CN105760299A - Full-automatic script test method based on intelligent substation - Google Patents

Full-automatic script test method based on intelligent substation Download PDF

Info

Publication number
CN105760299A
CN105760299A CN201610091636.0A CN201610091636A CN105760299A CN 105760299 A CN105760299 A CN 105760299A CN 201610091636 A CN201610091636 A CN 201610091636A CN 105760299 A CN105760299 A CN 105760299A
Authority
CN
China
Prior art keywords
test
data
devices
intelligent substation
script
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610091636.0A
Other languages
Chinese (zh)
Inventor
曹敏
沈鑫
李萍
倪时龙
杨四华
何明跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Yunnan Power System Ltd
Original Assignee
Electric Power Research Institute of Yunnan Power System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Yunnan Power System Ltd filed Critical Electric Power Research Institute of Yunnan Power System Ltd
Priority to CN201610091636.0A priority Critical patent/CN105760299A/en
Publication of CN105760299A publication Critical patent/CN105760299A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Prevention of errors by analysis, debugging or testing of software
    • G06F11/3668Testing of software
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Prevention of errors by analysis, debugging or testing of software
    • G06F11/3668Testing of software
    • G06F11/3672Test management
    • G06F11/3684Test management for test design, e.g. generating new test cases
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Prevention of errors by analysis, debugging or testing of software
    • G06F11/3668Testing of software
    • G06F11/3672Test management
    • G06F11/3692Test management for test results analysis

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)

Abstract

本发明提供了一种基于智能变电站全自动脚本测试方法,包括以下步骤:检测接入的待测设备,并获取与待测设备相匹配的测试数据;选择数据库中与待测设备相匹配的测试脚本,并生成测试用例;更新与测试数据相对应的测试用例中的字段数据,并生成控制指令;接收待测设备发送的根据控制指令执行的测试结果;根据测试结果,判断对待测设备测试的准确性。通过自动化测试脚本,能够动态改变测试数据和功能,并对比测试结果,不需要重新编辑整个测试设计,在被测系统出现变动时,能够及时准确的修改上次的测试脚本,将其更新至复合此次测试的状态,从而可以提高测试效率,解决测试开发周期长、方法复杂以及人员编程能力要求高等问题。

The invention provides a fully automatic script testing method based on an intelligent substation, comprising the following steps: detecting the connected equipment to be tested, and obtaining test data matching the equipment to be tested; selecting the test data matching the equipment to be tested in the database scripts, and generate test cases; update the field data in the test cases corresponding to the test data, and generate control instructions; receive the test results sent by the device under test and execute according to the control instructions; judge the test of the device under test according to the test results accuracy. Through automated test scripts, it is possible to dynamically change test data and functions, and compare test results without re-editing the entire test design. When the system under test changes, it is possible to promptly and accurately modify the last test script and update it to the composite The status of this test can improve the test efficiency and solve the problems of long test development cycle, complex methods and high requirements for personnel programming ability.

Description

一种基于智能变电站全自动脚本测试方法A fully automatic script testing method based on smart substation

技术领域technical field

本发明涉及电力系统自动化技术领域,特别是涉及一种基于智能变电站全自动脚本测试方法。The invention relates to the technical field of power system automation, in particular to a fully automatic script testing method based on an intelligent substation.

背景技术Background technique

智能变电站是采用先进、可靠、集成和环保的智能设备,以全站信息数字化、通信平台网络化、信息共享标准化为基本要求,自动完成信息采集、测量、控制、保护、计量和检测等基本功能,同时,具备支持电网实时自动控制、智能调节、在线分析决策和协同互动等高级功能的变电站。Smart substation adopts advanced, reliable, integrated and environment-friendly intelligent equipment, with the basic requirements of digitalization of whole station information, networking of communication platform, and standardization of information sharing, and automatically completes basic functions such as information collection, measurement, control, protection, measurement and detection. At the same time, it is a substation with advanced functions such as real-time automatic control of the power grid, intelligent adjustment, online analysis and decision-making, and collaborative interaction.

