透水层810(厚度300mm)以及设置在砂砾石透水层810上的土工布820(尺寸:300g/m2)构成。过滤排水层800与排水过滤结构600组合使用,形成天然雨水快速下渗过滤并经由被局部破拆后的挡墙墙身400的排水凹槽410排至河道的雨水净化系统。A filter drainage layer 800 connected to the drainage filter structure 600 is laid on the ground behind the partially demolished retaining wall body 400. The filter drainage layer 800 consists of a gravel permeable layer 810 (thickness 300mm) and a gravel permeable layer. Geotextile 820 (dimensions: 300 g/m 2 ) on 810 constitutes. The filter drainage layer 800 is used in combination with the drainage filter structure 600 to form a rainwater purification system in which natural rainwater is quickly infiltrated and filtered and discharged to the river through the drainage groove 410 of the partially demolished retaining wall body 400 .
在过滤排水层800上沿坡面由下至上间隔砌筑有三级墙后陆生梯台900,三级墙后陆生梯台900的设计高程为3.40m、3.65m、3.90m,每级墙后陆生梯台900的高度为0.25m。每一级墙后陆生梯台900上种植陆生植物,例如云南黄馨、紫叶小檗等小型灌木,其余以草皮为主。三级墙后陆生梯台900采用挡墙墙身400被局部破拆的那部分石料铺设在过滤排水层800上而构成。三级墙后陆生梯台900的宽度由高至低逐渐加大,分别为0.6m、0.8m、1.0m。三级墙后陆生梯台900上沿挡墙岸线延伸方向间隔设置有若干人行小道(尺寸:0.3m×0.1m×1m),每一人行小道的一端位于堤顶处,其另一端向下延伸至水平观景平台处。On the filter drainage layer 800, a three-stage wall rear terrace 900 is built at intervals along the slope from bottom to top. The design elevation of the three-stage wall rear land terrace 900 is 3.40m, 3.65m, 3.90m, and each stage The height of the land terrace 900 behind the wall is 0.25m. Terrestrial plants are planted on the terrestrial terrace 900 behind each level of wall, such as small shrubs such as yunnanensis and barberry, and the rest are mainly turf. The land terrace 900 behind the tertiary wall is formed by laying the partially demolished part of the retaining wall body 400 on the filter drainage layer 800 . The width of the land terrace 900 behind the third-level wall gradually increases from high to low, respectively 0.6m, 0.8m, and 1.0m. A number of pedestrian paths (dimensions: 0.3m×0.1m×1m) are arranged at intervals along the extension direction of the shoreline of the retaining wall on the land platform 900 behind the third-level wall. One end of each pedestrian path is located at the top of the embankment, and the other end faces Extend down to the horizontal viewing platform.
在堤顶上沿挡墙岸线延伸方向铺设有一条人行步道1000,人行步道1000由若干均匀间隔设置的青石板构成。相邻的两块青石板之间种植草皮,在堤顶上位于所述人行步道的两侧堤肩种植灌木或乔木。A sidewalk 1000 is laid on the top of the embankment along the extending direction of the shoreline of the retaining wall. The sidewalk 1000 is composed of a number of evenly spaced bluestone slabs. Grass is planted between two adjacent bluestone slabs, and shrubs or trees are planted on the shoulders of both sides of the walkway on the top of the embankment.
