Li et al., 2021 - Google Patents
A simulation study on the robotic mobile fulfillment system in high-density storage warehousesLi et al., 2021
- Document ID
- 11926996188247161610
- Author
- Li X
- Yang X
- Zhang C
- Qi M
- Publication year
- Publication venue
- Simulation Modelling Practice and Theory
External Links
Snippet
The robotic mobile fulfillment system (RMFS) is a parts-to-picker material handling system that has emerged in e-commerce warehouses and aims to save labor costs and achieve higher picking efficiency. This study investigates an RMFS in high-density storage …
- 238000003860 storage 0 title abstract description 108
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement, balancing against orders
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/4189—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by the transport system
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Li et al. | A simulation study on the robotic mobile fulfillment system in high-density storage warehouses | |
| Lee et al. | Smart robotic mobile fulfillment system with dynamic conflict-free strategies considering cyber-physical integration | |
| CN110182527B (en) | Warehouse-in and warehouse-out control method and conveying system for shelf array | |
| JP7019935B2 (en) | Entry / exit control method and transfer system for shelf arrays | |
| Winkelhaus et al. | Hybrid order picking: A simulation model of a joint manual and autonomous order picking system | |
| Azadeh et al. | Robotized and automated warehouse systems: Review and recent developments | |
| EP4006794A1 (en) | Robotic load handler coordination system, cell grid system and method of coordinating a robotic load handler | |
| Confessore et al. | A network flow based heuristic approach for optimising AGV movements | |
| Bolu et al. | Path planning for multiple mobile robots in smart warehouse | |
| CN110182528B (en) | Warehouse-in and warehouse-out control method and conveying system for shelf array | |
| CN110182529B (en) | Inbound and outbound control method and handling system for rack array | |
| Van der Meer | Operational control of internal transport | |
| Ellithy et al. | AGV and Industry 4.0 in warehouses: a comprehensive analysis of existing literature and an innovative framework for flexible automation | |
| US12403601B2 (en) | System and method for queueing robot operations in a warehouse environment based on workflow optimization instructions | |
| Dabić-Miletić et al. | Ranking of autonomous alternatives for the realization of intralogistics activities in sustainable warehouse systems using the TOPSIS method | |
| US12012283B1 (en) | Robotic fulfillment system carton release logic | |
| Dabic-Miletic | Benefits and challenges of implementing autonomous technology for sustainable material handling in industrial processes | |
| Van Belle et al. | A service-oriented approach for holonic manufacturing control and beyond | |
| Wang | Intelligent warehouse multi-robot scheduling system based on improved A* algorithm | |
| Wang et al. | Efficient routing in robotic movable fulfillment systems with integer programming: A rolling horizon and heuristic approach | |
| Dehghan et al. | Dynamic Task Allocation in Intelligent Warehouses with Hybrid Workforce of Automated Guided Vehicles and Human Pickers | |
| US20240174445A1 (en) | Adaptive autonomous mobile robot tasking | |
| der Gaast et al. | Working together-scheduling operations in assisted order picking | |
| US20240391697A1 (en) | Adaptive autonomous mobile robot tasking and management | |
| Srivastav et al. | Introduction to the flexible manufacturing system in Industry 4.0 |