智能变电站信息的正确性和完整性不但直接影响到变电站智能化的实现程度,同时智能变电站的运行状态也完全依赖于对所获取信息的综合处理,因此如何保证及时、准确、完整地获取足够的变电站运行信息,并对这些信息进行快速的综合处理,实时把握和预测智能变电站的运行状态,对各种异常情况进行预警,及时采取措施预防故障的发生,从而根据变电站的实际运行状况对变电站的运行进行连续评估,是保证智能变电站工程建设和运行维护的迫切需求。The correctness and completeness of smart substation information not only directly affects the realization of substation intelligence, but also the operation status of smart substation is completely dependent on the comprehensive processing of the acquired information, so how to ensure timely, accurate and complete acquisition of sufficient information Substation operation information, and quickly comprehensively process these information, grasp and predict the operation status of the smart substation in real time, give early warning to various abnormal situations, and take timely measures to prevent the occurrence of faults, so as to control the substation according to the actual operation status of the substation. Continuous evaluation of operation is an urgent need to ensure the construction, operation and maintenance of smart substation projects.

然而,当被测系统业务产生变动时,修改测试设计值最后上线测试,留给测试人员的时间往往很短,相对应的测试实施开发成本也较高,很难在规定时间内及时完成。However, when the business of the system under test changes, the time left for testers to modify the test design value and finally launch the test is often very short, and the corresponding test implementation and development costs are also high, making it difficult to complete it within the specified time.

发明内容Contents of the invention

本发明实施例中提供了一种基于智能变电站全自动脚本测试方法,以解决现有技术中的智能变电站测试实施中对被测试参数、配置、方案等设计内容修改复杂、成本高、效率低的问题。In the embodiment of the present invention, a fully automatic script testing method based on smart substation is provided to solve the problem of complex modification, high cost and low efficiency of the design content of the tested parameters, configuration, scheme, etc. in the smart substation test implementation in the prior art. question.

为了解决上述技术问题,本发明实施例公开了如下技术方案:In order to solve the above technical problems, the embodiment of the present invention discloses the following technical solutions:

一种基于智能变电站全自动脚本测试方法,包括以下步骤:检测接入的待测设备,并获取与所述待测设备相匹配的测试数据;选择数据库中与所述待测设备相匹配的测试脚本,并生成包括所述测试脚本的测试用例;更新与所述测试数据相对应的所述测试用例中的字段数据,并生成与所述待测设备相匹配的控制指令,所述控制指令用于测试所述待测设备;接收所述待测设备发送的根据所述控制指令执行的测试结果;根据所述测试结果,判断对所述待测设备测试的准确性。A fully automatic script testing method based on an intelligent substation, comprising the following steps: detecting the connected equipment to be tested, and obtaining test data matching the equipment to be tested; selecting a test in a database that matches the equipment to be tested script, and generate a test case that includes the test script; update the field data in the test case corresponding to the test data, and generate a control instruction that matches the device under test, and the control instruction uses to test the device under test; receive the test result sent by the device under test and executed according to the control instruction; judge the accuracy of the test on the device under test according to the test result.

优选地,所述获取与所述待测设备相匹配的测试数据,包括:提取所述待测设备的识别码;根据所述识别码获取所述待测设备需要测试的测试类型;获取数据库中与所述测试类型相匹配的测试数据。Preferably, the acquiring test data matching the device under test includes: extracting the identification code of the device under test; obtaining the test type that the device under test needs to test according to the identification code; obtaining Test data that matches the test type.

优选地,提取所述待测设备的识别码;根据所述识别码获取所述待测设备需要测试的测试类型;获取数据库中与所述测试类型相匹配的多个测试脚本。Preferably, the identification code of the device under test is extracted; the test type to be tested by the device under test is obtained according to the identification code; and a plurality of test scripts matching the test type in the database are obtained.

优选地,所述生成包括所述测试脚本的测试用例,包括:获取与所述待测设备相匹配的多个测试脚本的测试次序;根据所述测试次序将多个测试脚本编译生成所述测试用例。Preferably, the generating the test case including the test script includes: obtaining a test sequence of multiple test scripts matching the device under test; compiling the multiple test scripts according to the test sequence to generate the test Example.

优选地,所述更新与所述测试数据相对应的所述测试用例中的字段数据,包括:提取所述测试数据用例中与所述测试数据相对应的字段;将所述字段内的变量更新为所述测试数据。Preferably, the updating the field data in the test case corresponding to the test data includes: extracting the field corresponding to the test data in the test data case; updating the variables in the field for the test data.