本发明的生态自净型景观护岸改造结构的施工方法,包括以下步骤:The construction method of the ecological self-purification type landscape revetment reconstruction structure of the present invention comprises the following steps:
步骤1,构筑围堰。根据河道自身特点,可采用拦河围堰或者顺河围堰,并将围堰与拟建挡墙岸线之间的河水抽干;Step 1, build the cofferdam. According to the characteristics of the river course, cofferdams or cofferdams along the river can be used, and the river water between the cofferdams and the shoreline of the proposed retaining wall can be drained;
步骤2,基坑开挖。在基坑开挖前,应降低地下水位,使得地下水位降低至开挖面0.5m~1m以下,以砂砾石透水层下边界为开挖边坡,分层开挖至设计高程2.4m处;Step 2, foundation pit excavation. Before excavation of the foundation pit, the groundwater level should be lowered so that the groundwater level is lowered to 0.5m-1m below the excavation surface, and the lower boundary of the sand and gravel permeable layer is used as the excavation slope, and the excavation is carried out layer by layer to the design elevation of 2.4m;
步骤3,将挡墙墙身400局部破拆至设计高程,同时将破拆后的石料做适当处理,再对挡墙墙身400被局部破拆时所涉及的表面采用1:3水泥砂浆对石缝进行抹平处理;Step 3, partially demolish the retaining wall body 400 to the design elevation, and at the same time properly dispose of the demolished stone materials, and then use 1:3 cement mortar for the surface involved when the retaining wall body 400 is partially demolished. Stone joints are smoothed;
步骤4,在被局部破拆后的挡墙墙身400的挡土侧面上铺装排水过滤结构600,即采用机械吊装或者人工操作方式将棱形生态石笼610和袋装碎石过滤层620依次铺装在被局部破拆后的挡墙墙身400的挡土侧面上;Step 4: Pave the drainage filter structure 600 on the retaining side of the partially demolished retaining wall body 400, that is, mechanically hoist or manually install the prismatic ecological gabion 610 and bagged crushed stone filter layer 620 Pave and install on the retaining side of the partially demolished retaining wall body 400 in turn;
步骤5,在被局部破拆后的挡墙墙身400后方的地面上铺设过滤排水层800,即分层铺设砂砾石透水层810和土工布820,并压实整平;Step 5, laying the filter drainage layer 800 on the ground behind the partially demolished retaining wall body 400, that is, laying the sand and gravel permeable layer 810 and the geotextile 820 layer by layer, and compacting and leveling;
步骤6,在被局部破拆后的挡墙墙身400的后方回填土并铺设至设计高程3.0m,并压实整平;Step 6, backfill the soil behind the partially demolished retaining wall body 400 and lay it to the design elevation of 3.0m, and compact and level it;
步骤7,采用机械吊装或人工铺设方式在被局部破拆后的挡墙墙身和排水过滤结构的顶面上铺设顶层铺装垫层700,并采用人工铺设方式在顶层铺装垫层700上沿挡墙岸线延伸方向间隔铺设防腐木710;Step 7: Lay the top pavement cushion 700 on the top surface of the partially demolished retaining wall and the drainage filter structure by mechanical hoisting or manual laying, and manually lay the top pavement cushion 700 Lay anti-corrosion wood 710 at intervals along the extension direction of the retaining wall shoreline;
步骤9,在过滤排水层800上砌筑三级墙后陆生梯台900,按照高程3.4m、3.65m、3.9m、4.2m分层砌筑和填土,先砌筑废弃石块或透水砖,然后填土压实,再进行上一层平台的砌筑,然后在每一级墙后陆生梯台上种植陆生植物;Step 9: On the filter drainage layer 800, build the terrestrial terrace 900 behind the three-level wall, build and fill in layers according to the elevations of 3.4m, 3.65m, 3.9m, and 4.2m, and first build waste stones or permeable bricks, then fill and compact, and then build the upper platform, and then plant terrestrial plants on the terrestrial terrace behind each level of wall;
步骤10,在堤顶铺设人行步道1000,采用机械吊装或人工铺设方式将青石板铺设到位,形成人行步道1000;Step 10, laying a pedestrian walkway 1000 on the top of the embankment, laying bluestone slabs in place by mechanical hoisting or manual laying, forming a pedestrian walkway 1000;
步骤11,在河道堤岸的地面上位于被局部破拆后的挡墙墙身400的迎水侧面的前方设置第一级墙前水生平台510和第二级墙前水生平台520,并在第一级墙前水生平台510和第二级墙前水生平台520的外缘处打设密排的圆木桩511、521,再在第一级墙前水生平台510和第二级墙前水生平台520上种植水生植物;Step 11, on the ground of the river embankment, in front of the water-facing side of the partially demolished retaining wall body 400, set the first-level wall front aquatic platform 510 and the second-level wall front aquatic platform 520, and Close-packed round wooden stakes 511, 521 are set at the outer edge of the aquatic platform 510 in front of the first-level wall and the aquatic platform 520 in front of the second-level wall, and then the aquatic platform 510 in front of the first-level wall and the aquatic platform 520 in front of the second-level wall plant aquatic plants;
步骤12,拆除围堰,并对施工场地进行整理。Step 12, remove the cofferdam and tidy up the construction site.
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above. Those skilled in the industry should understand that the present invention is not limited by the above-mentioned embodiments. What are described in the above-mentioned embodiments and the description only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have Variations and improvements are possible, which fall within the scope of the claimed invention. The protection scope of the present invention is defined by the appended claims and their equivalents.