优选地,所述判断对所述待测设备测试的准确性,包括:对比所述测试结果与预先存储的预测结果是否一致;当所述测试结果与预先存储的预测结果一致时,判断对所述待测设备测试准确。Preferably, the judging the accuracy of the test of the device under test includes: comparing whether the test result is consistent with the pre-stored prediction result; when the test result is consistent with the pre-stored prediction result, judging the accuracy of the test The device under test is tested accurately.

由以上技术方案可见,本发明实施例提供的基于智能变电站全自动化脚本设计的测试方法,通过自动化测试脚本,能够动态改变测试数据和功能,并对比测试结果,不需要重新编辑整个测试设计,在被测系统出现变动时,能够及时准确的修改上次的测试脚本,将其更新至复合此次测试的状态,从而可以提高测试效率,解决测试开发周期长、方法复杂以及人员编程能力要求高等问题。It can be seen from the above technical solutions that the test method based on the fully automated script design of the intelligent substation provided by the embodiment of the present invention can dynamically change the test data and functions through the automated test script, and compare the test results without re-editing the entire test design. When the system under test changes, it is possible to promptly and accurately modify the last test script and update it to the state of this test, which can improve test efficiency and solve problems such as long test development cycle, complex methods and high requirements for personnel programming ability .

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,对于本领域普通技术人员而言,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, for those of ordinary skill in the art, In other words, other drawings can also be obtained from these drawings on the premise of not paying creative work.

图1为本发明实施例提供的一种基于智能变电站全自动脚本测试方法的流程示意图。Fig. 1 is a schematic flowchart of a fully automatic script testing method based on an intelligent substation provided by an embodiment of the present invention.

具体实施方式detailed description

为了使本技术领域的人员更好地理解本发明中的技术方案,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本发明保护的范围。In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described The embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts shall fall within the protection scope of the present invention.

参见图1,为本发明实施例提供的一种基于智能变电站全自动脚本测试方法的流程示意图。Referring to FIG. 1 , it is a schematic flowchart of a fully automatic script testing method based on an intelligent substation provided by an embodiment of the present invention.

如图1所示,本发明实施例提供的一种基于智能变电站全自动脚本测试方法,包括以下步骤:As shown in Figure 1, a fully automatic script testing method based on an intelligent substation provided by an embodiment of the present invention includes the following steps:

步骤S1,检测接入的待测设备,并获取与待测设备相匹配的测试数据;其中获取与待测设备相匹配的待测数据,又包括:Step S1, detecting the connected device under test, and obtaining test data matching the device under test; obtaining the data under test matching the device under test includes:

步骤S101,提取接入的待测设备的识别码,如设备型号或设备规格之类,识别设备;Step S101, extracting the identification code of the connected device under test, such as the device model or device specification, to identify the device;

步骤S102,根据识别码获取待测设备需要测试的测试类型,根据每一类待测设备,数据库中有其相应的待测类型,根据待测设备的识别码,可自动提取其所需要测试的测试类型;Step S102, according to the identification code to obtain the test type of the equipment to be tested, according to each type of equipment to be tested, there is a corresponding type to be tested in the database, and according to the identification code of the equipment to be tested, the required test can be automatically extracted test type;

步骤S103,获取数据库中与测试类型相匹配的测试数据,根据测试设备以及测试类型,从数据库中选择与其相对应的测试数据,包括参数、变量等。Step S103, obtaining the test data matching the test type in the database, and selecting the corresponding test data from the database, including parameters, variables, etc., according to the test equipment and the test type.

步骤S2,选择数据库中与待测设备相匹配的测试脚本,并生成包括测试脚本的测试用例;其中:Step S2, selecting a test script matching the device under test in the database, and generating a test case including the test script; wherein:

步骤S2中,选择数据库中与待测设备相匹配的测试脚本,又包括:In step S2, select a test script matching the device under test in the database, including:

步骤S211,提取接入的待测设备的识别码,如设备型号或设备规格之类,识别设备;Step S211, extracting the identification code of the connected device under test, such as the device model or device specification, to identify the device;

步骤S212,根据识别码获取待测设备需要测试的测试类型,根据每一类待测设备,数据库中有其相应的待测类型,根据待测设备的识别码,可自动提取其所需要测试的测试类型;Step S212, according to the identification code to obtain the test type of the equipment to be tested, according to each type of equipment to be tested, there is a corresponding type to be tested in the database, and according to the identification code of the equipment to be tested, the required test can be automatically extracted test type;

步骤S213,获取数据库中与测试类型相匹配的多个测试脚本,根据测试设备以及测试类型,从数据库中选择与其相对应的多个测试脚本,其中测试脚本为一个特定测试的一系列指令,这些指令可以被自动化测试工具执行,每个测试设备的测试类型均可由多个测试脚本进行构建。Step S213, obtain a plurality of test scripts matching the test type in the database, select a plurality of test scripts corresponding to it from the database according to the test equipment and the test type, wherein the test script is a series of instructions for a specific test, these Instructions can be executed by automated testing tools, and the test type of each test device can be constructed by multiple test scripts.

步骤S2中,生成包括测试脚本的测试用例,又包括:In step S2, generate test cases including test scripts, including:

步骤S221,获取与待测设备相匹配的多个测试脚本的测试次序,根据测试设备的测试类型,判断并获取的多个测试脚本所需要测试的次序;Step S221, obtaining the test sequence of multiple test scripts matching the device to be tested, and judging and obtaining the test sequence required by the multiple test scripts according to the test type of the test device;

步骤S222,根据测试次序将多个测试脚本编译生成测试用例,根据获取的测试次序,多多个测试脚本进行编译重组,将多个测试脚本编译为一整套测试用例,测试用例为针对待测设备而生成。Step S222, compile multiple test scripts according to the test sequence to generate test cases, compile and reorganize multiple test scripts according to the obtained test sequence, compile multiple test scripts into a complete set of test cases, and the test cases are for the device under test. generate.

步骤S3,更新与测试数据相对应的测试用例中的字段数据,并生成与待测设备相匹配的控制指令,控制指令用于测试待测设备;其中,新与测试数据相对应的测试用例中的字段数据,又包括:Step S3, update the field data in the test case corresponding to the test data, and generate a control command matching the device under test, the control command is used to test the device under test; wherein, the new test case corresponding to the test data field data, including:

步骤S301,提取测试用例中与测试数据相对应的字段,对测试用例进行解析,并识别其中与测试数据相对应的字段,如包含测试数据(参数、变量)等的程序;Step S301, extracting the fields corresponding to the test data in the test case, analyzing the test case, and identifying the fields corresponding to the test data, such as programs containing test data (parameters, variables), etc.;

步骤S302,将字段内的变量更新为测试数据,将与测试数据相对应的字段内的变量更新为与待测设备相匹配的参数。In step S302, the variables in the field are updated to test data, and the variables in the field corresponding to the test data are updated to parameters matching the device under test.

改变参数后的测试用例即为针对待测设备的测试程序,即生成了与待测设备相匹配的控制指令,控制指令用于测试待测设备,系统向待测设备发送相应的控制指令,对待测设备进行测试。The test case after changing the parameters is the test program for the device under test, that is, the control command matching the device under test is generated. The control command is used to test the device under test, and the system sends the corresponding control command to the device under test. testing equipment.

步骤S4,接收待测设备发送的根据控制指令执行的测试结果,待测设备根据控制指令进行测试,测试完毕生成测试结果,测试结果可为测试报文或其他形式,并将测试结果发送至系统,系统接收测试设备发送的根据控制指令执行的测试结果。Step S4: Receive the test result sent by the device under test and execute the test according to the control command. The device under test performs the test according to the control command. After the test is completed, the test result is generated. The test result can be a test message or other forms, and the test result is sent to the system. , the system receives the test results sent by the test equipment and executed according to the control instructions.