Claims (16)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610712442.8A CN106149625B (en) | 2016-08-23 | 2016-08-23 | A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610712442.8A CN106149625B (en) | 2016-08-23 | 2016-08-23 | A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106149625A CN106149625A (en) | 2016-11-23 |
| CN106149625B true CN106149625B (en) | 2018-09-21 |
Family
ID=57341783
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610712442.8A Active CN106149625B (en) | 2016-08-23 | 2016-08-23 | A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106149625B (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107268534A (en) * | 2017-01-06 | 2017-10-20 | 江苏省科佳工程设计有限公司 | Approach channel shore protection repairs structure and its method |
| CN106917410B (en) * | 2017-02-21 | 2019-07-19 | 浙江水利水电学院 | A kind of construction method of backwater slope shoulder protection structure |
| CN107460935A (en) * | 2017-02-28 | 2017-12-12 | 江苏省科佳工程设计有限公司 | Rain pipe buries structure and its method |
| CN110029622A (en) * | 2019-03-26 | 2019-07-19 | 广东省水利水电科学研究院 | A kind of green road system of seashore that can resist strong storm surge |
| CN110407328A (en) * | 2019-08-30 | 2019-11-05 | 花王生态工程股份有限公司 | A kind of river ecological management system |
| CN111893948A (en) * | 2020-07-23 | 2020-11-06 | 上海市水利工程设计研究院有限公司 | An ecological wetland bank protection structure based on river and lake terrain remodeling and its construction method |
| CN112854251A (en) * | 2020-12-31 | 2021-05-28 | 中国建筑股份有限公司 | Multistage construction platform for critical stable slope and construction method thereof |
| CN116335081A (en) * | 2023-03-10 | 2023-06-27 | 浙江省钱塘江管理局勘测设计院 | Multifunctional hidden breakwater wall and embankment top structure transformation method |
| CN118756640A (en) * | 2024-08-13 | 2024-10-11 | 广东海洋大学 | A vegetation wave-breaking ecological breakwater and its use method |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100492078B1 (en) * | 2002-06-24 | 2005-06-02 | 원 회 양 | The revetment structure that is consisted of retaining wall that have function that defend waves |
| CN1313680C (en) * | 2005-08-18 | 2007-05-02 | 山东大学 | A bank protection method with porous media screen |
| CN201649038U (en) * | 2010-04-07 | 2010-11-24 | 上海市政工程设计研究总院 | Pile platform revetment with function of greening scenery |
| CN102154997A (en) * | 2011-05-23 | 2011-08-17 | 东南大学 | Ecotypic bank revetment structure |
| CN203795373U (en) * | 2014-03-31 | 2014-08-27 | 上海万朗管业有限公司 | River channel bank protection structure |
| CN206438465U (en) * | 2016-08-23 | 2017-08-25 | 上海市水利工程设计研究院有限公司 | A kind of ecological self-purification type landscape revetment reconstruction structure |
-
2016
- 2016-08-23 CN CN201610712442.8A patent/CN106149625B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN106149625A (en) | 2016-11-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106149625B (en) | A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method | |
| CN103821107B (en) | Casing and plate combined ecological bank protection structure | |
| CN101105034A (en) | Ecological protection method for sand-filling road foundation hollow block | |
| CN104234061A (en) | Reinforced ecological concrete revetment and construction method thereof | |
| CN206438465U (en) | A kind of ecological self-purification type landscape revetment reconstruction structure | |
| CN107630436A (en) | A kind of ecological wetland type bank slope structure and its construction method for administering mining collapse area | |
| CN211200281U (en) | Interlocking slope protection structure for river channel treatment | |
| CN110306565A (en) | A kind of Road ecology slope protection system and construction method | |
| CN104131530B (en) | Levee revetment structure under rapid and soft foundation severe environment | |
| CN206693140U (en) | A kind of protection slope | |
| CN217480070U (en) | Multistage ecological revetment of mountain area river course | |
| CN204690780U (en) | A kind of inter-embedding type ecological block retaining wall | |
| CN118273270A (en) | Combined ecological bank protection construction structure and construction method | |
| CN217325475U (en) | Reinforced structure is restoreed to hydraulic retaining wall that collapses | |
| CN206418460U (en) | Ecological slope protection structure | |
| CN112854131B (en) | Ecological revetment in water source protection area and construction method thereof | |
| CN214832388U (en) | River course shore protection structure of reinforcing river bank steadiness | |
| CN215593889U (en) | Ecological revetment structure suitable for urban river | |
| CN205062744U (en) | Half gravity type two -stage view anti -flood wall on half cantilever | |
| CN108222216A (en) | A kind of rainwater ecological exhaust system and its construction method | |
| CN114411805A (en) | Collapsed hydraulic retaining wall repairing and reinforcing structure and method | |
| CN207619923U (en) | A kind of ecological wetland type bank slope structure for administering mining collapse area | |
| CN113863145A (en) | Construction method of bridge on slope for easy-to-slide side slope and bridge | |
| CN207686047U (en) | A kind of ecological block wall | |
| CN206467631U (en) | The domatic beam attachment structure of ecological slope protection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||