步骤S5,根据测试结果,判断对待测设备测试的准确性,包括:Step S5, according to the test result, judge the accuracy of the test of the device under test, including:

步骤S501,对比测试结果与预先存储的预测结果是否一致,测试系统对接收到的测试结果进行分析验证,并与之前预先存储的测试结果进行比对,判断测试系统自动生成的测试用例所测试出的测试结果与预先存储的测试结果是否一致;Step S501, comparing whether the test result is consistent with the pre-stored prediction result, the test system analyzes and verifies the received test result, compares it with the previously pre-stored test result, and judges whether the test result tested by the test case automatically generated by the test system Whether the test results are consistent with the pre-stored test results;

步骤S502,当所述测试结果与预先预存的测试结果一致时,判断对待测设备的测试准确,当测试系统自动生成的测试用例对待测设备所测量出来的结果和预先预存的测试结果一致时,系统判断对待测设备的测试准确,测试完成;而当测试系统自动生成的测试用例对待测设备所测量出来的结果和预先预存的测试结果不一致时,系统判断对待测设备的测试不准确,则需要对其测试脚本和测试数据等进行相应调整,并重新进行测试。Step S502, when the test result is consistent with the pre-stored test result, it is judged that the test of the device under test is accurate; when the test case automatically generated by the test system is consistent with the pre-stored test result, The system judges that the test of the device under test is accurate, and the test is completed; and when the test results automatically generated by the test system for the device under test are inconsistent with the pre-stored test results, the system judges that the test of the device under test is inaccurate. Make corresponding adjustments to its test scripts and test data, and re-test.

由以上技术方案可见,本发明实施例提供的基于智能变电站全自动化脚本设计的测试方法,通过自动化测试脚本,能够动态改变测试数据和功能,并对比测试结果,不需要重新编辑整个测试设计,在被测系统出现变动时,能够及时准确的修改上次的测试脚本,将其更新至复合此次测试的状态,从而可以提高测试效率,解决测试开发周期长、方法复杂以及人员编程能力要求高等问题。It can be seen from the above technical solutions that the test method based on the fully automated script design of the intelligent substation provided by the embodiment of the present invention can dynamically change the test data and functions through the automated test script, and compare the test results without re-editing the entire test design. When the system under test changes, it is possible to promptly and accurately modify the last test script and update it to the state of this test, which can improve test efficiency and solve problems such as long test development cycle, complex methods and high requirements for personnel programming ability .

需要说明的是,在本文中,诸如“第一”和“第二”等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relative terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply these No such actual relationship or order exists between entities or operations. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

以上所述仅是本发明的具体实施方式,使本领域技术人员能够理解或实现本发明。对这些实施例的多种修改对本领域的技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above descriptions are only specific embodiments of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. one kind based on the full-automatic script method of testing of intelligent substation, it is characterised in that comprise the following steps:
The Devices to test that detection accesses, and the test data that acquisition and described Devices to test match;
Select the test script matched with described Devices to test in data base, and generate the test case including described test script;
Updating the field data in the described test case corresponding with described test data the control instruction that generation and described Devices to test match, described control instruction is used for testing described Devices to test;
Receive the test result performed according to described control instruction that described Devices to test sends;
According to described test result, it is judged that the accuracy that described Devices to test is tested.
2. according to claim 1 based on the full-automatic script method of testing of intelligent substation, it is characterised in that the test data that described acquisition and described Devices to test match, including:
Extract the identification code of described Devices to test;
Obtain described Devices to test according to described identification code and need the test-types of test;
Obtain the test data matched in data base with described test-types.
3. according to claim 1 based on the full-automatic script method of testing of intelligent substation, it is characterised in that the test script matched with described Devices to test in described selection data base, including:
Extract the identification code of described Devices to test;
Obtain described Devices to test according to described identification code and need the test-types of test;
Obtain the multiple test scripts matched in data base with described test-types.
4. according to claim 3 based on the full-automatic script method of testing of intelligent substation, it is characterised in that described generation includes the test case of described test script, including:
Obtain the test sequence of the multiple test scripts matched with described Devices to test;
According to described test sequence, the compiling of multiple test scripts is generated described test case.
5. according to claim 1 based on the full-automatic script method of testing of intelligent substation, it is characterised in that the field data in the described test case that described renewal is corresponding with described test data, including:
Extract field corresponding with described test data in described test case;
It is described test data by the variable update in described field.
6. according to claim 1 based on the full-automatic script method of testing of intelligent substation, it is characterised in that the accuracy that described Devices to test is tested by described judgement, including:
Whether contrast described test result consistent with predicting the outcome of prestoring;
When described test result with prestore when predicting the outcome consistent, it is judged that the test of described Devices to test is accurate.
CN201610091636.0A 2016-02-18 2016-02-18 Full-automatic script test method based on intelligent substation Pending CN105760299A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610091636.0A CN105760299A (en) 2016-02-18 2016-02-18 Full-automatic script test method based on intelligent substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610091636.0A CN105760299A (en) 2016-02-18 2016-02-18 Full-automatic script test method based on intelligent substation

Publications (1)

Publication Number Publication Date
CN105760299A true CN105760299A (en) 2016-07-13

Family

ID=56330144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610091636.0A Pending CN105760299A (en) 2016-02-18 2016-02-18 Full-automatic script test method based on intelligent substation

Country Status (1)

Country Link
CN (1) CN105760299A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107844411A (en) * 2016-09-18 2018-03-27 阿里巴巴集团控股有限公司 A kind of method of testing and relevant apparatus
JP2018077697A (en) * 2016-11-10 2018-05-17 株式会社日立製作所 Verification system and verification method
CN108804271A (en) * 2018-06-28 2018-11-13 北京潘达互娱科技有限公司 Interface tolerating measure method and device
CN109507488A (en) * 2019-01-21 2019-03-22 武汉裕量信息科技有限公司 Electromagnetism interference free performance test macro
CN109783287A (en) * 2018-12-28 2019-05-21 北京五维星宇科技有限公司 Test instruction generation method, system, terminal and medium based on configuration file
CN110850324A (en) * 2018-07-24 2020-02-28 雅达电子国际有限公司 Automated test system and method for power supply units
CN111159050A (en) * 2019-12-30 2020-05-15 深圳Tcl新技术有限公司 Intelligent lock testing method and device and computer readable storage medium
CN111309586A (en) * 2018-12-12 2020-06-19 迈普通信技术股份有限公司 Command testing method, device and storage medium thereof
CN112260892A (en) * 2020-10-14 2021-01-22 国网山东省电力公司临朐县供电公司 Management method, system, terminal and storage medium for power distribution system scheduling node
CN112711526A (en) * 2019-10-25 2021-04-27 腾讯科技(深圳)有限公司 UI test method, device, equipment and storage medium
CN112994989A (en) * 2021-05-20 2021-06-18 北京智芯微电子科技有限公司 Evaluation method, device and system for internet of things terminal and storage medium
CN113315774A (en) * 2021-05-31 2021-08-27 浙江正泰仪器仪表有限责任公司 Instrument testing method and instrument testing device
CN113986751A (en) * 2021-11-09 2022-01-28 中国建设银行股份有限公司 Testing method and device suitable for multiple operating systems
CN114116507A (en) * 2021-12-02 2022-03-01 安徽继远检验检测技术有限公司 A source code detection system and method based on Devops endogenous security

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851665A (en) * 2005-11-07 2006-10-25 华为技术有限公司 Method for completing product automation test utilizing test kit
CN101187894A (en) * 2006-11-15 2008-05-28 中兴通讯股份有限公司 A keyword-driven automatic testing method and its testing system
CN101241467A (en) * 2008-03-05 2008-08-13 罗笑南 Automatized white box test system and method facing to WEB application
CN104536891A (en) * 2014-12-26 2015-04-22 小米科技有限责任公司 Method and device for testing system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851665A (en) * 2005-11-07 2006-10-25 华为技术有限公司 Method for completing product automation test utilizing test kit
CN101187894A (en) * 2006-11-15 2008-05-28 中兴通讯股份有限公司 A keyword-driven automatic testing method and its testing system
CN101241467A (en) * 2008-03-05 2008-08-13 罗笑南 Automatized white box test system and method facing to WEB application
CN104536891A (en) * 2014-12-26 2015-04-22 小米科技有限责任公司 Method and device for testing system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
葛亮: "智能变电站在线监测系统测试平台的设计与实现", 《中国优秀硕士学位论文全文数据库信息科技辑》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107844411A (en) * 2016-09-18 2018-03-27 阿里巴巴集团控股有限公司 A kind of method of testing and relevant apparatus
JP2018077697A (en) * 2016-11-10 2018-05-17 株式会社日立製作所 Verification system and verification method
CN108804271A (en) * 2018-06-28 2018-11-13 北京潘达互娱科技有限公司 Interface tolerating measure method and device
CN110850324A (en) * 2018-07-24 2020-02-28 雅达电子国际有限公司 Automated test system and method for power supply units
CN111309586A (en) * 2018-12-12 2020-06-19 迈普通信技术股份有限公司 Command testing method, device and storage medium thereof
CN109783287B (en) * 2018-12-28 2022-09-13 北京五维星宇科技有限公司 Test instruction generation method, system, terminal and medium based on configuration file
CN109783287A (en) * 2018-12-28 2019-05-21 北京五维星宇科技有限公司 Test instruction generation method, system, terminal and medium based on configuration file
CN109507488A (en) * 2019-01-21 2019-03-22 武汉裕量信息科技有限公司 Electromagnetism interference free performance test macro
CN112711526A (en) * 2019-10-25 2021-04-27 腾讯科技(深圳)有限公司 UI test method, device, equipment and storage medium
CN112711526B (en) * 2019-10-25 2024-05-14 腾讯科技(深圳)有限公司 UI test method, device, equipment and storage medium
CN111159050A (en) * 2019-12-30 2020-05-15 深圳Tcl新技术有限公司 Intelligent lock testing method and device and computer readable storage medium
CN112260892A (en) * 2020-10-14 2021-01-22 国网山东省电力公司临朐县供电公司 Management method, system, terminal and storage medium for power distribution system scheduling node
CN112994989B (en) * 2021-05-20 2021-08-06 北京智芯微电子科技有限公司 Evaluation method, device, system, and storage medium of IoT terminal
CN112994989A (en) * 2021-05-20 2021-06-18 北京智芯微电子科技有限公司 Evaluation method, device and system for internet of things terminal and storage medium
CN113315774A (en) * 2021-05-31 2021-08-27 浙江正泰仪器仪表有限责任公司 Instrument testing method and instrument testing device
CN113986751A (en) * 2021-11-09 2022-01-28 中国建设银行股份有限公司 Testing method and device suitable for multiple operating systems
CN114116507A (en) * 2021-12-02 2022-03-01 安徽继远检验检测技术有限公司 A source code detection system and method based on Devops endogenous security
CN114116507B (en) * 2021-12-02 2022-09-23 安徽继远检验检测技术有限公司 Source code detection system and method based on Devops endogenous security

Similar Documents

Publication Publication Date Title
CN105760299A (en) Full-automatic script test method based on intelligent substation
CN104765692B (en) Method and apparatus for automatic test software
Ploennigs et al. Adapting semantic sensor networks for smart building diagnosis
CN110929036A (en) Electricity marketing audit management method, device, computer equipment and storage medium
US11016477B2 (en) Devices, methods, and systems for a distributed rule based automated fault detection
CN112506757A (en) Automatic test method, system, computer device and medium thereof
Misirli et al. Ai-based software defect predictors: Applications and benefits in a case study
CN113157385B (en) An automated detection method for smart contract vulnerabilities based on graph neural networks
CN109635950B (en) Electric energy meter running state monitoring method based on genetic algorithm and community clustering
CN107665172A (en) A kind of Software Defects Predict Methods based on complicated weighting software network
US20230297744A1 (en) Systems and methods for ai/ml based digital twin for power system
CN112083275A (en) Distribution network fault type identification method and system
CN116483730A (en) Service system automatic test method based on domestic software and hardware and open source test tool
CN114977176B (en) Power load decomposition method, device, equipment and storage medium
CN120012757A (en) Method, device, computer equipment and storage medium for reviewing bidding documents
CN110968703A (en) Method and system for constructing abnormal metering point knowledge base based on LSTM end-to-end extraction algorithm
CN119883892A (en) Automated test integration system in software development process
Ghasemi et al. Complexity estimation service for change management in industrial automation systems using Digital Twin
KR101984257B1 (en) Cloud service based big data analysing system and method therein
CN110837946A (en) A Genetic Algorithm-Based Electric Energy Meter State Evaluation Method
Garg Exploring the use of artificial intelligence for software testing and debugging
KS A method for predicting software reliability using object oriented design metrics
Liu et al. Drift: Fine-grained prediction of the co-evolution of production and test code via machine learning
Singh et al. Interpretive structural modelling in assessment of agile methodology
Mohacsi et al. AI-based enhancement of test models in an industrial model-based testing tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160713

RJ01 Rejection of invention patent application after publication
点击 这是indexloc提供的php浏览器服务,不要输入任何密码和下载